ENS 47238: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 09/03/2011 02:35 EDT
| event date = 09/03/2011 02:35 EDT
| last update date = 09/03/2011
| last update date = 09/03/2011
| title = Technical Specification Required Shutdown Due To Rhr/Cs Room Cooler Being Inoperable
| title = Technical Specification Required Shutdown Due to Rhr/Cs Room Cooler Being Inoperable
| event text = Technical specification required shutdown due to reactor recirculation unit #7 [RHR/CS Room Cooler] inoperable.  This cooling unit impacts the operability of 'A' Low Pressure Coolant Injection (LPCI) and 'A' Core Spray (CS).
| event text = Technical specification required shutdown due to reactor recirculation unit #7 [RHR/CS Room Cooler] inoperable.  This cooling unit impacts the operability of 'A' Low Pressure Coolant Injection (LPCI) and 'A' Core Spray (CS).
Entered TS 3.5.A.6.  Commenced reducing power for 24 hour cold shutdown LCO.
Entered TS 3.5.A.6.  Commenced reducing power for 24 hour cold shutdown LCO.

Latest revision as of 21:06, 1 March 2018

ENS 47238 +/-
Where
Vermont Yankee File:NorthStar Vermont Yankee icon.png
Vermont (NRC Region 1)
Reporting
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown
Time - Person (Reporting Time:+-3.12 h-0.13 days <br />-0.0186 weeks <br />-0.00427 months <br />)
Opened: Michael Pletcher
03:28 Sep 3, 2011
NRC Officer: Donald Norwood
Last Updated: Sep 3, 2011
47238 - NRC Website
Loading map...