ENS 47239
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
19:30 Sep 3, 2011 | |
Title | Technical Specification Required Shutdown Due to "a" Train Service Water Leak |
Event Description | A leak in the "A" train of the service water system was identified on August 17, 2011. The leak is in the auxiliary building at the minus 5' elevation and the water is being collected in the waste drain tank. At 1530 on September 3, 2011, the leak was quantified as being less than 15 gpm and the service water system was declared inoperable in accordance with Technical Specification (TS) 3.7.4.1 for the Service Water System and the Technical Requirements Manual 3.4.10 for Structural Integrity. The leak is on a 10" flange between two bolt holes in a welded area of the flange. Maintenance has been able to reduce the leakage to approximately 3 gpm.
The plant is in a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Tech Spec and is making preparations to shutdown to mode 5 for repairs. The licensee notified the NRC Resident Inspector and will notify state and local authorities. |
Where | |
---|---|
Millstone Connecticut (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
Time - Person (Reporting Time:+-3.92 h-0.163 days <br />-0.0233 weeks <br />-0.00537 months <br />) | |
Opened: | Ken Hajnal 15:35 Sep 3, 2011 |
NRC Officer: | Mark Abramovitz |
Last Updated: | Sep 3, 2011 |
47239 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 47239\u003C/a\u003E - \u003Ca href=\"/Millstone\" title=\"Millstone\"\u003EMillstone\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ETechnical Specification Required Shutdown Due to \"a\" Train Service Water Leak\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 47239 - Millstone\n","link":"","lat":41.310722222222225,"lon":-72.16767777777778,"icon":"/w/images/b/b0/Dominion_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 544492019-12-18T00:29:00018 December 2019 00:29:00
[Table view]10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown ENS 503132014-07-26T18:11:00026 July 2014 18:11:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Turbine Driven Afw Pump Failure ENS 498602014-02-27T13:09:00027 February 2014 13:09:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Plant Shutdown Required by Technical Specification ENS 497792014-01-31T08:30:00031 January 2014 08:30:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Degradation of the Pressurizer Proportional Heaters Group 1 ENS 520002013-06-13T00:13:00013 June 2013 00:13:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown and Reactor Trip ENS 481812012-08-12T04:44:00012 August 2012 04:44:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Ultimate Heat Sink Exceeding Temperature Limit ENS 472392011-09-03T19:30:0003 September 2011 19:30:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to "a" Train Service Water Leak ENS 424632006-04-01T03:20:0001 April 2006 03:20:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Inoperable Afw Turbine 2019-12-18T00:29:00 | |