ML20133F985: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:_.
{{#Wiki_filter:_.
  '            cc arco 8             'o                         UNITED STATES
cc arco 8
      ~
'o UNITED STATES E'
E'             ? ,'n NUCLEAR REGULATORY COMMISSION
?,'n NUCLEAR REGULATORY COMMISSION
        $              . E*                      WASHINGTON, D. C. 20555 o
. E
          \ ..../
~
* OCi   bl*
WASHINGTON, D. C. 20555 o\\..../
OCi bl*
Docket Nos.: 50-498 and 50-499 APPLICANT: Houston Lignting and Power Company
Docket Nos.: 50-498 and 50-499 APPLICANT: Houston Lignting and Power Company
              ' 7'. ITY :     South Texas Project, Units 1 & 2 UMMARY OF MEETING HELD ON SEPTEMBER 9 & 10, 1985 TO DISCUSS CONCERNS OF THE POWER SYSTEMS BRANCH (MECHANICAL) ing was held to achieve closure of the open items remaining in the eview in this area. The Meeting Notice (Enclosure 1) provides the Jund and agenda. The list of attendees is attached as Enclosure 2 ach day of the meeting. The applicant used draft copies of changes to
' 7'. ITY :
                    . ion responses and changes to FSAR pages to elicit staff coninents on sosed resolutions. Most of the open items were closed, as indicated ow under discussion, with final actions on same items requiring additional mmitments on the part of the applicant or consultation among the staff.
South Texas Project, Units 1 & 2 UMMARY OF MEETING HELD ON SEPTEMBER 9 & 10, 1985 TO DISCUSS CONCERNS OF THE POWER SYSTEMS BRANCH (MECHANICAL) ing was held to achieve closure of the open items remaining in the eview in this area. The Meeting Notice (Enclosure 1) provides the Jund and agenda. The list of attendees is attached as Enclosure 2 ach day of the meeting. The applicant used draft copies of changes to
submittal reflecting the applicants commitments is expected in the near future .
. ion responses and changes to FSAR pages to elicit staff coninents on sosed resolutions. Most of the open items were closed, as indicated ow under discussion, with final actions on same items requiring additional mmitments on the part of the applicant or consultation among the staff.
submittal reflecting the applicants commitments is expected in the near future.
Discussion The items listed below correspond to those listed in the attachment to the Meeting Notice.
Discussion The items listed below correspond to those listed in the attachment to the Meeting Notice.
: 1.     This item is closed with the applicants proposed modification to Q040.10. (Confirmation; procedures are in place by Region IV)
1.
: 2.     This item is closed because the applicant has committed to provide an acceptable communication system. (Confirmation; procedures are in place by Region IV)
This item is closed with the applicants proposed modification to Q040.10.
: 3.       This item is closed because the applicants proposed modification to the response to Q430.76N is acceptable. (Confirmation; procedures are in place by Region IV)
(Confirmation; procedures are in place by Region IV) 2.
: 4.       This item is closed because the applicant has connitted to providing adequate lighting in vital areas.
This item is closed because the applicant has committed to provide an acceptable communication system.
: 5.       This item is closed because the applicant has made satisfactory commitments.
(Confirmation; procedures are in place by Region IV) 3.
8510150079 831003 DR ADOCK O           y48 i
This item is closed because the applicants proposed modification to the response to Q430.76N is acceptable.
: 6.     This item is closed with the amplification and clarification provided.
(Confirmation; procedures are in place by Region IV) 4.
: 7.     This item is closed with the clarification provided.
This item is closed because the applicant has connitted to providing adequate lighting in vital areas.
: 8.     This item is closed with the revised response to Q430.58N.
5.
: 9.     This item is closed with the revised response to Q430.28N.
This item is closed because the applicant has made satisfactory commitments.
8510150079 831003 y48 DR ADOCK O i
 
6.
This item is closed with the amplification and clarification provided.
7.
This item is closed with the clarification provided.
8.
This item is closed with the revised response to Q430.58N.
9.
This item is closed with the revised response to Q430.28N.
: 10. This items is closed with the proposed revision to FSAR Section 9.5.5.6.
: 10. This items is closed with the proposed revision to FSAR Section 9.5.5.6.
(Confirmation; procedures are in place - by Region IV)
(Confirmation; procedures are in place - by Region IV)
Line 78: Line 90:
: 43. This item is open. The staff has committed to respond shortly to the applicants position that the information presented shows the design to be adequate.
: 43. This item is open. The staff has committed to respond shortly to the applicants position that the information presented shows the design to be adequate.
: 44. This item is closed with the proposed revisions to FSAR Section 9.5.8.2 and Q430.60N.
: 44. This item is closed with the proposed revisions to FSAR Section 9.5.8.2 and Q430.60N.
: 45. This item is closed with information to be provided in an upcoming FSAR 1               amendment on Q40.37, with inclusion of a P&I diagram, t
: 45. This item is closed with information to be provided in an upcoming FSAR 1
amendment on Q40.37, with inclusion of a P&I diagram, t


4-46 & 47. These items are closed with the proposed revisions to FSAR Section 10.4.4.3, 10.4.4.4 and the response to Q430.105N.
4-46 & 47. These items are closed with the proposed revisions to FSAR Section 10.4.4.3, 10.4.4.4 and the response to Q430.105N.
E             c c w-N. Prasad Kadambi, Project Manager Licensing Branch No. 3
E c
      .                                          Division of Licensing
c w-N. Prasad Kadambi, Project Manager Licensing Branch No. 3 Division of Licensing


==Enclosures:==
==Enclosures:==
As stated cc: See next page
As stated cc: See next page
                                    '<r h
'<r h
r
r
                                                                                                  .-j
.-j


Q
Q s
      . , s 46 & 47. These items are closed with the proposed revisions to FSAR Section 10.4.4.3, 10.4.4.4 and the response to Q430.105N.
46 & 47. These items are closed with the proposed revisions to FSAR Section 10.4.4.3, 10.4.4.4 and the response to Q430.105N.
N. Prasad Kadambi, Project Manager Licensing Branch No. 3 Division of Licensing
N. Prasad Kadambi, Project Manager Licensing Branch No. 3 Division of Licensing


==Enclosures:==
==Enclosures:==
As stated cc: See next page i
As stated cc: See next page i
k                                                                     '
k DL:LB#3 DSI:PSB DL 43 s:
DL:LB#3                         DSI:PSB                                     DL . 43 s:     ' NPKajambf/es                   MISrinivasan- GM64ghton-
' NPKajambf/es MISrinivasan-GM64ghton-
            - 9/1985                         9/g6/85                                     9/p/85 7
- 9/1985 9/g6/85 9/p/85 7


South Texas Mr. J. H. Goldberg                   William S. Jordan, III, Esq.
South Texas Mr. J. H. Goldberg William S. Jordan, III, Esq.
Group Vice President, Nuclear               Harmon, Weiss & Jordan Houston Lighting and Power Company   2001 S Street, N.W.
Group Vice President, Nuclear Harmon, Weiss & Jordan Houston Lighting and Power Company 2001 S Street, N.W.
P. O. Box 1700                       Suite 430 Houston, Texas 77001                 Washington, D. C. 20009 Brian Berwick, Esq.
P. O. Box 1700 Suite 430 Houston, Texas 77001 Washington, D. C.
Mr. J. T. Westermeir                   Assistant Attorney General Manager, South Texas Project           Environmental Protection Division Houston Lighting and Power Company   P. O. Box 12548 P. O. Box 1700                       Capitol Station Houston, Texas 77001                 Austin, Texas 78711 Mr. E. R. Brooks                       Mr. Claude E. Johnson, Resident Mr. R. L. Range                           Inspector / South Texas Project Central Power and Light Company       c/o U. S. NRC i
20009 Brian Berwick, Esq.
P. O. Box 2121                       P. O. Box 910 Corpus Christi, Texas 78403           Bay City, Texas 77414 Mr. H. L. Peterson                     Mr. Jonathan Davis Mr. G. Pokorny                         Assistant City Attorney City of Austin                         City of Austin P. O. Box 1088                         P. O. Box 1088                               ;
Mr. J. T. Westermeir Assistant Attorney General Manager, South Texas Project Environmental Protection Division Houston Lighting and Power Company P. O. Box 12548 P. O. Box 1700 Capitol Station Houston, Texas 77001 Austin, Texas 78711 Mr. E. R. Brooks Mr. Claude E. Johnson, Resident Mr. R. L. Range Inspector / South Texas Project i
Austin, Texas 78767                   Austin, Texas 78767 Mr. J. B. Poston Mr. A. Von Rosenberg                   Ms. Pat Coy City Public Service Board             Citizens Concerned About Nuclear P. O. Box 1771                           Power                                   '
Central Power and Light Company c/o U. S. NRC P. O. Box 2121 P. O. Box 910 Corpus Christi, Texas 78403 Bay City, Texas 77414 Mr. H. L. Peterson Mr. Jonathan Davis Mr. G. Pokorny Assistant City Attorney City of Austin City of Austin P. O. Box 1088 P. O. Box 1088 Austin, Texas 78767 Austin, Texas 78767 Mr. J. B. Poston Mr. A. Von Rosenberg Ms. Pat Coy City Public Service Board Citizens Concerned About Nuclear P. O. Box 1771 Power San Antonio, Texas 78296 5106 Casa Oro San Antonio, Texas 78233 Jack R. Newman, Esq.
San Antonio, Texas 78296               5106 Casa Oro San Antonio, Texas 78233 Jack R. Newman, Esq.
Newman & Holtzinger, P.C.
Newman & Holtzinger, P.C.             Mr. Mark R. Wisenberg 1615 L Street, NW                     Manager, Nuclear Licensing Washington, DC 20036                   Houston Lighting and Power Company P. O. Box 1700 Melbert Schwartz,Jr., Esq.             Houston, Texas 77001 Baker & Botts One Shell Plaza                       Mr. Charles Halligan               '
Mr. Mark R. Wisenberg 1615 L Street, NW Manager, Nuclear Licensing Washington, DC 20036 Houston Lighting and Power Company P. O. Box 1700 Melbert Schwartz,Jr., Esq.
Houston, Texas 77002                   Mr. Burton L. Lex Bechtel Corporation Mrs. Peggy Buchorn                     P. O. Box 2166 Executive Director                     Houston, Texas 77001 Citizens for Equitable Utilities, Inc.
Houston, Texas 77001 Baker & Botts One Shell Plaza Mr. Charles Halligan Houston, Texas 77002 Mr. Burton L. Lex Bechtel Corporation Mrs. Peggy Buchorn P. O. Box 2166 Executive Director Houston, Texas 77001 Citizens for Equitable Utilities, Inc.
Route 1, Box 1684
Route 1, Box 1684
    .Brazoria, Texas 77422 l
.Brazoria, Texas 77422 l
a   !
a 9
9 5       -4   -
5
-4


4
4
                                                                                                                . Regional Administrator - Region IV                                                 ,
.. Regional Administrator - Region IV U. S. Nuclear Regulatory Comission 611 Ryan Plaza Drive Suite 1000 Arlington,Texasi.276011 Mr. Lanny Sinkin Citizens Concerned About Nuclear Power 3022 Porter St. N. W. #304 Washington, D. C.
U. S. Nuclear Regulatory Comission 611 Ryan Plaza Drive                   ''
20008 Mr. S.' Head P
Suite 1000 Arlington,Texasi.276011 Mr. Lanny Sinkin Citizens Concerned About Nuclear Power 3022 Porter St. N. W. #304 Washington, D. C. 20008 Mr. S.' Head P                             'HL&P1 Representative o Suite 1309
'HL&P1 Representative o Suite 1309
                              .7910 Woodmont Avenue Bethesda . Maryland 20814 i
.7910 Woodmont Avenue Bethesda. Maryland 20814 i
f 6
f 6
t ,. '
t,. '
i l '
i l '
                                            ;                        /
/
1
1
* i
", [; f,.';
                                      " , [; f,.';
i
(                                         4-l                                 !
(
I f.
4-l I
f.
(5 g
(5 g
l l ;,
l l ;,
t 4-
t
    )                                                                                                            ,
)
                            ,./                           '
4-
o                       ,              .
,./
o
~
l
l
                    . i ..         3.N               _  _
. i..
                                                                              ~
3.N


OCT 3 1985 MEETING  
OCT 3 1985 MEETING  


==SUMMARY==
==SUMMARY==
DISTRTRIITION
DISTRTRIITION
      " Docket _No(s): ; 502498/499'
" Docket _No(s): ; 502498/499'
            ~
~
NRC PDR Local PDR N3IC PRC System LB3 Reading Attorney, OELD GWKnighton Project Manager     NPKadambi JLee NRC PARTICIPANTS N. P. Kadambi A. Ungaro R. Giardina bec: Applicant & Service List l
NRC PDR Local PDR N3IC PRC System LB3 Reading Attorney, OELD GWKnighton Project Manager NPKadambi JLee NRC PARTICIPANTS N. P. Kadambi A. Ungaro R. Giardina bec: Applicant & Service List l


          +          %,,
[f
[f 3*
+
o 3 ,.
UNITED STATES 3,.
g E
g NUCLEAR REGULATORY COMMISSION 3*
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 i
E WASHINGTON, D. C. 20555 i
          \ ..... /                                 SEP 5     1985 Docket Nos.: 50-498 and 50-499 MEMORANDUM FOR:     George W. Knightnn, Chief Licensing Branch No. 3, DL FROM:               N. Prasad Kadambi, Project Manager Licensing Branch No. 3, DL
o
\\..... /
SEP 5 1985 Docket Nos.: 50-498 and 50-499 MEMORANDUM FOR:
George W. Knightnn, Chief Licensing Branch No. 3, DL FROM:
N. Prasad Kadambi, Project Manager Licensing Branch No. 3, DL


==SUBJECT:==
==SUBJECT:==
NOTICE OF MEETING WITH HOUSTON LIGHTING & POWER COMPANY'S (HL&P) SOUTH TEXAS PROJECT TO DISCUSS POWER SYSTEMS BRANCH (MECHANICAL) QUESTIONS                                                   '
NOTICE OF MEETING WITH HOUSTON LIGHTING & POWER COMPANY'S (HL&P) SOUTH TEXAS PROJECT TO DISCUSS POWER SYSTEMS BRANCH (MECHANICAL) QUESTIONS DATE & TIME:
DATE & TIME:         September 9, 1985                     September 10, 1985 1:00 pm                               8:00 am LOCATION:           Rooms P-110 and P-118 respectively 7920 Norfolk Avenue Bethesda, Maryland PURPOSE:             This meeting is a follow-up to HL&P's response to a staff request for additional infonnation (dated April 24,1985) and information presented at a July 2,1985 meeting (HL&P {{letter dated|date=July 23, 1985|text=letter dated July 23,1985}}). The applicant has provided draft responses (see Attachment) which will comprise the agenda items for this meeting.
September 9, 1985 September 10, 1985 1:00 pm 8:00 am LOCATION:
PARTICIPANTS:       NRC N. P. Kadambi, A. Ungaro, R. Giardina HL&P                   Bechtel M. Powell, et al.       J. Atwell, et al.
Rooms P-110 and P-118 respectively 7920 Norfolk Avenue Bethesda, Maryland PURPOSE:
This meeting is a follow-up to HL&P's response to a staff request for additional infonnation (dated April 24,1985) and information presented at a July 2,1985 meeting (HL&P {{letter dated|date=July 23, 1985|text=letter dated July 23,1985}}). The applicant has provided draft responses (see Attachment) which will comprise the agenda items for this meeting.
PARTICIPANTS:
NRC N. P. Kadambi, A. Ungaro, R. Giardina HL&P Bechtel M. Powell, et al.
J. Atwell, et al.
t' N. Prasad Kadambi, Project Manager Licensing Branch No. 3 DL
t' N. Prasad Kadambi, Project Manager Licensing Branch No. 3 DL


==Enclosure:==
==Enclosure:==
As stated cc:   See next page Note: NRC meetings are open to be observed by interested members of the public.
As stated cc:
See next page Note: NRC meetings are open to be observed by interested members of the public.
If interested, please contact N. P. Kadambi at (301) 424-0508.
If interested, please contact N. P. Kadambi at (301) 424-0508.
    ~Q & A 1 O*d 1 Q w           A--
~Q & A 1 O*d 1 Q w A--
yJ}U~lJ Uf " Js2             1
yJ}U~lJ Uf " Js2 1


i                                                                                                                     ,
i Attachment 1.
Attachment                                                   ,
STP has already provided response to this concern (9.5.2.3.1) with the exception of p. art 5.
: 1.     STP has already provided response to this concern (9.5.2.3.1) with the exception of p. art 5. Refer to STP response to Q040.10 including Table Q 040.10-1.
Refer to STP response to Q040.10 including Table Q 040.10-1.
The STP communication system provides an integrated design that will provide effective communication between plant personnel in all vital areas during normal plant operation and during the full spectrum of accident or incident conditions (including fire) under maximum potential noise levels. This conforms with the requirements of
The STP communication system provides an integrated design that will provide effective communication between plant personnel in all vital areas during normal plant operation and during the full spectrum of accident or incident conditions (including fire) under maximum potential noise levels. This conforms with the requirements of Standard Review Plan 9.5.2 (NUREG 0800).
,                  Standard Review Plan 9.5.2 (NUREG 0800).             The areas (working stations) described by STP's response in Q040.10 are the only areas in the plant for which communication is necessary to support safe shutdown of the plant or mitigation of the consequences of an accident. No other areas are considered to be " vital", with respect to the need for
The areas (working stations) described by STP's response in Q040.10 are the only areas in the plant for which communication is necessary to support safe shutdown of the plant or mitigation of the consequences of an accident. No other areas are considered to be " vital", with respect to the need for communications, or are necessary to support safe shutdown or accident mitigation activities.
;                  communications, or are necessary to support safe shutdown or accident mitigation activities.     STP's response including the list of subject
STP's response including the list of subject areas is similar to those of other previously reviewed plants.
-                    areas is similar to those of other previously reviewed plants.
With respect to part 5 regarding performance /preoperational tests for communications, refer to Section 14.2.12.2 item 19. Q40.10 will be revised to reflect that this is found in 14.2.12.2.
With respect to part 5 regarding performance /preoperational tests for communications, refer to Section 14.2.12.2 item 19. Q40.10 will be revised to reflect that this is found in 14.2.12.2. (Ref.9.5.2.3.1)
(Ref.9.5.2.3.1) 2.
: 2.       In response to the concern regarding communication system functionality following a DBE (9.5.2.3.2), we note that the STP design is such that it is not necessary for operators to leave the control room to bring d
In response to the concern regarding communication system functionality following a DBE (9.5.2.3.2), we note that the STP design is such that it is not necessary for operators to leave the control room to bring the plant to safe shutdown during or after a seismic event.
the plant to safe shutdown during or after a seismic event.
d Additionally, as stated in tne response to Q430.77N the following subsystems will be available during and after a DBE:
:                    Additionally, as stated in tne response to Q430.77N the following subsystems will be available during and after a DBE:
i
i
: 1) Sound powered Maintenance Jacks i                           2) Hand-held radio transceiver
: 1) Sound powered Maintenance Jacks i
: 3) Telephone EPBAX l                   (Ref.9.5.2.3.2)
: 2) Hand-held radio transceiver
: 3.       Section 9.5.2 and the response to Q430.76N have been revised to address Inspection and Testing. (Ref. 9.5.2.3.3)
: 3) Telephone EPBAX l
: 4.       STP has ab eady provided response to this concern. Refer to Table
(Ref.9.5.2.3.2) 3.
Section 9.5.2 and the response to Q430.76N have been revised to address Inspection and Testing.
(Ref. 9.5.2.3.3) 4.
STP has ab eady provided response to this concern. Refer to Table
: 9. 5.3 -1.
: 9. 5.3 -1.
The STP lighting system provides an integrated design that provides adequate emergency station lighting in all areas, from onsite power sources, required for fire fighting, control and maintenance of safety-related equipment, and the access routes to and from these areas. Tnis conforms with Standard Review Plan 9.5.3 (NUREG 0800).
The STP lighting system provides an integrated design that provides adequate emergency station lighting in all areas, from onsite power sources, required for fire fighting, control and maintenance of safety-related equipment, and the access routes to and from these areas. Tnis conforms with Standard Review Plan 9.5.3 (NUREG 0800).
The areas (working stations) described by STP's response in Q430.78N                         ,
The areas (working stations) described by STP's response in Q430.78N i
i 6019N:0249N/l
6019N:0249N/l


and Table 9.5.3-1 represent the only areas in the plant for which lighting is necessary to support safe shutdown of the plant or mitigation of consequences of an accident. No other areas are considered to be " vital" with respect to the need for lighting or are necessary to support safe shutdown or accident mitigation activities.
and Table 9.5.3-1 represent the only areas in the plant for which lighting is necessary to support safe shutdown of the plant or mitigation of consequences of an accident. No other areas are considered to be " vital" with respect to the need for lighting or are necessary to support safe shutdown or accident mitigation activities.
STP's response including the list of subject areas is similar to those of other previously reviewed plants.
STP's response including the list of subject areas is similar to those of other previously reviewed plants.
For additional descriptive information related to this concern refer to
For additional descriptive information related to this concern refer to
            . Section 9.5.3 and tne responses to Q430.80N, Q430.81N, and Q430.82N.
. Section 9.5.3 and tne responses to Q430.80N, Q430.81N, and Q430.82N.
(Ref. 9.5.3.3.1)
(Ref. 9.5.3.3.1)
I
I 5.
: 5. As sated in our response to Q430.82N and described in Section 9.5.3.2 STP utilizes an integrated emergency lighting system to provide adequate emergency station illumination levels. This conforms to Standard Review Plan 9.5.3 (NUREG 0800) which states that "... the emergency lighting system (s) is acceptable if the integrated design of the system's) will provide adequate emergency station lighting in all areas, from onsite-power sources, required for fire fighting, control i              and maintenance of safety-related equipment, and the access routes to and from these areas...". Ten foot-candles at work stations and two to five at access / egress routes are provided via the integrated use of STP's Essential AC Lighting System and the Emergency DC Lighting System as described in Section 9.5.3. These areas are provided with lighting j               powered from onsite sources as shown on Table 9.5.3-1. (Ref. 9.5.3.3.2 )
As sated in our response to Q430.82N and described in Section 9.5.3.2 STP utilizes an integrated emergency lighting system to provide adequate emergency station illumination levels.
!        6. Section 9.5.3 has been revised to include a new Section 9.5.3.3 titled Safety Evaluation.
This conforms to Standard Review Plan 9.5.3 (NUREG 0800) which states that "... the emergency lighting system (s) is acceptable if the integrated design of the system's) will provide adequate emergency station lighting in all areas, from onsite-power sources, required for fire fighting, control and maintenance of safety-related equipment, and the access routes to i
and from these areas...".
Ten foot-candles at work stations and two to five at access / egress routes are provided via the integrated use of STP's Essential AC Lighting System and the Emergency DC Lighting System as described in Section 9.5.3.
These areas are provided with lighting j
powered from onsite sources as shown on Table 9.5.3-1.
(Ref. 9.5.3.3.2 )
6.
Section 9.5.3 has been revised to include a new Section 9.5.3.3 titled Safety Evaluation.
Backup de lignting has been discussed for all areas needing backup lighting as described in 9.5.3.2 and Table 9.5.3-1.
Backup de lignting has been discussed for all areas needing backup lighting as described in 9.5.3.2 and Table 9.5.3-1.
,              Portable de lighting has been discussed in STP's response to Q430.78N
Portable de lighting has been discussed in STP's response to Q430.78N and in the Fire hazards Analysis Report.
:              and in the Fire hazards Analysis Report.
Note that the non-safety related DG (the TSC DG) is not common to Units 1 and 2.
Note that the non-safety related DG (the TSC DG) is not common to Units 1 and 2. One TSC DG is provided for each unit. The only comon DG utilized for lighting is the non-Class 1E DG which powers the yard area lighting which is not necessary for any emergency situations. This DG is independent of the TSC DG's. (Ref. 9.5.3.3.4 )
One TSC DG is provided for each unit. The only comon DG utilized for lighting is the non-Class 1E DG which powers the yard area lighting which is not necessary for any emergency situations. This DG is independent of the TSC DG's.
: 7. The STP design is such that it is not necessary for operators to leave the control room to being the plant to safe shutdown during or after a seismic event. Note also that the control room, auxiliary shutdown panel an transfer switch panels are provided with backup power from Class IE DG's. These DG's are also protected from the effects of a i               seismic event and tornado missile impacts. See also FSAR Section l               9.5.3.1 item 2.   (Ref 9.5.3.3.4) l l
(Ref. 9.5.3.3.4 )
t 6019N:0249N/2 l                         -._              .._ __ _ _ _ _... _ ._. _ __ _ , _ _ _._ _ _    _
7.
The STP design is such that it is not necessary for operators to leave the control room to being the plant to safe shutdown during or after a seismic event. Note also that the control room, auxiliary shutdown panel an transfer switch panels are provided with backup power from Class IE DG's.
These DG's are also protected from the effects of a i
seismic event and tornado missile impacts. See also FSAR Section l
9.5.3.1 item 2.
(Ref 9.5.3.3.4) l l
t 6019N:0249N/2 l


c
c 8.
: 8. The response to Q430.58N has been revised to address housecleaning measures as well as the use of dust-tight enclosures.       (Ref.
The response to Q430.58N has been revised to address housecleaning measures as well as the use of dust-tight enclosures.
: 9. 5. 4 .1. 3 .2 )
(Ref.
: 9. The response to Q430.28N has been revised to provide more detailed infonnation on training for the emergency diesel generators. (Ref.
: 9. 5. 4.1. 3.2 )
: 9. 5.4 .1. 3.3 )
9.
: 10. Section 9.5.5.6 has been revised to include the loading requirements of the DG during testing and troubleshooting. (Ref. 9.5.4.1.3.4 )
The response to Q430.28N has been revised to provide more detailed infonnation on training for the emergency diesel generators.
(Ref.
: 9. 5.4.1. 3.3 )
10.
Section 9.5.5.6 has been revised to include the loading requirements of the DG during testing and troubleshooting. (Ref. 9.5.4.1.3.4 )
: 11. The response to Q430.102 has been revised to address this concern.
: 11. The response to Q430.102 has been revised to address this concern.
(Ref. 9.5.4.1.3.5)
(Ref. 9.5.4.1.3.5)
: 12. The response to Q430.24N has been revised to incorporate a final equipment check. (Ref . 9.5.4.1.3.6)
: 12. The response to Q430.24N has been revised to incorporate a final equipment check.
: 13. The response to Q430.24N has been revised to incorporate a brief discussion of the Preventive Maintenance program. (Ref. 9. 5.4.1.3.7 )
(Ref. 9.5.4.1.3.6)
: 14. The concern in the past has been vibrations causing instrumentation problems on DG skid mounted panels. As described in the response to 0430.25N, the panels are not located on the DG skid and they have been vibration a ed as part of their equipment qualification program. (Ref.
: 13. The response to Q430.24N has been revised to incorporate a brief discussion of the Preventive Maintenance program.
: 9. 5. 4 .1. 3 . 8
(Ref. 9. 5.4.1.3.7 )
: 15. Section 9.5.4.1(5) has been revised to reflect the industry standards which are met by the diesel mounted piping. Also see the revised response to Q430.47N. (Ref. 9. 5.4.2.3.1.1)
: 14. The concern in the past has been vibrations causing instrumentation problems on DG skid mounted panels. As described in the response to 0430.25N, the panels are not located on the DG skid and they have been vibration a ed as part of their equipment qualification program.
: 16. Section 9.5.4.2 has been revised to reflect a description of the fuel oil drain tank and transfer pump.   (Ref. 9. 5.4.2.3.1.2 )
(Ref.
: 9. 5. 4.1. 3. 8 15.
Section 9.5.4.1(5) has been revised to reflect the industry standards which are met by the diesel mounted piping. Also see the revised response to Q430.47N.
(Ref. 9. 5.4.2.3.1.1)
: 16. Section 9.5.4.2 has been revised to reflect a description of the fuel oil drain tank and transfer pump.
(Ref. 9. 5.4.2.3.1.2 )
: 17. Section 9.5.4.3 has been revised to describe the project's internal corrosion protection program for the FOST and AFOST. (Ref.
: 17. Section 9.5.4.3 has been revised to describe the project's internal corrosion protection program for the FOST and AFOST. (Ref.
9.5.4.2.3.2.1)
9.5.4.2.3.2.1)
: 18. Section 9.5.4.4 has been revised to reflect the frequency of calibration for the instrumentation. (Ref. 9. 5.4.2.3.2.2 )
: 18. Section 9.5.4.4 has been revised to reflect the frequency of calibration for the instrumentation.
: 19. The response to Q040.20 provides STP's connitment to the McGuire Tech Specs with the noted exception. (Ref. 9.5.4.2.3.3.3.1)
(Ref. 9. 5.4.2.3.2.2 )
: 20. Section 9.5.4.4 has been revised to indicate the frequency of water removal in both the FOST and AFOST.   (Ref.9.5.4.2.3.3.2)
: 19. The response to Q040.20 provides STP's connitment to the McGuire Tech Specs with the noted exception.
: 21. The types of maintenance and testing of the cathodic protection system have been been added to Section 9.5.4.3. (Ref. 9.5.4.2.3.3.3) 6019N:0249N/3
(Ref. 9.5.4.2.3.3.3.1)
: 20. Section 9.5.4.4 has been revised to indicate the frequency of water removal in both the FOST and AFOST.
(Ref.9.5.4.2.3.3.2)
: 21. The types of maintenance and testing of the cathodic protection system have been been added to Section 9.5.4.3.
(Ref. 9.5.4.2.3.3.3) 6019N:0249N/3


      ,s .
',s 1
        .-                                                                                    1 I
I
: 22. This is a staff open item on themselves. However, please refer to Question numbers 40.22, 430.46N, 430.86N, and 430.98N for our responses to this topic.   (Ref. 9. 5.4.2.3.4 )
: 22. This is a staff open item on themselves. However, please refer to Question numbers 40.22, 430.46N, 430.86N, and 430.98N for our responses to this topic.
: 23. Section 9.5.4.3 has been revised to reflect the design of the emergency fill connection with respect to tornado protection.     (Ref.
(Ref. 9. 5.4.2.3.4 )
: 23. Section 9.5.4.3 has been revised to reflect the design of the emergency fill connection with respect to tornado protection.
(Ref.
9.5.4.2.3.5.1)
9.5.4.2.3.5.1)
: 24. A description of the emergency fill connection was transmitted in letter ST-HL-AE-1268, Section 9.5.4.3 and Figure 9.5.4-1 (Amd. 49) reflect the connection which consists of a filter and a locked closed ASME III valve. (Ref. 9.5.4.2.3.5.2 )
: 24. A description of the emergency fill connection was transmitted in letter ST-HL-AE-1268, Section 9.5.4.3 and Figure 9.5.4-1 (Amd. 49) reflect the connection which consists of a filter and a locked closed ASME III valve.
: 25. The response to Q430.86N nas been revised to state that adequate head is available on the tank trucks to pump the oil to the emergency fill connection.   (Ref. 9. 5.4.2.3.5.3 )
(Ref. 9.5.4.2.3.5.2 )
: 26. Section 9.5.5.1 has been revised to reflect the industry standards which are met by the diesel mounted piping. Also see tne revised response to Q430.47N.     (Ref. 9.5.5.3.1)
: 25. The response to Q430.86N nas been revised to state that adequate head is available on the tank trucks to pump the oil to the emergency fill connection.
: 27. Section 9.5.5.4 has been revised to reflect the frequency of calibration for the cooling water instrumentation. (Ref. 9.5.5.3.2 )
(Ref. 9. 5.4.2.3.5.3 )
: 28. The response to 0430.91N has been revised to include a more detailed discussion of this concern. (Ref. 9.5.5.3.3)
: 26. Section 9.5.5.1 has been revised to reflect the industry standards which are met by the diesel mounted piping. Also see tne revised response to Q430.47N.
(Ref. 9.5.5.3.1)
: 27. Section 9.5.5.4 has been revised to reflect the frequency of calibration for the cooling water instrumentation.
(Ref. 9.5.5.3.2 )
: 28. The response to 0430.91N has been revised to include a more detailed discussion of this concern.
(Ref. 9.5.5.3.3)
: 29. The response to Q430.102 has been revised to address this concern..
: 29. The response to Q430.102 has been revised to address this concern..
(Ref. 9.5.5.3.4)
(Ref. 9.5.5.3.4)
: 30. Section 9.5.6.1 has been revised to reflect the industry standards which are met by the diesel mounted piping. Also see the revised response to Q430.47N.     (Ref.9.5.6.3.1)
: 30. Section 9.5.6.1 has been revised to reflect the industry standards which are met by the diesel mounted piping. Also see the revised response to Q430.47N.
: 31. Section 9.5.6.5 has been revised to reflect the calibration frequency of tne starting air system instrumentation.   (Ref. 9. 5.6.3.2 )
(Ref.9.5.6.3.1)
: 32. Section 9.5.6.2 has been revised to reflect the pre- and after filters located in the system to prevent oil carryover from the compressor.
: 31. Section 9.5.6.5 has been revised to reflect the calibration frequency of tne starting air system instrumentation.
(Ref. 9. 5.6.3.2 )
: 32. Section 9.5.6.2 has been revised to reflect the pre-and after filters located in the system to prevent oil carryover from the compressor.
(Ref. 9.5.6.3.3)
(Ref. 9.5.6.3.3)
: 33. Section 9.5.6.5 has been revised to indicate the period of inspection for the air dryer. (Ref. 9.5.6.3.4 )
: 33. Section 9.5.6.5 has been revised to indicate the period of inspection for the air dryer.
: 34. The response to Q430.94N has been revised to reflect the fact that no instrument air is required to provide the safety trips or support operation of the diesel in the emergency mode.     (Ref. 9.5.6.3.5) l 6019N:0249N/4
(Ref. 9.5.6.3.4 )
: 34. The response to Q430.94N has been revised to reflect the fact that no instrument air is required to provide the safety trips or support operation of the diesel in the emergency mode.
(Ref. 9.5.6.3.5) l 6019N:0249N/4


s-
s -
: 35. Section 9.5.7.1 has been revised to reflect the industry standards which are met by the diesel mounted piping. Also see the revised response to Q430.47N. (Ref. 9.5.7.3.1)
35.
: 36. Section 9.5.7.5 has been revised to include the calibration frequency of the lube oil instrumentation. (Ref. 9.5.7.3.2 )
Section 9.5.7.1 has been revised to reflect the industry standards which are met by the diesel mounted piping. Also see the revised response to Q430.47N.
: 37. Section 9.5.7.2 has been revised to include the frequency of lube oil inspection. (Ref. 9.5.7.3.3 )
(Ref. 9.5.7.3.1)
: 36. Section 9.5.7.5 has been revised to include the calibration frequency of the lube oil instrumentation.
(Ref. 9.5.7.3.2 )
: 37. Section 9.5.7.2 has been revised to include the frequency of lube oil inspection.
(Ref. 9.5.7.3.3 )
: 38. The existing response to NRC Question 430.99N is acceptable. The direction for lube oil filling will be in a procedure which will clearly identify which connection is to be used. (Ref. 9.5.7.3.4 )
: 38. The existing response to NRC Question 430.99N is acceptable. The direction for lube oil filling will be in a procedure which will clearly identify which connection is to be used. (Ref. 9.5.7.3.4 )
: 39. Section 9.5.8.1 has been revised to reflect the industry standards which are met by the diesel mounted piping. Also see the revised response to Q430.47N. (Ref. 9.5.8.3.1)
: 39. Section 9.5.8.1 has been revised to reflect the industry standards which are met by the diesel mounted piping. Also see the revised response to Q430.47N.
: 40. Section 9.5.9.5 has been revised to provide the frequency of calibration of the combustion air intake and exhaust instrumentation.
(Ref. 9.5.8.3.1) 40.
Section 9.5.9.5 has been revised to provide the frequency of calibration of the combustion air intake and exhaust instrumentation.
(Ref. 9.5.8.3.1)
(Ref. 9.5.8.3.1)
: 41. As stated in Section 9.5.8.3, the methodology used was that found in R .G . 1. 7 8. Thus, the X/Q method described in Appendix B was used to determine the worst case (centerline) concentration of the N2 gas at the intake to the DG. This concentration was then used to displace oxygen at the intake to arrive at the total displaced oxygen of 17%.
: 41. As stated in Section 9.5.8.3, the methodology used was that found in R.G. 1. 7 8.
(Ref . 9. 5.8.3.3 )
Thus, the X/Q method described in Appendix B was used to determine the worst case (centerline) concentration of the N2 gas at the intake to the DG.
: 42. The results of the current analysis are presented in section 9.5.8.3.
This concentration was then used to displace oxygen at the intake to arrive at the total displaced oxygen of 17%.
Additional analyses are being performed and the results will be avail-able in September (Ref. 9.5.8.3.4)
(Ref. 9. 5.8.3.3 )
: 43. See 42 (Ref. 9.5.8.3.5)
42.
: 44. Section 9.5.8.2 and Q430.60N have been revised to describe the DG exhaust design. (Ref. 9.5.8.3.6)
The results of the current analysis are presented in section 9.5.8.3.
: 45. Question 40.37 has t.een revised and will appear in Amd. 51. (Ref.
Additional analyses are being performed and the results will be avail-able in September (Ref. 9.5.8.3.4) 43.
See 42 (Ref. 9.5.8.3.5)
: 44. Section 9.5.8.2 and Q430.60N have been revised to describe the DG exhaust design.
(Ref. 9.5.8.3.6) 45.
Question 40.37 has t.een revised and will appear in Amd. 51. (Ref.
10.2.3.1)
10.2.3.1)
: 46. Table 10.4-4 has been revised to include the spurious opening of the turbine bypass valve. With respect to the two items shown in your
: 46. Table 10.4-4 has been revised to include the spurious opening of the turbine bypass valve. With respect to the two items shown in your Section 10.4.4.3.1:
  ,            Section 10.4.4.3.1:
I a)
I a) The opening of a turbine bypass valve is an ANS Condition II event as described in Section 15.1.4. Thus, the effects of the event are provided in the FSAR.                                          .
The opening of a turbine bypass valve is an ANS Condition II event as described in Section 15.1.4.
Thus, the effects of the event are provided in the FSAR.
j i
j i
6019N:0249N/5
6019N:0249N/5


b)   Each turbine bypass line has a drain which automatically will drain any liquid which collects in the line. In the event failure occurred to automatically drain the line, the separate high level alarm would provide indication. In any event, the worst scenario would be failure to pass steam which is equivalent to failure of the valve to open which is included in the FMEA (Table 10.4-4).
b)
: 47. Section 10.4.4.4 and the response to Q430.105N have been revised to reflect STP's position on the frequency of inspection of the turbine bypass lines.   (R ef. 10.4.4.3.2 )
Each turbine bypass line has a drain which automatically will drain any liquid which collects in the line.
In the event failure occurred to automatically drain the line, the separate high level alarm would provide indication.
In any event, the worst scenario would be failure to pass steam which is equivalent to failure of the valve to open which is included in the FMEA (Table 10.4-4).
: 47. Section 10.4.4.4 and the response to Q430.105N have been revised to reflect STP's position on the frequency of inspection of the turbine bypass lines.
(R ef. 10.4.4.3.2 )
6019N:0249N/6
6019N:0249N/6


  ,'-                                                      Enclosure 2 a
a Mearns L S c o ra Te us Pawe c_r Du Taa Pcea. 63rsus be-e (Mecamic%)
Mearns L S c o ra Te us Pawe c_r Du Taa Pcea. 63rsus be-e (Mecamic%)
Gc~ew s.
Gc~ew s .
%= p rrmen,
                  %= p rrmen , 9 ; I 9 Es--
9 ; I 9 Es--
        )J Age.                                   [FritiATion N b Ontwsz                           NRC/ tar /D u P A UtmnM                             MB/DS//A/M Qw).
)J Age.
      ? J. <5, es a                         P s cs /t>s i /,a gsrt.
[FritiATion N b Ontwsz NRC/ tar /D u P A UtmnM MB/DS//A/M Qw).
n . J. Geq                           Hue / nu L
? J.
      / day,>e </h6                         MtAP 1epel9 @ry3 aL                                     13<ekkl       lrt.
<5, es a P s cs /t>s i /,a gsrt.
D.B $8 77hja/                           /3 e e ti.'c <.'   /1cc!4nNi.
n. J. Geq Hue / nu L 9
7 9x PA                                   s/&
/ day,>e </h6 MtAP 1epel @ry3 aL 13<ekkl lrt.
R. E f/\udu                           R L.r F           .
D.B
: d. 4, du         ,
$8 77hja/
arf Lcms g G-(A).     htg'Noen X J,       O s<s k                     Lkle-/'Ot/4c iklP,xlaatwPu't)k 3
/3 e e ti.'c <.'
A'. 2 - 7;pye/                         m -e/du- w.s o, T IJ   htv-y                         g4P Esse M. Sr.-l>lv a san (eui~C;")           pais,/ni/cip:
/1cc!4nNi.
7 9x PA s/&
R. E f/\\udu R L.r F
: d. 4, du arf Lcms g G-(A).
'N Lkle-/'Ot/4c 3 htg oen X J, O s<s k iklP,xlaatwPu't)k A'. 2 - 7;pye/
m -e/du-w.s o, T IJ htv-y g4P Esse M. Sr.-l>lv a san (eui~C;")
pais,/ni/cip:
i l
i l


r
r
    /
/
EETla cs AlirH SU TH Te.m s ho 7c=c-T Cu Te e.
EETla cs AlirH SU TH Te.m s ho 7c=c-T Cu Te e.
Pcva SysTmsleAsce (Mcc_etamca Q             [oucem s S E.Fi m S E R. l C j l #1 E 5-   ,
Pcva SysTmsleAsce (Mcc_etamca Q
N A M E.                                 Aseicssr<e a      .
[oucem s S E.Fi m S E R.
N    Passe     Name                       >agc/sa/o c .
l C j l # E 5-1 N A M E.
E J. 6 ,4 4 b J /-                         PS R /Ds i /d 4 4-M   s n r u wnpaJ                         "    "      ''
Aseicssr<ea N
: p. 3,   (Ser                           HL &t   /fq r.
Passe Name
        /t. eT $                                   pkh /m '
>agc/sa/o c.
: 7. f Aleses&                                 NLf/ Aluelw Jd)v
E J. 6,4 4 b J /-
      # /. j pye / .
PS R /Ds i /d 4 4-M s n r u wnpaJ
N 4 //= Areb.,- W. d C2p r R.D. Munkv                                 H L i-P Erg.
/fq r.
O A.j Ak                                   ph e P ljens-;u RA,     ne~                               dLJP Fwyvy D.2.$E7/9]//                                 dccH7Cl cul 7 (       ,de (                               G<cA N         / tc. .
p.
: k. k Ua G&f2D                             PS15lP5llLW2R s w .8 % nea                                 neefvtpes nc_ % d                                       ntP en y 7
3, (Ser HL &t
/t. eT $
pkh /m '
: 7. f Aleses&
NLf/ Aluelw Jd)v
# /.
j pye /
N 4 //=
Areb.,- W. d C2 r p
R.D. Munkv H L i-P Erg.
O A. Ak ph e P ljens-;u j
dLJP Fwyvy RA, ne~
D.2.$E7/9]//
dccH7Cl cul 7 (
,de (
G<cA N
/ tc..
: k. k Ua G&f2D PS15lP5llLW2R s w.8 % nea neefvtpes nc_ % d ntP en y 7
l L}}
l L}}

Latest revision as of 08:21, 12 December 2024

Summary of 850909 & 10 Meetings W/Util Re Power Sys Branch Concerns on Communication Sys,Vital Areas & Mod to Q040.10. Meeting Agenda & List of Attendees Encl
ML20133F985
Person / Time
Site: South Texas  
Issue date: 10/03/1985
From: Kadambi N
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8510150079
Download: ML20133F985 (8)


Text

_.

cc arco 8

'o UNITED STATES E'

?,'n NUCLEAR REGULATORY COMMISSION

. E

~

WASHINGTON, D. C. 20555 o\\..../

OCi bl*

Docket Nos.: 50-498 and 50-499 APPLICANT: Houston Lignting and Power Company

' 7'. ITY :

South Texas Project, Units 1 & 2 UMMARY OF MEETING HELD ON SEPTEMBER 9 & 10, 1985 TO DISCUSS CONCERNS OF THE POWER SYSTEMS BRANCH (MECHANICAL) ing was held to achieve closure of the open items remaining in the eview in this area. The Meeting Notice (Enclosure 1) provides the Jund and agenda. The list of attendees is attached as Enclosure 2 ach day of the meeting. The applicant used draft copies of changes to

. ion responses and changes to FSAR pages to elicit staff coninents on sosed resolutions. Most of the open items were closed, as indicated ow under discussion, with final actions on same items requiring additional mmitments on the part of the applicant or consultation among the staff.

submittal reflecting the applicants commitments is expected in the near future.

Discussion The items listed below correspond to those listed in the attachment to the Meeting Notice.

1.

This item is closed with the applicants proposed modification to Q040.10.

(Confirmation; procedures are in place by Region IV) 2.

This item is closed because the applicant has committed to provide an acceptable communication system.

(Confirmation; procedures are in place by Region IV) 3.

This item is closed because the applicants proposed modification to the response to Q430.76N is acceptable.

(Confirmation; procedures are in place by Region IV) 4.

This item is closed because the applicant has connitted to providing adequate lighting in vital areas.

5.

This item is closed because the applicant has made satisfactory commitments.

8510150079 831003 y48 DR ADOCK O i

6.

This item is closed with the amplification and clarification provided.

7.

This item is closed with the clarification provided.

8.

This item is closed with the revised response to Q430.58N.

9.

This item is closed with the revised response to Q430.28N.

10. This items is closed with the proposed revision to FSAR Section 9.5.5.6.

(Confirmation; procedures are in place - by Region IV)

11. This item is closed with the revised response to Q430.102.

12 8 13. These items are closed with the revised response to Q430.24N.

14. Additional information, including a letter from the vendor, is required to confirm that excessive vibrations will not affect the diesel generator instruments.
15. This item is closed with the proposed revision to FSAR Section 9.5.4.1(5) and response to Q430.47N.
16. This item is closed with the proposed revision to FSAR Section 9.5.4.2.
17. This item is closed with the proposed revision to Section 9.5.4.3.
18. This item has been closed with the proposed revision to FSAR Section 9.5.4.4.

(Confirmation; procedures are in place - Region IV)

19. This item is closed with the proposed revision to FSAR Section 9.5.4.4 and submittal of the consultant's letter on diesel fuel testing.
20. This item is closed with the proposed revision to FSAR Section 9.5.4.4 and submittal of the consultant's letter on diesel fuel testing.
21. This item is closed with the proposed revision to FSAR Section 9.5.4.3.

(Confirmation; procedures are in place - by Region IV)

22. This item is closed because the staff has found that the applicant has considered maximum flood levels in a satisfactory manner.

23 & 24. These items are closed with the proposed revision to FSAR Section 9.5.4.3.

25. This item has been closed with the revised response to Q430.86N.

(Confirmation; procedures are in place - by Region IV)

26. This item is closed with the proposed revision to FSAR Section 9.5.5.1.
27. This item is closed with the proposed revision to FSAR Section 9.5.5.4.
28. This item is closed with the revised response to Q430.91N.
29. This item is closed with the revised response to Q430.102.
30. This item is closed with the revisions to FSAR Section 9.5.6.1 and to the response to Q430.47N.
31. This item is closed with the revision to FSAR Section 9.5.6.5.
32. This item is closed with the revision to FSAR Section 9.5.6.2.
33. This item is closed with the proposed revision to Section 9.5.6.5.
34. This item is closed with the revised response to Q430.94N.
35. This item is closed with the revisions to FSAR Section 9.5.7.1 and response to Q430.47N.
36. This item is closed with the revision to FSAR Section 9.5.7.5.

(Confirmation; procedures are in place by - Region IV)

37. This item is closed with the revision to FSAR Section 9.5.7.2.

(Confirmation procedures are in place - Region IV)

38. This item is closed with the proposed revision to the Q430.99N response.
39. This item is closed with the revisions to FSAR Section 9.5.8.1 and the response to Q430.47N.
40. This item is closed with the revision to FSAR Section 9.5.8.5.

(Confirmation; procedures are in place - by Region IV)

41. This item is open until computational differences between the staff and the applicant are resolved.
42. This item is open. The staff has committed to respond shortly to the applicants position that the information presented shows the design to be adequate.
43. This item is open. The staff has committed to respond shortly to the applicants position that the information presented shows the design to be adequate.
44. This item is closed with the proposed revisions to FSAR Section 9.5.8.2 and Q430.60N.
45. This item is closed with information to be provided in an upcoming FSAR 1

amendment on Q40.37, with inclusion of a P&I diagram, t

4-46 & 47. These items are closed with the proposed revisions to FSAR Section 10.4.4.3, 10.4.4.4 and the response to Q430.105N.

E c

c w-N. Prasad Kadambi, Project Manager Licensing Branch No. 3 Division of Licensing

Enclosures:

As stated cc: See next page

'<r h

r

.-j

Q s

46 & 47. These items are closed with the proposed revisions to FSAR Section 10.4.4.3, 10.4.4.4 and the response to Q430.105N.

N. Prasad Kadambi, Project Manager Licensing Branch No. 3 Division of Licensing

Enclosures:

As stated cc: See next page i

k DL:LB#3 DSI:PSB DL 43 s:

' NPKajambf/es MISrinivasan-GM64ghton-

- 9/1985 9/g6/85 9/p/85 7

South Texas Mr. J. H. Goldberg William S. Jordan, III, Esq.

Group Vice President, Nuclear Harmon, Weiss & Jordan Houston Lighting and Power Company 2001 S Street, N.W.

P. O. Box 1700 Suite 430 Houston, Texas 77001 Washington, D. C.

20009 Brian Berwick, Esq.

Mr. J. T. Westermeir Assistant Attorney General Manager, South Texas Project Environmental Protection Division Houston Lighting and Power Company P. O. Box 12548 P. O. Box 1700 Capitol Station Houston, Texas 77001 Austin, Texas 78711 Mr. E. R. Brooks Mr. Claude E. Johnson, Resident Mr. R. L. Range Inspector / South Texas Project i

Central Power and Light Company c/o U. S. NRC P. O. Box 2121 P. O. Box 910 Corpus Christi, Texas 78403 Bay City, Texas 77414 Mr. H. L. Peterson Mr. Jonathan Davis Mr. G. Pokorny Assistant City Attorney City of Austin City of Austin P. O. Box 1088 P. O. Box 1088 Austin, Texas 78767 Austin, Texas 78767 Mr. J. B. Poston Mr. A. Von Rosenberg Ms. Pat Coy City Public Service Board Citizens Concerned About Nuclear P. O. Box 1771 Power San Antonio, Texas 78296 5106 Casa Oro San Antonio, Texas 78233 Jack R. Newman, Esq.

Newman & Holtzinger, P.C.

Mr. Mark R. Wisenberg 1615 L Street, NW Manager, Nuclear Licensing Washington, DC 20036 Houston Lighting and Power Company P. O. Box 1700 Melbert Schwartz,Jr., Esq.

Houston, Texas 77001 Baker & Botts One Shell Plaza Mr. Charles Halligan Houston, Texas 77002 Mr. Burton L. Lex Bechtel Corporation Mrs. Peggy Buchorn P. O. Box 2166 Executive Director Houston, Texas 77001 Citizens for Equitable Utilities, Inc.

Route 1, Box 1684

.Brazoria, Texas 77422 l

a 9

5

-4

4

.. Regional Administrator - Region IV U. S. Nuclear Regulatory Comission 611 Ryan Plaza Drive Suite 1000 Arlington,Texasi.276011 Mr. Lanny Sinkin Citizens Concerned About Nuclear Power 3022 Porter St. N. W. #304 Washington, D. C.

20008 Mr. S.' Head P

'HL&P1 Representative o Suite 1309

.7910 Woodmont Avenue Bethesda. Maryland 20814 i

f 6

t,. '

i l '

/

1

", [; f,.';

i

(

4-l I

f.

(5 g

l l ;,

t

)

4-

,./

o

~

l

. i..

3.N

OCT 3 1985 MEETING

SUMMARY

DISTRTRIITION

" Docket _No(s): ; 502498/499'

~

NRC PDR Local PDR N3IC PRC System LB3 Reading Attorney, OELD GWKnighton Project Manager NPKadambi JLee NRC PARTICIPANTS N. P. Kadambi A. Ungaro R. Giardina bec: Applicant & Service List l

[f

+

UNITED STATES 3,.

g NUCLEAR REGULATORY COMMISSION 3*

E WASHINGTON, D. C. 20555 i

o

\\..... /

SEP 5 1985 Docket Nos.: 50-498 and 50-499 MEMORANDUM FOR:

George W. Knightnn, Chief Licensing Branch No. 3, DL FROM:

N. Prasad Kadambi, Project Manager Licensing Branch No. 3, DL

SUBJECT:

NOTICE OF MEETING WITH HOUSTON LIGHTING & POWER COMPANY'S (HL&P) SOUTH TEXAS PROJECT TO DISCUSS POWER SYSTEMS BRANCH (MECHANICAL) QUESTIONS DATE & TIME:

September 9, 1985 September 10, 1985 1:00 pm 8:00 am LOCATION:

Rooms P-110 and P-118 respectively 7920 Norfolk Avenue Bethesda, Maryland PURPOSE:

This meeting is a follow-up to HL&P's response to a staff request for additional infonnation (dated April 24,1985) and information presented at a July 2,1985 meeting (HL&P letter dated July 23,1985). The applicant has provided draft responses (see Attachment) which will comprise the agenda items for this meeting.

PARTICIPANTS:

NRC N. P. Kadambi, A. Ungaro, R. Giardina HL&P Bechtel M. Powell, et al.

J. Atwell, et al.

t' N. Prasad Kadambi, Project Manager Licensing Branch No. 3 DL

Enclosure:

As stated cc:

See next page Note: NRC meetings are open to be observed by interested members of the public.

If interested, please contact N. P. Kadambi at (301) 424-0508.

~Q & A 1 O*d 1 Q w A--

yJ}U~lJ Uf " Js2 1

i Attachment 1.

STP has already provided response to this concern (9.5.2.3.1) with the exception of p. art 5.

Refer to STP response to Q040.10 including Table Q 040.10-1.

The STP communication system provides an integrated design that will provide effective communication between plant personnel in all vital areas during normal plant operation and during the full spectrum of accident or incident conditions (including fire) under maximum potential noise levels. This conforms with the requirements of Standard Review Plan 9.5.2 (NUREG 0800).

The areas (working stations) described by STP's response in Q040.10 are the only areas in the plant for which communication is necessary to support safe shutdown of the plant or mitigation of the consequences of an accident. No other areas are considered to be " vital", with respect to the need for communications, or are necessary to support safe shutdown or accident mitigation activities.

STP's response including the list of subject areas is similar to those of other previously reviewed plants.

With respect to part 5 regarding performance /preoperational tests for communications, refer to Section 14.2.12.2 item 19. Q40.10 will be revised to reflect that this is found in 14.2.12.2.

(Ref.9.5.2.3.1) 2.

In response to the concern regarding communication system functionality following a DBE (9.5.2.3.2), we note that the STP design is such that it is not necessary for operators to leave the control room to bring the plant to safe shutdown during or after a seismic event.

d Additionally, as stated in tne response to Q430.77N the following subsystems will be available during and after a DBE:

i

1) Sound powered Maintenance Jacks i
2) Hand-held radio transceiver
3) Telephone EPBAX l

(Ref.9.5.2.3.2) 3.

Section 9.5.2 and the response to Q430.76N have been revised to address Inspection and Testing.

(Ref. 9.5.2.3.3) 4.

STP has ab eady provided response to this concern. Refer to Table

9. 5.3 -1.

The STP lighting system provides an integrated design that provides adequate emergency station lighting in all areas, from onsite power sources, required for fire fighting, control and maintenance of safety-related equipment, and the access routes to and from these areas. Tnis conforms with Standard Review Plan 9.5.3 (NUREG 0800).

The areas (working stations) described by STP's response in Q430.78N i

6019N:0249N/l

and Table 9.5.3-1 represent the only areas in the plant for which lighting is necessary to support safe shutdown of the plant or mitigation of consequences of an accident. No other areas are considered to be " vital" with respect to the need for lighting or are necessary to support safe shutdown or accident mitigation activities.

STP's response including the list of subject areas is similar to those of other previously reviewed plants.

For additional descriptive information related to this concern refer to

. Section 9.5.3 and tne responses to Q430.80N, Q430.81N, and Q430.82N.

(Ref. 9.5.3.3.1)

I 5.

As sated in our response to Q430.82N and described in Section 9.5.3.2 STP utilizes an integrated emergency lighting system to provide adequate emergency station illumination levels.

This conforms to Standard Review Plan 9.5.3 (NUREG 0800) which states that "... the emergency lighting system (s) is acceptable if the integrated design of the system's) will provide adequate emergency station lighting in all areas, from onsite-power sources, required for fire fighting, control and maintenance of safety-related equipment, and the access routes to i

and from these areas...".

Ten foot-candles at work stations and two to five at access / egress routes are provided via the integrated use of STP's Essential AC Lighting System and the Emergency DC Lighting System as described in Section 9.5.3.

These areas are provided with lighting j

powered from onsite sources as shown on Table 9.5.3-1.

(Ref. 9.5.3.3.2 )

6.

Section 9.5.3 has been revised to include a new Section 9.5.3.3 titled Safety Evaluation.

Backup de lignting has been discussed for all areas needing backup lighting as described in 9.5.3.2 and Table 9.5.3-1.

Portable de lighting has been discussed in STP's response to Q430.78N and in the Fire hazards Analysis Report.

Note that the non-safety related DG (the TSC DG) is not common to Units 1 and 2.

One TSC DG is provided for each unit. The only comon DG utilized for lighting is the non-Class 1E DG which powers the yard area lighting which is not necessary for any emergency situations. This DG is independent of the TSC DG's.

(Ref. 9.5.3.3.4 )

7.

The STP design is such that it is not necessary for operators to leave the control room to being the plant to safe shutdown during or after a seismic event. Note also that the control room, auxiliary shutdown panel an transfer switch panels are provided with backup power from Class IE DG's.

These DG's are also protected from the effects of a i

seismic event and tornado missile impacts. See also FSAR Section l

9.5.3.1 item 2.

(Ref 9.5.3.3.4) l l

t 6019N:0249N/2 l

c 8.

The response to Q430.58N has been revised to address housecleaning measures as well as the use of dust-tight enclosures.

(Ref.

9. 5. 4.1. 3.2 )

9.

The response to Q430.28N has been revised to provide more detailed infonnation on training for the emergency diesel generators.

(Ref.

9. 5.4.1. 3.3 )

10.

Section 9.5.5.6 has been revised to include the loading requirements of the DG during testing and troubleshooting. (Ref. 9.5.4.1.3.4 )

11. The response to Q430.102 has been revised to address this concern.

(Ref. 9.5.4.1.3.5)

12. The response to Q430.24N has been revised to incorporate a final equipment check.

(Ref. 9.5.4.1.3.6)

13. The response to Q430.24N has been revised to incorporate a brief discussion of the Preventive Maintenance program.

(Ref. 9. 5.4.1.3.7 )

14. The concern in the past has been vibrations causing instrumentation problems on DG skid mounted panels. As described in the response to 0430.25N, the panels are not located on the DG skid and they have been vibration a ed as part of their equipment qualification program.

(Ref.

9. 5. 4.1. 3. 8 15.

Section 9.5.4.1(5) has been revised to reflect the industry standards which are met by the diesel mounted piping. Also see the revised response to Q430.47N.

(Ref. 9. 5.4.2.3.1.1)

16. Section 9.5.4.2 has been revised to reflect a description of the fuel oil drain tank and transfer pump.

(Ref. 9. 5.4.2.3.1.2 )

17. Section 9.5.4.3 has been revised to describe the project's internal corrosion protection program for the FOST and AFOST. (Ref.

9.5.4.2.3.2.1)

18. Section 9.5.4.4 has been revised to reflect the frequency of calibration for the instrumentation.

(Ref. 9. 5.4.2.3.2.2 )

19. The response to Q040.20 provides STP's connitment to the McGuire Tech Specs with the noted exception.

(Ref. 9.5.4.2.3.3.3.1)

20. Section 9.5.4.4 has been revised to indicate the frequency of water removal in both the FOST and AFOST.

(Ref.9.5.4.2.3.3.2)

21. The types of maintenance and testing of the cathodic protection system have been been added to Section 9.5.4.3.

(Ref. 9.5.4.2.3.3.3) 6019N:0249N/3

',s 1

I

22. This is a staff open item on themselves. However, please refer to Question numbers 40.22, 430.46N, 430.86N, and 430.98N for our responses to this topic.

(Ref. 9. 5.4.2.3.4 )

23. Section 9.5.4.3 has been revised to reflect the design of the emergency fill connection with respect to tornado protection.

(Ref.

9.5.4.2.3.5.1)

24. A description of the emergency fill connection was transmitted in letter ST-HL-AE-1268, Section 9.5.4.3 and Figure 9.5.4-1 (Amd. 49) reflect the connection which consists of a filter and a locked closed ASME III valve.

(Ref. 9.5.4.2.3.5.2 )

25. The response to Q430.86N nas been revised to state that adequate head is available on the tank trucks to pump the oil to the emergency fill connection.

(Ref. 9. 5.4.2.3.5.3 )

26. Section 9.5.5.1 has been revised to reflect the industry standards which are met by the diesel mounted piping. Also see tne revised response to Q430.47N.

(Ref. 9.5.5.3.1)

27. Section 9.5.5.4 has been revised to reflect the frequency of calibration for the cooling water instrumentation.

(Ref. 9.5.5.3.2 )

28. The response to 0430.91N has been revised to include a more detailed discussion of this concern.

(Ref. 9.5.5.3.3)

29. The response to Q430.102 has been revised to address this concern..

(Ref. 9.5.5.3.4)

30. Section 9.5.6.1 has been revised to reflect the industry standards which are met by the diesel mounted piping. Also see the revised response to Q430.47N.

(Ref.9.5.6.3.1)

31. Section 9.5.6.5 has been revised to reflect the calibration frequency of tne starting air system instrumentation.

(Ref. 9. 5.6.3.2 )

32. Section 9.5.6.2 has been revised to reflect the pre-and after filters located in the system to prevent oil carryover from the compressor.

(Ref. 9.5.6.3.3)

33. Section 9.5.6.5 has been revised to indicate the period of inspection for the air dryer.

(Ref. 9.5.6.3.4 )

34. The response to Q430.94N has been revised to reflect the fact that no instrument air is required to provide the safety trips or support operation of the diesel in the emergency mode.

(Ref. 9.5.6.3.5) l 6019N:0249N/4

s -

35.

Section 9.5.7.1 has been revised to reflect the industry standards which are met by the diesel mounted piping. Also see the revised response to Q430.47N.

(Ref. 9.5.7.3.1)

36. Section 9.5.7.5 has been revised to include the calibration frequency of the lube oil instrumentation.

(Ref. 9.5.7.3.2 )

37. Section 9.5.7.2 has been revised to include the frequency of lube oil inspection.

(Ref. 9.5.7.3.3 )

38. The existing response to NRC Question 430.99N is acceptable. The direction for lube oil filling will be in a procedure which will clearly identify which connection is to be used. (Ref. 9.5.7.3.4 )
39. Section 9.5.8.1 has been revised to reflect the industry standards which are met by the diesel mounted piping. Also see the revised response to Q430.47N.

(Ref. 9.5.8.3.1) 40.

Section 9.5.9.5 has been revised to provide the frequency of calibration of the combustion air intake and exhaust instrumentation.

(Ref. 9.5.8.3.1)

41. As stated in Section 9.5.8.3, the methodology used was that found in R.G. 1. 7 8.

Thus, the X/Q method described in Appendix B was used to determine the worst case (centerline) concentration of the N2 gas at the intake to the DG.

This concentration was then used to displace oxygen at the intake to arrive at the total displaced oxygen of 17%.

(Ref. 9. 5.8.3.3 )

42.

The results of the current analysis are presented in section 9.5.8.3.

Additional analyses are being performed and the results will be avail-able in September (Ref. 9.5.8.3.4) 43.

See 42 (Ref. 9.5.8.3.5)

44. Section 9.5.8.2 and Q430.60N have been revised to describe the DG exhaust design.

(Ref. 9.5.8.3.6) 45.

Question 40.37 has t.een revised and will appear in Amd. 51. (Ref.

10.2.3.1)

46. Table 10.4-4 has been revised to include the spurious opening of the turbine bypass valve. With respect to the two items shown in your Section 10.4.4.3.1:

I a)

The opening of a turbine bypass valve is an ANS Condition II event as described in Section 15.1.4.

Thus, the effects of the event are provided in the FSAR.

j i

6019N:0249N/5

b)

Each turbine bypass line has a drain which automatically will drain any liquid which collects in the line.

In the event failure occurred to automatically drain the line, the separate high level alarm would provide indication.

In any event, the worst scenario would be failure to pass steam which is equivalent to failure of the valve to open which is included in the FMEA (Table 10.4-4).

47. Section 10.4.4.4 and the response to Q430.105N have been revised to reflect STP's position on the frequency of inspection of the turbine bypass lines.

(R ef. 10.4.4.3.2 )

6019N:0249N/6

a Mearns L S c o ra Te us Pawe c_r Du Taa Pcea. 63rsus be-e (Mecamic%)

Gc~ew s.

%= p rrmen,

9 ; I 9 Es--

)J Age.

[FritiATion N b Ontwsz NRC/ tar /D u P A UtmnM MB/DS//A/M Qw).

? J.

<5, es a P s cs /t>s i /,a gsrt.

n. J. Geq Hue / nu L 9

/ day,>e </h6 MtAP 1epel @ry3 aL 13<ekkl lrt.

D.B

$8 77hja/

/3 e e ti.'c <.'

/1cc!4nNi.

7 9x PA s/&

R. E f/\\udu R L.r F

d. 4, du arf Lcms g G-(A).

'N Lkle-/'Ot/4c 3 htg oen X J, O slv a san (eui~C;")

pais,/ni/cip:

i l

r

/

EETla cs AlirH SU TH Te.m s ho 7c=c-T Cu Te e.

Pcva SysTmsleAsce (Mcc_etamca Q

[oucem s S E.Fi m S E R.

l C j l # E 5-1 N A M E.

Aseicssr<ea N

Passe Name

>agc/sa/o c.

E J. 6,4 4 b J /-

PS R /Ds i /d 4 4-M s n r u wnpaJ

/fq r.

p.

3, (Ser HL &t

/t. eT $

pkh /m '

7. f Aleses&

NLf/ Aluelw Jd)v

  1. /.

j pye /

N 4 //=

Areb.,- W. d C2 r p

R.D. Munkv H L i-P Erg.

O A. Ak ph e P ljens-;u j

dLJP Fwyvy RA, ne~

D.2.$E7/9]//

dccH7Cl cul 7 (

,de (

G<cA N

/ tc..

k. k Ua G&f2D PS15lP5llLW2R s w.8 % nea neefvtpes nc_ % d ntP en y 7

l L