05000295/LER-1997-001, Forwards LER 97-001-00 Which Involved Discovery of Lack of Sump Cover Plate Holes Contrary to Plant Structural Drawing Details,Per 10CFR50.73(a)(2)(ii)(B): Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 1: Line 1:
#REDIRECT [[05000295/LER-1997-001]]
{{Adams
| number = ML20134L375
| issue date = 02/10/1997
| title = Forwards LER 97-001-00 Which Involved Discovery of Lack of Sump Cover Plate Holes Contrary to Plant Structural Drawing Details,Per 10CFR50.73(a)(2)(ii)(B)
| author name = Lacey W
| author affiliation = COMMONWEALTH EDISON CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000295
| license number =
| contact person =
| document report number = NUDOCS 9702190079
| package number = ML20134L378
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 1
}}
{{LER
| Title = Forwards LER 97-001-00 Which Involved Discovery of Lack of Sump Cover Plate Holes Contrary to Plant Structural Drawing Details,Per 10CFR50.73(a)(2)(ii)(B)
| Plant =
| Reporting criterion = 10 CFR 50.73(a)(2)(ii)(B)
| Power level =
| Mode =
| Docket = 05000295
| LER year = 1997
| LER number = 1
| LER revision = 0
| Event date =
| Report date =
| ENS =
| abstract =
}}
 
=text=
{{#Wiki_filter:Q>mmonwealth litiwn Q>mpany f
Zion Generating Station lui $hiloh Ik>utes ard Zion.11. G ON2797 Tcl M 17-744208 i February 10. 1997 U.S. Nuclear Regulatory Commission Document Control Desk Washington. DC 20555 The enclosed abstract for Licensee Event Report (LER) number 97-001-00. Docket No. 50-295/DPR-39 from Zion Generating Station is being transmitted to you pursuant to 10 CFR 50.73(a)(2)(ii)(B) which requires a thirty day written report when any condition that was outside the design basis of the plant.
This event involved a discovery of the lack of sump cover plate holes contrary to plant structural drawing details.
Holes have been drilled into the sump cover plates thus meeting the requirements of the applicable design drawings.
However, investigation into the event is ongoing, and an evaluation is being l
performed to determine the safety impact of the event.
Once completed, a supplemental LER will be submitted.
Should you have any questions regarding this matter, please contact Mr. Neil M. Brennan. Regulatory Assurance, at (847)746-2084 extension 2380.
Very truly yours.
/
g S.
acey
.f Plant General ana er Zion Generatin ation
 
==Enclosure:==
Licensee Event Report cc:
NRC Region III Administrator NRC Senior Resident Inspector
/
IDNS Resident Inspector y
INPO Record Center
/q lilinois Department of Nuclear Safety h
~
9702190079 970210 PDR ADOCK 05000295 S
PDR.
)
1800g7 A l n.com o>mpan>
}}
 
{{LER-Nav}}

Latest revision as of 04:51, 12 December 2024

Forwards LER 97-001-00 Which Involved Discovery of Lack of Sump Cover Plate Holes Contrary to Plant Structural Drawing Details,Per 10CFR50.73(a)(2)(ii)(B)
ML20134L375
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 02/10/1997
From: Lacey W
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20134L378 List:
References
NUDOCS 9702190079
Download: ML20134L375 (1)


LER-1997-001, Forwards LER 97-001-00 Which Involved Discovery of Lack of Sump Cover Plate Holes Contrary to Plant Structural Drawing Details,Per 10CFR50.73(a)(2)(ii)(B)
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition
2951997001R00 - NRC Website

text

Q>mmonwealth litiwn Q>mpany f

Zion Generating Station lui $hiloh Ik>utes ard Zion.11. G ON2797 Tcl M 17-744208 i February 10. 1997 U.S. Nuclear Regulatory Commission Document Control Desk Washington. DC 20555 The enclosed abstract for Licensee Event Report (LER) number 97-001-00. Docket No. 50-295/DPR-39 from Zion Generating Station is being transmitted to you pursuant to 10 CFR 50.73(a)(2)(ii)(B) which requires a thirty day written report when any condition that was outside the design basis of the plant.

This event involved a discovery of the lack of sump cover plate holes contrary to plant structural drawing details.

Holes have been drilled into the sump cover plates thus meeting the requirements of the applicable design drawings.

However, investigation into the event is ongoing, and an evaluation is being l

performed to determine the safety impact of the event.

Once completed, a supplemental LER will be submitted.

Should you have any questions regarding this matter, please contact Mr. Neil M. Brennan. Regulatory Assurance, at (847)746-2084 extension 2380.

Very truly yours.

/

g S.

acey

.f Plant General ana er Zion Generatin ation

Enclosure:

Licensee Event Report cc:

NRC Region III Administrator NRC Senior Resident Inspector

/

IDNS Resident Inspector y

INPO Record Center

/q lilinois Department of Nuclear Safety h

~

9702190079 970210 PDR ADOCK 05000295 S