ENS 52646: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
| event date = 03/28/2017 19:57 CDT | | event date = 03/28/2017 19:57 CDT | ||
| last update date = 05/23/2017 | | last update date = 05/23/2017 | ||
| title = Unanalyzed Condition | | title = Unanalyzed Condition for a Postulated Moderate Energy Line Break | ||
| event text = On March 28, 2017 at approximately 1957 CDT, a condition was discovered whereby a postulated moderate-energy line break (MELB) involving three fire protection (FP) pipe segments in the Safeguards Building did not contain MELB shielding. It was subsequently determined a postulated crack in one of the affected FP piping sections could adversely affect circuitry associated with the cooling support system for the train A RHR [Residual Heat Removal] pump room, potentially causing the ventilation system to be unavailable to support operation of the train A RHR pump. This condition is not consistent with the CPNPP licensing basis for the protection of essential safe shutdown RHR equipment. | | event text = On March 28, 2017 at approximately 1957 CDT, a condition was discovered whereby a postulated moderate-energy line break (MELB) involving three fire protection (FP) pipe segments in the Safeguards Building did not contain MELB shielding. It was subsequently determined a postulated crack in one of the affected FP piping sections could adversely affect circuitry associated with the cooling support system for the train A RHR [Residual Heat Removal] pump room, potentially causing the ventilation system to be unavailable to support operation of the train A RHR pump. This condition is not consistent with the CPNPP licensing basis for the protection of essential safe shutdown RHR equipment. | ||
At approximately 1957 CDT train A RHR was declared inoperable but available and the unit entered a seventy-two hour LCO [Limiting Condition for Operation] Action Statement per Technical Specification 3.5.2 B pending completion of mitigative actions. | At approximately 1957 CDT train A RHR was declared inoperable but available and the unit entered a seventy-two hour LCO [Limiting Condition for Operation] Action Statement per Technical Specification 3.5.2 B pending completion of mitigative actions. |
Latest revision as of 20:42, 1 March 2018
Where | |
---|---|
Comanche Peak Texas (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition | |
Time - Person (Reporting Time:+2.52 h0.105 days <br />0.015 weeks <br />0.00345 months <br />) | |
Opened: | Raul Martinez 03:28 Mar 29, 2017 |
NRC Officer: | Mark Abramovitz |
Last Updated: | May 23, 2017 |
52646 - NRC Website
| |