Line 17: Line 17:
| event date = 03/28/2017 19:57 CDT
| event date = 03/28/2017 19:57 CDT
| last update date = 05/23/2017
| last update date = 05/23/2017
| title = Unanalyzed Condition For A Postulated Moderate Energy Line Break
| title = Unanalyzed Condition for a Postulated Moderate Energy Line Break
| event text = On March 28, 2017 at approximately 1957 CDT, a condition was discovered whereby a postulated moderate-energy line break (MELB) involving three fire protection (FP) pipe segments in the Safeguards Building did not contain MELB shielding. It was subsequently determined a postulated crack in one of the affected FP piping sections could adversely affect circuitry associated with the cooling support system for the train A RHR [Residual Heat Removal] pump room, potentially causing the ventilation system to be unavailable to support operation of the train A RHR pump. This condition is not consistent with the CPNPP licensing basis for the protection of essential safe shutdown RHR equipment.
| event text = On March 28, 2017 at approximately 1957 CDT, a condition was discovered whereby a postulated moderate-energy line break (MELB) involving three fire protection (FP) pipe segments in the Safeguards Building did not contain MELB shielding. It was subsequently determined a postulated crack in one of the affected FP piping sections could adversely affect circuitry associated with the cooling support system for the train A RHR [Residual Heat Removal] pump room, potentially causing the ventilation system to be unavailable to support operation of the train A RHR pump. This condition is not consistent with the CPNPP licensing basis for the protection of essential safe shutdown RHR equipment.
At approximately 1957 CDT train A RHR was declared inoperable but available and the unit entered a seventy-two hour LCO [Limiting Condition for Operation] Action Statement per Technical Specification 3.5.2 B pending completion of mitigative actions.
At approximately 1957 CDT train A RHR was declared inoperable but available and the unit entered a seventy-two hour LCO [Limiting Condition for Operation] Action Statement per Technical Specification 3.5.2 B pending completion of mitigative actions.

Latest revision as of 20:42, 1 March 2018

ENS 52646 +/- *RETRACTED*
Where
Comanche Peak Luminant icon.png
Texas (NRC Region 4)
Reporting
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition
Time - Person (Reporting Time:+2.52 h0.105 days <br />0.015 weeks <br />0.00345 months <br />)
Opened: Raul Martinez
03:28 Mar 29, 2017
NRC Officer: Mark Abramovitz
Last Updated: May 23, 2017