ML20138H810: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:e | {{#Wiki_filter:e | ||
: | |||
.x n | |||
-. . | |||
# | ,_ | ||
.- | |||
# | |||
. | |||
6 | |||
DEC 101985 | |||
f | |||
Docket No. | |||
50-334 | |||
License No. | |||
DPR-66 | |||
, | |||
Duquesne Light Company | |||
c | |||
. -ATTN: | |||
Mr.' J. J. Carey | |||
T | |||
.Vice President = | |||
< | |||
' | |||
j | |||
rNuclear Group | |||
_ | |||
- | |||
. _ . | |||
Post Office Box 4- | |||
;Shippingport, Penn'ylvania 15077 | |||
s | |||
T Gentl'emen: | |||
,' | |||
, | |||
, | |||
. (- | |||
J Sub' ject: | |||
Inspection No. 50-334/85-26 | |||
- | |||
+ | |||
This refers .to the special safeguards . inspection conducted by Mr. W. Troskoski of | |||
~ | |||
f this office ori-November 20-22 1985 of activities authorized by NRC and to the dis- | |||
.cussions of our findings held by Mr. Troskoski with Mr. J. D. Sieber at the con- | |||
clusion_of the inspection. | |||
, | |||
^ - Areas.' examined during.this inspection are described in the NRC Region I Inspection | |||
Report which is enclosed with this letter. ,The inspection was conducted.to review | |||
' | |||
.the circumstances associated with the access'into the protected area by a plant | |||
employee without his photo-identification badge on November 19, 1985. | |||
The inspec- | |||
*' : tion consisted of/ interviews with: licensee. personnel and a review of. access con- | |||
trol logs,and. records. | |||
, | |||
' | |||
-The inspection. identified one apparent violation of NRC' requirements involving | |||
. access control for personnel. We are' concerned that- four similar violations have | |||
t | |||
> | |||
; | |||
occurred since June 1, 1984, and that your corrective' actions for those violations | |||
^ | ^ | ||
= have apparently been ineffective. Therefore,-we have . scheduled an enforcement | |||
~ | |||
: conference in our: office in King ~ of Prussia, Pennsylvania on December 19, 1985 | |||
.at.1:00 p.m.:to discuss.these matters. | |||
, | |||
'At the conference you shoul'd be prepared to discuss the causal factors which led | |||
to this apparent violation, as well as the measures you have taken and any addi- | |||
V | |||
-tional measures"you plan:to.take to ensure the effectiveness of your security pro-- | |||
gram. | |||
Our decision concerning the appropriate enforcement action regarding this | |||
matter will<be communicated to you following the conference by separate correspon- | |||
dence. | |||
. | |||
.Your cooperation'with us in this matter is appreciated. | |||
-r | |||
Sincerely, | |||
* | |||
. | |||
' | |||
;0rginal Signed BEsi | |||
g512170330.8 | |||
1h | |||
~ | |||
Richard W. Starostecki, Director- | |||
_ | |||
Division of Reactor Projects | |||
PDR -ADOCM 0 | |||
g | |||
, | |||
G | |||
$ | |||
s\\s | |||
- | |||
i | i | ||
. . , | |||
, | |||
. | |||
. | |||
-Duquesne Light Company | |||
2- | |||
DEC 101985 | |||
- | |||
'' | |||
Enclosure: | |||
NRC Region'I Inspection Report No. 50-334/85-26 | |||
- | |||
cc w/ enc 1: | |||
H. M. Siegel, Manager, Nuclear Engineering Department | |||
C. E. Ewing, QA Manager | |||
W.' S.' Lacey, Station Superintendent. | |||
R. Druga, Chief Engineer | |||
R. Martin, Nuclear Engineer ~ | |||
, | |||
J. Sieber, Manager, Nuclear Safety and Licensing | |||
- | |||
T. D. Jones,. Manager, Nuclear Operations | |||
N. R. Tonet, Manager,' Nuclear Engineering | |||
Public Document Room (PDR) | |||
local Public Document Room (LPDR) | |||
Nuclear Safety Information Center (NSIC) | |||
NRC Resident Inspector | |||
. Commonwealth of Pennsylvania | |||
bcc w/ encl: | |||
Region I Docket Room (with concurrences) | |||
Management Assistant, DRMA (w/o encl) | |||
Section Chief, DRP | |||
m | |||
M. McBride, RI, Pilgrim | |||
G. Walton, SRI, BV-2 | |||
P. Tam, LPM, NRR | |||
J. Axelrad, IE | |||
R. Burnett, NMSS. | |||
. | |||
L. Bush, IE | |||
. | |||
B | |||
' | |||
. | |||
. | |||
. | |||
ngeyStardptecki | |||
#oskoski/ca | |||
pp | |||
Dn | |||
p | |||
Ke ig | |||
Joyner- | |||
r1zi | |||
I | |||
l | |||
12/5/85 | |||
),g | |||
p- Vf$ | |||
nfajV | |||
$ | |||
G(f | |||
0FFICIAL RECORD COPY | |||
' | |||
, | |||
9 | |||
}} | }} | ||
Latest revision as of 19:13, 11 December 2024
| ML20138H810 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 12/10/1985 |
| From: | Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Carey J DUQUESNE LIGHT CO. |
| Shared Package | |
| ML20138H814 | List: |
| References | |
| NUDOCS 8512170330 | |
| Download: ML20138H810 (2) | |
See also: IR 05000334/1985026
Text
e
.x n
-. .
,_
.-
.
6
DEC 101985
f
Docket No.
50-334
License No.
,
Duquesne Light Company
c
. -ATTN:
Mr.' J. J. Carey
T
.Vice President =
<
'
j
rNuclear Group
_
-
. _ .
Post Office Box 4-
- Shippingport, Penn'ylvania 15077
s
T Gentl'emen:
,'
,
,
. (-
J Sub' ject:
Inspection No. 50-334/85-26
-
+
This refers .to the special safeguards . inspection conducted by Mr. W. Troskoski of
~
f this office ori-November 20-22 1985 of activities authorized by NRC and to the dis-
.cussions of our findings held by Mr. Troskoski with Mr. J. D. Sieber at the con-
clusion_of the inspection.
,
^ - Areas.' examined during.this inspection are described in the NRC Region I Inspection
Report which is enclosed with this letter. ,The inspection was conducted.to review
'
.the circumstances associated with the access'into the protected area by a plant
employee without his photo-identification badge on November 19, 1985.
The inspec-
- ' : tion consisted of/ interviews with: licensee. personnel and a review of. access con-
trol logs,and. records.
,
'
-The inspection. identified one apparent violation of NRC' requirements involving
. access control for personnel. We are' concerned that- four similar violations have
t
>
occurred since June 1, 1984, and that your corrective' actions for those violations
^
= have apparently been ineffective. Therefore,-we have . scheduled an enforcement
~
- conference in our: office in King ~ of Prussia, Pennsylvania on December 19, 1985
.at.1:00 p.m.:to discuss.these matters.
,
'At the conference you shoul'd be prepared to discuss the causal factors which led
to this apparent violation, as well as the measures you have taken and any addi-
V
-tional measures"you plan:to.take to ensure the effectiveness of your security pro--
gram.
Our decision concerning the appropriate enforcement action regarding this
matter will<be communicated to you following the conference by separate correspon-
dence.
.
.Your cooperation'with us in this matter is appreciated.
-r
Sincerely,
.
'
- 0rginal Signed BEsi
g512170330.8
1h
~
Richard W. Starostecki, Director-
_
Division of Reactor Projects
PDR -ADOCM 0
g
,
G
$
s\\s
-
i
. . ,
,
.
.
-Duquesne Light Company
2-
DEC 101985
-
Enclosure:
NRC Region'I Inspection Report No. 50-334/85-26
-
cc w/ enc 1:
H. M. Siegel, Manager, Nuclear Engineering Department
C. E. Ewing, QA Manager
W.' S.' Lacey, Station Superintendent.
R. Druga, Chief Engineer
R. Martin, Nuclear Engineer ~
,
J. Sieber, Manager, Nuclear Safety and Licensing
-
T. D. Jones,. Manager, Nuclear Operations
N. R. Tonet, Manager,' Nuclear Engineering
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
. Commonwealth of Pennsylvania
bcc w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
Section Chief, DRP
m
M. McBride, RI, Pilgrim
G. Walton, SRI, BV-2
P. Tam, LPM, NRR
J. Axelrad, IE
R. Burnett, NMSS.
.
L. Bush, IE
.
B
'
.
.
.
ngeyStardptecki
- oskoski/ca
pp
Dn
p
Ke ig
Joyner-
r1zi
I
l
12/5/85
),g
p- Vf$
nfajV
$
G(f
0FFICIAL RECORD COPY
'
,
9