ML20138H810
| ML20138H810 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 12/10/1985 |
| From: | Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Carey J DUQUESNE LIGHT CO. |
| Shared Package | |
| ML20138H814 | List: |
| References | |
| NUDOCS 8512170330 | |
| Download: ML20138H810 (2) | |
See also: IR 05000334/1985026
Text
e
.x n
-. .
,_
.-
.
6
DEC 101985
f
Docket No.
50-334
License No.
,
Duquesne Light Company
c
. -ATTN:
Mr.' J. J. Carey
T
.Vice President =
<
'
j
rNuclear Group
_
-
. _ .
Post Office Box 4-
- Shippingport, Penn'ylvania 15077
s
T Gentl'emen:
,'
,
,
. (-
J Sub' ject:
Inspection No. 50-334/85-26
-
+
This refers .to the special safeguards . inspection conducted by Mr. W. Troskoski of
~
f this office ori-November 20-22 1985 of activities authorized by NRC and to the dis-
.cussions of our findings held by Mr. Troskoski with Mr. J. D. Sieber at the con-
clusion_of the inspection.
,
^ - Areas.' examined during.this inspection are described in the NRC Region I Inspection
Report which is enclosed with this letter. ,The inspection was conducted.to review
'
.the circumstances associated with the access'into the protected area by a plant
employee without his photo-identification badge on November 19, 1985.
The inspec-
- ' : tion consisted of/ interviews with: licensee. personnel and a review of. access con-
trol logs,and. records.
,
'
-The inspection. identified one apparent violation of NRC' requirements involving
. access control for personnel. We are' concerned that- four similar violations have
t
>
occurred since June 1, 1984, and that your corrective' actions for those violations
^
= have apparently been ineffective. Therefore,-we have . scheduled an enforcement
~
- conference in our: office in King ~ of Prussia, Pennsylvania on December 19, 1985
.at.1:00 p.m.:to discuss.these matters.
,
'At the conference you shoul'd be prepared to discuss the causal factors which led
to this apparent violation, as well as the measures you have taken and any addi-
V
-tional measures"you plan:to.take to ensure the effectiveness of your security pro--
gram.
Our decision concerning the appropriate enforcement action regarding this
matter will<be communicated to you following the conference by separate correspon-
dence.
.
.Your cooperation'with us in this matter is appreciated.
-r
Sincerely,
.
'
- 0rginal Signed BEsi
g512170330.8
1h
~
Richard W. Starostecki, Director-
_
Division of Reactor Projects
PDR -ADOCM 0
g
,
G
$
s\\s
-
i
. . ,
,
.
.
-Duquesne Light Company
2-
DEC 101985
-
Enclosure:
NRC Region'I Inspection Report No. 50-334/85-26
-
cc w/ enc 1:
H. M. Siegel, Manager, Nuclear Engineering Department
C. E. Ewing, QA Manager
W.' S.' Lacey, Station Superintendent.
R. Druga, Chief Engineer
R. Martin, Nuclear Engineer ~
,
J. Sieber, Manager, Nuclear Safety and Licensing
-
T. D. Jones,. Manager, Nuclear Operations
N. R. Tonet, Manager,' Nuclear Engineering
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
. Commonwealth of Pennsylvania
bcc w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
Section Chief, DRP
m
M. McBride, RI, Pilgrim
G. Walton, SRI, BV-2
P. Tam, LPM, NRR
J. Axelrad, IE
R. Burnett, NMSS.
.
L. Bush, IE
.
B
'
.
.
.
ngeyStardptecki
- oskoski/ca
pp
Dn
p
Ke ig
Joyner-
r1zi
I
l
12/5/85
),g
p- Vf$
nfajV
$
G(f
0FFICIAL RECORD COPY
'
,
9