ML20199K943: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- | {{#Wiki_filter:_ | ||
- | |||
. | |||
- | |||
_ -__-_ _ _ _______ | |||
* | |||
* | |||
r | |||
In Reply Refer To: | |||
APR 0 41.986 | |||
Dockets: | |||
50-445/85-16 | |||
50-446/85-13 | |||
Texas Utilities Generating Company | |||
ATTN: Mr. W. G. Counsil | |||
Executive Vice President | |||
400 North Olive Street, Lock Box 81 | |||
Dallas, Texas | |||
75201 | |||
Gentlemen: | |||
This refers to the inspection conducted by Mr. T. F. Westerman and other members | |||
of the Region IV Comanche Peak Group during the period November 1-30, 1985, of | |||
activities covered by NRC Construction Permits CPPR-126 and CPPR-127 for the | |||
Comanche Peak Steam Electric Station, Units 1 &nd 2, and to the respective | |||
discussion of our findings with Messrs. R. E. Camp and J. T. Merritt, and other | |||
members of your staff at the conclusion of the inspection. | |||
Areas examined during the inspection included construction and Comanche Peak | |||
Response Team activities. | |||
Within these areas, the inspection consisted of | |||
selective examination of procedures and repre | |||
'ative records, interviews with | |||
personnel, and observations by the inspectors. | |||
.hese findings are documented in | |||
the enclosed inspection report. | |||
During this inspection, it was found that certain of your activities were in | |||
violation of NRC requirements. Consequently, you are required to respond to | |||
these violations, in writing, in accordance with the provisions of Section 2.201 | |||
of the NRC's " Rules of Practice," Part 2, Title'10, Code of Federal Regulations. | |||
Your response should be based on the specifics contained in the Notice of | |||
Violation enclosed with this letter. | |||
During this inspection, it was found that certain of your activities appeared | |||
to deviate from commitments made to the NRC. These items and references to the | |||
commitments are identified in the enclosed Notice of Deviation. You are | |||
requested to respond to these deviations in writing. | |||
Your response should be | |||
based on the specifics contained in the Notice of Deviation enclosed with this | |||
letter. With respect to item A.5 in the Notice of Deviation, out-of-scope | |||
examples of incorrect tagging were also observed during the inspection as | |||
discussed in paragraph 7.e.(2) of Appendix D of this report. You are | |||
requested to include these inspection findings in your response to item A.5, | |||
taking into consideration that they pertain directly to the applicant and not | |||
the reinspection effort. | |||
Six unresolved items are identified as follows in the enclosed inspection | |||
report: Apperdix C, paragraphs 3. 4.a. 4.b. and 6; Appendix D, paragraph 6.a. | |||
k | |||
kh | |||
RIV: CPG / SRI / CON | |||
SRI /0PSg | |||
CPG | |||
CPG | |||
DRSP | |||
NRR | |||
, | |||
SHPhillips u | |||
DLKelley | |||
IBarnes | |||
TFWesterman | |||
EHJohnson | |||
VSNoonan | |||
' | |||
4 /2./86 h l | |||
j/3)/86 | |||
y /e /86 | |||
it/ 9/86 | |||
A /4 /86 | |||
+/y /86 k | |||
A | |||
$4 $$El $Nh25 | |||
/E0I | |||
I l | |||
n | |||
_ | |||
r | e | ||
r | |||
Texas Utilities Generating Company | |||
-2- | |||
We have also examined actions you have taken with regard to previously | |||
identified inspection findings. The st eus of these items is identified in | |||
paragraph 2 of Appendix C, and paragraph 2 of Appendix D of the enclosed report. | |||
The responses directed by this letter and the accompanying Notices are not | |||
subject to the clearance procedures of the Office of Management and Budget as | |||
required by the Paperwork Reduction Act of 1980, PL 96-511. | |||
Should you have any question, concerning this inspection, we will be pleased to | |||
discuss them with you. | |||
Sincerely, | |||
at;y2 S'$1 W | |||
E. H. J0WOU | |||
E. H. Johnson, Director | |||
Division of Reactor Safety and | |||
Projects | |||
Enclosures: | |||
1. | |||
Appendix A - Notice of Violation | |||
. | |||
2. | |||
Appendix B - Notice of Deviation | |||
3. | |||
Appendix C - NRC Construction Inspection Report | |||
50-445/85-16 | |||
50-446/85-13 | |||
4. | |||
Appendix D - NRC Comanche Peak Response | |||
Team Activities Inspection Report | |||
50-445/85-16 | |||
50-446/85-13 | |||
cc w/ enclosures: | |||
Texas Utilities Generating Company | |||
ATTN: | |||
J. W. Beck, Vice President, Licensing | |||
Quality Assurance and Nuclear Fuels | |||
Skyway Tower | |||
400 North Olive Street | |||
Lock Box 81 | |||
Dallas, Texas | |||
75201 | |||
Juanita Ellis | |||
President, CASE | |||
1426 South Polk Street | |||
Dallas, Texas | |||
75224 | |||
Renea Hicks | |||
Assistant Attorney General | |||
Environmental Protection | |||
Division | |||
P.O. Box 12548 | |||
Austin, Texas | |||
76711 | |||
Texas Radiation Control Program Director | |||
-- - | |||
. .__ . | |||
. - . | |||
- | |||
. | |||
, | |||
, - | |||
, | |||
j | j | ||
' Texas Utilities Generating Company | |||
-3- | |||
4 | 4 | ||
bec to DMB (IE01) | |||
bec distrib. by RIV: | |||
*RPB | |||
* MIS System | |||
*RRI-0PS | |||
*RSTS Operator | |||
*RRI-CONST | |||
*R&SPB | |||
*T. F. Westerman, CPTG | |||
DRSP | |||
, | , | ||
V. Noonan. NRR | |||
R. Martin, RA | |||
S. Treby, ELD | |||
*RSB | |||
j | *RIV File | ||
J. Taylor, IE | |||
*D. Weiss, LFMB (AR-2015) | |||
R. Heishman, IE | |||
, | |||
j | |||
I. Barnes | |||
t | |||
*w/766 | |||
. | . | ||
1 | 1 | ||
: | : | ||
. | |||
d | d | ||
; | ; | ||
| Line 160: | Line 212: | ||
l | l | ||
, | , | ||
.7--m- | |||
,, | |||
,,p | |||
4 - - , ., | |||
q | |||
r --. . - . | |||
-- - - , | |||
- - - - - | |||
, | |||
- , - - | |||
.--gy | |||
-- | |||
w | |||
}} | }} | ||
Latest revision as of 04:07, 8 December 2024
| ML20199K943 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 04/04/1986 |
| From: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20199K948 | List: |
| References | |
| NUDOCS 8604100259 | |
| Download: ML20199K943 (3) | |
See also: IR 05000445/1985016
Text
_
-
.
-
_ -__-_ _ _ _______
r
In Reply Refer To:
APR 0 41.986
Dockets:
50-445/85-16
50-446/85-13
Texas Utilities Generating Company
ATTN: Mr. W. G. Counsil
Executive Vice President
400 North Olive Street, Lock Box 81
Dallas, Texas
75201
Gentlemen:
This refers to the inspection conducted by Mr. T. F. Westerman and other members
of the Region IV Comanche Peak Group during the period November 1-30, 1985, of
activities covered by NRC Construction Permits CPPR-126 and CPPR-127 for the
Comanche Peak Steam Electric Station, Units 1 &nd 2, and to the respective
discussion of our findings with Messrs. R. E. Camp and J. T. Merritt, and other
members of your staff at the conclusion of the inspection.
Areas examined during the inspection included construction and Comanche Peak
Response Team activities.
Within these areas, the inspection consisted of
selective examination of procedures and repre
'ative records, interviews with
personnel, and observations by the inspectors.
.hese findings are documented in
the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title'10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
During this inspection, it was found that certain of your activities appeared
to deviate from commitments made to the NRC. These items and references to the
commitments are identified in the enclosed Notice of Deviation. You are
requested to respond to these deviations in writing.
Your response should be
based on the specifics contained in the Notice of Deviation enclosed with this
letter. With respect to item A.5 in the Notice of Deviation, out-of-scope
examples of incorrect tagging were also observed during the inspection as
discussed in paragraph 7.e.(2) of Appendix D of this report. You are
requested to include these inspection findings in your response to item A.5,
taking into consideration that they pertain directly to the applicant and not
the reinspection effort.
Six unresolved items are identified as follows in the enclosed inspection
report: Apperdix C, paragraphs 3. 4.a. 4.b. and 6; Appendix D, paragraph 6.a.
k
kh
RIV: CPG / SRI / CON
SRI /0PSg
CPG
CPG
DRSP
,
SHPhillips u
DLKelley
IBarnes
TFWesterman
EHJohnson
VSNoonan
'
4 /2./86 h l
j/3)/86
y /e /86
it/ 9/86
A /4 /86
+/y /86 k
A
$4 $$El $Nh25
/E0I
I l
n
_
e
r
Texas Utilities Generating Company
-2-
We have also examined actions you have taken with regard to previously
identified inspection findings. The st eus of these items is identified in
paragraph 2 of Appendix C, and paragraph 2 of Appendix D of the enclosed report.
The responses directed by this letter and the accompanying Notices are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any question, concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
at;y2 S'$1 W
E. H. J0WOU
E. H. Johnson, Director
Division of Reactor Safety and
Projects
Enclosures:
1.
Appendix A - Notice of Violation
.
2.
Appendix B - Notice of Deviation
3.
Appendix C - NRC Construction Inspection Report
50-445/85-16
50-446/85-13
4.
Appendix D - NRC Comanche Peak Response
Team Activities Inspection Report
50-445/85-16
50-446/85-13
cc w/ enclosures:
Texas Utilities Generating Company
ATTN:
J. W. Beck, Vice President, Licensing
Quality Assurance and Nuclear Fuels
Skyway Tower
400 North Olive Street
Lock Box 81
Dallas, Texas
75201
Juanita Ellis
President, CASE
1426 South Polk Street
Dallas, Texas
75224
Renea Hicks
Assistant Attorney General
Environmental Protection
Division
P.O. Box 12548
76711
Texas Radiation Control Program Director
-- -
. .__ .
. - .
-
.
,
, -
,
j
' Texas Utilities Generating Company
-3-
4
bec to DMB (IE01)
bec distrib. by RIV:
- RPB
- MIS System
- RRI-0PS
- RSTS Operator
- RRI-CONST
- R&SPB
- T. F. Westerman, CPTG
DRSP
,
V. Noonan. NRR
R. Martin, RA
S. Treby, ELD
- RSB
- RIV File
J. Taylor, IE
- D. Weiss, LFMB (AR-2015)
R. Heishman, IE
,
j
I. Barnes
t
- w/766
.
1
.
d
i
l
.
J
l
4
i
l
l
,
.7--m-
,,
,,p
4 - - , .,
q
r --. . - .
-- - - ,
- - - - -
,
- , - -
.--gy
--
w