{{#Wiki_filter:CHAPTER TABLE OF CONTENTS CHAPTER 3.8 ELECTRICAL POWER SYSTEMS Section                                                                                                                     Page 3.8.1   AC Sources - Operating ...................................................................................... 3.8-1 ACTIONS ........................................................................................................ 3.8-1 SURVEILLANCE REQUIREMENTS ............................................................... 3.8-6 3.8.2   AC Sources - Shutdown .................................................................................... 3.8-18 ACTIONS ...................................................................................................... 3.8-18 SURVEILLANCE REQUIREMENTS ............................................................. 3.8-21 3.8.3   Diesel Fuel Oil, Lube Oil, and Starting Air ......................................................... 3.8-22 ACTIONS ...................................................................................................... 3.8-22 SURVEILLANCE REQUIREMENTS ............................................................. 3.8-24 3.8.4   DC Sources - Operating .................................................................................... 3.8-25 ACTIONS ...................................................................................................... 3.8-25 SURVEILLANCE REQUIREMENTS ............................................................. 3.8-25 3.8.5   DC Sources - Shutdown .................................................................................... 3.8-28 ACTIONS ...................................................................................................... 3.8-28 SURVEILLANCE REQUIREMENTS ............................................................. 3.8-29 3.8.6   Battery Cell Parameters .................................................................................... 3.8-30 ACTIONS ...................................................................................................... 3.8-30 SURVEILLANCE REQUIREMENTS ............................................................. 3.8-31 3.8.7   Inverters - Operating ......................................................................................... 3.8-34 ACTIONS ...................................................................................................... 3.8-34 SURVEILLANCE REQUIREMENTS ............................................................. 3.8-35 3.8.8   Inverters - Shutdown ......................................................................................... 3.8-36 ACTIONS ...................................................................................................... 3.8-36 CALLAWAY PLANT                                      3.8-i
{{#Wiki_filter:CALLAWAY PLANT 3.8-i CHAPTER TABLE OF CONTENTS CHAPTER 3.8 ELECTRICAL POWER SYSTEMS Section Page 3.8.1 AC Sources - Operating...................................................................................... 3.8-1 ACTIONS........................................................................................................ 3.8-1 SURVEILLANCE REQUIREMENTS............................................................... 3.8-6 3.8.2 AC Sources - Shutdown.................................................................................... 3.8-18 ACTIONS...................................................................................................... 3.8-18 SURVEILLANCE REQUIREMENTS............................................................. 3.8-21 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air......................................................... 3.8-22 ACTIONS...................................................................................................... 3.8-22 SURVEILLANCE REQUIREMENTS............................................................. 3.8-24 3.8.4 DC Sources - Operating.................................................................................... 3.8-25 ACTIONS...................................................................................................... 3.8-25 SURVEILLANCE REQUIREMENTS............................................................. 3.8-25 3.8.5 DC Sources - Shutdown.................................................................................... 3.8-28 ACTIONS...................................................................................................... 3.8-28 SURVEILLANCE REQUIREMENTS............................................................. 3.8-29 3.8.6 Battery Cell Parameters.................................................................................... 3.8-30 ACTIONS...................................................................................................... 3.8-30 SURVEILLANCE REQUIREMENTS............................................................. 3.8-31 3.8.7 Inverters - Operating......................................................................................... 3.8-34 ACTIONS...................................................................................................... 3.8-34 SURVEILLANCE REQUIREMENTS............................................................. 3.8-35 3.8.8 Inverters - Shutdown......................................................................................... 3.8-36 ACTIONS...................................................................................................... 3.8-36


CHAPTER TABLE OF CONTENTS (Continued)
CHAPTER TABLE OF CONTENTS (Continued)
Section                                                                                                                     Page SURVEILLANCE REQUIREMENTS ............................................................. 3.8-37 3.8.9   Distribution Systems - Operating ...................................................................... 3.8-38 ACTIONS ...................................................................................................... 3.8-38 SURVEILLANCE REQUIREMENTS ............................................................. 3.8-39 3.8.10 Distribution Systems - Shutdown ...................................................................... 3.8-40 ACTIONS ...................................................................................................... 3.8-40 SURVEILLANCE REQUIREMENTS ............................................................. 3.8-41 CALLAWAY PLANT                                      3.8-ii
Section Page CALLAWAY PLANT 3.8-ii SURVEILLANCE REQUIREMENTS............................................................. 3.8-37 3.8.9 Distribution Systems - Operating...................................................................... 3.8-38 ACTIONS...................................................................................................... 3.8-38 SURVEILLANCE REQUIREMENTS............................................................. 3.8-39 3.8.10 Distribution Systems - Shutdown...................................................................... 3.8-40 ACTIONS...................................................................................................... 3.8-40 SURVEILLANCE REQUIREMENTS............................................................. 3.8-41


LIST OF TABLES Number                               Title 3.8.6-1   Battery Cell Parameters Requirements CALLAWAY PLANT                      3.8.1-iii
CALLAWAY PLANT 3.8.1-iii LIST OF TABLES Number Title 3.8.6-1 Battery Cell Parameters Requirements


AC Sources - Operating 3.8.1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources - Operating LCO 3.8.1                   The following AC electrical sources shall be OPERABLE:
CALLAWAY PLANT 3.8-1 Amendment No. 199 AC Sources - Operating 3.8.1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources - Operating LCO 3.8.1 The following AC electrical sources shall be OPERABLE:
: a.       Two qualified circuits between the offsite transmission network and the onsite Class 1E AC Electrical Power Distribution System; and
a.
: b.       Two diesel generators (DGs) capable of supplying the onsite Class 1E power distribution subsystem(s); and
Two qualified circuits between the offsite transmission network and the onsite Class 1E AC Electrical Power Distribution System; and b.
: c.       Load Shedder and Emergency Load Sequencer (LSELS) for Train A and Train B.
Two diesel generators (DGs) capable of supplying the onsite Class 1E power distribution subsystem(s); and c.
APPLICABILITY:             MODES 1, 2, 3, and 4.
Load Shedder and Emergency Load Sequencer (LSELS) for Train A and Train B.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTIONS
ACTIONS
----------------------------------------------------------- NOTE -----------------------------------------------------------
----------------------------------------------------------- NOTE -----------------------------------------------------------
----------------------------------------------------------- NOTE -----------------------------------------------------------
LCO 3.0.4.b is not applicable to DGs.
LCO 3.0.4.b is not applicable to DGs.
COMPLETION CONDITION                                 REQUIRED ACTION TIME A. One offsite circuit                     A.1           Perform SR 3.8.1.1 for               1 hour inoperable.                                            OPERABLE offsite circuit.                             AND Once per 8 hours thereafter AND A.2           ------------ NOTE -----------
CONDITION REQUIRED ACTION COMPLETION TIME A.
One offsite circuit inoperable.
A.1 Perform SR 3.8.1.1 for OPERABLE offsite circuit.
AND 1 hour AND Once per 8 hours thereafter A.2
------------ NOTE -----------
In MODES 1, 2, and 3, the turbine driven auxiliary feedwater pump is considered a required redundant feature.
In MODES 1, 2, and 3, the turbine driven auxiliary feedwater pump is considered a required redundant feature.
(continued)
(continued)
CALLAWAY PLANT                                              3.8-1                                  Amendment No. 199


AC Sources - Operating 3.8.1 ACTIONS COMPLETION CONDITION        REQUIRED ACTION TIME A. One offsite circuit       Declare required                   24 hours from inoperable.                feature(s) with no offsite         discovery of no (continued)              power available                   offsite power to one inoperable when its               train concurrent redundant required                 with inoperability of feature(s) is inoperable.         redundant required feature(s)
AC Sources - Operating 3.8.1 ACTIONS CALLAWAY PLANT 3.8-2 Amendment 133 A.
AND A.3   Restore offsite circuit to         72 hours OPERABLE status.
One offsite circuit inoperable.
AND 6 days from discovery of failure to meet LCO B. One DG inoperable. B.1   Perform SR 3.8.1.1 for             1 hour the offsite circuit(s).
(continued)
AND Once per 8 hours thereafter AND B.2   ------------ NOTE -----------
Declare required feature(s) with no offsite power available inoperable when its redundant required feature(s) is inoperable.
AND 24 hours from discovery of no offsite power to one train concurrent with inoperability of redundant required feature(s)
A.3 Restore offsite circuit to OPERABLE status.
72 hours AND 6 days from discovery of failure to meet LCO B.
One DG inoperable.
B.1 Perform SR 3.8.1.1 for the offsite circuit(s).
AND 1 hour AND Once per 8 hours thereafter B.2
------------ NOTE -----------
In MODES 1, 2, and 3, the turbine driven auxiliary feedwater pump is considered a required redundant feature.
In MODES 1, 2, and 3, the turbine driven auxiliary feedwater pump is considered a required redundant feature.
(continued)
(continued)
CALLAWAY PLANT              3.8-2                                    Amendment 133
CONDITION REQUIRED ACTION COMPLETION TIME


AC Sources - Operating 3.8.1 ACTIONS COMPLETION CONDITION          REQUIRED ACTION TIME B. One DG inoperable.         Declare required                  4 hours from (continued)               feature(s) supported by           discovery of the inoperable DG                 Condition B inoperable when its               concurrent with required redundant                 inoperability of feature(s) is inoperable.         redundant required feature(s)
AC Sources - Operating 3.8.1 ACTIONS CALLAWAY PLANT 3.8-3 Amendment 186 B.
AND B.3.1   Determine OPERABLE                 24 hours DG is not inoperable due to common cause failure.
One DG inoperable.
OR B.3.2   ------------ NOTE -----------
(continued)
Declare required feature(s) supported by the inoperable DG inoperable when its required redundant feature(s) is inoperable.
AND 4 hours from discovery of Condition B concurrent with inoperability of redundant required feature(s)
B.3.1 Determine OPERABLE DG is not inoperable due to common cause failure.
OR 24 hours B.3.2
------------ NOTE -----------
The required ACTION of B.3.2 is satisfied by the automatic start and sequence loading of the diesel generator.
The required ACTION of B.3.2 is satisfied by the automatic start and sequence loading of the diesel generator.
Perform SR 3.8.1.2 for             24 hours OPERABLE DG.
Perform SR 3.8.1.2 for OPERABLE DG.
AND (continued)
AND 24 hours (continued)
CALLAWAY PLANT                3.8-3                                    Amendment 186
CONDITION REQUIRED ACTION COMPLETION TIME


AC Sources - Operating 3.8.1 ACTIONS COMPLETION CONDITION          REQUIRED ACTION TIME B. One DG inoperable. B.4   Restore DG to                     ---------NOTE---------
AC Sources - Operating 3.8.1 ACTIONS CALLAWAY PLANT 3.8-4 Amendment 199 B.
(continued)              OPERABLE status.                  A one-time Completion Time of 14 days is allowed to support planned replacement of ESW B train piping prior to April 30, 2009.
One DG inoperable.
72 hours AND 6 days from discovery of failure to meet LCO C. Two offsite circuits C.1   ------------ NOTE -----------
(continued)
inoperable.                In MODES 1, 2, and 3, the turbine driven auxiliary feedwater pump is considered a required redundant feature.
B.4 Restore DG to OPERABLE status.
Declare required                   12 hours from feature(s) inoperable             discovery of when its redundant                 Condition C required feature(s) is             concurrent with inoperable.                        inoperability of redundant required features AND (continued)
---------NOTE---------
CALLAWAY PLANT                3.8-4                                      Amendment 199
A one-time Completion Time of 14 days is allowed to support planned replacement of ESW B train piping prior to April 30, 2009.
72 hours AND 6 days from discovery of failure to meet LCO C.
Two offsite circuits inoperable.
C.1
------------ NOTE -----------
In MODES 1, 2, and 3, the turbine driven auxiliary feedwater pump is considered a required redundant feature.
Declare required feature(s) inoperable when its redundant required feature(s) is inoperable.
AND 12 hours from discovery of Condition C concurrent with inoperability of redundant required features (continued)
CONDITION REQUIRED ACTION COMPLETION TIME


AC Sources - Operating 3.8.1 ACTIONS COMPLETION CONDITION                  REQUIRED ACTION TIME C. Two offsite circuits C.2            Restore one offsite circuit        24 hours inoperable.                          to OPERABLE status.
AC Sources - Operating 3.8.1 ACTIONS CALLAWAY PLANT 3.8-5 Amendment 186 l C.
Two offsite circuits inoperable.
(continued)
(continued)
D. One offsite circuit -------------------- NOTE -------------------
C.2 Restore one offsite circuit to OPERABLE status.
inoperable.          Enter applicable Conditions and Required Actions of LCO 3.8.9, AND                  Distribution Systems - Operating, when Condition D is entered with no One DG inoperable. AC power source to any train.
24 hours D.
D.1           Restore offsite circuit to         12 hours OPERABLE status.
One offsite circuit inoperable.
OR D.2           Restore DG to                       12 hours OPERABLE status.
AND One DG inoperable.
E. Two DGs inoperable. E.1           Restore one DG to                   2 hours OPERABLE status.
-------------------- NOTE -------------------
F. One required LSELS   F.1           Declare the affected DG             Immediately inoperable.                          and offsite circuit inoperable.
Enter applicable Conditions and Required Actions of LCO 3.8.9, Distribution Systems - Operating, when Condition D is entered with no AC power source to any train.
AND F.2           Restore required LSELS             12 hours to OPERABLE status.
D.1 Restore offsite circuit to OPERABLE status.
(continued)
OR 12 hours D.2 Restore DG to OPERABLE status.
CALLAWAY PLANT                        3.8-5                                    Amendment 186 l
12 hours E.
Two DGs inoperable.
E.1 Restore one DG to OPERABLE status.
2 hours F.
One required LSELS inoperable.
F.1 Declare the affected DG and offsite circuit inoperable.
AND Immediately F.2 Restore required LSELS to OPERABLE status.
12 hours (continued)
CONDITION REQUIRED ACTION COMPLETION TIME


AC Sources - Operating 3.8.1 ACTIONS (continued)
AC Sources - Operating 3.8.1 ACTIONS (continued)
COMPLETION CONDITION                        REQUIRED ACTION TIME G. Required Action and             G.1        Be in MODE 3.          6 hours associated Completion Time of Condition A, B, C, D, E,     AND or F not met.
CALLAWAY PLANT 3.8-6 Amendment No. 202 SURVEILLANCE REQUIREMENTS G.
G.2         Be in MODE 5.           36 hours H. Three or more AC sources       H.1         Enter LCO 3.0.3.       Immediately inoperable.
Required Action and associated Completion Time of Condition A, B, C, D, E, or F not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                    FREQUENCY SR 3.8.1.1       Verify correct breaker alignment and indicated power   In accordance availability for each required offsite circuit.       with the Surveillance Frequency Control Program (continued)
G.1 Be in MODE 3.
CALLAWAY PLANT                                3.8-6                    Amendment No. 202
AND 6 hours G.2 Be in MODE 5.
36 hours H.
Three or more AC sources inoperable.
H.1 Enter LCO 3.0.3.
Immediately SURVEILLANCE FREQUENCY SR 3.8.1.1 Verify correct breaker alignment and indicated power availability for each required offsite circuit.
In accordance with the Surveillance Frequency Control Program (continued)
CONDITION REQUIRED ACTION COMPLETION TIME


AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                                    FREQUENCY SR 3.8.1.2   --------------------------- NOTES --------------------------------
CALLAWAY PLANT 3.8-7 Amendment No. 202 SR 3.8.1.2
: 1. Performance of SR 3.8.1.7 satisfies this SR.
--------------------------- NOTES --------------------------------
: 2. All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.
1.
: 3. A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer. When modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1.7 must be met.
Performance of SR 3.8.1.7 satisfies this SR.
Verify each DG starts from standby conditions and                       In accordance achieves steady state voltage 3740 V and 4320 V,                     with the and frequency 58.8 Hz and 61.2 Hz.                                   Surveillance Frequency Control Program (continued)
2.
CALLAWAY PLANT                                  3.8-7                                  Amendment No. 202
All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.
3.
A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer. When modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1.7 must be met.
Verify each DG starts from standby conditions and achieves steady state voltage 3740 V and 4320 V, and frequency 58.8 Hz and 61.2 Hz.
In accordance with the Surveillance Frequency Control Program (continued)
SURVEILLANCE FREQUENCY


AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                                    FREQUENCY SR 3.8.1.3   --------------------------- NOTES --------------------------------
CALLAWAY PLANT 3.8-8 Amendment No. 202 SR 3.8.1.3
: 1. DG loadings may include gradual loading as recommended by the manufacturer.
--------------------------- NOTES --------------------------------
: 2. Momentary transients outside the load range do not invalidate this test.
1.
: 3. This Surveillance shall be conducted on only one DG at a time.
DG loadings may include gradual loading as recommended by the manufacturer.
: 4. This SR shall be preceded by and immediately follow without shutdown a successful performance of SR 3.8.1.2 or SR 3.8.1.7.
2.
Verify each DG is synchronized and loaded and                           In accordance operates for 60 minutes at a load 5580 kW and                       with the 6201 kW.                                                               Surveillance Frequency Control Program SR 3.8.1.4   Verify each fuel oil transfer pump starts on low level in               In accordance the associated day tank standpipe.                                       with the Surveillance Frequency Control Program SR 3.8.1.5   Check for and remove accumulated water from each                         In accordance day tank.                                                               with the Surveillance Frequency Control Program SR 3.8.1.6   Verify each fuel oil transfer system operates to                         In accordance transfer fuel oil from storage tank to the day tank.                     with the Surveillance Frequency Control Program (continued)
Momentary transients outside the load range do not invalidate this test.
CALLAWAY PLANT                                  3.8-8                                  Amendment No. 202
3.
This Surveillance shall be conducted on only one DG at a time.
4.
This SR shall be preceded by and immediately follow without shutdown a successful performance of SR 3.8.1.2 or SR 3.8.1.7.
Verify each DG is synchronized and loaded and operates for 60 minutes at a load 5580 kW and 6201 kW.
In accordance with the Surveillance Frequency Control Program SR 3.8.1.4 Verify each fuel oil transfer pump starts on low level in the associated day tank standpipe.
In accordance with the Surveillance Frequency Control Program SR 3.8.1.5 Check for and remove accumulated water from each day tank.
In accordance with the Surveillance Frequency Control Program SR 3.8.1.6 Verify each fuel oil transfer system operates to transfer fuel oil from storage tank to the day tank.
In accordance with the Surveillance Frequency Control Program (continued)
SURVEILLANCE FREQUENCY


AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                                    FREQUENCY SR 3.8.1.7   ------------------------------ NOTE -------------------------------
CALLAWAY PLANT 3.8-9 Amendment No. 202 SR 3.8.1.7
------------------------------ NOTE -------------------------------
All DG starts may be preceded by an engine prelube period.
All DG starts may be preceded by an engine prelube period.
Verify each DG starts from standby condition and                         In accordance achieves in 12 seconds, voltage 3740 V and                           with the 4320 V, and frequency 58.8 Hz and 61.2 Hz.                         Surveillance Frequency Control Program SR 3.8.1.8   Not used.
Verify each DG starts from standby condition and achieves in 12 seconds, voltage 3740 V and 4320 V, and frequency 58.8 Hz and 61.2 Hz.
SR 3.8.1.9   Not used.
In accordance with the Surveillance Frequency Control Program SR 3.8.1.8 Not used.
SR 3.8.1.10 Verify each DG operating at a power factor 0.9 and                     In accordance 0.8 does not trip and voltage is maintained 4784 V                   with the and frequency is maintained 65.4 Hz during and                         Surveillance following a load rejection of 5580 kW and                             Frequency 6201 kW.                                                               Control Program (continued)
SR 3.8.1.9 Not used.
CALLAWAY PLANT                                  3.8-9                                  Amendment No. 202
SR 3.8.1.10 Verify each DG operating at a power factor 0.9 and 0.8 does not trip and voltage is maintained 4784 V and frequency is maintained 65.4 Hz during and following a load rejection of 5580 kW and 6201 kW.
In accordance with the Surveillance Frequency Control Program (continued)
SURVEILLANCE FREQUENCY


AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                                    FREQUENCY SR 3.8.1.11 --------------------------- NOTES --------------------------------
CALLAWAY PLANT 3.8-10 Amendment No. 202 SR 3.8.1.11
: 1. All DG starts may be preceded by an engine prelube period.
--------------------------- NOTES --------------------------------
: 2. This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
1.
Verify on an actual or simulated loss of offsite power                   In accordance signal:                                                                 with the Surveillance
All DG starts may be preceded by an engine prelube period.
: a.     De-energization of emergency buses;                             Frequency Control Program
2.
: b.     Load shedding from emergency buses;
This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
: c.     DG auto-starts from standby condition and:
Verify on an actual or simulated loss of offsite power signal:
: 1.     energizes permanently connected loads in 12 seconds,
a.
: 2.     energizes auto-connected shutdown loads through the shutdown load sequencer,
De-energization of emergency buses; b.
: 3.     maintains steady state voltage 3740 V and 4320 V,
Load shedding from emergency buses; c.
: 4.     maintains steady state frequency 58.8 Hz and 61.2 Hz, and
DG auto-starts from standby condition and:
: 5.     supplies permanently connected and auto-connected shutdown loads for 5 minutes.
1.
(continued)
energizes permanently connected loads in 12 seconds, 2.
CALLAWAY PLANT                                3.8-10                                  Amendment No. 202
energizes auto-connected shutdown loads through the shutdown load sequencer, 3.
maintains steady state voltage 3740 V and 4320 V, 4.
maintains steady state frequency 58.8 Hz and 61.2 Hz, and 5.
supplies permanently connected and auto-connected shutdown loads for 5 minutes.
In accordance with the Surveillance Frequency Control Program (continued)
SURVEILLANCE FREQUENCY


AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                                    FREQUENCY SR 3.8.1.12 --------------------------- NOTES --------------------------------
CALLAWAY PLANT 3.8-11 Amendment No. 202 SR 3.8.1.12
: 1. All DG starts may be preceded by prelube period.
--------------------------- NOTES --------------------------------
: 2. This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
1.
Verify on an actual or simulated safety injection signal                 In accordance each DG auto-starts from standby condition and:                         with the Surveillance
All DG starts may be preceded by prelube period.
: a.     In 12 seconds after auto-start and during                     Frequency tests, achieves voltage 3740 V and 4320 V;                   Control Program
2.
: b.     In 12 seconds after auto-start and during tests, achieves frequency 58.8 Hz and 61.2 Hz;
This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
: c.     Operates for 5 minutes;
Verify on an actual or simulated safety injection signal each DG auto-starts from standby condition and:
: d.     Permanently connected loads remain energized from the offsite power system; and
a.
: e.     Emergency loads are auto-connected and energized through the LOCA load sequencer from the offsite power system.
In 12 seconds after auto-start and during tests, achieves voltage 3740 V and 4320 V; b.
(continued)
In 12 seconds after auto-start and during tests, achieves frequency 58.8 Hz and 61.2 Hz; c.
CALLAWAY PLANT                                3.8-11                                  Amendment No. 202
Operates for 5 minutes; d.
Permanently connected loads remain energized from the offsite power system; and e.
Emergency loads are auto-connected and energized through the LOCA load sequencer from the offsite power system.
In accordance with the Surveillance Frequency Control Program (continued)
SURVEILLANCE FREQUENCY


AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                  FREQUENCY SR 3.8.1.13 Verify each DG's automatic trips are bypassed on     In accordance actual or simulated loss of voltage signal on the    with the emergency bus concurrent with an actual or           Surveillance simulated safety injection signal except:           Frequency Control Program
CALLAWAY PLANT 3.8-12 Amendment No. 202 SR 3.8.1.13 Verify each DG's automatic trips are bypassed on actual or simulated loss of voltage signal on the emergency bus concurrent with an actual or simulated safety injection signal except:
: a. Engine overspeed;
a.
: b. Generator differential current;
Engine overspeed; b.
: c. Low lube oil pressure;
Generator differential current; c.
: d. High crankcase pressure;
Low lube oil pressure; d.
: e. Start failure relay; and
High crankcase pressure; e.
: f. High jacket coolant temperature.
Start failure relay; and f.
(continued)
High jacket coolant temperature.
CALLAWAY PLANT                            3.8-12                Amendment No. 202
In accordance with the Surveillance Frequency Control Program (continued)
SURVEILLANCE FREQUENCY


AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                                    FREQUENCY SR 3.8.1.14 --------------------------- NOTES --------------------------------
CALLAWAY PLANT 3.8-13 Amendment No. 202 SR 3.8.1.14
: 1. Momentary transients outside the load and power factor ranges do not invalidate this test.
--------------------------- NOTES --------------------------------
: 2. The DG may be loaded to 5580 kW and 6201 kW for the entire test period if auto-connected design loads are less than 6201 kW.
1.
Verify each DG operating at a power factor 0.9 and                     In accordance 0.8 operates for 24 hours:                                           with the Surveillance
Momentary transients outside the load and power factor ranges do not invalidate this test.
: a.     For 2 hours loaded 6600 kW and                               Frequency 6821 kW; and                                                   Control Program
2.
: b.     For the remaining hours of the test loaded 5580 kW and 6201 kW.
The DG may be loaded to 5580 kW and 6201 kW for the entire test period if auto-connected design loads are less than 6201 kW.
SR 3.8.1.15 --------------------------- NOTES --------------------------------
Verify each DG operating at a power factor 0.9 and 0.8 operates for 24 hours:
: 1. This Surveillance shall be performed within 5 minutes of shutting down the DG after the DG has operated 2 hours loaded 5580 kW and 6201 kW. Momentary transients outside of load range do not invalidate this test.
a.
: 2. All DG starts may be preceded by an engine prelube period.
For 2 hours loaded 6600 kW and 6821 kW; and b.
Verify each DG starts and achieves, in 12 seconds,                     In accordance voltage 3740 V, and 4320 V and frequency                             with the 58.8 Hz and 61.2 Hz.                                                 Surveillance Frequency Control Program (continued)
For the remaining hours of the test loaded 5580 kW and 6201 kW.
CALLAWAY PLANT                                3.8-13                                  Amendment No. 202
In accordance with the Surveillance Frequency Control Program SR 3.8.1.15
--------------------------- NOTES --------------------------------
1.
This Surveillance shall be performed within 5 minutes of shutting down the DG after the DG has operated 2 hours loaded 5580 kW and 6201 kW. Momentary transients outside of load range do not invalidate this test.
2.
All DG starts may be preceded by an engine prelube period.
Verify each DG starts and achieves, in 12 seconds, voltage 3740 V, and 4320 V and frequency 58.8 Hz and 61.2 Hz.
In accordance with the Surveillance Frequency Control Program (continued)
SURVEILLANCE FREQUENCY


AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                                    FREQUENCY SR 3.8.1.16 ------------------------------ NOTE -------------------------------
CALLAWAY PLANT 3.8-14 Amendment No. 202 SR 3.8.1.16
------------------------------ NOTE -------------------------------
This Surveillance shall not normally be performed in MODE 1, 2, 3, or 4. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
This Surveillance shall not normally be performed in MODE 1, 2, 3, or 4. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
Verify each DG:                                                         In accordance with the
Verify each DG:
: a.     Synchronizes with offsite power source while                     Surveillance loaded with emergency loads upon a simulated                     Frequency restoration of offsite power;                                   Control Program
a.
: b.     Transfers loads to offsite power source; and
Synchronizes with offsite power source while loaded with emergency loads upon a simulated restoration of offsite power; b.
: c.     Returns to ready-to-load operation.
Transfers loads to offsite power source; and c.
SR 3.8.1.17 ------------------------------ NOTE -------------------------------
Returns to ready-to-load operation.
In accordance with the Surveillance Frequency Control Program SR 3.8.1.17
------------------------------ NOTE -------------------------------
This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
Verify, with a DG operating in test mode and                             In accordance connected to its bus, an actual or simulated Safety                     with the Injection signal overrides the test mode by:                             Surveillance Frequency
Verify, with a DG operating in test mode and connected to its bus, an actual or simulated Safety Injection signal overrides the test mode by:
: a.     Returning DG to ready-to-load operation; and                     Control Program
a.
: b.     Automatically energizing the emergency load from offsite power.
Returning DG to ready-to-load operation; and b.
(continued)
Automatically energizing the emergency load from offsite power.
CALLAWAY PLANT                                3.8-14                                  Amendment No. 202
In accordance with the Surveillance Frequency Control Program (continued)
SURVEILLANCE FREQUENCY


AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                  FREQUENCY SR 3.8.1.18 ------------------------------ NOTE -------------------------------
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS CALLAWAY PLANT 3.8-15 Amendment 202 SR 3.8.1.18
------------------------------ NOTE -------------------------------
This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
Verify interval between each sequenced load block is In accordance within +/- 10% of design interval for each LOCA and                       with the shutdown load sequencer.                                                 Surveillance Frequency Control Program (continued)
Verify interval between each sequenced load block is within +/- 10% of design interval for each LOCA and shutdown load sequencer.
CALLAWAY PLANT                                3.8-15                                      Amendment 202
In accordance with the Surveillance Frequency Control Program (continued)
SURVEILLANCE FREQUENCY


AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                    FREQUENCY SR 3.8.1.19 --------------------------- NOTES --------------------------------
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS CALLAWAY PLANT 3.8-16 Amendment 202 SR 3.8.1.19
: 1. All DG starts may be preceded by an engine prelube period.
--------------------------- NOTES --------------------------------
: 2. This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
1.
Verify on an actual or simulated loss of offsite power                   In accordance signal in conjunction with an actual or simulated                       with the Safety Injection signal:                                                 Surveillance Frequency
All DG starts may be preceded by an engine prelube period.
: a.     De-energization of emergency buses;                             Control Program
2.
: b.     Load shedding from emergency buses; and
This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
: c.     DG auto-starts from standby condition and:
Verify on an actual or simulated loss of offsite power signal in conjunction with an actual or simulated Safety Injection signal:
: 1.     energizes permanently connected loads in 12 seconds,
a.
: 2.     energizes auto-connected emergency loads through LOCA load sequencer,
De-energization of emergency buses; b.
: 3.     achieves steady state voltage 3740 V and 4320 V,
Load shedding from emergency buses; and c.
: 4.     achieves steady state frequency 58.8 Hz and 61.2 Hz, and
DG auto-starts from standby condition and:
: 5.     supplies permanently connected and auto-connected emergency loads for 5 minutes.
1.
energizes permanently connected loads in 12 seconds, 2.
energizes auto-connected emergency loads through LOCA load sequencer, 3.
achieves steady state voltage 3740 V and 4320 V, 4.
achieves steady state frequency 58.8 Hz and 61.2 Hz, and In accordance with the Surveillance Frequency Control Program 5.
supplies permanently connected and auto-connected emergency loads for 5 minutes.
(continued)
(continued)
CALLAWAY PLANT                                3.8-16                                      Amendment 202
SURVEILLANCE FREQUENCY


AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                                    FREQUENCY SR 3.8.1.20 ------------------------------ NOTE -------------------------------
CALLAWAY PLANT 3.8-17 Amendment No. 202 SR 3.8.1.20
------------------------------ NOTE -------------------------------
All DG starts may be preceded by an engine prelube period.
All DG starts may be preceded by an engine prelube period.
Verify when started simultaneously from standby                         In accordance condition, each DG achieves, in 12 seconds,                           with the voltage 3740 V and 4320 V, and frequency                             Surveillance 58.8 Hz and 61.2 Hz.                                                 Frequency Control Program SR 3.8.1.21 ------------------------------ NOTE -------------------------------
Verify when started simultaneously from standby condition, each DG achieves, in 12 seconds, voltage 3740 V and 4320 V, and frequency 58.8 Hz and 61.2 Hz.
In accordance with the Surveillance Frequency Control Program SR 3.8.1.21
------------------------------ NOTE -------------------------------
The continuity check may be excluded from the actuation logic test.
The continuity check may be excluded from the actuation logic test.
Perform ACTUATION LOGIC TEST for each train of                           In accordance the load shedder and emergency load sequencer.                           with the Surveillance Frequency Control Program CALLAWAY PLANT                                3.8-17                                  Amendment No. 202
Perform ACTUATION LOGIC TEST for each train of the load shedder and emergency load sequencer.
In accordance with the Surveillance Frequency Control Program SURVEILLANCE FREQUENCY


AC Sources - Shutdown 3.8.2 3.8 ELECTRICAL POWER SYSTEMS 3.8.2 AC Sources - Shutdown LCO 3.8.2                   The following AC electrical power sources shall be OPERABLE:
CALLAWAY PLANT 3.8-18 Amendment No. 202 l AC Sources - Shutdown 3.8.2 3.8 ELECTRICAL POWER SYSTEMS 3.8.2 AC Sources - Shutdown LCO 3.8.2 The following AC electrical power sources shall be OPERABLE:
: a.       One qualified circuit between the offsite transmission network and the onsite Class 1E AC electrical power distribution subsystem required by LCO 3.8.10, "Distribution Systems - Shutdown"; and
a.
: b.       One diesel generator (DG) capable of supplying one train of the onsite Class 1E AC electrical power distribution subsystems required by LCO 3.8.10; and
One qualified circuit between the offsite transmission network and the onsite Class 1E AC electrical power distribution subsystem required by LCO 3.8.10, "Distribution Systems - Shutdown"; and b.
: c.       The shutdown portion of one Load Shedder and Emergency Load Sequencer (LSELS) associated with the required DC and AC electrical power distribution train.
One diesel generator (DG) capable of supplying one train of the onsite Class 1E AC electrical power distribution subsystems required by LCO 3.8.10; and c.
APPLICABILITY:             MODES 5 and 6, During movement of irradiated fuel assemblies.
The shutdown portion of one Load Shedder and Emergency Load Sequencer (LSELS) associated with the required DC and AC electrical power distribution train.
APPLICABILITY:
MODES 5 and 6, During movement of irradiated fuel assemblies.
ACTIONS
ACTIONS
----------------------------------------------------------- NOTE -----------------------------------------------------------
----------------------------------------------------------- NOTE -----------------------------------------------------------
----------------------------------------------------------- NOTE -----------------------------------------------------------
LCO 3.0.3 is not applicable.
LCO 3.0.3 is not applicable.
COMPLETION CONDITION                                   REQUIRED ACTION TIME A. One required offsite circuit           -------------------- NOTE -------------------
CONDITION REQUIRED ACTION COMPLETION TIME A.
inoperable.                              Enter applicable Conditions and Required Actions of LCO 3.8.10, with the required train de-energized as a result of Condition A.
One required offsite circuit inoperable.
A.1           Declare affected required           Immediately feature(s) with no offsite power available inoperable.
-------------------- NOTE -------------------
OR (continued)
Enter applicable Conditions and Required Actions of LCO 3.8.10, with the required train de-energized as a result of Condition A.
CALLAWAY PLANT                                              3.8-18                                Amendment No. 202 l
A.1 Declare affected required feature(s) with no offsite power available inoperable.
OR Immediately (continued)


AC Sources - Shutdown 3.8.2 ACTIONS COMPLETION CONDITION                    REQUIRED ACTION TIME A One required offsite circuit A.2.1    Suspend CORE                Immediately inoperable.                            ALTERATIONS.
AC Sources - Shutdown 3.8.2 ACTIONS CALLAWAY PLANT 3.8-19 Amendment 202 l A
One required offsite circuit inoperable.
(continued)
(continued)
AND
A.2.1 Suspend CORE ALTERATIONS.
.                              A.2.2     Suspend movement of         Immediately irradiated fuel assemblies.
AND Immediately A.2.2 Suspend movement of irradiated fuel assemblies.
AND A.2.3     Suspend operations           Immediately involving positive reactivity additions that could result in loss of required SDM or boron concentration.
AND Immediately A.2.3 Suspend operations involving positive reactivity additions that could result in loss of required SDM or boron concentration.
AND A.2.4     Initiate action to restore   Immediately required offsite power circuit to OPERABLE status.
AND Immediately A.2.4 Initiate action to restore required offsite power circuit to OPERABLE status.
(continued)
Immediately (continued)
CALLAWAY PLANT                          3.8-19                            Amendment 202 l
CONDITION REQUIRED ACTION COMPLETION TIME


AC Sources - Shutdown 3.8.2 ACTIONS (continued)
AC Sources - Shutdown 3.8.2 ACTIONS (continued)
COMPLETION CONDITION        REQUIRED ACTION TIME B. One required DG   B.1     Suspend CORE                 Immediately inoperable.                ALTERATIONS.
CALLAWAY PLANT 3.8-20 Amendment No. 202 l B.
AND B.2     Suspend movement of         Immediately irradiated fuel assemblies.
One required DG inoperable.
AND
B.1 Suspend CORE ALTERATIONS.
.                    B.3     Suspend operations           Immediately involving positive reactivity additions that could result in loss of required SDM or boron concentration.
AND Immediately B.2 Suspend movement of irradiated fuel assemblies.
AND B.4     Initiate action to restore   Immediately required DG to OPERABLE status.
AND Immediately B.3 Suspend operations involving positive reactivity additions that could result in loss of required SDM or boron concentration.
C. One required LSELS C.1     Declare the affected DG     Immediately (shutdown portion)        and offsite circuit inoperable.                inoperable.
AND Immediately B.4 Initiate action to restore required DG to OPERABLE status.
CALLAWAY PLANT              3.8-20                        Amendment No. 202 l
Immediately C.
One required LSELS (shutdown portion) inoperable.
C.1 Declare the affected DG and offsite circuit inoperable.
Immediately CONDITION REQUIRED ACTION COMPLETION TIME


AC Sources - Shutdown 3.8.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                   FREQUENCY SR 3.8.2.1   --------------------------------- NOTE ----------------------------
AC Sources - Shutdown 3.8.2 CALLAWAY PLANT 3.8-21 Amendment No. 202 l SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.2.1
--------------------------------- NOTE ----------------------------
The following SRs are not required to be performed:
The following SRs are not required to be performed:
SR 3.8.1.3, SR 3.8.1.10, SR 3.8.1.11, SR 3.8.1.14 through SR 3.8.1.16, and SR 3.8.1.18, (Shutdown Load Sequencer only).
SR 3.8.1.3, SR 3.8.1.10, SR 3.8.1.11, SR 3.8.1.14 through SR 3.8.1.16, and SR 3.8.1.18, (Shutdown Load Sequencer only).
For AC sources required to be OPERABLE, the                             In accordance with following SRs are applicable:                                           applicable SRs SR   3.8.1.1         SR   3.8.1.11 SR   3.8.1.2         SR   3.8.1.14 SR   3.8.1.3         SR   3.8.1.15 SR   3.8.1.4         SR   3.8.1.16 SR   3.8.1.5         SR   3.8.1.18 (shutdown load SR   3.8.1.6                     sequencer only)
For AC sources required to be OPERABLE, the following SRs are applicable:
SR   3.8.1.7         SR 3.8.1.21 (shutdown load SR   3.8.1.10                   sequencer only)
SR 3.8.1.1 SR 3.8.1.11 SR 3.8.1.2 SR 3.8.1.14 SR 3.8.1.3 SR 3.8.1.15 SR 3.8.1.4 SR 3.8.1.16 SR 3.8.1.5 SR 3.8.1.18 (shutdown load SR 3.8.1.6 sequencer only)
CALLAWAY PLANT                                3.8-21                                Amendment No. 202 l
SR 3.8.1.7 SR 3.8.1.21 (shutdown load SR 3.8.1.10 sequencer only)
In accordance with applicable SRs


Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air LCO 3.8.3                   The stored diesel fuel oil, lube oil, and starting air subsystem shall be within limits for each required diesel generator (DG).
CALLAWAY PLANT 3.8-22 Amendment No. 202 l Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air LCO 3.8.3 The stored diesel fuel oil, lube oil, and starting air subsystem shall be within limits for each required diesel generator (DG).
APPLICABILITY:             When associated DG is required to be OPERABLE.
APPLICABILITY:
When associated DG is required to be OPERABLE.
ACTIONS
ACTIONS
----------------------------------------------------------- NOTE -----------------------------------------------------------
----------------------------------------------------------- NOTE -----------------------------------------------------------
----------------------------------------------------------- NOTE -----------------------------------------------------------
Separate Condition entry is allowed for each DG.
Separate Condition entry is allowed for each DG.
COMPLETION CONDITION                                 REQUIRED ACTION TIME A. One or more DGs with fuel               A.1            Restore fuel oil level to            48 hours level < 80,900 gal and                                 within limits.
CONDITION REQUIRED ACTION COMPLETION TIME A.
      > 69,800 gal in storage tank.
One or more DGs with fuel level < 80,900 gal and  
B. One or more DGs with lube               B.1           Restore lube oil                     48 hours oil inventory < 750 gal and                            inventory to within limits.
> 69,800 gal in storage tank.
      > 686 gal.
A.1 Restore fuel oil level to within limits.
C. One or more DGs with                     C.1            Restore fuel oil total              7 days stored fuel oil total                                   particulates within limit.
48 hours B.
particulates not within limit.
One or more DGs with lube oil inventory < 750 gal and
D. One or more DGs with new                 D.1           Restore stored fuel oil             30 days fuel oil properties not within                          properties to within limits.                                                limits.
> 686 gal.
(continued)
B.1 Restore lube oil inventory to within limits.
CALLAWAY PLANT                                              3.8-22                                Amendment No. 202 l
48 hours C.
One or more DGs with stored fuel oil total particulates not within limit.
C.1 Restore fuel oil total particulates within limit.
7 days D.
One or more DGs with new fuel oil properties not within limits.
D.1 Restore stored fuel oil properties to within limits.
30 days (continued)


Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 ACTIONS (continued)
Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 ACTIONS (continued)
COMPLETION CONDITION                    REQUIRED ACTION TIME E. One or more DGs with two        E.1    Restore two starting air  48 hours starting air receivers in               receivers with pressure service with pressure                   435 psig.
CALLAWAY PLANT 3.8-23 Amendment No. 202 l E.
    < 435 psig and 250 psig.
One or more DGs with two starting air receivers in service with pressure  
OR OR One or more DGs with only       E.2    Restore one starting air  48 hours one starting air receiver in           receiver with pressure service with pressure                   610 psig.
< 435 psig and 250 psig.
    < 610 psig and 300 psig.
E.1 Restore two starting air receivers with pressure 435 psig.
F. Required Action and             F.1     Declare associated DG     Immediately associated Completion                  inoperable.
OR 48 hours OR One or more DGs with only one starting air receiver in service with pressure  
Time not met.
< 610 psig and 300 psig.
OR One or more DGs diesel fuel oil, lube oil, or starting air subsystems not within limits for reasons other than Condition A, B, C, D, or E.
E.2 Restore one starting air receiver with pressure 610 psig.
CALLAWAY PLANT                          3.8-23                      Amendment No. 202 l
48 hours F.
Required Action and associated Completion Time not met.
F.1 Declare associated DG inoperable.
Immediately OR One or more DGs diesel fuel oil, lube oil, or starting air subsystems not within limits for reasons other than Condition A, B, C, D, or E.
CONDITION REQUIRED ACTION COMPLETION TIME


Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                       FREQUENCY SR 3.8.3.1   Verify each fuel oil storage tank contains 80,900 gal     In accordance of fuel.                                                   with the Surveillance Frequency Control Program SR 3.8.3.2   Verify lubricating oil inventory is 750 gal.             In accordance with the Surveillance Frequency Control Program SR 3.8.3.3   Verify fuel oil properties of new and stored fuel oil are   In accordance with tested in accordance with, and maintained within the       the Diesel Fuel Oil limits of, the Diesel Fuel Oil Testing Program.             Testing Program SR 3.8.3.4   Verify pressure in two starting air receivers is 435     In accordance psig or pressure in one starting air receiver is 610     with the psig, for each DG starting air subsystem.                   Surveillance Frequency Control Program SR 3.8.3.5   Check for and remove accumulated water from each           In accordance fuel oil storage tank.                                     with the Surveillance Frequency Control Program SR 3.8.3.6   Not used.
Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 CALLAWAY PLANT 3.8-24 Amendment No. 202 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.3.1 Verify each fuel oil storage tank contains 80,900 gal of fuel.
CALLAWAY PLANT                            3.8-24                          Amendment No. 202
In accordance with the Surveillance Frequency Control Program SR 3.8.3.2 Verify lubricating oil inventory is 750 gal.
In accordance with the Surveillance Frequency Control Program SR 3.8.3.3 Verify fuel oil properties of new and stored fuel oil are tested in accordance with, and maintained within the limits of, the Diesel Fuel Oil Testing Program.
In accordance with the Diesel Fuel Oil Testing Program SR 3.8.3.4 Verify pressure in two starting air receivers is 435 psig or pressure in one starting air receiver is 610 psig, for each DG starting air subsystem.
In accordance with the Surveillance Frequency Control Program SR 3.8.3.5 Check for and remove accumulated water from each fuel oil storage tank.
In accordance with the Surveillance Frequency Control Program SR 3.8.3.6 Not used.


DC Sources - Operating 3.8.4 3.8 ELECTRICAL POWER SYSTEMS 3.8.4 DC Sources - Operating LCO 3.8.4           The Train A and Train B DC electrical power subsystems shall be OPERABLE.
CALLAWAY PLANT 3.8-25 Amendment No. 202 DC Sources - Operating 3.8.4 3.8 ELECTRICAL POWER SYSTEMS 3.8.4 DC Sources - Operating LCO 3.8.4 The Train A and Train B DC electrical power subsystems shall be OPERABLE.
APPLICABILITY:       MODES 1, 2, 3, and 4.
APPLICABILITY:
ACTIONS COMPLETION CONDITION                         REQUIRED ACTION TIME A. One DC electrical power         A.1         Restore DC electrical     2 hours subsystem inoperable.                      power subsystem to OPERABLE status.
MODES 1, 2, 3, and 4.
B. Require Action and             B.1         Be in MODE 3.             6 hours Associated Completion Time not met.                  AND B.2         Be in MODE 5.             36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE                                      FREQUENCY SR 3.8.4.1         Verify battery terminal voltage is 130.2 V on float   In accordance charge.                                                  with the Surveillance Frequency Control Program (continued)
ACTIONS SURVEILLANCE REQUIREMENTS CONDITION REQUIRED ACTION COMPLETION TIME A.
CALLAWAY PLANT                                3.8-25                        Amendment No. 202
One DC electrical power subsystem inoperable.
A.1 Restore DC electrical power subsystem to OPERABLE status.
2 hours B.
Require Action and Associated Completion Time not met.
B.1 Be in MODE 3.
AND 6 hours B.2 Be in MODE 5.
36 hours SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is 130.2 V on float charge.
In accordance with the Surveillance Frequency Control Program (continued)


DC Sources - Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
DC Sources - Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                      FREQUENCY SR 3.8.4.2   Verify no visible corrosion at battery terminals and     In accordance connectors.                                              with the Surveillance OR                                                        Frequency Control Program Verify battery connection resistance is 69E-6 ohm for cell to cell connections and 69E-6 ohm for terminal connections.
CALLAWAY PLANT 3.8-26 Amendment No. 202 SR 3.8.4.2 Verify no visible corrosion at battery terminals and connectors.
SR 3.8.4.3   Verify battery cells, cell plates, and racks show no     In accordance visual indication of physical damage or abnormal         with the deterioration that could degrade battery performance. Surveillance Frequency Control Program SR 3.8.4.4   Remove visible terminal corrosion, verify battery cell   In accordance to cell and terminal connections are clean and tight,     with the and are coated with anti-corrosion material.             Surveillance Frequency Control Program SR 3.8.4.5   Verify battery connection resistance is 69E-6 ohm       In accordance for cell to cell connections, and 69E-6 ohm for         with the terminal connections.                                     Surveillance Frequency Control Program SR 3.8.4.6   Verify each battery charger supplies 300 amps at       In accordance 130.2 V for 1 hour.                                   with the Surveillance Frequency Control Program (continued)
OR In accordance with the Surveillance Frequency Verify battery connection resistance is 69E-6 ohm for cell to cell connections and 69E-6 ohm for terminal connections.
CALLAWAY PLANT                            3.8-26                      Amendment No. 202
Control Program SR 3.8.4.3 Verify battery cells, cell plates, and racks show no visual indication of physical damage or abnormal deterioration that could degrade battery performance.
In accordance with the Surveillance Frequency Control Program SR 3.8.4.4 Remove visible terminal corrosion, verify battery cell to cell and terminal connections are clean and tight, and are coated with anti-corrosion material.
In accordance with the Surveillance Frequency Control Program SR 3.8.4.5 Verify battery connection resistance is 69E-6 ohm for cell to cell connections, and 69E-6 ohm for terminal connections.
In accordance with the Surveillance Frequency Control Program SR 3.8.4.6 Verify each battery charger supplies 300 amps at 130.2 V for 1 hour.
In accordance with the Surveillance Frequency Control Program (continued)
SURVEILLANCE FREQUENCY


DC Sources - Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
DC Sources - Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                                    FREQUENCY SR 3.8.4.7   ----------------------------- NOTES ------------------------------
CALLAWAY PLANT 3.8-27 Amendment No. 202 SR 3.8.4.7
: 1.     The modified performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7.
----------------------------- NOTES ------------------------------
: 2.     This Surveillance shall not be performed in MODE 1, 2, 3, or 4.
1.
Verify battery capacity is adequate to supply, and                       In accordance maintain in OPERABLE status, the required                               with the emergency loads for the design duty cycle when                           Surveillance subjected to a battery service test.                                     Frequency Control Program SR 3.8.4.8   ----------------------------- NOTE --------------------------------
The modified performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7.
2.
This Surveillance shall not be performed in MODE 1, 2, 3, or 4.
Verify battery capacity is adequate to supply, and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.
In accordance with the Surveillance Frequency Control Program SR 3.8.4.8
----------------------------- NOTE --------------------------------
This Surveillance shall not be performed in MODE 1, 2, 3, or 4.
This Surveillance shall not be performed in MODE 1, 2, 3, or 4.
Verify battery capacity is 80% of the manufacturer's                   In accordance rating when subjected to a performance discharge                         with the test or a modified performance discharge test.                           Surveillance Frequency Control Program AND 18 months when battery shows degradation or has reached 85% of expected life CALLAWAY PLANT                                3.8-27                                  Amendment No. 202
Verify battery capacity is 80% of the manufacturer's rating when subjected to a performance discharge test or a modified performance discharge test.
In accordance with the Surveillance Frequency Control Program AND 18 months when battery shows degradation or has reached 85% of expected life SURVEILLANCE FREQUENCY


DC Sources - Shutdown 3.8.5 3.8 ELECTRICAL POWER SYSTEMS 3.8.5 DC Sources - Shutdown LCO 3.8.5                   The Train A or Train B DC electrical power subsystem shall be OPERABLE to support one train of the DC electrical power distribution subsystems required by LCO 3.8.10, "Distribution Systems - Shutdown."
CALLAWAY PLANT 3.8-28 Amendment No. 202 l DC Sources - Shutdown 3.8.5 3.8 ELECTRICAL POWER SYSTEMS 3.8.5 DC Sources - Shutdown LCO 3.8.5 The Train A or Train B DC electrical power subsystem shall be OPERABLE to support one train of the DC electrical power distribution subsystems required by LCO 3.8.10, "Distribution Systems - Shutdown."
APPLICABILITY:             MODES 5 and 6, During movement of irradiated fuel assemblies.
APPLICABILITY:
MODES 5 and 6, During movement of irradiated fuel assemblies.
ACTIONS
ACTIONS
----------------------------------------------------------- NOTE -----------------------------------------------------------
----------------------------------------------------------- NOTE -----------------------------------------------------------
----------------------------------------------------------- NOTE -----------------------------------------------------------
LCO 3.0.3 is not applicable.
LCO 3.0.3 is not applicable.
COMPLETION CONDITION                                 REQUIRED ACTION TIME A. Required DC electrical                   A.1           Declare affected required           Immediately power subsystem                                        feature(s) inoperable.
CONDITION REQUIRED ACTION COMPLETION TIME A.
inoperable.
Required DC electrical power subsystem inoperable.
OR A.2.1         Suspend CORE                         Immediately ALTERATIONS.
A.1 Declare affected required feature(s) inoperable.
AND A.2.2         Suspend movement of                 Immediately irradiated fuel assemblies.
OR Immediately A.2.1 Suspend CORE ALTERATIONS.
AND (continued)
AND Immediately A.2.2 Suspend movement of irradiated fuel assemblies.
CALLAWAY PLANT                                              3.8-28                                Amendment No. 202 l
AND Immediately (continued)


DC Sources - Shutdown 3.8.5 ACTIONS COMPLETION CONDITION                              REQUIRED ACTION TIME A. Required DC electrical             A.2.3           Suspend operations                 Immediately power subsystem                                    involving positive inoperable.                                        reactivity additions that (continued)                                      could result in loss of required SDM or boron concentration.
DC Sources - Shutdown 3.8.5 ACTIONS CALLAWAY PLANT 3.8-29 Amendment 202 l SURVEILLANCE REQUIREMENTS A.
AND A.2.4           Initiate action to restore         Immediately required DC electrical power subsystem to OPERABLE status.
Required DC electrical power subsystem inoperable.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                    FREQUENCY SR 3.8.5.1       --------------------------------- NOTE ----------------------------
(continued)
A.2.3 Suspend operations involving positive reactivity additions that could result in loss of required SDM or boron concentration.
AND Immediately A.2.4 Initiate action to restore required DC electrical power subsystem to OPERABLE status.
Immediately SURVEILLANCE FREQUENCY SR 3.8.5.1
--------------------------------- NOTE ----------------------------
The following SRs are not required to be performed:
The following SRs are not required to be performed:
SR 3.8.4.6, SR 3.8.4.7, and SR 3.8.4.8.
SR 3.8.4.6, SR 3.8.4.7, and SR 3.8.4.8.
For DC sources required to be OPERABLE, the                               In accordance with following SRs are applicable:                                             applicable SRs SR 3.8.4.1           SR 3.8.4.4           SR 3.8.4.7 SR 3.8.4.2           SR 3.8.4.5           SR 3.8.4.8 SR 3.8.4.3           SR 3.8.4.6 CALLAWAY PLANT                                    3.8-29                                    Amendment 202 l
For DC sources required to be OPERABLE, the following SRs are applicable:
SR 3.8.4.1 SR 3.8.4.4 SR 3.8.4.7 SR 3.8.4.2 SR 3.8.4.5 SR 3.8.4.8 SR 3.8.4.3 SR 3.8.4.6 In accordance with applicable SRs CONDITION REQUIRED ACTION COMPLETION TIME


Battery Cell Parameters 3.8.6 3.8 ELECTRICAL POWER SYSTEMS 3.8.6 Battery Cell Parameters LCO 3.8.6                   Battery cell parameters for Train A and Train B batteries shall be within the limits of Table 3.8.6-1.
CALLAWAY PLANT 3.8-30 Amendment No. 202 l Battery Cell Parameters 3.8.6 3.8 ELECTRICAL POWER SYSTEMS 3.8.6 Battery Cell Parameters LCO 3.8.6 Battery cell parameters for Train A and Train B batteries shall be within the limits of Table 3.8.6-1.
APPLICABILITY:             When associated DC electrical power subsystems are required to be OPERABLE.
APPLICABILITY:
When associated DC electrical power subsystems are required to be OPERABLE.
ACTIONS
ACTIONS
----------------------------------------------------------- NOTE -----------------------------------------------------------
----------------------------------------------------------- NOTE -----------------------------------------------------------
----------------------------------------------------------- NOTE -----------------------------------------------------------
Separate Condition entry is allowed for each battery.
Separate Condition entry is allowed for each battery.
COMPLETION CONDITION                                 REQUIRED ACTION TIME A. One or more batteries with               A.1            Verify pilot cells                  1 hour one or more battery cell                               electrolyte level and float parameters not within                                   voltage meet Category A or B limits.                                 Table 3.8.6-1 Category C limits.
CONDITION REQUIRED ACTION COMPLETION TIME A.
AND A.2           Verify battery cell                 24 hours parameters meet Table 3.8.6-1 Category C             AND limits.
One or more batteries with one or more battery cell parameters not within Category A or B limits.
Once per 7 days thereafter AND A.3           Restore battery cell                 31 days parameters to Category A and B limits of Table 3.8.6-1.
A.1 Verify pilot cells electrolyte level and float voltage meet Table 3.8.6-1 Category C limits.
(continued)
AND 1 hour A.2 Verify battery cell parameters meet Table 3.8.6-1 Category C limits.
CALLAWAY PLANT                                              3.8-30                                Amendment No. 202 l
AND 24 hours AND Once per 7 days thereafter A.3 Restore battery cell parameters to Category A and B limits of Table 3.8.6-1.
31 days (continued)


Battery Cell Parameters 3.8.6 ACTIONS (continued)
Battery Cell Parameters 3.8.6 ACTIONS (continued)
COMPLETION CONDITION                        REQUIRED ACTION TIME B. Required Action and           B.1        Declare associated    Immediately associated Completion                     battery inoperable.
CALLAWAY PLANT 3.8-31 Amendment No. 202 SURVEILLANCE REQUIREMENTS B.
Time of Condition A not met.
Required Action and associated Completion Time of Condition A not met.
OR One or more batteries with average electrolyte temperature of the representative cells < 60 &deg;F.
OR B.1 Declare associated battery inoperable.
Immediately One or more batteries with average electrolyte temperature of the representative cells < 60 &deg;F.
OR One or more batteries with one or more battery cell parameters not within Category C values.
OR One or more batteries with one or more battery cell parameters not within Category C values.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                  FREQUENCY SR 3.8.6.1       Verify battery cell parameters meet Table 3.8.6-1     In accordance Category A limits.                                   with the Surveillance Frequency Control Program (continued)
SURVEILLANCE FREQUENCY SR 3.8.6.1 Verify battery cell parameters meet Table 3.8.6-1 Category A limits.
CALLAWAY PLANT                              3.8-31                    Amendment No. 202
In accordance with the Surveillance Frequency Control Program (continued)
CONDITION REQUIRED ACTION COMPLETION TIME


Battery Cell Parameters 3.8.6 SURVEILLANCE REQUIREMENTS (continued)
Battery Cell Parameters 3.8.6 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                    FREQUENCY SR 3.8.6.2   Verify battery cell parameters meet Table 3.8.6-1     In accordance Category B limits.                                   with the Surveillance Frequency Control Program AND Once within 7 days after a battery discharge
CALLAWAY PLANT 3.8-32 Amendment No. 202 SR 3.8.6.2 Verify battery cell parameters meet Table 3.8.6-1 Category B limits.
                                                                    < 110 V AND Once within 7 days after a battery overcharge
In accordance with the Surveillance Frequency Control Program AND Once within 7 days after a battery discharge  
                                                                    > 150 V SR 3.8.6.3   Verify average electrolyte temperature of             In accordance representative cells is 60&deg;F.                       with the Surveillance Frequency Control Program CALLAWAY PLANT                          3.8-32                    Amendment No. 202
< 110 V AND Once within 7 days after a battery overcharge  
> 150 V SR 3.8.6.3 Verify average electrolyte temperature of representative cells is 60&deg;F.
In accordance with the Surveillance Frequency Control Program SURVEILLANCE FREQUENCY


Battery Cell Parameters 3.8.6 TABLE 3.8.6-1 (PAGE 1 OF 1)
CALLAWAY PLANT 3.8-33 Amendment No. 202 l Battery Cell Parameters 3.8.6 TABLE 3.8.6-1 (PAGE 1 OF 1)
BATTERY CELL PARAMETERS REQUIREMENTS CATEGORY A:                                      CATEGORY C:
BATTERY CELL PARAMETERS REQUIREMENTS (a)
LIMITS FOR EACH            CATEGORY B:        ALLOWABLE LIMITS PARAMETER                  DESIGNATED            LIMITS FOR EACH            FOR EACH PILOT CELL            CONNECTED CELL        CONNECTED CELL Electrolyte Level        > Minimum level            > Minimum level        Above top of plates, indication mark, and      indication mark, and  and not overflowing 1/4 inch above              1/4 inch above maximum level              maximum level indication mark(a)        indication mark(a)
It is acceptable for the electrolyte level to temporarily increase above the specified maximum during equalizing charges provided it is not overflowing.
Float Voltage              2.13 V                    2.13 V              > 2.07 V Specific Gravity(b)(c)    1.200                    1.195                Not more than 0.020 below average of all AND                    connected cells Average of all        AND connected cells
(b)
                                                      > 1.205                Average of all connected cells 1.195 (a)  It is acceptable for the electrolyte level to temporarily increase above the specified maximum during equalizing charges provided it is not overflowing.
Corrected for electrolyte temperature and level. Level correction is not required, however, when battery charging is < 2 amps when on float charge.
(b)   Corrected for electrolyte temperature and level. Level correction is not required, however, when battery charging is < 2 amps when on float charge.
(c)
(c)   A battery charging current of < 2 amps when on float charge is acceptable for meeting specific gravity limits following a battery recharge, for a maximum of 7 days. When charging current is used to satisfy specific gravity requirements, specific gravity of each connected cell shall be measured prior to expiration of the 7 day allowance.
A battery charging current of < 2 amps when on float charge is acceptable for meeting specific gravity limits following a battery recharge, for a maximum of 7 days. When charging current is used to satisfy specific gravity requirements, specific gravity of each connected cell shall be measured prior to expiration of the 7 day allowance.
CALLAWAY PLANT                                  3.8-33                      Amendment No. 202 l
PARAMETER CATEGORY A:
LIMITS FOR EACH DESIGNATED PILOT CELL CATEGORY B:
LIMITS FOR EACH CONNECTED CELL CATEGORY C:
ALLOWABLE LIMITS FOR EACH CONNECTED CELL Electrolyte Level
> Minimum level indication mark, and 1/4 inch above maximum level indication mark(a)
> Minimum level indication mark, and 1/4 inch above maximum level indication mark(a)
Above top of plates, and not overflowing Float Voltage 2.13 V 2.13 V
> 2.07 V Specific Gravity(b)(c) 1.200 1.195 AND Average of all connected cells
> 1.205 Not more than 0.020 below average of all connected cells AND Average of all connected cells 1.195


Inverters - Operating 3.8.7 3.8 ELECTRICAL POWER SYSTEMS 3.8.7 Inverters - Operating LCO 3.8.7           The required Train A and Train B inverters shall be OPERABLE.
CALLAWAY PLANT 3.8-34 Amendment No. 202 l Inverters - Operating 3.8.7 3.8 ELECTRICAL POWER SYSTEMS 3.8.7 Inverters - Operating LCO 3.8.7 The required Train A and Train B inverters shall be OPERABLE.
APPLICABILITY:       MODES 1, 2, 3, and 4.
APPLICABILITY:
ACTIONS COMPLETION CONDITION                       REQUIRED ACTION TIME A. One required inverter       A.1         ------------ NOTE -----------
MODES 1, 2, 3, and 4.
inoperable.                              Enter applicable Conditions and Required Actions of LCO 3.8.9, "Distribution Systems - Operating" with any vital bus de-energized.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Restore inverter to               24 hours OPERABLE status.
One required inverter inoperable.
B. Required Action and         B.1         Be in MODE 3.                     6 hours associated Completion Time not met.                AND B.2         Be in MODE 5.                     36 hours CALLAWAY PLANT                              3.8-34                              Amendment No. 202 l
A.1
------------ NOTE -----------
Enter applicable Conditions and Required Actions of LCO 3.8.9, "Distribution Systems - Operating" with any vital bus de-energized.
Restore inverter to OPERABLE status.
24 hours B.
Required Action and associated Completion Time not met.
B.1 Be in MODE 3.
AND 6 hours B.2 Be in MODE 5.
36 hours


Inverters - Operating 3.8.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                 FREQUENCY SR 3.8.7.1   Verify correct inverter voltage, and alignment to In accordance required AC vital buses.                           with the Surveillance Frequency Control Program CALLAWAY PLANT                          3.8-35                Amendment No. 202
Inverters - Operating 3.8.7 CALLAWAY PLANT 3.8-35 Amendment No. 202 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.7.1 Verify correct inverter voltage, and alignment to required AC vital buses.
In accordance with the Surveillance Frequency Control Program


Inverters - Shutdown 3.8.8 3.8 ELECTRICAL POWER SYSTEMS 3.8.8 Inverters - Shutdown LCO 3.8.8                   The Train A or Train B inverters shall be OPERABLE to support one train of the onsite Class 1E AC vital bus electrical power distribution subsystems required by LCO 3.8.10, "Distribution Systems - Shutdown."
CALLAWAY PLANT 3.8-36 Amendment No. 202 l Inverters - Shutdown 3.8.8 3.8 ELECTRICAL POWER SYSTEMS 3.8.8 Inverters - Shutdown LCO 3.8.8 The Train A or Train B inverters shall be OPERABLE to support one train of the onsite Class 1E AC vital bus electrical power distribution subsystems required by LCO 3.8.10, "Distribution Systems - Shutdown."
APPLICABILITY:             MODES 5 and 6, During movement of irradiated fuel assemblies.
APPLICABILITY:
MODES 5 and 6, During movement of irradiated fuel assemblies.
ACTIONS
ACTIONS
----------------------------------------------------------- NOTE -----------------------------------------------------------
----------------------------------------------------------- NOTE -----------------------------------------------------------
LCO 3.0.3 is not applicable.
LCO 3.0.3 is not applicable.
COMPLETION CONDITION                                 REQUIRED ACTION TIME A. One or more required                     A.1           Declare affected required           Immediately inverters inoperable.                                  feature(s) inoperable.
CONDITION REQUIRED ACTION COMPLETION TIME A.
OR A.2.1         Suspend CORE                         Immediately ALTERATIONS.
One or more required inverters inoperable.
AND A.2.2         Suspend movement of                 Immediately irradiated fuel assemblies.
A.1 Declare affected required feature(s) inoperable.
AND (continued)
OR Immediately A.2.1 Suspend CORE ALTERATIONS.
CALLAWAY PLANT                                              3.8-36                                Amendment No. 202 l
AND Immediately A.2.2 Suspend movement of irradiated fuel assemblies.
AND Immediately (continued)


Inverters - Shutdown 3.8.8 ACTIONS COMPLETION CONDITION                        REQUIRED ACTION TIME A. One or more required           A.2.3       Suspend operations         Immediately inverters inoperable.                      involving positive (continued)                              reactivity additions that could result in loss of required SDM or boron concentration.
Inverters - Shutdown 3.8.8 ACTIONS CALLAWAY PLANT 3.8-37 Amendment 202 SURVEILLANCE REQUIREMENTS A.
AND
One or more required inverters inoperable.
.                                  A.2.4       Initiate action to restore Immediately required inverters to OPERABLE status.
(continued)
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                        FREQUENCY SR 3.8.8.1       Verify correct inverter voltage, and alignments to       In accordance required AC vital buses.                                 with the Surveillance Frequency Control Program CALLAWAY PLANT                              3.8-37                            Amendment 202
A.2.3 Suspend operations involving positive reactivity additions that could result in loss of required SDM or boron concentration.
AND Immediately A.2.4 Initiate action to restore required inverters to OPERABLE status.
Immediately SURVEILLANCE FREQUENCY SR 3.8.8.1 Verify correct inverter voltage, and alignments to required AC vital buses.
In accordance with the Surveillance Frequency Control Program CONDITION REQUIRED ACTION COMPLETION TIME


Distribution Systems - Operating 3.8.9 3.8 ELECTRICAL POWER SYSTEMS 3.8.9 Distribution Systems - Operating LCO 3.8.9             Train A and Train B AC, DC, and AC vital bus electrical power distribution subsystems shall be OPERABLE.
CALLAWAY PLANT 3.8-38 Amendment No. 202 l Distribution Systems - Operating 3.8.9 3.8 ELECTRICAL POWER SYSTEMS 3.8.9 Distribution Systems - Operating LCO 3.8.9 Train A and Train B AC, DC, and AC vital bus electrical power distribution subsystems shall be OPERABLE.
APPLICABILITY:       MODES 1, 2, 3, and 4.
APPLICABILITY:
ACTIONS COMPLETION CONDITION                       REQUIRED ACTION TIME A. One AC electrical power       A.1       Restore AC electrical       8 hours distribution subsystem                    power distribution inoperable.                              subsystem to                 AND OPERABLE status.
MODES 1, 2, 3, and 4.
16 hours from discovery of failure to meet LCO B. One AC vital bus               B.1       Restore AC vital bus         2 hours subsystem inoperable.                    subsystem to OPERABLE status.             AND 16 hours from discovery of failure to meet LCO (continued)
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
CALLAWAY PLANT                              3.8-38                        Amendment No. 202 l
One AC electrical power distribution subsystem inoperable.
A.1 Restore AC electrical power distribution subsystem to OPERABLE status.
8 hours AND 16 hours from discovery of failure to meet LCO B.
One AC vital bus subsystem inoperable.
B.1 Restore AC vital bus subsystem to OPERABLE status.
2 hours AND 16 hours from discovery of failure to meet LCO (continued)


Distribution Systems - Operating 3.8.9 ACTIONS (continued)
Distribution Systems - Operating 3.8.9 ACTIONS (continued)
COMPLETION CONDITION                          REQUIRED ACTION TIME C. One DC electrical power         C.1         Restore DC electrical       2 hours distribution subsystem                        power distribution inoperable.                                  subsystem to                 AND OPERABLE status.
CALLAWAY PLANT 3.8-39 Amendment No. 202 SURVEILLANCE REQUIREMENTS C.
16 hours from discovery of failure to meet LCO D. Required Action and             D.1         Be in MODE 3.               6 hours associated Completion Time not met.                    AND D.2         Be in MODE 5.               36 hours E. Two trains with inoperable       E.1         Enter LCO 3.0.3.             Immediately distribution subsystems that result in a loss of safety function.
One DC electrical power distribution subsystem inoperable.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                         FREQUENCY SR 3.8.9.1         Verify correct breaker alignments and voltage to           In accordance required AC, DC, and AC vital bus electrical power         with the distribution subsystems.                                   Surveillance Frequency Control Program CALLAWAY PLANT                                3.8-39                          Amendment No. 202
C.1 Restore DC electrical power distribution subsystem to OPERABLE status.
2 hours AND 16 hours from discovery of failure to meet LCO D.
Required Action and associated Completion Time not met.
D.1 Be in MODE 3.
AND 6 hours D.2 Be in MODE 5.
36 hours E.
Two trains with inoperable distribution subsystems that result in a loss of safety function.
E.1 Enter LCO 3.0.3.
Immediately SURVEILLANCE FREQUENCY SR 3.8.9.1 Verify correct breaker alignments and voltage to required AC, DC, and AC vital bus electrical power distribution subsystems.
In accordance with the Surveillance Frequency Control Program CONDITION REQUIRED ACTION COMPLETION TIME


Distribution Systems - Shutdown 3.8.10 3.8 ELECTRICAL POWER SYSTEMS 3.8.10 Distribution Systems - Shutdown LCO 3.8.10                 The necessary portion of the Train A or Train B AC, DC, and AC vital bus electrical power distribution subsystems shall be OPERABLE to support one train of equipment required to be OPERABLE.
CALLAWAY PLANT 3.8-40 Amendment No. 202 l Distribution Systems - Shutdown 3.8.10 3.8 ELECTRICAL POWER SYSTEMS 3.8.10 Distribution Systems - Shutdown LCO 3.8.10 The necessary portion of the Train A or Train B AC, DC, and AC vital bus electrical power distribution subsystems shall be OPERABLE to support one train of equipment required to be OPERABLE.
APPLICABILITY:             MODES 5 and 6, During movement of irradiated fuel assemblies.
APPLICABILITY:
MODES 5 and 6, During movement of irradiated fuel assemblies.
ACTIONS
ACTIONS
----------------------------------------------------------- NOTE -----------------------------------------------------------
----------------------------------------------------------- NOTE -----------------------------------------------------------
----------------------------------------------------------- NOTE -----------------------------------------------------------
LCO 3.0.3 is not applicable.
LCO 3.0.3 is not applicable.
COMPLETION CONDITION                                 REQUIRED ACTION TIME A. One or more required AC,                 A.1            Declare associated                  Immediately DC, or AC vital bus                                     supported required electrical power distribution                           feature(s) inoperable.
CONDITION REQUIRED ACTION COMPLETION TIME A.
subsystems inoperable.
One or more required AC, DC, or AC vital bus electrical power distribution subsystems inoperable.
OR A.2.1         Suspend CORE                         Immediately ALTERATIONS.
A.1 Declare associated supported required feature(s) inoperable.
AND A.2.2         Suspend movement of                 Immediately irradiated fuel assemblies.
OR Immediately A.2.1 Suspend CORE ALTERATIONS.
AND (continued)
AND Immediately A.2.2 Suspend movement of irradiated fuel assemblies.
CALLAWAY PLANT                                              3.8-40                                Amendment No. 202 l
AND Immediately (continued)


Distribution Systems - Shutdown 3.8.10 ACTIONS COMPLETION CONDITION                        REQUIRED ACTION TIME A. One or more required AC,       A.2.3       Suspend operations             Immediately DC, or AC vital bus                        involving positive electrical power distribution              reactivity additions that subsystems inoperable.                      could result in loss of (continued)                                required SDM or boron concentration.
Distribution Systems - Shutdown 3.8.10 ACTIONS CALLAWAY PLANT 3.8-41 Amendment 202 SURVEILLANCE REQUIREMENTS A.
AND A.2.4       Initiate actions to restore   Immediately required AC, DC, and AC vital bus electrical power distribution subsystems to OPERABLE status.
One or more required AC, DC, or AC vital bus electrical power distribution subsystems inoperable.
AND A.2.5       Declare associated             Immediately required residual heat removal subsystem(s) inoperable and not in operation.
(continued)
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                          FREQUENCY SR 3.8.10.1     Verify correct breaker alignments and voltage to             In accordance required AC, DC, and AC vital bus electrical power           with the distribution subsystems.                                     Surveillance Frequency Control Program CALLAWAY PLANT                              3.8-41                                Amendment 202}}
A.2.3 Suspend operations involving positive reactivity additions that could result in loss of required SDM or boron concentration.
AND Immediately A.2.4 Initiate actions to restore required AC, DC, and AC vital bus electrical power distribution subsystems to OPERABLE status.
AND Immediately A.2.5 Declare associated required residual heat removal subsystem(s) inoperable and not in operation.
Immediately SURVEILLANCE FREQUENCY SR 3.8.10.1 Verify correct breaker alignments and voltage to required AC, DC, and AC vital bus electrical power distribution subsystems.
In accordance with the Surveillance Frequency Control Program CONDITION REQUIRED ACTION COMPLETION TIME}}

Latest revision as of 18:55, 6 December 2024

Technical Specifications, Chapter 3.8, Electrical Power Systems
ML20209A130
Person / Time
Site: Callaway Ameren icon.png
Issue date: 11/13/2019
From:
Ameren Missouri, Union Electric Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20209A098 List: ... further results
References
ULNRC-06547
Download: ML20209A130 (44)


Text

CALLAWAY PLANT 3.8-i CHAPTER TABLE OF CONTENTS CHAPTER 3.8 ELECTRICAL POWER SYSTEMS Section Page 3.8.1 AC Sources - Operating...................................................................................... 3.8-1 ACTIONS........................................................................................................ 3.8-1 SURVEILLANCE REQUIREMENTS............................................................... 3.8-6 3.8.2 AC Sources - Shutdown.................................................................................... 3.8-18 ACTIONS...................................................................................................... 3.8-18 SURVEILLANCE REQUIREMENTS............................................................. 3.8-21 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air......................................................... 3.8-22 ACTIONS...................................................................................................... 3.8-22 SURVEILLANCE REQUIREMENTS............................................................. 3.8-24 3.8.4 DC Sources - Operating.................................................................................... 3.8-25 ACTIONS...................................................................................................... 3.8-25 SURVEILLANCE REQUIREMENTS............................................................. 3.8-25 3.8.5 DC Sources - Shutdown.................................................................................... 3.8-28 ACTIONS...................................................................................................... 3.8-28 SURVEILLANCE REQUIREMENTS............................................................. 3.8-29 3.8.6 Battery Cell Parameters.................................................................................... 3.8-30 ACTIONS...................................................................................................... 3.8-30 SURVEILLANCE REQUIREMENTS............................................................. 3.8-31 3.8.7 Inverters - Operating......................................................................................... 3.8-34 ACTIONS...................................................................................................... 3.8-34 SURVEILLANCE REQUIREMENTS............................................................. 3.8-35 3.8.8 Inverters - Shutdown......................................................................................... 3.8-36 ACTIONS...................................................................................................... 3.8-36

CHAPTER TABLE OF CONTENTS (Continued)

Section Page CALLAWAY PLANT 3.8-ii SURVEILLANCE REQUIREMENTS............................................................. 3.8-37 3.8.9 Distribution Systems - Operating...................................................................... 3.8-38 ACTIONS...................................................................................................... 3.8-38 SURVEILLANCE REQUIREMENTS............................................................. 3.8-39 3.8.10 Distribution Systems - Shutdown...................................................................... 3.8-40 ACTIONS...................................................................................................... 3.8-40 SURVEILLANCE REQUIREMENTS............................................................. 3.8-41

CALLAWAY PLANT 3.8.1-iii LIST OF TABLES Number Title 3.8.6-1 Battery Cell Parameters Requirements

CALLAWAY PLANT 3.8-1 Amendment No. 199 AC Sources - Operating 3.8.1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources - Operating LCO 3.8.1 The following AC electrical sources shall be OPERABLE:

a.

Two qualified circuits between the offsite transmission network and the onsite Class 1E AC Electrical Power Distribution System; and b.

Two diesel generators (DGs) capable of supplying the onsite Class 1E power distribution subsystem(s); and c.

Load Shedder and Emergency Load Sequencer (LSELS) for Train A and Train B.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS


NOTE -----------------------------------------------------------


NOTE -----------------------------------------------------------

LCO 3.0.4.b is not applicable to DGs.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One offsite circuit inoperable.

A.1 Perform SR 3.8.1.1 for OPERABLE offsite circuit.

AND 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter A.2


NOTE -----------

In MODES 1, 2, and 3, the turbine driven auxiliary feedwater pump is considered a required redundant feature.

(continued)

AC Sources - Operating 3.8.1 ACTIONS CALLAWAY PLANT 3.8-2 Amendment 133 A.

One offsite circuit inoperable.

(continued)

Declare required feature(s) with no offsite power available inoperable when its redundant required feature(s) is inoperable.

AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from discovery of no offsite power to one train concurrent with inoperability of redundant required feature(s)

A.3 Restore offsite circuit to OPERABLE status.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND 6 days from discovery of failure to meet LCO B.

One DG inoperable.

B.1 Perform SR 3.8.1.1 for the offsite circuit(s).

AND 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter B.2


NOTE -----------

In MODES 1, 2, and 3, the turbine driven auxiliary feedwater pump is considered a required redundant feature.

(continued)

CONDITION REQUIRED ACTION COMPLETION TIME

AC Sources - Operating 3.8.1 ACTIONS CALLAWAY PLANT 3.8-3 Amendment 186 B.

One DG inoperable.

(continued)

Declare required feature(s) supported by the inoperable DG inoperable when its required redundant feature(s) is inoperable.

AND 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery of Condition B concurrent with inoperability of redundant required feature(s)

B.3.1 Determine OPERABLE DG is not inoperable due to common cause failure.

OR 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> B.3.2


NOTE -----------

The required ACTION of B.3.2 is satisfied by the automatic start and sequence loading of the diesel generator.

Perform SR 3.8.1.2 for OPERABLE DG.

AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (continued)

CONDITION REQUIRED ACTION COMPLETION TIME

AC Sources - Operating 3.8.1 ACTIONS CALLAWAY PLANT 3.8-4 Amendment 199 B.

One DG inoperable.

(continued)

B.4 Restore DG to OPERABLE status.


NOTE---------

A one-time Completion Time of 14 days is allowed to support planned replacement of ESW B train piping prior to April 30, 2009.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND 6 days from discovery of failure to meet LCO C.

Two offsite circuits inoperable.

C.1


NOTE -----------

In MODES 1, 2, and 3, the turbine driven auxiliary feedwater pump is considered a required redundant feature.

Declare required feature(s) inoperable when its redundant required feature(s) is inoperable.

AND 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> from discovery of Condition C concurrent with inoperability of redundant required features (continued)

CONDITION REQUIRED ACTION COMPLETION TIME

AC Sources - Operating 3.8.1 ACTIONS CALLAWAY PLANT 3.8-5 Amendment 186 l C.

Two offsite circuits inoperable.

(continued)

C.2 Restore one offsite circuit to OPERABLE status.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> D.

One offsite circuit inoperable.

AND One DG inoperable.


NOTE -------------------

Enter applicable Conditions and Required Actions of LCO 3.8.9, Distribution Systems - Operating, when Condition D is entered with no AC power source to any train.

D.1 Restore offsite circuit to OPERABLE status.

OR 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> D.2 Restore DG to OPERABLE status.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> E.

Two DGs inoperable.

E.1 Restore one DG to OPERABLE status.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> F.

One required LSELS inoperable.

F.1 Declare the affected DG and offsite circuit inoperable.

AND Immediately F.2 Restore required LSELS to OPERABLE status.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

CONDITION REQUIRED ACTION COMPLETION TIME

AC Sources - Operating 3.8.1 ACTIONS (continued)

CALLAWAY PLANT 3.8-6 Amendment No. 202 SURVEILLANCE REQUIREMENTS G.

Required Action and associated Completion Time of Condition A, B, C, D, E, or F not met.

G.1 Be in MODE 3.

AND 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> G.2 Be in MODE 5.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> H.

Three or more AC sources inoperable.

H.1 Enter LCO 3.0.3.

Immediately SURVEILLANCE FREQUENCY SR 3.8.1.1 Verify correct breaker alignment and indicated power availability for each required offsite circuit.

In accordance with the Surveillance Frequency Control Program (continued)

CONDITION REQUIRED ACTION COMPLETION TIME

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

CALLAWAY PLANT 3.8-7 Amendment No. 202 SR 3.8.1.2


NOTES --------------------------------

1.

Performance of SR 3.8.1.7 satisfies this SR.

2.

All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.

3.

A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer. When modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1.7 must be met.

Verify each DG starts from standby conditions and achieves steady state voltage 3740 V and 4320 V, and frequency 58.8 Hz and 61.2 Hz.

In accordance with the Surveillance Frequency Control Program (continued)

SURVEILLANCE FREQUENCY

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

CALLAWAY PLANT 3.8-8 Amendment No. 202 SR 3.8.1.3


NOTES --------------------------------

1.

DG loadings may include gradual loading as recommended by the manufacturer.

2.

Momentary transients outside the load range do not invalidate this test.

3.

This Surveillance shall be conducted on only one DG at a time.

4.

This SR shall be preceded by and immediately follow without shutdown a successful performance of SR 3.8.1.2 or SR 3.8.1.7.

Verify each DG is synchronized and loaded and operates for 60 minutes at a load 5580 kW and 6201 kW.

In accordance with the Surveillance Frequency Control Program SR 3.8.1.4 Verify each fuel oil transfer pump starts on low level in the associated day tank standpipe.

In accordance with the Surveillance Frequency Control Program SR 3.8.1.5 Check for and remove accumulated water from each day tank.

In accordance with the Surveillance Frequency Control Program SR 3.8.1.6 Verify each fuel oil transfer system operates to transfer fuel oil from storage tank to the day tank.

In accordance with the Surveillance Frequency Control Program (continued)

SURVEILLANCE FREQUENCY

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

CALLAWAY PLANT 3.8-9 Amendment No. 202 SR 3.8.1.7


NOTE -------------------------------

All DG starts may be preceded by an engine prelube period.

Verify each DG starts from standby condition and achieves in 12 seconds, voltage 3740 V and 4320 V, and frequency 58.8 Hz and 61.2 Hz.

In accordance with the Surveillance Frequency Control Program SR 3.8.1.8 Not used.

SR 3.8.1.9 Not used.

SR 3.8.1.10 Verify each DG operating at a power factor 0.9 and 0.8 does not trip and voltage is maintained 4784 V and frequency is maintained 65.4 Hz during and following a load rejection of 5580 kW and 6201 kW.

In accordance with the Surveillance Frequency Control Program (continued)

SURVEILLANCE FREQUENCY

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

CALLAWAY PLANT 3.8-10 Amendment No. 202 SR 3.8.1.11


NOTES --------------------------------

1.

All DG starts may be preceded by an engine prelube period.

2.

This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.

Verify on an actual or simulated loss of offsite power signal:

a.

De-energization of emergency buses; b.

Load shedding from emergency buses; c.

DG auto-starts from standby condition and:

1.

energizes permanently connected loads in 12 seconds, 2.

energizes auto-connected shutdown loads through the shutdown load sequencer, 3.

maintains steady state voltage 3740 V and 4320 V, 4.

maintains steady state frequency 58.8 Hz and 61.2 Hz, and 5.

supplies permanently connected and auto-connected shutdown loads for 5 minutes.

In accordance with the Surveillance Frequency Control Program (continued)

SURVEILLANCE FREQUENCY

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

CALLAWAY PLANT 3.8-11 Amendment No. 202 SR 3.8.1.12


NOTES --------------------------------

1.

All DG starts may be preceded by prelube period.

2.

This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.

Verify on an actual or simulated safety injection signal each DG auto-starts from standby condition and:

a.

In 12 seconds after auto-start and during tests, achieves voltage 3740 V and 4320 V; b.

In 12 seconds after auto-start and during tests, achieves frequency 58.8 Hz and 61.2 Hz; c.

Operates for 5 minutes; d.

Permanently connected loads remain energized from the offsite power system; and e.

Emergency loads are auto-connected and energized through the LOCA load sequencer from the offsite power system.

In accordance with the Surveillance Frequency Control Program (continued)

SURVEILLANCE FREQUENCY

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

CALLAWAY PLANT 3.8-12 Amendment No. 202 SR 3.8.1.13 Verify each DG's automatic trips are bypassed on actual or simulated loss of voltage signal on the emergency bus concurrent with an actual or simulated safety injection signal except:

a.

Engine overspeed; b.

Generator differential current; c.

Low lube oil pressure; d.

High crankcase pressure; e.

Start failure relay; and f.

High jacket coolant temperature.

In accordance with the Surveillance Frequency Control Program (continued)

SURVEILLANCE FREQUENCY

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

CALLAWAY PLANT 3.8-13 Amendment No. 202 SR 3.8.1.14


NOTES --------------------------------

1.

Momentary transients outside the load and power factor ranges do not invalidate this test.

2.

The DG may be loaded to 5580 kW and 6201 kW for the entire test period if auto-connected design loads are less than 6201 kW.

Verify each DG operating at a power factor 0.9 and 0.8 operates for 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s:

a.

For 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded 6600 kW and 6821 kW; and b.

For the remaining hours of the test loaded 5580 kW and 6201 kW.

In accordance with the Surveillance Frequency Control Program SR 3.8.1.15


NOTES --------------------------------

1.

This Surveillance shall be performed within 5 minutes of shutting down the DG after the DG has operated 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded 5580 kW and 6201 kW. Momentary transients outside of load range do not invalidate this test.

2.

All DG starts may be preceded by an engine prelube period.

Verify each DG starts and achieves, in 12 seconds, voltage 3740 V, and 4320 V and frequency 58.8 Hz and 61.2 Hz.

In accordance with the Surveillance Frequency Control Program (continued)

SURVEILLANCE FREQUENCY

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

CALLAWAY PLANT 3.8-14 Amendment No. 202 SR 3.8.1.16


NOTE -------------------------------

This Surveillance shall not normally be performed in MODE 1, 2, 3, or 4. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.

Verify each DG:

a.

Synchronizes with offsite power source while loaded with emergency loads upon a simulated restoration of offsite power; b.

Transfers loads to offsite power source; and c.

Returns to ready-to-load operation.

In accordance with the Surveillance Frequency Control Program SR 3.8.1.17


NOTE -------------------------------

This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.

Verify, with a DG operating in test mode and connected to its bus, an actual or simulated Safety Injection signal overrides the test mode by:

a.

Returning DG to ready-to-load operation; and b.

Automatically energizing the emergency load from offsite power.

In accordance with the Surveillance Frequency Control Program (continued)

SURVEILLANCE FREQUENCY

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS CALLAWAY PLANT 3.8-15 Amendment 202 SR 3.8.1.18


NOTE -------------------------------

This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.

Verify interval between each sequenced load block is within +/- 10% of design interval for each LOCA and shutdown load sequencer.

In accordance with the Surveillance Frequency Control Program (continued)

SURVEILLANCE FREQUENCY

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS CALLAWAY PLANT 3.8-16 Amendment 202 SR 3.8.1.19


NOTES --------------------------------

1.

All DG starts may be preceded by an engine prelube period.

2.

This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.

Verify on an actual or simulated loss of offsite power signal in conjunction with an actual or simulated Safety Injection signal:

a.

De-energization of emergency buses; b.

Load shedding from emergency buses; and c.

DG auto-starts from standby condition and:

1.

energizes permanently connected loads in 12 seconds, 2.

energizes auto-connected emergency loads through LOCA load sequencer, 3.

achieves steady state voltage 3740 V and 4320 V, 4.

achieves steady state frequency 58.8 Hz and 61.2 Hz, and In accordance with the Surveillance Frequency Control Program 5.

supplies permanently connected and auto-connected emergency loads for 5 minutes.

(continued)

SURVEILLANCE FREQUENCY

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

CALLAWAY PLANT 3.8-17 Amendment No. 202 SR 3.8.1.20


NOTE -------------------------------

All DG starts may be preceded by an engine prelube period.

Verify when started simultaneously from standby condition, each DG achieves, in 12 seconds, voltage 3740 V and 4320 V, and frequency 58.8 Hz and 61.2 Hz.

In accordance with the Surveillance Frequency Control Program SR 3.8.1.21


NOTE -------------------------------

The continuity check may be excluded from the actuation logic test.

Perform ACTUATION LOGIC TEST for each train of the load shedder and emergency load sequencer.

In accordance with the Surveillance Frequency Control Program SURVEILLANCE FREQUENCY

CALLAWAY PLANT 3.8-18 Amendment No. 202 l AC Sources - Shutdown 3.8.2 3.8 ELECTRICAL POWER SYSTEMS 3.8.2 AC Sources - Shutdown LCO 3.8.2 The following AC electrical power sources shall be OPERABLE:

a.

One qualified circuit between the offsite transmission network and the onsite Class 1E AC electrical power distribution subsystem required by LCO 3.8.10, "Distribution Systems - Shutdown"; and b.

One diesel generator (DG) capable of supplying one train of the onsite Class 1E AC electrical power distribution subsystems required by LCO 3.8.10; and c.

The shutdown portion of one Load Shedder and Emergency Load Sequencer (LSELS) associated with the required DC and AC electrical power distribution train.

APPLICABILITY:

MODES 5 and 6, During movement of irradiated fuel assemblies.

ACTIONS


NOTE -----------------------------------------------------------


NOTE -----------------------------------------------------------

LCO 3.0.3 is not applicable.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One required offsite circuit inoperable.


NOTE -------------------

Enter applicable Conditions and Required Actions of LCO 3.8.10, with the required train de-energized as a result of Condition A.

A.1 Declare affected required feature(s) with no offsite power available inoperable.

OR Immediately (continued)

AC Sources - Shutdown 3.8.2 ACTIONS CALLAWAY PLANT 3.8-19 Amendment 202 l A

One required offsite circuit inoperable.

(continued)

A.2.1 Suspend CORE ALTERATIONS.

AND Immediately A.2.2 Suspend movement of irradiated fuel assemblies.

AND Immediately A.2.3 Suspend operations involving positive reactivity additions that could result in loss of required SDM or boron concentration.

AND Immediately A.2.4 Initiate action to restore required offsite power circuit to OPERABLE status.

Immediately (continued)

CONDITION REQUIRED ACTION COMPLETION TIME

AC Sources - Shutdown 3.8.2 ACTIONS (continued)

CALLAWAY PLANT 3.8-20 Amendment No. 202 l B.

One required DG inoperable.

B.1 Suspend CORE ALTERATIONS.

AND Immediately B.2 Suspend movement of irradiated fuel assemblies.

AND Immediately B.3 Suspend operations involving positive reactivity additions that could result in loss of required SDM or boron concentration.

AND Immediately B.4 Initiate action to restore required DG to OPERABLE status.

Immediately C.

One required LSELS (shutdown portion) inoperable.

C.1 Declare the affected DG and offsite circuit inoperable.

Immediately CONDITION REQUIRED ACTION COMPLETION TIME

AC Sources - Shutdown 3.8.2 CALLAWAY PLANT 3.8-21 Amendment No. 202 l SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.2.1


NOTE ----------------------------

The following SRs are not required to be performed:

SR 3.8.1.3, SR 3.8.1.10, SR 3.8.1.11, SR 3.8.1.14 through SR 3.8.1.16, and SR 3.8.1.18, (Shutdown Load Sequencer only).

For AC sources required to be OPERABLE, the following SRs are applicable:

SR 3.8.1.1 SR 3.8.1.11 SR 3.8.1.2 SR 3.8.1.14 SR 3.8.1.3 SR 3.8.1.15 SR 3.8.1.4 SR 3.8.1.16 SR 3.8.1.5 SR 3.8.1.18 (shutdown load SR 3.8.1.6 sequencer only)

SR 3.8.1.7 SR 3.8.1.21 (shutdown load SR 3.8.1.10 sequencer only)

In accordance with applicable SRs

CALLAWAY PLANT 3.8-22 Amendment No. 202 l Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air LCO 3.8.3 The stored diesel fuel oil, lube oil, and starting air subsystem shall be within limits for each required diesel generator (DG).

APPLICABILITY:

When associated DG is required to be OPERABLE.

ACTIONS


NOTE -----------------------------------------------------------


NOTE -----------------------------------------------------------

Separate Condition entry is allowed for each DG.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more DGs with fuel level < 80,900 gal and

> 69,800 gal in storage tank.

A.1 Restore fuel oil level to within limits.

48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> B.

One or more DGs with lube oil inventory < 750 gal and

> 686 gal.

B.1 Restore lube oil inventory to within limits.

48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> C.

One or more DGs with stored fuel oil total particulates not within limit.

C.1 Restore fuel oil total particulates within limit.

7 days D.

One or more DGs with new fuel oil properties not within limits.

D.1 Restore stored fuel oil properties to within limits.

30 days (continued)

Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 ACTIONS (continued)

CALLAWAY PLANT 3.8-23 Amendment No. 202 l E.

One or more DGs with two starting air receivers in service with pressure

< 435 psig and 250 psig.

E.1 Restore two starting air receivers with pressure 435 psig.

OR 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> OR One or more DGs with only one starting air receiver in service with pressure

< 610 psig and 300 psig.

E.2 Restore one starting air receiver with pressure 610 psig.

48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> F.

Required Action and associated Completion Time not met.

F.1 Declare associated DG inoperable.

Immediately OR One or more DGs diesel fuel oil, lube oil, or starting air subsystems not within limits for reasons other than Condition A, B, C, D, or E.

CONDITION REQUIRED ACTION COMPLETION TIME

Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 CALLAWAY PLANT 3.8-24 Amendment No. 202 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.3.1 Verify each fuel oil storage tank contains 80,900 gal of fuel.

In accordance with the Surveillance Frequency Control Program SR 3.8.3.2 Verify lubricating oil inventory is 750 gal.

In accordance with the Surveillance Frequency Control Program SR 3.8.3.3 Verify fuel oil properties of new and stored fuel oil are tested in accordance with, and maintained within the limits of, the Diesel Fuel Oil Testing Program.

In accordance with the Diesel Fuel Oil Testing Program SR 3.8.3.4 Verify pressure in two starting air receivers is 435 psig or pressure in one starting air receiver is 610 psig, for each DG starting air subsystem.

In accordance with the Surveillance Frequency Control Program SR 3.8.3.5 Check for and remove accumulated water from each fuel oil storage tank.

In accordance with the Surveillance Frequency Control Program SR 3.8.3.6 Not used.

CALLAWAY PLANT 3.8-25 Amendment No. 202 DC Sources - Operating 3.8.4 3.8 ELECTRICAL POWER SYSTEMS 3.8.4 DC Sources - Operating LCO 3.8.4 The Train A and Train B DC electrical power subsystems shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS SURVEILLANCE REQUIREMENTS CONDITION REQUIRED ACTION COMPLETION TIME A.

One DC electrical power subsystem inoperable.

A.1 Restore DC electrical power subsystem to OPERABLE status.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> B.

Require Action and Associated Completion Time not met.

B.1 Be in MODE 3.

AND 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> B.2 Be in MODE 5.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is 130.2 V on float charge.

In accordance with the Surveillance Frequency Control Program (continued)

DC Sources - Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)

CALLAWAY PLANT 3.8-26 Amendment No. 202 SR 3.8.4.2 Verify no visible corrosion at battery terminals and connectors.

OR In accordance with the Surveillance Frequency Verify battery connection resistance is 69E-6 ohm for cell to cell connections and 69E-6 ohm for terminal connections.

Control Program SR 3.8.4.3 Verify battery cells, cell plates, and racks show no visual indication of physical damage or abnormal deterioration that could degrade battery performance.

In accordance with the Surveillance Frequency Control Program SR 3.8.4.4 Remove visible terminal corrosion, verify battery cell to cell and terminal connections are clean and tight, and are coated with anti-corrosion material.

In accordance with the Surveillance Frequency Control Program SR 3.8.4.5 Verify battery connection resistance is 69E-6 ohm for cell to cell connections, and 69E-6 ohm for terminal connections.

In accordance with the Surveillance Frequency Control Program SR 3.8.4.6 Verify each battery charger supplies 300 amps at 130.2 V for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

In accordance with the Surveillance Frequency Control Program (continued)

SURVEILLANCE FREQUENCY

DC Sources - Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)

CALLAWAY PLANT 3.8-27 Amendment No. 202 SR 3.8.4.7


NOTES ------------------------------

1.

The modified performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7.

2.

This Surveillance shall not be performed in MODE 1, 2, 3, or 4.

Verify battery capacity is adequate to supply, and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.

In accordance with the Surveillance Frequency Control Program SR 3.8.4.8


NOTE --------------------------------

This Surveillance shall not be performed in MODE 1, 2, 3, or 4.

Verify battery capacity is 80% of the manufacturer's rating when subjected to a performance discharge test or a modified performance discharge test.

In accordance with the Surveillance Frequency Control Program AND 18 months when battery shows degradation or has reached 85% of expected life SURVEILLANCE FREQUENCY

CALLAWAY PLANT 3.8-28 Amendment No. 202 l DC Sources - Shutdown 3.8.5 3.8 ELECTRICAL POWER SYSTEMS 3.8.5 DC Sources - Shutdown LCO 3.8.5 The Train A or Train B DC electrical power subsystem shall be OPERABLE to support one train of the DC electrical power distribution subsystems required by LCO 3.8.10, "Distribution Systems - Shutdown."

APPLICABILITY:

MODES 5 and 6, During movement of irradiated fuel assemblies.

ACTIONS


NOTE -----------------------------------------------------------


NOTE -----------------------------------------------------------

LCO 3.0.3 is not applicable.

CONDITION REQUIRED ACTION COMPLETION TIME A.

Required DC electrical power subsystem inoperable.

A.1 Declare affected required feature(s) inoperable.

OR Immediately A.2.1 Suspend CORE ALTERATIONS.

AND Immediately A.2.2 Suspend movement of irradiated fuel assemblies.

AND Immediately (continued)

DC Sources - Shutdown 3.8.5 ACTIONS CALLAWAY PLANT 3.8-29 Amendment 202 l SURVEILLANCE REQUIREMENTS A.

Required DC electrical power subsystem inoperable.

(continued)

A.2.3 Suspend operations involving positive reactivity additions that could result in loss of required SDM or boron concentration.

AND Immediately A.2.4 Initiate action to restore required DC electrical power subsystem to OPERABLE status.

Immediately SURVEILLANCE FREQUENCY SR 3.8.5.1


NOTE ----------------------------

The following SRs are not required to be performed:

SR 3.8.4.6, SR 3.8.4.7, and SR 3.8.4.8.

For DC sources required to be OPERABLE, the following SRs are applicable:

SR 3.8.4.1 SR 3.8.4.4 SR 3.8.4.7 SR 3.8.4.2 SR 3.8.4.5 SR 3.8.4.8 SR 3.8.4.3 SR 3.8.4.6 In accordance with applicable SRs CONDITION REQUIRED ACTION COMPLETION TIME

CALLAWAY PLANT 3.8-30 Amendment No. 202 l Battery Cell Parameters 3.8.6 3.8 ELECTRICAL POWER SYSTEMS 3.8.6 Battery Cell Parameters LCO 3.8.6 Battery cell parameters for Train A and Train B batteries shall be within the limits of Table 3.8.6-1.

APPLICABILITY:

When associated DC electrical power subsystems are required to be OPERABLE.

ACTIONS


NOTE -----------------------------------------------------------


NOTE -----------------------------------------------------------

Separate Condition entry is allowed for each battery.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more batteries with one or more battery cell parameters not within Category A or B limits.

A.1 Verify pilot cells electrolyte level and float voltage meet Table 3.8.6-1 Category C limits.

AND 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> A.2 Verify battery cell parameters meet Table 3.8.6-1 Category C limits.

AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND Once per 7 days thereafter A.3 Restore battery cell parameters to Category A and B limits of Table 3.8.6-1.

31 days (continued)

Battery Cell Parameters 3.8.6 ACTIONS (continued)

CALLAWAY PLANT 3.8-31 Amendment No. 202 SURVEILLANCE REQUIREMENTS B.

Required Action and associated Completion Time of Condition A not met.

OR B.1 Declare associated battery inoperable.

Immediately One or more batteries with average electrolyte temperature of the representative cells < 60 °F.

OR One or more batteries with one or more battery cell parameters not within Category C values.

SURVEILLANCE FREQUENCY SR 3.8.6.1 Verify battery cell parameters meet Table 3.8.6-1 Category A limits.

In accordance with the Surveillance Frequency Control Program (continued)

CONDITION REQUIRED ACTION COMPLETION TIME

Battery Cell Parameters 3.8.6 SURVEILLANCE REQUIREMENTS (continued)

CALLAWAY PLANT 3.8-32 Amendment No. 202 SR 3.8.6.2 Verify battery cell parameters meet Table 3.8.6-1 Category B limits.

In accordance with the Surveillance Frequency Control Program AND Once within 7 days after a battery discharge

< 110 V AND Once within 7 days after a battery overcharge

> 150 V SR 3.8.6.3 Verify average electrolyte temperature of representative cells is 60°F.

In accordance with the Surveillance Frequency Control Program SURVEILLANCE FREQUENCY

CALLAWAY PLANT 3.8-33 Amendment No. 202 l Battery Cell Parameters 3.8.6 TABLE 3.8.6-1 (PAGE 1 OF 1)

BATTERY CELL PARAMETERS REQUIREMENTS (a)

It is acceptable for the electrolyte level to temporarily increase above the specified maximum during equalizing charges provided it is not overflowing.

(b)

Corrected for electrolyte temperature and level. Level correction is not required, however, when battery charging is < 2 amps when on float charge.

(c)

A battery charging current of < 2 amps when on float charge is acceptable for meeting specific gravity limits following a battery recharge, for a maximum of 7 days. When charging current is used to satisfy specific gravity requirements, specific gravity of each connected cell shall be measured prior to expiration of the 7 day allowance.

PARAMETER CATEGORY A:

LIMITS FOR EACH DESIGNATED PILOT CELL CATEGORY B:

LIMITS FOR EACH CONNECTED CELL CATEGORY C:

ALLOWABLE LIMITS FOR EACH CONNECTED CELL Electrolyte Level

> Minimum level indication mark, and 1/4 inch above maximum level indication mark(a)

> Minimum level indication mark, and 1/4 inch above maximum level indication mark(a)

Above top of plates, and not overflowing Float Voltage 2.13 V 2.13 V

> 2.07 V Specific Gravity(b)(c) 1.200 1.195 AND Average of all connected cells

> 1.205 Not more than 0.020 below average of all connected cells AND Average of all connected cells 1.195

CALLAWAY PLANT 3.8-34 Amendment No. 202 l Inverters - Operating 3.8.7 3.8 ELECTRICAL POWER SYSTEMS 3.8.7 Inverters - Operating LCO 3.8.7 The required Train A and Train B inverters shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One required inverter inoperable.

A.1


NOTE -----------

Enter applicable Conditions and Required Actions of LCO 3.8.9, "Distribution Systems - Operating" with any vital bus de-energized.

Restore inverter to OPERABLE status.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> B.

Required Action and associated Completion Time not met.

B.1 Be in MODE 3.

AND 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> B.2 Be in MODE 5.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

Inverters - Operating 3.8.7 CALLAWAY PLANT 3.8-35 Amendment No. 202 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.7.1 Verify correct inverter voltage, and alignment to required AC vital buses.

In accordance with the Surveillance Frequency Control Program

CALLAWAY PLANT 3.8-36 Amendment No. 202 l Inverters - Shutdown 3.8.8 3.8 ELECTRICAL POWER SYSTEMS 3.8.8 Inverters - Shutdown LCO 3.8.8 The Train A or Train B inverters shall be OPERABLE to support one train of the onsite Class 1E AC vital bus electrical power distribution subsystems required by LCO 3.8.10, "Distribution Systems - Shutdown."

APPLICABILITY:

MODES 5 and 6, During movement of irradiated fuel assemblies.

ACTIONS


NOTE -----------------------------------------------------------

LCO 3.0.3 is not applicable.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more required inverters inoperable.

A.1 Declare affected required feature(s) inoperable.

OR Immediately A.2.1 Suspend CORE ALTERATIONS.

AND Immediately A.2.2 Suspend movement of irradiated fuel assemblies.

AND Immediately (continued)

Inverters - Shutdown 3.8.8 ACTIONS CALLAWAY PLANT 3.8-37 Amendment 202 SURVEILLANCE REQUIREMENTS A.

One or more required inverters inoperable.

(continued)

A.2.3 Suspend operations involving positive reactivity additions that could result in loss of required SDM or boron concentration.

AND Immediately A.2.4 Initiate action to restore required inverters to OPERABLE status.

Immediately SURVEILLANCE FREQUENCY SR 3.8.8.1 Verify correct inverter voltage, and alignments to required AC vital buses.

In accordance with the Surveillance Frequency Control Program CONDITION REQUIRED ACTION COMPLETION TIME

CALLAWAY PLANT 3.8-38 Amendment No. 202 l Distribution Systems - Operating 3.8.9 3.8 ELECTRICAL POWER SYSTEMS 3.8.9 Distribution Systems - Operating LCO 3.8.9 Train A and Train B AC, DC, and AC vital bus electrical power distribution subsystems shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One AC electrical power distribution subsystem inoperable.

A.1 Restore AC electrical power distribution subsystem to OPERABLE status.

8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> AND 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to meet LCO B.

One AC vital bus subsystem inoperable.

B.1 Restore AC vital bus subsystem to OPERABLE status.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> AND 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to meet LCO (continued)

Distribution Systems - Operating 3.8.9 ACTIONS (continued)

CALLAWAY PLANT 3.8-39 Amendment No. 202 SURVEILLANCE REQUIREMENTS C.

One DC electrical power distribution subsystem inoperable.

C.1 Restore DC electrical power distribution subsystem to OPERABLE status.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> AND 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to meet LCO D.

Required Action and associated Completion Time not met.

D.1 Be in MODE 3.

AND 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> D.2 Be in MODE 5.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> E.

Two trains with inoperable distribution subsystems that result in a loss of safety function.

E.1 Enter LCO 3.0.3.

Immediately SURVEILLANCE FREQUENCY SR 3.8.9.1 Verify correct breaker alignments and voltage to required AC, DC, and AC vital bus electrical power distribution subsystems.

In accordance with the Surveillance Frequency Control Program CONDITION REQUIRED ACTION COMPLETION TIME

CALLAWAY PLANT 3.8-40 Amendment No. 202 l Distribution Systems - Shutdown 3.8.10 3.8 ELECTRICAL POWER SYSTEMS 3.8.10 Distribution Systems - Shutdown LCO 3.8.10 The necessary portion of the Train A or Train B AC, DC, and AC vital bus electrical power distribution subsystems shall be OPERABLE to support one train of equipment required to be OPERABLE.

APPLICABILITY:

MODES 5 and 6, During movement of irradiated fuel assemblies.

ACTIONS


NOTE -----------------------------------------------------------


NOTE -----------------------------------------------------------

LCO 3.0.3 is not applicable.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more required AC, DC, or AC vital bus electrical power distribution subsystems inoperable.

A.1 Declare associated supported required feature(s) inoperable.

OR Immediately A.2.1 Suspend CORE ALTERATIONS.

AND Immediately A.2.2 Suspend movement of irradiated fuel assemblies.

AND Immediately (continued)

Distribution Systems - Shutdown 3.8.10 ACTIONS CALLAWAY PLANT 3.8-41 Amendment 202 SURVEILLANCE REQUIREMENTS A.

One or more required AC, DC, or AC vital bus electrical power distribution subsystems inoperable.

(continued)

A.2.3 Suspend operations involving positive reactivity additions that could result in loss of required SDM or boron concentration.

AND Immediately A.2.4 Initiate actions to restore required AC, DC, and AC vital bus electrical power distribution subsystems to OPERABLE status.

AND Immediately A.2.5 Declare associated required residual heat removal subsystem(s) inoperable and not in operation.

Immediately SURVEILLANCE FREQUENCY SR 3.8.10.1 Verify correct breaker alignments and voltage to required AC, DC, and AC vital bus electrical power distribution subsystems.

In accordance with the Surveillance Frequency Control Program CONDITION REQUIRED ACTION COMPLETION TIME