ML20209G004: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:~
{{#Wiki_filter:~
  ;a
;a
L*
L*
        *    *
/Q
                                                                                  /Q
*
                                                                                  '
*
                                          APR 101987
APR 101987
      Docket Nos. 50-327, 50-328
'
      License Nos. DPR-77, DPR-79
Docket Nos. 50-327, 50-328
      T/nnesseeVallcyAuthority
License Nos. DPR-77, DPR-79
    /TTN: Mr. S. A. White
T/nnesseeVallcyAuthority
              Manager of Nuclear Power
/TTN:
      6N 38A Lookout Place
Mr. S. A. White
      1101 Market Street
Manager of Nuclear Power
      Chattanooga, T;l 37402-2801
6N 38A Lookout Place
      Gentlemen:
1101 Market Street
      SUBJECT:   NOTICE OF VIOLATION AND NOTICE OF DEVIATION
Chattanooga, T;l 37402-2801
                  (NRC INSPECTION REPORT N05. 50-327/87-08 AND 50-328/87-08)
Gentlemen:
      This refers to the Nuclear Regulatory Commission (NRC) routine resident
SUBJECT:
      inspection conducted by Ken Jenison on February 6 - March 5, 1987.   The inspec-
NOTICE OF VIOLATION AND NOTICE OF DEVIATION
      tion included a review of activities authorized for your Sequoyah facility. At
(NRC INSPECTION REPORT N05. 50-327/87-08 AND 50-328/87-08)
      the conclusion of the inspection, the findings were discussed with those
This refers to the Nuclear Regulatory Commission (NRC) routine resident
      members of your staff identified in the enclosed inspectinn report.
inspection conducted by Ken Jenison on February 6 - March 5, 1987.
      Areas examined during the inspection are identified in the report. Within
The inspec-
      these areas, the inspection consisted of selective examinations of procedures
tion included a review of activities authorized for your Sequoyah facility.
      and representative records, interviews with personnel, and observation of
At
      activities in progress.
the conclusion of the inspection, the findings were discussed with those
      The inspection findings indicate that certain activities appeared to violate
members of your staff identified in the enclosed inspectinn report.
      NRC requirements and other activities appeared to deviate from a commitment to
Areas examined during the inspection are identified in the report.
      the NRC.   The violation involves a failure to properly frisk prior to leaving
Within
      a radiologically controlled area and the deviation concerns a lack of preven-
these areas, the inspection consisted of selective examinations of procedures
      tive maintenance on the condensate demineralizer waste evaporator pursuant to
and representative records, interviews with personnel, and observation of
      your FSAR.   Accordingly, the violation and deviation, with pertinent references
activities in progress.
      and elements to be included in your response, are described in the enclosed
The inspection findings indicate that certain activities appeared to violate
      Notices.
NRC requirements and other activities appeared to deviate from a commitment to
      Your attention is called to the unresolved items identified in the inspection
the NRC.
      report which involve: concern with the ability to effect adequate control
The violation involves a failure to properly frisk prior to leaving
      room evacuation and plar.t shutdown with minimum staffing levels; concern with
a radiologically controlled area and the deviation concerns a lack of preven-
      the adequacy of a specific diesel generator test; and a concern with the use
tive maintenance on the condensate demineralizer waste evaporator pursuant to
      of a cable tray jumper without the use of a conduit. These matters will be
your FSAR.
      pursued during future inspections.
Accordingly, the violation and deviation, with pertinent references
      In accordance with 10 CFR 2.790(a), a copy of this letter, its enclosure, and
and elements to be included in your response, are described in the enclosed
      any reply will be placed in the NRC Public Document Room.       If you wish to
Notices.
      withhold information contained therein, please notify this office by telephone
Your attention is called to the unresolved items identified in the inspection
      within ten days of the date of this letter and submit a written application to
report which involve:
      withhold information contained therein promptly thereaf ter. Such application
concern with the ability to effect adequate control
      must be consistent with the requirement of 10 CFR 2.790(b)(1). If we do not
room evacuation and plar.t shutdown with minimum staffing levels; concern with
          8704300447 8704to
the adequacy of a specific diesel generator test; and a concern with the use
          PDR
of a cable tray jumper without the use of a conduit.
          G    ADOCK 05000327
These matters will be
                            PDR
pursued during future inspections.
                                                                                          1\
In accordance with 10 CFR 2.790(a), a copy of this letter, its enclosure, and
                                                                                        zect
any reply will be placed in the NRC Public Document Room.
If you wish to
withhold information contained therein, please notify this office by telephone
within ten days of the date of this letter and submit a written application to
withhold information contained therein promptly thereaf ter.
Such application
must be consistent with the requirement of 10 CFR 2.790(b)(1).
If we do not
8704300447 8704to
PDR
ADOCK 05000327
G
PDR
1\\
zect


                                                                -.     -                                     -_
-.
                        .-
-
      ,
-_
                                                                                                                      ,3.- ;
.-
                                .       .
,3.-
                                  Tennessee Valley Authority                         2
;
                                  hear from you in this regard within the period specified above, this letter,
,
                                  its enclosure, and any reply will be made available to the public and be placed
.
                                  in the NRC Public Document Room.
.
Tennessee Valley Authority
2
hear from you in this regard within the period specified above, this letter,
its enclosure, and any reply will be made available to the public and be placed
in the NRC Public Document Room.
The responses directed by this letter and its enclosure are not subiect to the
.
clearance procedures of the Office of Management and Budget as regulred by the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
'
Sincerely,
Original signed by A. Ignatonis
Gary G. Zech, Assistant Director,
Regional Programs
Division of TVA Projects
Office of Special Projects
-
Enclosures:
1.
Notice of Violation
.
.
                                  The responses directed by this letter and its enclosure are not subiect to the
2.
                                  clearance procedures of the Office of Management and Budget as regulred by the
Notice of Deviation
                                  Paperwork Reduction Act of 1980, PL 96-511.
"
                                  Should you have any questions concerning this letter, please contact us.
3.
NRC Inspection Report
'
/ c w/encis:
c
H. L. Abercrombie, Site Director
, Sequoyah Nuclear Plant
,
/R. W. Cantrell, Acting Director
/ Nuclear Engineering
/ R. L. Gridley, Director
j Nuclear Safety and Licensing
V M. R. Harding, Site Licensing
l
Manager
bec w/encis:
J. N. Grace, RII
/J. G. Keppler, OSP
y/S. D. Ebneter, OSP
vJ. A. Zwolinski, OSP
/ B. D. Liaw, OSP
v5. D. Richardson, OSP
v5. R. Connelly, OIA
/ K. P. Barr, RII
sNRC Resident Inspector
NRC Document control Desk
State of Tennessee
,
<
'
'
                                                                                    Sincerely,
RII ,[ '
                                                                                    Original signed by A. Ignatonis
R
                                                                                    Gary G. Zech, Assistant Director,
R
                                                                                      Regional Programs
;
                                                                                    Division of TVA Projects
RC rol :1b
                          -
Fdy
                                                                                    Office of Special Projects
4R
                                  Enclosures:
#
                                  1.    Notice of Violation        .
04/g/87
                                2.      Notice of Deviation        "'
04/r/87
                                3.      NRC Inspection Report
04/q/87
                                c
. _ _ - _ _ _ - _ -
                            / cH.w/encis:
--
                                      L. Abercrombie, Site Director
. ._
,                              , Sequoyah Nuclear Plant
.
                            /R. W. Cantrell, Acting Director
-
                              / Nuclear Engineering
-
                            / R. L. Gridley, Director
. -
                              j Nuclear Safety and Licensing
.
                            V M. R. Harding, Site Licensing
- -- . -
l                                    Manager
- .
                                bec w/encis:
                                J. N. Grace, RII
                            /J. G. Keppler, OSP
                            y/S. D. Ebneter, OSP
                              vJ. A. Zwolinski, OSP
                            / B. D. Liaw, OSP
                              v5. D. Richardson, OSP
                              v5. R. Connelly, OIA
                            / K. P. Barr, RII
                              sNRC Resident Inspector
                                NRC Document control Desk
                                State of Tennessee
,
  <
'
                              RII ,[ '                  R                  R
;                            RC rol :1b                 Fdy #             4R
                              04/g/87                     04/r/87           04/q/87
    . _ _ - _ _ _ - _ -                   --       . ._         .   -   -     . -   .
                                                                                                _- -- . - _ - .
}}
}}

Latest revision as of 17:56, 6 December 2024

Forwards Insp Repts 50-327/87-08 & 50-328/87-08 on 870206- 0305 & Notices of Violation & Deviation.Unresolved Items Including Concern Re Use of Cable Tray Jumper W/O Use of Conduit Will Be Pursued During Future Insps
ML20209G004
Person / Time
Site: Sequoyah  
Issue date: 04/10/1987
From: Zech G
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20209G008 List:
References
NUDOCS 8704300447
Download: ML20209G004 (2)


See also: IR 05000327/1987008

Text

~

a

L*

/Q

APR 101987

'

Docket Nos. 50-327, 50-328

License Nos. DPR-77, DPR-79

T/nnesseeVallcyAuthority

/TTN:

Mr. S. A. White

Manager of Nuclear Power

6N 38A Lookout Place

1101 Market Street

Chattanooga, T;l 37402-2801

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION AND NOTICE OF DEVIATION

(NRC INSPECTION REPORT N05. 50-327/87-08 AND 50-328/87-08)

This refers to the Nuclear Regulatory Commission (NRC) routine resident

inspection conducted by Ken Jenison on February 6 - March 5, 1987.

The inspec-

tion included a review of activities authorized for your Sequoyah facility.

At

the conclusion of the inspection, the findings were discussed with those

members of your staff identified in the enclosed inspectinn report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements and other activities appeared to deviate from a commitment to

the NRC.

The violation involves a failure to properly frisk prior to leaving

a radiologically controlled area and the deviation concerns a lack of preven-

tive maintenance on the condensate demineralizer waste evaporator pursuant to

your FSAR.

Accordingly, the violation and deviation, with pertinent references

and elements to be included in your response, are described in the enclosed

Notices.

Your attention is called to the unresolved items identified in the inspection

report which involve:

concern with the ability to effect adequate control

room evacuation and plar.t shutdown with minimum staffing levels; concern with

the adequacy of a specific diesel generator test; and a concern with the use

of a cable tray jumper without the use of a conduit.

These matters will be

pursued during future inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter, its enclosure, and

any reply will be placed in the NRC Public Document Room.

If you wish to

withhold information contained therein, please notify this office by telephone

within ten days of the date of this letter and submit a written application to

withhold information contained therein promptly thereaf ter.

Such application

must be consistent with the requirement of 10 CFR 2.790(b)(1).

If we do not

8704300447 8704to

PDR

ADOCK 05000327

G

PDR

1\\

zect

-.

-

-_

.-

,3.-

,

.

.

Tennessee Valley Authority

2

hear from you in this regard within the period specified above, this letter,

its enclosure, and any reply will be made available to the public and be placed

in the NRC Public Document Room.

The responses directed by this letter and its enclosure are not subiect to the

.

clearance procedures of the Office of Management and Budget as regulred by the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

'

Sincerely,

Original signed by A. Ignatonis

Gary G. Zech, Assistant Director,

Regional Programs

Division of TVA Projects

Office of Special Projects

-

Enclosures:

1.

Notice of Violation

.

2.

Notice of Deviation

"

3.

NRC Inspection Report

'

/ c w/encis:

c

H. L. Abercrombie, Site Director

, Sequoyah Nuclear Plant

,

/R. W. Cantrell, Acting Director

/ Nuclear Engineering

/ R. L. Gridley, Director

j Nuclear Safety and Licensing

V M. R. Harding, Site Licensing

l

Manager

bec w/encis:

J. N. Grace, RII

/J. G. Keppler, OSP

y/S. D. Ebneter, OSP

vJ. A. Zwolinski, OSP

/ B. D. Liaw, OSP

v5. D. Richardson, OSP

v5. R. Connelly, OIA

/ K. P. Barr, RII

sNRC Resident Inspector

NRC Document control Desk

State of Tennessee

,

<

'

RII ,[ '

R

R

RC rol :1b

Fdy

4R

04/g/87

04/r/87

04/q/87

. _ _ - _ _ _ - _ -

--

. ._

.

-

-

. -

.

- -- . -

- .