ML20247K666: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:,-                                       -
{{#Wiki_filter:,-
                                                                                          -- ; -
-
                                                                                                  g ------ -- --
-- ;
p . og                                     a
-
      "';g.-                               . ..
g ------ -- --
p . og
a
"';g.-
. ..
L
L
    .
.
...o                                                       ..
...o
E.                                                     SEP 0 71989
..
                Docket.No.150-293..
E.
                Boston Edison-Company.
SEP 0 71989
                ATTN: Mr. Ralph.G., Bird                                                                   ,
Docket.No.150-293..
                        -Senior Vice. President-Nuclear
Boston Edison-Company.
              . Rocky Hill Road
ATTN: Mr. Ralph.G., Bird
                Plymouth, Massachusetts 02360
,
                Gentlemen:
-Senior Vice. President-Nuclear
        .
. Rocky Hill Road
                Subject: NRC Region.I Inspection Report No. 50-293/89-07
Plymouth, Massachusetts 02360
                This refers to-the inspection conducted by the NRC Restart Staff on May 25
Gentlemen:
                through July 10, 1989 at the Pilgrim Nuclear Power. Station, Plymouth, Massa-
.
                chusetts. Areas' examined during this inspection are described in the.NRC
Subject: NRC Region.I Inspection Report No. 50-293/89-07
                Region ~I. Inspection Report which is enclosed with this letter.
This refers to-the inspection conducted by the NRC Restart Staff on May 25
                The Restart' Staff, through selected around-the-clock shift inspections and rou-
through July 10, 1989 at the Pilgrim Nuclear Power. Station, Plymouth, Massa-
                tine. program inspections, observed management controls, conduct of operations
chusetts. Areas' examined during this inspection are described in the.NRC
                and startup testing activities of the licensee's Power Ascension Test-Program.
Region ~I. Inspection Report which is enclosed with this letter.
                Results of the NRC Restart Staff inspections and assessments are taken into-
The Restart' Staff, through selected around-the-clock shift inspections and rou-
                consideration by the NRC Restart Assessment Panel during ongoing licensee.per-
tine. program inspections, observed management controls, conduct of operations
                formance reviews and ' deliberations at each Power Ascension Test Program ap-
and startup testing activities of the licensee's Power Ascension Test-Program.
                proval point.
Results of the NRC Restart Staff inspections and assessments are taken into-
                The Restart Staff has concluded that overall plant operations were conducted
consideration by the NRC Restart Assessment Panel during ongoing licensee.per-
                in a safety-conscious manner. The Restart Staff has determined that your con-
formance reviews and ' deliberations at each Power Ascension Test Program ap-
              ' duct and control of the first phase of the Shutdown from Outside the Control
proval point.
                Room test was excellent.
The Restart Staff has concluded that overall plant operations were conducted
                However, our inspection also noted that several of your activities were not
in a safety-conscious manner. The Restart Staff has determined that your con-
                conducted in accordance with NRC requirements as set forth in the Notice of
' duct and control of the first phase of the Shutdown from Outside the Control
                Violation, Appendix A, enclosed herein. These violations have been categorized
Room test was excellent.
                by severity level in accordance with the revised NRC Enforcement Policy (10 CFR
However, our inspection also noted that several of your activities were not
                2, Appendix C) published in the Federal Register Notice (Enforcement Policy
conducted in accordance with NRC requirements as set forth in the Notice of
                1988). You are required to respond to this letter and in preparing your re-
Violation, Appendix A, enclosed herein. These violations have been categorized
                sponse, jou should follow the instructions in Appendix A.
by severity level in accordance with the revised NRC Enforcement Policy (10 CFR
                The response directed by this letter and the accompanying notice are not sub-
2, Appendix C) published in the Federal Register Notice (Enforcement Policy
                ject.to the clearance procedures of the Office of Management and Budget as re-
1988). You are required to respond to this letter and in preparing your re-
                quired by the Paperwork Reduction Act of 1980, PL 96-511.
sponse, jou should follow the instructions in Appendix A.
                                                                                                      i   t
The response directed by this letter and the accompanying notice are not sub-
                                      OFFICIAL RECORD COPY IR PILGRIM 89-07 - 0001.0.0                         /
ject.to the clearance procedures of the Office of Management and Budget as re-
          8909210226 890907                                    08/22/89                                       (
quired by the Paperwork Reduction Act of 1980, PL 96-511.
          PDR
i
          Q
t
                    ADOCK 05000293
OFFICIAL RECORD COPY IR PILGRIM 89-07 - 0001.0.0
                                  PDC
/
                                                                                                f
08/22/89
                                                                      _ _ _ _ _ _ _ _ _ .               .       ..J
(
8909210226 890907
f
PDR
ADOCK 05000293
Q
PDC
_ _ _ _ _ _ _ _ _
.
.
..J


                  .
c
1 -   ;
1 -
'.     4
;
        m      ''
.
                    '
'.
                                                                                                                            .,
4
        ,
'
            ~ Boston Edison Company.                     2                                         -
.,
                                                                                  ,7
m
            - Your. cooperation with'us in this matter is appreciated.
''
                                                          Sincerely,
~ Boston Edison Company.
                                                                                                      '
2
-
,
,7
- Your. cooperation with'us in this matter is appreciated.
Sincerely,
'
i-
i-
                                                            Original Signed By:
Original Signed By:
                ,                                          Samuel J. Collins, Deputy Director
Samuel J. Collins, Deputy Director
                                                          Division of Reactor Projects
,
              Enclosures:
Division of Reactor Projects
            '1. _ Appendix A, Notice'of Violation
Enclosures:
              2.     NRC. Region I~ Inspection Report No. 50-293/89-07 w/ attachments
'1.
              cc w/ enc 1s:
_ Appendix A, Notice'of Violation
            'K. Highfill, Station Director
2.
              R. Anderson, Plant Manager
NRC. Region I~ Inspection Report No. 50-293/89-07 w/ attachments
              J. Dietrich, Licensing Division Manager
cc w/ enc 1s:
              E. Robinson, Nuclear-Information Manager
'K. Highfill, Station Director
              R. Swanson, Nuclear Engineering Department Manager
R. Anderson, Plant Manager
              The Honorable John F. Kerry
J. Dietrich, Licensing Division Manager
              The Honorable Edward J.'Markey
E. Robinson, Nuclear-Information Manager
          .The Honorable Edward-P. Kirby
R. Swanson, Nuclear Engineering Department Manager
              The Honorable Peter V. Forman
The Honorable John F. Kerry
              The Honorable Nicholas J. Costello
The Honorable Edward J.'Markey
            >The' Honorable Lawrence R. Alexander
.The Honorable Edward-P. Kirby
              B. McIntyre, Chairman, Department of Public Utilities
The Honorable Peter V. Forman
              Chairman, Plymouth Board of Selectmen
The Honorable Nicholas J. Costello
              Chairman, Duxbury Board of Selectmen
>The' Honorable Lawrence R. Alexander
              Plymouth Civil Defense Director
B. McIntyre, Chairman, Department of Public Utilities
              P. Agnes,' Assistant Secretary of Public Safety, Commonwealth of Massachusetts
Chairman, Plymouth Board of Selectmen
              S. Pollard, Massachusetts Secretary of Energy Resources
Chairman, Duxbury Board of Selectmen
              R. Shimshak, MASSPIRG
Plymouth Civil Defense Director
              Public Document Room (PDR)
P. Agnes,' Assistant Secretary of Public Safety, Commonwealth of Massachusetts
              Local Public Document Room (LPDR)
S. Pollard, Massachusetts Secretary of Energy Resources
            Nuclear Safety Information Center (NSIC)
R. Shimshak, MASSPIRG
            NRC Resident Inspector
Public Document Room (PDR)
            Commonwealth of Massachusetts (2)
Local Public Document Room (LPDR)
                                                                                                                                i
Nuclear Safety Information Center (NSIC)
                                  0FFICIAL RECORD COPY IR PILGRIM 89-07 - 0002.0.0
NRC Resident Inspector
                                                          08/22/89
Commonwealth of Massachusetts (2)
e                                                 -               -   - - _ _ - - - . - - . - - -     _ _ - - _ - _ _ - -
i
                                                                                                                                ,
0FFICIAL RECORD COPY IR PILGRIM 89-07 - 0002.0.0
08/22/89
e
-
-
- - _ _ - - - . - - . - - -
_ _ - - _ - _ _ - -
,


m . .             .
m . .
                          -
.
                              ,
-
                                                                                            --- -               -
---
      ,
-
        ,,   ,
-
          4.         "
,
  f.
,
                  Boston' Edison Company                     3'
,,
                                                                      SEP e 7 igeg
,
                  bec w/encls:.
"
                  Region I. Docket Room (with concurrences)
4.
                - Management Assistant, DRMA (w/o encis)
f.
                  W. Russell, RI
Boston' Edison Company
                - T.. Martin,' RI
3'
                  W. Kane, RI
SEP e 7 igeg
              : B. Boger,'RI-
bec w/encls:.
                .,
Region I. Docket Room (with concurrences)
                  M. Knapp, RI
- Management Assistant, DRMA (w/o encis)
                  J. Johnson, RI
W. Russell, RI
                  S. Collins, RI
- T.. Martin,' RI
                  J. Johnson, RI.
W. Kane, RI
                :
: B. Boger,'RI-
                  R.tBlough, RI.
M. Knapp, RI
                  R; Bellamy,.RI
.,J. Johnson, RI
                  J. Durr,' RI.
S. Collins, RI
                  R..Gallo, RI
J. Johnson, RI.
                  R.. Bores, RI (See Paragraph 8.0)-
R.tBlough, RI.
                  M. Miller, RI
:
                  K. Abraham, RI
R; Bellamy,.RI
                - P. Eapen, RI
J. Durr,' RI.
                  J. Golla, RI
R..Gallo, RI
                  R. Wessman, NRR
R.. Bores, RI (See Paragraph 8.0)-
                . D. Mcdonald, NRR
M. Miller, RI
                  R. Hernan, NRR.
K. Abraham, RI
              - J. Hayes, NRR
- P. Eapen, RI
                  L. Zerr, NRR
J. Golla, RI
              . S. Pu11ani, RI
R. Wessman, NRR
                  C. Warren, SRI - Arkansas Nuclear One
. D. Mcdonald, NRR
                  C. Marschall, SRI'- Pilgrim Station
R. Hernan, NRR.
                  T. Kim, RI.- Pilgrim Station
- J. Hayes, NRR
                  C. Carpenter, RI - Pilgrim Station
L. Zerr, NRR
              . G. Bethke, NRC Contractor
. S. Pu11ani, RI
              - R. Keimig, RI (See Paragraph 7.0)
C. Warren, SRI - Arkansas Nuclear One
                  RI-                        RI RP    (t.hteoqh)     RI            P                  P
C. Marschall, SRI'- Pilgrim Station
T. Kim, RI.- Pilgrim Station
C. Carpenter, RI - Pilgrim Station
. G. Bethke, NRC Contractor
- R. Keimig, RI (See Paragraph 7.0)
(t.hteoqh)
l.
l.
                  C          / dt.
RI-
                            f
RI RP
                                            .R         y.
RI
                                                      ~-
P
                                                                      JJohnson                          ns
P
                                                                a
/ dt.
                  8/7789                     8/22/89                   8/D/89                     h/b/89
.R
                                      0FFICIAL RECORD COPY IR PILGRIM 89-07 - 0003.0.0
y.
                                                            08/22/89
JJohnson
                                                                                                                  I
ns
f
C
~-
a
h/ /89
8/7789
8/22/89
8/D/89
b
0FFICIAL RECORD COPY IR PILGRIM 89-07 - 0003.0.0
08/22/89
I
1
1
                                                                                                              '
l
l                                                                _       ___- ________ ___               -_-
_
___- ________ ___
- _ -
'
}}
}}

Latest revision as of 20:05, 1 December 2024

Forwards Insp Rept 50-293/89-07 on 890525-0710 & Notice of Violation
ML20247K666
Person / Time
Site: Pilgrim
Issue date: 09/07/1989
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
Shared Package
ML20247K670 List:
References
NUDOCS 8909210226
Download: ML20247K666 (3)


See also: IR 05000293/1989007

Text

,-

-

-- ;

-

g ------ -- --

p . og

a

"';g.-

. ..

L

.

...o

..

E.

SEP 0 71989

Docket.No.150-293..

Boston Edison-Company.

ATTN: Mr. Ralph.G., Bird

,

-Senior Vice. President-Nuclear

. Rocky Hill Road

Plymouth, Massachusetts 02360

Gentlemen:

.

Subject: NRC Region.I Inspection Report No. 50-293/89-07

This refers to-the inspection conducted by the NRC Restart Staff on May 25

through July 10, 1989 at the Pilgrim Nuclear Power. Station, Plymouth, Massa-

chusetts. Areas' examined during this inspection are described in the.NRC

Region ~I. Inspection Report which is enclosed with this letter.

The Restart' Staff, through selected around-the-clock shift inspections and rou-

tine. program inspections, observed management controls, conduct of operations

and startup testing activities of the licensee's Power Ascension Test-Program.

Results of the NRC Restart Staff inspections and assessments are taken into-

consideration by the NRC Restart Assessment Panel during ongoing licensee.per-

formance reviews and ' deliberations at each Power Ascension Test Program ap-

proval point.

The Restart Staff has concluded that overall plant operations were conducted

in a safety-conscious manner. The Restart Staff has determined that your con-

' duct and control of the first phase of the Shutdown from Outside the Control

Room test was excellent.

However, our inspection also noted that several of your activities were not

conducted in accordance with NRC requirements as set forth in the Notice of

Violation, Appendix A, enclosed herein. These violations have been categorized

by severity level in accordance with the revised NRC Enforcement Policy (10 CFR 2, Appendix C) published in the Federal Register Notice (Enforcement Policy

1988). You are required to respond to this letter and in preparing your re-

sponse, jou should follow the instructions in Appendix A.

The response directed by this letter and the accompanying notice are not sub-

ject.to the clearance procedures of the Office of Management and Budget as re-

quired by the Paperwork Reduction Act of 1980, PL 96-511.

i

t

OFFICIAL RECORD COPY IR PILGRIM 89-07 - 0001.0.0

/

08/22/89

(

8909210226 890907

f

PDR

ADOCK 05000293

Q

PDC

_ _ _ _ _ _ _ _ _

.

.

..J

c

1 -

.

'.

4

'

.,

m

~ Boston Edison Company.

2

-

,

,7

- Your. cooperation with'us in this matter is appreciated.

Sincerely,

'

i-

Original Signed By:

Samuel J. Collins, Deputy Director

,

Division of Reactor Projects

Enclosures:

'1.

_ Appendix A, Notice'of Violation

2.

NRC. Region I~ Inspection Report No. 50-293/89-07 w/ attachments

cc w/ enc 1s:

'K. Highfill, Station Director

R. Anderson, Plant Manager

J. Dietrich, Licensing Division Manager

E. Robinson, Nuclear-Information Manager

R. Swanson, Nuclear Engineering Department Manager

The Honorable John F. Kerry

The Honorable Edward J.'Markey

.The Honorable Edward-P. Kirby

The Honorable Peter V. Forman

The Honorable Nicholas J. Costello

>The' Honorable Lawrence R. Alexander

B. McIntyre, Chairman, Department of Public Utilities

Chairman, Plymouth Board of Selectmen

Chairman, Duxbury Board of Selectmen

Plymouth Civil Defense Director

P. Agnes,' Assistant Secretary of Public Safety, Commonwealth of Massachusetts

S. Pollard, Massachusetts Secretary of Energy Resources

R. Shimshak, MASSPIRG

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

i

0FFICIAL RECORD COPY IR PILGRIM 89-07 - 0002.0.0

08/22/89

e

-

-

- - _ _ - - - . - - . - - -

_ _ - - _ - _ _ - -

,

m . .

.

-

---

-

-

,

,

,,

,

"

4.

f.

Boston' Edison Company

3'

SEP e 7 igeg

bec w/encls:.

Region I. Docket Room (with concurrences)

- Management Assistant, DRMA (w/o encis)

W. Russell, RI

- T.. Martin,' RI

W. Kane, RI

B. Boger,'RI-

M. Knapp, RI

.,J. Johnson, RI

S. Collins, RI

J. Johnson, RI.

R.tBlough, RI.

R; Bellamy,.RI

J. Durr,' RI.

R..Gallo, RI

R.. Bores, RI (See Paragraph 8.0)-

M. Miller, RI

K. Abraham, RI

- P. Eapen, RI

J. Golla, RI

R. Wessman, NRR

. D. Mcdonald, NRR

R. Hernan, NRR.

- J. Hayes, NRR

L. Zerr, NRR

. S. Pu11ani, RI

C. Warren, SRI - Arkansas Nuclear One

C. Marschall, SRI'- Pilgrim Station

T. Kim, RI.- Pilgrim Station

C. Carpenter, RI - Pilgrim Station

. G. Bethke, NRC Contractor

- R. Keimig, RI (See Paragraph 7.0)

(t.hteoqh)

l.

RI-

RI RP

RI

P

P

/ dt.

.R

y.

JJohnson

ns

f

C

~-

a

h/ /89

8/7789

8/22/89

8/D/89

b

0FFICIAL RECORD COPY IR PILGRIM 89-07 - 0003.0.0

08/22/89

I

1

l

_

___- ________ ___

- _ -

'