05000250/LER-2023-002, Manual Reactor Trip Due to Steam Generator Feedwater Regulating Valve Positioner Failure: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 32: | Line 32: | ||
=text= | =text= | ||
{{#Wiki_filter:October 2, 2023 Docket No. 50-250 L-2023-138 10 CPR 50.73 U.S. Nuclear Regulatmy Commission ATTN: Document Control Desk Washington, DC 20555-00001 | {{#Wiki_filter:October 2, 2023 Docket No. 50-250 L-2023-138 10 CPR 50.73 U.S. Nuclear Regulatmy Commission ATTN: Document Control Desk Washington, DC 20555-00001 Re: | ||
Turkey Point Nuclear Plant, Unit 3 Docket 50-250 Reportable Event: 2023-02-00 Date of Event: August 4, 2023 Manual Reactor Trip due to Steam Generator Feedwater Regulating Valve Positioner Failure The attached Licensee Event Report 2023-02 is being submitted pursuant to the requirements of 10 CFR 50.73 to provide notification of the subject event. If you have any questions, please contact Mr. | |||
Kenneth Mack, Fleet Licensing Manager, at 561-904-3635. | |||
Respectfully, DL~~b Dianne Strand General Manager, Regulatory Affairs Florida Power & Light Company Attachment cc: Turkey Point NRC Senior Resident Inspector Turkey Point NRC Project Manager Florida Power & Light Company 9760 SW 344th Street, Homestead, FL 33035 | |||