ML17324B358: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML17324B358
| number = ML17324B358
| issue date = 11/27/2017
| issue date = 11/27/2017
| title = Braidwood Station, Unit 1 - Review of Steam Generator Tube Report for the Fall 2016 Inspections During Refueling Outage 19 (CAC No. Mf9343; Epid L-2017-LLL-0007)
| title = Braidwood Station, Unit 1 - Review of Steam Generator Tube Report for the Fall 2016 Inspections During Refueling Outage 19 (CAC No. MF9343; EPID L-2017-LLL-0007)
| author name = Wiebe J S
| author name = Wiebe J S
| author affiliation = NRC/NRR/DORL/LPLIII
| author affiliation = NRC/NRR/DORL/LPLIII

Revision as of 00:18, 27 February 2018

Braidwood Station, Unit 1 - Review of Steam Generator Tube Report for the Fall 2016 Inspections During Refueling Outage 19 (CAC No. MF9343; EPID L-2017-LLL-0007)
ML17324B358
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 11/27/2017
From: Joel Wiebe
Plant Licensing Branch III
To: Bryan Hanson
Exelon Generation Co
Wiebe J S
References
CAC MF9343, EPID L-2017-LLL-0007
Download: ML17324B358 (3)