NMP2L2877, 2023 Annual Environmental Operating Report: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 18: Line 18:
{{#Wiki_filter:Constellation~
{{#Wiki_filter:Constellation~


Appendix             B
Appendix B


NMP2L2877 April 19, 2024
NMP2L2877 April 19, 2024


U                 .S. Nuclear           Regulatory                 Commission Attn:                                 Document                                         Control     Desk Washington                                 , DC 20555-0001
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001


Nine Mile Point Nuclear           Station, Unit       2 Renewed                       Facility Operating License       No           . NPF-69 Docket       No           . 50-410
Nine Mile Point Nuclear Station, Unit 2 Renewed Facility Operating License No. NPF-69 Docket No. 50-410


==Subject:==
==Subject:==
2023   Annual                               Environmental                         Operating             Report
2023 Annual Environmental Operating Report


In                         accordance                                                                       with Appendix                         B ,             Environmental                                     Protection               Plan           ,             of           the       Renewed                                         Faci     lity Operating License     No           . NPF-69 for Nine Mile Point Nuclear           Station, Unit       2 , attached             is the 2023 Annual                                     Environmental                               Operating Report for the period of   January                                                       1,     2023     through             December 31       , 2023 .
In accordance with Appendix B, Environmental Protection Plan, of the Renewed Faci lity Operating License No. NPF-69 for Nine Mile Point Nuclear Station, Unit 2, attached is the 2023 Annual Environmental Operating Report for the period of January 1, 2023 through December 31, 2023.


Th is submittal does           not           contain                         any                                   new                   regulatory         commitments                           .
Th is submittal does not contain any new regulatory commitments.


Should             you                                   have             questions         regarding   the information                 in this submittal,   please contact                             Brandon Shultz, Site Regulatory               Assurance                               Manager                         , at (315)   349-7012 .
Should you have questions regarding the information in this submittal, please contact Brandon Shultz, Site Regulatory Assurance Manager, at (315) 349-7012.


Sincerely,
Sincerely,
~                                                                                                                                                                                                                                                                                     M                                       UfL~-
~ M UfL~-


Peter M . Orphanos Site Vice           President, Nine Mile Point Nuclear           Station
Peter M. Orphanos Site Vice President, Nine Mile Point Nuclear Station


PMO/EEK
PMO/EEK


Enclosure                   :                                                             Nine Mile Point Nuclear           Station, Un                           it 2 2023 Annual                               Environmenta                                     l Operating Report
Enclosure : Nine Mile Point Nuclear Station, Un it 2 2023 Annual Environmenta l Operating Report


cc             :                                                               NRC     Regional         Administrator, Region             I NRC     Project Manager NRC   Resident Inspector Enclosure
cc : NRC Regional Administrator, Region I NRC Project Manager NRC Resident Inspector Enclosure


Nine Mile Point   Nuclear               Station,         Unit         2
Nine Mile Point Nuclear Station, Unit 2


2023 Annual                                   Environmental                                     Operating     Report ATTACHMENT
2023 Annual Environmental Operating Report ATTACHMENT


NMPNS         UNIT       2 2023     ANNUAL       ENVIRONMENTAL                             OPERATING                       REPORT
NMPNS UNIT 2 2023 ANNUAL ENVIRONMENTAL OPERATING REPORT


Subsection                       5 .4.1               of       the               Environmental                               Protection                       Plan               (EPP),                 as             contained                               in             Appendix                         B           of       the Renewed               Operating                 License             for           the         Nine             Mile           Point         Nuclear                 Station               Unit           2,           requires               that           an         Annual Environmental                       Operating                 Report                 be         submitted                 to         the         Commission                         prior           to         May                   l           of each           year.                                   The following                   addresses                   the             requirements                       found                   in             Subsection                       5.4.1             of   the           EPP             for           the             submittal                   of     the Annual       Environmental                 Operating           Report:
Subsection 5.4.1 of the Environmental Protection Plan (EPP), as contained in Appendix B of the Renewed Operating License for the Nine Mile Point Nuclear Station Unit 2, requires that an Annual Environmental Operating Report be submitted to the Commission prior to May l of each year. The following addresses the requirements found in Subsection 5.4.1 of the EPP for the submittal of the Annual Environmental Operating Report:
: 1.                                     Provide     summaries       and   analyses     of the   results   of the   environmental   protection       activities   required by   Subsection   4.2   (if any)     of the   EPP for       the   report     period,         including   a     comparison         with related preoperational                       studies,             operational                   controls                 (as                 appropriate),                   and       previous                 non-radiological environmental                 monitoring             reports,               and               an                 assessment           of the             observed                 impacts             of the         plant operation                   on               the           environment.                           If harmful               effects   or             evidence       of trends             towards               irreversible damage           to     the   environment     are         observed,     a     detailed       analysis       of the data         and   a   proposed         course of mitigating action shall     be provided.
: 1. Provide summaries and analyses of the results of the environmental protection activities required by Subsection 4.2 (if any) of the EPP for the report period, including a comparison with related preoperational studies, operational controls (as appropriate), and previous non-radiological environmental monitoring reports, and an assessment of the observed impacts of the plant operation on the environment. If harmful effects or evidence of trends towards irreversible damage to the environment are observed, a detailed analysis of the data and a proposed course of mitigating action shall be provided.


Subsection           4.2   of the     EPP   denotes       three     areas     of environmental                     monitoring:
Subsection 4.2 of the EPP denotes three areas of environmental monitoring:
* Subsection               4.2.1         (Aquatic         Monitoring)             has       no     specific         monitoring                 requirements                 although it     is   noted       that   the     Commission                 will       rely     on   the   decisions           made       by   the     State     of New     York under               the             authority                   of     the           Clean               Water               Act           (CW A)             for           any               requirements.                                             Aquatic monitoring                             is             specified                       in           the           station's                       State             Pollutant                 Discharge                   Elimination                     System Permit             (SPDES                 Permit)               which                 is           a         site           permit             applicable                   to         Nine             Mile             Point         Nuclear Station               Unit               I         and           Unit           2.                       The         SPDES             Permit             requires               a         limited             Aquatic               Monitoring Program             (referred           to         in       the     permit           as       Biological           Monitoring               Requirements)                     which,       at     the present               time,                     is           only             applicable                 to             Unit                     1.                                 Unit           2               is                 in             compliance                         with               the           CW A.
* Subsection 4.2.1 (Aquatic Monitoring) has no specific monitoring requirements although it is noted that the Commission will rely on the decisions made by the State of New York under the authority of the Clean Water Act (CW A) for any requirements. Aquatic monitoring is specified in the station's State Pollutant Discharge Elimination System Permit (SPDES Permit) which is a site permit applicable to Nine Mile Point Nuclear Station Unit I and Unit 2. The SPDES Permit requires a limited Aquatic Monitoring Program (referred to in the permit as Biological Monitoring Requirements) which, at the present time, is only applicable to Unit 1. Unit 2 is in compliance with the CW A.
Therefore,               no   Aquatic       Monitoring             Program             is     presently           required         for     Unit     2.
Therefore, no Aquatic Monitoring Program is presently required for Unit 2.
* Subsection         4.2.2       (Terrestrial           Monitoring)           does     not   contain       any       monitoring               requirements.
* Subsection 4.2.2 (Terrestrial Monitoring) does not contain any monitoring requirements.
* Subsection           4.2.3     (Noise       Monitoring)           does     not contai\\1 any       monitoring               requirements.
* Subsection 4.2.3 (Noise Monitoring) does not contai\\1 any monitoring requirements.
: 2.                                 Provide       a list of EPP     non-compliances   and corrective     actions   taken   to   remedy     them.
: 2. Provide a list of EPP non-compliances and corrective actions taken to remedy them.


A     review         of the     EPP       requirements                 and       plant       records         showed       that     there       were       no     non-compliances with     the     EPP   requirements             during       2023.
A review of the EPP requirements and plant records showed that there were no non-compliances with the EPP requirements during 2023.
: 3.                                     Provide             a           list       of all           changes               in           station             design         or             operation,               tests,         and           experiments         made               in accordance                         with               EPP                   Subsection               3.1                   which             involved             a             potentially                       significant                 unreviewed environmental     question (non-radiological).
: 3. Provide a list of all changes in station design or operation, tests, and experiments made in accordance with EPP Subsection 3.1 which involved a potentially significant unreviewed environmental question (non-radiological).


A           review               of       plant             records,                 including                 environmental                             evaluations,                       showed                 that             there             were                     no changes               in     station       design/operation,         tests,       or   experiments               during       2023         that     could         have         involved               a potentially             significant           unreviewed             environmental                 question         (non-radiological).
A review of plant records, including environmental evaluations, showed that there were no changes in station design/operation, tests, or experiments during 2023 that could have involved a potentially significant unreviewed environmental question (non-radiological).


Page       I   of2
Page I of2
./.                       List all non-routine   reports     submilled in accordance         with Subsection 5 . ./.2 of the EPP.
./. List all non-routine reports submilled in accordance with Subsection 5../.2 of the EPP.


During       2023,       there       were       no     non-routine             reports       submitted               to     the     Commission                         in   accordance             with Subsection           5.4.2     of the     EPP.
During 2023, there were no non-routine reports submitted to the Commission in accordance with Subsection 5.4.2 of the EPP.


Page 2 of2}}
Page 2 of2}}

Revision as of 14:05, 4 October 2024

2023 Annual Environmental Operating Report
ML24136A102
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 04/19/2024
From: Orphanos P
Constellation Energy Generation
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMP2L2877
Download: ML24136A102 (1)


Text

Constellation~

Appendix B

NMP2L2877 April 19, 2024

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Nine Mile Point Nuclear Station, Unit 2 Renewed Facility Operating License No. NPF-69 Docket No. 50-410

Subject:

2023 Annual Environmental Operating Report

In accordance with Appendix B, Environmental Protection Plan, of the Renewed Faci lity Operating License No. NPF-69 for Nine Mile Point Nuclear Station, Unit 2, attached is the 2023 Annual Environmental Operating Report for the period of January 1, 2023 through December 31, 2023.

Th is submittal does not contain any new regulatory commitments.

Should you have questions regarding the information in this submittal, please contact Brandon Shultz, Site Regulatory Assurance Manager, at (315) 349-7012.

Sincerely,

~ M UfL~-

Peter M. Orphanos Site Vice President, Nine Mile Point Nuclear Station

PMO/EEK

Enclosure : Nine Mile Point Nuclear Station, Un it 2 2023 Annual Environmenta l Operating Report

cc : NRC Regional Administrator, Region I NRC Project Manager NRC Resident Inspector Enclosure

Nine Mile Point Nuclear Station, Unit 2

2023 Annual Environmental Operating Report ATTACHMENT

NMPNS UNIT 2 2023 ANNUAL ENVIRONMENTAL OPERATING REPORT

Subsection 5.4.1 of the Environmental Protection Plan (EPP), as contained in Appendix B of the Renewed Operating License for the Nine Mile Point Nuclear Station Unit 2, requires that an Annual Environmental Operating Report be submitted to the Commission prior to May l of each year. The following addresses the requirements found in Subsection 5.4.1 of the EPP for the submittal of the Annual Environmental Operating Report:

1. Provide summaries and analyses of the results of the environmental protection activities required by Subsection 4.2 (if any) of the EPP for the report period, including a comparison with related preoperational studies, operational controls (as appropriate), and previous non-radiological environmental monitoring reports, and an assessment of the observed impacts of the plant operation on the environment. If harmful effects or evidence of trends towards irreversible damage to the environment are observed, a detailed analysis of the data and a proposed course of mitigating action shall be provided.

Subsection 4.2 of the EPP denotes three areas of environmental monitoring:

  • Subsection 4.2.1 (Aquatic Monitoring) has no specific monitoring requirements although it is noted that the Commission will rely on the decisions made by the State of New York under the authority of the Clean Water Act (CW A) for any requirements. Aquatic monitoring is specified in the station's State Pollutant Discharge Elimination System Permit (SPDES Permit) which is a site permit applicable to Nine Mile Point Nuclear Station Unit I and Unit 2. The SPDES Permit requires a limited Aquatic Monitoring Program (referred to in the permit as Biological Monitoring Requirements) which, at the present time, is only applicable to Unit 1. Unit 2 is in compliance with the CW A.

Therefore, no Aquatic Monitoring Program is presently required for Unit 2.

  • Subsection 4.2.2 (Terrestrial Monitoring) does not contain any monitoring requirements.
  • Subsection 4.2.3 (Noise Monitoring) does not contai\\1 any monitoring requirements.
2. Provide a list of EPP non-compliances and corrective actions taken to remedy them.

A review of the EPP requirements and plant records showed that there were no non-compliances with the EPP requirements during 2023.

3. Provide a list of all changes in station design or operation, tests, and experiments made in accordance with EPP Subsection 3.1 which involved a potentially significant unreviewed environmental question (non-radiological).

A review of plant records, including environmental evaluations, showed that there were no changes in station design/operation, tests, or experiments during 2023 that could have involved a potentially significant unreviewed environmental question (non-radiological).

Page I of2

./. List all non-routine reports submilled in accordance with Subsection 5../.2 of the EPP.

During 2023, there were no non-routine reports submitted to the Commission in accordance with Subsection 5.4.2 of the EPP.

Page 2 of2