|
|
Line 18: |
Line 18: |
| {{#Wiki_filter:Constellation~ | | {{#Wiki_filter:Constellation~ |
|
| |
|
| Appendix B | | Appendix B |
|
| |
|
| NMP2L2877 April 19, 2024 | | NMP2L2877 April 19, 2024 |
|
| |
|
| U .S. Nuclear Regulatory Commission Attn: Document Control Desk Washington , DC 20555-0001 | | U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 |
|
| |
|
| Nine Mile Point Nuclear Station, Unit 2 Renewed Facility Operating License No . NPF-69 Docket No . 50-410 | | Nine Mile Point Nuclear Station, Unit 2 Renewed Facility Operating License No. NPF-69 Docket No. 50-410 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| 2023 Annual Environmental Operating Report | | 2023 Annual Environmental Operating Report |
|
| |
|
| In accordance with Appendix B , Environmental Protection Plan , of the Renewed Faci lity Operating License No . NPF-69 for Nine Mile Point Nuclear Station, Unit 2 , attached is the 2023 Annual Environmental Operating Report for the period of January 1, 2023 through December 31 , 2023 . | | In accordance with Appendix B, Environmental Protection Plan, of the Renewed Faci lity Operating License No. NPF-69 for Nine Mile Point Nuclear Station, Unit 2, attached is the 2023 Annual Environmental Operating Report for the period of January 1, 2023 through December 31, 2023. |
|
| |
|
| Th is submittal does not contain any new regulatory commitments . | | Th is submittal does not contain any new regulatory commitments. |
|
| |
|
| Should you have questions regarding the information in this submittal, please contact Brandon Shultz, Site Regulatory Assurance Manager , at (315) 349-7012 . | | Should you have questions regarding the information in this submittal, please contact Brandon Shultz, Site Regulatory Assurance Manager, at (315) 349-7012. |
|
| |
|
| Sincerely, | | Sincerely, |
| ~ M UfL~- | | ~ M UfL~- |
|
| |
|
| Peter M . Orphanos Site Vice President, Nine Mile Point Nuclear Station | | Peter M. Orphanos Site Vice President, Nine Mile Point Nuclear Station |
|
| |
|
| PMO/EEK | | PMO/EEK |
|
| |
|
| Enclosure : Nine Mile Point Nuclear Station, Un it 2 2023 Annual Environmenta l Operating Report | | Enclosure : Nine Mile Point Nuclear Station, Un it 2 2023 Annual Environmenta l Operating Report |
|
| |
|
| cc : NRC Regional Administrator, Region I NRC Project Manager NRC Resident Inspector Enclosure | | cc : NRC Regional Administrator, Region I NRC Project Manager NRC Resident Inspector Enclosure |
|
| |
|
| Nine Mile Point Nuclear Station, Unit 2 | | Nine Mile Point Nuclear Station, Unit 2 |
|
| |
|
| 2023 Annual Environmental Operating Report ATTACHMENT | | 2023 Annual Environmental Operating Report ATTACHMENT |
|
| |
|
| NMPNS UNIT 2 2023 ANNUAL ENVIRONMENTAL OPERATING REPORT | | NMPNS UNIT 2 2023 ANNUAL ENVIRONMENTAL OPERATING REPORT |
|
| |
|
| Subsection 5 .4.1 of the Environmental Protection Plan (EPP), as contained in Appendix B of the Renewed Operating License for the Nine Mile Point Nuclear Station Unit 2, requires that an Annual Environmental Operating Report be submitted to the Commission prior to May l of each year. The following addresses the requirements found in Subsection 5.4.1 of the EPP for the submittal of the Annual Environmental Operating Report: | | Subsection 5.4.1 of the Environmental Protection Plan (EPP), as contained in Appendix B of the Renewed Operating License for the Nine Mile Point Nuclear Station Unit 2, requires that an Annual Environmental Operating Report be submitted to the Commission prior to May l of each year. The following addresses the requirements found in Subsection 5.4.1 of the EPP for the submittal of the Annual Environmental Operating Report: |
| : 1. Provide summaries and analyses of the results of the environmental protection activities required by Subsection 4.2 (if any) of the EPP for the report period, including a comparison with related preoperational studies, operational controls (as appropriate), and previous non-radiological environmental monitoring reports, and an assessment of the observed impacts of the plant operation on the environment. If harmful effects or evidence of trends towards irreversible damage to the environment are observed, a detailed analysis of the data and a proposed course of mitigating action shall be provided. | | : 1. Provide summaries and analyses of the results of the environmental protection activities required by Subsection 4.2 (if any) of the EPP for the report period, including a comparison with related preoperational studies, operational controls (as appropriate), and previous non-radiological environmental monitoring reports, and an assessment of the observed impacts of the plant operation on the environment. If harmful effects or evidence of trends towards irreversible damage to the environment are observed, a detailed analysis of the data and a proposed course of mitigating action shall be provided. |
|
| |
|
| Subsection 4.2 of the EPP denotes three areas of environmental monitoring: | | Subsection 4.2 of the EPP denotes three areas of environmental monitoring: |
| * Subsection 4.2.1 (Aquatic Monitoring) has no specific monitoring requirements although it is noted that the Commission will rely on the decisions made by the State of New York under the authority of the Clean Water Act (CW A) for any requirements. Aquatic monitoring is specified in the station's State Pollutant Discharge Elimination System Permit (SPDES Permit) which is a site permit applicable to Nine Mile Point Nuclear Station Unit I and Unit 2. The SPDES Permit requires a limited Aquatic Monitoring Program (referred to in the permit as Biological Monitoring Requirements) which, at the present time, is only applicable to Unit 1. Unit 2 is in compliance with the CW A. | | * Subsection 4.2.1 (Aquatic Monitoring) has no specific monitoring requirements although it is noted that the Commission will rely on the decisions made by the State of New York under the authority of the Clean Water Act (CW A) for any requirements. Aquatic monitoring is specified in the station's State Pollutant Discharge Elimination System Permit (SPDES Permit) which is a site permit applicable to Nine Mile Point Nuclear Station Unit I and Unit 2. The SPDES Permit requires a limited Aquatic Monitoring Program (referred to in the permit as Biological Monitoring Requirements) which, at the present time, is only applicable to Unit 1. Unit 2 is in compliance with the CW A. |
| Therefore, no Aquatic Monitoring Program is presently required for Unit 2. | | Therefore, no Aquatic Monitoring Program is presently required for Unit 2. |
| * Subsection 4.2.2 (Terrestrial Monitoring) does not contain any monitoring requirements. | | * Subsection 4.2.2 (Terrestrial Monitoring) does not contain any monitoring requirements. |
| * Subsection 4.2.3 (Noise Monitoring) does not contai\\1 any monitoring requirements. | | * Subsection 4.2.3 (Noise Monitoring) does not contai\\1 any monitoring requirements. |
| : 2. Provide a list of EPP non-compliances and corrective actions taken to remedy them. | | : 2. Provide a list of EPP non-compliances and corrective actions taken to remedy them. |
|
| |
|
| A review of the EPP requirements and plant records showed that there were no non-compliances with the EPP requirements during 2023. | | A review of the EPP requirements and plant records showed that there were no non-compliances with the EPP requirements during 2023. |
| : 3. Provide a list of all changes in station design or operation, tests, and experiments made in accordance with EPP Subsection 3.1 which involved a potentially significant unreviewed environmental question (non-radiological). | | : 3. Provide a list of all changes in station design or operation, tests, and experiments made in accordance with EPP Subsection 3.1 which involved a potentially significant unreviewed environmental question (non-radiological). |
|
| |
|
| A review of plant records, including environmental evaluations, showed that there were no changes in station design/operation, tests, or experiments during 2023 that could have involved a potentially significant unreviewed environmental question (non-radiological). | | A review of plant records, including environmental evaluations, showed that there were no changes in station design/operation, tests, or experiments during 2023 that could have involved a potentially significant unreviewed environmental question (non-radiological). |
|
| |
|
| Page I of2 | | Page I of2 |
| ./. List all non-routine reports submilled in accordance with Subsection 5 . ./.2 of the EPP. | | ./. List all non-routine reports submilled in accordance with Subsection 5../.2 of the EPP. |
|
| |
|
| During 2023, there were no non-routine reports submitted to the Commission in accordance with Subsection 5.4.2 of the EPP. | | During 2023, there were no non-routine reports submitted to the Commission in accordance with Subsection 5.4.2 of the EPP. |
|
| |
|
| Page 2 of2}} | | Page 2 of2}} |
|
---|
Category:Environmental Monitoring Report
MONTHYEARML24158A2052024-05-15015 May 2024 Annual Radioactive Environmental Operating Report NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 22024-05-15015 May 2024 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report2024-04-30030 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report NMP2L2877, 2023 Annual Environmental Operating Report2024-04-19019 April 2024 2023 Annual Environmental Operating Report NMP1L3522, Independent Spent Fuel Storage Installation (ISFSI) - 2022 Radioactive Effluent Release Report2023-04-30030 April 2023 Independent Spent Fuel Storage Installation (ISFSI) - 2022 Radioactive Effluent Release Report NMP1L3459, 2021 Annual Radiological Environmental Operating Report2022-05-0808 May 2022 2021 Annual Radiological Environmental Operating Report NMP1L3457, 2021 Radioactive Effluent Release Report for Nine Mile Point Units 1 and 22022-04-30030 April 2022 2021 Radioactive Effluent Release Report for Nine Mile Point Units 1 and 2 NMP2L2805, Annual Environmental Operating Report2022-04-23023 April 2022 Annual Environmental Operating Report NMP1L3388, 2020 Radioactive Effluent Release Report for Nine Mile Point Units 1 and 22021-04-30030 April 2021 2020 Radioactive Effluent Release Report for Nine Mile Point Units 1 and 2 NMP2L2765, Submittal of 2020 Annual Environmental Operating Report2021-04-23023 April 2021 Submittal of 2020 Annual Environmental Operating Report NMP1L3336, Independent Spent Fuel Storage Installation (ISFSI) - Submittal of 2019 Radioactive Effluent Release Report2020-04-30030 April 2020 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of 2019 Radioactive Effluent Release Report NMP2L2727, Submittal of 2019 Annual Environmental Operating Report2020-04-27027 April 2020 Submittal of 2019 Annual Environmental Operating Report NMP1L3273, 2018 Radioactive Effluent Release Report for Nine Mile Point Units 1 and 22019-04-23023 April 2019 2018 Radioactive Effluent Release Report for Nine Mile Point Units 1 and 2 NMP1L3212, Submittal of 2017 Annual Radiological Environmental Operating Report2018-05-10010 May 2018 Submittal of 2017 Annual Radiological Environmental Operating Report NMP2L2671, Submittal of 2017 Annual Environmental Operating Report2018-04-19019 April 2018 Submittal of 2017 Annual Environmental Operating Report NMP1L3211, Independent Spent Fuel Storage Installation - 2017 Radioactive Effluent Release Report2018-04-19019 April 2018 Independent Spent Fuel Storage Installation - 2017 Radioactive Effluent Release Report NMP1L3151, Submittal of 2016 Annual Radiological Environmental Operating Report2017-05-12012 May 2017 Submittal of 2016 Annual Radiological Environmental Operating Report NMP1L3150, Independent Spent Fuel Storage Installation, Submittal of 2016 Radioactive Effluent Release Report2017-04-28028 April 2017 Independent Spent Fuel Storage Installation, Submittal of 2016 Radioactive Effluent Release Report NMP2L2645, Annual Environmental Operating Report2017-04-19019 April 2017 Annual Environmental Operating Report ML16139A5592016-05-13013 May 2016 Transmittal of 2015 Annual Radiological Environmental Operating Report NMP1L3082, Radioactive Effluent Release Report for 20152016-05-0202 May 2016 Radioactive Effluent Release Report for 2015 NMP2L2617, Transmittal of 2015 Annual Environmental Operating Report2016-04-15015 April 2016 Transmittal of 2015 Annual Environmental Operating Report ML15138A1332015-05-13013 May 2015 2014 Annual Radiological Environmental Operating Report ML15133A3212015-05-0101 May 2015 2014 Radioactive Effluent Release Report ML14139A0832014-05-0808 May 2014 Annual Radiological Environmental Operating Report ML14135A0792014-05-0101 May 2014 Radioactive Effluent Release Report, January - December 2013 ML14135A0782014-05-0101 May 2014 Submittal of Radioactive Effluent Release Report, January - December 2013 ML13310A6092013-10-25025 October 2013 Unusual or Important Environmental Event ML13142A5292013-05-15015 May 2013 LLC 2012 Annual Radiological Environmental Operating Report, 5.0 Data Evaluation and Discussion ML13142A5302013-05-15015 May 2013 LLC 2012 Annual Radiological Environmental Operating Report, 7.0 Historical Data Tables ML13142A5272013-05-15015 May 2013 LLC 2012 Annual Radiological Environmental Operating Report, Enclosure ML13130A0062013-05-0101 May 2013 Radioactive Effluent Release Report, January - December 2012 ML13128A3662013-05-0101 May 2013 Radioactive Effluent Release Report, January - December 2012 ML13094A4062013-03-29029 March 2013 Annual Environmental Operating Report ML12144A4132012-05-15015 May 2012 Transmittal of 2011 Annual Radiological Environmental Operating Report ML12108A0032012-04-0606 April 2012 2011 Annual Environmental Operating Report ML11145A0692011-05-13013 May 2011 Submittal of 2010 Annual Radiological Environmental Operating Report ML11129A0802011-05-0101 May 2011 Radioactive Effluent Release Report, January - December 2010 ML11123A0172011-04-22022 April 2011 2010 Annual Environmental Operating Report ML1015301232010-05-28028 May 2010 State Pollutant Discharge Elimination System Permit No. Ny 000 1015, April 2010, Discharge Monitoring Report ML1013806562010-05-0707 May 2010 Submittal of 2009 Annual Radiological Environmental Operating Report ML1013006832010-05-0101 May 2010 Radioactive Effluent Release Report, January - December 2009 ML1013006842010-05-0101 May 2010 Radioactive Effluent Release Report, January - December 2009 ML0930201162009-10-22022 October 2009 Submittal of State Pollutant Discharge Elimination System Discharge Permit NY-000-1015 ML0913908252009-05-15015 May 2009 2008 Annual Radiological Environmental Operating Report ML0912804332009-05-0101 May 2009 Radioactive Effluent Release Report, January - December 2008 ML0814102992008-05-0808 May 2008 2007 Annual Radiological Environmental Operating Report ML0714102822007-05-11011 May 2007 Annual Radiological Environmental Operating Report ML0712806002007-05-0101 May 2007 Radioactive Effluent Release Report, January - December 2006 ML0710904622007-04-0909 April 2007 Annual Environmental Operating Report 2024-05-15
[Table view] Category:Letter type:NMP
MONTHYEARNMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling NMP1L3591, Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request2024-05-18018 May 2024 Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request NMP1L3589, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-05-16016 May 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 22024-05-15015 May 2024 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report2024-04-30030 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report NMP2L2877, 2023 Annual Environmental Operating Report2024-04-19019 April 2024 2023 Annual Environmental Operating Report NMP2L2878, Core Operating Limits Report2024-04-16016 April 2024 Core Operating Limits Report NMP1L3577, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-03-13013 March 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owners Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owners Activity Report for RFO-27 Inservice Examinations NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications NMP2L2844, Independent Spent Fuel Storage Installation, General License 30-day Cask Registration Notifications2023-06-13013 June 2023 Independent Spent Fuel Storage Installation, General License 30-day Cask Registration Notifications NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3523, Annual Radioactive Environmental Operating Report2023-05-12012 May 2023 Annual Radioactive Environmental Operating Report NMP1L3522, Independent Spent Fuel Storage Installation (ISFSI) - 2022 Radioactive Effluent Release Report2023-04-30030 April 2023 Independent Spent Fuel Storage Installation (ISFSI) - 2022 Radioactive Effluent Release Report NMP1L3525, Core Operating Limits Report2023-04-19019 April 2023 Core Operating Limits Report NMP1L3526, Submittal of Emergency Relief Request I5R-14 Concerning a Proposed Alternative Associated with N2E Safe End-to-Nozzle Dissimilar Metal Weld Repair with Laminar Indication2023-04-13013 April 2023 Submittal of Emergency Relief Request I5R-14 Concerning a Proposed Alternative Associated with N2E Safe End-to-Nozzle Dissimilar Metal Weld Repair with Laminar Indication NMP1L3520, Supplemental Information for License Amendment Request – Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 22023-04-0404 April 2023 Supplemental Information for License Amendment Request – Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2 NMP1L3519, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-03-30030 March 2023 Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3516, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-03-29029 March 2023 Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3517, Proposed Alternative Associated with a Weld Overlay Repair to the Torus2023-03-29029 March 2023 Proposed Alternative Associated with a Weld Overlay Repair to the Torus NMP1L3518, Proposed Alternative to Utilize Specific Provisions of Code Case N-716-3, Alternative Classification and Examination Requirements Section XI, Division 12023-03-29029 March 2023 Proposed Alternative to Utilize Specific Provisions of Code Case N-716-3, Alternative Classification and Examination Requirements Section XI, Division 1 NMP1L3515, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-03-27027 March 2023 Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3513, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-03-24024 March 2023 Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3499, CFR 50.46 Annual Report2023-01-27027 January 2023 CFR 50.46 Annual Report NMP1L3482, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-12-15015 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3486, Radiological Emergency Plan Document Revision2022-12-15015 December 2022 Radiological Emergency Plan Document Revision NMP1L3484, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Reatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-15015 December 2022 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Reatment of Structures, Systems and Components for Nuclear Power Reactors NMP1L3485, Proposed Alternative Associated with a Weld Overlay Repair to the Torus2022-12-0808 December 2022 Proposed Alternative Associated with a Weld Overlay Repair to the Torus NMP2L2823, Supplemental Information for License Amendment Request – Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators2022-10-28028 October 2022 Supplemental Information for License Amendment Request – Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators NMP1L3481, Constellation Energy Generation, LLC, 10 CFR 50, Appendix E - Development of Evacuation Time Estimates2022-09-15015 September 2022 Constellation Energy Generation, LLC, 10 CFR 50, Appendix E - Development of Evacuation Time Estimates NMP1L3477, License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise.2022-08-12012 August 2022 License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise. NMP1L3478, Response to Request for Additional Information - Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps2022-08-0505 August 2022 Response to Request for Additional Information - Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits NMP1L3467, License Amendment Request - Revision to Alternative Source Term Calculation for Main Steam Isolation Valve (MSIV) Leakage and Non-MSIV Leakage2022-06-29029 June 2022 License Amendment Request - Revision to Alternative Source Term Calculation for Main Steam Isolation Valve (MSIV) Leakage and Non-MSIV Leakage NMP1L3465, Independent Spent Fuel Storage Installation - General License 30-day Cask Registration Notifications2022-06-17017 June 2022 Independent Spent Fuel Storage Installation - General License 30-day Cask Registration Notifications 2024-09-20
[Table view] |
Text
Constellation~
Appendix B
NMP2L2877 April 19, 2024
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Nine Mile Point Nuclear Station, Unit 2 Renewed Facility Operating License No. NPF-69 Docket No. 50-410
Subject:
2023 Annual Environmental Operating Report
In accordance with Appendix B, Environmental Protection Plan, of the Renewed Faci lity Operating License No. NPF-69 for Nine Mile Point Nuclear Station, Unit 2, attached is the 2023 Annual Environmental Operating Report for the period of January 1, 2023 through December 31, 2023.
Th is submittal does not contain any new regulatory commitments.
Should you have questions regarding the information in this submittal, please contact Brandon Shultz, Site Regulatory Assurance Manager, at (315) 349-7012.
Sincerely,
~ M UfL~-
Peter M. Orphanos Site Vice President, Nine Mile Point Nuclear Station
PMO/EEK
Enclosure : Nine Mile Point Nuclear Station, Un it 2 2023 Annual Environmenta l Operating Report
cc : NRC Regional Administrator, Region I NRC Project Manager NRC Resident Inspector Enclosure
Nine Mile Point Nuclear Station, Unit 2
2023 Annual Environmental Operating Report ATTACHMENT
NMPNS UNIT 2 2023 ANNUAL ENVIRONMENTAL OPERATING REPORT
Subsection 5.4.1 of the Environmental Protection Plan (EPP), as contained in Appendix B of the Renewed Operating License for the Nine Mile Point Nuclear Station Unit 2, requires that an Annual Environmental Operating Report be submitted to the Commission prior to May l of each year. The following addresses the requirements found in Subsection 5.4.1 of the EPP for the submittal of the Annual Environmental Operating Report:
- 1. Provide summaries and analyses of the results of the environmental protection activities required by Subsection 4.2 (if any) of the EPP for the report period, including a comparison with related preoperational studies, operational controls (as appropriate), and previous non-radiological environmental monitoring reports, and an assessment of the observed impacts of the plant operation on the environment. If harmful effects or evidence of trends towards irreversible damage to the environment are observed, a detailed analysis of the data and a proposed course of mitigating action shall be provided.
Subsection 4.2 of the EPP denotes three areas of environmental monitoring:
- Subsection 4.2.1 (Aquatic Monitoring) has no specific monitoring requirements although it is noted that the Commission will rely on the decisions made by the State of New York under the authority of the Clean Water Act (CW A) for any requirements. Aquatic monitoring is specified in the station's State Pollutant Discharge Elimination System Permit (SPDES Permit) which is a site permit applicable to Nine Mile Point Nuclear Station Unit I and Unit 2. The SPDES Permit requires a limited Aquatic Monitoring Program (referred to in the permit as Biological Monitoring Requirements) which, at the present time, is only applicable to Unit 1. Unit 2 is in compliance with the CW A.
Therefore, no Aquatic Monitoring Program is presently required for Unit 2.
- Subsection 4.2.2 (Terrestrial Monitoring) does not contain any monitoring requirements.
- Subsection 4.2.3 (Noise Monitoring) does not contai\\1 any monitoring requirements.
- 2. Provide a list of EPP non-compliances and corrective actions taken to remedy them.
A review of the EPP requirements and plant records showed that there were no non-compliances with the EPP requirements during 2023.
- 3. Provide a list of all changes in station design or operation, tests, and experiments made in accordance with EPP Subsection 3.1 which involved a potentially significant unreviewed environmental question (non-radiological).
A review of plant records, including environmental evaluations, showed that there were no changes in station design/operation, tests, or experiments during 2023 that could have involved a potentially significant unreviewed environmental question (non-radiological).
Page I of2
./. List all non-routine reports submilled in accordance with Subsection 5../.2 of the EPP.
During 2023, there were no non-routine reports submitted to the Commission in accordance with Subsection 5.4.2 of the EPP.
Page 2 of2