ML20097C854: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 23: Line 23:
WNSCORSin Electnc meacomnr                              .
WNSCORSin Electnc meacomnr                              .
231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 September 7, 1984 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C.                  20555 Attention:            Mr. J. R. Miller, Chief Operating Reactors, Branch 3 Gentlemen:
231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 September 7, 1984 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C.                  20555 Attention:            Mr. J. R. Miller, Chief Operating Reactors, Branch 3 Gentlemen:
DOCKET NOS. 50-266 AND 50-301 MODIFICATION TO TECHNICAL SPECIFICATION CHANGE REQUEST NO. 79 FIRE PROTECTION MODIFICATIONS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Together with a letter dated April 13, 1984, Wisconsin Electric Power Company, licensee for the Point Beach Nuclear Plant, submitted a license amendments application to incorporate revisions to those plant Technical Specifications addressing fire protection and detection systems. The April 13 letter was a modification to the Technical Specifications proposed with our
DOCKET NOS. 50-266 AND 50-301 MODIFICATION TO TECHNICAL SPECIFICATION CHANGE REQUEST NO. 79 FIRE PROTECTION MODIFICATIONS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Together with a {{letter dated|date=April 13, 1984|text=letter dated April 13, 1984}}, Wisconsin Electric Power Company, licensee for the Point Beach Nuclear Plant, submitted a license amendments application to incorporate revisions to those plant Technical Specifications addressing fire protection and detection systems. The April 13 letter was a modification to the Technical Specifications proposed with our
       -letter dated April 19, 1983.
       -{{letter dated|date=April 19, 1983|text=letter dated April 19, 1983}}.
Included with the proposed Technical f.pecification pages enclosed with our April 13 letter was Table 15.3.14-1,
Included with the proposed Technical f.pecification pages enclosed with our April 13 letter was Table 15.3.14-1,
       " Safe Shutdown Area Fire Protection". Attached we have provided a revision to that proposed table. The purpose of this revision is to include the water sprinkler system fire protection which is being added by plant modification to portions of the eight-foot elevation of the auxiliary building north and south.                      It is requested that this revised table be reviewed and considered together with our previously proposed Technical Specifications in this matter.
       " Safe Shutdown Area Fire Protection". Attached we have provided a revision to that proposed table. The purpose of this revision is to include the water sprinkler system fire protection which is being added by plant modification to portions of the eight-foot elevation of the auxiliary building north and south.                      It is requested that this revised table be reviewed and considered together with our previously proposed Technical Specifications in this matter.

Latest revision as of 12:28, 24 September 2022

Application for Amend to Licenses DPR-24 & DPR-27,consisting of Mod to 840413 Tech Spec Change Request 79 Re Fire Protection & Detection Sys
ML20097C854
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/07/1984
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton, John Miller
Office of Nuclear Reactor Regulation
Shared Package
ML20097C861 List:
References
NUDOCS 8409170288
Download: ML20097C854 (2)


Text

.

/

WNSCORSin Electnc meacomnr .

231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 September 7, 1984 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Attention: Mr. J. R. Miller, Chief Operating Reactors, Branch 3 Gentlemen:

DOCKET NOS. 50-266 AND 50-301 MODIFICATION TO TECHNICAL SPECIFICATION CHANGE REQUEST NO. 79 FIRE PROTECTION MODIFICATIONS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Together with a letter dated April 13, 1984, Wisconsin Electric Power Company, licensee for the Point Beach Nuclear Plant, submitted a license amendments application to incorporate revisions to those plant Technical Specifications addressing fire protection and detection systems. The April 13 letter was a modification to the Technical Specifications proposed with our

-letter dated April 19, 1983.

Included with the proposed Technical f.pecification pages enclosed with our April 13 letter was Table 15.3.14-1,

" Safe Shutdown Area Fire Protection". Attached we have provided a revision to that proposed table. The purpose of this revision is to include the water sprinkler system fire protection which is being added by plant modification to portions of the eight-foot elevation of the auxiliary building north and south. It is requested that this revised table be reviewed and considered together with our previously proposed Technical Specifications in this matter.

As discussed in the April-13 letter, some of the fire protection systems addressed by the proposed Technical Specifications are not yet operable. The water sprinkler system in the auxiliary building north and south is presently being installed (or scheduled for installation) and, thus, we would request you notify us prior to issuance of these amendments so that we may establish a schedule for the effective date of the specifications.

noekun R-e9

$006 8409170288 840907 PDR ADOCK 05000266 Ifi /

P PDR

c.

[

/

er Mr. H. R. Denton- September 7, 1984 We,have reviewed'the requirements of 10 CFR 50.91 in relation to this revision'to Table 15'3.14-1.

. Since this proposed. change involves an addition to the' specification, we

'have. concluded,. based on the guidance provided by the NRC at

- 48 Federal Register 14870, that.this change does not involve a.

significant: hazards consideration.

. Enclosed are~three signNd" originals.and forty copies Lof.this modification to.our application. Please contact us-if

.you:have any questions concerning this material.

Very truly yours,

.+

Vice" President-Nuclear Power C.-W. Fay Enclosure

~Copics to NRC Resident Inspector C.-F.1-Riederer, PSCW.

Subscribed and sworn to before me

~

this % . day of September 1984.

>$disEm Q Y wam Notary-Publib, State:of Wisconsin My! Commission expires 6 -/a- J/ .

1 4

I i:

[

l~

t ..

1