ML20133J928: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 26: Line 26:
==Dear Dr. Guo:==
==Dear Dr. Guo:==


By letter dated December 12, 2019 (Agencywide Documents Access and Management System
By {{letter dated|date=December 12, 2019|text=letter dated December 12, 2019}} (Agencywide Documents Access and Management System
[ADAMS] Accession Number ML19350B163), you submitted to the U.S. Nuclear Regulatory Commission (NRC) the triennial update to the Pennsylvania State University (PSU)
[ADAMS] Accession Number ML19350B163), you submitted to the U.S. Nuclear Regulatory Commission (NRC) the triennial update to the Pennsylvania State University (PSU)
Decommissioning Funding Plan (DFP) required by Title 10 of the Code of Federal Regulations (10 CFR) Paragraphs 70.25(e)(2) for the SNM-95 Special Nuclear Materials License. The financial instrument used by the PSU was a self guarantee (SG), consistent with 10 CFR 70.25(e)(2)(f)(2) for a nonprofit entity, such as a college or university. This was submitted for review in separate correspondence (ADAMS Accession No. ML19357A042) dated December 19, 2019. The DFP update is to include a detailed decommissioning cost estimate (DCE) for meeting the criteria of the 10 CFR 20.1402, Radiological criteria for unrestricted use.
Decommissioning Funding Plan (DFP) required by Title 10 of the Code of Federal Regulations (10 CFR) Paragraphs 70.25(e)(2) for the SNM-95 Special Nuclear Materials License. The financial instrument used by the PSU was a self guarantee (SG), consistent with 10 CFR 70.25(e)(2)(f)(2) for a nonprofit entity, such as a college or university. This was submitted for review in separate correspondence (ADAMS Accession No. ML19357A042) dated December 19, 2019. The DFP update is to include a detailed decommissioning cost estimate (DCE) for meeting the criteria of the 10 CFR 20.1402, Radiological criteria for unrestricted use.
Following initial receipt, an acceptance review of your submittal was performed, and identified no administrative omissions or deficiencies that would prevent proceeding with a detailed review. This acceptance was sent to you, by e-mail dated January 22, 2020 (ADAMS Accession No. ML20022A087). There were no deficiencies identified in the detailed review. The Financial Assessment Branch of the Division of Rulemaking, Environmental, and Financial Support in the Office of Nuclear Material Safety and Safeguards conducted the technical review of the adequacy of the submittal for SNM-95.
Following initial receipt, an acceptance review of your submittal was performed, and identified no administrative omissions or deficiencies that would prevent proceeding with a detailed review. This acceptance was sent to you, by e-mail dated January 22, 2020 (ADAMS Accession No. ML20022A087). There were no deficiencies identified in the detailed review. The Financial Assessment Branch of the Division of Rulemaking, Environmental, and Financial Support in the Office of Nuclear Material Safety and Safeguards conducted the technical review of the adequacy of the submittal for SNM-95.
The PSU is required to submit a DCE to the NRC for review and approval as a part of the DFP update. By letter dated May 11, 2020 (ADAMS Accession No. ML20118C220), the NRC staff concluded that the SG satisfies the requirements of 10 CFR 70.25(e)(1), is consistent with NUREG-1757, Vol. 3, Rev. 1, Consolidated Decommissioning Guidance Financial Assurance, The documents transmitted contain security-related information. When separated from Enclosure 2, the remaining documents are decontrolled.
The PSU is required to submit a DCE to the NRC for review and approval as a part of the DFP update. By {{letter dated|date=May 11, 2020|text=letter dated May 11, 2020}} (ADAMS Accession No. ML20118C220), the NRC staff concluded that the SG satisfies the requirements of 10 CFR 70.25(e)(1), is consistent with NUREG-1757, Vol. 3, Rev. 1, Consolidated Decommissioning Guidance Financial Assurance, The documents transmitted contain security-related information. When separated from Enclosure 2, the remaining documents are decontrolled.
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION



Latest revision as of 23:29, 9 August 2022

Transmittal Pennsylvania State University Review of Decommissioning Funding Plan
ML20133J928
Person / Time
Site: 07000013
Issue date: 05/18/2020
From: Ty Naquin
NRC/NMSS/DFM/FFLB
To: Guo Y
Pennsylvania State Univ, University Park, PA, US Federal Power Commission
TDNaquin NMSS/DFM/FFL 415.7352
Shared Package
ML20133J927 List:
References
CAC A38003, EPID L-2019-DFA-0016
Download: ML20133J928 (3)


Text

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION May 18, 2020 Yuanqing Guo, Ph.D., CHP Radiation Safety Officer Environmental Health and Safety The Pennsylvania State University 228 Academic Projects Building University Park, PA 16802

SUBJECT:

PENNSYLVANIA STATE UNIVERSITY - 2019 TRIENNIAL UPDATE TO DECOMMISSIONING FUNDING PLAN AND DECOMMISSIONING COST ESTIMATE, SPECIAL NUCLEAR MATERIAL LICENSE SNM-95, DOCKET 07000113 (CAC/EPID A38003/07000113/L-2019-DFA-0016)

Dear Dr. Guo:

By letter dated December 12, 2019 (Agencywide Documents Access and Management System

[ADAMS] Accession Number ML19350B163), you submitted to the U.S. Nuclear Regulatory Commission (NRC) the triennial update to the Pennsylvania State University (PSU)

Decommissioning Funding Plan (DFP) required by Title 10 of the Code of Federal Regulations (10 CFR) Paragraphs 70.25(e)(2) for the SNM-95 Special Nuclear Materials License. The financial instrument used by the PSU was a self guarantee (SG), consistent with 10 CFR 70.25(e)(2)(f)(2) for a nonprofit entity, such as a college or university. This was submitted for review in separate correspondence (ADAMS Accession No. ML19357A042) dated December 19, 2019. The DFP update is to include a detailed decommissioning cost estimate (DCE) for meeting the criteria of the 10 CFR 20.1402, Radiological criteria for unrestricted use.

Following initial receipt, an acceptance review of your submittal was performed, and identified no administrative omissions or deficiencies that would prevent proceeding with a detailed review. This acceptance was sent to you, by e-mail dated January 22, 2020 (ADAMS Accession No. ML20022A087). There were no deficiencies identified in the detailed review. The Financial Assessment Branch of the Division of Rulemaking, Environmental, and Financial Support in the Office of Nuclear Material Safety and Safeguards conducted the technical review of the adequacy of the submittal for SNM-95.

The PSU is required to submit a DCE to the NRC for review and approval as a part of the DFP update. By letter dated May 11, 2020 (ADAMS Accession No. ML20118C220), the NRC staff concluded that the SG satisfies the requirements of 10 CFR 70.25(e)(1), is consistent with NUREG-1757, Vol. 3, Rev. 1, Consolidated Decommissioning Guidance Financial Assurance, The documents transmitted contain security-related information. When separated from Enclosure 2, the remaining documents are decontrolled.

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION Y. Guo 2 Recordkeeping, and Timeliness, February 2012 (ADAMS Accession No. ML12048A683), and is therefore acceptable. A technical evaluation report for the analysis of the materials license is enclosed.

In accordance with 10 CFR Section 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter and Enclosure 1 will be available electronically for public inspection in the NRC Public Document Room or from ADAMS. The ADAMS database is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Enclosure 2 of this letter will be unavailable to the public in accordance with 10 CFR Paragraph 2.390(d).

If you have any questions regarding this matter, please feel free to contact me at (301) 415-7352 or via e-mail at: Tyrone.Naquin@nrc.gov.

Sincerely, Tyrone D. Naquin, Project Manager Fuel Facility Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No. 70-0113 License No. SNM-95

Enclosure:

1. Technical Evaluation Report (Publicly Available)
2. Technical Evaluation Report (Non-publicly Available)

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

ML20133J927 (Pkg), ML20133J928 (Ltr)

ML20133J929 (Encl.) *via email OFFICE DFM/FFLB/PM* DFM/FFLB/LA* DFM/FFLB/BC* DFM/FFLB/PM*

NAME TNaquin ELee JZimmerman TNaquin DATE 05/13/2020 05/15/2020 05/18/2020 05/18/2020