ML21068A367: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Attachment 5 of Holtec Letter 5014917 Multi-Purpose Canister (MPC) 3.1.1 COMPLETION CONDITION                        REQUIRED ACTION TIME E. Required Actions and          E.1  Remove all fuel assemblies    30 days associated Completion              from the SFSC.
Times not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                    FREQUENCY SR 3.1.1.1          Verify that the MPC cavity has been dried in          Once, prior to accordance with the applicable limits in Table        TRANSPORT 3-1, within the specified vacuum drying time limits    OPERATIONS as applicable.
SR 3.1.1.2          Verify MPC helium backfill quantity is within the      Once, prior to limit specified in Table 3-2 for the applicable MPC    TRANSPORT model. Re-performance of this surveillance is not      OPERATIONS required upon successful completion of Action C.2.2.
SR 3.1.1.3          Verify that the helium leak rate through the MPC      Once, prior to vent and drain port confinement welds meets the        TRANSPORT leaktight criteria of ANSI N14.5-1997. This            OPERATIONS surveillance does not need to be performed in the MPC utilizing the REDUNDANT PORT COVER DESIGN.
Certificate of Compliance No. 1014                                        Amendment No. 165 Appendix A-100U                              3.1.1-3 1 of 1}}

Latest revision as of 19:56, 19 January 2022

HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix A-100U
ML21068A367
Person / Time
Site: Holtec
Issue date: 03/09/2021
From:
Holtec
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML21068A360 List:
References
5014917
Download: ML21068A367 (1)


Text

Attachment 5 of Holtec Letter 5014917 Multi-Purpose Canister (MPC) 3.1.1 COMPLETION CONDITION REQUIRED ACTION TIME E. Required Actions and E.1 Remove all fuel assemblies 30 days associated Completion from the SFSC.

Times not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.1.1 Verify that the MPC cavity has been dried in Once, prior to accordance with the applicable limits in Table TRANSPORT 3-1, within the specified vacuum drying time limits OPERATIONS as applicable.

SR 3.1.1.2 Verify MPC helium backfill quantity is within the Once, prior to limit specified in Table 3-2 for the applicable MPC TRANSPORT model. Re-performance of this surveillance is not OPERATIONS required upon successful completion of Action C.2.2.

SR 3.1.1.3 Verify that the helium leak rate through the MPC Once, prior to vent and drain port confinement welds meets the TRANSPORT leaktight criteria of ANSI N14.5-1997. This OPERATIONS surveillance does not need to be performed in the MPC utilizing the REDUNDANT PORT COVER DESIGN.

Certificate of Compliance No. 1014 Amendment No. 165 Appendix A-100U 3.1.1-3 1 of 1