{{#Wiki_filter:September 27, 2021 10 CPR 50.90 Docket No. 50-443 SBK-L-21105 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Seabrook Station Withdrawal of Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink One-Time Allowed Outage Time (AOT) Extension
 
==References:==
: 1. NextEra Energy Seabrook, LLC letter SBK-L-21103, "Request for Exercise of Enforcement Discretion," September 25, 2021 (ML21268A003).
: 2. NextEra Energy Seabrook, LLC letter SBK-L-21104, "Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink One-Time Allowed Outage Time (AOT) Extension," September 25, 2021 (ML21268A004).
In Reference 1, NextEra Energy Seabrook, LLC (NextEra) submitted a written request for approval of enforcement discretion, as discussed verbally between NextEra and the Nuclear Regulatory Committee (NRC) staff on September 23 , 2021. During the call, NextEra verbally requested enforcement discretion pertaining to Technical Specification (TS) 3.7.4, "Service Water System I Ultimate Heat Sink." That request was to allow delaying taking actions specified within the Technical Specifications, and to provide additional time to process an Emergency License Amendment Request (LAR). The period of enforcement discretion requested was five days. In Reference 2, NextEra submitted an Emergency LAR that would modify TS 3.7.4 ACTION b, by extending the Allowed Outage Time (AOT) on a one-time basis for a Service Water (SW) system cooling tower cell from seven days to sixteen days.
Based upon subsequent repair efforts on SW cooling tower fan 5 lB (l-SW-FN-5 lB), a 24-hour endurance run, and declaration of operability prior to the expiration of the 5-day enforcement discretion period, NextEra hereby withdraws emergency LAR 21-02.
Should you have any questions regarding this information, please contact Matthew Levander, Licensing Manager, at (603) 773-7631.
NextEra Energy Seabrook, LLC P.O. Box 300, Lafayette Road, Seabrook, NH 03 874
 
U.S. Nuclear Regulatory Commission SBK-L-21105 I Page 2 Sincerely, NextEra Energy Seabrook, LLC cc NRC Region I Administrator NRC Project Manager NRC Senior Resident Inspector Director Homeland Security and Emergency Management New Hampshire Department of Safety Division of Homeland Security and Emergency Management Bureau of Emergency Management 33 Hazen Drive Concord, NH 03305 Katharine Cederberg, Lead Nuclear Planner The Commonwealth of Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399}}

Latest revision as of 15:45, 18 January 2022

Withdrawal of Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink One-Time Allowed Outage Time (AOT) Extension
ML21270A107
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 09/27/2021
From: Booth B
NextEra Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SBK-L-21105
Download: ML21270A107 (2)


Text

September 27, 2021 10 CPR 50.90 Docket No. 50-443 SBK-L-21105 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Seabrook Station Withdrawal of Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink One-Time Allowed Outage Time (AOT) Extension

References:

1. NextEra Energy Seabrook, LLC letter SBK-L-21103, "Request for Exercise of Enforcement Discretion," September 25, 2021 (ML21268A003).
2. NextEra Energy Seabrook, LLC letter SBK-L-21104, "Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink One-Time Allowed Outage Time (AOT) Extension," September 25, 2021 (ML21268A004).

In Reference 1, NextEra Energy Seabrook, LLC (NextEra) submitted a written request for approval of enforcement discretion, as discussed verbally between NextEra and the Nuclear Regulatory Committee (NRC) staff on September 23 , 2021. During the call, NextEra verbally requested enforcement discretion pertaining to Technical Specification (TS) 3.7.4, "Service Water System I Ultimate Heat Sink." That request was to allow delaying taking actions specified within the Technical Specifications, and to provide additional time to process an Emergency License Amendment Request (LAR). The period of enforcement discretion requested was five days. In Reference 2, NextEra submitted an Emergency LAR that would modify TS 3.7.4 ACTION b, by extending the Allowed Outage Time (AOT) on a one-time basis for a Service Water (SW) system cooling tower cell from seven days to sixteen days.

Based upon subsequent repair efforts on SW cooling tower fan 5 lB (l-SW-FN-5 lB), a 24-hour endurance run, and declaration of operability prior to the expiration of the 5-day enforcement discretion period, NextEra hereby withdraws emergency LAR 21-02.

Should you have any questions regarding this information, please contact Matthew Levander, Licensing Manager, at (603) 773-7631.

NextEra Energy Seabrook, LLC P.O. Box 300, Lafayette Road, Seabrook, NH 03 874

U.S. Nuclear Regulatory Commission SBK-L-21105 I Page 2 Sincerely, NextEra Energy Seabrook, LLC cc NRC Region I Administrator NRC Project Manager NRC Senior Resident Inspector Director Homeland Security and Emergency Management New Hampshire Department of Safety Division of Homeland Security and Emergency Management Bureau of Emergency Management 33 Hazen Drive Concord, NH 03305 Katharine Cederberg, Lead Nuclear Planner The Commonwealth of Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399