05000324/FIN-2008002-01: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{finding
{{finding
| title = Review Adequacy Of Suppression Pool Temperature Monitoring System Calibration Relative To Technical Specification Sr 3.3.3.1.3 Channel Calibration
| title = Review Adequacy of Suppression Pool Temperature Monitoring System Calibration Relative to Technical Specification SR 3.3.3.1.3 Channel Calibration


| docket = 05000324, 05000325
| docket = 05000324, 05000325
Line 13: Line 13:
| identified by = NRC
| identified by = NRC
| Inspection procedure = IP 71111.15
| Inspection procedure = IP 71111.15
| Inspector = J Austin, R Moore, R Musser, R Lewis, C Even, M Coursey, G Kolcum, B Collins, J Eargler, Musser G, Kolcum J, Fuller H, Gepford J, Austi
| Inspector = J Austin, R Moore, R Musser, R Lewis, C Even, M Coursey, G Kolcum, B Collins, J Eargler, Musserg Kolcum, J Fuller, H Gepford, J Austin
| CCA = N/A for ROP
| CCA = N/A for ROP
| INPO aspect =  
| INPO aspect =  

Revision as of 19:32, 20 February 2018

01
Site: Brunswick Duke Energy icon.png
Report IR 05000324/2008002 Section 1R15
Date counted Mar 31, 2008 (2008Q1)
Type: URI:
cornerstone No Cornerstone
Identified by: NRC identified
Inspection Procedure: IP 71111.15
Inspectors (proximate) J Austin
R Moore
R Musser
R Lewis
C Even
M Coursey
G Kolcum
B Collins
J Eargler
Musserg Kolcum
J Fuller
H Gepford
J Austin
INPO aspect
'