ML20065R400: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:$d $
M                    DOW CHEMICAL U.S.A.
October 20, 1982                                                      uicsiGAN omsioN MIDLAND, MICHIGAN 48!40 James R. Miller, Chief Standardization & Special Projects Division of Licensing U.S.N.R.C.
Washington, D.C. 20555
 
==Dear Sir:==
 
During the afternoon of Wednesday, October 6, 1982 the Dow TRIGA                    '
reactor was operated for a period of about one hour while the pump which is intended to pull air through the Eberline AMS-3 Continuous Air Monitor was not operating. This instrument is required by the license to be operating while the reactor is operating.
The malfunction was detected during the daily shutdown procedure some 20 minutes after the completion of the reactor operation. The pump has since been repaired, the Continuous Air Monitor has been checked and found to be operating normally, and the reactor has been operated.
We believe that this malfunction did not cause the loss of any signi-ficant signals since: (a) the Area Monitor, also in the reactor room, did not clarm, and (b) the successful operation of the TRIGA reactor after repair of the pump did not indicate any leakage of airborne radioactive materials.
The Reactor Operations Committee will neet to consider possible changes of procedures or equipment which might help eliminate recurrence of this problem.
S1 O rely yours,
                  - dA                              -
L. W. Rampy Chairman, M.Chairman, J. noll Radiation Safety Committee                  Reactor Operations Committee 1803 Building                              1602 Building kf cc: Office of Inspection and Enforcement U.S.N.R.C. Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137                                                    o}O 8210290202 821020                                                                  E PDR S
ADOCK 05000025                                                                  i' PDR                                                                        "
AN OPEHATING UNIT OF THE DOW CHEMICAL COMPANY
                                                                                          .}}

Latest revision as of 04:40, 6 January 2021

Ro:On 821006,malfunction of Eberline AMS-3 Continuous Air Monitor Pump Caused Pump to Be Inoperable for Approx 1-h.No Loss of Significant Signals Indicated.Pump Repaired.Changes to Procedures or Equipment Under Review
ML20065R400
Person / Time
Site: Dow Chemical Company
Issue date: 10/20/1982
From: Knoll F, Rampy L
DOW CHEMICAL CO.
To: John Miller
Office of Nuclear Reactor Regulation
References
NUDOCS 8210290202
Download: ML20065R400 (1)


Text

$d $

M DOW CHEMICAL U.S.A.

October 20, 1982 uicsiGAN omsioN MIDLAND, MICHIGAN 48!40 James R. Miller, Chief Standardization & Special Projects Division of Licensing U.S.N.R.C.

Washington, D.C. 20555

Dear Sir:

During the afternoon of Wednesday, October 6, 1982 the Dow TRIGA '

reactor was operated for a period of about one hour while the pump which is intended to pull air through the Eberline AMS-3 Continuous Air Monitor was not operating. This instrument is required by the license to be operating while the reactor is operating.

The malfunction was detected during the daily shutdown procedure some 20 minutes after the completion of the reactor operation. The pump has since been repaired, the Continuous Air Monitor has been checked and found to be operating normally, and the reactor has been operated.

We believe that this malfunction did not cause the loss of any signi-ficant signals since: (a) the Area Monitor, also in the reactor room, did not clarm, and (b) the successful operation of the TRIGA reactor after repair of the pump did not indicate any leakage of airborne radioactive materials.

The Reactor Operations Committee will neet to consider possible changes of procedures or equipment which might help eliminate recurrence of this problem.

S1 O rely yours,

- dA -

L. W. Rampy Chairman, M.Chairman, J. noll Radiation Safety Committee Reactor Operations Committee 1803 Building 1602 Building kf cc: Office of Inspection and Enforcement U.S.N.R.C. Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 o}O 8210290202 821020 E PDR S

ADOCK 05000025 i' PDR "

AN OPEHATING UNIT OF THE DOW CHEMICAL COMPANY

.