Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20205K385 | 31 December 1998 | Dow Triga Research Reactor Annual Rept for 1998. with | |
ML20203A103 | 11 February 1998 | Safety Evaluation Supporting Amend 8 to License R-108 | |
ML20217P634 | 31 December 1997 | Dow Triga Research Reactor Annual Rept - 1997 | |
ML20210R122 | 19 August 1997 | Safety Evaluation Supporting Amend 7 to License R-108 | |
ML20137C540 | 31 December 1996 | Dow Triga Research Reactor Annual Rept - 1996 | |
ML20101F276 | 31 December 1995 | Dow Triga Research Reactor Annual Rept - 1995 | |
ML20081F149 | 31 December 1994 | Dow Triga Research Reactor Annual Rept-1994 | |
ML20063G729 | 31 December 1993 | Dow Triga Research Reactor Annual Rept for 1993 | |
ML20127B466 | 31 December 1992 | Dow Triga Research Reactor Annual Rept 1992 | |
ML20141M046 | 31 December 1991 | Dow Triga Research Reactor Annual Rept - 1991 | |
ML20077B473 | 10 May 1991 | Ro:On 910507,operator Failed to Perform Surveillances & Channel Tests for All 6 Scram Channels & 2 Interlocks Prior to Reactor Operation.Caused by Personnel Error. Tailgate Meeting Held & Mods to Hardware Initiated | |
ML20081M756 | 26 March 1991 | Dow Triga Research Reactor Annual Rept - 1991, Covering May - Dec 1990 Period | |
ML20062F749 | 19 November 1990 | Microprocessor-Based I&C Sys for Dow Triga Research Reactor | |
ML20081E090 | 30 June 1990 | Dow Triga Research Reactor Annual Rept - 1990 | |
ML20006B658 | 19 January 1990 | Ro:On 900116,wide Range Log Channel Failed While Reactor Taken to Power.Caused by Poor Connection in Rotary Switch in Wide Range Log Channel.Authorization to Replace Entire Control Console Initiated in Early Jan 1990 | |
ML19354D587 | 21 December 1989 | Ro:On 891220,wide Range Log Channel Failed While Reactor Was Being Taken to Power.Caused by Poor Connection in Rotary Switch in Log Channel.Switch Repaired & Reactor Returned to Operation | |
ML20246J598 | 30 April 1989 | Safety Evaluation Report Related to the Renewal of the Facility License for the Research Reactor at the Dow Chemical Company | Safe Shutdown Shutdown Margin Emergency Lighting Earthquake Fuel cladding |
ML20237L456 | 14 August 1987 | Dow Triga Research Reactor Requalification Program | |
ML20210S605 | 9 February 1987 | Revised Licensed Operator Requalification Program for Facility | |
ML20214C549 | 31 December 1986 | Dow Triga Research Reactor Requalification Program | |
ML20214C541 | 31 December 1986 | Dow Triga Research Reactor Environ Rept | |
ML20214C535 | 31 December 1986 | SAR for Dow Triga Research Reactor 300 Kw | Shutdown Margin Earthquake |
ML20212Q697 | 26 August 1986 | Ro:On 860821,during Prestartup,Source Interlock Operated But Failed to Prevent Movement of Control Rods.Caused by Temporary Loss of Electrical Contact in Logic Circuits. Movement Restored Proper Electrical Contact | |
ML20214C512 | 31 December 1985 | Dow Chemical Co,1985 Annual Rept | |
ML20136H329 | 13 November 1985 | Ro:On 851112,wide-range Log Channel Malfunctioned During Operation of Reactor.Caused by Faulty Calibr Switch in Log Channel.Switch Adjusted & Reactor Operated at Several Power Levels Up to 95 Kw | |
ML20114B322 | 14 January 1985 | Ro:On 850107,while Taking Unit to 95 Kw Power,Period Meter Indicated Period Decreasing W/Log Power Trace Levelling & Linear Power Trace Rising.Caused by wide-range Log Channel Malfunction.Manual Scram Initiated & Reactor Secured | |
ML20101M849 | 10 December 1984 | Ro:On 841203,wide-range Log Channel Malfunctioned,Resulting in Manual Scram.Cause Traced to Resistor in Filter on Detector High Voltage Supply.Repairs & Testing in Progress | |
ML20065R400 | 20 October 1982 | Ro:On 821006,malfunction of Eberline AMS-3 Continuous Air Monitor Pump Caused Pump to Be Inoperable for Approx 1-h.No Loss of Significant Signals Indicated.Pump Repaired.Changes to Procedures or Equipment Under Review | |
ML20052E236 | 28 April 1982 | RO: on 820421,instructions Given to Disconnect Power Supply & Single Lead to Compensated Ion Chamber.Incident in Violation of Tech Specs Requiring Two Linear Safety Channels Operating While Reactor Is Operating | |
ML20137G450 | 24 March 1981 | Ro:During walk-through of Operator Training Program, O-ring Seal of Filter Holder Found Not Seated Properly Causing Partial Bypass of Filter for Air Sucked Into instrument.Filter-in Lock Adjusted | |
ML20137G446 | 23 June 1977 | Ro:On 770621,radioactive Source Containing 200 Mci Cs-137 Recovered from Brine Well 33.Incident Described in | |
ML20137H384 | 12 January 1976 | Ro:On 760106,operator Left Console Key in Switch So That Reactor Not Secured Per Tech Specs.Key Withdrawn from Console.Incident Discussed W/Operators & Large Red Plastic Tag Attached to Key to Make It More Visible | |
ML20137G816 | 16 February 1973 | Ro:On 730125,available Excess Reactivity of Core Exceeded Tech Specs Limit.Caused by Change in Worth of Control Rods. Rearrangement of Core Configuration Initiated to Reduce Available Excess Reactivity | |
ML20137G793 | 22 November 1971 | Ro:On 711022,during Startup of Reactor,Period Limiting Signal Unavailable for Servo Sys Which Continued to Raise Rod Causing Rapid Rise of Power.While Reactor Manually Scrammed,Reactor Period Less than Min Allowed in Tech Specs |