{{#Wiki_filter:Cheri Nagel -PROG RAM IMPLEMENTATION MATRIX.doc 1 IINagel -PROGRAM IMPLEMENTATION MATRIX.doc Page 1 II From: "BELL, Russ" <rjb@nei.org>
{{#Wiki_filter:Paie 1II qleri Nagel - PROGRAM Cheri Nagel -             IMPLEMENTATION MATRIX.doc PROG RAM IMPLEMENTATION           MATRIX.doc                                                                 Page 1 II From:             "BELL, Russ" <rjb@nei.org>
To: "Joe Colaccino" <JXC1 @nrc.gov>Date: 04/04/2005 4:29PM  
To:               "Joe Colaccino" <JXC1 @nrc.gov>
Date:             04/04/2005 4:29PM


==Subject:==
==Subject:==
PROGRAM IMPLEMENTATION MATRIX.doc The attached DRAFT pgm implementation matrix is provided as a basis for discussion at our public meeting on Apr. 7.If you have any questions, please advise.Thanks.This electronic message transmission contains information from the Nuclear Energy Institute, Inc. The information is intended solely for the use of the addressee and its use by any other person is not authorized.
PROGRAM IMPLEMENTATION MATRIX.doc The attached DRAFT pgm implementation matrix is provided as a basis for discussion at our public meeting on Apr. 7.
If you are not the intended recipient, you have received this communication in error, and any review, use, disclosure, copying or distribution of the contents of this communication is strictly prohibited.
If you have any questions, please advise.
Thanks.
This electronic message transmission contains information from the Nuclear Energy Institute, Inc. The information is intended solely for the use of the addressee and its use by any other person is not authorized. If you are not the intended recipient, you have received this communication in error, and any review, use, disclosure, copying or distribution of the contents of this communication is strictly prohibited.
If you have received this electronic transmission in error, please notify the sender immediately by telephone or by electronic mail and permanently delete the original message.
If you have received this electronic transmission in error, please notify the sender immediately by telephone or by electronic mail and permanently delete the original message.
c:\temp\GWIOOOOi.TM P Page  c-:\temp\GW)00001 .TMP-Page 1 ilMail Envelope Properties (4251A3AF.126:
 
16: 28966)
Page 1I c:\temp\GWIOOOOi.TM c-:\temp\GW)00001 .TMPP                                                  -Page 1 il Mail Envelope Properties   (4251A3AF.126: 16: 28966)


==Subject:==
==Subject:==
Creation Date: From: Created By: PROGRAM IMPLEMENTATION MATRIX.doc 04/04/2005 4:29PM"BELL, Russ" <rjb@nei.org>
PROGRAM IMPLEMENTATION MATRIX.doc Creation Date:      04/04/2005 4:29PM From:                "BELL, Russ" <rjb@nei.org>
rjb@nei.org Recipients nrc.gov owf4_po.OWFN_DO JXC1 (Joseph Colaccino)
Created By:          rjb@nei.org Recipients nrc.gov owf4_po.OWFN_DO JXC1 (Joseph Colaccino)
Post Office owf4_po.OWFNDO Route nrc.gov Files Size Date & Time MESSAGE 772 04/04/2005 TEXT.htm 1481 PROGRAM IMPLEMENTATION MATRIX.doc 49152 Mime.822 72074 Options Expiration Date: Priority: Reply Requested:
Post Office                                   Route owf4_po.OWFNDO                               nrc.gov Files                         Size             Date & Time MESSAGE                       772               04/04/2005 TEXT.htm                     1481 PROGRAM IMPLEMENTATION MATRIX.doc               49152 Mime.822                     72074 Options Expiration Date:             None Priority:                     Standard Reply Requested:             No Return Notification:         None Concealed  
Return Notification:
Concealed  


==Subject:==
==Subject:==
Security: None Standard No None No Standard DRAFT PROGRAM IMPLEMENTATION MATRIX April 4, 2005 The Commission issued SRM/SECY-04-0032 on May 14, 2004. The SRM provided clarification to previously issued Commission guidance (SRM/SECY-02-0067) on the level of program description detail that must be provided in a COL application in lieu of programmatic ITAAC. The SRM listed 14 programs that are required by regulation and sorted the 14 programs into Categories A through E to aid in the determination of the need for ITAAC or for an increased level of detail in the COLA description.
No Security:                     Standard
The SECY categorized 10 programs as potentially requiring ITAAC or an increased level of detail in the COLA description, and the Commission requested that the staff present its conclusions on these 10 programs in a follow-up SECY. As has been discussed with the Staff, one of those 10, Reportability, is not considered an operational "program" like the others; NRC reporting requirements are typically implemented in procedures that directly reflect the detailed regulatory requirements for current plants. The following table describes the expected timeline for program implementation for the remaining programs.
 
The implementation matrix was requested by the Staff in a meeting on March 3, 2005. Note that, Fitness for Duty, Access Authorization and Physical Security are combined into a single program for purposes of COLA description.
DRAFT PROGRAM IMPLEMENTATION MATRIX                                                                               April 4, 2005 The Commission issued SRM/SECY-04-0032 on May 14, 2004. The SRM provided clarification to previously issued Commission guidance (SRM/SECY-02-0067) on the level of program description detail that must be provided in a COL application in lieu of programmatic ITAAC. The SRM listed 14 programs that are required by regulation and sorted the 14 programs into Categories A through E to aid in the determination of the need for ITAAC or for an increased level of detail in the COLA description. The SECY categorized 10 programs as potentially requiring ITAAC or an increased level of detail in the COLA description, and the Commission requested that the staff present its conclusions on these 10 programs in a follow-up SECY. As has been discussed with the Staff, one of those 10, Reportability, is not considered an operational "program" like the others; NRC reporting requirements are typically implemented in procedures that directly reflect the detailed regulatory requirements for current plants. The following table describes the expected timeline for program implementation for the remaining programs. The implementation matrix was requested by the Staff in a meeting on March 3, 2005. Note that, Fitness for Duty, Access Authorization and Physical Security are combined into a single program for purposes of COLA description.
DRAFT PROGRAM IMPLEMENTATION MATRIX Program FSAR Implementation Timing Ref.COLA Submittal Prior to COL Prior to Prior to Prior to Commercial Issuance Fuel Receipt Fuel Load Full Power Operation Fire 9.5.1 FP Description Develop Complete Protection in COLA procedures, procedures organization, and responsibilities.
DRAFT PROGRAM IMPLEMENTATION MATRIX Program           FSAR                                     Implementation Timing Ref.
organization.
COLA Submittal Prior to COL     Prior to         Prior to       Prior to     Commercial Issuance       Fuel Receipt     Fuel Load       Full Power   Operation Fire             9.5.1   FP Description                 Develop           Complete Protection                 in COLA                         procedures,       procedures organization,     and responsibilities. organization.
Implement for buildings Fully containing new implemented fuel and adjacent areas, as appropriate.
Implement for buildings         Fully containing new   implemented fuel and adjacent areas, as appropriate.
Program FSAR Implementation Timing Ref.COLA Submittal Prior to COL Prior to Prior to Prior to Commercial Issuance Fuel Receipt FuelLoad Full Power Oeration Security, 13.6 Certain FFD Develop Program fully Access program applicable implemented Authorization, Security Plan requirements procedures, Fitness for submittal apply during contracts, Duty concurrent with active organization.
 
COLA construction, which may begin prior to COL issuance Radiation 12.5 RP description Program Fully Protection in COLA implemented in implemented Program phases as needed for materials received on site QA Program -17.2 Program Procedures Fully Operations description in developed, implemented COLA organization in place Program FSAR lmplementation Timinq Ref.COLA Submittal Prior to COL Prior to Prior to Prior to Commercial Issuance Fuel Receipt Fuel Load Full Power Operation Emergency 13.3 Develop plant- Fully Planning specific ITAAC. implemented Emergency  
Program       FSAR                                 Implementation Timing Ref.
-state and Plan submitted local concurrent with agreements COLA. in place or Certifications justification from state and submitted by local applicant governments or, if not available, justification Licensed 13.2.2 Program Sufficient 10 CFR Operator description in operators 50.54(m)Training COLA trained, human requirements factors training met. All included, licensed operators operators licensed per 10 trained.CFR 55 Training 13.2 Program Sufficient plant Initial training description in personnel of plant COLA training personnel complete complete}}
COLA Submittal Prior to COL   Prior to       Prior to     Prior to   Commercial Issuance       Fuel Receipt   FuelLoad     Full Power Oeration Security,     13.6                 Certain FFD Develop           Program fully Access                             program       applicable     implemented Authorization,     Security Plan   requirements procedures, Fitness for         submittal       apply during contracts, Duty               concurrent with active         organization.
COLA           construction, which may begin prior to COL issuance Radiation     12.5 RP description                 Program         Fully Protection         in COLA                       implemented in implemented Program                                           phases as needed for materials received on site QA Program -   17.2 Program                       Procedures     Fully Operations         description in                 developed,     implemented COLA                           organization in place
 
Program   FSAR                                 lmplementation Timinq Ref.
COLA Submittal Prior to COL Prior to         Prior to         Prior to   Commercial Issuance   Fuel Receipt     Fuel Load       Full Power Operation Emergency 13.3   Develop plant-                               Fully Planning         specific ITAAC.                             implemented Emergency                                   - state and Plan submitted                               local concurrent with                             agreements COLA.                                       in place or Certifications                               justification from state and                               submitted by local                                       applicant governments or, if not available, justification Licensed 13.2.2 Program                     Sufficient       10 CFR Operator         description in             operators       50.54(m)
Training         COLA                       trained, human   requirements factors training met. All included,       licensed operators       operators licensed per 10 trained.
CFR 55 Training 13.2   Program                     Sufficient plant Initial training description in             personnel       of plant COLA                       training         personnel complete         complete}}

Latest revision as of 01:31, 24 November 2019

Attachment 5 - April 4, 2005, E-Mail from NEI on Draft Operation Program Implementation Matrix
ML050970140
Person / Time
Site: Nuclear Energy Institute
Issue date: 04/04/2005
From: Bell R
Nuclear Energy Institute
To: Joseph Colaccino
NRC/NRR/DRIP/RNRP, Nuclear Energy Institute
Colaccino,Joseph,NRR/DRIP/RNRP,415-2753
References
Download: ML050970140 (5)


Text

Paie 1II qleri Nagel - PROGRAM Cheri Nagel - IMPLEMENTATION MATRIX.doc PROG RAM IMPLEMENTATION MATRIX.doc Page 1 II From: "BELL, Russ" <rjb@nei.org>

To: "Joe Colaccino" <JXC1 @nrc.gov>

Date: 04/04/2005 4:29PM

Subject:

PROGRAM IMPLEMENTATION MATRIX.doc The attached DRAFT pgm implementation matrix is provided as a basis for discussion at our public meeting on Apr. 7.

If you have any questions, please advise.

Thanks.

This electronic message transmission contains information from the Nuclear Energy Institute, Inc. The information is intended solely for the use of the addressee and its use by any other person is not authorized. If you are not the intended recipient, you have received this communication in error, and any review, use, disclosure, copying or distribution of the contents of this communication is strictly prohibited.

If you have received this electronic transmission in error, please notify the sender immediately by telephone or by electronic mail and permanently delete the original message.

Page 1I c:\temp\GWIOOOOi.TM c-:\temp\GW)00001 .TMPP -Page 1 il Mail Envelope Properties (4251A3AF.126: 16: 28966)

Subject:

PROGRAM IMPLEMENTATION MATRIX.doc Creation Date: 04/04/2005 4:29PM From: "BELL, Russ" <rjb@nei.org>

Created By: rjb@nei.org Recipients nrc.gov owf4_po.OWFN_DO JXC1 (Joseph Colaccino)

Post Office Route owf4_po.OWFNDO nrc.gov Files Size Date & Time MESSAGE 772 04/04/2005 TEXT.htm 1481 PROGRAM IMPLEMENTATION MATRIX.doc 49152 Mime.822 72074 Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed

Subject:

No Security: Standard

DRAFT PROGRAM IMPLEMENTATION MATRIX April 4, 2005 The Commission issued SRM/SECY-04-0032 on May 14, 2004. The SRM provided clarification to previously issued Commission guidance (SRM/SECY-02-0067) on the level of program description detail that must be provided in a COL application in lieu of programmatic ITAAC. The SRM listed 14 programs that are required by regulation and sorted the 14 programs into Categories A through E to aid in the determination of the need for ITAAC or for an increased level of detail in the COLA description. The SECY categorized 10 programs as potentially requiring ITAAC or an increased level of detail in the COLA description, and the Commission requested that the staff present its conclusions on these 10 programs in a follow-up SECY. As has been discussed with the Staff, one of those 10, Reportability, is not considered an operational "program" like the others; NRC reporting requirements are typically implemented in procedures that directly reflect the detailed regulatory requirements for current plants. The following table describes the expected timeline for program implementation for the remaining programs. The implementation matrix was requested by the Staff in a meeting on March 3, 2005. Note that, Fitness for Duty, Access Authorization and Physical Security are combined into a single program for purposes of COLA description.

DRAFT PROGRAM IMPLEMENTATION MATRIX Program FSAR Implementation Timing Ref.

COLA Submittal Prior to COL Prior to Prior to Prior to Commercial Issuance Fuel Receipt Fuel Load Full Power Operation Fire 9.5.1 FP Description Develop Complete Protection in COLA procedures, procedures organization, and responsibilities. organization.

Implement for buildings Fully containing new implemented fuel and adjacent areas, as appropriate.

Program FSAR Implementation Timing Ref.

COLA Submittal Prior to COL Prior to Prior to Prior to Commercial Issuance Fuel Receipt FuelLoad Full Power Oeration Security, 13.6 Certain FFD Develop Program fully Access program applicable implemented Authorization, Security Plan requirements procedures, Fitness for submittal apply during contracts, Duty concurrent with active organization.

COLA construction, which may begin prior to COL issuance Radiation 12.5 RP description Program Fully Protection in COLA implemented in implemented Program phases as needed for materials received on site QA Program - 17.2 Program Procedures Fully Operations description in developed, implemented COLA organization in place

Program FSAR lmplementation Timinq Ref.

COLA Submittal Prior to COL Prior to Prior to Prior to Commercial Issuance Fuel Receipt Fuel Load Full Power Operation Emergency 13.3 Develop plant- Fully Planning specific ITAAC. implemented Emergency - state and Plan submitted local concurrent with agreements COLA. in place or Certifications justification from state and submitted by local applicant governments or, if not available, justification Licensed 13.2.2 Program Sufficient 10 CFR Operator description in operators 50.54(m)

Training COLA trained, human requirements factors training met. All included, licensed operators operators licensed per 10 trained.

CFR 55 Training 13.2 Program Sufficient plant Initial training description in personnel of plant COLA training personnel complete complete