ML091140348: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:SER Appendix A: Commitments for License Renewal Of Oyster Creek Generating Station Commitment No. 27, ASME Section XI, Subsection IWE* UFSAR Supplement Section A.1.27* LRA Section B.1.27" Existing program is credited.
{{#Wiki_filter:SER Appendix A: Commitments for License Renewal Of Oyster Creek Generating Station Commitment No. 27, ASME Section XI, Subsection IWE
The program will be enhanced to include: Commitment No. 27, Item (3) The reactor cavity seal leakage trough drains and the drywell sand bed region drains will be monitored for leakage. (Periodically)
* UFSAR Supplement Section A.1.27
* LRA Section B.1.27
" Existing program is credited. The program will be enhanced to include:
Commitment No. 27, Item (3) The reactor cavity seal leakage trough drains and the drywell sand bed region drains will be monitored for leakage. (Periodically)
Commitment No. 27, Item (13) The reactor cavity concrete trough drain will be verified to be clear from blockage once per refueling cycle. Any identified issues will be addressed via the corrective action process. (Once per refueling cycle)}}
Commitment No. 27, Item (13) The reactor cavity concrete trough drain will be verified to be clear from blockage once per refueling cycle. Any identified issues will be addressed via the corrective action process. (Once per refueling cycle)}}

Latest revision as of 06:47, 14 November 2019

SER Appendix a: Commitments for License Renewal of Oyster Creek Generating Station, Commitment No. 27, ASME Section XI, Subsection IWE
ML091140348
Person / Time
Site: Oyster Creek
Issue date: 03/20/2009
From:
- No Known Affiliation
To:
Office of Information Services
References
FOIA/PA-2009-0070
Download: ML091140348 (1)


Text

SER Appendix A: Commitments for License Renewal Of Oyster Creek Generating Station Commitment No. 27, ASME Section XI, Subsection IWE

  • UFSAR Supplement Section A.1.27

" Existing program is credited. The program will be enhanced to include:

Commitment No. 27, Item (3) The reactor cavity seal leakage trough drains and the drywell sand bed region drains will be monitored for leakage. (Periodically)

Commitment No. 27, Item (13) The reactor cavity concrete trough drain will be verified to be clear from blockage once per refueling cycle. Any identified issues will be addressed via the corrective action process. (Once per refueling cycle)