ML13099A261: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Attachment 6  OBDI 202 - IOLE Process DRAFT OUTLINE COMMENTS Facility:
{{#Wiki_filter:DRAFT OUTLINE COMMENTS Grand Facility:                                         First Exam Date:             12/7/12 Gulf Written Exam Outline (9/25/12)
Grand Gulf First Exam Date:12/7/12 Written Exam Outline (9/25/12) Comment Resolution 1 No comments - NRC generated outline 2   3   4   5     Administrative JPM Outline (9/25/12) Comment Resolution 1 RO - Review of Cooldown Record. Used on 2011 NRC Exam. Was this randomly selected?
Comment                                     Resolution 1   No comments - NRC generated outline 2
Yes 2   3   4   5     Control Room / In-Plant System JPM Outline (9/25/12) Comment Resolution 1 g. Reactor Manual Scram Switch Test. Used on 2011 NRC Exam. Randomly selected?
3 4
Yes 2 Need importance rating annotated on In Plant, Energize RPS Alternate Feed.
5 Administrative JPM Outline (9/25/12)
Fixed 3   4   5    
Comment                                     Resolution RO - Review of Cooldown Record.         Yes 1  Used on 2011 NRC Exam. Was this randomly selected?
2 3
4 5
Control Room / In-Plant System JPM Outline (9/25/12)
Comment                                     Resolution
: g. Reactor Manual Scram Switch Test. Yes 1  Used on 2011 NRC Exam. Randomly selected?
Need importance rating annotated on In   Fixed 2
Plant, Energize RPS Alternate Feed.
3 4
5                                                     OBDI 202 - IOLE Process


Attachment 6  OBDI 202 - IOLE Process
Simulator Scenario Outline Comments (9/25/12)
 
Comment                                 Resolution Scenario 1, Event 6, 7 - Loss of CCW       Revised leading to the reactor scram is ONE 1
Simulator Scenario Outline Comments (9/25/12) Comment Resolution 1 Scenario 1, Event 6, 7 - Loss of CCW leading to the reactor scram is ONE Major event. Event 6 and 7 are not both Majors. Revise D-1.
Major event. Event 6 and 7 are not both Majors. Revise D-1.
Revised 2 Scenario 2, Event 5 - Any chance the applicants could scram due to the loss of two IRM channels? If so we should move right before the major.
Scenario 2, Event 5 - Any chance the       No applicants could scram due to the loss of 2
No 3 Scenario 2, Event 7 and 8 - Same comment as the first scenario. The major event is the scram due to the CRDM malfunction. This is really one event. The CST rupture would be its own event and count as the component failure. Corrected 4 Scenario 2, Event 8 - Is the un-isolable recirc line break counted as the component malfunction? Do the operators perform any functions to correct even though it is un-isolable?
two IRM channels? If so we should move right before the major.
No 5 Scenario 2, Event 9 - What is the major electrical transient and the crew response?
Scenario 2, Event 7 and 8 - Same           Corrected comment as the first scenario. The major event is the scram due to the 3 CRDM malfunction. This is really one event. The CST rupture would be its own event and count as the component failure.
Scenario 2, Event 8 - Is the un-isolable   No recirc line break counted as the 4 component malfunction? Do the operators perform any functions to correct even though it is un-isolable?
Scenario 2, Event 9 - What is the major 5 electrical transient and the crew response?
6 Scenario 3, Event 1- Secure the Div. 1 DG - what is the failure?
6 Scenario 3, Event 1- Secure the Div. 1 DG - what is the failure?
7 Scenario 3, Event 6 - Loss of EST transformer cannot count toward  
7 Scenario 3, Event 6 - Loss of EST             Corrected transformer cannot count toward Abnormal due to following the Major (1021, App. D, pg. 9) 8 Scenario 3, Event 7 - What is the crew response to ADS valve failure to open?
 
9 Scenario 4, Event 3 and 4 - Switch             Revised these events in case applicants allow the plant to scram.
Abnormal due to following the Major (1021, App. D, pg. 9)
10 Scenario 4, Event 5 and 6 - CRDM               Corrected malfunction leads to ATWS. This is one major. The CR drifts count as the instrument malfunction but the CRDM with ATWS is one event. Reduce major count by one.
Corrected 8 Scenario 3, Event 7 - What is the crew response to ADS valve failure to open?
11 Scenario 4, Event 8 - Critical Task           Defined must be accomplished prior to reaching HCTL. Please define for Examiners.                                                 OBDI 202 - IOLE Process
9 Scenario 4, Event 3 and 4 - Switch these events in case applicants allow the plant to scram.
Revised 10 Scenario 4, Event 5 and 6 - CRDM malfunction leads to ATWS. This is one  
 
major. The CR drifts count as the instrument malfunction but the CRDM  
 
with ATWS is one event. Reduce major count by one.
Corrected 11 Scenario 4, Event 8 - Critical Task must be accomplished prior to reaching HCTL. Please define for Examiners.
Defined Attachment 6  OBDI 202 - IOLE Process 12 Scenario 5, Event 1 - What is the failure with placing SSW 'A' in Standby? 


12 Scenario 5, Event 1 - What is the            Fixed failure with placing SSW A in Standby?
Event 1 counted as component malfunction.
Event 1 counted as component malfunction.
Fixed 13 Scenario 5, Event 3 - Any chance applicants could scram plant because of the failure of two APRM channels?
13 Scenario 5, Event 3 - Any chance             No applicants could scram plant because of the failure of two APRM channels?
No 14 Scenario 5, Event 6 - What is the component failure? The Fuel cladding leak? Response to scram? If this is so then this whole event is the major and not a component failure as well.
14 Scenario 5, Event 6 - What is the             Fixed component failure? The Fuel cladding leak? Response to scram? If this is so then this whole event is the major and not a component failure as well.
Fixed 15 Scenario 5, Event 8 - Looks like this should be a major only. Let's discuss.
15 Scenario 5, Event 8 - Looks like this         Yes and fixed should be a major only. Lets discuss.
Yes and fixed
General Outline Comments (9/25/12)
 
Comment                                   Resolution What facility document defines the 1
General Outline Comments (9/25/12) Comment Resolution 1 What facility document defines the critical tasks in the scenarios?
critical tasks in the scenarios?
2 ES-301-5 will change based on changes to scenario comments.
ES-301-5 will change based on changes Corrected 2
Corrected 3 Depending on which scenario is the backup the ES-301-5 could change as well. 4 ES-301-4 totals will change based on attribute changes after discussion.
to scenario comments.
Corrected 5}}
Depending on which scenario is the backup the ES-301-5 could change as well.
ES-301-4 totals will change based on       Corrected 4
attribute changes after discussion.
5                                                     OBDI 202 - IOLE Process}}

Latest revision as of 20:45, 4 November 2019

12 Draft Outline Comments
ML13099A261
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 12/10/2012
From: Chris Steely
Operations Branch IV
To:
Entergy Operations
laura hurley
References
Download: ML13099A261 (3)


Text

DRAFT OUTLINE COMMENTS Grand Facility: First Exam Date: 12/7/12 Gulf Written Exam Outline (9/25/12)

Comment Resolution 1 No comments - NRC generated outline 2

3 4

5 Administrative JPM Outline (9/25/12)

Comment Resolution RO - Review of Cooldown Record. Yes 1 Used on 2011 NRC Exam. Was this randomly selected?

2 3

4 5

Control Room / In-Plant System JPM Outline (9/25/12)

Comment Resolution

g. Reactor Manual Scram Switch Test. Yes 1 Used on 2011 NRC Exam. Randomly selected?

Need importance rating annotated on In Fixed 2

Plant, Energize RPS Alternate Feed.

3 4

5 OBDI 202 - IOLE Process

Simulator Scenario Outline Comments (9/25/12)

Comment Resolution Scenario 1, Event 6, 7 - Loss of CCW Revised leading to the reactor scram is ONE 1

Major event. Event 6 and 7 are not both Majors. Revise D-1.

Scenario 2, Event 5 - Any chance the No applicants could scram due to the loss of 2

two IRM channels? If so we should move right before the major.

Scenario 2, Event 7 and 8 - Same Corrected comment as the first scenario. The major event is the scram due to the 3 CRDM malfunction. This is really one event. The CST rupture would be its own event and count as the component failure.

Scenario 2, Event 8 - Is the un-isolable No recirc line break counted as the 4 component malfunction? Do the operators perform any functions to correct even though it is un-isolable?

Scenario 2, Event 9 - What is the major 5 electrical transient and the crew response?

6 Scenario 3, Event 1- Secure the Div. 1 DG - what is the failure?

7 Scenario 3, Event 6 - Loss of EST Corrected transformer cannot count toward Abnormal due to following the Major (1021, App. D, pg. 9) 8 Scenario 3, Event 7 - What is the crew response to ADS valve failure to open?

9 Scenario 4, Event 3 and 4 - Switch Revised these events in case applicants allow the plant to scram.

10 Scenario 4, Event 5 and 6 - CRDM Corrected malfunction leads to ATWS. This is one major. The CR drifts count as the instrument malfunction but the CRDM with ATWS is one event. Reduce major count by one.

11 Scenario 4, Event 8 - Critical Task Defined must be accomplished prior to reaching HCTL. Please define for Examiners. OBDI 202 - IOLE Process

12 Scenario 5, Event 1 - What is the Fixed failure with placing SSW A in Standby?

Event 1 counted as component malfunction.

13 Scenario 5, Event 3 - Any chance No applicants could scram plant because of the failure of two APRM channels?

14 Scenario 5, Event 6 - What is the Fixed component failure? The Fuel cladding leak? Response to scram? If this is so then this whole event is the major and not a component failure as well.

15 Scenario 5, Event 8 - Looks like this Yes and fixed should be a major only. Lets discuss.

General Outline Comments (9/25/12)

Comment Resolution What facility document defines the 1

critical tasks in the scenarios?

ES-301-5 will change based on changes Corrected 2

to scenario comments.

Depending on which scenario is the 3 backup the ES-301-5 could change as well.

ES-301-4 totals will change based on Corrected 4

attribute changes after discussion.

5 OBDI 202 - IOLE Process