ML13295A670: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:OPERATING DATA REPORT DOCKET: 313 PREPARER NAME: Steven L. Coffman UNIT_NME: ANO Unit 1 PREPARER TELEPHONE: 479-858-5560 RPT_PERIOD: 201307 | ||
: | : 1. Design Electrical Rating: 850 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 836 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 0.00 1,975.00 275,328.17 | ||
: 4. Number of Hours Generator On-line 0.00 1,975.00 272,194.08 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 817.50 | |||
: 6. Net Electrical energy Generated (MWHrs) 0.00 1,631,945.00 215,063,615.24 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2013- 3/24/2013 S 744.00 C 4 1R24 Refueling Outage 01 | |||
==SUMMARY== | ==SUMMARY== | ||
ANO-1 remained shutdown for the entire month of July, continuing the 1R24 Refueling Outage. | ANO-1 remained shutdown for the entire month of July, continuing the 1R24 Refueling Outage. | ||
: | |||
OPERATING DATA REPORT DOCKET: 313 PREPARER NAME: Steven L. Coffman UNIT_NME: ANO Unit 1 PREPARER TELEPHONE: 479-858-5560 RPT_PERIOD: 201308 | |||
: 1. Design Electrical Rating: 850 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 836 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 568.58 2,543.58 275,896.75 | |||
: 4. Number of Hours Generator On-line 511.15 2,486.15 272,705.23 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 817.50 | |||
: 6. Net Electrical energy Generated (MWHrs) 378,889.00 2,010,834.00 215,442,504.24 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2013- 8/14/2013 F 66.13 F 1 Required shutdown due to steam generator 02 feedwater chemistry action level exceeded. | |||
2013- 3/24/2013 S 166.72 C 4 1R24 Refueling Outage 01 | |||
==SUMMARY== | ==SUMMARY== | ||
ANO-1 began the month in a continued shutdown for the 1R24 Refueling Outage. On 08/07/2013, the Unit was reconnected to the grid and commenced post-1R24 power escalation and testing. On 08/14/2013, the Unit was manually taken off line due exceeding steam generator feedwater chemistry action levels, and was reconnected to the grid on 08/17/2013. The Unit achieved full power on 08/19/2013, and operated at, or near full power for the remainder of the month. | ANO-1 began the month in a continued shutdown for the 1R24 Refueling Outage. On 08/07/2013, the Unit was reconnected to the grid and commenced post-1R24 power escalation and testing. On 08/14/2013, the Unit was manually taken off line due exceeding steam generator feedwater chemistry action levels, and was reconnected to the grid on 08/17/2013. The Unit achieved full power on 08/19/2013, and operated at, or near full power for the remainder of the month. | ||
: | |||
OPERATING DATA REPORT DOCKET: 313 PREPARER NAME: Steven L. Coffman UNIT_NME: ANO Unit 1 PREPARER TELEPHONE: 479-858-5560 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 850 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 836 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 720.00 3,263.58 276,616.75 | |||
: 4. Number of Hours Generator On-line 720.00 3,206.15 273,425.23 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 817.50 | |||
: 6. Net Electrical energy Generated (MWHrs) 579,549.00 2,590,383.00 216,022,053.24 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
ANO-1 began the month at, or near full power. On 09/27/2013, power was decreased to approximately 71 percent due to a heater drain pump failure. Power was later increased to approximately 82 percent and remained there through the end of the month to facilitate heater drain pump replacement. | ANO-1 began the month at, or near full power. On 09/27/2013, power was decreased to approximately 71 percent due to a heater drain pump failure. Power was later increased to approximately 82 percent and remained there through the end of the month to facilitate heater drain pump replacement. | ||
: | OPERATING DATA REPORT DOCKET: 368 PREPARER NAME: Steven L. Coffman UNIT_NME: ANO Unit 2 PREPARER TELEPHONE: 479-858-5560 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1032 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 988 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,413.49 248,272.53 | |||
: 4. Number of Hours Generator On-line 744.00 4,407.82 245,502.00 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 738,538.00 4,395,800.00 221,708,068.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
ANO-2 operated the entire month at, or near full power. | ANO-2 operated the entire month at, or near full power. | ||
: | OPERATING DATA REPORT DOCKET: 368 PREPARER NAME: Steven L. Coffman UNIT_NME: ANO Unit 2 PREPARER TELEPHONE: 479-858-5560 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1032 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 988 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,157.49 249,016.53 | |||
: 4. Number of Hours Generator On-line 744.00 5,151.82 246,246.00 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 736,533.00 5,132,333.00 222,444,601.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
ANO-2 operated the entire month at, or near full power. | ANO-2 operated the entire month at, or near full power. | ||
: | OPERATING DATA REPORT DOCKET: 368 PREPARER NAME: Steven L. Coffman UNIT_NME: ANO Unit 2 PREPARER TELEPHONE: 479-858-5560 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1032 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 988 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 5,877.49 249,736.53 | |||
: 4. Number of Hours Generator On-line 720.00 5,871.82 246,966.00 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 716,174.00 5,848,507.00 223,160,775.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
ANO-2 operated the entire month at, or near full power. | ANO-2 operated the entire month at, or near full power. | ||
: | OPERATING DATA REPORT DOCKET: 334 PREPARER NAME: David T. Jones UNIT_NME: Beaver Valley Unit 1 PREPARER TELEPHONE: 724-682-4962 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 911 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 892 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,087.00 246,600.54 | |||
: 4. Number of Hours Generator On-line 744.00 5,087.00 243,917.24 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 665,039.30 4,546,576.70 193,439,329.50 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
BVPS-1 operated at a nominal value of 100% power for the entire month of July 2013, except for 50 minutes on 7/9/13 when power was reduced to approximately 98.2% during a planned Moderator Temperature Coefficient Test. | BVPS-1 operated at a nominal value of 100% power for the entire month of July 2013, except for 50 minutes on 7/9/13 when power was reduced to approximately 98.2% during a planned Moderator Temperature Coefficient Test. | ||
: | OPERATING DATA REPORT DOCKET: 334 PREPARER NAME: RJ Hepp UNIT_NME: Beaver Valley Unit 1 PREPARER TELEPHONE: 724-682-7675 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 911 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 892 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,831.00 247,344.54 | |||
: 4. Number of Hours Generator On-line 744.00 5,831.00 244,661.24 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 667,820.90 5,214,397.60 194,107,150.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
BVPS-1 operated at a nominal value of 100% power for the entire month of August 2013. | BVPS-1 operated at a nominal value of 100% power for the entire month of August 2013. | ||
: | OPERATING DATA REPORT DOCKET: 334 PREPARER NAME: R. J. Hepp UNIT_NME: Beaver Valley Unit 1 PREPARER TELEPHONE: 724-682-7675 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 911 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 892 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 696.47 6,527.47 248,041.01 | |||
: 4. Number of Hours Generator On-line 696.02 6,527.02 245,357.26 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 600,261.60 5,814,659.20 194,707,412.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 9/30/2013 S 23.98 C 1 The Unit was shutdown for its planned 22nd refueling outage on 9/30/13 at 0001 hours. | |||
==SUMMARY== | ==SUMMARY== | ||
The Unit operated at a nominal value of 100% power until 9/7/13 when an end of cycle fuel coastdown was begun. The Unit continued to coastdown until 9/28/13 when output was reduced to approximately 50% for planned Main Steam Safety Valve testing. Following satisfactory testing the Unit was shutdown for its planned 22nd refueling outage on 9/30/13 at 0001 hours. | The Unit operated at a nominal value of 100% power until 9/7/13 when an end of cycle fuel coastdown was begun. The Unit continued to coastdown until 9/28/13 when output was reduced to approximately 50% for planned Main Steam Safety Valve testing. Following satisfactory testing the Unit was shutdown for its planned 22nd refueling outage on 9/30/13 at 0001 hours. | ||
: | OPERATING DATA REPORT DOCKET: 412 PREPARER NAME: David T. Jones UNIT_NME: Beaver Valley Unit 2 PREPARER TELEPHONE: 724-682-4962 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 904 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 885 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,797.15 195,883.35 | |||
: 4. Number of Hours Generator On-line 744.00 4,785.06 194,942.21 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 677,398.30 4,420,654.20 159,558,237.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
BVPS-2 operated at a nominal value at 100% power for the entire month of July 2013, except for 13.7 hours on 7/20/13 when Operations reduced power to approximately 98.5% in order to repair the LEFM. | BVPS-2 operated at a nominal value at 100% power for the entire month of July 2013, except for 13.7 hours on 7/20/13 when Operations reduced power to approximately 98.5% in order to repair the LEFM. | ||
: | OPERATING DATA REPORT DOCKET: 412 PREPARER NAME: RJ Hepp UNIT_NME: Beaver Valley Unit 2 PREPARER TELEPHONE: 724-682-7675 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 904 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 885 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,541.15 196,627.35 | |||
: 4. Number of Hours Generator On-line 744.00 5,529.06 195,686.21 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 680,615.80 5,101,270.00 160,238,853.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
BVPS-2 operated at a nominal value of 100% power for the entire month of August 2013. | BVPS-2 operated at a nominal value of 100% power for the entire month of August 2013. | ||
: | OPERATING DATA REPORT DOCKET: 412 PREPARER NAME: R. J. Hepp UNIT_NME: Beaver Valley Unit 2 PREPARER TELEPHONE: 724-682-7675 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 904 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 885 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,261.15 197,347.35 | |||
: 4. Number of Hours Generator On-line 720.00 6,249.06 196,406.21 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 662,663.60 5,763,933.60 160,901,517.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The Unit operated at a nominal value of 100% power for the entire month of September 2013 with the exception of a small reduction on 9/28/13. The Unit reduced output to approximately 97.5% in order to repair [2HDH-LCV103B2], 1st Point Heater Normal Level Control Valve. | The Unit operated at a nominal value of 100% power for the entire month of September 2013 with the exception of a small reduction on 9/28/13. | ||
The Unit reduced output to approximately 97.5% in order to repair [2HDH-LCV103B2], 1st Point Heater Normal Level Control Valve. [Note: this event was planned 17 days in advance of the reduction, therefore, it is considered a planned event for INPO (>10 days), yet remains an unplanned event for WANO (<28 days).] | |||
: | |||
OPERATING DATA REPORT DOCKET: 456 PREPARER NAME: David Johnson UNIT_NME: Braidwood Unit 1 PREPARER TELEPHONE: 815-417-2478 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 1187 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1151 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,087.00 195,066.31 | |||
: 4. Number of Hours Generator On-line 744.00 5,087.00 193,975.32 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 869,976.00 6,041,364.00 217,376,359.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
U-1 Operated at Full Power the entire month. | U-1 Operated at Full Power the entire month. | ||
: | OPERATING DATA REPORT DOCKET: 456 PREPARER NAME: David Johnson UNIT_NME: Braidwood Unit 1 PREPARER TELEPHONE: 815-417-2478 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1187 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1151 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,831.00 195,810.31 | |||
: 4. Number of Hours Generator On-line 744.00 5,831.00 194,719.32 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 870,970.00 6,912,334.00 218,247,329.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit operated nornally at full power except for a planned CW Pp Forebay inspection. | The unit operated nornally at full power except for a planned CW Pp Forebay inspection. | ||
: | OPERATING DATA REPORT DOCKET: 456 PREPARER NAME: David Johnson UNIT_NME: Braidwood Unit 1 PREPARER TELEPHONE: 815-417-2478 RPT_PERIOD: 201309 | ||
: | : 1. Design Electrical Rating: 1187 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1151 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 209.85 6,040.85 196,020.16 | |||
: 4. Number of Hours Generator On-line 197.80 6,028.80 194,917.12 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 211,033.00 7,123,367.00 218,458,362.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments A1R17 9/9/2013 S 522.20 C 1 Unit 1 entered a planned refueling outage on 9/9/2013 @ 00:00, with return of the unit occuring 9/30/2013 with Unit 1 Reactor critical at 06:09 and the Main Generator synched to the output grid at 18:12. Outage duration was 17 days, 18 hours and 12 minutes. | |||
==SUMMARY== | ==SUMMARY== | ||
Refuel outage A1R17 started on 9/9/2013 and ended on 9/30/2013. | Refuel outage A1R17 started on 9/9/2013 and ended on 9/30/2013. | ||
: | OPERATING DATA REPORT DOCKET: 457 PREPARER NAME: David Johnson UNIT_NME: Braidwood Unit 2 PREPARER TELEPHONE: 815-417-2478 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1155 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1125 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 652.10 4,923.13 198,793.36 | |||
: 4. Number of Hours Generator On-line 635.95 4,906.97 197,928.49 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 708,926.00 5,664,300.00 219,789,522.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments A2M0 6/28/2013 S 108.05 B 4 Unit 2 Shutdown for a planned 2A RCP seal 5 replacement. | |||
==SUMMARY== | ==SUMMARY== | ||
U-2 began the month in a planned maintenance outage A2M05 to replace RCP seals (Planned Energy Loss 95638 MWh & Unplanned Energy Loss (Outage Extension) 30056 MWh). A FW valve issue, unrelated to the outage scope, occurred during the ramp to full power following the maintenance outage, delaying the ramp up (Unplanned Energy loss (Forced) of 8026 MWh and Unplanned Energy Loss (Forced - < 10days) of 8026 MWh). | U-2 began the month in a planned maintenance outage A2M05 to replace RCP seals (Planned Energy Loss 95638 MWh & Unplanned Energy Loss (Outage Extension) 30056 MWh). A FW valve issue, unrelated to the outage scope, occurred during the ramp to full power following the maintenance outage, delaying the ramp up (Unplanned Energy loss (Forced) of 8026 MWh and Unplanned Energy Loss (Forced - < 10days) of 8026 MWh). | ||
: | OPERATING DATA REPORT DOCKET: 457 PREPARER NAME: David Johnson UNIT_NME: Braidwood Unit 2 PREPARER TELEPHONE: 815-417-2478 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1155 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1125 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,667.13 199,537.36 | |||
: 4. Number of Hours Generator On-line 744.00 5,650.97 198,672.49 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 843,581.00 6,507,881.00 220,633,103.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit operated normally at full power except for planned CW Pp forebay inspections. Unplanned losses due to emergent work during the 2B CW Pp forebay inspection. | The unit operated normally at full power except for planned CW Pp forebay inspections. Unplanned losses due to emergent work during the 2B CW Pp forebay inspection. | ||
: | OPERATING DATA REPORT DOCKET: 457 PREPARER NAME: David Johnson UNIT_NME: Braidwood Unit 2 PREPARER TELEPHONE: 815-417-2478 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1155 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1125 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,387.13 200,257.36 | |||
: 4. Number of Hours Generator On-line 720.00 6,370.97 199,392.49 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 825,692.00 7,333,573.00 221,458,795.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 2 operated at full power through out the month. | Unit 2 operated at full power through out the month. | ||
: | OPERATING DATA REPORT DOCKET: 259 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 1 PREPARER TELEPHONE: 729-7914 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1120 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1101 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,882.15 109,074.13 | |||
: 4. Number of Hours Generator On-line 744.00 4,869.37 107,182.51 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 809,927.00 5,429,800.00 106,021,803.11 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 259 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 1 PREPARER TELEPHONE: 729-7914 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 1120 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1101 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,626.15 109,818.13 | ||
: 4. Number of Hours Generator On-line 744.00 5,613.37 107,926.51 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 819,258.00 6,249,058.00 106,841,061.11 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 259 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 1 PREPARER TELEPHONE: 729-7914 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 1120 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1101 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 720.00 6,346.15 110,538.13 | ||
: 4. Number of Hours Generator On-line 720.00 6,333.37 108,646.51 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 780,238.00 7,029,296.00 107,621,299.11 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 260 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 2 PREPARER TELEPHONE: 729-7914 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 1120 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1104 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 3,875.39 233,177.84 | ||
: 4. Number of Hours Generator On-line 744.00 3,854.32 229,888.25 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 808,379.00 4,103,310.00 236,428,757.91 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 260 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 2 PREPARER TELEPHONE: 729-7914 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 1120 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1104 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 4,619.39 233,921.84 | ||
: 4. Number of Hours Generator On-line 744.00 4,598.32 230,632.25 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 805,488.00 4,908,798.00 237,234,245.91 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 260 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 2 PREPARER TELEPHONE: 729-7914 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 1120 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1104 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 720.00 5,339.39 234,641.84 | ||
: 4. Number of Hours Generator On-line 720.00 5,318.32 231,352.25 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 788,818.00 5,697,616.00 238,023,063.91 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 296 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 3 PREPARER TELEPHONE: 729-7914 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 1120 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1105 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 4,797.68 189,857.15 | ||
: 4. Number of Hours Generator On-line 744.00 4,769.55 187,836.90 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 801,435.00 5,208,956.00 196,881,501.54 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 296 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 3 PREPARER TELEPHONE: 729-2914 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 1120 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1105 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,541.68 190,601.15 | ||
: 4. Number of Hours Generator On-line 744.00 5,513.55 188,580.90 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 796,563.00 6,005,519.00 197,678,064.54 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 296 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 3 PREPARER TELEPHONE: 729-7914 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 1120 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1105 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 720.00 6,261.68 191,321.15 | ||
: 4. Number of Hours Generator On-line 720.00 6,233.55 189,300.90 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 782,162.00 6,787,681.00 198,460,226.54 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 325 PREPARER NAME: Adam Flora UNIT_NME: Brunswick Unit 1 PREPARER TELEPHONE: 910-457-2027 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 983 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 938 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 4,838.25 245,762.47 | ||
: 4. Number of Hours Generator On-line 744.00 4,809.65 240,585.46 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 700,370.00 4,571,060.00 194,660,919.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 325 PREPARER NAME: Adam Flora UNIT_NME: Brunswick Unit 1 PREPARER TELEPHONE: 910-457-2027 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 983 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 938 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,582.25 246,506.47 | ||
: 4. Number of Hours Generator On-line 744.00 5,553.65 241,329.46 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 706,728.00 5,277,788.00 195,367,647.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 325 PREPARER NAME: Adam Flora UNIT_NME: Brunswick Unit 1 PREPARER TELEPHONE: 910-457-2027 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 983 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 938 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 720.00 6,302.25 247,226.47 | ||
: 4. Number of Hours Generator On-line 720.00 6,273.65 242,049.46 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 677,673.00 5,955,461.00 196,045,320.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 324 PREPARER NAME: Adam Flora UNIT_NME: Brunswick Unit 2 PREPARER TELEPHONE: 910-457-2027 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 980 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 920 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 3,558.22 254,501.61 | ||
: 4. Number of Hours Generator On-line 744.00 3,475.14 247,591.57 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 687,194.00 3,115,783.00 192,798,238.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 324 PREPARER NAME: Adam Flora UNIT_NME: Brunswick Unit 2 PREPARER TELEPHONE: 910-457-2027 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 980 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 920 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 4,302.22 255,245.61 | ||
: 4. Number of Hours Generator On-line 692.82 4,167.96 248,284.39 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 591,407.00 3,707,190.00 193,389,645.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments B221 8/9/2013 F 51.18 B 5 Unit shutdown when turbine/generator was M1 disconnected from the grid to repair loose connection on the 2C main power transformer highside bushing. | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 324 PREPARER NAME: Adam Flora UNIT_NME: Brunswick Unit 2 PREPARER TELEPHONE: 910-457-2027 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 980 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 920 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 720.00 5,022.22 255,965.61 | ||
: 4. Number of Hours Generator On-line 720.00 4,887.96 249,004.39 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 672,595.00 4,379,785.00 194,062,240.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 454 PREPARER NAME: David Eder UNIT_NME: Byron Unit 1 PREPARER TELEPHONE: 815 406-2194 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 1187 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1138 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,087.00 216,991.17 | ||
: 4. Number of Hours Generator On-line 744.00 5,087.00 215,812.70 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 863,574.00 5,972,899.00 235,994,305.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit on line entire month. | Unit on line entire month. | ||
: | OPERATING DATA REPORT DOCKET: 454 PREPARER NAME: David Eder UNIT_NME: Byron Unit 1 PREPARER TELEPHONE: 815 406-2194 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1187 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1138 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,831.00 217,735.17 | |||
: 4. Number of Hours Generator On-line 744.00 5,831.00 216,556.70 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 863,462.00 6,836,361.00 236,857,767.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 1 on line entire month. | Unit 1 on line entire month. | ||
: | OPERATING DATA REPORT DOCKET: 454 PREPARER NAME: David Eder UNIT_NME: Byron Unit 1 PREPARER TELEPHONE: 815 406-2194 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1187 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1138 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,551.00 218,455.17 | |||
: 4. Number of Hours Generator On-line 720.00 6,551.00 217,276.70 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 842,914.00 7,679,275.00 237,700,681.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
unit was on line the entire month | unit was on line the entire month | ||
: | |||
OPERATING DATA REPORT DOCKET: 455 PREPARER NAME: David Eder UNIT_NME: Byron Unit 2 PREPARER TELEPHONE: 815 406-2194 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 1155 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1120 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 4,527.30 209,942.53 | |||
: 4. Number of Hours Generator On-line 744.00 4,486.82 208,914.82 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 842,490.00 5,065,533.00 226,896,090.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit on line entire month | Unit on line entire month | ||
: | |||
OPERATING DATA REPORT DOCKET: 455 PREPARER NAME: David Eder UNIT_NME: Byron Unit 2 PREPARER TELEPHONE: 815 406-2194 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 1155 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1120 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,271.30 210,686.53 | |||
: 4. Number of Hours Generator On-line 744.00 5,230.82 209,658.82 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 843,483.00 5,909,016.00 227,739,573.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 2 on line entire month. | Unit 2 on line entire month. | ||
: | OPERATING DATA REPORT DOCKET: 455 PREPARER NAME: David Eder UNIT_NME: Byron Unit 2 PREPARER TELEPHONE: 815 406-2194 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1155 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1120 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 5,991.30 211,406.53 | |||
: 4. Number of Hours Generator On-line 720.00 5,950.82 210,378.82 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 813,840.00 6,722,856.00 228,553,413.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit was on line the entire month. | Unit was on line the entire month. | ||
A 300 MWe down power was performed during the month at the request of the grid operator due to a 345 KV line issue that originated outside of the site switchyard. This event is not under "plant management control". | A 300 MWe down power was performed during the month at the request of the grid operator due to a 345 KV line issue that originated outside of the site switchyard. This event is not under "plant management control". | ||
: | OPERATING DATA REPORT DOCKET: 483 PREPARER NAME: J. P. Kovar UNIT_NME: Callaway Unit 1 PREPARER TELEPHONE: 314-225-1478 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1228 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1190 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 623.55 3,790.64 224,336.76 | |||
: 4. Number of Hours Generator On-line 623.55 3,751.12 221,852.48 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 724,274.00 4,471,797.00 251,816,355.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2013- 7/26/2013 F 120.45 A 3 Faults in the isophase bus ducts. | |||
02 Repaired/replaced some isophase bus ducts and dampers in the cooling system for the isophase bus. Note: the plant was offline between late on 2013.07.26 and 2013.08.18. | |||
==SUMMARY== | ==SUMMARY== | ||
Power reduction to 65% for 'B' Main Feedwater Pump repairs 1222 07/20/2013 to 1950 07/23/2013. Reactor/turbine trip from fire in 'B' isophase duct 2333 07/26/2013 - resumed generation 0922 08/18/2013. | Power reduction to 65% for 'B' Main Feedwater Pump repairs 1222 07/20/2013 to 1950 07/23/2013. Reactor/turbine trip from fire in 'B' isophase duct 2333 07/26/2013 - resumed generation 0922 08/18/2013. | ||
: | OPERATING DATA REPORT DOCKET: 483 PREPARER NAME: J. P. Kovar UNIT_NME: Callaway Unit 1 PREPARER TELEPHONE: 314-225-1478 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1228 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1190 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 370.42 4,161.06 224,707.18 | |||
: 4. Number of Hours Generator On-line 326.63 4,077.75 222,179.11 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 336,782.00 4,808,579.00 252,153,137.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2013- 7/26/2013 F 417.37 A 4 Faults in the isophase bus ducts. | |||
02 Repaired/replaced some isophase bus ducts and dampers in the cooling system for the isophase bus. Note: the plant was offline between late on 2013.07.26 and 2013.08.18. | |||
==SUMMARY== | ==SUMMARY== | ||
Forced outage from B isophase bus duct fire continued into August - ended with breaker close at 0922 on 08/18/2013. Power hold at 65% to complete work on B main feedwater pump and tune A main feedwater pump settings (identified in July) began at 2249 same day . 100% power achieved at 1930 on 08/24/2013. | Forced outage from B isophase bus duct fire continued into August - ended with breaker close at 0922 on 08/18/2013. Power hold at 65% to complete work on B main feedwater pump and tune A main feedwater pump settings (identified in July) began at 2249 same day . 100% power achieved at 1930 on 08/24/2013. | ||
: | OPERATING DATA REPORT DOCKET: 483 PREPARER NAME: J. P. Kovar UNIT_NME: Callaway Unit 1 PREPARER TELEPHONE: 314-225-1478 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1228 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1190 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 4,881.06 225,427.18 | |||
: 4. Number of Hours Generator On-line 720.00 4,797.75 222,899.11 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 872,034.00 5,680,613.00 253,025,171.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The plant operated at essentially full power for the month. | The plant operated at essentially full power for the month. | ||
: | OPERATING DATA REPORT DOCKET: 317 PREPARER NAME: Herman O. Olsen UNIT_NME: Calvert Cliffs Unit 1 PREPARER TELEPHONE: (410) 495-6734 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 845 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 866 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,087.00 270,703.70 | |||
: 4. Number of Hours Generator On-line 744.00 5,087.00 267,188.26 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 643,961.00 4,555,169.00 223,006,997.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Line 315: | Line 479: | ||
On 07/01/2013 at 1500, power was reduced to 85% for waterbox cleaning. Cleaning was completed on 07/02/2013 and power was increased at 1350. Power was returned to 100% at 1719. | On 07/01/2013 at 1500, power was reduced to 85% for waterbox cleaning. Cleaning was completed on 07/02/2013 and power was increased at 1350. Power was returned to 100% at 1719. | ||
The unit operated at 100% power for the remainder month. | The unit operated at 100% power for the remainder month. | ||
: | OPERATING DATA REPORT DOCKET: 317 PREPARER NAME: Herman O. Olsen UNIT_NME: Calvert Cliffs Unit 1 PREPARER TELEPHONE: 410-495-6734 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 845 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 866 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,831.00 271,447.70 | |||
: 4. Number of Hours Generator On-line 744.00 5,831.00 267,932.26 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 635,267.00 5,190,436.00 223,642,264.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit began the month at 100%. | The unit began the month at 100%. | ||
On 08/12/2013 at 1905 a rapid down power to 83% was performed due to reduced condenser vacuum caused by rapid fouling of a water box. The waterbox cleaning was completed on 08/13/2013 and power was increased at 2212. Power was returned to 100% on 08/14/2013 at 0330.On 08/15/2013 at 2359 power was reduced to 86% for waterbox cleaning. Cleaning was completed on 08/17/2013 and power was increased at 2050. Reactor power was returned to 100% on 08/18/2013 at 0443.The unit operated at 100% power for the remainder of the month. | On 08/12/2013 at 1905 a rapid down power to 83% was performed due to reduced condenser vacuum caused by rapid fouling of a water box. The waterbox cleaning was completed on 08/13/2013 and power was increased at 2212. Power was returned to 100% on 08/14/2013 at 0330. | ||
On 08/15/2013 at 2359 power was reduced to 86% for waterbox cleaning. Cleaning was completed on 08/17/2013 and power was increased at 2050. Reactor power was returned to 100% on 08/18/2013 at 0443. | |||
: | The unit operated at 100% power for the remainder of the month. | ||
: | OPERATING DATA REPORT DOCKET: 317 PREPARER NAME: Herman O. Olsen UNIT_NME: Calvert Cliffs Unit 1 PREPARER TELEPHONE: 410-495-6734 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 845 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 866 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 720.00 6,551.00 272,167.70 | |||
: 4. Number of Hours Generator On-line 720.00 6,551.00 268,652.26 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 629,032.00 5,819,468.00 224,271,296.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit began the month at 100%. | The unit began the month at 100%. | ||
On 09/20/2013 at 0200 power was reduced to 83% for Main Turbine Valve testing and waterbox cleaning. Power was increased to 90% at 0900. Valve testing was completed and power was increased to 93% at 1121. Waterbox cleaning was completed on 09/21/2013 at 1422 and power was returned to 100% at 1745. | On 09/20/2013 at 0200 power was reduced to 83% for Main Turbine Valve testing and waterbox cleaning. Power was increased to 90% at 0900. | ||
Valve testing was completed and power was increased to 93% at 1121. Waterbox cleaning was completed on 09/21/2013 at 1422 and power was returned to 100% at 1745. | |||
The unit operated at 100% power for the remainder month. | The unit operated at 100% power for the remainder month. | ||
: | OPERATING DATA REPORT DOCKET: 318 PREPARER NAME: Herman O. Olsen UNIT_NME: Calvert Cliffs Unit 2 PREPARER TELEPHONE: (410) 495-6734 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 845 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 850 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,143.90 264,898.95 | |||
: 4. Number of Hours Generator On-line 744.00 4,090.12 262,763.69 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 618,261.00 3,434,206.00 219,053,519.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit began the month at 99.5% reactor power. | The unit began the month at 99.5% reactor power. | ||
On 07/11/2013 at 2106 power was reduced to 95% for Variable Temperature Average testing (PSTP-4). Testing was completed and power was increased on 07/12/2013 at 0110. Reactor power was returned to 99.5% at 0400.On 07/19/2013 at 2100 reactor power was reduced to 80.3% to perform waterbox cleaning. Cleaning was completed on 07/21/2013 at 0630 and power was restored to 99.5% at 1308. | On 07/11/2013 at 2106 power was reduced to 95% for Variable Temperature Average testing (PSTP-4). Testing was completed and power was increased on 07/12/2013 at 0110. Reactor power was returned to 99.5% at 0400. | ||
On 07/19/2013 at 2100 reactor power was reduced to 80.3% to perform waterbox cleaning. Cleaning was completed on 07/21/2013 at 0630 and power was restored to 99.5% at 1308. | |||
The unit operated at 99.5% for the remainder of the month. | The unit operated at 99.5% for the remainder of the month. | ||
: | OPERATING DATA REPORT DOCKET: 318 PREPARER NAME: Herman O. Olsen UNIT_NME: Calvert Cliffs Unit 2 PREPARER TELEPHONE: 410-495-6734 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 845 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 850 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,887.90 265,642.95 | |||
: 4. Number of Hours Generator On-line 744.00 4,834.12 263,507.69 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 622,950.00 4,057,156.00 219,676,469.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit began the month at 99.5% reactor power. | The unit began the month at 99.5% reactor power. | ||
On 08/01/2013 at 1128, 21 Circulating Water Pump tripped. An expeditious power reduction was commenced at 1131 and power was reduced to 85%. Troubleshooting identified a loose wire in the pump exciter cabinet. Repairs were performed and the pump was restored. Power was increased at 2015 and returned to 99.5% at 2335. | On 08/01/2013 at 1128, 21 Circulating Water Pump tripped. An expeditious power reduction was commenced at 1131 and power was reduced to 85%. Troubleshooting identified a loose wire in the pump exciter cabinet. Repairs were performed and the pump was restored. Power was increased at 2015 and returned to 99.5% at 2335. | ||
On 08/09/2013 at 0515 power was reduced to 84% to clean waterboxes. Cleaning was completed and power was restored to 99.5% at 2225.On 08/12/2013 at 0735 power was reduced to 88% to clean 21B waterbox. Cleaning was completed and power was restored to 99.5% at 1915.On 08/17/2013 at 0027 power was reduced to 92% to clean waterboxes. Cleaning was completed and power was restored to 99.5% at 0945.The unit operated at 99.5% for the remainder of the month. | On 08/09/2013 at 0515 power was reduced to 84% to clean waterboxes. Cleaning was completed and power was restored to 99.5% at 2225. | ||
On 08/12/2013 at 0735 power was reduced to 88% to clean 21B waterbox. Cleaning was completed and power was restored to 99.5% at 1915. | |||
On 08/17/2013 at 0027 power was reduced to 92% to clean waterboxes. Cleaning was completed and power was restored to 99.5% at 0945. | |||
The unit operated at 99.5% for the remainder of the month. | |||
OPERATING DATA REPORT DOCKET: 318 PREPARER NAME: Herman O. Olsen UNIT_NME: Calvert Cliffs Unit 2 PREPARER TELEPHONE: 410-495-6734 RPT_PERIOD: 201309 | |||
: 1. Design Electrical Rating: 845 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 850 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 616.13 5,504.03 266,259.08 | |||
: 4. Number of Hours Generator On-line 608.72 5,442.84 264,116.41 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 510,757.00 4,567,913.00 220,187,226.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 004 9/5/2013 F 111.28 A 1 The unit began the month at 99.5% reactor power. | |||
On 09/05/2013 at 1016, control element assembly (CEA) #27 dropped to the bottom of the core while performing surveillance test procedure O-29-2. | |||
Reactor power stabilized at 91%. An abnormal operating procedure was entered and attempts to restore the CEA to the correct level were not successful. At 1207 reactor power was reduced in preparation for a reactor shutdown. This down power met the criteria for the NRC Unplanned Power Change per 7000 Critical Hours performance indicator. The unit was removed from the grid at 1651 and the reactor was shut down at 1735. The unit was cooled down to mode 5 on 09/06/2013 at 0752 to support troubleshooting and repairs. The cause of the dropped CEA was determined to be a ground due to degraded insulation. The ground was located at the coil stack connection at the reactor head. The coil stack was replaced, other connections inspected, and all control element drive mechanisms were electrically tested (meggered) during the shutdown and prior to startup to verify no other ground fault conditions existed. Resistance checks of individual coils were performed and all were verified to be within 10% of the mean. Plant heat up commenced on 09/08/2013 at 1730 and the reactor was taken critical on 09/10/2013 at 0127. | |||
Power was increased and the unit was paralleled to the grid at 0808. Reactor power was restored to 99.5% at 2130. | |||
The unit operated at 99.5% for the remainder of the month. | |||
==SUMMARY== | ==SUMMARY== | ||
The unit began the month at 99.5% reactor power. | The unit began the month at 99.5% reactor power. | ||
On 09/05/2013 at 1016, control element assembly (CEA) #27 dropped to the bottom of the core while performing surveillance test procedure O-29-2. Reactor power stabilized at 91%. An abnormal operating procedure was entered and attempts to restore the CEA to the correct level were not successful. At 1207 reactor power was reduced in preparation for a reactor shutdown. This down power met the criteria for the NRC Unplanned Power Change per 7000 Critical Hours performance indicator. The unit was removed from the grid at 1651 and the reactor was shut down at 1735. The unit was cooled down to mode 5 on 09/06/2013 at 0752 to support troubleshooting and repairs. The cause of the dropped CEA was determined to be a ground due to degraded insulation. The ground was located at the coil stack connection at the reactor head. The coil stack was replaced, other connections inspected, and all control element drive mechanisms were electrically tested (meggered) during the shutdown and prior to startup to verify no other ground fault conditions existed. Resistance checks of individual coils were performed and all were verified to be within 10% of the mean. Plant heat up commenced on 09/08/2013 at 1730 and the reactor was taken critical on 09/10/2013 at 0127. | On 09/05/2013 at 1016, control element assembly (CEA) #27 dropped to the bottom of the core while performing surveillance test procedure O-29-2. Reactor power stabilized at 91%. An abnormal operating procedure was entered and attempts to restore the CEA to the correct level were not successful. At 1207 reactor power was reduced in preparation for a reactor shutdown. This down power met the criteria for the NRC Unplanned Power Change per 7000 Critical Hours performance indicator. The unit was removed from the grid at 1651 and the reactor was shut down at 1735. The unit was cooled down to mode 5 on 09/06/2013 at 0752 to support troubleshooting and repairs. The cause of the dropped CEA was determined to be a ground due to degraded insulation. The ground was located at the coil stack connection at the reactor head. The coil stack was replaced, other connections inspected, and all control element drive mechanisms were electrically tested (meggered) during the shutdown and prior to startup to verify no other ground fault conditions existed. Resistance checks of individual coils were performed and all were verified to be within 10% of the mean. Plant heat up commenced on 09/08/2013 at 1730 and the reactor was taken critical on 09/10/2013 at 0127. Power was increased and the unit was paralleled to the grid at 0808. Reactor power was restored to 99.5% at 2130. | ||
Power was increased and the unit was paralleled to the grid at 0808. Reactor power was restored to 99.5% at 2130. | |||
The unit operated at 99.5% for the remainder of the month. | The unit operated at 99.5% for the remainder of the month. | ||
: | OPERATING DATA REPORT DOCKET: 413 PREPARER NAME: Glenda Helton UNIT_NME: Catawba Unit 1 PREPARER TELEPHONE: 803-701-3352 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1145 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,087.00 211,815.05 | |||
: 4. Number of Hours Generator On-line 744.00 5,087.00 209,645.86 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 838,923.00 5,867,132.00 235,227,374.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Catawba Unit 1 began the month of July 2013 at a power level of 98.6% Full Power and increasing, recovering from an emergent power reduction necessitated by loss of numerous Cooling Tower fans following a lightning strike. 100% Full Power was ultimately reached at 0151 on 7/1/13.At 0140 on 7/27/13, a power reduction was initiated from 100% Full Power to allow replacement of a 1B Main Feedwater Pump Turbine control system processor card. At 0705 on 7/27/13, the power reduction was halted at 49.5% Full Power, to remove 1B Main Feedwater Pump from service for the processor card replacement. At 1735 on 7/27/13, following restoration of 1B Main Feedwater Pump, power escalation was commenced from 49.5% Full Power. At 2142 on 7/27/13, power escalation was suspended at 81% Full Power, for performance of Main Turbine Control Valve Movement periodic testing, and was subsequently resumed at 2220. 100% Full Power was ultimately reached at 0325 on 7/28/13 and Unit 1 operated at or near 100% Full Power for the remainder of the month. | Catawba Unit 1 began the month of July 2013 at a power level of 98.6% Full Power and increasing, recovering from an emergent power reduction necessitated by loss of numerous Cooling Tower fans following a lightning strike. 100% Full Power was ultimately reached at 0151 on 7/1/13. | ||
At 0140 on 7/27/13, a power reduction was initiated from 100% Full Power to allow replacement of a 1B Main Feedwater Pump Turbine control system processor card. At 0705 on 7/27/13, the power reduction was halted at 49.5% Full Power, to remove 1B Main Feedwater Pump from service for the processor card replacement. At 1735 on 7/27/13, following restoration of 1B Main Feedwater Pump, power escalation was commenced from 49.5% Full Power. At 2142 on 7/27/13, power escalation was suspended at 81% Full Power, for performance of Main Turbine Control Valve Movement periodic testing, and was subsequently resumed at 2220. 100% Full Power was ultimately reached at 0325 on 7/28/13 and Unit 1 operated at or near 100% Full Power for the remainder of the month. | |||
: | |||
OPERATING DATA REPORT DOCKET: 413 PREPARER NAME: Glenda Helton UNIT_NME: Catawba Unit 1 PREPARER TELEPHONE: 803-701-3352 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 1145 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,831.00 212,559.05 | |||
: 4. Number of Hours Generator On-line 744.00 5,831.00 210,389.86 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 851,199.00 6,718,331.00 236,078,573.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Catawba Unit 1 began and concluded the month of August 2013 operating at or near 100% Full Power. No planned or unplanned power reductions were incurred during the month. | Catawba Unit 1 began and concluded the month of August 2013 operating at or near 100% Full Power. No planned or unplanned power reductions were incurred during the month. | ||
: | OPERATING DATA REPORT DOCKET: 413 PREPARER NAME: Glenda Helton UNIT_NME: Catawba Unit 1 PREPARER TELEPHONE: 803-701-3352 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1145 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,551.00 213,279.05 | |||
: 4. Number of Hours Generator On-line 720.00 6,551.00 211,109.86 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 824,856.00 7,543,187.00 236,903,429.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Catawba Unit 1 began the month of September 2013 operating at or near 100% Full Power. At 1419 on 9/13/13, power reduction from 100% Full Power was commenced to support Unit 2's Auxiliary Steam demand for the 2EOC19 Refueling Outage Shutdown. Power reduction was halted at 98.5% Full Power at 2028 on 9/13/13. At 2204 on 9/14/13 power escalation was commenced from 98.5% Full Power. At 0100 on 9/15/13 power escalation was suspended at 99% Full Power. Power escalation was resumed from 99% Full Power at 1345 on 9/15/13. 100% Full Power was ultimately reached at 1555 on 9/15/13, and Unit 1 operated at or near 100% Full Power for the remainder of the month. | Catawba Unit 1 began the month of September 2013 operating at or near 100% Full Power. At 1419 on 9/13/13, power reduction from 100% Full Power was commenced to support Unit 2's Auxiliary Steam demand for the 2EOC19 Refueling Outage Shutdown. Power reduction was halted at 98.5% Full Power at 2028 on 9/13/13. At 2204 on 9/14/13 power escalation was commenced from 98.5% Full Power. At 0100 on 9/15/13 power escalation was suspended at 99% Full Power. Power escalation was resumed from 99% Full Power at 1345 on 9/15/13. 100% Full Power was ultimately reached at 1555 on 9/15/13, and Unit 1 operated at or near 100% Full Power for the remainder of the month. | ||
: | OPERATING DATA REPORT DOCKET: 414 PREPARER NAME: Glenda Helton UNIT_NME: Catawba Unit 2 PREPARER TELEPHONE: 803-701-3352 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1145 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,087.00 205,689.73 | |||
: 4. Number of Hours Generator On-line 744.00 5,087.00 203,968.28 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 854,042.00 5,877,661.00 229,518,008.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Catawba Unit 2 began and concluded the month of July 2013 operating at or near 100% Full Power. No planned or unplanned power reductions were incurred during the month. | Catawba Unit 2 began and concluded the month of July 2013 operating at or near 100% Full Power. No planned or unplanned power reductions were incurred during the month. | ||
: | OPERATING DATA REPORT DOCKET: 414 PREPARER NAME: Glenda Helton UNIT_NME: Catawba Unit 2 PREPARER TELEPHONE: 803-701-3352 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1145 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,831.00 206,433.73 | |||
: 4. Number of Hours Generator On-line 744.00 5,831.00 204,712.28 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 856,114.00 6,733,775.00 230,374,122.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Catawba Unit 2 began and concluded the month of August 2013 operating at or near 100% Full Power. No planned or unplanned power reductions were incurred during the month | Catawba Unit 2 began and concluded the month of August 2013 operating at or near 100% Full Power. No planned or unplanned power reductions were incurred during the month | ||
: | |||
OPERATING DATA REPORT DOCKET: 414 PREPARER NAME: Glenda Helton UNIT_NME: Catawba Unit 2 PREPARER TELEPHONE: 803-701-3352 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 1145 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 316.20 6,147.20 206,749.93 | |||
: 4. Number of Hours Generator On-line 316.02 6,147.02 205,028.30 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 343,203.00 7,076,978.00 230,717,325.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 9/14/2013 S 403.98 C 1 2EOC19 Refueling Outage | |||
==SUMMARY== | ==SUMMARY== | ||
Catawba Unit 2 began the month of September 2013 operating at or near 100% Full Power. At 1500 on 9/2/13, power reduction from 100% Full Power was commenced for 2EOC19 power coast-down (1st decrease). Power reduction was halted at 99% Full Power at 1700 on 9/2/13. At 0156 on 9/4/13, power reduction was commenced from 99% Full Power for 2EOC19 power coast-down (2nd decrease.) Power reduction was halted at 98% Full Power at 0430 on 9/4/13. At 1130 on 9/6/13, Power reduction was commenced from 97% Full Power for 2EOC19 power coast-down (3rd decrease.) Power reduction was halted at 96% full power at 1304 on 9/6/13. At 2145, on 9/8/13, power reduction was commenced from 95% full power for 2EOC19 power coast-down (4th decrease.) Power reduction was halted at 94% full power at 2325 on 9/8/13. At 1926 on 9/12/13, power reduction commenced from 93% full power for 2EOC19 power coast-down (5th decrease.) At 2028, on 9/12/13, power reduction halted at 92% full power. At 2101, on 9/13/13, Unit 2 shutdown commenced from 92% full power for entry into 2EOC19 Refueling Outage. The turbine/generator was taken offline at 0401 on 9/14/13. Mode 2 was entered at 0401 on 9/14/13. Mode 3 was entered at 0412 on 9/14/13. Mode 4 was entered at 0834 on 9/14/13. Mode 5 was entered at 1220 on 9/14/13. Mode 6 was entered at 1829 on 9/17/13. No Mode was entered at 1322 on 9/22/13 and Unit 2 remained in No Mode for the remainder of September 2013. | Catawba Unit 2 began the month of September 2013 operating at or near 100% Full Power. At 1500 on 9/2/13, power reduction from 100% Full Power was commenced for 2EOC19 power coast-down (1st decrease). Power reduction was halted at 99% Full Power at 1700 on 9/2/13. At 0156 on 9/4/13, power reduction was commenced from 99% Full Power for 2EOC19 power coast-down (2nd decrease.) Power reduction was halted at 98% Full Power at 0430 on 9/4/13. At 1130 on 9/6/13, Power reduction was commenced from 97% Full Power for 2EOC19 power coast-down (3rd decrease.) Power reduction was halted at 96% full power at 1304 on 9/6/13. At 2145, on 9/8/13, power reduction was commenced from 95% full power for 2EOC19 power coast-down (4th decrease.) Power reduction was halted at 94% full power at 2325 on 9/8/13. At 1926 on 9/12/13, power reduction commenced from 93% full power for 2EOC19 power coast-down (5th decrease.) At 2028, on 9/12/13, power reduction halted at 92% full power. At 2101, on 9/13/13, Unit 2 shutdown commenced from 92% full power for entry into 2EOC19 Refueling Outage. The turbine/generator was taken offline at 0401 on 9/14/13. Mode 2 was entered at 0401 on 9/14/13. Mode 3 was entered at 0412 on 9/14/13. Mode 4 was entered at 0834 on 9/14/13. Mode 5 was entered at 1220 on 9/14/13. Mode 6 was entered at 1829 on 9/17/13. No Mode was entered at 1322 on 9/22/13 and Unit 2 remained in No Mode for the remainder of September 2013. | ||
: | |||
OPERATING DATA REPORT DOCKET: 461 PREPARER NAME: Joe Wemlinger UNIT_NME: Clinton Unit 1 PREPARER TELEPHONE: 217-937-3846 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 1062 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1022 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,017.45 177,782.27 | |||
: 4. Number of Hours Generator On-line 744.00 4,926.22 174,862.43 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 4.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 784,159.00 5,216,996.00 167,945,519.48 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
710 MWe-h planned loss for a control rod sequence exchange. | 710 MWe-h planned loss for a control rod sequence exchange. | ||
: | OPERATING DATA REPORT DOCKET: 461 PREPARER NAME: Joe Wemlinger UNIT_NME: Clinton Unit 1 PREPARER TELEPHONE: 217-937-3846 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1062 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1022 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,761.45 178,526.27 | |||
: 4. Number of Hours Generator On-line 744.00 5,670.22 175,606.43 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 4.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 780,993.00 5,997,989.00 168,726,512.48 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
There was one forced loss and one planned loss in August, 2013.The planned loss for August 2013 of 2398 MWe-hr was due to a planned control rod | There was one forced loss and one planned loss in August, 2013. | ||
The forced loss for August 2013 of 2198 MWe-hr was due to a loss of feedwater heating | The planned loss for August 2013 of 2398 MWe-hr was due to a planned control rod pattern adjustment on 8/17/13. | ||
The forced loss for August 2013 of 2198 MWe-hr was due to a loss of feedwater heating from Feedwater Heaters 5B and 6B. The cause was a malfunctioning controller, which was replaced. | |||
: | |||
OPERATING DATA REPORT DOCKET: 461 PREPARER NAME: Joe Wemlinger UNIT_NME: Clinton Unit 1 PREPARER TELEPHONE: 217-937-3846 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 1062 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1022 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 720.00 6,481.45 179,246.27 | |||
: 4. Number of Hours Generator On-line 720.00 6,390.22 176,326.43 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 4.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 755,883.00 6,753,872.00 169,482,395.48 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
CPS had two forced losses. On 9/12/13 the 6A 'Feedwater Heater Emergency Drain valve failed open, resulting in a forced loss of 121 MWE-hr. The two planned losses were due to a control rod pattern adjustment and turbine surveillances, and implementation of Final Feedwater Temperature Reduction for unit coastdown into refueling outage C1R14. | CPS had two forced losses. On 9/12/13 the 6A 'Feedwater Heater Emergency Drain valve failed open, resulting in a forced loss of 121 MWE-hr. | ||
The two planned losses were due to a control rod pattern adjustment and turbine surveillances, and implementation of Final Feedwater Temperature Reduction for unit coastdown into refueling outage C1R14. | |||
: | |||
OPERATING DATA REPORT DOCKET: 397 PREPARER NAME: Darla Johnson UNIT_NME: Columbia Gen Sta Unit 2 PREPARER TELEPHONE: 509-377-4570 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 1153 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1107 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 4,066.75 200,458.48 | |||
: 4. Number of Hours Generator On-line 744.00 4,005.22 195,983.99 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 3,357.70 | |||
: 6. Net Electrical energy Generated (MWHrs) 806,046.17 4,357,682.64 201,169,881.38 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Columbia operated at 100% power except for a downpower to 64% to fix a tube leak on COND-HX-3C. Columbia also downpowered to 98% for rod line maintenance. Additional forced losses were taken from a high level trip on COND-HX-4C although no downpower occurred. | Columbia operated at 100% power except for a downpower to 64% to fix a tube leak on COND-HX-3C. Columbia also downpowered to 98% for rod line maintenance. Additional forced losses were taken from a high level trip on COND-HX-4C although no downpower occurred. | ||
: | OPERATING DATA REPORT DOCKET: 397 PREPARER NAME: Darla Johnson UNIT_NME: Columbia Gen Sta Unit 2 PREPARER TELEPHONE: 509-377-4570 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1153 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1107 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,810.75 201,202.48 | |||
: 4. Number of Hours Generator On-line 744.00 4,749.22 196,727.99 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 3,357.70 | |||
: 6. Net Electrical energy Generated (MWHrs) 821,066.37 5,178,749.01 201,990,947.75 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Columbia operated at 100% power except for a downpower to 97% for MT Bypass Valve Testing. Columbia downpowered to 80% for a single rod scram, to 98% for SJAE B Drain Temperature, and to 95% to shutdown CW-P-1A. | Columbia operated at 100% power except for a downpower to 97% for MT Bypass Valve Testing. Columbia downpowered to 80% for a single rod scram, to 98% for SJAE B Drain Temperature, and to 95% to shutdown CW-P-1A. | ||
: | OPERATING DATA REPORT DOCKET: 397 PREPARER NAME: Darla Johnson UNIT_NME: Columbia Gen Sta Unit 2 PREPARER TELEPHONE: 509-377-4570 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1153 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1107 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 5,530.75 201,922.48 | |||
: 4. Number of Hours Generator On-line 720.00 5,469.22 197,447.99 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 3,357.70 | |||
: 6. Net Electrical energy Generated (MWHrs) 792,920.70 5,971,669.71 202,783,868.45 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Columbia operated at 100% throughout the month of September except for a planned downpower to 65% for Sequence Exchange and TGV/BPV Testing and an unplanned downpower to 90% for a control rod insertion. Additional unplanned losses were experienced throughout the month due to CW-P-1A being out of service. | Columbia operated at 100% throughout the month of September except for a planned downpower to 65% for Sequence Exchange and TGV/BPV Testing and an unplanned downpower to 90% for a control rod insertion. Additional unplanned losses were experienced throughout the month due to CW-P-1A being out of service. | ||
OPERATING DATA REPORT DOCKET: 445 PREPARER NAME: G.D. Lytle UNIT_NME: Comanche Peak Unit 1 PREPARER TELEPHONE: 254-897-5455 RPT_PERIOD: 201307 | |||
: 1. Design Electrical Rating: 1218 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1205 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 732.18 4,562.93 181,729.16 | |||
: 4. Number of Hours Generator On-line 724.82 4,538.12 180,629.26 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 867,740.00 5,525,651.00 201,756,887.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1-13-2 7/27/2013 S 19.18 B 1 Enter MODE 3 to repair Reactor Coolant Pump 1-02 seal water injection drain valve 1-CS-8364B, leaking inside containment. Repairs successful. | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 1 began the month at 100% reactor, 1266 MWe turbine power. On 7/26/13 at 22:00, licensed operators began ramping the unit to about 20% reactor, 200 MWe in preparation for a planned unit and reactor shutdown to conduct a maintenance outage to repair a leaking Reactor Coolant Pump (RCP 1-02) seal water injection line drain valve, 1-CS-8364B inside the containment building. On 7/27/13 at 00:59, licensed operators manually tripped the reactor from about 20% reactor, 200 MWe turbine power per station procedures to enter MODE 3 and commence the outage. Repairs to 1-CS-8364B were successful. On 7/27/13 at 12:20, Unit 1 entered MODE 2 and at 12:48 reactor operators declared the reactor critical. On 7/27/13 at 16:48, Unit 1 entered MODE 1. On 7/27/13 at 20:10, the main generator was synchronized to the grid ending the maintenance outage with a duration of about 19.18 hours. On 7/27/13 at 21:33, the unit began ramping up to return to full power operation. On 7/29/13 at 02:23, Unit 1 returned to full power operation at 100% reactor, 1257 MWE turbine power. Unit 1 ended the month at 100% reactor, 1263 MWe turbine power. | Unit 1 began the month at 100% reactor, 1266 MWe turbine power. On 7/26/13 at 22:00, licensed operators began ramping the unit to about 20% reactor, 200 MWe in preparation for a planned unit and reactor shutdown to conduct a maintenance outage to repair a leaking Reactor Coolant Pump (RCP 1-02) seal water injection line drain valve, 1-CS-8364B inside the containment building. On 7/27/13 at 00:59, licensed operators manually tripped the reactor from about 20% reactor, 200 MWe turbine power per station procedures to enter MODE 3 and commence the outage. Repairs to 1-CS-8364B were successful. On 7/27/13 at 12:20, Unit 1 entered MODE 2 and at 12:48 reactor operators declared the reactor critical. On 7/27/13 at 16:48, Unit 1 entered MODE 1. On 7/27/13 at 20:10, the main generator was synchronized to the grid ending the maintenance outage with a duration of about 19.18 hours. On 7/27/13 at 21:33, the unit began ramping up to return to full power operation. On 7/29/13 at 02:23, Unit 1 returned to full power operation at 100% reactor, 1257 MWE turbine power. Unit 1 ended the month at 100% reactor, 1263 MWe turbine power. | ||
: | OPERATING DATA REPORT DOCKET: 445 PREPARER NAME: G.D. Lytle UNIT_NME: Comanche Peak Unit 1 PREPARER TELEPHONE: 254-897-5455 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1218 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1205 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,306.93 182,473.16 | |||
: 4. Number of Hours Generator On-line 744.00 5,282.12 181,373.26 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 904,799.00 6,430,450.00 202,661,686.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 1 began the month at 100% reactor, 1263 MWe turbine power. Unit 1 ended the month at 100% reactor, 1259 MWe turbine power. | Unit 1 began the month at 100% reactor, 1263 MWe turbine power. Unit 1 ended the month at 100% reactor, 1259 MWe turbine power. | ||
: | OPERATING DATA REPORT DOCKET: 445 PREPARER NAME: G.D. Lytle UNIT_NME: Comanche Peak Unit 1 PREPARER TELEPHONE: 254-897-5455 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1218 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1205 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,026.93 183,193.16 | |||
: 4. Number of Hours Generator On-line 720.00 6,002.12 182,093.26 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 875,928.00 7,306,378.00 203,537,614.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 1 began the month at 100% reactor, 1259 MWe turbine power. Unit 1 ended the month at 100% reactor, 1269 MWe turbine power. | Unit 1 began the month at 100% reactor, 1259 MWe turbine power. Unit 1 ended the month at 100% reactor, 1269 MWe turbine power. | ||
: | OPERATING DATA REPORT DOCKET: 446 PREPARER NAME: G.D. Lytle UNIT_NME: Comanche Peak Unit 2 PREPARER TELEPHONE: 254-897-5455 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1207 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1195 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,087.00 161,173.21 | |||
: 4. Number of Hours Generator On-line 744.00 5,087.00 160,442.96 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 896,889.00 6,198,317.00 181,366,598.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 2 began the month at 100% reactor, 1255 MWe turbine power. Unit 2 ended the month at 100% reactor, 1253 MWe turbine power. | Unit 2 began the month at 100% reactor, 1255 MWe turbine power. Unit 2 ended the month at 100% reactor, 1253 MWe turbine power. | ||
: | OPERATING DATA REPORT DOCKET: 446 PREPARER NAME: G.D. Lytle UNIT_NME: Comanche Peak Unit 2 PREPARER TELEPHONE: 254-897-5455 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1207 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1195 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,831.00 161,917.21 | |||
: 4. Number of Hours Generator On-line 744.00 5,831.00 161,186.96 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 893,994.00 7,092,311.00 182,260,592.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 2 began the month at 100% reactor, 1253 MWe turbine power. Unit 2 ended the month at 100% reactor, 1250 MWe turbine power. | Unit 2 began the month at 100% reactor, 1253 MWe turbine power. Unit 2 ended the month at 100% reactor, 1250 MWe turbine power. | ||
: | OPERATING DATA REPORT DOCKET: 446 PREPARER NAME: G.D. Lytle UNIT_NME: Comanche Peak Unit 2 PREPARER TELEPHONE: 254-897-5455 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1207 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1195 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,551.00 162,637.21 | |||
: 4. Number of Hours Generator On-line 720.00 6,551.00 161,906.96 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 866,198.00 7,958,509.00 183,126,790.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 2 began the month at 100% reactor 1250 MWe turbine power. Unit 2 ended the month at 100% reactor, 1258 MWe turbine power. | Unit 2 began the month at 100% reactor 1250 MWe turbine power. Unit 2 ended the month at 100% reactor, 1258 MWe turbine power. | ||
: | OPERATING DATA REPORT DOCKET: 315 PREPARER NAME: K. Kohn UNIT_NME: Cook Unit 1 PREPARER TELEPHONE: 269-465-5901 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1084 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1030 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 3,835.87 240,635.65 | |||
: 4. Number of Hours Generator On-line 744.00 3,796.85 237,550.83 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 321.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 774,142.00 4,003,034.00 227,935,430.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
None. | None. | ||
: | OPERATING DATA REPORT DOCKET: 315 PREPARER NAME: K. Kohn UNIT_NME: Cook Unit 1 PREPARER TELEPHONE: 269-465-5901 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1084 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1030 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,579.87 241,379.65 | |||
: 4. Number of Hours Generator On-line 744.00 4,540.85 238,294.83 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 321.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 767,138.00 4,770,172.00 228,702,568.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
None. | None. | ||
: | OPERATING DATA REPORT DOCKET: 315 PREPARER NAME: K. Kohn UNIT_NME: Cook Unit 1 PREPARER TELEPHONE: 269-465-5901 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1084 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1030 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 5,299.87 242,099.65 | |||
: 4. Number of Hours Generator On-line 720.00 5,260.85 239,014.83 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 321.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 739,244.00 5,509,416.00 229,441,812.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Planned Main Turbine Control Valve Testing performed on 9/15/13 @ 2230. Rx power was reduced to 91%. | Planned Main Turbine Control Valve Testing performed on 9/15/13 @ 2230. Rx power was reduced to 91%. | ||
OPERATING DATA REPORT DOCKET: 316 PREPARER NAME: K. Kohn UNIT_NME: Cook Unit 2 PREPARER TELEPHONE: 269-465-5901 RPT_PERIOD: 201307 | |||
: 1. Design Electrical Rating: 1107 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1077 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 697.07 5,040.07 224,938.52 | |||
: 4. Number of Hours Generator On-line 685.98 5,028.98 220,588.00 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 726,761.00 5,597,889.00 224,767,943.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 234 7/28/2013 F 58.02 A 2 U2F13A Rx/Gen trip on 7/28/2013 @ 1018 due to an incorrect controller setpoint on the Condensate Heater Bypass Control Valve. Rx taken critical on 7/30/2013 @ 0914 and Generator synch occurred on 7/30/2013 @ 2019. | |||
==SUMMARY== | ==SUMMARY== | ||
U2F13A Rx/Gen trip on 7/28/2013 @ 1018 due to an incorrect controller setpoint on the Condensate Heater Bypass Control Valve. Rx taken critical on 7/30/2013 @ 0914 and Generator synch occurred on 7/30/2013 @ 2019. | U2F13A Rx/Gen trip on 7/28/2013 @ 1018 due to an incorrect controller setpoint on the Condensate Heater Bypass Control Valve. Rx taken critical on 7/30/2013 @ 0914 and Generator synch occurred on 7/30/2013 @ 2019. | ||
: | OPERATING DATA REPORT DOCKET: 316 PREPARER NAME: K. Kohn UNIT_NME: Cook Unit 2 PREPARER TELEPHONE: 269-465-5901 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1107 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1077 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,784.07 225,682.52 | |||
: 4. Number of Hours Generator On-line 744.00 5,772.98 221,332.00 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 800,022.00 6,397,911.00 225,567,965.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
U2F13A Rx/Gen trip due to an incorrect controller setpoint on the Condensate Heater Bypass Control Valve. Power ascension to 100% from 8/1/2013 @ 0000 to 8/1/2013 @ 0200. | U2F13A Rx/Gen trip due to an incorrect controller setpoint on the Condensate Heater Bypass Control Valve. Power ascension to 100% from 8/1/2013 @ 0000 to 8/1/2013 @ 0200. | ||
: | OPERATING DATA REPORT DOCKET: 316 PREPARER NAME: K. Kohn UNIT_NME: Cook Unit 2 PREPARER TELEPHONE: 269-465-5901 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1107 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1077 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,504.07 226,402.52 | |||
: 4. Number of Hours Generator On-line 720.00 6,492.98 222,052.00 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 760,084.00 7,157,995.00 226,328,049.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Rx power reduction to 48% began on 9/29/2013 @ 2000 to support TREVI testing prior to the U2C21 Refueling Outage. | Rx power reduction to 48% began on 9/29/2013 @ 2000 to support TREVI testing prior to the U2C21 Refueling Outage. | ||
: | OPERATING DATA REPORT DOCKET: 298 PREPARER NAME: Brian Shryock UNIT_NME: Cooper Unit 1 PREPARER TELEPHONE: 402-825-2984 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 815 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 768.88 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,087.00 276,237.77 | |||
: 4. Number of Hours Generator On-line 744.00 5,087.00 272,893.41 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 540,769.66 3,925,176.58 191,806,755.98 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
No information for this reporting period. | No information for this reporting period. | ||
: | OPERATING DATA REPORT DOCKET: 298 PREPARER NAME: Brian Shryock UNIT_NME: Cooper Unit 1 PREPARER TELEPHONE: 402-825-2984 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 815 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 768.88 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,831.00 276,981.77 | |||
: 4. Number of Hours Generator On-line 744.00 5,831.00 273,637.41 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 572,241.66 4,497,418.24 192,378,997.64 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
No information for this reporting period. | No information for this reporting period. | ||
: | OPERATING DATA REPORT DOCKET: 298 PREPARER NAME: Brian Shryock UNIT_NME: Cooper Unit 1 PREPARER TELEPHONE: 402-825-2984 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 815 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 768.88 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,551.00 277,701.77 | |||
: 4. Number of Hours Generator On-line 720.00 6,551.00 274,357.41 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 553,316.80 5,050,735.04 192,932,314.44 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
No information for this reporting period. | No information for this reporting period. | ||
OPERATING DATA REPORT DOCKET: 346 PREPARER NAME: J. Syrowski UNIT_NME: Davis-Besse Unit 1 PREPARER TELEPHONE: 419-249-2417 RPT_PERIOD: 201307 | |||
: 1. Design Electrical Rating: 908 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 894 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 476.87 4,793.20 220,567.08 | |||
: 4. Number of Hours Generator On-line 462.10 4,778.43 217,267.18 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 5,532.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 399,908.00 4,339,570.50 183,626,883.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 6/29/2013 F 281.90 A 4 Reactor Trip on Reactor Protection System due to Flux/Delta Flux/Flow on trip of Reactor Coolant Pump 1-2 due to electrical problem. | |||
==SUMMARY== | ==SUMMARY== | ||
On July 12, 2013, the Reactor was taken critical and the Unit synchronized to the grid following completion of repair activities for the plant trip that occurred on June 29, 2013. Power ascension to 100% power was completed on July 14 following routine testing and emergent repairs to feedwater heater level controls. On July 22 and July 24, planned downpowers to approximately 99% power were conducted to support Reactor Trip Breaker testing. The plant remained at approximately 100% power the remainder of the month. | On July 12, 2013, the Reactor was taken critical and the Unit synchronized to the grid following completion of repair activities for the plant trip that occurred on June 29, 2013. Power ascension to 100% power was completed on July 14 following routine testing and emergent repairs to feedwater heater level controls. On July 22 and July 24, planned downpowers to approximately 99% power were conducted to support Reactor Trip Breaker testing. The plant remained at approximately 100% power the remainder of the month. | ||
: | OPERATING DATA REPORT DOCKET: 346 PREPARER NAME: J. Syrowski UNIT_NME: Davis-Besse Unit 1 PREPARER TELEPHONE: 419-249-2417 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 908 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 894 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,537.20 221,311.08 | |||
: 4. Number of Hours Generator On-line 744.00 5,522.43 218,011.18 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 5,532.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 672,378.60 5,011,949.10 184,299,261.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
On August 14, 2013, a planned downpower to approximately 99% power was conducted to support Reactor Trip Breaker testing. On August 29 a planned downpower to approximately 99% power was conducted to support Reactor Trip Breaker maintenance and testing. The plant remained at approximately 100% power the remainder of the month. | On August 14, 2013, a planned downpower to approximately 99% power was conducted to support Reactor Trip Breaker testing. On August 29 a planned downpower to approximately 99% power was conducted to support Reactor Trip Breaker maintenance and testing. The plant remained at approximately 100% power the remainder of the month. | ||
: | OPERATING DATA REPORT DOCKET: 346 PREPARER NAME: J. Syrowski UNIT_NME: Davis-Besse Unit 1 PREPARER TELEPHONE: 419-249-2417 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 908 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 894 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,257.20 222,031.08 | |||
: 4. Number of Hours Generator On-line 720.00 6,242.43 218,731.18 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 5,532.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 652,537.10 5,664,486.20 184,951,798.70 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
On September 4 and 25, 2013, planned downpowers to approximately 99% power were conducted to support Reactor Trip Breaker testing. On September 7 a planned downpower to approximately 99% power was conducted to support Reactor Trip Breaker maintenance and testing. On September 18 a planned downpower to approximately 99% power was conducted to support Reactor Trip Breaker maintenance and testing and Integrated Control System maintenance. The plant remained at approximately 100% power the remainder of the month. | On September 4 and 25, 2013, planned downpowers to approximately 99% power were conducted to support Reactor Trip Breaker testing. On September 7 a planned downpower to approximately 99% power was conducted to support Reactor Trip Breaker maintenance and testing. On September 18 a planned downpower to approximately 99% power was conducted to support Reactor Trip Breaker maintenance and testing and Integrated Control System maintenance. The plant remained at approximately 100% power the remainder of the month. | ||
OPERATING DATA REPORT DOCKET: 275 PREPARER NAME: M. Padovan UNIT_NME: Diablo Canyon Unit 1 PREPARER TELEPHONE: (805) 545-4540 RPT_PERIOD: 201307 | |||
: 1. Design Electrical Rating: 1138 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1122 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 719.53 4,946.40 219,714.00 | |||
: 4. Number of Hours Generator On-line 705.72 4,932.59 217,725.36 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 781,724.00 5,604,961.00 231,763,888.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 6/26/2013 F 38.28 A 4 An inspection identified a thru wall crack in the socket weld at the half coupling attached to Line-985, upstream of RHR-1-RV-8708. Engineering accepted a fatigue resistant socket weld profile at socket welded half coupling and a weld repair was performed. | |||
==SUMMARY== | ==SUMMARY== | ||
Following a Residual Heat Removal system weld repair, Operations performed a ramp up in power, reaching full power at 0400 on July 4th, 2013. Unit 1 operated at approximately 100 percent power for the rest of the month of July, 2013. | Following a Residual Heat Removal system weld repair, Operations performed a ramp up in power, reaching full power at 0400 on July 4th, 2013. Unit 1 operated at approximately 100 percent power for the rest of the month of July, 2013. | ||
: | OPERATING DATA REPORT DOCKET: 275 PREPARER NAME: (805) 545-4540 UNIT_NME: Diablo Canyon Unit 1 PREPARER TELEPHONE: M. Padovan RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1138 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1122 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,690.40 220,458.00 | |||
: 4. Number of Hours Generator On-line 744.00 5,676.59 218,469.36 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 848,141.00 6,453,102.00 232,612,029.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Diablo Canyon Unit One began and ended the month of August, 2013 in Mode 1 (Power Operation) at approximately 100 percent reactor power. There were no significant operational occurrences. | Diablo Canyon Unit One began and ended the month of August, 2013 in Mode 1 (Power Operation) at approximately 100 percent reactor power. | ||
There were no significant operational occurrences. | |||
: | |||
OPERATING DATA REPORT DOCKET: 275 PREPARER NAME: Mark Padovan UNIT_NME: Diablo Canyon Unit 1 PREPARER TELEPHONE: 805-545-4540 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 1138 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1122 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 720.00 6,410.40 221,178.00 | |||
: 4. Number of Hours Generator On-line 720.00 6,396.59 219,189.36 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 821,185.00 7,274,287.00 233,433,214.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 1 operated at approximately 100 percent power for the month of September 2013. | Unit 1 operated at approximately 100 percent power for the month of September 2013. | ||
: | OPERATING DATA REPORT DOCKET: 323 PREPARER NAME: M. Padovan UNIT_NME: Diablo Canyon Unit 2 PREPARER TELEPHONE: (805) 545-4540 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1151 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1118 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 665.95 3,891.00 214,950.73 | |||
: 4. Number of Hours Generator On-line 656.13 3,826.46 213,036.92 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 721,930.00 4,278,799.00 228,014,080.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2 7/10/2013 F 87.87 A 3 A Licensee Event Report and Root Cause Evaluation are being prepared to determine the cause and corrective actions. | |||
==SUMMARY== | ==SUMMARY== | ||
Diablo Canyon Unit 2 began the month of July in Mode 1 (Power Operation) at approximately 100 percent reactor power. On July 10th, an apparent electrical flashover of a Unit 2 main bank transformer lightning arrestor resulted in a reactor trip. Preliminary investigation suggests that the electrical disturbance was experienced during routine "hot washing" an insulator. On July 13th, 2013, Unit 2 was returned to critical and entered Mode 1 (power operation). On July 15th, 2013, Unit 2 returned to full power and it remained there for the rest of the month. | Diablo Canyon Unit 2 began the month of July in Mode 1 (Power Operation) at approximately 100 percent reactor power. On July 10th, an apparent electrical flashover of a Unit 2 main bank transformer lightning arrestor resulted in a reactor trip. Preliminary investigation suggests that the electrical disturbance was experienced during routine "hot washing" an insulator. On July 13th, 2013, Unit 2 was returned to critical and entered Mode 1 (power operation). On July 15th, 2013, Unit 2 returned to full power and it remained there for the rest of the month. | ||
: | OPERATING DATA REPORT DOCKET: 323 PREPARER NAME: (805) 545-4540 UNIT_NME: Diablo Canyon Unit 2 PREPARER TELEPHONE: M. Padovan RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1151 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1118 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,635.00 215,694.73 | |||
: 4. Number of Hours Generator On-line 744.00 4,570.46 213,780.92 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 843,997.00 5,122,796.00 228,858,077.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Diablo Canyon Unit Two began and ended the month of August, 2013 in Mode 1 (Power Operation) at approximately 100 percent reactor power. There were no significant operational occurrences. | Diablo Canyon Unit Two began and ended the month of August, 2013 in Mode 1 (Power Operation) at approximately 100 percent reactor power. | ||
There were no significant operational occurrences. | |||
: | |||
OPERATING DATA REPORT DOCKET: 323 PREPARER NAME: M. Padovan UNIT_NME: Diablo Canyon Unit 2 PREPARER TELEPHONE: 805-545-4540 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 1151 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1118 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 720.00 5,355.00 216,414.73 | |||
: 4. Number of Hours Generator On-line 720.00 5,290.46 214,500.92 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 817,391.00 5,940,187.00 229,675,468.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Diablo Canyon Unit 2 operated at approximately 100 percent power for the month of September 2013. | Diablo Canyon Unit 2 operated at approximately 100 percent power for the month of September 2013. | ||
: | OPERATING DATA REPORT DOCKET: 237 PREPARER NAME: Dave Kijowski UNIT_NME: Dresden Unit 2 PREPARER TELEPHONE: 815-416-4227 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 894 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 870 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,087.00 303,765.74 | |||
: 4. Number of Hours Generator On-line 744.00 5,087.00 294,590.59 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 4.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 677,151.00 4,690,095.00 213,341,844.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
With the exception of short periods for routine maintenance and surveillances, Unit 2 operated at full power for the reporting period. | With the exception of short periods for routine maintenance and surveillances, Unit 2 operated at full power for the reporting period. | ||
: | OPERATING DATA REPORT DOCKET: 237 PREPARER NAME: Dave Kijowski UNIT_NME: Dresden Unit 2 PREPARER TELEPHONE: 815-416-4227 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 894 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 870 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,831.00 304,509.74 | |||
: 4. Number of Hours Generator On-line 744.00 5,831.00 295,334.59 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 4.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 672,326.00 5,362,421.00 214,014,170.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
On August 10, at approximately 2200 hours, load was reduced to approximately 84% electrical for a planned control rod pattern adjustment. On August 11, at approximately 0100 hours, the unit returned to full power operation.On August 28, at approximately 1600 hours, load was reduced to approximately 98% electrical due to an unplanned trip of the 2B Circ Water Pump. On August 29, at approximately 1200 hours, load was further reduced due to condenser limitations with the combination of warm intake temperatures and two circ water pump operation. Load was reduced to as low as 89% electrical during this period of warm weather and two pump operation. The unit remained at approximately 89% electrical operation for the remainder of the reporting period. | On August 10, at approximately 2200 hours, load was reduced to approximately 84% electrical for a planned control rod pattern adjustment. On August 11, at approximately 0100 hours, the unit returned to full power operation. | ||
On August 28, at approximately 1600 hours, load was reduced to approximately 98% electrical due to an unplanned trip of the 2B Circ Water Pump. On August 29, at approximately 1200 hours, load was further reduced due to condenser limitations with the combination of warm intake temperatures and two circ water pump operation. Load was reduced to as low as 89% electrical during this period of warm weather and two pump operation. The unit remained at approximately 89% electrical operation for the remainder of the reporting period. | |||
: | |||
OPERATING DATA REPORT DOCKET: 237 PREPARER NAME: Dave Kijowski UNIT_NME: Dresden Unit 2 PREPARER TELEPHONE: 815-416-4227 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 894 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 870 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 720.00 6,551.00 305,229.74 | |||
: 4. Number of Hours Generator On-line 720.00 6,551.00 296,054.59 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 4.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 655,673.00 6,018,094.00 214,669,843.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Entering the month, unit load was at approximately 89% electrical due to an unplanned trip of the 2B Circ Water Pump. On September 1, at approximately 1600 hours, the unit was returned to full power operation.On September 7, at approximately 2300 hours, load was reduced to approximately 78% electrical for a planned control rod pattern adjustment. On September 8, at approximately 1000 hours, the unit returned to full power operation.On September 21, at approximately 2200 hours, load was reduced to approximately 86% electrical for a planned control rod pattern adjustment. On September 22, at approximately 0100 hours, the unit returned to full power operation.With the exception of short periods for routine maintenance and surveillances, Unit 2 operated at full power for the remainder of the reporting period. | Entering the month, unit load was at approximately 89% electrical due to an unplanned trip of the 2B Circ Water Pump. On September 1, at approximately 1600 hours, the unit was returned to full power operation. | ||
On September 7, at approximately 2300 hours, load was reduced to approximately 78% electrical for a planned control rod pattern adjustment. | |||
: | On September 8, at approximately 1000 hours, the unit returned to full power operation. | ||
On September 21, at approximately 2200 hours, load was reduced to approximately 86% electrical for a planned control rod pattern adjustment. | |||
: | On September 22, at approximately 0100 hours, the unit returned to full power operation. | ||
With the exception of short periods for routine maintenance and surveillances, Unit 2 operated at full power for the remainder of the reporting period. | |||
OPERATING DATA REPORT DOCKET: 249 PREPARER NAME: Dave Kijowski UNIT_NME: Dresden Unit 3 PREPARER TELEPHONE: 815-416-4227 RPT_PERIOD: 201307 | |||
: 1. Design Electrical Rating: 879 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 850 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,087.00 291,325.05 | |||
: 4. Number of Hours Generator On-line 744.00 5,087.00 282,828.15 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 1.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 676,259.00 4,672,982.00 204,775,455.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
With the exception of short periods for routine maintenance and surveillances, Unit 3 operated at full power for the reporting period. | With the exception of short periods for routine maintenance and surveillances, Unit 3 operated at full power for the reporting period. | ||
: | OPERATING DATA REPORT DOCKET: 249 PREPARER NAME: Dave Kijowski UNIT_NME: Dresden Unit 3 PREPARER TELEPHONE: 815-416-4227 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 879 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 850 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,831.00 292,069.05 | |||
: 4. Number of Hours Generator On-line 744.00 5,831.00 283,572.15 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 1.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 675,205.00 5,348,187.00 205,450,660.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
On August 31, at approximately 2200 hours, load was reduced to approximately 66% electrical for planned turbine valve testing and control rod pattern adjustment. The unit was operating at approximately 70% electrical at the end of the reporting period. | On August 31, at approximately 2200 hours, load was reduced to approximately 66% electrical for planned turbine valve testing and control rod pattern adjustment. The unit was operating at approximately 70% electrical at the end of the reporting period. | ||
: | OPERATING DATA REPORT DOCKET: 249 PREPARER NAME: Dave Kijowski UNIT_NME: Dresden Unit 3 PREPARER TELEPHONE: 815-416-4227 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 879 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 850 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,551.00 292,789.05 | |||
: 4. Number of Hours Generator On-line 720.00 6,551.00 284,292.15 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 1.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 654,286.00 6,002,473.00 206,104,946.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Entering the month, unit load was at approximately 70% electrical for planned turbine valve testing and control rod pattern adjustment. On September 1, at approximately 1300 hours, the unit was returned to full power operation.With the exception of short periods for routine maintenance and surveillances, Unit 3 operated at full power for the remainder of the reporting period. | Entering the month, unit load was at approximately 70% electrical for planned turbine valve testing and control rod pattern adjustment. On September 1, at approximately 1300 hours, the unit was returned to full power operation. | ||
With the exception of short periods for routine maintenance and surveillances, Unit 3 operated at full power for the remainder of the reporting period. | |||
: | |||
OPERATING DATA REPORT DOCKET: 331 PREPARER NAME: Wendell Horst UNIT_NME: Duane Arnold Unit 1 PREPARER TELEPHONE: 319 851-7359 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 621.9 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 601.6 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,087.00 280,212.11 | |||
: 4. Number of Hours Generator On-line 744.00 5,087.00 275,254.47 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 192.80 | |||
: 6. Net Electrical energy Generated (MWHrs) 447,623.96 3,097,483.69 138,115,281.87 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 331 PREPARER NAME: Wendell Horst UNIT_NME: Duane Arnold Unit 1 PREPARER TELEPHONE: 319 851-7359 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 621.9 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 601.6 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,831.00 280,956.11 | ||
: 4. Number of Hours Generator On-line 744.00 5,831.00 275,998.47 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 192.80 | |||
: 6. Net Electrical energy Generated (MWHrs) 447,146.62 3,544,630.31 138,562,428.49 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unplanned energy loss in August 2013 was due to problems with the feedwater LEFM flow indicators. | The unplanned energy loss in August 2013 was due to problems with the feedwater LEFM flow indicators. | ||
: | OPERATING DATA REPORT DOCKET: 331 PREPARER NAME: Wendell Horst UNIT_NME: Duane Arnold Unit 1 PREPARER TELEPHONE: 319 851-7359 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 621.9 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 601.6 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,551.00 281,676.11 | |||
: 4. Number of Hours Generator On-line 720.00 6,551.00 276,718.47 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 192.80 | |||
: 6. Net Electrical energy Generated (MWHrs) 430,065.00 3,974,695.31 138,992,493.49 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unplanned energy loss in September 2013 was a result of a minor downpower to restore Reactor Water Cleanup following repair of MO2701, RWCU Supply Outboard Isolation, which failed to close when demanded. PEL was due to the quarterly surveillance and control rod sequence exchange downpower, and repair of a lube oil leak on Reactor Feedwater Pump B. | Unplanned energy loss in September 2013 was a result of a minor downpower to restore Reactor Water Cleanup following repair of MO2701, RWCU Supply Outboard Isolation, which failed to close when demanded. PEL was due to the quarterly surveillance and control rod sequence exchange downpower, and repair of a lube oil leak on Reactor Feedwater Pump B. | ||
: | OPERATING DATA REPORT DOCKET: 348 PREPARER NAME: Khris Miller UNIT_NME: Farley Unit 1 PREPARER TELEPHONE: 334-814-4549 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 854 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 874 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,043.55 266,900.26 | |||
: 4. Number of Hours Generator On-line 744.00 5,033.30 264,172.00 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 648,345.00 4,438,273.00 214,655,579.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
There were no significant power reductions this period. | There were no significant power reductions this period. | ||
: | OPERATING DATA REPORT DOCKET: 348 PREPARER NAME: Khris Miller UNIT_NME: Farley Unit 1 PREPARER TELEPHONE: 334-814-4549 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 854 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 874 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,787.55 267,644.26 | |||
: 4. Number of Hours Generator On-line 744.00 5,777.30 264,916.00 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 646,171.00 5,084,444.00 215,301,750.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
There were no significant power reductions this period. | There were no significant power reductions this period. | ||
OPERATING DATA REPORT DOCKET: 348 PREPARER NAME: Khris Miller UNIT_NME: Farley Unit 1 PREPARER TELEPHONE: 334-814-4549 RPT_PERIOD: 201309 | |||
: 1. Design Electrical Rating: 854 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 874 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 678.83 6,466.38 268,323.09 | |||
: 4. Number of Hours Generator On-line 677.78 6,455.08 265,593.78 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 558,087.00 5,642,531.00 215,859,837.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 25 9/29/2013 S 42.22 C 1 At 1359 on September 12, 2013 Unit 1 began to ramp down prior to the normal refueling outage U1R25. The Unit was removed from the grid at 0547 on September 29, 2013. The reactor was shut down at 0650 on September 29, 2013. | |||
==SUMMARY== | ==SUMMARY== | ||
At 1359 on September 12, 2013 Unit 1 began to ramp down prior to the normal refueling outage U1R25. The Unit was removed from the grid at 0547 on September 29, 2013. The reactor was shut down at 0650 on September 29, 2013. | At 1359 on September 12, 2013 Unit 1 began to ramp down prior to the normal refueling outage U1R25. The Unit was removed from the grid at 0547 on September 29, 2013. The reactor was shut down at 0650 on September 29, 2013. | ||
: | OPERATING DATA REPORT DOCKET: 364 PREPARER NAME: Khris Miller UNIT_NME: Farley Unit 2 PREPARER TELEPHONE: 334-814-4549 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 855 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 883 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,503.08 249,507.85 | |||
: 4. Number of Hours Generator On-line 744.00 4,469.25 247,004.56 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 652,036.00 3,818,528.00 202,647,981.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
There were no significant power reductions this period. | There were no significant power reductions this period. | ||
: | OPERATING DATA REPORT DOCKET: 364 PREPARER NAME: Khris Miller UNIT_NME: Farley Unit 2 PREPARER TELEPHONE: 334-814-4549 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 855 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 883 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,247.08 250,251.85 | |||
: 4. Number of Hours Generator On-line 744.00 5,213.25 247,748.56 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 650,557.00 4,469,085.00 203,298,538.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
There were no significant power reductions this period. | There were no significant power reductions this period. | ||
: | OPERATING DATA REPORT DOCKET: 364 PREPARER NAME: Khris Miller UNIT_NME: Farley Unit 2 PREPARER TELEPHONE: 334-814-4549 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 855 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 883 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 5,967.08 250,971.85 | |||
: 4. Number of Hours Generator On-line 720.00 5,933.25 248,468.56 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 632,876.00 5,101,961.00 203,931,414.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
There were no significant power reductions this period. | There were no significant power reductions this period. | ||
: | OPERATING DATA REPORT DOCKET: 341 PREPARER NAME: E. Sorg UNIT_NME: Fermi Unit 2 PREPARER TELEPHONE: 734-586-4294 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1150 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1037.3 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,783.68 180,842.43 | |||
: 4. Number of Hours Generator On-line 744.00 4,745.58 175,956.65 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 522,400.00 3,386,990.00 179,939,590.92 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit operated at 68% power the entire month. | The unit operated at 68% power the entire month. | ||
: | OPERATING DATA REPORT DOCKET: 341 PREPARER NAME: E. Sorg UNIT_NME: Fermi Unit 2 PREPARER TELEPHONE: 734-586-4294 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1150 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1037.3 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,527.68 181,586.43 | |||
: 4. Number of Hours Generator On-line 744.00 5,489.58 176,700.65 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 526,801.00 3,913,791.00 180,466,391.92 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit operated at approximately 68% for the entire month of August with the following exceptions:8/6/13 2057 to 2129: | The unit operated at approximately 68% for the entire month of August with the following exceptions: | ||
8/6/13 2057 to 2129: Planned power change from 68% to 62% for Turbine Control Valve vibration measurement. | |||
8/27/13 0207 to 0225: Planned power change from 68% to 65% for HCU maintenance. | |||
8/30/13 2330 to 8/31/13 0129: Planned power change from 68% to 62% for scram time testing. | |||
OPERATING DATA REPORT DOCKET: 341 PREPARER NAME: E. Sorg UNIT_NME: Fermi Unit 2 PREPARER TELEPHONE: 734-586-4294 RPT_PERIOD: 201309 | |||
: 1. Design Electrical Rating: 1150 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1037.3 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 409.42 5,937.10 181,995.85 | |||
: 4. Number of Hours Generator On-line 364.48 5,854.06 177,065.13 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 280,255.00 4,194,046.00 180,746,646.92 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments PO 9/9/2013 S 355.52 B 1 Planned shutdown to restore the South Reactor 13-02 Feed Pump turbine following repair and refurbishment. | |||
==SUMMARY== | ==SUMMARY== | ||
The unit operated at 68% power until 9/8/2013 when a planned shutdown to Planned Outage (PO) 13-02 was commenced. The reactor was taken subcritical on 9/9/2013 at 0300. Following repairs the reactor was taken critical 9/22/13 at 0135, and the generator was synched to the Detroit Edison grid at 2231 on 9/23/13. Power ascension to 100% reactor power was completed on 9/30/2013 at 1440. | The unit operated at 68% power until 9/8/2013 when a planned shutdown to Planned Outage (PO) 13-02 was commenced. The reactor was taken subcritical on 9/9/2013 at 0300. Following repairs the reactor was taken critical 9/22/13 at 0135, and the generator was synched to the Detroit Edison grid at 2231 on 9/23/13. Power ascension to 100% reactor power was completed on 9/30/2013 at 1440. | ||
: | OPERATING DATA REPORT DOCKET: 333 PREPARER NAME: Ryan Perry UNIT_NME: FitzPatrick Unit 1 PREPARER TELEPHONE: 3153496218 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 816 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 813 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,990.00 269,302.51 | |||
: 4. Number of Hours Generator On-line 744.00 4,884.05 263,346.39 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 605,447.00 3,920,964.00 202,779,795.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The plant operated at or near 100% power for the month of July with the exception of the following event:The downpower event was from 7/18/2013-7/19/2013 to approximately 47% power for Condenser tube leaks of the A1 waterbox. | The plant operated at or near 100% power for the month of July with the exception of the following event: | ||
The downpower event was from 7/18/2013-7/19/2013 to approximately 47% power for Condenser tube leaks of the A1 waterbox. | |||
: | |||
OPERATING DATA REPORT DOCKET: 333 PREPARER NAME: Ryan Perry UNIT_NME: FitzPatrick Unit 1 PREPARER TELEPHONE: 3153496218 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 816 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 813 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,734.00 270,046.51 | |||
: 4. Number of Hours Generator On-line 744.00 5,628.05 264,090.39 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 591,499.00 4,512,463.00 203,371,294.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The plant operated at or near 100% power for the month of August with the exception of the following event:The downpower event was from 8/23/2013-8/24/2013 to approximately 48.5% power for Condenser tube leaks. | The plant operated at or near 100% power for the month of August with the exception of the following event: | ||
The downpower event was from 8/23/2013-8/24/2013 to approximately 48.5% power for Condenser tube leaks. | |||
: | |||
OPERATING DATA REPORT DOCKET: 333 PREPARER NAME: Ryan Perry UNIT_NME: FitzPatrick Unit 1 PREPARER TELEPHONE: 315-349-6218 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 816 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 813 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 720.00 6,454.00 270,766.51 | |||
: 4. Number of Hours Generator On-line 720.00 6,348.05 264,810.39 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 521,285.00 5,033,748.00 203,892,579.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The plant operated at or near 100% power for the month of September with the exception of the following event:The downpower event was from 9/6/2013 to 9/13/2013 to approximately 48% for 'B' Reactor Feedpump repairs. | The plant operated at or near 100% power for the month of September with the exception of the following event: | ||
The downpower event was from 9/6/2013 to 9/13/2013 to approximately 48% for 'B' Reactor Feedpump repairs. | |||
: 4. Number of Hours Generator On-line | |||
: 5. Reserve Shutdown Hours | OPERATING DATA REPORT DOCKET: 285 PREPARER NAME: Jake Walker UNIT_NME: Fort Calhoun Unit 1 PREPARER TELEPHONE: 402-533-6693 RPT_PERIOD: 201307 | ||
: 6. Net Electrical energy Generated (MWHrs) | : 1. Design Electrical Rating: 502 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 482 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 0.00 0.00 270,885.19 | |||
: 4. Number of Hours Generator On-line 0.00 0.00 269,363.34 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 0.00 0.00 119,655,821.80 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2011- 4/9/2011 S 744.00 C 4 Shutdown for Cycle 26 End of Cycle RFO. No corrective actions necessary. | |||
==SUMMARY== | ==SUMMARY== | ||
FCS remained shutdown through July 2013. Flood recovery and IMC 0350 activities are on-going. The plant will remain shutdown until flood recovery and NRC Inspection Manual Chapter 0350 activities are complete. Due to being placed in NRC Inspection Manual Chapter 0350, all hours spent shutdown are considered Unplanned Energy Loss - Outage Extension until Chapter 0350 activities are complete. | FCS remained shutdown through July 2013. Flood recovery and IMC 0350 activities are on-going. The plant will remain shutdown until flood recovery and NRC Inspection Manual Chapter 0350 activities are complete. Due to being placed in NRC Inspection Manual Chapter 0350, all hours spent shutdown are considered Unplanned Energy Loss - Outage Extension until Chapter 0350 activities are complete. | ||
: 4. Number of Hours Generator On-line | OPERATING DATA REPORT DOCKET: 285 PREPARER NAME: Jake Walker UNIT_NME: Fort Calhoun Unit 1 PREPARER TELEPHONE: 402-533-6693 RPT_PERIOD: 201308 | ||
: 5. Reserve Shutdown Hours | : 1. Design Electrical Rating: 502 | ||
: 6. Net Electrical energy Generated (MWHrs) | : 2. Maximum Dependable Capacity (MWe-Net) 482 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 0.00 0.00 270,885.19 | |||
: 4. Number of Hours Generator On-line 0.00 0.00 269,363.34 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 0.00 0.00 119,655,821.80 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2011- 4/9/2011 S 744.00 C 4 Shutdown for Cycle 26 End of Cycle RFO. No corrective actions necessary. | |||
==SUMMARY== | ==SUMMARY== | ||
FCS remained shutdown through August 2013. Flood recovery and IMC 0350 activities are on-going. The plant will remain shutdown until flood recovery and NRC Inspection Manual Chapter 0350 activities are complete. Due to being placed in NRC Inspection Manual Chapter 0350, all hours spent shutdown are considered Unplanned Energy Loss - Outage Extension until Chapter 0350 activities are complete. | FCS remained shutdown through August 2013. Flood recovery and IMC 0350 activities are on-going. The plant will remain shutdown until flood recovery and NRC Inspection Manual Chapter 0350 activities are complete. Due to being placed in NRC Inspection Manual Chapter 0350, all hours spent shutdown are considered Unplanned Energy Loss - Outage Extension until Chapter 0350 activities are complete. | ||
: 4. Number of Hours Generator On-line | OPERATING DATA REPORT DOCKET: 285 PREPARER NAME: Jake Walker UNIT_NME: Fort Calhoun Unit 1 PREPARER TELEPHONE: 402-533-6693 RPT_PERIOD: 201309 | ||
: 5. Reserve Shutdown Hours | : 1. Design Electrical Rating: 502 | ||
: 6. Net Electrical energy Generated (MWHrs) | : 2. Maximum Dependable Capacity (MWe-Net) 482 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 0.00 0.00 270,885.19 | |||
: 4. Number of Hours Generator On-line 0.00 0.00 269,363.34 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 0.00 0.00 119,655,821.80 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2011- 4/9/2011 S 720.00 C 4 Shutdown for Cycle 26 End of Cycle RFO. No corrective actions necessary. | |||
==SUMMARY== | ==SUMMARY== | ||
FCS remained shutdown through September 2013. Flood recovery and IMC 0350 activities are on-going. The plant will remain shutdown until flood recovery and NRC Inspection Manual Chapter 0350 activities are complete. Due to being placed in NRC Inspection Manual Chapter 0350, all hours spent shutdown are considered Unplanned Energy Loss - Outage Extension until Chapter 0350 activities are complete. | FCS remained shutdown through September 2013. Flood recovery and IMC 0350 activities are on-going. The plant will remain shutdown until flood recovery and NRC Inspection Manual Chapter 0350 activities are complete. Due to being placed in NRC Inspection Manual Chapter 0350, all hours spent shutdown are considered Unplanned Energy Loss - Outage Extension until Chapter 0350 activities are complete. | ||
OPERATING DATA REPORT DOCKET: 244 PREPARER NAME: John V. Walden UNIT_NME: Ginna Unit 1 PREPARER TELEPHONE: 585-771-3588 RPT_PERIOD: 201307 | |||
: 1. Design Electrical Rating: 585 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 560 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 666.03 5,009.03 326,749.25 | |||
: 4. Number of Hours Generator On-line 651.78 4,994.78 323,285.39 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 8.50 | |||
: 6. Net Electrical energy Generated (MWHrs) 363,934.79 2,886,433.68 154,693,996.11 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 7/24/2013 F 92.22 B 3 The reactor trip was caused by an unexpected generator trip during positive VAR testing. A generator protection relay trip setpoint was programmed incorrectly during the 2012 refueling outage. LER 2013-002 was submitted on this event. Reprogramming of the generator protection relay was performed to remove the trip function. | |||
==SUMMARY== | ==SUMMARY== | ||
The unit operated at full power from the beginning of the month until July 23, 2013 at 1419, when the main generator tripped during positive VAR testing. The generator trip caused a turbine trip and reactor trip from full power. The reactor criticality was achieved on July 27, 2013 at 2017 following generator protection relay reprogramming to remove the trip function. The unit was brought on-line on July 28, 2013 at 1032. Full power operations resumed on July 29, 2013 at 0500 and continued through the end of the month. | The unit operated at full power from the beginning of the month until July 23, 2013 at 1419, when the main generator tripped during positive VAR testing. The generator trip caused a turbine trip and reactor trip from full power. The reactor criticality was achieved on July 27, 2013 at 2017 following generator protection relay reprogramming to remove the trip function. The unit was brought on-line on July 28, 2013 at 1032. Full power operations resumed on July 29, 2013 at 0500 and continued through the end of the month. | ||
: | OPERATING DATA REPORT DOCKET: 244 PREPARER NAME: John V. Walden UNIT_NME: Ginna Unit 1 PREPARER TELEPHONE: 585-771-3588 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 585 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 560 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,753.03 327,493.25 | |||
: 4. Number of Hours Generator On-line 744.00 5,738.78 324,029.39 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 8.50 | |||
: 6. Net Electrical energy Generated (MWHrs) 418,662.66 3,305,096.34 155,112,658.77 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit operated at full power for the entire month of August. Average power for the month was 99.8%. | The unit operated at full power for the entire month of August. Average power for the month was 99.8%. | ||
: | OPERATING DATA REPORT DOCKET: 244 PREPARER NAME: John V. Walden UNIT_NME: Ginna Unit 1 PREPARER TELEPHONE: 585-771-3588 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 585 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 560 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,473.03 328,213.25 | |||
: 4. Number of Hours Generator On-line 720.00 6,458.78 324,749.39 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 8.50 | |||
: 6. Net Electrical energy Generated (MWHrs) 407,739.32 3,712,835.66 155,520,398.09 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit operated at full power for the entire month of September. Average power for the month was 99.9%. | The unit operated at full power for the entire month of September. Average power for the month was 99.9%. | ||
OPERATING DATA REPORT DOCKET: 416 PREPARER NAME: Allison Hughes UNIT_NME: Grand Gulf Unit 1 PREPARER TELEPHONE: 601-437-7341 RPT_PERIOD: 201307 | |||
: 1. Design Electrical Rating: 1279 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1266 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 710.53 4,675.43 221,880.84 | |||
: 4. Number of Hours Generator On-line 710.53 4,602.80 217,270.69 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 978,908.00 6,403,037.00 257,885,313.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2013- 7/30/2013 F 33.47 A 3 At 14:32 on July 30, 2012, GGNS experienced an 03 unexpected Reactor Scram. At the time, the plant was operating at 100% Rated Core Thermal Power. The scram occurred shortly after the Turbine Stress Evaluator (TSE) was turned on. I C turned the TSE on and the TSE-INFL alarm in the control room cleared. LOAD-LTD was noted to be dropping after the TSE was turned on. | |||
Approximately one minute later, LOAD-ACTUAL was noted to be dropping and the reactor scrammed due to a turbine trip. The shift immediately entered EP-2 for Reactor Scram, the Reactor Scram ONEP, and Turbine Trip ONEP. | Approximately one minute later, LOAD-ACTUAL was noted to be dropping and the reactor scrammed due to a turbine trip. The shift immediately entered EP-2 for Reactor Scram, the Reactor Scram ONEP, and Turbine Trip ONEP. | ||
RCIC initiated and injected during the transient. | RCIC initiated and injected during the transient. | ||
However, no Level 2 alarms were received. | However, no Level 2 alarms were received. | ||
Reactor levels were verified and RCIC was subsequently secured. All other systems operated as expected. The plant was stabilized with pressure control on the bypass valves, and level controlled on the startup level control valve. | Reactor levels were verified and RCIC was subsequently secured. All other systems operated as expected. The plant was stabilized with pressure control on the bypass valves, and level controlled on the startup level control valve. | ||
==SUMMARY== | ==SUMMARY== | ||
The plant continues to operate at EPU power. However a performance test has not been performed and a new Reference Unit Power (RUP) has not been determined. Losses during the month were corrected to the RUP using a ratio of the previous license power (3898) to the current license power (4408).2013- | The plant continues to operate at EPU power. However a performance test has not been performed and a new Reference Unit Power (RUP) has not been determined. Losses during the month were corrected to the RUP using a ratio of the previous license power (3898) to the current license power (4408). | ||
OPERATING DATA REPORT DOCKET: 416 PREPARER NAME: Andrew Fox UNIT_NME: Grand Gulf Unit 1 PREPARER TELEPHONE: 601 437-6204 RPT_PERIOD: 201308 | |||
: 1. Design Electrical Rating: 1279 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1266 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 688.77 5,364.20 222,569.61 | |||
: 4. Number of Hours Generator On-line 657.18 5,259.98 217,927.87 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 879,922.00 7,282,959.00 258,765,235.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2013- 7/30/2013 F 86.82 A 4 At 14:32 on July 30, 2012, GGNS experienced an 03 unexpected Reactor Scram. At the time, the plant was operating at 100% Rated Core Thermal Power. The scram occurred shortly after the Turbine Stress Evaluator (TSE) was turned on. I C turned the TSE on and the TSE-INFL alarm in the control room cleared. LOAD-LTD was noted to be dropping after the TSE was turned on. | |||
Approximately one minute later, LOAD-ACTUAL was noted to be dropping and the reactor scrammed due to a turbine trip. The shift immediately entered EP-2 for Reactor Scram, the Reactor Scram ONEP, and Turbine Trip ONEP. | Approximately one minute later, LOAD-ACTUAL was noted to be dropping and the reactor scrammed due to a turbine trip. The shift immediately entered EP-2 for Reactor Scram, the Reactor Scram ONEP, and Turbine Trip ONEP. | ||
RCIC initiated and injected during the transient. | RCIC initiated and injected during the transient. | ||
However, no Level 2 alarms were received. | However, no Level 2 alarms were received. | ||
Reactor levels were verified and RCIC was subsequently secured. All other systems operated as expected. The plant was stabilized with pressure control on the bypass valves, and level controlled on the startup level control valve. | Reactor levels were verified and RCIC was subsequently secured. All other systems operated as expected. The plant was stabilized with pressure control on the bypass valves, and level controlled on the startup level control valve. | ||
==SUMMARY== | ==SUMMARY== | ||
The plant continues to operate at EPU power. However a performance test has not been performed and a new Reference Unit Power (RUP) has not been determined. Losses during the month were corrected to the RUP using a ratio of the previous license power (3898) to the current license power (4408). | The plant continues to operate at EPU power. However a performance test has not been performed and a new Reference Unit Power (RUP) has not been determined. Losses during the month were corrected to the RUP using a ratio of the previous license power (3898) to the current license power (4408). | ||
: 4. Number of Hours Generator On-line | OPERATING DATA REPORT DOCKET: 416 PREPARER NAME: Andrew Fox UNIT_NME: Grand Gulf Unit 1 PREPARER TELEPHONE: 601 437-6204 RPT_PERIOD: 201309 | ||
: 5. Reserve Shutdown Hours | : 1. Design Electrical Rating: 1279 | ||
: 6. Net Electrical energy Generated (MWHrs) | : 2. Maximum Dependable Capacity (MWe-Net) 1266 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,084.20 223,289.61 | |||
: 4. Number of Hours Generator On-line 720.00 5,979.98 218,647.87 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 990,253.00 8,273,212.00 259,755,488.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | |||
The plant continues to operate at EPU power. However a performance test has not been performed and a new Reference Unit Power (RUP) has not been determined. Losses during the month were corrected to the RUP using a ratio of the previous license power (3898) to the current license power (4408). | |||
OPERATING DATA REPORT DOCKET: 400 PREPARER NAME: John Kelly UNIT_NME: Harris Unit 1 PREPARER TELEPHONE: 9193622194 RPT_PERIOD: 201307 | |||
: 1. Design Electrical Rating: 973 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 928 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 4,559.77 204,056.66 | |||
: 4. Number of Hours Generator On-line 744.00 4,540.17 202,643.42 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 696,829.00 4,264,218.00 176,974,126.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
There were no unit shutdowns in July 2013. | There were no unit shutdowns in July 2013. | ||
OPERATING DATA REPORT DOCKET: 400 PREPARER NAME: John Kelly UNIT_NME: Harris Unit 1 PREPARER TELEPHONE: 9193622194 RPT_PERIOD: 201308 | |||
: 1. Design Electrical Rating: 973 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 928 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,303.77 204,800.66 | |||
: 4. Number of Hours Generator On-line 711.80 5,251.97 203,355.22 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 645,140.00 4,909,358.00 177,619,266.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 61704 8/3/2013 S 32.20 H 5 There was a planned unit shutdown to address 5 increased vibrations for Low Pressure Turbine 2 bearing #5. A balance weight was installed which reduced vibrations. Additional corrective actions to address the bearing vibration will be documented in NCR 00617045 | |||
==SUMMARY== | ==SUMMARY== | ||
There was a planned unit shutdown to address increased vibrations for Low Pressure Turbine 2 Bearing #5. A balance weight was installed which reduced vibrations. | There was a planned unit shutdown to address increased vibrations for Low Pressure Turbine 2 Bearing #5. A balance weight was installed which reduced vibrations. | ||
OPERATING DATA REPORT DOCKET: 400 PREPARER NAME: Dustin Martin UNIT_NME: Harris Unit 1 PREPARER TELEPHONE: 9193622679 RPT_PERIOD: 201309 | |||
: 1. Design Electrical Rating: 973 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 928 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 720.00 6,023.77 205,520.66 | |||
: 4. Number of Hours Generator On-line 709.25 5,961.22 204,064.47 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 656,853.00 5,566,211.00 178,276,119.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 62596 9/15/2013 S 10.75 H 5 There was a planned unit shutdown to address 0 increased vibrations for Low Pressure Turbine bearing #5. A balance weight was installed which reduced vibrations. Additional corrective actions to address the bearing vibration will be documented in NCR 00625960. | |||
==SUMMARY== | ==SUMMARY== | ||
There was a planned unit shutdown to address increased vibrations for Low Pressure Turbine 2 Bearing #5. A balance weight was installed which reduced vibrations. | There was a planned unit shutdown to address increased vibrations for Low Pressure Turbine 2 Bearing #5. A balance weight was installed which reduced vibrations. | ||
: | OPERATING DATA REPORT DOCKET: 321 PREPARER NAME: Ben Mosley UNIT_NME: Hatch Unit 1 PREPARER TELEPHONE: 912-537-5872 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 885 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 876 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,718.85 276,791.47 | |||
: 4. Number of Hours Generator On-line 744.00 4,683.02 269,977.64 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 616,685.00 3,996,097.00 207,945,108.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Power was reduced to 65% in order to perform a power suppression test, turbine valve testing, control rod drive exercises and a rod sequence exchange on 07/03/2013. Upon completion of these activities, power was increased and subsequently decreased to 77% to perform an additional rod pattern adjustment on 07/08/2013. The unit was returned to rated thermal power on 07/09/2013. There were no additional significant generation loss events (>20%) for the remainder of the month. | Power was reduced to 65% in order to perform a power suppression test, turbine valve testing, control rod drive exercises and a rod sequence exchange on 07/03/2013. Upon completion of these activities, power was increased and subsequently decreased to 77% to perform an additional rod pattern adjustment on 07/08/2013. The unit was returned to rated thermal power on 07/09/2013. There were no additional significant generation loss events (>20%) for the remainder of the month. | ||
: | OPERATING DATA REPORT DOCKET: 321 PREPARER NAME: Ben Mosley UNIT_NME: Hatch Unit 1 PREPARER TELEPHONE: 912-537-5872 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 885 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 876 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,462.85 277,535.47 | |||
: 4. Number of Hours Generator On-line 744.00 5,427.02 270,721.64 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 646,619.00 4,642,716.00 208,591,727.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
There were no significant generation loss events (>20%) this month. | There were no significant generation loss events (>20%) this month. | ||
: | OPERATING DATA REPORT DOCKET: 321 PREPARER NAME: Ben Mosley UNIT_NME: Hatch Unit 1 PREPARER TELEPHONE: 912-537-5872 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 885 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 876 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,182.85 278,255.47 | |||
: 4. Number of Hours Generator On-line 720.00 6,147.02 271,441.64 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 631,777.00 5,274,493.00 209,223,504.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
There were no significant generation loss events (>20%) this month. | There were no significant generation loss events (>20%) this month. | ||
: | OPERATING DATA REPORT DOCKET: 366 PREPARER NAME: Ben Mosley UNIT_NME: Hatch Unit 2 PREPARER TELEPHONE: 912-537-5872 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 908 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 883 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,275.08 251,551.46 | |||
: 4. Number of Hours Generator On-line 744.00 4,207.58 246,470.25 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 654,717.00 3,681,444.00 193,624,580.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
There were no significant generation loss events (>20%) this month. | There were no significant generation loss events (>20%) this month. | ||
: | OPERATING DATA REPORT DOCKET: 366 PREPARER NAME: Ben Mosley UNIT_NME: Hatch Unit 2 PREPARER TELEPHONE: 912-537-5872 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 908 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 883 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,019.08 252,295.46 | |||
: 4. Number of Hours Generator On-line 744.00 4,951.58 247,214.25 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 653,432.00 4,334,876.00 194,278,012.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
There were no significant generation loss events (>20%) this month. | There were no significant generation loss events (>20%) this month. | ||
: | OPERATING DATA REPORT DOCKET: 366 PREPARER NAME: Ben Mosley UNIT_NME: Hatch Unit 2 PREPARER TELEPHONE: 912-537-5872 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 908 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 883 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 603.98 5,623.06 252,899.44 | |||
: 4. Number of Hours Generator On-line 567.23 5,518.81 247,781.48 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 466,622.00 4,801,498.00 194,744,634.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 13- 9/15/2013 S 152.77 B 1 Unit was shutdown to perform maintenance on an MSIV which failed to close during testing on 09/14/2013. | |||
==SUMMARY== | ==SUMMARY== | ||
The unit began the month operating at rated thermal power. Power was reduced to 65% for Turbine Valve testing, CRD Exercise and Rod Pattern Adjustment on 09/14/2013. While at 65% and during testing of a Main Steam Isolation Valve (MSIV), the MSIV failed to close on demand on 09/14/2013. Power was reduced to 50% to support maintenance of the MSIV on 09/14/2013. The reactor was subsequently shutdown per the normal plant shutdown procedure via manual scram to repair the MSIV on 09/15/2013. Following the outage, the reactor was critical on 09/20/2013. Power was increased and the unit was returned to rated thermal power on 09/24/2013. | The unit began the month operating at rated thermal power. Power was reduced to 65% for Turbine Valve testing, CRD Exercise and Rod Pattern Adjustment on 09/14/2013. While at 65% and during testing of a Main Steam Isolation Valve (MSIV), the MSIV failed to close on demand on 09/14/2013. Power was reduced to 50% to support maintenance of the MSIV on 09/14/2013. The reactor was subsequently shutdown per the normal plant shutdown procedure via manual scram to repair the MSIV on 09/15/2013. Following the outage, the reactor was critical on 09/20/2013. Power was increased and the unit was returned to rated thermal power on 09/24/2013. | ||
: | OPERATING DATA REPORT DOCKET: 354 PREPARER NAME: Walter Bischoff UNIT_NME: Hope Creek Unit 1 PREPARER TELEPHONE: 8563391037 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1228.1 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1172 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,966.57 205,565.17 | |||
: 4. Number of Hours Generator On-line 744.00 4,944.33 201,919.21 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 839,293.00 5,934,359.00 213,478,684.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The month started with the unit online and the reactor critical at 98.0% RTP due to main condenser pressures reaching the main turbine design back pressure limit as a result of: extreme | The month started with the unit online and the reactor critical at 98.0% RTP due to main condenser pressures reaching the main turbine design back pressure limit as a result of: extreme environmental conditions, high dry bulb and wet bulb air temperatures. The unit returned to 100% RTP on 7/1/13 at 0147 One (1) planned power change greater than 15% occurred in July 2013. | ||
Zero (0) unplanned power changes greater than 15% occurred in July 2013.The month ended with the unit online and the reactor critical at 99.8% RTP. The SRVs were not challenged by any over pressurization events or transients that would have required the valves to respond automatically. | A power decrease of approximately 26.2% (100% to 73.8%) occurred on 7/26/2013 at 2000 for Main Condenser waterbox cycling. Power was stabilized at 73.8% RCTP on 7/27/2013 at 0057. Power ascension started on 7/27/2013 at 0508. The unit returned to 100% on 7/27/2013 at 1050. | ||
This is a planned power reduction IAW NEI 99-02. | |||
: | Zero (0) unplanned power changes greater than 15% occurred in July 2013. | ||
The month ended with the unit online and the reactor critical at 99.8% RTP. | |||
: | The SRVs were not challenged by any over pressurization events or transients that would have required the valves to respond automatically. | ||
OPERATING DATA REPORT DOCKET: 354 PREPARER NAME: Walter Bischoff UNIT_NME: Hope Creek Unit 1 PREPARER TELEPHONE: 8563391037 RPT_PERIOD: 201308 | |||
: 1. Design Electrical Rating: 1228.1 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1172 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,710.57 206,309.17 | |||
: 4. Number of Hours Generator On-line 744.00 5,688.33 202,663.21 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 857,101.00 6,791,460.00 214,335,785.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The month started with the unit online and the reactor critical at 99.8% RTP One (1) planned power change greater than 15% occurred in August 2013.A power decrease of approximately 15.5% (100% to 84.5%) occurred on 8/10/2013 at 2007 for control rod pattern adjustments. Power was stabilized at 84.5% RCTP on 8/10/2013 at 2224. Power ascension started on 8/10/2013 at 2228. The unit returned to 100% on 8/11/2013 at 0248. This is a planned power reduction IAW NEI 99-02. All control rod pattern changes are considered planned.One (1) unplanned power change greater than 15% occurred in August 2013.A power decrease of approximately 30.6% (100% to 69.4%) occurred on 8/1/2013 at 2334 due to a recirc runback to 45% cause by a trip of the B Circ water pump. Power was stabilized at 69.4% RCTP on 8/2/2013 at 0300. Power ascension started on 8/2/2013 at 0313. The unit returned to 100% on 8/5/2013 at 0157. This is an unplanned power reduction and is not excluded IAW NEI 99-02.The month ended with the unit online and the reactor critical at 93.1% RTP due to main condenser pressures reaching the main turbine design back pressure limit as a result of: extreme | The month started with the unit online and the reactor critical at 99.8% RTP One (1) planned power change greater than 15% occurred in August 2013. | ||
A power decrease of approximately 15.5% (100% to 84.5%) occurred on 8/10/2013 at 2007 for control rod pattern adjustments. Power was stabilized at 84.5% RCTP on 8/10/2013 at 2224. Power ascension started on 8/10/2013 at 2228. The unit returned to 100% on 8/11/2013 at 0248. | |||
: | This is a planned power reduction IAW NEI 99-02. All control rod pattern changes are considered planned. | ||
One (1) unplanned power change greater than 15% occurred in August 2013. | |||
: | A power decrease of approximately 30.6% (100% to 69.4%) occurred on 8/1/2013 at 2334 due to a recirc runback to 45% cause by a trip of the B Circ water pump. Power was stabilized at 69.4% RCTP on 8/2/2013 at 0300. Power ascension started on 8/2/2013 at 0313. The unit returned to 100% on 8/5/2013 at 0157. This is an unplanned power reduction and is not excluded IAW NEI 99-02. | ||
The month ended with the unit online and the reactor critical at 93.1% RTP due to main condenser pressures reaching the main turbine design back pressure limit as a result of: extreme environmental conditions, high dry bulb and wet bulb air temperatures. | |||
The SRVs were not challenged by any over pressurization events or transients that would have required the valves to respond automatically. | |||
OPERATING DATA REPORT DOCKET: 354 PREPARER NAME: Walter Bischoff UNIT_NME: Hope Creek Unit 1 PREPARER TELEPHONE: 8563391037 RPT_PERIOD: 201309 | |||
: 1. Design Electrical Rating: 1228.1 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1172 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 720.00 6,430.57 207,029.17 | |||
: 4. Number of Hours Generator On-line 720.00 6,408.33 203,383.21 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 826,175.00 7,617,635.00 215,161,960.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The month started with the unit online and the reactor critical at 93.1% RTP due to main condenser pressures reaching the main turbine design back pressure limit as a result of: extreme | The month started with the unit online and the reactor critical at 93.1% RTP due to main condenser pressures reaching the main turbine design back pressure limit as a result of: extreme environmental conditions, high dry bulb and wet bulb air temperatures. The unit returned to 100% RTP on 9/3/13 at 2222. | ||
One (1) planned power change greater than 15% occurred in September 2013.A power decrease of approximately 24% (100% to 76%) occurred on 9/7/2013 at 0005 for main turbine valve testing. Power was stabilized at 76% RCTP on 9/7/2013 at 0303. Power ascension started on 9/7/2013 at 1401. The unit returned to 100% on 9/7/2013 at 1839. This is a planned power reduction IAW NEI 99-02. | One (1) planned power change greater than 15% occurred in September 2013. | ||
One (1) unplanned power change greater than 15% occurred in September 2013.A planned power decrease of approximately 12% (100% to 88%) occurred on 9/19/2013 at 2000 for planned control rod pattern adjustments. Power was stabilized at 88% RTP but there was no power ascension. A power decrease of approximately 28% (88% to 60%) occurred on 9/19/2013 at 2142 due to the A recirc pump speed controller failing to 0% demand reducing the pump to minimum speed. Power was stabilized at 60% RCTP on 9/20/2013 at 0304. Power ascension started on 9/20/2013 at 1643. The unit returned to 100% on 9/21/2013 at 0542. This is an unplanned power reduction and is not excluded IAW NEI 99-02.The month ended with the unit online and the reactor critical at 99.9% RTP The SRVs were not challenged by any over pressurization events or transients that would have required the valves to respond automatically. | A power decrease of approximately 24% (100% to 76%) occurred on 9/7/2013 at 0005 for main turbine valve testing. Power was stabilized at 76% RCTP on 9/7/2013 at 0303. Power ascension started on 9/7/2013 at 1401. The unit returned to 100% on 9/7/2013 at 1839. This is a planned power reduction IAW NEI 99-02. | ||
One (1) unplanned power change greater than 15% occurred in September 2013. | |||
: | A planned power decrease of approximately 12% (100% to 88%) occurred on 9/19/2013 at 2000 for planned control rod pattern adjustments. | ||
Power was stabilized at 88% RTP but there was no power ascension. A power decrease of approximately 28% (88% to 60%) occurred on 9/19/2013 at 2142 due to the A recirc pump speed controller failing to 0% demand reducing the pump to minimum speed. Power was stabilized at 60% RCTP on 9/20/2013 at 0304. Power ascension started on 9/20/2013 at 1643. The unit returned to 100% on 9/21/2013 at 0542. This is an unplanned power reduction and is not excluded IAW NEI 99-02. | |||
: | The month ended with the unit online and the reactor critical at 99.9% RTP The SRVs were not challenged by any over pressurization events or transients that would have required the valves to respond automatically. | ||
OPERATING DATA REPORT DOCKET: 247 PREPARER NAME: Ron Macina UNIT_NME: Indian Point Unit 2 PREPARER TELEPHONE: (914)254-6839 RPT_PERIOD: 201307 | |||
: 1. Design Electrical Rating: 1035 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 998 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 725.33 5,016.43 262,471.53 | |||
: 4. Number of Hours Generator On-line 717.78 5,001.46 257,919.40 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 650,352.89 5,039,852.63 231,358,352.07 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2 7/3/2013 F 26.22 A 2 IP2 Manually tripped at full power due to a loss of feedwater caused by a loss of instrument air to the main feeedwater regulating valves. | |||
==SUMMARY== | ==SUMMARY== | ||
Indian Point 2 was synchronized to the grid for a total of 717.78 hours, producing a gross generation of 675,255 MWhrs. The Unit began the month at full power. The Unit operated at full power until July 3, 2013 when at approximately 0747 hours the unit was manually tripped due to a loss of feedwater caused by a loss of instrument air to the Main Feedwater Regulating Valves (MFRV's). The Reactor was made critical on July 4, 2013 at approximately 0221 hours and the Unit was synchronized to the grid on July 4, 2013 at approximately 0954 hours. At approximately 1612 hours on July 4, 2013 when at about 60% Reactor Power an excessive oscillation was discovered in the 21 MFRV. It was also discovered that the 21 MFRV would not go full open and was placed in manual. On July 5, 2013 at approximately 1600 hours Reactor Power was increased to approximately 80% on the low flow bypass. 80% Reactor Power was reached on July 5, 2013 at approximately 2118 hours. On July 7, 2013 at approximately 1317 hours Reactor Power was reduced from approximately 80% to approximately 24% in order to repair the 21 MFRV. Power ascension recommenced on July 9, 2013 at approximately 0748 hours. Full power was reached on July 9, 2013 at approximately 1602 hours. The Unit remained at full power for the remainder of the month. | Indian Point 2 was synchronized to the grid for a total of 717.78 hours, producing a gross generation of 675,255 MWhrs. The Unit began the month at full power. The Unit operated at full power until July 3, 2013 when at approximately 0747 hours the unit was manually tripped due to a loss of feedwater caused by a loss of instrument air to the Main Feedwater Regulating Valves (MFRV's). The Reactor was made critical on July 4, 2013 at approximately 0221 hours and the Unit was synchronized to the grid on July 4, 2013 at approximately 0954 hours. At approximately 1612 hours on July 4, 2013 when at about 60% Reactor Power an excessive oscillation was discovered in the 21 MFRV. It was also discovered that the 21 MFRV would not go full open and was placed in manual. On July 5, 2013 at approximately 1600 hours Reactor Power was increased to approximately 80% on the low flow bypass. 80% Reactor Power was reached on July 5, 2013 at approximately 2118 hours. On July 7, 2013 at approximately 1317 hours Reactor Power was reduced from approximately 80% to approximately 24% in order to repair the 21 MFRV. Power ascension recommenced on July 9, 2013 at approximately 0748 hours. Full power was reached on July 9, 2013 at approximately 1602 hours. The Unit remained at full power for the remainder of the month. | ||
: | OPERATING DATA REPORT DOCKET: 247 PREPARER NAME: John Garry UNIT_NME: Indian Point Unit 2 PREPARER TELEPHONE: (914)254-6881 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1035 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 998 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,760.43 263,215.53 | |||
: 4. Number of Hours Generator On-line 744.00 5,745.46 258,663.40 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 741,606.00 5,781,458.63 232,099,958.07 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Indian Point 2 was synchronized to the grid for a total of 744 hours, producing a gross generation of 766,990 MWhrs. The unit operated at full power for the entire month. | Indian Point 2 was synchronized to the grid for a total of 744 hours, producing a gross generation of 766,990 MWhrs. The unit operated at full power for the entire month. | ||
: | OPERATING DATA REPORT DOCKET: 247 PREPARER NAME: John Garry UNIT_NME: Indian Point Unit 2 PREPARER TELEPHONE: 914-254-6881 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1035 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 998 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,480.43 263,935.53 | |||
: 4. Number of Hours Generator On-line 720.00 6,465.46 259,383.40 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 722,608.37 6,504,067.00 232,822,566.44 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Indian Point 2 was synchronized to the grid for a total of 720 hours, producing a gross generation of 747100.36 MWhrs. The unit operated at full power for the entire month. | Indian Point 2 was synchronized to the grid for a total of 720 hours, producing a gross generation of 747100.36 MWhrs. The unit operated at full power for the entire month. | ||
: | OPERATING DATA REPORT DOCKET: 286 PREPARER NAME: Ron Macina UNIT_NME: Indian Point Unit 3 PREPARER TELEPHONE: (914)254-6839 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1048 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1030 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 677.05 4,393.62 233,674.18 | |||
: 4. Number of Hours Generator On-line 677.05 4,359.20 230,295.53 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 695,525.00 4,476,199.00 216,728,208.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2 7/29/2013 S 66.95 B 1 Planned Shutdown to repair FCV-427, 32 Steam Generator Main Feed Reg Valve. | |||
==SUMMARY== | ==SUMMARY== | ||
Indian Point 3 was synchronized to the grid for a total of 677.05 hours, producing a gross generation of 719,471 MWhrs. The unit began the month at full power. On July 29, 2013 at approximately 2300 hours, a planned Reactor Power reduction to approximately 25% was made in order to perform diagnostics testing on the 32 Main Feedwater Regulating Valve (MFRV). It was determined to that in order to repair the 32 MFRV a shutdown was required in order to go internal to the valve. On July 29, 2013 at approximately 0503 hours the unit was shutdown as part of the original plan as a contingency item. The unit remained shutdown for the rest of the month. | Indian Point 3 was synchronized to the grid for a total of 677.05 hours, producing a gross generation of 719,471 MWhrs. The unit began the month at full power. On July 29, 2013 at approximately 2300 hours, a planned Reactor Power reduction to approximately 25% was made in order to perform diagnostics testing on the 32 Main Feedwater Regulating Valve (MFRV). It was determined to that in order to repair the 32 MFRV a shutdown was required in order to go internal to the valve. On July 29, 2013 at approximately 0503 hours the unit was shutdown as part of the original plan as a contingency item. The unit remained shutdown for the rest of the month. | ||
: | OPERATING DATA REPORT DOCKET: 286 PREPARER NAME: Ron Macina UNIT_NME: Indian Point Unit 3 PREPARER TELEPHONE: (914)254-6839 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1048 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1030 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 741.50 5,135.12 234,415.68 | |||
: 4. Number of Hours Generator On-line 736.95 5,096.15 231,032.48 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 753,115.00 5,229,314.00 217,481,323.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2 7/29/2013 S 7.05 B 4 Planned Shutdown to repair FCV-427, 32 Steam Generator Main Feed Reg Valve. | |||
==SUMMARY== | ==SUMMARY== | ||
Indian Point 3 was synchronized to the grid for a total of 739.95 hours, producing a gross generation of 778,851 MWhrs. The unit began the month shutdown to repair | Indian Point 3 was synchronized to the grid for a total of 739.95 hours, producing a gross generation of 778,851 MWhrs. The unit began the month shutdown to repair the 32 Main Feedwater Regulating Valve (MFRV). The reactor was made critical on 8/1/2013 at approximately 02:30 hours and the Unit was synchronized to the grid on 8/1/2013 at approximately 07:03 hours. Full power was reached on 8/3/2013 at approximately 00:00 hours. The Unit remained at full power for the remainder of the month. | ||
: | OPERATING DATA REPORT DOCKET: 286 PREPARER NAME: John Garry UNIT_NME: Indian Point Unit 3 PREPARER TELEPHONE: 914-254-6881 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1048 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1030 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 5,855.12 235,135.68 | |||
: 4. Number of Hours Generator On-line 720.00 5,816.15 231,752.48 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 749,006.00 5,978,320.00 218,230,329.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Indian Point 3 was synchronized to the grid for a total of 720 hours, producing a gross generation of 774131.00 MWhrs. The unit operated at full power for the entire month. | Indian Point 3 was synchronized to the grid for a total of 720 hours, producing a gross generation of 774131.00 MWhrs. The unit operated at full power for the entire month. | ||
: | OPERATING DATA REPORT DOCKET: 373 PREPARER NAME: S. Shields UNIT_NME: LaSalle Unit 1 PREPARER TELEPHONE: (815) 415-2811 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1178 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1111 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,799.47 204,703.33 | |||
: 4. Number of Hours Generator On-line 744.00 4,792.20 202,181.28 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 1.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 844,093.00 5,537,352.00 213,553,960.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 1 operated at or near full power for the month. | Unit 1 operated at or near full power for the month. | ||
: | OPERATING DATA REPORT DOCKET: 373 PREPARER NAME: S. Shields UNIT_NME: LaSalle Unit 1 PREPARER TELEPHONE: (815) 415-2811 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1178 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1111 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,543.47 205,447.33 | |||
: 4. Number of Hours Generator On-line 744.00 5,536.20 202,925.28 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 1.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 844,884.00 6,382,236.00 214,398,844.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 1 operated at or near full power for the month. Planned energy losses for control rod maintenance. | Unit 1 operated at or near full power for the month. Planned energy losses for control rod maintenance. | ||
: | OPERATING DATA REPORT DOCKET: 373 PREPARER NAME: S. Shields UNIT_NME: LaSalle Unit 1 PREPARER TELEPHONE: (815) 415-2811 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1178 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1111 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,263.47 206,167.33 | |||
: 4. Number of Hours Generator On-line 720.00 6,256.20 203,645.28 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 1.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 817,702.00 7,199,938.00 215,216,546.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 1 operated at or near full power for the month except for a planned control rod sequence exchange on 9/8/13 to approximately 720 MWe. | Unit 1 operated at or near full power for the month except for a planned control rod sequence exchange on 9/8/13 to approximately 720 MWe. | ||
: | OPERATING DATA REPORT DOCKET: 374 PREPARER NAME: S. Shields UNIT_NME: LaSalle Unit 2 PREPARER TELEPHONE: (815) 415-2811 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1178 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1111 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,337.88 196,728.51 | |||
: 4. Number of Hours Generator On-line 744.00 4,289.44 195,378.39 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 846,467.00 4,778,730.00 208,458,848.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 2 operated at or near full power for the month. | Unit 2 operated at or near full power for the month. | ||
: | OPERATING DATA REPORT DOCKET: 374 PREPARER NAME: S. Shields UNIT_NME: LaSalle Unit 2 PREPARER TELEPHONE: (815) 415-2811 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1178 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1111 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,081.88 197,472.51 | |||
: 4. Number of Hours Generator On-line 744.00 5,033.44 196,122.39 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 846,116.00 5,624,846.00 209,304,964.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 2 operated at or near full power for the month. Downpower for control rod maintenance and rod pattern exchange. | Unit 2 operated at or near full power for the month. Downpower for control rod maintenance and rod pattern exchange. | ||
: | OPERATING DATA REPORT DOCKET: 374 PREPARER NAME: S. Shields UNIT_NME: LaSalle Unit 2 PREPARER TELEPHONE: (815) 415-2811 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1178 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1111 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 5,801.88 198,192.51 | |||
: 4. Number of Hours Generator On-line 720.00 5,753.44 196,842.39 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 790,713.00 6,415,559.00 210,095,677.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 2 operated at or near full power for the month except for a planned downpower for a control rod sequence exchange on 9/1/13 to approximately 720 MWe and an unplanned downpower for power suppression testing on 9/28/13 to approximately 700 MWe. | Unit 2 operated at or near full power for the month except for a planned downpower for a control rod sequence exchange on 9/1/13 to approximately 720 MWe and an unplanned downpower for power suppression testing on 9/28/13 to approximately 700 MWe. | ||
: | OPERATING DATA REPORT DOCKET: 352 PREPARER NAME: Leonard J. Maioriello UNIT_NME: Limerick Unit 1 PREPARER TELEPHONE: 610 718-3512 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1205 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1099 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,087.00 219,372.04 | |||
: 4. Number of Hours Generator On-line 744.00 5,087.00 216,833.76 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 836,756.00 5,894,387.00 233,165,100.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 1 began the month of July 2013 at 100.0% rated thermal power (RTP).On July 5th at 15:32 hours, reactor power was reduced from 99.9% to 98.1% RTP due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.8% RTP at 22:39 hours.On July 6th at 16:44 hours, reactor power was reduced from 99.9% to 98.1% RTP due to high condensate temperature caused by high ambient conditions. | Unit 1 began the month of July 2013 at 100.0% rated thermal power (RTP). | ||
On July 7th at 02:34 hours, reactor power was restored to 99.6% RTP.On July 7th at 15:23 hours, reactor power was reduced from 100.0% to 98.0% RTP due to high condensate temperature caused by high ambient conditions. At 17:54 hours reactor power was further reduced down to 78.5% RTP due to loss of Instrument Air header pressure. Reactor power was restored to 99.5% RTP at 23:28 hours. (IR 1533093)On July 15th at 17:38 hours, reactor power was reduced from 100.0% to 98.1% RTP due to high condensate temperature caused by high ambient conditions. | On July 5th at 15:32 hours, reactor power was reduced from 99.9% to 98.1% RTP due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.8% RTP at 22:39 hours. | ||
On July 16th at 03:20 hours, reactor power was restored to 99.8% RTP.On July 17th at 15:03 hours, reactor power was reduced from 99.9% to 92.1% RTP due to high condensate temperature caused by high ambient conditions. | On July 6th at 16:44 hours, reactor power was reduced from 99.9% to 98.1% RTP due to high condensate temperature caused by high ambient conditions. | ||
On July 20th at 01:25 hours, reactor power was restored to 99.5% RTP. Reactor power was reduced from 99.9% to 97.6% RTP at 13:49 hours due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.6% RTP at 23:51 hours.Unit 1 ended the month of July 2013 at 100.0% RTP. | On July 7th at 02:34 hours, reactor power was restored to 99.6% RTP. | ||
On July 7th at 15:23 hours, reactor power was reduced from 100.0% to 98.0% RTP due to high condensate temperature caused by high ambient conditions. At 17:54 hours reactor power was further reduced down to 78.5% RTP due to loss of Instrument Air header pressure. Reactor power was restored to 99.5% RTP at 23:28 hours. (IR 1533093) | |||
: | On July 15th at 17:38 hours, reactor power was reduced from 100.0% to 98.1% RTP due to high condensate temperature caused by high ambient conditions. | ||
On July 16th at 03:20 hours, reactor power was restored to 99.8% RTP. | |||
: | On July 17th at 15:03 hours, reactor power was reduced from 99.9% to 92.1% RTP due to high condensate temperature caused by high ambient conditions. | ||
On July 20th at 01:25 hours, reactor power was restored to 99.5% RTP. Reactor power was reduced from 99.9% to 97.6% RTP at 13:49 hours due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.6% RTP at 23:51 hours. | |||
Unit 1 ended the month of July 2013 at 100.0% RTP. | |||
OPERATING DATA REPORT DOCKET: 352 PREPARER NAME: Leonard J. Maioriello UNIT_NME: Limerick Unit 1 PREPARER TELEPHONE: 610-718-3512 RPT_PERIOD: 201308 | |||
: 1. Design Electrical Rating: 1205 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1099 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,831.00 220,116.04 | |||
: 4. Number of Hours Generator On-line 744.00 5,831.00 217,577.76 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 848,376.00 6,742,763.00 234,013,476.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 1 began the month of August 2013 at 100.0% rated thermal power (RTP).There were no reductions in power during the month of August.Unit 1 ended the month of August 2013 at 100.0% RTP. | Unit 1 began the month of August 2013 at 100.0% rated thermal power (RTP). | ||
There were no reductions in power during the month of August. | |||
: | Unit 1 ended the month of August 2013 at 100.0% RTP. | ||
: | OPERATING DATA REPORT DOCKET: 352 PREPARER NAME: Leonard J. Maioriello UNIT_NME: Limerick Unit 1 PREPARER TELEPHONE: 610-718-3512 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1205 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1099 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 720.00 6,551.00 220,836.04 | |||
: 4. Number of Hours Generator On-line 720.00 6,551.00 218,297.76 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 824,036.00 7,566,799.00 234,837,512.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 1 began the month of September 2013 at 100.0% rated thermal power (RTP).On September 11th at 12:26 hours, reactor power was reduced from 99.8% to 96.8% RTP due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.6% RTP at 20:11 hours.On September 12th at 00:29 hours, reactor power was reduced from 100.0% to 95.0% RTP due to a planned load drop for online HCU testing. Reactor power was restored to 99.6% RTP at 01:36 hours.On September 15th at 01:00 hours, reactor power was reduced from 100.0% to 72.2% RTP due to a planned load drop to perform turbine valve testing. | Unit 1 began the month of September 2013 at 100.0% rated thermal power (RTP). | ||
On September 11th at 12:26 hours, reactor power was reduced from 99.8% to 96.8% RTP due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.6% RTP at 20:11 hours. | |||
: | On September 12th at 00:29 hours, reactor power was reduced from 100.0% to 95.0% RTP due to a planned load drop for online HCU testing. | ||
Reactor power was restored to 99.6% RTP at 01:36 hours. | |||
: | On September 15th at 01:00 hours, reactor power was reduced from 100.0% to 72.2% RTP due to a planned load drop to perform turbine valve testing. | ||
On September 16th at 02:05 hours, reactor power was restored to 99.8% RTP. | |||
On September 29th at 08:01 hours, reactor power was reduced from 100.0% to 76.4% RTP due to a planned load drop to perform control rod scram time testing. Reactor power was restored to 99.6% RTP at 12:23 hours. | |||
Unit 1 ended the month of September 2013 at 99.9% RTP. | |||
OPERATING DATA REPORT DOCKET: 353 PREPARER NAME: Leonard J. Maioriello UNIT_NME: Limerick Unit 2 PREPARER TELEPHONE: 610 718-3512 RPT_PERIOD: 201307 | |||
: 1. Design Electrical Rating: 1205 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1108 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 4,522.70 194,880.19 | |||
: 4. Number of Hours Generator On-line 744.00 4,469.81 192,493.11 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 847,594.00 5,141,350.00 211,839,191.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 2 began the month of June 2013 at 100% of rated thermal power (RTP).On July 7th at 18:41 hours, reactor power was reduced from 100.0% to 98.4% RTP due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.6% RTP at 20:13 hours.On July 15th at 18:50 hours, reactor power was reduced from 99.8% to 96.6% RTP due to high condensate temperature caused by high ambient conditions. | Unit 2 began the month of June 2013 at 100% of rated thermal power (RTP). | ||
On July 16th at 00:37 hours reactor power was restored to 99.6% RTP.On July 18th at 11:57 hours, reactor power was reduced from 100.0% to 96.4% RTP due to high condensate temperature caused by high ambient conditions. | On July 7th at 18:41 hours, reactor power was reduced from 100.0% to 98.4% RTP due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.6% RTP at 20:13 hours. | ||
On July 19th at 04:38 hours, reactor power was restored to 99.6% RTP. Reactor power was reduced from 100.0% to 92.9% RTP at 11:18 hours due to high condensate temperature caused by high ambient conditions. On July 20th at 00:36 hours, reactor power was restored to 99.5% RTP. Reactor power was reduced from 99.8% to 96.8% RTP at 13:44 hours due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.7% RTP at 22:04 hours.Unit 2 ended the month of July 2013 at 100.0% RTP. | On July 15th at 18:50 hours, reactor power was reduced from 99.8% to 96.6% RTP due to high condensate temperature caused by high ambient conditions. | ||
On July 16th at 00:37 hours reactor power was restored to 99.6% RTP. | |||
: | On July 18th at 11:57 hours, reactor power was reduced from 100.0% to 96.4% RTP due to high condensate temperature caused by high ambient conditions. | ||
On July 19th at 04:38 hours, reactor power was restored to 99.6% RTP. Reactor power was reduced from 100.0% to 92.9% RTP at 11:18 hours due to high condensate temperature caused by high ambient conditions. | |||
: | On July 20th at 00:36 hours, reactor power was restored to 99.5% RTP. Reactor power was reduced from 99.8% to 96.8% RTP at 13:44 hours due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.7% RTP at 22:04 hours. | ||
Unit 2 ended the month of July 2013 at 100.0% RTP. | |||
OPERATING DATA REPORT DOCKET: 353 PREPARER NAME: Leonard J. Maioriello UNIT_NME: Limerick Unit 2 PREPARER TELEPHONE: 610-718-3512 RPT_PERIOD: 201308 | |||
: 1. Design Electrical Rating: 1205 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1108 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,266.70 195,624.19 | |||
: 4. Number of Hours Generator On-line 744.00 5,213.81 193,237.11 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 856,717.00 5,998,067.00 212,695,908.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 2 began the month of August 2013 at 100% of rated thermal power (RTP).There were no reductions in power during the month of August.Unit 2 ended the month of August 2013 at 99.9% RTP. | Unit 2 began the month of August 2013 at 100% of rated thermal power (RTP). | ||
There were no reductions in power during the month of August. | |||
: | Unit 2 ended the month of August 2013 at 99.9% RTP. | ||
: | OPERATING DATA REPORT DOCKET: 353 PREPARER NAME: Leonard J. Maioriello UNIT_NME: Limerick Unit 2 PREPARER TELEPHONE: 610-718-3512 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1205 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1108 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 720.00 5,986.70 196,344.19 | |||
: 4. Number of Hours Generator On-line 720.00 5,933.81 193,957.11 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 831,404.00 6,829,471.00 213,527,312.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 2 began the month of September 2013 at 99.9% of rated thermal power (RTP).On September 7th at 14:23 hours, reactor power was reduced from 99.9% to 99.2% RTP due to an unplanned double notching of a control rod. Reactor power was restored to 99.7% RTP at 16:40 hours.On September 8th at 10:30 hours, reactor power was reduced from 99.8% to 81.5% RTP due to a planned load drop to perform turbine valve testing. | Unit 2 began the month of September 2013 at 99.9% of rated thermal power (RTP). | ||
On September 7th at 14:23 hours, reactor power was reduced from 99.9% to 99.2% RTP due to an unplanned double notching of a control rod. | |||
: | Reactor power was restored to 99.7% RTP at 16:40 hours. | ||
On September 8th at 10:30 hours, reactor power was reduced from 99.8% to 81.5% RTP due to a planned load drop to perform turbine valve testing. | |||
: | On September 9th at 03:30 hours, reactor power was restored to 99.5% RTP. | ||
On September 11th at 12:05 hours, reactor power was reduced from 99.9% to 95.4% RTP due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.7% RTP at 21:04 hours. | |||
On September 16th at 03:59 hours, reactor power was reduced from 99.9% to 95.1% RTP due to a planned load drop to repair a feedwater heater instrument valve. Reactor power was restored to 99.6% RTP at 04:45 hours. Reactor power was again reduced from 100.0% to 93.8% | |||
RTP at 20:00 hours in order to place the feedwater heater back into service. Reactor power was restored to 99.8% RTP at 20:50 hours. | |||
Unit 2 ended the month of September 2013 at 99.9% RTP. | |||
OPERATING DATA REPORT DOCKET: 369 PREPARER NAME: Kay Crane UNIT_NME: McGuire Unit 1 PREPARER TELEPHONE: (980) 875-4306 RPT_PERIOD: 201307 | |||
: 1. Design Electrical Rating: 1166 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 4,151.52 227,774.78 | |||
: 4. Number of Hours Generator On-line 744.00 4,113.33 226,214.20 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 854,435.00 4,621,870.00 246,663,865.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 369 PREPARER NAME: Kay Crane UNIT_NME: McGuire Unit 1 PREPARER TELEPHONE: (980) 875-4306 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 1166 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 4,895.52 228,518.78 | ||
: 4. Number of Hours Generator On-line 744.00 4,857.33 226,958.20 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 852,685.00 5,474,555.00 247,516,550.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 369 PREPARER NAME: Kay Crane UNIT_NME: McGuire Unit 1 PREPARER TELEPHONE: (980) 875-4306 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 1166 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 720.00 5,615.52 229,238.78 | ||
: 4. Number of Hours Generator On-line 720.00 5,577.33 227,678.20 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 823,724.00 6,298,279.00 248,340,274.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 370 PREPARER NAME: Kay Crane UNIT_NME: McGuire Unit 2 PREPARER TELEPHONE: (980) 875-4306 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 1170 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,087.00 220,784.38 | ||
: 4. Number of Hours Generator On-line 744.00 5,087.00 219,148.04 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 856,552.00 5,847,496.00 244,561,128.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 370 PREPARER NAME: Kay Crane UNIT_NME: McGuire Unit 2 PREPARER TELEPHONE: (980) 875-4306 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 1170 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,831.00 221,528.38 | ||
: 4. Number of Hours Generator On-line 744.00 5,831.00 219,892.04 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 854,028.00 6,701,524.00 245,415,156.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 370 PREPARER NAME: Kay Crane UNIT_NME: McGuire Unit 2 PREPARER TELEPHONE: (980) 875-4306 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 1170 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 720.00 6,551.00 222,248.38 | ||
: 4. Number of Hours Generator On-line 720.00 6,551.00 220,612.04 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 825,544.00 7,527,068.00 246,240,700.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 336 PREPARER NAME: Stephen Claffey UNIT_NME: Millstone Unit 2 PREPARER TELEPHONE: 860-447-1791 x2456 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 877.2 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 869.5 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,087.00 234,445.08 | ||
: 4. Number of Hours Generator On-line 744.00 5,087.00 228,358.30 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 468.20 | |||
: 6. Net Electrical energy Generated (MWHrs) 647,403.70 4,453,762.90 191,248,055.90 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Millstone Unit 2 operated at or near 100% power throughout the month of July, 2013. | Millstone Unit 2 operated at or near 100% power throughout the month of July, 2013. | ||
: | OPERATING DATA REPORT DOCKET: 336 PREPARER NAME: S. Claffey UNIT_NME: Millstone Unit 2 PREPARER TELEPHONE: 860-447-1791 x2456 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 877.2 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 869.5 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,831.00 235,189.08 | |||
: 4. Number of Hours Generator On-line 744.00 5,831.00 229,102.30 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 468.20 | |||
: 6. Net Electrical energy Generated (MWHrs) 645,986.00 5,099,748.90 191,894,041.90 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Millstone Unit 2 operated at or near 100% power throughout the month of August, 2013. | Millstone Unit 2 operated at or near 100% power throughout the month of August, 2013. | ||
: | OPERATING DATA REPORT DOCKET: 336 PREPARER NAME: S. Claffey UNIT_NME: Millstone Unit 2 PREPARER TELEPHONE: 860-447-1791 x2456 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 877.2 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 869.5 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,551.00 235,909.08 | |||
: 4. Number of Hours Generator On-line 720.00 6,551.00 229,822.30 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 468.20 | |||
: 6. Net Electrical energy Generated (MWHrs) 624,487.80 5,724,236.70 192,518,529.70 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Millstone Unit 2 operated at or near 100% power from the beginning of the month until September 21, 2013. At 0900 hours on September 21, 2013, the unit commenced a load reduction to approximately 90% power for Main Turbine Control Valve operability testing. At 1243 hours on September 21, 2013, commenced a power ascension and returned to 100% power at 1520 hours on September 21, 2013. Millstone Unit 2 operated at or near 100% power for the remainder of the month. | Millstone Unit 2 operated at or near 100% power from the beginning of the month until September 21, 2013. At 0900 hours on September 21, 2013, the unit commenced a load reduction to approximately 90% power for Main Turbine Control Valve operability testing. At 1243 hours on September 21, 2013, commenced a power ascension and returned to 100% power at 1520 hours on September 21, 2013. Millstone Unit 2 operated at or near 100% power for the remainder of the month. | ||
: | OPERATING DATA REPORT DOCKET: 423 PREPARER NAME: K. Cook UNIT_NME: Millstone Unit 3 PREPARER TELEPHONE: 860-447-1791X6572 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1229 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1210 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,275.23 188,036.56 | |||
: 4. Number of Hours Generator On-line 744.00 4,241.12 185,949.24 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 910,774.20 5,199,822.80 210,421,741.34 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Millstone Unit 3 operated at or near 100% power throughout the month of July, 2013. | Millstone Unit 3 operated at or near 100% power throughout the month of July, 2013. | ||
: | OPERATING DATA REPORT DOCKET: 423 PREPARER NAME: K. Cook UNIT_NME: Millstone Unit 3 PREPARER TELEPHONE: 860-447-1791X6572 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1229 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1210 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 657.05 4,932.28 188,693.61 | |||
: 4. Number of Hours Generator On-line 632.78 4,873.90 186,582.02 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 753,567.10 5,953,389.90 211,175,308.44 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2013- 8/9/2013 F 111.22 A 3 Power to main feedwater pump recirculation valve loops has been temporarily moved from load center 32L to load center 32A. | |||
==SUMMARY== | ==SUMMARY== | ||
Millstone Unit 3 operated at or near 100% power through the month of August until August 9, 2013 at 2119 hours when the plant experienced an automatic reactor trip due to steam generator "C" low water levels caused by loss of a non-vital load center. After investigations were completed, the reactor was taken critical at 1216 hours on August 13, 2013. The unit phased to the grid at 1232 hours on August 14, 2013. The plant reached 100% power at 0810 hours on August 16, 2013. The unit operated at or near 100% power throughout the rest of August 2013. | Millstone Unit 3 operated at or near 100% power through the month of August until August 9, 2013 at 2119 hours when the plant experienced an automatic reactor trip due to steam generator "C" low water levels caused by loss of a non-vital load center. After investigations were completed, the reactor was taken critical at 1216 hours on August 13, 2013. The unit phased to the grid at 1232 hours on August 14, 2013. The plant reached 100% power at 0810 hours on August 16, 2013. The unit operated at or near 100% power throughout the rest of August 2013. | ||
: | OPERATING DATA REPORT DOCKET: 423 PREPARER NAME: K. Cook UNIT_NME: Millstone Unit 3 PREPARER TELEPHONE: 860-447-1791X6572 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1229 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1210 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 5,652.28 189,413.61 | |||
: 4. Number of Hours Generator On-line 720.00 5,593.90 187,302.02 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 879,854.70 6,833,244.60 212,055,163.14 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Millstone Unit 3 operated at or near 100% power throughout the month of September, 2013. | Millstone Unit 3 operated at or near 100% power throughout the month of September, 2013. | ||
: | OPERATING DATA REPORT DOCKET: 263 PREPARER NAME: Kevin Austin UNIT_NME: Monticello Unit 1 PREPARER TELEPHONE: 763-271-5875 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 600 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 578.1 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 362.77 1,805.39 310,874.23 | |||
: 4. Number of Hours Generator On-line 306.35 1,746.50 306,663.86 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 71,069.00 895,635.00 162,394,979.30 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 3/2/2013 S 437.65 C 4 RFO-26 | |||
==SUMMARY== | ==SUMMARY== | ||
Reactor startup from RFO-26 commenced on 7/16/2013. There was one forced downpower from 7/23 to 7/26 during the startup due to feedwater control system oscillations. (AR 1391178) | Reactor startup from RFO-26 commenced on 7/16/2013. There was one forced downpower from 7/23 to 7/26 during the startup due to feedwater control system oscillations. (AR 1391178) | ||
: | |||
OPERATING DATA REPORT DOCKET: 263 PREPARER NAME: Kevin Austin UNIT_NME: Monticello Unit 1 PREPARER TELEPHONE: 763-271-5875 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 600 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 578.1 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 2,549.39 311,618.23 | |||
: 4. Number of Hours Generator On-line 744.00 2,490.50 307,407.86 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 412,756.00 1,308,391.00 162,807,735.30 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Reactor startup from RFO-26 continued and 100% power was reached on 8/3. There was one planned downpower on 8/24 for quarterly turbine valve testing and control rod timing, and one forced downpower from 8/27 to 8/30 due to an automatic runback on #12 recirc flow control. | Reactor startup from RFO-26 continued and 100% power was reached on 8/3. There was one planned downpower on 8/24 for quarterly turbine valve testing and control rod timing, and one forced downpower from 8/27 to 8/30 due to an automatic runback on #12 recirc flow control. | ||
: | OPERATING DATA REPORT DOCKET: 263 PREPARER NAME: Kevin Austin UNIT_NME: Monticello Unit 1 PREPARER TELEPHONE: 763-271-5875 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 600 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 578.1 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 3,269.39 312,338.23 | |||
: 4. Number of Hours Generator On-line 720.00 3,210.50 308,127.86 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 408,379.00 1,716,770.00 163,216,114.30 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
There was one forced downpower from 9/1 to 9/11 due to an automatic runback on #11 recirc flow control. | There was one forced downpower from 9/1 to 9/11 due to an automatic runback on #11 recirc flow control. | ||
: | OPERATING DATA REPORT DOCKET: 220 PREPARER NAME: Yvette Herrmann UNIT_NME: Nine Mile Point Unit 1 PREPARER TELEPHONE: 315-349-4501 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 613 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 565 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 691.87 4,330.30 291,425.11 | |||
: 4. Number of Hours Generator On-line 678.55 4,260.20 286,280.48 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 20.40 | |||
: 6. Net Electrical energy Generated (MWHrs) 397,414.81 2,608,621.14 163,576,328.56 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1P130 7/8/2013 S 65.45 B 1 Planned per INPO/NRC, Unplanned per WANO 1 | |||
==SUMMARY== | ==SUMMARY== | ||
Outage due to Drywell leakage was Unplanned per WANO and Planned per INPO/NRC. | Outage due to Drywell leakage was Unplanned per WANO and Planned per INPO/NRC. | ||
: | |||
OPERATING DATA REPORT DOCKET: 220 PREPARER NAME: Yvette Herrmann UNIT_NME: Nine Mile Point Unit 1 PREPARER TELEPHONE: 315-349-4501 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 613 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 565 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,074.30 292,169.11 | |||
: 4. Number of Hours Generator On-line 744.00 5,004.20 287,024.48 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 20.40 | |||
: 6. Net Electrical energy Generated (MWHrs) 448,964.16 3,057,585.30 164,025,292.72 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
There were no unplanned losses in August 2013. | There were no unplanned losses in August 2013. | ||
: | OPERATING DATA REPORT DOCKET: 220 PREPARER NAME: Yvette Herrmann UNIT_NME: Nine Mile Point Unit 1 PREPARER TELEPHONE: 315-349-4501 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 613 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 565 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 5,794.30 292,889.11 | |||
: 4. Number of Hours Generator On-line 720.00 5,724.20 287,744.48 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 20.40 | |||
: 6. Net Electrical energy Generated (MWHrs) 438,586.99 3,496,172.29 164,463,879.71 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unplanned Energy Loss due to Trip of MG-131 on 9/20/2013. | Unplanned Energy Loss due to Trip of MG-131 on 9/20/2013. | ||
: | OPERATING DATA REPORT DOCKET: 410 PREPARER NAME: Yvette Herrmann UNIT_NME: Nine Mile Point Unit 2 PREPARER TELEPHONE: 315-349-4501 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1299.9 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1276.8 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,087.00 190,054.96 | |||
: 4. Number of Hours Generator On-line 744.00 5,087.00 186,661.02 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 942,769.73 6,537,099.77 203,525,206.21 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
There were no unplanned energy losses in the month of July 2013. | There were no unplanned energy losses in the month of July 2013. | ||
: | OPERATING DATA REPORT DOCKET: 410 PREPARER NAME: Yvette Herrmann UNIT_NME: Nine Mile Point Unit 2 PREPARER TELEPHONE: 315-349-4501 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1299.9 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1276.8 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,831.00 190,798.96 | |||
: 4. Number of Hours Generator On-line 744.00 5,831.00 187,405.02 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 946,127.28 7,483,227.05 204,471,333.49 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
There were no losses in August 2013. | There were no losses in August 2013. | ||
: | OPERATING DATA REPORT DOCKET: 410 PREPARER NAME: Yvette Herrmann UNIT_NME: Nine Mile Point Unit 2 PREPARER TELEPHONE: 315-349-4501 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1299.9 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1276.8 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,551.00 191,518.96 | |||
: 4. Number of Hours Generator On-line 720.00 6,551.00 188,125.02 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 916,722.05 8,399,949.10 205,388,055.54 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
There were no unplanned power changes in September 2013. | There were no unplanned power changes in September 2013. | ||
: | OPERATING DATA REPORT DOCKET: 338 PREPARER NAME: W.C.BEASLEY UNIT_NME: North Anna Unit 1 PREPARER TELEPHONE: 540-894-2520 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 973 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 943 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,087.00 258,880.17 | |||
: 4. Number of Hours Generator On-line 744.00 5,087.00 255,144.86 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 708,482.16 4,950,912.89 223,806,109.19 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Began the Month @ 100% Power, 1007 MWe. On 7-9-13 @ 0937, ramped down approx 3% IAW 1-PT-13.4 (MTC Test). On 7-9-13 @ 1001, ramped unit up 3%, IAW 1-PT-13.4 (MTC Test). Ended the Month @ 100% Power 1004 MWe. | Began the Month @ 100% Power, 1007 MWe. On 7-9-13 @ 0937, ramped down approx 3% IAW 1-PT-13.4 (MTC Test). On 7-9-13 @ 1001, ramped unit up 3%, IAW 1-PT-13.4 (MTC Test). Ended the Month @ 100% Power 1004 MWe. | ||
: | OPERATING DATA REPORT DOCKET: 338 PREPARER NAME: W.C.Beasley UNIT_NME: North Anna Unit 1 PREPARER TELEPHONE: 540-894-2520 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 973 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 943 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,831.00 259,624.17 | |||
: 4. Number of Hours Generator On-line 744.00 5,831.00 255,888.86 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 711,086.52 5,661,999.41 224,517,195.71 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Began the Month @ 100% Power, 1004 MWe. Ended the Month @ 100% Power, 1008 MWe. | Began the Month @ 100% Power, 1004 MWe. Ended the Month @ 100% Power, 1008 MWe. | ||
: | OPERATING DATA REPORT DOCKET: 338 PREPARER NAME: W.C.Beasley UNIT_NME: North Anna Unit 1 PREPARER TELEPHONE: 540-894-2520 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 973 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 943 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 169.52 6,000.52 259,793.69 | |||
: 4. Number of Hours Generator On-line 168.45 5,999.45 256,057.31 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 158,413.72 5,820,413.13 224,675,609.43 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments N1- 9/8/2013 S 551.55 C 1 Suutdown for scheduled refueling outage. | |||
2013-001 | |||
==SUMMARY== | ==SUMMARY== | ||
Began the Month @ 100% Power, 1008 MWe. On 9-7-13 @ 1933, commence rampdown for scheduled refueling outage. On 9-8-13 @ 0027, unit off line. Ended the Month in Mode 6. | Began the Month @ 100% Power, 1008 MWe. On 9-7-13 @ 1933, commence rampdown for scheduled refueling outage. On 9-8-13 @ 0027, unit off line. Ended the Month in Mode 6. | ||
: | OPERATING DATA REPORT DOCKET: 339 PREPARER NAME: W.C.BEASLEY UNIT_NME: North Anna Unit 2 PREPARER TELEPHONE: 540-894-2502 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 973 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 943 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,002.06 246,182.61 | |||
: 4. Number of Hours Generator On-line 744.00 3,969.07 244,369.89 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 705,815.46 3,774,776.52 216,148,900.65 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Began the Month @ 100% Power, 1004 MWe. Ended the Month @ 100% Power, 1001 MWe. | Began the Month @ 100% Power, 1004 MWe. Ended the Month @ 100% Power, 1001 MWe. | ||
: | OPERATING DATA REPORT DOCKET: 339 PREPARER NAME: W.C.Beasley UNIT_NME: North Anna Unit 2 PREPARER TELEPHONE: 540-894-2520 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 973 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 943 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,746.06 246,926.61 | |||
: 4. Number of Hours Generator On-line 744.00 4,713.07 245,113.89 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 709,210.24 4,483,986.76 216,858,110.89 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Began the Month @ 100% Power, 1001 MWe. Ended the Month @ 100% Power, 1004 MWe. | Began the Month @ 100% Power, 1001 MWe. Ended the Month @ 100% Power, 1004 MWe. | ||
: | OPERATING DATA REPORT DOCKET: 339 PREPARER NAME: W.C.Beasley UNIT_NME: North Anna Unit 2 PREPARER TELEPHONE: 540-894-2520 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 973 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 943 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 5,466.06 247,646.61 | |||
: 4. Number of Hours Generator On-line 720.00 5,433.07 245,833.89 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 692,687.63 5,176,674.39 217,550,798.52 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Began the Month @ 100% Power, 1004 MWe. Ended the Month @ 100% Power, 1021 MWe. | Began the Month @ 100% Power, 1004 MWe. Ended the Month @ 100% Power, 1021 MWe. | ||
: | OPERATING DATA REPORT DOCKET: 269 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 1 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 886 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,087.00 285,811.98 | |||
: 4. Number of Hours Generator On-line 744.00 5,087.00 281,788.17 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 636,016.00 4,385,245.00 232,211,085.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 269 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 1 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 886 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,831.00 286,555.98 | ||
: 4. Number of Hours Generator On-line 744.00 5,831.00 282,532.17 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 631,910.00 5,017,155.00 232,842,995.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 269 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 1 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 886 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 720.00 6,551.00 287,275.98 | ||
: 4. Number of Hours Generator On-line 720.00 6,551.00 283,252.17 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 610,386.00 5,627,541.00 233,453,381.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 270 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 2 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 886 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,087.00 287,271.45 | ||
: 4. Number of Hours Generator On-line 744.00 5,087.00 284,165.32 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 637,002.00 4,405,991.00 234,338,910.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 270 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 2 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 886 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,831.00 288,015.45 | ||
: 4. Number of Hours Generator On-line 744.00 5,831.00 284,909.32 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 633,464.00 5,039,455.00 234,972,374.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 270 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 2 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 886 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 720.00 6,551.00 288,735.45 | ||
: 4. Number of Hours Generator On-line 720.00 6,551.00 285,629.32 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 606,493.00 5,645,948.00 235,578,867.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 287 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 3 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 886 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,087.00 279,425.95 | ||
: 4. Number of Hours Generator On-line 744.00 5,087.00 276,213.16 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 645,198.00 4,454,491.00 231,173,902.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 287 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 3 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 886 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,831.00 280,169.95 | ||
: 4. Number of Hours Generator On-line 744.00 5,831.00 276,957.16 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 640,950.00 5,095,441.00 231,814,852.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 287 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 3 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 886 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 720.00 6,551.00 280,889.95 | ||
: 4. Number of Hours Generator On-line 720.00 6,551.00 277,677.16 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 617,812.00 5,713,253.00 232,432,664.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 219 PREPARER NAME: C. Lefler Jr. | |||
: | UNIT_NME: Oyster Creek Unit 1 PREPARER TELEPHONE: 609-971-2158 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 650 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 619 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,087.00 297,319.96 | |||
: 4. Number of Hours Generator On-line 744.00 5,087.00 292,292.99 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 918.20 | |||
: 6. Net Electrical energy Generated (MWHrs) 444,287.00 3,139,284.00 169,742,397.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unplanned loss generation for July was 0 MWh. The FLR was 0, which is below the Site goal of 0.31. The Oyster Creek Planned Energy losses for the month of July are:1) MC Backwash - 223.81 MWh - 7/2, 7/8-11, 7/13-18, 7/21, 7/24-30 | The unplanned loss generation for July was 0 MWh. The FLR was 0, which is below the Site goal of 0.31. | ||
The Oyster Creek Planned Energy losses for the month of July are: | |||
: | : 1) MC Backwash - 223.81 MWh - 7/2, 7/8-11, 7/13-18, 7/21, 7/24-30 | ||
: 2) Environmental Derate - 2,447.49 MWh - 7/3-7, 7/18-22 Assuming 0 FLR, this PI will be in goal in November 2013. | |||
: | |||
OPERATING DATA REPORT DOCKET: 219 PREPARER NAME: L. Velez UNIT_NME: Oyster Creek Unit 1 PREPARER TELEPHONE: 6099714410 RPT_PERIOD: 201308 | |||
: 1. Design Electrical Rating: 650 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 619 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,831.00 298,063.96 | |||
: 4. Number of Hours Generator On-line 744.00 5,831.00 293,036.99 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 918.20 | |||
: 6. Net Electrical energy Generated (MWHrs) 453,796.00 3,593,080.00 170,196,193.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unplanned loss generation for August was 0 MWh. The FLR was 0.. The Oyster Creek Planned Energy losses for the month of August are: 1) MC Backwash - 222.8 MWh - 8/1, 8/4, 8/6, 8/8, 8/10, 8/13, 8/16, 8/20, 8/25 and 8/30. | The unplanned loss generation for August was 0 MWh. The FLR was 0.. | ||
The Oyster Creek Planned Energy losses for the month of August are: | |||
: | : 1) MC Backwash - 222.8 MWh - 8/1, 8/4, 8/6, 8/8, 8/10, 8/13, 8/16, 8/20, 8/25 and 8/30. | ||
: | |||
OPERATING DATA REPORT DOCKET: 219 PREPARER NAME: L. Velez UNIT_NME: Oyster Creek Unit 1 PREPARER TELEPHONE: 609-971-4410 RPT_PERIOD: 201309 | |||
: 1. Design Electrical Rating: 650 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 619 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 713.95 6,544.95 298,777.91 | |||
: 4. Number of Hours Generator On-line 706.83 6,537.83 293,743.82 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 918.20 | |||
: 6. Net Electrical energy Generated (MWHrs) 431,057.00 4,024,137.00 170,627,250.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1M30 9/30/2013 S 13.17 B 1 Turbine Controls Testing (Speed Load Changer) to 1M30 Outage | |||
==SUMMARY== | ==SUMMARY== | ||
The unplanned loss generation for September was 79.4 MWh, due to 1C3 FWH Normal Drain Valve causing FWH fluctuations, as documented under IR 1554558. | The unplanned loss generation for September was 79.4 MWh, due to 1C3 FWH Normal Drain Valve causing FWH fluctuations, as documented under IR 1554558. | ||
The Oyster Creek Planned Energy losses for the month of September are: 1) Rod for Flow Swap ??? 341.77 MWh ??? 9/1 and 9/2 | The Oyster Creek Planned Energy losses for the month of September are: | ||
: 1) Rod for Flow Swap ??? 341.77 MWh ??? 9/1 and 9/2 | |||
: 2) Normal Load Maintenance ??? 34.09 MWh ??? 9/5 | : 2) Normal Load Maintenance ??? 34.09 MWh ??? 9/5 | ||
: 3) 1M30 ??? 12,972 MWh ??? 9/29 and 9/30 | : 3) 1M30 ??? 12,972 MWh ??? 9/29 and 9/30 | ||
: | |||
OPERATING DATA REPORT DOCKET: 255 PREPARER NAME: R. Levack UNIT_NME: Palisades Unit 1 PREPARER TELEPHONE: 269-764-2068 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 805 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 744 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 3,919.33 251,837.72 | |||
: 4. Number of Hours Generator On-line 744.00 3,893.90 245,653.70 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 586,088.00 3,097,695.14 176,074,721.90 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Palisades operated at full power for the month of July 2013. | Palisades operated at full power for the month of July 2013. | ||
: | OPERATING DATA REPORT DOCKET: 255 PREPARER NAME: Eric Edwards UNIT_NME: Palisades Unit 1 PREPARER TELEPHONE: 269-764-2086 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 805 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 744 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,663.33 252,581.72 | |||
: 4. Number of Hours Generator On-line 744.00 4,637.90 246,397.70 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 586,334.79 3,684,029.93 176,661,056.69 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Palisades operated at full power for the month of August 2013. | Palisades operated at full power for the month of August 2013. | ||
: | OPERATING DATA REPORT DOCKET: 255 PREPARER NAME: Eric Edwards UNIT_NME: Palisades Unit 1 PREPARER TELEPHONE: 269-764-2086 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 805 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 744 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 5,383.33 253,301.72 | |||
: 4. Number of Hours Generator On-line 720.00 5,357.90 247,117.70 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 570,971.26 4,255,001.19 177,232,027.95 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Palisades operated at full power for the month of September 2013. | Palisades operated at full power for the month of September 2013. | ||
: | OPERATING DATA REPORT DOCKET: 528 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 1 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1333 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1311 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,402.22 193,525.03 | |||
: 4. Number of Hours Generator On-line 744.00 4,372.03 191,485.11 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 941,363.72 5,671,215.04 233,942,487.99 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit began the month at full power. On July 2nd at 20:26, the unit downpowered to 59% RX power after a 480 V load center fault caused a loss of Main Feedwater Pump B, initiating a reactor power cutback. The unit was returned to full power on July 6th at 02:00. The unit ended the month at full power. | The unit began the month at full power. On July 2nd at 20:26, the unit downpowered to 59% RX power after a 480 V load center fault caused a loss of Main Feedwater Pump B, initiating a reactor power cutback. The unit was returned to full power on July 6th at 02:00. The unit ended the month at full power. | ||
: | OPERATING DATA REPORT DOCKET: 528 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 1 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1333 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1311 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,146.22 194,269.03 | |||
: 4. Number of Hours Generator On-line 744.00 5,116.03 192,229.11 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 972,874.58 6,644,089.62 234,915,362.57 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit began the month and ended the month in Mode 1 with the reactor at full power. | The unit began the month and ended the month in Mode 1 with the reactor at full power. | ||
: | OPERATING DATA REPORT DOCKET: 528 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 1 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1333 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1311 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 5,866.22 194,989.03 | |||
: 4. Number of Hours Generator On-line 720.00 5,836.03 192,949.11 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 944,713.81 7,588,803.43 235,860,076.38 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit began the month and ended the month in Mode 1 with the reactor at full power. | The unit began the month and ended the month in Mode 1 with the reactor at full power. | ||
: | OPERATING DATA REPORT DOCKET: 529 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 2 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1336 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1314 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,088.00 196,215.78 | |||
: 4. Number of Hours Generator On-line 744.00 5,088.00 194,295.23 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 978,759.52 6,765,089.30 243,574,251.94 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit began the month and ended the month in Mode 1 with the reactor at full power. | The unit began the month and ended the month in Mode 1 with the reactor at full power. | ||
: | OPERATING DATA REPORT DOCKET: 529 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 2 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1336 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1314 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,832.00 196,959.78 | |||
: 4. Number of Hours Generator On-line 744.00 5,832.00 195,039.23 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 982,008.67 7,747,097.97 244,556,260.61 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit began the month and ended the month in Mode 1 with the reactor at full power. | The unit began the month and ended the month in Mode 1 with the reactor at full power. | ||
: | OPERATING DATA REPORT DOCKET: 529 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 2 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1336 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1314 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,552.00 197,679.78 | |||
: 4. Number of Hours Generator On-line 720.00 6,552.00 195,759.23 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 952,196.36 8,699,294.33 245,508,456.97 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit began the month and ended the month in Mode 1 with the reactor at full power. | The unit began the month and ended the month in Mode 1 with the reactor at full power. | ||
: | OPERATING DATA REPORT DOCKET: 530 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 3 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1334 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1312 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,088.00 191,259.73 | |||
: 4. Number of Hours Generator On-line 744.00 5,088.00 189,501.37 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 972,291.97 6,613,458.63 235,282,099.81 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit began the month and ended the month in Mode 1 with the reactor at full power. | The unit began the month and ended the month in Mode 1 with the reactor at full power. | ||
: | OPERATING DATA REPORT DOCKET: 530 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 3 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1334 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1312 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,832.00 192,003.73 | |||
: 4. Number of Hours Generator On-line 744.00 5,832.00 190,245.37 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 975,605.20 7,589,063.83 236,257,705.01 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit began the month and ended the month in Mode 1 with the reactor at full power. | The unit began the month and ended the month in Mode 1 with the reactor at full power. | ||
: | OPERATING DATA REPORT DOCKET: 530 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 3 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1334 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1312 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,552.00 192,723.73 | |||
: 4. Number of Hours Generator On-line 720.00 6,552.00 190,965.37 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 945,616.41 8,534,680.24 237,203,321.42 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit began the month and ended the month in Mode 1 with the reactor at full power. | The unit began the month and ended the month in Mode 1 with the reactor at full power. | ||
: | OPERATING DATA REPORT DOCKET: 277 PREPARER NAME: Brad Deihl UNIT_NME: Peach Bottom Unit 2 PREPARER TELEPHONE: 717-456-4420 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1138 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1112 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,087.00 270,107.94 | |||
: 4. Number of Hours Generator On-line 744.00 5,087.00 265,370.29 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 828,630.90 5,890,056.10 272,959,125.30 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 2 began the month of July at 100% of maximum allowable power (3514 MWth). There were no load reductions on Unit 2 for the month of July 2013. Unit 2 ended the month of July at 100% of maximum allowable power (3514 MWth). | Unit 2 began the month of July at 100% of maximum allowable power (3514 MWth). | ||
There were no load reductions on Unit 2 for the month of July 2013. | |||
: | Unit 2 ended the month of July at 100% of maximum allowable power (3514 MWth). | ||
: | OPERATING DATA REPORT DOCKET: 277 PREPARER NAME: Brad Deihl UNIT_NME: Peach Bottom Unit 2 PREPARER TELEPHONE: 717-456-4420 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1138 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1112 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,831.00 270,851.94 | |||
: 4. Number of Hours Generator On-line 744.00 5,831.00 266,114.29 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 815,151.00 6,705,207.10 273,774,276.30 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 2 began the month of August at 100% of maximum allowable power (3514 MWth). On August 30, 2013 at 21:02, Unit 2 commenced a planned load reduction to 60% CTP for Rod Pattern Adjustment, Turbine Testing, and waterbox cleaning. During the downpower, the 2B Recirc Pump tripped. Minimum power of 36.7% was reached on August 30th at 21:59. The unit ended the month at 48.5% power. | Unit 2 began the month of August at 100% of maximum allowable power (3514 MWth). | ||
On August 30, 2013 at 21:02, Unit 2 commenced a planned load reduction to 60% CTP for Rod Pattern Adjustment, Turbine Testing, and waterbox cleaning. During the downpower, the 2B Recirc Pump tripped. Minimum power of 36.7% was reached on August 30th at 21:59. The unit ended the month at 48.5% power. | |||
Unit 2 ended the month of August at 48.5% of maximum allowable power (3514 MWth). | Unit 2 ended the month of August at 48.5% of maximum allowable power (3514 MWth). | ||
: | OPERATING DATA REPORT DOCKET: 277 PREPARER NAME: Brad Deihl UNIT_NME: Peach Bottom Unit 2 PREPARER TELEPHONE: 717-456-4420 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1138 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1112 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,551.00 271,571.94 | |||
: 4. Number of Hours Generator On-line 720.00 6,551.00 266,834.29 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 801,512.10 7,506,719.20 274,575,788.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 2 began the month of September at 48.5% of maximum allowable power (3514 MWth) due to the 2B recirc pump trip event. On September 1, 2013, Unit 2 continued the planned load reduction to 60% CTP for Rod Pattern Adjustment, Turbine Testing, waterbox cleaning, and recovery from the the 2B Recirc Pump trip. Minimum power of 32.7% was reached on September 2nd at 22:39. The unit was returned to full power on September 2, 2013 at 10:32. | Unit 2 began the month of September at 48.5% of maximum allowable power (3514 MWth) due to the 2B recirc pump trip event. | ||
On September 2, 2013 at 23:02, Unit 2 commenced a planned load reduction to 79.7% CTP for a follow up rod pattern adjustment. Minimum power was reached on September 2nd at 23:30. The unit was returned to 100%% power on September 3, 2013 at 06:02. Unit 2 ended the month of September at 100% of maximum allowable power (3514 MWth). | On September 1, 2013, Unit 2 continued the planned load reduction to 60% CTP for Rod Pattern Adjustment, Turbine Testing, waterbox cleaning, and recovery from the the 2B Recirc Pump trip. Minimum power of 32.7% was reached on September 2nd at 22:39. The unit was returned to full power on September 2, 2013 at 10:32. | ||
On September 2, 2013 at 23:02, Unit 2 commenced a planned load reduction to 79.7% CTP for a follow up rod pattern adjustment. Minimum power was reached on September 2nd at 23:30. The unit was returned to 100%% power on September 3, 2013 at 06:02. | |||
: | Unit 2 ended the month of September at 100% of maximum allowable power (3514 MWth). | ||
: | OPERATING DATA REPORT DOCKET: 278 PREPARER NAME: Brad Deihl UNIT_NME: Peach Bottom Unit 3 PREPARER TELEPHONE: 717-456-4420 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1179 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1095 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,087.00 269,513.28 | |||
: 4. Number of Hours Generator On-line 744.00 5,087.00 265,262.72 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 808,844.90 5,853,314.10 271,990,373.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 3 began the month of July at 99.97% of maximum allowable power (3513 MWth).On July 5, 2013 at 23:02, Unit 3 commenced a planned load reduction to 81.4% CTP to remove the 5A and 5C Feed Water Heater from service. Min power was reached on July 6th at 01:01. The unit was returned to 99.97% power on July 6, 2013 at 04:18. On July 26, 2013 at 23:01, Unit 3 commenced a planned load reduction to 94.4% CTP to remove the 5B Feed Water Heater from service. Min power was reached on July 26th at 23:08. The unit was returned to 99.97% power on July 27, 2013 at 01:26. Unit 3 coasted to 99.0% CTP following the removal of the final 5th stage feed water heater. Unit 3 ended the month of July at 99.0% of maximum allowable power (3513 MWth). Unit 3 is limited to a maximum allowable power level of 3513 MWth (99.97%) due to Leading Edge Flow Meter (LEFM) imposed restrictions. | Unit 3 began the month of July at 99.97% of maximum allowable power (3513 MWth). | ||
On July 5, 2013 at 23:02, Unit 3 commenced a planned load reduction to 81.4% CTP to remove the 5A and 5C Feed Water Heater from service. | |||
: | Min power was reached on July 6th at 01:01. The unit was returned to 99.97% power on July 6, 2013 at 04:18. | ||
On July 26, 2013 at 23:01, Unit 3 commenced a planned load reduction to 94.4% CTP to remove the 5B Feed Water Heater from service. Min power was reached on July 26th at 23:08. The unit was returned to 99.97% power on July 27, 2013 at 01:26. | |||
: | Unit 3 coasted to 99.0% CTP following the removal of the final 5th stage feed water heater. | ||
Unit 3 ended the month of July at 99.0% of maximum allowable power (3513 MWth). Unit 3 is limited to a maximum allowable power level of 3513 MWth (99.97%) due to Leading Edge Flow Meter (LEFM) imposed restrictions. | |||
OPERATING DATA REPORT DOCKET: 278 PREPARER NAME: Brad Deihl UNIT_NME: Peach Bottom Unit 3 PREPARER TELEPHONE: 717-456-4420 RPT_PERIOD: 201308 | |||
: 1. Design Electrical Rating: 1179 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1095 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,831.00 270,257.28 | |||
: 4. Number of Hours Generator On-line 744.00 5,831.00 266,006.72 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 752,754.00 6,606,068.10 272,743,127.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 3 began the month of August at 99.07% of maximum allowable power (3513 MWth).On August 2, 2013 at 23:03, Unit 3 commenced a planned load reduction to 93.6% CTP to remove the 4B and 4C Feed Water Heater from service. Minimum power was reached on August 3rd at 01:47. The unit was returned to 98.1% power on August 3, 2013 at 09:02. Unit 3 coasted to 88.7% CTP following the removal of the 4th stage feed water heaters. Unit 3 ended the month of August at 88.7% of maximum allowable power (3513 MWth). Unit 3 is limited to a maximum allowable power level of 3513 MWth (99.97%) due to Leading Edge Flow Meter (LEFM) imposed restrictions. | Unit 3 began the month of August at 99.07% of maximum allowable power (3513 MWth). | ||
On August 2, 2013 at 23:03, Unit 3 commenced a planned load reduction to 93.6% CTP to remove the 4B and 4C Feed Water Heater from service. Minimum power was reached on August 3rd at 01:47. The unit was returned to 98.1% power on August 3, 2013 at 09:02. | |||
: | Unit 3 coasted to 88.7% CTP following the removal of the 4th stage feed water heaters. | ||
: | Unit 3 ended the month of August at 88.7% of maximum allowable power (3513 MWth). Unit 3 is limited to a maximum allowable power level of 3513 MWth (99.97%) due to Leading Edge Flow Meter (LEFM) imposed restrictions. | ||
: | |||
OPERATING DATA REPORT DOCKET: 278 PREPARER NAME: Brad Deihl UNIT_NME: Peach Bottom Unit 3 PREPARER TELEPHONE: 717-456-4420 RPT_PERIOD: 201309 | |||
: 1. Design Electrical Rating: 1179 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1095 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 193.57 6,024.57 270,450.85 | |||
: 4. Number of Hours Generator On-line 192.03 6,023.03 266,198.75 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 168,170.10 6,774,238.20 272,911,297.10 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments P3R19 9/9/2013 S 527.97 C 1 On September 8, 2013 at 15:02, Unit 3 commenced a planned power reduction for P3R19 refueling outage. At 00:02 on September 9th, the Unit 3 generator was tripped. At 01:34 on September 9, 2013 the Unit 3 reactor was manually scrammed. | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 3 began the month of September at 88.7% of maximum allowable power (3513 MWth) due to EOC coastdown.On September 8, 2013 at 15:02, Unit 3 commenced a planned power reduction for P3R19 refueling outage. At 00:02 on September 9th, the Unit 3 generator was tripped. At 01:34 on September 9, 2013 the Unit 3 reactor was manually scrammed. Unit 3 ended the month of September at 0% of maximum allowable power (3513 MWth). Unit 3 is limited to a maximum allowable power level of 3513 MWth (99.97%) due to Leading Edge Flow Meter (LEFM) imposed restrictions. | Unit 3 began the month of September at 88.7% of maximum allowable power (3513 MWth) due to EOC coastdown. | ||
On September 8, 2013 at 15:02, Unit 3 commenced a planned power reduction for P3R19 refueling outage. At 00:02 on September 9th, the Unit 3 generator was tripped. At 01:34 on September 9, 2013 the Unit 3 reactor was manually scrammed. | |||
: | Unit 3 ended the month of September at 0% of maximum allowable power (3513 MWth). Unit 3 is limited to a maximum allowable power level of 3513 MWth (99.97%) due to Leading Edge Flow Meter (LEFM) imposed restrictions. | ||
: | OPERATING DATA REPORT DOCKET: 440 PREPARER NAME: T. Phelps UNIT_NME: Perry Unit 1 PREPARER TELEPHONE: 440-280-7660 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1268 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1240 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 3,562.21 185,781.09 | |||
: 4. Number of Hours Generator On-line 744.00 3,371.12 182,035.21 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 928,048.10 3,965,388.60 213,503,198.10 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The Perry Nuclear Power Plant ran the entire month of July 2013. | The Perry Nuclear Power Plant ran the entire month of July 2013. | ||
: | OPERATING DATA REPORT DOCKET: 440 PREPARER NAME: T. Phelps UNIT_NME: Perry Unit 1 PREPARER TELEPHONE: 440-280-7660 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1268 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1240 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,306.21 186,525.09 | |||
: 4. Number of Hours Generator On-line 744.00 4,115.12 182,779.21 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 916,126.30 4,881,514.90 214,419,324.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The Perry Plant ran the entire month of August, 2013. | The Perry Plant ran the entire month of August, 2013. | ||
OPERATING DATA REPORT DOCKET: 440 PREPARER NAME: T. Phelps UNIT_NME: Perry Unit 1 PREPARER TELEPHONE: 440-280-7660 RPT_PERIOD: 201309 | |||
: 1. Design Electrical Rating: 1268 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1240 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 679.63 4,985.84 187,204.72 | |||
: 4. Number of Hours Generator On-line 657.47 4,772.59 183,436.68 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 777,536.50 5,659,051.40 215,196,860.90 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 4 9/6/2013 S 62.53 A 1 Replaced a non-safety related 120 VAC regulating transformer which services the digital feedwater control logic. The transformer was showing signs of degradation beginning on August 30, 2013. | |||
==SUMMARY== | ==SUMMARY== | ||
The Perry Nuclear Power Plant was on line for 657.5 hours during the month of September 2013. The plant performed a planned outage to troubleshoot and repair the high voltage on panel V-1-A . The unit returned to 100% on 9/13/13 @0349. The plant remained on line through the month's end. | The Perry Nuclear Power Plant was on line for 657.5 hours during the month of September 2013. The plant performed a planned outage to troubleshoot and repair the high voltage on panel V-1-A . The unit returned to 100% on 9/13/13 @0349. The plant remained on line through the month's end. | ||
: | OPERATING DATA REPORT DOCKET: 293 PREPARER NAME: Brent Lyons UNIT_NME: Pilgrim Unit 1 PREPARER TELEPHONE: 508-830-8270 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 690 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 684.7 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 3,788.02 269,500.96 | |||
: 4. Number of Hours Generator On-line 744.00 3,627.37 266,778.95 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 499,579.00 2,306,909.00 164,466,482.53 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
At the beginning of the month, reactor power was 100%. On July 17th at 12:30, a power reduction commenced due to TS sea water inlet temp limitations (75F). Power was returned to 100% on July 18th at 02:08. The duration of the downpower was 13 hrs and 37 mins. The minimum power level achieved was 84.60%. On July 18th at 15:35, a power reduction commenced due to sea water inlet temp challenging the TS limit of 75F. Power was returned to 100% on July 18th at 20:41. The duration of the downpower was 5 hrs and 6 mins. The minimum power level achieved was 92.70%. On July 25th at 23:51, a power reduction commenced due to sea water inlet temp challenging the TS limit of 75F. Power was returned to 100% on July 26th at 07:58. The duration of the downpower was 8 hrs and 7 mins. The minimum power level achieved was 89.90%. The reactor remained at full power throughout the remainder of the month. | At the beginning of the month, reactor power was 100%. On July 17th at 12:30, a power reduction commenced due to TS sea water inlet temp limitations (75F). Power was returned to 100% on July 18th at 02:08. The duration of the downpower was 13 hrs and 37 mins. The minimum power level achieved was 84.60%. On July 18th at 15:35, a power reduction commenced due to sea water inlet temp challenging the TS limit of 75F. Power was returned to 100% on July 18th at 20:41. The duration of the downpower was 5 hrs and 6 mins. The minimum power level achieved was 92.70%. On July 25th at 23:51, a power reduction commenced due to sea water inlet temp challenging the TS limit of 75F. Power was returned to 100% on July 26th at 07:58. The duration of the downpower was 8 hrs and 7 mins. The minimum power level achieved was 89.90%. The reactor remained at full power throughout the remainder of the month. | ||
OPERATING DATA REPORT DOCKET: 293 PREPARER NAME: Brent Lyons UNIT_NME: Pilgrim Unit 1 PREPARER TELEPHONE: 508-830-8270 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 690 | ||
: | : 2. Maximum Dependable Capacity (MWe-Net) 684.7 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 657.88 4,445.90 270,158.84 | |||
: 4. Number of Hours Generator On-line 642.13 4,269.50 267,421.08 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 379,986.00 2,686,895.00 164,846,468.53 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 4 8/22/2013 F 101.87 A 2 On August 22, 2013 at 07:55, operators manually scrammed the reactor in response to a trip of all three (3) reactor feed pumps. This trip was the result of Instrument power panel Y1 breaker 24 tripping open on a ground fault condition. The power from this breaker supplies the seal cooling water flow switches to all reactor feed pumps. By design, a loss of cooling water flow or a loss of power to the flow switches will generate a signal to the trip the associated reactor feed pump after a sixty (60) second time delay. The reactor was made critical on August 25, 2013 at 22:02. The main generator was synchronized to the grid on August 26, 2013 at 13:47. | |||
==SUMMARY== | ==SUMMARY== | ||
At the beginning of the month, reactor power was 100%. On August 22, 2013 at 07:55, operators manually scrammed the reactor in response to a trip of all three (3) reactor feed pumps. This trip was the result of Instrument power panel Y1 breaker 24 tripping open on a ground fault condition. The power from this breaker supplies the seal cooling water flow switches to all three reactor feed pumps. By design, a loss of cooling water flow or a loss of power to the flow switches will generate a signal to the trip the associated reactor feed pump after a sixty (60) second time delay. The reactor was made critical on August 25, 2013 at 22:02. The main generator was synchronized to the grid on August 26, 2013 at 13:47. Reactor power was raised to approximately 75% RCTP on August 28th, 2013 and remained at this level until the end of the month. Power ascension was limited due to the inability to start Reactor Feed Pump 'A'. | At the beginning of the month, reactor power was 100%. On August 22, 2013 at 07:55, operators manually scrammed the reactor in response to a trip of all three (3) reactor feed pumps. This trip was the result of Instrument power panel Y1 breaker 24 tripping open on a ground fault condition. | ||
The power from this breaker supplies the seal cooling water flow switches to all three reactor feed pumps. By design, a loss of cooling water flow or a loss of power to the flow switches will generate a signal to the trip the associated reactor feed pump after a sixty (60) second time delay. The reactor was made critical on August 25, 2013 at 22:02. The main generator was synchronized to the grid on August 26, 2013 at 13:47. Reactor power was raised to approximately 75% RCTP on August 28th, 2013 and remained at this level until the end of the month. Power ascension was limited due to the inability to start Reactor Feed Pump 'A'. | |||
: | OPERATING DATA REPORT DOCKET: 293 PREPARER NAME: Brent Lyons UNIT_NME: Pilgrim Unit 1 PREPARER TELEPHONE: 508-830-8270 RPT_PERIOD: 201309 | ||
: | : 1. Design Electrical Rating: 690 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 684.7 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 568.42 5,014.32 270,727.26 | |||
: 4. Number of Hours Generator On-line 551.17 4,820.67 267,972.25 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 326,768.00 3,013,663.00 165,173,236.53 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 5 9/8/2013 F 168.83 A 1 On September 8th, 2013 at 14:03, a controlled shutdown commenced to allow repairs of leaks in the condenser bay. At 21:38, all control rods were fully inserted. Repairs in the condenser bay were completed and reactor startup commenced on September 15th, 2013 at 00:00. At 05:13, the reactor was made critical and at 19:27 the main generator was synchronized to the grid. Reactor power achieved approximately 75% on September 17th, 2013 at 07:40. At this time, reactor power was still limited due to RFP 'A'. A temporary modification that routed new cables to RFP 'A' was completed and the pump was placed into service. On September 17th, 2013 at 07:40, power ascension once again commenced and full reactor power was achieved at 13:00. | |||
==SUMMARY== | ==SUMMARY== | ||
At the beginning of the month, reactor power was 75% due to the inability to start Reactor Feed Pump 'A'. On September 8th, 2013 at 14:03, a controlled shutdown commenced to allow repairs of leaks in the condenser bay. At 21:38, all control rods were fully inserted. Repairs in the condenser bay were completed and reactor startup commenced on September 15th, 2013 at 00:00. At 05:13, the reactor was made critical and at 19:27 the main generator was synchronized to the grid. Reactor power achieved approximately 75% on September 17th, 2013 at 07:40. At this time, reactor power was still limited due to RFP 'A'. A temporary modification that routed new cables to RFP 'A' was completed and the pump was placed into service. On September 17th, 2013 at 07:40, power ascension once again commenced and full reactor power was achieved at 13:00. On September 18th, 2013 at 10:04, a reactor downpower commenced to adjust the control rod pattern. The minimum power achieved during this evolution was 78%. At 14:40, reactor power once again achieved 100%. Reactor power was maintained at 100% throughout the remainder of the month. | At the beginning of the month, reactor power was 75% due to the inability to start Reactor Feed Pump 'A'. On September 8th, 2013 at 14:03, a controlled shutdown commenced to allow repairs of leaks in the condenser bay. At 21:38, all control rods were fully inserted. Repairs in the condenser bay were completed and reactor startup commenced on September 15th, 2013 at 00:00. At 05:13, the reactor was made critical and at 19:27 the main generator was synchronized to the grid. Reactor power achieved approximately 75% on September 17th, 2013 at 07:40. At this time, reactor power was still limited due to RFP 'A'. A temporary modification that routed new cables to RFP 'A' was completed and the pump was placed into service. On September 17th, 2013 at 07:40, power ascension once again commenced and full reactor power was achieved at 13:00. | ||
On September 18th, 2013 at 10:04, a reactor downpower commenced to adjust the control rod pattern. The minimum power achieved during this evolution was 78%. At 14:40, reactor power once again achieved 100%. Reactor power was maintained at 100% throughout the remainder of the month. | |||
: | |||
OPERATING DATA REPORT DOCKET: 266 PREPARER NAME: Roger Clark UNIT_NME: Point Beach Unit 1 PREPARER TELEPHONE: 920-755-7464 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 615 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 576 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 4,368.03 315,362.22 | |||
: 4. Number of Hours Generator On-line 744.00 4,339.62 311,388.74 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 846.90 | |||
: 6. Net Electrical energy Generated (MWHrs) 445,303.30 2,559,039.80 148,553,421.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 266 PREPARER NAME: Roger Clark UNIT_NME: Point Beach Unit 1 PREPARER TELEPHONE: 920-755-7464 RPT_PERIOD: 201308 | |||
: 1. Design Electrical Rating: 615 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 576 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,112.03 316,106.22 | |||
: 4. Number of Hours Generator On-line 712.13 5,051.75 312,100.87 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 846.90 | |||
: 6. Net Electrical energy Generated (MWHrs) 415,805.80 2,974,845.60 148,969,227.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 113 8/19/2013 F 31.87 A 5 Unit 1 main generator was taken offline due to a 1X-01C transformer cooling malfunction. Malfunction was repaired and the unit was placed back online. | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 266 PREPARER NAME: Roger Clark UNIT_NME: Point Beach Unit 1 PREPARER TELEPHONE: 920-755-7464 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 615 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 576 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 720.00 5,832.03 316,826.22 | ||
: 4. Number of Hours Generator On-line 720.00 5,771.75 312,820.87 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 846.90 | |||
: 6. Net Electrical energy Generated (MWHrs) 427,932.50 3,402,778.10 149,397,159.90 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 301 PREPARER NAME: Roger Clark UNIT_NME: Point Beach Unit 2 PREPARER TELEPHONE: 920-755-7464 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 615 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 578 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,087.00 308,427.80 | ||
: 4. Number of Hours Generator On-line 744.00 5,087.00 304,910.83 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 302.20 | |||
: 6. Net Electrical energy Generated (MWHrs) 444,540.30 3,048,117.30 148,127,427.90 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 301 PREPARER NAME: Roger Clark UNIT_NME: Point Beach Unit 2 PREPARER TELEPHONE: 920-755-7464 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 615 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 578 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,831.00 309,171.80 | ||
: 4. Number of Hours Generator On-line 744.00 5,831.00 305,654.83 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 302.20 | |||
: 6. Net Electrical energy Generated (MWHrs) 434,152.80 3,482,270.10 148,561,580.70 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 301 PREPARER NAME: Roger Clark UNIT_NME: Point Beach Unit 2 PREPARER TELEPHONE: 920-755-7464 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 615 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 578 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 720.00 6,551.00 309,891.80 | ||
: 4. Number of Hours Generator On-line 720.00 6,551.00 306,374.83 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 302.20 | |||
: 6. Net Electrical energy Generated (MWHrs) 427,615.50 3,909,885.60 148,989,196.20 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 282 PREPARER NAME: Thomas Scheibel UNIT_NME: Prairie Island Unit 1 PREPARER TELEPHONE: 651-267-6355 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 557 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 522.1 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,087.00 304,383.84 | ||
: 4. Number of Hours Generator On-line 744.00 5,059.32 301,809.75 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 394,395.00 2,675,846.00 153,134,076.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 1 was base loaded during July 2013. | Unit 1 was base loaded during July 2013. | ||
Unit 1 has a planned 2% down power of 7-22-13, to adjust the level in 12A Feedwater Heater. This was a planned loss of 133.3 MW-hr. | Unit 1 has a planned 2% down power of 7-22-13, to adjust the level in 12A Feedwater Heater. This was a planned loss of 133.3 MW-hr. | ||
: | OPERATING DATA REPORT DOCKET: 282 PREPARER NAME: Thomas Scheibel UNIT_NME: Prairie Island Unit 1 PREPARER TELEPHONE: 651-267-6355 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 557 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 522.1 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,831.00 305,127.84 | |||
: 4. Number of Hours Generator On-line 744.00 5,803.32 302,553.75 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 395,147.00 3,070,993.00 153,529,223.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 1 was base loaded during August 2013. | Unit 1 was base loaded during August 2013. | ||
There was a planned 2% down power on Unit 1 to perform SP 1101, 12 MD AFW PP QTLY FLOW & VALVE TEST. This was a planned loss of 28.1 MW-hr. | There was a planned 2% down power on Unit 1 to perform SP 1101, 12 MD AFW PP QTLY FLOW & VALVE TEST. This was a planned loss of 28.1 MW-hr. | ||
: | OPERATING DATA REPORT DOCKET: 282 PREPARER NAME: Thomas Scheibel UNIT_NME: Prairie Island Unit 1 PREPARER TELEPHONE: 651-267-6355 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 557 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 522.1 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,551.00 305,847.84 | |||
: 4. Number of Hours Generator On-line 720.00 6,523.32 303,273.75 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 372,576.00 3,443,569.00 153,901,799.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 1 was base loaded during September 2013. | Unit 1 was base loaded during September 2013. | ||
There was a planned 60% down power on Unit 1 to perform SP 1054 Turbine Valve Testing. This was a planned loss of 11,704.4 MW.hr. | There was a planned 60% down power on Unit 1 to perform SP 1054 Turbine Valve Testing. This was a planned loss of 11,704.4 MW.hr. | ||
: | OPERATING DATA REPORT DOCKET: 306 PREPARER NAME: Thomas Scheibel UNIT_NME: Prairie Island Unit 2 PREPARER TELEPHONE: 651-267-6355 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 557 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 518.8 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,087.00 302,909.38 | |||
: 4. Number of Hours Generator On-line 744.00 5,087.00 300,879.48 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 310,744.00 2,559,813.00 152,588,923.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 2 was base loaded during July 2013. | Unit 2 was base loaded during July 2013. | ||
During July, Unit 2 was operated at 81%. This was an unplanned down power, due to increased vibration on the Turbine Generator. There was an unplanned foced loss of 83,378.8 MW-hr. | During July, Unit 2 was operated at 81%. This was an unplanned down power, due to increased vibration on the Turbine Generator. There was an unplanned foced loss of 83,378.8 MW-hr. | ||
: | OPERATING DATA REPORT DOCKET: 306 PREPARER NAME: Thomas Scheibel UNIT_NME: Prairie Island Unit 2 PREPARER TELEPHONE: 651-267-6355 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 557 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 518.8 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,831.00 303,653.38 | |||
: 4. Number of Hours Generator On-line 744.00 5,831.00 301,623.48 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 312,797.00 2,872,610.00 152,901,720.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 2 was base loaded during August 2013. | Unit 2 was base loaded during August 2013. | ||
During August, Unit 2 was operated at 81%. There was an unplanned forced down power, due to increased vibration on the Turbine Generator. There was a forced loss of 81,495.8 MW-hr. | During August, Unit 2 was operated at 81%. There was an unplanned forced down power, due to increased vibration on the Turbine Generator. | ||
There was a forced loss of 81,495.8 MW-hr. | |||
: | |||
OPERATING DATA REPORT DOCKET: 306 PREPARER NAME: Thomas Scheibel UNIT_NME: Prairie Island Unit 2 PREPARER TELEPHONE: 651-267-6355 RPT_PERIOD: 201309 | |||
: 1. Design Electrical Rating: 557 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 518.8 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 480.12 6,311.12 304,133.50 | |||
: 4. Number of Hours Generator On-line 480.02 6,311.02 302,103.50 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 197,102.00 3,069,712.00 153,098,822.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2R28 9/21/2013 S 239.98 C 1 Unit Shutdown impacting Prairie Island Unit 2 occurred this reporting period for commencement of 2R28 refueling outage. | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 2 was base loaded during September. | Unit 2 was base loaded during September. | ||
During September, Unit 2 was operated at 81% due to increased vibration on the Turbine Generator. There was an unplanned forced loss of 50,353.0 MW-hr. | During September, Unit 2 was operated at 81% due to increased vibration on the Turbine Generator. There was an unplanned forced loss of 50,353.0 MW-hr. | ||
On September 21st, Unit 2 was taken off line for Scheduled Refueling Outage, 2R28. This was a planned loss of 142,601.9 MW-hr. During this outage the turbine vibration problem will be repaired and also the replacement of #21 and #22 Steam Generators. | On September 21st, Unit 2 was taken off line for Scheduled Refueling Outage, 2R28. This was a planned loss of 142,601.9 MW-hr. During this outage the turbine vibration problem will be repaired and also the replacement of #21 and #22 Steam Generators. | ||
: | OPERATING DATA REPORT DOCKET: 254 PREPARER NAME: Jason M. Smith UNIT_NME: Quad Cities Unit 1 PREPARER TELEPHONE: (309) 227-2813 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 866 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 866 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,467.87 297,705.15 | |||
: 4. Number of Hours Generator On-line 744.00 4,399.78 291,797.46 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 1,655.20 | |||
: 6. Net Electrical energy Generated (MWHrs) 681,310.00 4,080,949.00 208,823,063.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
U1 July 2013 Unit 1 started the month at approximately full reactor power and remained at full power for the rest of the month. | U1 July 2013 Unit 1 started the month at approximately full reactor power and remained at full power for the rest of the month. | ||
: | OPERATING DATA REPORT DOCKET: 254 PREPARER NAME: Jason M. Smith UNIT_NME: Quad Cities Unit 1 PREPARER TELEPHONE: (309) 227-2813 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 866 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 866 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,211.87 298,449.15 | |||
: 4. Number of Hours Generator On-line 744.00 5,143.78 292,541.46 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 1,655.20 | |||
: 6. Net Electrical energy Generated (MWHrs) 683,257.00 4,764,206.00 209,506,320.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
U1 August 2013 Unit 1 started the month at approximately full reactor power and remained at full power for the rest of the month. | U1 August 2013 Unit 1 started the month at approximately full reactor power and remained at full power for the rest of the month. | ||
: | OPERATING DATA REPORT DOCKET: 254 PREPARER NAME: Jason M. Smith UNIT_NME: Quad Cities Unit 1 PREPARER TELEPHONE: 309 227-2813 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 866 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 866 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 5,931.87 299,169.15 | |||
: 4. Number of Hours Generator On-line 720.00 5,863.78 293,261.46 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 1,655.20 | |||
: 6. Net Electrical energy Generated (MWHrs) 663,096.00 5,427,302.00 210,169,416.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
U1 September 2013 Unit 1 started the month at approximately full reactor power and remained at full power for the rest of the month with the following exceptions.1. Short duration down power from 09/14/2013 to 09/15/2013 for planned Turbine Testing. 2. Short duration down power from 09/28/2013 to 09/29/2013 for planned Turbine Testing and CRD SCRAM Timing. | U1 September 2013 Unit 1 started the month at approximately full reactor power and remained at full power for the rest of the month with the following exceptions. | ||
: 1. Short duration down power from 09/14/2013 to 09/15/2013 for planned Turbine Testing. | |||
: | : 2. Short duration down power from 09/28/2013 to 09/29/2013 for planned Turbine Testing and CRD SCRAM Timing. | ||
: | OPERATING DATA REPORT DOCKET: 265 PREPARER NAME: Jason M. Smith UNIT_NME: Quad Cities Unit 2 PREPARER TELEPHONE: (309) 227-2813 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 957.3 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 888 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,061.87 290,552.57 | |||
: 4. Number of Hours Generator On-line 744.00 5,049.97 285,326.10 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 2,312.90 | |||
: 6. Net Electrical energy Generated (MWHrs) 677,795.00 4,671,270.00 211,459,708.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
U2 July 2013 Unit 2 started the month at approximately full reactor power and remained at full power for the rest of the month. | U2 July 2013 Unit 2 started the month at approximately full reactor power and remained at full power for the rest of the month. | ||
: | OPERATING DATA REPORT DOCKET: 265 PREPARER NAME: Jason M. Smith UNIT_NME: Quad Cities Unit 2 PREPARER TELEPHONE: (309) 227-2813 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 957.3 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 888 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,805.87 291,296.57 | |||
: 4. Number of Hours Generator On-line 744.00 5,793.97 286,070.10 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 2,312.90 | |||
: 6. Net Electrical energy Generated (MWHrs) 678,658.00 5,349,928.00 212,138,366.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
U2 August 2013 Unit 2 started the month at approximately full reactor power and remained at full power for the rest of the month with the following exceptions.1. Between 8/26/13 and continuing to the end of the month there was a 2 MWe unplanned energy loss due to a stuck open 2C2 Low Pressure Feedwater Heater Emergency Drain Valve - this resulted in a loss of 276 MWe-hr during August 2013. | U2 August 2013 Unit 2 started the month at approximately full reactor power and remained at full power for the rest of the month with the following exceptions. | ||
: 1. Between 8/26/13 and continuing to the end of the month there was a 2 MWe unplanned energy loss due to a stuck open 2C2 Low Pressure Feedwater Heater Emergency Drain Valve - this resulted in a loss of 276 MWe-hr during August 2013. | |||
: | |||
OPERATING DATA REPORT DOCKET: 265 PREPARER NAME: Jason M. Smith UNIT_NME: Quad Cities Unit 2 PREPARER TELEPHONE: 309 227-2813 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 957.3 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 888 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 720.00 6,525.87 292,016.57 | |||
: 4. Number of Hours Generator On-line 720.00 6,513.97 286,790.10 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 2,312.90 | |||
: 6. Net Electrical energy Generated (MWHrs) 641,947.00 5,991,875.00 212,780,313.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
U2 September 2013 Unit 2 started the month at approximately full reactor power and remained at full power for the rest of the month with the following exceptions:1. Ongoing small (approximate 2 MW) Unplanned power loss from the 2C2 Feed Water Heater - Emergency Level Control Valve (E-LCV) that failed open on 08/26/2013 and was repaired during the planned downpower on 09/7/2013.2. Short duration Planned down power from 09/07/2013 to 09/08/13 to refill the MSDTs and correct the failed 2C2 E-LCV. 3. Short duration Planned down power on 09/09/2013 for CRD Pattern adjustment.4. Short duration Planned down power on 09/21/2013 for CRD Pattern adjustment.5. An Emergent Short duration downpower on 9/26/2013 to 9/27/2013 due to a loss of Feedwater heaters caused by a blown fuse.6. An Emergent Short duration downpower on 9/28/2013 due to a failed RPIS indication on CRD G-13 that required that rod to be fully inserted. | U2 September 2013 Unit 2 started the month at approximately full reactor power and remained at full power for the rest of the month with the following exceptions: | ||
: 1. Ongoing small (approximate 2 MW) Unplanned power loss from the 2C2 Feed Water Heater - Emergency Level Control Valve (E-LCV) that failed open on 08/26/2013 and was repaired during the planned downpower on 09/7/2013. | |||
: | : 2. Short duration Planned down power from 09/07/2013 to 09/08/13 to refill the MSDTs and correct the failed 2C2 E-LCV. | ||
: 3. Short duration Planned down power on 09/09/2013 for CRD Pattern adjustment. | |||
: | : 4. Short duration Planned down power on 09/21/2013 for CRD Pattern adjustment. | ||
: 5. An Emergent Short duration downpower on 9/26/2013 to 9/27/2013 due to a loss of Feedwater heaters caused by a blown fuse. | |||
: 6. An Emergent Short duration downpower on 9/28/2013 due to a failed RPIS indication on CRD G-13 that required that rod to be fully inserted. | |||
OPERATING DATA REPORT DOCKET: 458 PREPARER NAME: Thomas J. Bolke UNIT_NME: River Bend Unit 1 PREPARER TELEPHONE: (225)381-3719 RPT_PERIOD: 201307 | |||
: 1. Design Electrical Rating: 967 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 967 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 4,284.89 204,720.87 | |||
: 4. Number of Hours Generator On-line 744.00 4,224.67 200,054.68 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 720,701.00 4,029,150.00 183,780,642.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 458 PREPARER NAME: Thomas J. Bolke UNIT_NME: River Bend Unit 1 PREPARER TELEPHONE: (225)381-3719 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 967 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 967 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,028.89 205,464.87 | ||
: 4. Number of Hours Generator On-line 744.00 4,968.67 200,798.68 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 719,180.00 4,748,330.00 184,499,822.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 458 PREPARER NAME: Thomas J. Bolke UNIT_NME: River Bend Unit 1 PREPARER TELEPHONE: (225)381-3719 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 967 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 967 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 720.00 5,748.89 206,184.87 | ||
: 4. Number of Hours Generator On-line 720.00 5,688.67 201,518.68 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 699,175.00 5,447,505.00 185,198,997.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 261 PREPARER NAME: Tim Surma UNIT_NME: Robinson Unit 2 PREPARER TELEPHONE: 843-857-1086 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 795 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 741 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,087.00 294,973.79 | ||
: 4. Number of Hours Generator On-line 744.00 5,087.00 291,304.49 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 23.20 | |||
: 6. Net Electrical energy Generated (MWHrs) 562,215.00 3,907,746.00 197,230,799.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 261 PREPARER NAME: Tim Surma UNIT_NME: Robinson Unit 2 PREPARER TELEPHONE: 843-857-1086 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 795 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 741 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,831.00 295,717.79 | ||
: 4. Number of Hours Generator On-line 744.00 5,831.00 292,048.49 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 23.20 | |||
: 6. Net Electrical energy Generated (MWHrs) 562,450.00 4,470,196.00 197,793,249.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 261 PREPARER NAME: Tim Surma UNIT_NME: Robinson Unit 2 PREPARER TELEPHONE: 843-857-1086 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 795 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 741 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 316.33 6,147.33 296,034.12 | ||
: 4. Number of Hours Generator On-line 316.18 6,147.18 292,364.67 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 23.20 | |||
: 6. Net Electrical energy Generated (MWHrs) 231,715.00 4,701,911.00 198,024,964.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 9/14/2013 S 403.82 C 1 | |||
==SUMMARY== | ==SUMMARY== | ||
Planned shutdown for scheduled refueling outage RO-28 on 9-14-13 at 0419 hours. | Planned shutdown for scheduled refueling outage RO-28 on 9-14-13 at 0419 hours. | ||
: | |||
OPERATING DATA REPORT DOCKET: 272 PREPARER NAME: Kevin Falciani UNIT_NME: Salem Unit 1 PREPARER TELEPHONE: 856-339-2017 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 1169 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1116 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 4,184.57 228,032.55 | |||
: 4. Number of Hours Generator On-line 744.00 4,063.70 222,394.60 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 860,476.00 4,757,181.00 237,200,139.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 272 PREPARER NAME: Kevin Falciani UNIT_NME: Salem Unit 1 PREPARER TELEPHONE: 856-339-2017 RPT_PERIOD: 201308 | |||
: 1. Design Electrical Rating: 1169 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1116 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 709.50 4,894.07 228,742.05 | |||
: 4. Number of Hours Generator On-line 698.83 4,762.53 223,093.43 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 794,389.00 5,551,570.00 237,994,528.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments S1F13 8/22/2013 F 45.17 A 1 Unit 1 shutdown due to 1PS1 Pressurizer Valve | |||
-01 Leak. ACE being tracked on order 70157547. | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 1 shutdown due to 1PS1 leak on Pressurizer Spray Valve. ACE has been assigned and is being tacked on order 70157547. | Unit 1 shutdown due to 1PS1 leak on Pressurizer Spray Valve. ACE has been assigned and is being tacked on order 70157547. | ||
OPERATING DATA REPORT DOCKET: 272 PREPARER NAME: Kevin Falciani UNIT_NME: Salem Unit 1 PREPARER TELEPHONE: 856-339-2017 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 1169 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1116 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 720.00 5,614.07 229,462.05 | ||
: 4. Number of Hours Generator On-line 720.00 5,482.53 223,813.43 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 944,559.00 6,496,129.00 238,939,087.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 311 PREPARER NAME: Kevin Falciani UNIT_NME: Salem Unit 2 PREPARER TELEPHONE: 856-339-2017 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 1181 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1134 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,087.00 205,731.90 | ||
: 4. Number of Hours Generator On-line 744.00 5,087.00 201,627.44 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 855,682.00 5,971,788.00 215,429,798.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 311 PREPARER NAME: Kevin Falciani UNIT_NME: Salem Unit 2 PREPARER TELEPHONE: 856-339-2017 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 1181 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1134 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,831.00 206,475.90 | ||
: 4. Number of Hours Generator On-line 744.00 5,831.00 202,371.44 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 863,356.00 6,835,144.00 216,293,154.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 311 PREPARER NAME: Kevin Falciani UNIT_NME: Salem Unit 2 PREPARER TELEPHONE: 856-339-2017 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 1181 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1134 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 720.00 6,551.00 207,195.90 | ||
: 4. Number of Hours Generator On-line 720.00 6,551.00 203,091.44 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 835,587.00 7,670,731.00 217,128,741.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 443 PREPARER NAME: Kevin Randall UNIT_NME: Seabrook Unit 1 PREPARER TELEPHONE: 603.773.7992 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 1248 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1246 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,087.00 180,024.98 | ||
: 4. Number of Hours Generator On-line 744.00 5,087.00 176,440.43 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 926,830.27 6,346,479.82 204,219,773.54 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit operated at 100% power 744 out of 744 hours this month. This yielded an availability factor of 100% and a capacity factor of 99.9791% based on the MDC of 1246 MWe. | The unit operated at 100% power 744 out of 744 hours this month. This yielded an availability factor of 100% and a capacity factor of 99.9791% | ||
based on the MDC of 1246 MWe. | |||
: | |||
OPERATING DATA REPORT DOCKET: 443 PREPARER NAME: Kevin Randall UNIT_NME: Seabrook Unit 1 PREPARER TELEPHONE: 603.773.7992 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 1248 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1246 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,831.00 180,768.98 | |||
: 4. Number of Hours Generator On-line 744.00 5,831.00 177,184.43 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 927,927.04 7,274,406.86 205,147,700.58 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit operated at 100% power 744 out of 744 hours this month. This yielded an availability factor of 100% and a capacity factor of 100.0974% based on the MDC of 1246 MWe. | The unit operated at 100% power 744 out of 744 hours this month. This yielded an availability factor of 100% and a capacity factor of 100.0974% | ||
based on the MDC of 1246 MWe. | |||
: | |||
OPERATING DATA REPORT DOCKET: 443 PREPARER NAME: Kevin Randall UNIT_NME: Seabrook Unit 1 PREPARER TELEPHONE: 603.773.7992 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 1248 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1246 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 720.00 6,551.00 181,488.98 | |||
: 4. Number of Hours Generator On-line 720.00 6,551.00 177,904.43 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 896,941.44 8,171,348.30 206,044,642.02 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit operated at 100% power 709 out of 720 hours this month. This yielded an availability factor of 100% and a capacity factor of 99.9801% based on the MDC of 1246 MWe. | The unit operated at 100% power 709 out of 720 hours this month. This yielded an availability factor of 100% and a capacity factor of 99.9801% | ||
based on the MDC of 1246 MWe. | |||
: | |||
OPERATING DATA REPORT DOCKET: 327 PREPARER NAME: Linda Williams UNIT_NME: Sequoyah Unit 1 PREPARER TELEPHONE: Linda Williams RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 1184.37 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,087.00 210,374.85 | |||
: 4. Number of Hours Generator On-line 744.00 5,087.00 207,973.89 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 844,719.00 5,864,997.00 231,136,300.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
U1 Gross Max Dependable Capacity Factor was 99.671 for the month of July | U1 Gross Max Dependable Capacity Factor was 99.671 for the month of July 2013. | ||
: | OPERATING DATA REPORT DOCKET: 327 PREPARER NAME: Linda Williams UNIT_NME: Sequoyah Unit 1 PREPARER TELEPHONE: Linda Williams RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1184.37 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,831.00 211,118.85 | |||
: 4. Number of Hours Generator On-line 744.00 5,831.00 208,717.89 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 839,540.00 6,704,537.00 231,975,840.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
U1 Gross Max Dependable Capacity Factor was 99.075 for the month of August | U1 Gross Max Dependable Capacity Factor was 99.075 for the month of August 2013. | ||
: | OPERATING DATA REPORT DOCKET: 327 PREPARER NAME: Linda Williams UNIT_NME: Sequoyah Unit 1 PREPARER TELEPHONE: 423-843-7048 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1184.37 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,551.00 211,838.85 | |||
: 4. Number of Hours Generator On-line 720.00 6,551.00 209,437.89 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 743,812.00 7,448,349.00 232,719,652.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
U1 Gross Max Dependable Capacity Factor was 91.059 for the month of September | U1 Gross Max Dependable Capacity Factor was 91.059 for the month of September 2013. | ||
: | OPERATING DATA REPORT DOCKET: 328 PREPARER NAME: Linda Williams UNIT_NME: Sequoyah Unit 2 PREPARER TELEPHONE: Linda Williams RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1177.46 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1139.5 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,983.34 213,983.45 | |||
: 4. Number of Hours Generator On-line 744.00 4,845.69 211,240.04 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 846,252.00 5,479,649.00 230,178,105.10 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
U2 Gross Max Dependable Capacity Factor was 101.549 for the month of July 2013. | U2 Gross Max Dependable Capacity Factor was 101.549 for the month of July 2013. | ||
: | OPERATING DATA REPORT DOCKET: 328 PREPARER NAME: Linda Williams UNIT_NME: Sequoyah Unit 2 PREPARER TELEPHONE: Linda Williams RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1177.46 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1139.5 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,727.34 214,727.45 | |||
: 4. Number of Hours Generator On-line 744.00 5,589.69 211,984.04 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 840,796.00 6,320,445.00 231,018,901.10 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
U2 Gross Max Dependable Capacity Factor was 101.951for the month of August 2013. | U2 Gross Max Dependable Capacity Factor was 101.951for the month of August 2013. | ||
: | OPERATING DATA REPORT DOCKET: 328 PREPARER NAME: Linda Williams UNIT_NME: Sequoyah Unit 2 PREPARER TELEPHONE: 423-843-7048 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1177.46 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1139.5 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,447.34 215,447.45 | |||
: 4. Number of Hours Generator On-line 720.00 6,309.69 212,704.04 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 813,432.00 7,133,877.00 231,832,333.10 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
U2 Gross Max Dependable Capacity Factor was 103.095 for | U2 Gross Max Dependable Capacity Factor was 103.095 for the month of September 2013. | ||
: | OPERATING DATA REPORT DOCKET: 498 PREPARER NAME: R.L. Hill UNIT_NME: South Texas Unit 1 PREPARER TELEPHONE: 361.972.7667 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1250.6 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1250.6 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,981.80 185,618.50 | |||
: 4. Number of Hours Generator On-line 744.00 4,952.50 181,064.21 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 987,688.00 6,657,788.00 228,041,469.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Normal operation. | Normal operation. | ||
: | OPERATING DATA REPORT DOCKET: 498 PREPARER NAME: R.L. Hill UNIT_NME: South Texas Unit 1 PREPARER TELEPHONE: 361.972.7667 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1250.6 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1250.6 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,725.80 186,362.50 | |||
: 4. Number of Hours Generator On-line 744.00 5,696.50 181,808.21 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 947,644.00 7,605,432.00 228,989,113.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Precautionary reactor power reduction to 81% on 8/3/13 to allow LP Turbine 13S Extraction Steam bellows rupture damage analysis. Unit returned to 100% on 8/5/13. Reactor power reduction to 86.5% on 8/27/13 due to engineering recommendation for LP Turbine 13S Extraction Steam bellows damage. | Precautionary reactor power reduction to 81% on 8/3/13 to allow LP Turbine 13S Extraction Steam bellows rupture damage analysis. Unit returned to 100% on 8/5/13. Reactor power reduction to 86.5% on 8/27/13 due to engineering recommendation for LP Turbine 13S Extraction Steam bellows damage. | ||
: | OPERATING DATA REPORT DOCKET: 498 PREPARER NAME: R. L. Hill UNIT_NME: South Texas Unit 1 PREPARER TELEPHONE: 361.972.7667 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1250.6 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1250.6 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,445.80 187,082.50 | |||
: 4. Number of Hours Generator On-line 720.00 6,416.50 182,528.21 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 953,755.00 8,559,187.00 229,942,868.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Reactor power reduction to 86.5 % beginning on 8/27/13 due to engineering recommendation for LP Turbine 13S Extraction Steam bellows damage. | Reactor power reduction to 86.5 % beginning on 8/27/13 due to engineering recommendation for LP Turbine 13S Extraction Steam bellows damage. | ||
: | OPERATING DATA REPORT DOCKET: 499 PREPARER NAME: R.L. Hill UNIT_NME: South Texas Unit 2 PREPARER TELEPHONE: 361.972.766 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1250.6 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1250.6 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 2,598.29 174,566.63 | |||
: 4. Number of Hours Generator On-line 744.00 2,509.95 172,007.38 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 987,248.00 3,329,284.00 216,085,820.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Scheduled turbine valve testing/ Unplanned control rod issues. | Scheduled turbine valve testing/ Unplanned control rod issues. | ||
: | OPERATING DATA REPORT DOCKET: 499 PREPARER NAME: R.L. Hill UNIT_NME: South Texas Unit 2 PREPARER TELEPHONE: 361.972.7667 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1250.6 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1250.6 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 3,342.29 175,310.63 | |||
: 4. Number of Hours Generator On-line 744.00 3,253.95 172,751.38 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 984,277.00 4,313,561.00 217,070,097.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Normal operation. | Normal operation. | ||
: | OPERATING DATA REPORT DOCKET: 499 PREPARER NAME: R.L. Hill UNIT_NME: South Texas Unit 2 PREPARER TELEPHONE: 361.972.7667 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1250.6 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1250.6 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 4,062.29 176,030.63 | |||
: 4. Number of Hours Generator On-line 720.00 3,973.95 173,471.38 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 953,755.00 5,267,316.00 218,023,852.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Scheduled reactor power reduction to 90% for turbine valve testing. | Scheduled reactor power reduction to 90% for turbine valve testing. | ||
: | OPERATING DATA REPORT DOCKET: 335 PREPARER NAME: K R Boller UNIT_NME: St. Lucie Unit 1 PREPARER TELEPHONE: 772 467-7465 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1062 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 981 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,626.58 266,702.21 | |||
: 4. Number of Hours Generator On-line 744.00 4,616.47 264,231.23 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 744,205.00 4,599,145.00 218,399,912.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
PSL 1 operated in mode 1 the entire report period. | PSL 1 operated in mode 1 the entire report period. | ||
: | OPERATING DATA REPORT DOCKET: 335 PREPARER NAME: K R Boller UNIT_NME: St. Lucie Unit 1 PREPARER TELEPHONE: 772 467-7465 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1062 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 981 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,370.58 267,446.21 | |||
: 4. Number of Hours Generator On-line 744.00 5,360.47 264,975.23 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 738,402.00 5,337,547.00 219,138,314.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
PSL 1 operated in mode 1 the entire report period. | PSL 1 operated in mode 1 the entire report period. | ||
: | OPERATING DATA REPORT DOCKET: 335 PREPARER NAME: K R Boller UNIT_NME: St. Lucie Unit 1 PREPARER TELEPHONE: 774 467-7465 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1062 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 981 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 696.02 6,066.60 268,142.23 | |||
: 4. Number of Hours Generator On-line 696.02 6,056.49 265,671.25 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 675,651.00 6,013,198.00 219,813,965.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 28 9/30/2013 S 23.98 C 1 PSL 1 manual shutdown for SL1-25 refueling and maintenance | |||
==SUMMARY== | ==SUMMARY== | ||
PSL 1 operated in mode 1 until 9/30/2013 at 00:01 when the unit was removed from service for scheduled refueling and maintenance. PSL 1 remained offline through the end of the report period. | PSL 1 operated in mode 1 until 9/30/2013 at 00:01 when the unit was removed from service for scheduled refueling and maintenance. PSL 1 remained offline through the end of the report period. | ||
: | |||
OPERATING DATA REPORT DOCKET: 389 PREPARER NAME: K R Boller UNIT_NME: St. Lucie Unit 2 PREPARER TELEPHONE: 772 467-7465 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 1074 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 987 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,030.52 226,352.60 | |||
: 4. Number of Hours Generator On-line 744.00 4,967.78 223,871.34 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 753,741.00 5,018,606.00 185,724,043.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
PSL 2 operated in mode 1 the entire report period. | PSL 2 operated in mode 1 the entire report period. | ||
: | OPERATING DATA REPORT DOCKET: 389 PREPARER NAME: K R Boller UNIT_NME: St. Lucie Unit 2 PREPARER TELEPHONE: 772 467-7465 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1074 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 987 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,774.52 227,096.60 | |||
: 4. Number of Hours Generator On-line 744.00 5,711.78 224,615.34 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 749,319.00 5,767,925.00 186,473,362.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
PSL 2 operated in mode 1 the entire report period. | PSL 2 operated in mode 1 the entire report period. | ||
: | OPERATING DATA REPORT DOCKET: 389 PREPARER NAME: K R Boller UNIT_NME: St. Lucie Unit 2 PREPARER TELEPHONE: 772 467-7465 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1074 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 987 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,494.52 227,816.60 | |||
: 4. Number of Hours Generator On-line 720.00 6,431.78 225,335.34 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 718,003.00 6,485,928.00 187,191,365.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
PSL 2 operated in mode 1 the entire report period. | PSL 2 operated in mode 1 the entire report period. | ||
: | OPERATING DATA REPORT DOCKET: 395 PREPARER NAME: Wesley R. Higgins UNIT_NME: Summer Unit 1 PREPARER TELEPHONE: 8033454042 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 972.7 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 966 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,846.00 223,081.25 | |||
: 4. Number of Hours Generator On-line 744.00 4,828.40 220,645.77 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 730,801.00 4,753,270.00 200,714,259.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The plant operated at full power during Juky 2013. | The plant operated at full power during Juky 2013. | ||
: | OPERATING DATA REPORT DOCKET: 395 PREPARER NAME: Wesley R. Higgins UNIT_NME: Summer Unit 1 PREPARER TELEPHONE: 8033454042 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 972.7 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 966 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,590.00 223,825.25 | |||
: 4. Number of Hours Generator On-line 744.00 5,572.40 221,389.77 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 730,321.00 5,483,591.00 201,444,580.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
There were no Unit Shutdowns during June 2013. A power reduction commenced at approximately 23:45 on the 28th in support of main turbine valve testing | There were no Unit Shutdowns during June 2013. A power reduction commenced at approximately 23:45 on the 28th in support of main turbine valve testing (PTP-102.001). Power was reduced to approximately 90%. The plant was returned to 100% power at approximately 23:02 on the 29th. | ||
: | OPERATING DATA REPORT DOCKET: 395 PREPARER NAME: Wesley R. Higgins UNIT_NME: Summer Unit 1 PREPARER TELEPHONE: 8033454042 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 972.7 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 966 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,310.00 224,545.25 | |||
: 4. Number of Hours Generator On-line 720.00 6,292.40 222,109.77 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 705,365.00 6,188,956.00 202,149,945.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
There were no Unit Shutdowns during September 2013. A power reduction commenced at approximately 22:30 on the 27th in support of main turbine valve testing (PTP-102.001). Power was reduced to approximately 90%. The plant was returned to 100% power at approximately 10:15 on the 28th. | There were no Unit Shutdowns during September 2013. A power reduction commenced at approximately 22:30 on the 27th in support of main turbine valve testing (PTP-102.001). Power was reduced to approximately 90%. The plant was returned to 100% power at approximately 10:15 on the 28th. | ||
: | OPERATING DATA REPORT DOCKET: 280 PREPARER NAME: Marlene Haskett UNIT_NME: Surry Unit 1 PREPARER TELEPHONE: 757-365-2146 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 874 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 838 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,087.00 279,910.04 | |||
: 4. Number of Hours Generator On-line 744.00 5,087.00 276,779.72 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 3,736.20 | |||
: 6. Net Electrical energy Generated (MWHrs) 625,818.38 4,393,115.11 212,290,885.07 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 280 PREPARER NAME: Marlene Haskett UNIT_NME: Surry Unit 1 PREPARER TELEPHONE: 757-365-2146 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 874 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 838 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,831.00 280,654.04 | ||
: 4. Number of Hours Generator On-line 744.00 5,831.00 277,523.72 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 3,736.20 | |||
: 6. Net Electrical energy Generated (MWHrs) 629,992.00 5,023,107.11 212,920,877.07 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 280 PREPARER NAME: Marlene Haskett UNIT_NME: Surry Unit 1 PREPARER TELEPHONE: 757-365-2146 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 874 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 838 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 720.00 6,551.00 281,374.04 | ||
: 4. Number of Hours Generator On-line 720.00 6,551.00 278,243.72 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 3,736.20 | |||
: 6. Net Electrical energy Generated (MWHrs) 612,564.69 5,635,671.80 213,533,441.76 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 281 PREPARER NAME: Marlene Haskett UNIT_NME: Surry Unit 2 PREPARER TELEPHONE: 757-365-2146 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 874 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 838 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,087.00 277,054.04 | ||
: 4. Number of Hours Generator On-line 744.00 5,087.00 274,305.15 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 627,488.24 4,393,876.82 210,700,644.77 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 281 PREPARER NAME: Marlene Haskett UNIT_NME: Surry Unit 2 PREPARER TELEPHONE: 757-365-2146 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 874 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 838 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,831.00 277,798.04 | ||
: 4. Number of Hours Generator On-line 744.00 5,831.00 275,049.15 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 632,023.03 5,025,899.85 211,332,667.80 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 281 PREPARER NAME: Marlene Haskett UNIT_NME: Surry Unit 2 PREPARER TELEPHONE: 757-365-2146 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 874 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 838 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 720.00 6,551.00 278,518.04 | ||
: 4. Number of Hours Generator On-line 720.00 6,551.00 275,769.15 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 613,258.26 5,639,158.11 211,945,926.07 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
OPERATING DATA REPORT DOCKET: 387 PREPARER NAME: J. Hennings UNIT_NME: Susquehanna Unit 1 PREPARER TELEPHONE: 570-542-3747 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 1287 | ||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1257 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,394.30 224,734.76 | |||
: 4. Number of Hours Generator On-line 722.68 4,187.42 221,535.98 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 841,199.00 5,240,133.00 238,562,989.70 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments U1 7/21/2013 S 21.32 B 5 07/21/13 01:51 Tripped Unit 1 Main Turbine for 2013- Turbine Control valve EHC Maintenance. The reactor was maintained at approximately 15% | |||
power. 07/21/13 23:10 performed Auto Synchronization and loading of Main Generator. | |||
Note: The shutdown was planned less than 10 days in advanced, but more than 72 hrs in advance. This is not a Forced Loss Event because this shutdown plan was implemented to address the initial condition associated with the cause for the FLE reduction of 23% on 7/16/13. | |||
==SUMMARY== | ==SUMMARY== | ||
There was one power reduction greater than 20%. The Unplanned Power reduction was initiated on 7/16/13. The reduction from 96%to 74% power was required to reduce Turbine vibration experienced due to Turbine Control Valve position. The Turbine was taken off-line on July 21, after reducing power to 15%, to perform maintenance on the Turbine Control Valve servo valve that caused the intial reduction to 74%. The Reactor was maintained at approximately 15% power while the Turbine was off line. The Generator was put on line on 7/21/13, and the Reactor returned to full power on 7/24/13. There were no other power reductions greater than 20% this month. | There was one power reduction greater than 20%. The Unplanned Power reduction was initiated on 7/16/13. The reduction from 96%to 74% | ||
power was required to reduce Turbine vibration experienced due to Turbine Control Valve position. The Turbine was taken off-line on July 21, after reducing power to 15%, to perform maintenance on the Turbine Control Valve servo valve that caused the intial reduction to 74%. The Reactor was maintained at approximately 15% power while the Turbine was off line. The Generator was put on line on 7/21/13, and the Reactor returned to full power on 7/24/13. There were no other power reductions greater than 20% this month. | |||
OPERATING DATA REPORT DOCKET: 387 PREPARER NAME: J. Hennings UNIT_NME: Susquehanna Unit 1 PREPARER TELEPHONE: 570-542-3747 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 1287 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1257 This Month Yr-to-Date Cumulative | |||
: | : 3. Number of Hours the Reactor was Critical 744.00 5,138.30 225,478.76 | ||
: 4. Number of Hours Generator On-line 744.00 4,931.42 222,279.98 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 933,837.00 6,173,970.00 239,496,826.70 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
There was one unplanned power reduction of greater than 20% in August. On 8/27/13 a Reactor Feed Pump tripped, resulting in a Reactor power reduction to 65%. On 08/28/13 power was increased to 100%. (This is considered an Unplanned Power Change for NRC Performance Indicators, and a Forced Loss Event for INPO). | There was one unplanned power reduction of greater than 20% in August. On 8/27/13 a Reactor Feed Pump tripped, resulting in a Reactor power reduction to 65%. On 08/28/13 power was increased to 100%. (This is considered an Unplanned Power Change for NRC Performance Indicators, and a Forced Loss Event for INPO). | ||
: | OPERATING DATA REPORT DOCKET: 387 PREPARER NAME: J. Hennings UNIT_NME: Susquehanna Unit 1 PREPARER TELEPHONE: 570-542-3747 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1287 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1257 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 5,858.30 226,198.76 | |||
: 4. Number of Hours Generator On-line 720.00 5,651.42 222,999.98 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 905,554.00 7,079,524.00 240,402,380.70 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
On 09/12/13 a power reduction from 100% was performed for a planned control rod sequence exchange. The lowest power was | On 09/12/13 a power reduction from 100% was performed for a planned control rod sequence exchange. The lowest power was 65%. On 09/13/13, power was returned to full power. There were no other power reductions greater than 20 % in September. | ||
: | OPERATING DATA REPORT DOCKET: 388 PREPARER NAME: J. Hennings UNIT_NME: Susquehanna Unit 2 PREPARER TELEPHONE: 570-542-3747 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1287 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1257 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 3,996.33 220,543.15 | |||
: 4. Number of Hours Generator On-line 744.00 3,819.42 217,754.02 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 904,422.00 4,750,426.00 237,072,345.30 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
There were Two power reductions greater than 20% power this month. Both were in support of Transmission/Distribution Grid related maintnence: On 07/06/13, reduced power from 99.8% to approximately 65% due to the loss of a 500KV line on the Distribution Grid. Returned to 100% on 07/08/13. | There were Two power reductions greater than 20% power this month. Both were in support of Transmission/Distribution Grid related maintnence: | ||
On 07/27/13 began a scheduled power reduction from 100%, for the support of | On 07/06/13, reduced power from 99.8% to approximately 65% due to the loss of a 500KV line on the Distribution Grid. Returned to 100% on 07/08/13. | ||
On 07/27/13 began a scheduled power reduction from 100%, for the support of Electric Utilities work on a 500KV Transmission line. Lowest power level was 63%. Returned to 99.9% power on 07/28/13. | |||
: | |||
OPERATING DATA REPORT DOCKET: 388 PREPARER NAME: J. Hennings UNIT_NME: Susquehanna Unit 2 PREPARER TELEPHONE: 570-542-3747 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 1287 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1257 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 4,740.33 221,287.15 | |||
: 4. Number of Hours Generator On-line 744.00 4,563.42 218,498.02 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 939,578.00 5,690,004.00 238,011,923.30 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
There were no power reductions greater than 20% in the month of August. | There were no power reductions greater than 20% in the month of August. | ||
: | OPERATING DATA REPORT DOCKET: 388 PREPARER NAME: J. Hennings UNIT_NME: Susquehanna Unit 2 PREPARER TELEPHONE: 570-542-3747 RPT_PERIOD: 201309 | ||
: | : 1. Design Electrical Rating: 1287 | ||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1257 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 508.58 5,248.91 221,795.73 | |||
: 4. Number of Hours Generator On-line 483.52 5,046.94 218,981.54 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 556,871.00 6,246,875.00 238,568,794.30 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments U2 9/14/2013 S 236.48 B 2 Began power reduction at 09/13/13 22:00, from 2013- 100% to shut down for scheduled repair of (RBCCW) leakage into the Drywell and replacement of Turbine blades. | |||
Breaker opened: 09/14/13 02:48. | |||
Breaker closed: 09/23/13 23:17 Return to full power: 09/27/13 07:47 | |||
==SUMMARY== | ==SUMMARY== | ||
The one power reduction greater than 20% in the month of September, was for a planned Control Rod Sequence Exchange. On 09/06/13, the power reduction began from 100%. Reactor Power reached as low as 53.7% and was returned to 99.8% power on 9/8/13.There was one Unit shutdown in September, but there are 2 Reactor Shutdown entries impacting this occurrence, to accurately account for criticality time periods. The power reduction for scheduled shutdown to correct cooling water leaking into the Drywell, and for Main Turbine blade replacements, began at 09/13/13 22:00 from 100%. | The one power reduction greater than 20% in the month of September, was for a planned Control Rod Sequence Exchange. On 09/06/13, the power reduction began from 100%. Reactor Power reached as low as 53.7% and was returned to 99.8% power on 9/8/13. | ||
The Generator Breaker was opened 09/14/13 02:48 when the Reactor was at 15.5%. The Reactor was taken Sub-Critical by means of an Unplanned Manual Scram from 14% power at 09/14/13 03:30.Following the completion of the scheduled maintenance, during reactor startup. the Reactor was declared Critical at 09/22/13 22:02. Then, progressing through reactor start-up activities (re-ranging of IRM's), the Reactor was declared sub-critical at 09/22/13 23:13 (all rods not in, but | There was one Unit shutdown in September, but there are 2 Reactor Shutdown entries impacting this occurrence, to accurately account for criticality time periods. The power reduction for scheduled shutdown to correct cooling water leaking into the Drywell, and for Main Turbine blade replacements, began at 09/13/13 22:00 from 100%. | ||
The Generator Breaker was opened 09/14/13 02:48 when the Reactor was at 15.5%. The Reactor was taken Sub-Critical by means of an Unplanned Manual Scram from 14% power at 09/14/13 03:30. | |||
Following the completion of the scheduled maintenance, during reactor startup. the Reactor was declared Critical at 09/22/13 22:02. Then, progressing through reactor start-up activities (re-ranging of IRM's), the Reactor was declared sub-critical at 09/22/13 23:13 (all rods not in, but also not critical during Reactor start-up). The Reactor was then declared critical at 09/23/13 00:06, and ramp-up activities continued. The generator was put on line 9/23/13 23:17. Full power was achieved at 09/27/13 07:47. | |||
: | |||
OPERATING DATA REPORT DOCKET: 289 PREPARER NAME: Mark Fauber UNIT_NME: Three Mile Island Unit 1 PREPARER TELEPHONE: (717) 948-8787 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 819 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 802 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,087.00 254,203.85 | |||
: 4. Number of Hours Generator On-line 744.00 5,087.00 252,395.17 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 610,260.00 4,263,545.00 209,296,725.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit operated at nominal full power for the entire month of July. | The unit operated at nominal full power for the entire month of July. | ||
: | OPERATING DATA REPORT DOCKET: 289 PREPARER NAME: Mark Fauber UNIT_NME: Three Mile Island Unit 1 PREPARER TELEPHONE: (717) 948-8787 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 819 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 802 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,831.00 254,947.85 | |||
: 4. Number of Hours Generator On-line 744.00 5,831.00 253,139.17 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 614,906.00 4,878,451.00 209,911,631.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit operated at nominal full power for the entire month of August. | The unit operated at nominal full power for the entire month of August. | ||
: | OPERATING DATA REPORT DOCKET: 289 PREPARER NAME: Mark Fauber UNIT_NME: Three Mile Island Unit 1 PREPARER TELEPHONE: (717) 948-8787 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 819 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 802 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,551.00 255,667.85 | |||
: 4. Number of Hours Generator On-line 720.00 6,551.00 253,859.17 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 599,698.00 5,478,149.00 210,511,329.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit operated at nominal full power for the entire month of Septbember, with the exception of the period between 22:00 on 9/7/13 to 03:33 on 9/8/13, when a planned power reduction to approximately 89% power was completed. | The unit operated at nominal full power for the entire month of Septbember, with the exception of the period between 22:00 on 9/7/13 to 03:33 on 9/8/13, when a planned power reduction to approximately 89% power was completed. | ||
: | OPERATING DATA REPORT DOCKET: 250 PREPARER NAME: Colleen Phillips UNIT_NME: Turkey Point Unit 3 PREPARER TELEPHONE: 305-246-7106 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 720 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 693 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,371.26 274,527.90 | |||
: 4. Number of Hours Generator On-line 0.00 3,528.46 270,291.70 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 121.80 | |||
: 6. Net Electrical energy Generated (MWHrs) 601,876.30 3,279,364.25 179,967,464.81 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 3 was approximately 100% for the month. | Unit 3 was approximately 100% for the month. | ||
: | OPERATING DATA REPORT DOCKET: 250 PREPARER NAME: Colleen Phillips UNIT_NME: Turkey Point Unit 3 PREPARER TELEPHONE: 305-246-7106 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 720 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 693 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,115.26 275,271.90 | |||
: 4. Number of Hours Generator On-line 0.00 3,528.46 270,291.70 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 121.80 | |||
: 6. Net Electrical energy Generated (MWHrs) 597,500.50 3,876,864.75 180,564,965.31 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 3 was at approximately 100% for the month. | Unit 3 was at approximately 100% for the month. | ||
: | OPERATING DATA REPORT DOCKET: 250 PREPARER NAME: Colleen Phillips UNIT_NME: Turkey Point Unit 3 PREPARER TELEPHONE: 305-246-7106 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 720 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 693 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 5,835.26 275,991.90 | |||
: 4. Number of Hours Generator On-line 0.00 3,528.46 270,291.70 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 121.80 | |||
: 6. Net Electrical energy Generated (MWHrs) 577,747.62 4,454,612.37 181,142,712.93 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 3 was at approximately 100% power. | Unit 3 was at approximately 100% power. | ||
: | OPERATING DATA REPORT DOCKET: 251 PREPARER NAME: Colleen Phillips UNIT_NME: Turkey Point Unit 4 PREPARER TELEPHONE: 305-246-7106 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 720 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 693 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 2,763.08 272,065.23 | |||
: 4. Number of Hours Generator On-line 744.00 2,483.30 266,828.80 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 577.20 | |||
: 6. Net Electrical energy Generated (MWHrs) 609,626.23 1,666,814.45 178,915,449.26 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 4 was at approximately 100% for the month. | Unit 4 was at approximately 100% for the month. | ||
: | OPERATING DATA REPORT DOCKET: 251 PREPARER NAME: Colleen Phillips UNIT_NME: Turkey Point Unit 4 PREPARER TELEPHONE: 305-246-7106 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 720 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 693 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 3,507.08 272,809.23 | |||
: 4. Number of Hours Generator On-line 744.00 3,227.30 267,572.80 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 577.20 | |||
: 6. Net Electrical energy Generated (MWHrs) 605,877.39 2,272,691.84 179,521,326.65 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 4 was approximately 100% for the month. | Unit 4 was approximately 100% for the month. | ||
: | OPERATING DATA REPORT DOCKET: 251 PREPARER NAME: Colleen Phillips UNIT_NME: Turkey Point Unit 4 PREPARER TELEPHONE: 305-246-7106 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 720 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 693 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 4,227.08 273,529.23 | |||
: 4. Number of Hours Generator On-line 720.00 3,947.30 268,292.80 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 577.20 | |||
: 6. Net Electrical energy Generated (MWHrs) 585,886.05 2,858,577.89 180,107,212.70 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 4 was at approximately 100% for the month. | Unit 4 was at approximately 100% for the month. | ||
: | OPERATING DATA REPORT DOCKET: 271 PREPARER NAME: Anthony L. Stevens UNIT_NME: Vermont Yankee Unit 1 PREPARER TELEPHONE: (802) 451-3176 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 617 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 605 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,468.69 311,079.06 | |||
: 4. Number of Hours Generator On-line 744.00 4,449.65 307,167.81 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 446,584.00 2,648,399.00 156,051,746.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Dates | Dates Activity MW-hr S/F 07/02-07/03 CW System Chlorination 474 S 07/05-07/06 CW System Chlorination 382 S 07/07-07/09 Rod Sequence Exchange 4828 S 07/09 CW System Chlorination 132 S 07/09-07/10 2nd Pass Rod Pattern Adjustment 221 S 07/10-07/11 3rd Pass Rod Pattern Adjustment 106 S 07/12-07/13 CW System Chlorination 122 S 07/17 CW System Chlorination 348 S 07/21 CW System Chlorination 291 S 07/28 CW System Chlorination 24 S Total All Losses (Scheduled and Forced) = 6928 MW-hr | ||
: | |||
OPERATING DATA REPORT DOCKET: 271 PREPARER NAME: Anthony L. Stevens UNIT_NME: Vermont Yankee Unit 1 PREPARER TELEPHONE: (802) 451-3176 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 617 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 605 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,212.69 311,823.06 | |||
: 4. Number of Hours Generator On-line 744.00 5,193.65 307,911.81 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 446,712.00 3,095,111.00 156,498,458.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Dates | Dates Activity MW-hr S/F 08/02-08/03 CW System Chlorination 146 S 08/08-08/09 CW System Chlorination 522 S 08/13-08/14 CW System Chlorination 123 S 08/20-08/21 CW System Chlorination 145 S 08/26 Delta V Power Supply Failure 61 F 08/27-08/28 CW System Chlorination 307 S 08/30-08/31 CW System Chlorination 273 S Total All Losses (Scheduled and Forced) = 1577 MW-hr | ||
: | |||
OPERATING DATA REPORT DOCKET: 271 PREPARER NAME: Anthony L. Stevens UNIT_NME: Vermont Yankee Unit 1 PREPARER TELEPHONE: (802) 451-3176 RPT_PERIOD: 201309 | |||
: | : 1. Design Electrical Rating: 617 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 605 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 720.00 5,932.69 312,543.06 | |||
: 4. Number of Hours Generator On-line 720.00 5,913.65 308,631.81 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 398,447.00 3,493,558.00 156,896,905.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Dates | Dates Activity MW-hr S/F 09/10-09/11 CW System Chlorination 283 S 09/23-09/30 B Recirc MG Set Repair (Oil Leak) & Assoc. Passes 33666 F < 10 days 09/26 Rod Sequence Exch. 767 S 09/26 Single Rod Scram Testing 1582 S 09/26 Quarterly MSIV Testing 897 S 09/26 Quarterly Turbine Valve Testing 2200 S Total All Losses (Scheduled and Forced) = 39395 MW-hr | ||
: | |||
OPERATING DATA REPORT DOCKET: 424 PREPARER NAME: Doug Holt UNIT_NME: Vogtle Unit 1 PREPARER TELEPHONE: 706-826-3467 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 1169 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1150 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,087.00 209,224.49 | |||
: 4. Number of Hours Generator On-line 744.00 5,087.00 207,134.62 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 854,187.00 5,944,250.00 235,321,123.50 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Through July 1 at approximately 00:15, Unit 1 was at maximum operating power with no significant operating problems. On July 1 at approximately 00:15, Unit 1 began a planned derate to approximately 98% reactor power for turbine control valve testing. On July 1 at approximately 06:40, the Unit 1 reactor had returned to maximum operating power and remained there for the rest of the month. | Through July 1 at approximately 00:15, Unit 1 was at maximum operating power with no significant operating problems. On July 1 at approximately 00:15, Unit 1 began a planned derate to approximately 98% reactor power for turbine control valve testing. On July 1 at approximately 06:40, the Unit 1 reactor had returned to maximum operating power and remained there for the rest of the month. | ||
: | OPERATING DATA REPORT DOCKET: 424 PREPARER NAME: Doug Holt UNIT_NME: Vogtle Unit 1 PREPARER TELEPHONE: 706-826-3467 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1169 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1150 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,831.00 209,968.49 | |||
: 4. Number of Hours Generator On-line 744.00 5,831.00 207,878.62 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 856,700.00 6,800,950.00 236,177,823.50 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 1 was at maximum operating power during the month of August. | Unit 1 was at maximum operating power during the month of August. | ||
: | OPERATING DATA REPORT DOCKET: 424 PREPARER NAME: Doug Holt UNIT_NME: Vogtle Unit 1 PREPARER TELEPHONE: 706-826-3467 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1169 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1150 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,551.00 210,688.49 | |||
: 4. Number of Hours Generator On-line 720.00 6,551.00 208,598.62 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 832,984.00 7,633,934.00 237,010,807.50 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Through September 29 at approximately 02:10, Unit 1 was at maximum operating power with no significant operating problems. On September 29 at approximately 02:10, Unit 1 began a planned derate to approximately 98% reactor power for turbine control valve testing. On September 29 at approximately 05:30, the Unit 1 reactor had returned to maximum operating power and remained there for the rest of the month. | Through September 29 at approximately 02:10, Unit 1 was at maximum operating power with no significant operating problems. On September 29 at approximately 02:10, Unit 1 began a planned derate to approximately 98% reactor power for turbine control valve testing. On September 29 at approximately 05:30, the Unit 1 reactor had returned to maximum operating power and remained there for the rest of the month. | ||
: | OPERATING DATA REPORT DOCKET: 425 PREPARER NAME: Doug Holt UNIT_NME: Vogtle Unit 2 PREPARER TELEPHONE: 706-826-3467 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1169 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,342.53 193,828.63 | |||
: 4. Number of Hours Generator On-line 744.00 4,279.80 192,478.97 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 865,534.00 4,907,076.00 219,334,749.50 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 2 was at maximum operating power during the month of July. | Unit 2 was at maximum operating power during the month of July. | ||
: | OPERATING DATA REPORT DOCKET: 425 PREPARER NAME: Doug Holt UNIT_NME: Vogtle Unit 2 PREPARER TELEPHONE: 706-826-3467 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1169 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,086.53 194,572.63 | |||
: 4. Number of Hours Generator On-line 744.00 5,023.80 193,222.97 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 866,037.00 5,773,113.00 220,200,786.50 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unit 2 was at maximum operating power during the month of August. | Unit 2 was at maximum operating power during the month of August. | ||
: | OPERATING DATA REPORT DOCKET: 425 PREPARER NAME: Doug Holt UNIT_NME: Vogtle Unit 2 PREPARER TELEPHONE: 706-826-3467 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1169 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 5,806.53 195,292.63 | |||
: 4. Number of Hours Generator On-line 720.00 5,743.80 193,942.97 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 841,624.00 6,614,737.00 221,042,410.50 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Through September 7 at approximately 22:28, Unit 2 was at maximum operating power with no significant operating problems. On September 7 at approximately 22:28, Unit 2 began a planned derate to approximately 98% reactor power for turbine control valve testing. On September 8 at approximately 02:41, the Unit 2 reactor had returned to maximum operating power and remained there for the rest of the month. | Through September 7 at approximately 22:28, Unit 2 was at maximum operating power with no significant operating problems. On September 7 at approximately 22:28, Unit 2 began a planned derate to approximately 98% reactor power for turbine control valve testing. On September 8 at approximately 02:41, the Unit 2 reactor had returned to maximum operating power and remained there for the rest of the month. | ||
: | OPERATING DATA REPORT DOCKET: 382 PREPARER NAME: Jim Pollock UNIT_NME: Waterford Unit 3 PREPARER TELEPHONE: (504) 739-6561 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1173 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,538.95 213,980.15 | |||
: 4. Number of Hours Generator On-line 744.00 4,502.46 212,316.66 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 861,067.00 5,130,234.00 233,079,566.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit operated at an average reactor power level of 99.6% and experienced no shutdowns or significant power reductions during the period. | The unit operated at an average reactor power level of 99.6% and experienced no shutdowns or significant power reductions during the period. | ||
: | OPERATING DATA REPORT DOCKET: 382 PREPARER NAME: Jim Pollock UNIT_NME: Waterford Unit 3 PREPARER TELEPHONE: (504) 739-6561 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1173 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,282.95 214,724.15 | |||
: 4. Number of Hours Generator On-line 744.00 5,246.46 213,060.66 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 855,027.00 5,985,261.00 233,934,593.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit operated at an average reactor power level of 99.9% and experienced no shutdowns or significant power reductions during the period. | The unit operated at an average reactor power level of 99.9% and experienced no shutdowns or significant power reductions during the period. | ||
: | OPERATING DATA REPORT DOCKET: 382 PREPARER NAME: JIm Pollock UNIT_NME: Waterford Unit 3 PREPARER TELEPHONE: (504) 739-6561 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1173 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,002.95 215,444.15 | |||
: 4. Number of Hours Generator On-line 720.00 5,966.46 213,780.66 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 819,910.00 6,805,171.00 234,754,503.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit operated at an average reactor power level of 99.7% and experienced no shutdowns or significant power reductions during the period. | The unit operated at an average reactor power level of 99.7% and experienced no shutdowns or significant power reductions during the period. | ||
: | OPERATING DATA REPORT DOCKET: 390 PREPARER NAME: Tiffany Bridges UNIT_NME: Watts Bar Unit 1 PREPARER TELEPHONE: 423-365-1434 RPT_PERIOD: 201307 | ||
: 1. Design Electrical Rating: 1160 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1123 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 5,047.00 136,364.07 | |||
: 4. Number of Hours Generator On-line 744.00 5,036.35 135,664.98 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 833,711.00 5,764,198.00 152,035,645.08 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Grid related energy loss due to Auto Tripfrom a 1A Mainbank Transformer Mismatch that was Energy Deliverys equipment.Unplanned Losses are due to manageable losses. | Grid related energy loss due to Auto Tripfrom a 1A Mainbank Transformer Mismatch that was Energy Deliverys equipment. | ||
Unplanned Losses are due to manageable losses. | |||
: | |||
OPERATING DATA REPORT DOCKET: 390 PREPARER NAME: Tiffany Bridges UNIT_NME: Watts Bar Unit 1 PREPARER TELEPHONE: 423-365-1434 RPT_PERIOD: 201308 | |||
: | : 1. Design Electrical Rating: 1160 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1123 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 5,791.00 137,108.07 | |||
: 4. Number of Hours Generator On-line 744.00 5,780.35 136,408.98 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 837,231.00 6,601,429.00 152,872,876.08 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unplanned Losses are Manageable Losses. | Unplanned Losses are Manageable Losses. | ||
: | OPERATING DATA REPORT DOCKET: 390 PREPARER NAME: Tiffany Bridges UNIT_NME: Watts Bar Unit 1 PREPARER TELEPHONE: 423-365-1434 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1160 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1123 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 720.00 6,511.00 137,828.07 | |||
: 4. Number of Hours Generator On-line 720.00 6,500.35 137,128.98 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 6. Net Electrical energy Generated (MWHrs) 813,145.00 7,414,574.00 153,686,021.08 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
Unplanned Losses are Manageable Losses | Unplanned Losses are Manageable Losses | ||
: | |||
OPERATING DATA REPORT DOCKET: 482 PREPARER NAME: W M Muilenburg UNIT_NME: Wolf Creek Unit 1 PREPARER TELEPHONE: 620 364-8831 RPT_PERIOD: 201307 | |||
: | : 1. Design Electrical Rating: 1200 | ||
: 2. Maximum Dependable Capacity (MWe-Net) 1164 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 744.00 3,309.08 210,656.06 | |||
: 4. Number of Hours Generator On-line 744.00 3,218.67 208,963.65 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 339.80 | |||
: 6. Net Electrical energy Generated (MWHrs) 882,785.00 3,638,273.00 239,769,240.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit operated in Mode 1, at or near 100% power, from July 1, 2013 through July 31, 2013. | The unit operated in Mode 1, at or near 100% power, from July 1, 2013 through July 31, 2013. | ||
: | OPERATING DATA REPORT DOCKET: 482 PREPARER NAME: W M Muilenburg UNIT_NME: Wolf Creek Unit 1 PREPARER TELEPHONE: 620 364-8831 RPT_PERIOD: 201308 | ||
: 1. Design Electrical Rating: 1200 | |||
: | : 2. Maximum Dependable Capacity (MWe-Net) 1164 This Month Yr-to-Date Cumulative | ||
: 3. Number of Hours the Reactor was Critical 744.00 4,053.08 211,400.06 | |||
: 4. Number of Hours Generator On-line 744.00 3,962.67 209,707.65 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 339.80 | |||
: 6. Net Electrical energy Generated (MWHrs) 883,930.00 4,522,203.00 240,653,170.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
The unit operating in Mode 1, at or near 100% power, from August 1, 2013 through August 31, 2013. | The unit operating in Mode 1, at or near 100% power, from August 1, 2013 through August 31, 2013. | ||
: | OPERATING DATA REPORT DOCKET: 482 PREPARER NAME: W M Muilenburg UNIT_NME: Wolf Creek Unit 1 PREPARER TELEPHONE: 620 364-8831 RPT_PERIOD: 201309 | ||
: 1. Design Electrical Rating: 1200 | |||
: 2. Maximum Dependable Capacity (MWe-Net) 1164 This Month Yr-to-Date Cumulative | |||
: 3. Number of Hours the Reactor was Critical 298.57 4,351.65 211,698.63 | |||
: 4. Number of Hours Generator On-line 270.58 4,233.25 209,978.23 | |||
: 5. Reserve Shutdown Hours 0.00 0.00 339.80 | |||
: 6. Net Electrical energy Generated (MWHrs) 292,148.00 4,814,351.00 240,945,318.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 13-3 9/11/2013 F 449.42 D 1 SGK05A Train A, class 1E air conditioning unit not capable of performing its cooling function. | |||
==SUMMARY== | ==SUMMARY== | ||
The unit operating in Mode 1, at or near 100% power, from September 1, 2013 through September 11, 2013, when the unit was shutdown (Tech. Spec. 3.0.3) due to declaring SGK05A, Class 1E A/C unit nonfunctional. This resulted in Technical Specification equipment being declared inoperable. Replaced the A/C unit compresser and returned the unit to power on September 29, 2013. The unit continued to operate in Mode 1 at or near 100% power through September 30, 2013 | The unit operating in Mode 1, at or near 100% power, from September 1, 2013 through September 11, 2013, when the unit was shutdown (Tech. | ||
Spec. 3.0.3) due to declaring SGK05A, Class 1E A/C unit nonfunctional. This resulted in Technical Specification equipment being declared inoperable. Replaced the A/C unit compresser and returned the unit to power on September 29, 2013. The unit continued to operate in Mode 1 at or near 100% power through September 30, 2013.}} |
Latest revision as of 12:15, 4 November 2019
ML13295A670 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 03/24/2013 |
From: | Coffman S Entergy Operations |
To: | Office of Nuclear Reactor Regulation |
References | |
Download: ML13295A670 (300) | |
Text
OPERATING DATA REPORT DOCKET: 313 PREPARER NAME: Steven L. Coffman UNIT_NME: ANO Unit 1 PREPARER TELEPHONE: 479-858-5560 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 850
- 2. Maximum Dependable Capacity (MWe-Net) 836 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 0.00 1,975.00 275,328.17
- 4. Number of Hours Generator On-line 0.00 1,975.00 272,194.08
- 5. Reserve Shutdown Hours 0.00 0.00 817.50
- 6. Net Electrical energy Generated (MWHrs) 0.00 1,631,945.00 215,063,615.24 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2013- 3/24/2013 S 744.00 C 4 1R24 Refueling Outage 01
SUMMARY
ANO-1 remained shutdown for the entire month of July, continuing the 1R24 Refueling Outage.
OPERATING DATA REPORT DOCKET: 313 PREPARER NAME: Steven L. Coffman UNIT_NME: ANO Unit 1 PREPARER TELEPHONE: 479-858-5560 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 850
- 2. Maximum Dependable Capacity (MWe-Net) 836 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 568.58 2,543.58 275,896.75
- 4. Number of Hours Generator On-line 511.15 2,486.15 272,705.23
- 5. Reserve Shutdown Hours 0.00 0.00 817.50
- 6. Net Electrical energy Generated (MWHrs) 378,889.00 2,010,834.00 215,442,504.24 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2013- 8/14/2013 F 66.13 F 1 Required shutdown due to steam generator 02 feedwater chemistry action level exceeded.
2013- 3/24/2013 S 166.72 C 4 1R24 Refueling Outage 01
SUMMARY
ANO-1 began the month in a continued shutdown for the 1R24 Refueling Outage. On 08/07/2013, the Unit was reconnected to the grid and commenced post-1R24 power escalation and testing. On 08/14/2013, the Unit was manually taken off line due exceeding steam generator feedwater chemistry action levels, and was reconnected to the grid on 08/17/2013. The Unit achieved full power on 08/19/2013, and operated at, or near full power for the remainder of the month.
OPERATING DATA REPORT DOCKET: 313 PREPARER NAME: Steven L. Coffman UNIT_NME: ANO Unit 1 PREPARER TELEPHONE: 479-858-5560 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 850
- 2. Maximum Dependable Capacity (MWe-Net) 836 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 3,263.58 276,616.75
- 4. Number of Hours Generator On-line 720.00 3,206.15 273,425.23
- 5. Reserve Shutdown Hours 0.00 0.00 817.50
- 6. Net Electrical energy Generated (MWHrs) 579,549.00 2,590,383.00 216,022,053.24 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
ANO-1 began the month at, or near full power. On 09/27/2013, power was decreased to approximately 71 percent due to a heater drain pump failure. Power was later increased to approximately 82 percent and remained there through the end of the month to facilitate heater drain pump replacement.
OPERATING DATA REPORT DOCKET: 368 PREPARER NAME: Steven L. Coffman UNIT_NME: ANO Unit 2 PREPARER TELEPHONE: 479-858-5560 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1032
- 2. Maximum Dependable Capacity (MWe-Net) 988 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,413.49 248,272.53
- 4. Number of Hours Generator On-line 744.00 4,407.82 245,502.00
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 738,538.00 4,395,800.00 221,708,068.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
ANO-2 operated the entire month at, or near full power.
OPERATING DATA REPORT DOCKET: 368 PREPARER NAME: Steven L. Coffman UNIT_NME: ANO Unit 2 PREPARER TELEPHONE: 479-858-5560 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1032
- 2. Maximum Dependable Capacity (MWe-Net) 988 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,157.49 249,016.53
- 4. Number of Hours Generator On-line 744.00 5,151.82 246,246.00
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 736,533.00 5,132,333.00 222,444,601.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
ANO-2 operated the entire month at, or near full power.
OPERATING DATA REPORT DOCKET: 368 PREPARER NAME: Steven L. Coffman UNIT_NME: ANO Unit 2 PREPARER TELEPHONE: 479-858-5560 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1032
- 2. Maximum Dependable Capacity (MWe-Net) 988 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,877.49 249,736.53
- 4. Number of Hours Generator On-line 720.00 5,871.82 246,966.00
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 716,174.00 5,848,507.00 223,160,775.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
ANO-2 operated the entire month at, or near full power.
OPERATING DATA REPORT DOCKET: 334 PREPARER NAME: David T. Jones UNIT_NME: Beaver Valley Unit 1 PREPARER TELEPHONE: 724-682-4962 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 911
- 2. Maximum Dependable Capacity (MWe-Net) 892 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 246,600.54
- 4. Number of Hours Generator On-line 744.00 5,087.00 243,917.24
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 665,039.30 4,546,576.70 193,439,329.50 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
BVPS-1 operated at a nominal value of 100% power for the entire month of July 2013, except for 50 minutes on 7/9/13 when power was reduced to approximately 98.2% during a planned Moderator Temperature Coefficient Test.
OPERATING DATA REPORT DOCKET: 334 PREPARER NAME: RJ Hepp UNIT_NME: Beaver Valley Unit 1 PREPARER TELEPHONE: 724-682-7675 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 911
- 2. Maximum Dependable Capacity (MWe-Net) 892 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 247,344.54
- 4. Number of Hours Generator On-line 744.00 5,831.00 244,661.24
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 667,820.90 5,214,397.60 194,107,150.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
BVPS-1 operated at a nominal value of 100% power for the entire month of August 2013.
OPERATING DATA REPORT DOCKET: 334 PREPARER NAME: R. J. Hepp UNIT_NME: Beaver Valley Unit 1 PREPARER TELEPHONE: 724-682-7675 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 911
- 2. Maximum Dependable Capacity (MWe-Net) 892 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 696.47 6,527.47 248,041.01
- 4. Number of Hours Generator On-line 696.02 6,527.02 245,357.26
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 600,261.60 5,814,659.20 194,707,412.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 9/30/2013 S 23.98 C 1 The Unit was shutdown for its planned 22nd refueling outage on 9/30/13 at 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
SUMMARY
The Unit operated at a nominal value of 100% power until 9/7/13 when an end of cycle fuel coastdown was begun. The Unit continued to coastdown until 9/28/13 when output was reduced to approximately 50% for planned Main Steam Safety Valve testing. Following satisfactory testing the Unit was shutdown for its planned 22nd refueling outage on 9/30/13 at 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
OPERATING DATA REPORT DOCKET: 412 PREPARER NAME: David T. Jones UNIT_NME: Beaver Valley Unit 2 PREPARER TELEPHONE: 724-682-4962 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 904
- 2. Maximum Dependable Capacity (MWe-Net) 885 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,797.15 195,883.35
- 4. Number of Hours Generator On-line 744.00 4,785.06 194,942.21
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 677,398.30 4,420,654.20 159,558,237.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
BVPS-2 operated at a nominal value at 100% power for the entire month of July 2013, except for 13.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> on 7/20/13 when Operations reduced power to approximately 98.5% in order to repair the LEFM.
OPERATING DATA REPORT DOCKET: 412 PREPARER NAME: RJ Hepp UNIT_NME: Beaver Valley Unit 2 PREPARER TELEPHONE: 724-682-7675 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 904
- 2. Maximum Dependable Capacity (MWe-Net) 885 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,541.15 196,627.35
- 4. Number of Hours Generator On-line 744.00 5,529.06 195,686.21
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 680,615.80 5,101,270.00 160,238,853.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
BVPS-2 operated at a nominal value of 100% power for the entire month of August 2013.
OPERATING DATA REPORT DOCKET: 412 PREPARER NAME: R. J. Hepp UNIT_NME: Beaver Valley Unit 2 PREPARER TELEPHONE: 724-682-7675 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 904
- 2. Maximum Dependable Capacity (MWe-Net) 885 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,261.15 197,347.35
- 4. Number of Hours Generator On-line 720.00 6,249.06 196,406.21
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 662,663.60 5,763,933.60 160,901,517.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The Unit operated at a nominal value of 100% power for the entire month of September 2013 with the exception of a small reduction on 9/28/13.
The Unit reduced output to approximately 97.5% in order to repair [2HDH-LCV103B2], 1st Point Heater Normal Level Control Valve. [Note: this event was planned 17 days in advance of the reduction, therefore, it is considered a planned event for INPO (>10 days), yet remains an unplanned event for WANO (<28 days).]
OPERATING DATA REPORT DOCKET: 456 PREPARER NAME: David Johnson UNIT_NME: Braidwood Unit 1 PREPARER TELEPHONE: 815-417-2478 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1187
- 2. Maximum Dependable Capacity (MWe-Net) 1151 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 195,066.31
- 4. Number of Hours Generator On-line 744.00 5,087.00 193,975.32
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 869,976.00 6,041,364.00 217,376,359.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
U-1 Operated at Full Power the entire month.
OPERATING DATA REPORT DOCKET: 456 PREPARER NAME: David Johnson UNIT_NME: Braidwood Unit 1 PREPARER TELEPHONE: 815-417-2478 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1187
- 2. Maximum Dependable Capacity (MWe-Net) 1151 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 195,810.31
- 4. Number of Hours Generator On-line 744.00 5,831.00 194,719.32
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 870,970.00 6,912,334.00 218,247,329.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit operated nornally at full power except for a planned CW Pp Forebay inspection.
OPERATING DATA REPORT DOCKET: 456 PREPARER NAME: David Johnson UNIT_NME: Braidwood Unit 1 PREPARER TELEPHONE: 815-417-2478 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1187
- 2. Maximum Dependable Capacity (MWe-Net) 1151 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 209.85 6,040.85 196,020.16
- 4. Number of Hours Generator On-line 197.80 6,028.80 194,917.12
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 211,033.00 7,123,367.00 218,458,362.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments A1R17 9/9/2013 S 522.20 C 1 Unit 1 entered a planned refueling outage on 9/9/2013 @ 00:00, with return of the unit occuring 9/30/2013 with Unit 1 Reactor critical at 06:09 and the Main Generator synched to the output grid at 18:12. Outage duration was 17 days, 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> and 12 minutes.
SUMMARY
Refuel outage A1R17 started on 9/9/2013 and ended on 9/30/2013.
OPERATING DATA REPORT DOCKET: 457 PREPARER NAME: David Johnson UNIT_NME: Braidwood Unit 2 PREPARER TELEPHONE: 815-417-2478 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1155
- 2. Maximum Dependable Capacity (MWe-Net) 1125 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 652.10 4,923.13 198,793.36
- 4. Number of Hours Generator On-line 635.95 4,906.97 197,928.49
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 708,926.00 5,664,300.00 219,789,522.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments A2M0 6/28/2013 S 108.05 B 4 Unit 2 Shutdown for a planned 2A RCP seal 5 replacement.
SUMMARY
U-2 began the month in a planned maintenance outage A2M05 to replace RCP seals (Planned Energy Loss 95638 MWh & Unplanned Energy Loss (Outage Extension) 30056 MWh). A FW valve issue, unrelated to the outage scope, occurred during the ramp to full power following the maintenance outage, delaying the ramp up (Unplanned Energy loss (Forced) of 8026 MWh and Unplanned Energy Loss (Forced - < 10days) of 8026 MWh).
OPERATING DATA REPORT DOCKET: 457 PREPARER NAME: David Johnson UNIT_NME: Braidwood Unit 2 PREPARER TELEPHONE: 815-417-2478 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1155
- 2. Maximum Dependable Capacity (MWe-Net) 1125 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,667.13 199,537.36
- 4. Number of Hours Generator On-line 744.00 5,650.97 198,672.49
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 843,581.00 6,507,881.00 220,633,103.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit operated normally at full power except for planned CW Pp forebay inspections. Unplanned losses due to emergent work during the 2B CW Pp forebay inspection.
OPERATING DATA REPORT DOCKET: 457 PREPARER NAME: David Johnson UNIT_NME: Braidwood Unit 2 PREPARER TELEPHONE: 815-417-2478 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1155
- 2. Maximum Dependable Capacity (MWe-Net) 1125 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,387.13 200,257.36
- 4. Number of Hours Generator On-line 720.00 6,370.97 199,392.49
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 825,692.00 7,333,573.00 221,458,795.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 2 operated at full power through out the month.
OPERATING DATA REPORT DOCKET: 259 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 1 PREPARER TELEPHONE: 729-7914 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1120
- 2. Maximum Dependable Capacity (MWe-Net) 1101 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,882.15 109,074.13
- 4. Number of Hours Generator On-line 744.00 4,869.37 107,182.51
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 809,927.00 5,429,800.00 106,021,803.11 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 259 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 1 PREPARER TELEPHONE: 729-7914 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1120
- 2. Maximum Dependable Capacity (MWe-Net) 1101 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,626.15 109,818.13
- 4. Number of Hours Generator On-line 744.00 5,613.37 107,926.51
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 819,258.00 6,249,058.00 106,841,061.11 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 259 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 1 PREPARER TELEPHONE: 729-7914 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1120
- 2. Maximum Dependable Capacity (MWe-Net) 1101 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,346.15 110,538.13
- 4. Number of Hours Generator On-line 720.00 6,333.37 108,646.51
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 780,238.00 7,029,296.00 107,621,299.11 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 260 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 2 PREPARER TELEPHONE: 729-7914 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1120
- 2. Maximum Dependable Capacity (MWe-Net) 1104 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 3,875.39 233,177.84
- 4. Number of Hours Generator On-line 744.00 3,854.32 229,888.25
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 808,379.00 4,103,310.00 236,428,757.91 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 260 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 2 PREPARER TELEPHONE: 729-7914 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1120
- 2. Maximum Dependable Capacity (MWe-Net) 1104 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,619.39 233,921.84
- 4. Number of Hours Generator On-line 744.00 4,598.32 230,632.25
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 805,488.00 4,908,798.00 237,234,245.91 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 260 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 2 PREPARER TELEPHONE: 729-7914 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1120
- 2. Maximum Dependable Capacity (MWe-Net) 1104 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,339.39 234,641.84
- 4. Number of Hours Generator On-line 720.00 5,318.32 231,352.25
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 788,818.00 5,697,616.00 238,023,063.91 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 296 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 3 PREPARER TELEPHONE: 729-7914 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1120
- 2. Maximum Dependable Capacity (MWe-Net) 1105 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,797.68 189,857.15
- 4. Number of Hours Generator On-line 744.00 4,769.55 187,836.90
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 801,435.00 5,208,956.00 196,881,501.54 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 296 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 3 PREPARER TELEPHONE: 729-2914 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1120
- 2. Maximum Dependable Capacity (MWe-Net) 1105 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,541.68 190,601.15
- 4. Number of Hours Generator On-line 744.00 5,513.55 188,580.90
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 796,563.00 6,005,519.00 197,678,064.54 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 296 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 3 PREPARER TELEPHONE: 729-7914 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1120
- 2. Maximum Dependable Capacity (MWe-Net) 1105 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,261.68 191,321.15
- 4. Number of Hours Generator On-line 720.00 6,233.55 189,300.90
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 782,162.00 6,787,681.00 198,460,226.54 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 325 PREPARER NAME: Adam Flora UNIT_NME: Brunswick Unit 1 PREPARER TELEPHONE: 910-457-2027 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 983
- 2. Maximum Dependable Capacity (MWe-Net) 938 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,838.25 245,762.47
- 4. Number of Hours Generator On-line 744.00 4,809.65 240,585.46
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 700,370.00 4,571,060.00 194,660,919.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 325 PREPARER NAME: Adam Flora UNIT_NME: Brunswick Unit 1 PREPARER TELEPHONE: 910-457-2027 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 983
- 2. Maximum Dependable Capacity (MWe-Net) 938 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,582.25 246,506.47
- 4. Number of Hours Generator On-line 744.00 5,553.65 241,329.46
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 706,728.00 5,277,788.00 195,367,647.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 325 PREPARER NAME: Adam Flora UNIT_NME: Brunswick Unit 1 PREPARER TELEPHONE: 910-457-2027 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 983
- 2. Maximum Dependable Capacity (MWe-Net) 938 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,302.25 247,226.47
- 4. Number of Hours Generator On-line 720.00 6,273.65 242,049.46
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 677,673.00 5,955,461.00 196,045,320.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 324 PREPARER NAME: Adam Flora UNIT_NME: Brunswick Unit 2 PREPARER TELEPHONE: 910-457-2027 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 980
- 2. Maximum Dependable Capacity (MWe-Net) 920 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 3,558.22 254,501.61
- 4. Number of Hours Generator On-line 744.00 3,475.14 247,591.57
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 687,194.00 3,115,783.00 192,798,238.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 324 PREPARER NAME: Adam Flora UNIT_NME: Brunswick Unit 2 PREPARER TELEPHONE: 910-457-2027 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 980
- 2. Maximum Dependable Capacity (MWe-Net) 920 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,302.22 255,245.61
- 4. Number of Hours Generator On-line 692.82 4,167.96 248,284.39
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 591,407.00 3,707,190.00 193,389,645.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments B221 8/9/2013 F 51.18 B 5 Unit shutdown when turbine/generator was M1 disconnected from the grid to repair loose connection on the 2C main power transformer highside bushing.
SUMMARY
OPERATING DATA REPORT DOCKET: 324 PREPARER NAME: Adam Flora UNIT_NME: Brunswick Unit 2 PREPARER TELEPHONE: 910-457-2027 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 980
- 2. Maximum Dependable Capacity (MWe-Net) 920 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,022.22 255,965.61
- 4. Number of Hours Generator On-line 720.00 4,887.96 249,004.39
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 672,595.00 4,379,785.00 194,062,240.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 454 PREPARER NAME: David Eder UNIT_NME: Byron Unit 1 PREPARER TELEPHONE: 815 406-2194 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1187
- 2. Maximum Dependable Capacity (MWe-Net) 1138 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 216,991.17
- 4. Number of Hours Generator On-line 744.00 5,087.00 215,812.70
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 863,574.00 5,972,899.00 235,994,305.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit on line entire month.
OPERATING DATA REPORT DOCKET: 454 PREPARER NAME: David Eder UNIT_NME: Byron Unit 1 PREPARER TELEPHONE: 815 406-2194 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1187
- 2. Maximum Dependable Capacity (MWe-Net) 1138 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 217,735.17
- 4. Number of Hours Generator On-line 744.00 5,831.00 216,556.70
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 863,462.00 6,836,361.00 236,857,767.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 1 on line entire month.
OPERATING DATA REPORT DOCKET: 454 PREPARER NAME: David Eder UNIT_NME: Byron Unit 1 PREPARER TELEPHONE: 815 406-2194 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1187
- 2. Maximum Dependable Capacity (MWe-Net) 1138 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 218,455.17
- 4. Number of Hours Generator On-line 720.00 6,551.00 217,276.70
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 842,914.00 7,679,275.00 237,700,681.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
unit was on line the entire month
OPERATING DATA REPORT DOCKET: 455 PREPARER NAME: David Eder UNIT_NME: Byron Unit 2 PREPARER TELEPHONE: 815 406-2194 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1155
- 2. Maximum Dependable Capacity (MWe-Net) 1120 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,527.30 209,942.53
- 4. Number of Hours Generator On-line 744.00 4,486.82 208,914.82
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 842,490.00 5,065,533.00 226,896,090.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit on line entire month
OPERATING DATA REPORT DOCKET: 455 PREPARER NAME: David Eder UNIT_NME: Byron Unit 2 PREPARER TELEPHONE: 815 406-2194 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1155
- 2. Maximum Dependable Capacity (MWe-Net) 1120 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,271.30 210,686.53
- 4. Number of Hours Generator On-line 744.00 5,230.82 209,658.82
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 843,483.00 5,909,016.00 227,739,573.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 2 on line entire month.
OPERATING DATA REPORT DOCKET: 455 PREPARER NAME: David Eder UNIT_NME: Byron Unit 2 PREPARER TELEPHONE: 815 406-2194 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1155
- 2. Maximum Dependable Capacity (MWe-Net) 1120 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,991.30 211,406.53
- 4. Number of Hours Generator On-line 720.00 5,950.82 210,378.82
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 813,840.00 6,722,856.00 228,553,413.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit was on line the entire month.
A 300 MWe down power was performed during the month at the request of the grid operator due to a 345 KV line issue that originated outside of the site switchyard. This event is not under "plant management control".
OPERATING DATA REPORT DOCKET: 483 PREPARER NAME: J. P. Kovar UNIT_NME: Callaway Unit 1 PREPARER TELEPHONE: 314-225-1478 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1228
- 2. Maximum Dependable Capacity (MWe-Net) 1190 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 623.55 3,790.64 224,336.76
- 4. Number of Hours Generator On-line 623.55 3,751.12 221,852.48
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 724,274.00 4,471,797.00 251,816,355.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2013- 7/26/2013 F 120.45 A 3 Faults in the isophase bus ducts.
02 Repaired/replaced some isophase bus ducts and dampers in the cooling system for the isophase bus. Note: the plant was offline between late on 2013.07.26 and 2013.08.18.
SUMMARY
Power reduction to 65% for 'B' Main Feedwater Pump repairs 1222 07/20/2013 to 1950 07/23/2013. Reactor/turbine trip from fire in 'B' isophase duct 2333 07/26/2013 - resumed generation 0922 08/18/2013.
OPERATING DATA REPORT DOCKET: 483 PREPARER NAME: J. P. Kovar UNIT_NME: Callaway Unit 1 PREPARER TELEPHONE: 314-225-1478 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1228
- 2. Maximum Dependable Capacity (MWe-Net) 1190 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 370.42 4,161.06 224,707.18
- 4. Number of Hours Generator On-line 326.63 4,077.75 222,179.11
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 336,782.00 4,808,579.00 252,153,137.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2013- 7/26/2013 F 417.37 A 4 Faults in the isophase bus ducts.
02 Repaired/replaced some isophase bus ducts and dampers in the cooling system for the isophase bus. Note: the plant was offline between late on 2013.07.26 and 2013.08.18.
SUMMARY
Forced outage from B isophase bus duct fire continued into August - ended with breaker close at 0922 on 08/18/2013. Power hold at 65% to complete work on B main feedwater pump and tune A main feedwater pump settings (identified in July) began at 2249 same day . 100% power achieved at 1930 on 08/24/2013.
OPERATING DATA REPORT DOCKET: 483 PREPARER NAME: J. P. Kovar UNIT_NME: Callaway Unit 1 PREPARER TELEPHONE: 314-225-1478 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1228
- 2. Maximum Dependable Capacity (MWe-Net) 1190 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 4,881.06 225,427.18
- 4. Number of Hours Generator On-line 720.00 4,797.75 222,899.11
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 872,034.00 5,680,613.00 253,025,171.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The plant operated at essentially full power for the month.
OPERATING DATA REPORT DOCKET: 317 PREPARER NAME: Herman O. Olsen UNIT_NME: Calvert Cliffs Unit 1 PREPARER TELEPHONE: (410) 495-6734 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 845
- 2. Maximum Dependable Capacity (MWe-Net) 866 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 270,703.70
- 4. Number of Hours Generator On-line 744.00 5,087.00 267,188.26
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 643,961.00 4,555,169.00 223,006,997.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit began the month at 100%.
On 07/01/2013 at 1500, power was reduced to 85% for waterbox cleaning. Cleaning was completed on 07/02/2013 and power was increased at 1350. Power was returned to 100% at 1719.
The unit operated at 100% power for the remainder month.
OPERATING DATA REPORT DOCKET: 317 PREPARER NAME: Herman O. Olsen UNIT_NME: Calvert Cliffs Unit 1 PREPARER TELEPHONE: 410-495-6734 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 845
- 2. Maximum Dependable Capacity (MWe-Net) 866 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 271,447.70
- 4. Number of Hours Generator On-line 744.00 5,831.00 267,932.26
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 635,267.00 5,190,436.00 223,642,264.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit began the month at 100%.
On 08/12/2013 at 1905 a rapid down power to 83% was performed due to reduced condenser vacuum caused by rapid fouling of a water box. The waterbox cleaning was completed on 08/13/2013 and power was increased at 2212. Power was returned to 100% on 08/14/2013 at 0330.
On 08/15/2013 at 2359 power was reduced to 86% for waterbox cleaning. Cleaning was completed on 08/17/2013 and power was increased at 2050. Reactor power was returned to 100% on 08/18/2013 at 0443.
The unit operated at 100% power for the remainder of the month.
OPERATING DATA REPORT DOCKET: 317 PREPARER NAME: Herman O. Olsen UNIT_NME: Calvert Cliffs Unit 1 PREPARER TELEPHONE: 410-495-6734 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 845
- 2. Maximum Dependable Capacity (MWe-Net) 866 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 272,167.70
- 4. Number of Hours Generator On-line 720.00 6,551.00 268,652.26
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 629,032.00 5,819,468.00 224,271,296.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit began the month at 100%.
On 09/20/2013 at 0200 power was reduced to 83% for Main Turbine Valve testing and waterbox cleaning. Power was increased to 90% at 0900.
Valve testing was completed and power was increased to 93% at 1121. Waterbox cleaning was completed on 09/21/2013 at 1422 and power was returned to 100% at 1745.
The unit operated at 100% power for the remainder month.
OPERATING DATA REPORT DOCKET: 318 PREPARER NAME: Herman O. Olsen UNIT_NME: Calvert Cliffs Unit 2 PREPARER TELEPHONE: (410) 495-6734 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 845
- 2. Maximum Dependable Capacity (MWe-Net) 850 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,143.90 264,898.95
- 4. Number of Hours Generator On-line 744.00 4,090.12 262,763.69
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 618,261.00 3,434,206.00 219,053,519.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit began the month at 99.5% reactor power.
On 07/11/2013 at 2106 power was reduced to 95% for Variable Temperature Average testing (PSTP-4). Testing was completed and power was increased on 07/12/2013 at 0110. Reactor power was returned to 99.5% at 0400.
On 07/19/2013 at 2100 reactor power was reduced to 80.3% to perform waterbox cleaning. Cleaning was completed on 07/21/2013 at 0630 and power was restored to 99.5% at 1308.
The unit operated at 99.5% for the remainder of the month.
OPERATING DATA REPORT DOCKET: 318 PREPARER NAME: Herman O. Olsen UNIT_NME: Calvert Cliffs Unit 2 PREPARER TELEPHONE: 410-495-6734 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 845
- 2. Maximum Dependable Capacity (MWe-Net) 850 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,887.90 265,642.95
- 4. Number of Hours Generator On-line 744.00 4,834.12 263,507.69
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 622,950.00 4,057,156.00 219,676,469.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit began the month at 99.5% reactor power.
On 08/01/2013 at 1128, 21 Circulating Water Pump tripped. An expeditious power reduction was commenced at 1131 and power was reduced to 85%. Troubleshooting identified a loose wire in the pump exciter cabinet. Repairs were performed and the pump was restored. Power was increased at 2015 and returned to 99.5% at 2335.
On 08/09/2013 at 0515 power was reduced to 84% to clean waterboxes. Cleaning was completed and power was restored to 99.5% at 2225.
On 08/12/2013 at 0735 power was reduced to 88% to clean 21B waterbox. Cleaning was completed and power was restored to 99.5% at 1915.
On 08/17/2013 at 0027 power was reduced to 92% to clean waterboxes. Cleaning was completed and power was restored to 99.5% at 0945.
The unit operated at 99.5% for the remainder of the month.
OPERATING DATA REPORT DOCKET: 318 PREPARER NAME: Herman O. Olsen UNIT_NME: Calvert Cliffs Unit 2 PREPARER TELEPHONE: 410-495-6734 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 845
- 2. Maximum Dependable Capacity (MWe-Net) 850 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 616.13 5,504.03 266,259.08
- 4. Number of Hours Generator On-line 608.72 5,442.84 264,116.41
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 510,757.00 4,567,913.00 220,187,226.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 004 9/5/2013 F 111.28 A 1 The unit began the month at 99.5% reactor power.
On 09/05/2013 at 1016, control element assembly (CEA) #27 dropped to the bottom of the core while performing surveillance test procedure O-29-2.
Reactor power stabilized at 91%. An abnormal operating procedure was entered and attempts to restore the CEA to the correct level were not successful. At 1207 reactor power was reduced in preparation for a reactor shutdown. This down power met the criteria for the NRC Unplanned Power Change per 7000 Critical Hours performance indicator. The unit was removed from the grid at 1651 and the reactor was shut down at 1735. The unit was cooled down to mode 5 on 09/06/2013 at 0752 to support troubleshooting and repairs. The cause of the dropped CEA was determined to be a ground due to degraded insulation. The ground was located at the coil stack connection at the reactor head. The coil stack was replaced, other connections inspected, and all control element drive mechanisms were electrically tested (meggered) during the shutdown and prior to startup to verify no other ground fault conditions existed. Resistance checks of individual coils were performed and all were verified to be within 10% of the mean. Plant heat up commenced on 09/08/2013 at 1730 and the reactor was taken critical on 09/10/2013 at 0127.
Power was increased and the unit was paralleled to the grid at 0808. Reactor power was restored to 99.5% at 2130.
The unit operated at 99.5% for the remainder of the month.
SUMMARY
The unit began the month at 99.5% reactor power.
On 09/05/2013 at 1016, control element assembly (CEA) #27 dropped to the bottom of the core while performing surveillance test procedure O-29-2. Reactor power stabilized at 91%. An abnormal operating procedure was entered and attempts to restore the CEA to the correct level were not successful. At 1207 reactor power was reduced in preparation for a reactor shutdown. This down power met the criteria for the NRC Unplanned Power Change per 7000 Critical Hours performance indicator. The unit was removed from the grid at 1651 and the reactor was shut down at 1735. The unit was cooled down to mode 5 on 09/06/2013 at 0752 to support troubleshooting and repairs. The cause of the dropped CEA was determined to be a ground due to degraded insulation. The ground was located at the coil stack connection at the reactor head. The coil stack was replaced, other connections inspected, and all control element drive mechanisms were electrically tested (meggered) during the shutdown and prior to startup to verify no other ground fault conditions existed. Resistance checks of individual coils were performed and all were verified to be within 10% of the mean. Plant heat up commenced on 09/08/2013 at 1730 and the reactor was taken critical on 09/10/2013 at 0127. Power was increased and the unit was paralleled to the grid at 0808. Reactor power was restored to 99.5% at 2130.
The unit operated at 99.5% for the remainder of the month.
OPERATING DATA REPORT DOCKET: 413 PREPARER NAME: Glenda Helton UNIT_NME: Catawba Unit 1 PREPARER TELEPHONE: 803-701-3352 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1145
- 2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 211,815.05
- 4. Number of Hours Generator On-line 744.00 5,087.00 209,645.86
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 838,923.00 5,867,132.00 235,227,374.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Catawba Unit 1 began the month of July 2013 at a power level of 98.6% Full Power and increasing, recovering from an emergent power reduction necessitated by loss of numerous Cooling Tower fans following a lightning strike. 100% Full Power was ultimately reached at 0151 on 7/1/13.
At 0140 on 7/27/13, a power reduction was initiated from 100% Full Power to allow replacement of a 1B Main Feedwater Pump Turbine control system processor card. At 0705 on 7/27/13, the power reduction was halted at 49.5% Full Power, to remove 1B Main Feedwater Pump from service for the processor card replacement. At 1735 on 7/27/13, following restoration of 1B Main Feedwater Pump, power escalation was commenced from 49.5% Full Power. At 2142 on 7/27/13, power escalation was suspended at 81% Full Power, for performance of Main Turbine Control Valve Movement periodic testing, and was subsequently resumed at 2220. 100% Full Power was ultimately reached at 0325 on 7/28/13 and Unit 1 operated at or near 100% Full Power for the remainder of the month.
OPERATING DATA REPORT DOCKET: 413 PREPARER NAME: Glenda Helton UNIT_NME: Catawba Unit 1 PREPARER TELEPHONE: 803-701-3352 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1145
- 2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 212,559.05
- 4. Number of Hours Generator On-line 744.00 5,831.00 210,389.86
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 851,199.00 6,718,331.00 236,078,573.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Catawba Unit 1 began and concluded the month of August 2013 operating at or near 100% Full Power. No planned or unplanned power reductions were incurred during the month.
OPERATING DATA REPORT DOCKET: 413 PREPARER NAME: Glenda Helton UNIT_NME: Catawba Unit 1 PREPARER TELEPHONE: 803-701-3352 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1145
- 2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 213,279.05
- 4. Number of Hours Generator On-line 720.00 6,551.00 211,109.86
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 824,856.00 7,543,187.00 236,903,429.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Catawba Unit 1 began the month of September 2013 operating at or near 100% Full Power. At 1419 on 9/13/13, power reduction from 100% Full Power was commenced to support Unit 2's Auxiliary Steam demand for the 2EOC19 Refueling Outage Shutdown. Power reduction was halted at 98.5% Full Power at 2028 on 9/13/13. At 2204 on 9/14/13 power escalation was commenced from 98.5% Full Power. At 0100 on 9/15/13 power escalation was suspended at 99% Full Power. Power escalation was resumed from 99% Full Power at 1345 on 9/15/13. 100% Full Power was ultimately reached at 1555 on 9/15/13, and Unit 1 operated at or near 100% Full Power for the remainder of the month.
OPERATING DATA REPORT DOCKET: 414 PREPARER NAME: Glenda Helton UNIT_NME: Catawba Unit 2 PREPARER TELEPHONE: 803-701-3352 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1145
- 2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 205,689.73
- 4. Number of Hours Generator On-line 744.00 5,087.00 203,968.28
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 854,042.00 5,877,661.00 229,518,008.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Catawba Unit 2 began and concluded the month of July 2013 operating at or near 100% Full Power. No planned or unplanned power reductions were incurred during the month.
OPERATING DATA REPORT DOCKET: 414 PREPARER NAME: Glenda Helton UNIT_NME: Catawba Unit 2 PREPARER TELEPHONE: 803-701-3352 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1145
- 2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 206,433.73
- 4. Number of Hours Generator On-line 744.00 5,831.00 204,712.28
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 856,114.00 6,733,775.00 230,374,122.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Catawba Unit 2 began and concluded the month of August 2013 operating at or near 100% Full Power. No planned or unplanned power reductions were incurred during the month
OPERATING DATA REPORT DOCKET: 414 PREPARER NAME: Glenda Helton UNIT_NME: Catawba Unit 2 PREPARER TELEPHONE: 803-701-3352 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1145
- 2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 316.20 6,147.20 206,749.93
- 4. Number of Hours Generator On-line 316.02 6,147.02 205,028.30
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 343,203.00 7,076,978.00 230,717,325.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 9/14/2013 S 403.98 C 1 2EOC19 Refueling Outage
SUMMARY
Catawba Unit 2 began the month of September 2013 operating at or near 100% Full Power. At 1500 on 9/2/13, power reduction from 100% Full Power was commenced for 2EOC19 power coast-down (1st decrease). Power reduction was halted at 99% Full Power at 1700 on 9/2/13. At 0156 on 9/4/13, power reduction was commenced from 99% Full Power for 2EOC19 power coast-down (2nd decrease.) Power reduction was halted at 98% Full Power at 0430 on 9/4/13. At 1130 on 9/6/13, Power reduction was commenced from 97% Full Power for 2EOC19 power coast-down (3rd decrease.) Power reduction was halted at 96% full power at 1304 on 9/6/13. At 2145, on 9/8/13, power reduction was commenced from 95% full power for 2EOC19 power coast-down (4th decrease.) Power reduction was halted at 94% full power at 2325 on 9/8/13. At 1926 on 9/12/13, power reduction commenced from 93% full power for 2EOC19 power coast-down (5th decrease.) At 2028, on 9/12/13, power reduction halted at 92% full power. At 2101, on 9/13/13, Unit 2 shutdown commenced from 92% full power for entry into 2EOC19 Refueling Outage. The turbine/generator was taken offline at 0401 on 9/14/13. Mode 2 was entered at 0401 on 9/14/13. Mode 3 was entered at 0412 on 9/14/13. Mode 4 was entered at 0834 on 9/14/13. Mode 5 was entered at 1220 on 9/14/13. Mode 6 was entered at 1829 on 9/17/13. No Mode was entered at 1322 on 9/22/13 and Unit 2 remained in No Mode for the remainder of September 2013.
OPERATING DATA REPORT DOCKET: 461 PREPARER NAME: Joe Wemlinger UNIT_NME: Clinton Unit 1 PREPARER TELEPHONE: 217-937-3846 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1062
- 2. Maximum Dependable Capacity (MWe-Net) 1022 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,017.45 177,782.27
- 4. Number of Hours Generator On-line 744.00 4,926.22 174,862.43
- 5. Reserve Shutdown Hours 0.00 0.00 4.00
- 6. Net Electrical energy Generated (MWHrs) 784,159.00 5,216,996.00 167,945,519.48 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
710 MWe-h planned loss for a control rod sequence exchange.
OPERATING DATA REPORT DOCKET: 461 PREPARER NAME: Joe Wemlinger UNIT_NME: Clinton Unit 1 PREPARER TELEPHONE: 217-937-3846 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1062
- 2. Maximum Dependable Capacity (MWe-Net) 1022 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,761.45 178,526.27
- 4. Number of Hours Generator On-line 744.00 5,670.22 175,606.43
- 5. Reserve Shutdown Hours 0.00 0.00 4.00
- 6. Net Electrical energy Generated (MWHrs) 780,993.00 5,997,989.00 168,726,512.48 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
There was one forced loss and one planned loss in August, 2013.
The planned loss for August 2013 of 2398 MWe-hr was due to a planned control rod pattern adjustment on 8/17/13.
The forced loss for August 2013 of 2198 MWe-hr was due to a loss of feedwater heating from Feedwater Heaters 5B and 6B. The cause was a malfunctioning controller, which was replaced.
OPERATING DATA REPORT DOCKET: 461 PREPARER NAME: Joe Wemlinger UNIT_NME: Clinton Unit 1 PREPARER TELEPHONE: 217-937-3846 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1062
- 2. Maximum Dependable Capacity (MWe-Net) 1022 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,481.45 179,246.27
- 4. Number of Hours Generator On-line 720.00 6,390.22 176,326.43
- 5. Reserve Shutdown Hours 0.00 0.00 4.00
- 6. Net Electrical energy Generated (MWHrs) 755,883.00 6,753,872.00 169,482,395.48 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
CPS had two forced losses. On 9/12/13 the 6A 'Feedwater Heater Emergency Drain valve failed open, resulting in a forced loss of 121 MWE-hr.
The two planned losses were due to a control rod pattern adjustment and turbine surveillances, and implementation of Final Feedwater Temperature Reduction for unit coastdown into refueling outage C1R14.
OPERATING DATA REPORT DOCKET: 397 PREPARER NAME: Darla Johnson UNIT_NME: Columbia Gen Sta Unit 2 PREPARER TELEPHONE: 509-377-4570 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1153
- 2. Maximum Dependable Capacity (MWe-Net) 1107 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,066.75 200,458.48
- 4. Number of Hours Generator On-line 744.00 4,005.22 195,983.99
- 5. Reserve Shutdown Hours 0.00 0.00 3,357.70
- 6. Net Electrical energy Generated (MWHrs) 806,046.17 4,357,682.64 201,169,881.38 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Columbia operated at 100% power except for a downpower to 64% to fix a tube leak on COND-HX-3C. Columbia also downpowered to 98% for rod line maintenance. Additional forced losses were taken from a high level trip on COND-HX-4C although no downpower occurred.
OPERATING DATA REPORT DOCKET: 397 PREPARER NAME: Darla Johnson UNIT_NME: Columbia Gen Sta Unit 2 PREPARER TELEPHONE: 509-377-4570 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1153
- 2. Maximum Dependable Capacity (MWe-Net) 1107 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,810.75 201,202.48
- 4. Number of Hours Generator On-line 744.00 4,749.22 196,727.99
- 5. Reserve Shutdown Hours 0.00 0.00 3,357.70
- 6. Net Electrical energy Generated (MWHrs) 821,066.37 5,178,749.01 201,990,947.75 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Columbia operated at 100% power except for a downpower to 97% for MT Bypass Valve Testing. Columbia downpowered to 80% for a single rod scram, to 98% for SJAE B Drain Temperature, and to 95% to shutdown CW-P-1A.
OPERATING DATA REPORT DOCKET: 397 PREPARER NAME: Darla Johnson UNIT_NME: Columbia Gen Sta Unit 2 PREPARER TELEPHONE: 509-377-4570 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1153
- 2. Maximum Dependable Capacity (MWe-Net) 1107 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,530.75 201,922.48
- 4. Number of Hours Generator On-line 720.00 5,469.22 197,447.99
- 5. Reserve Shutdown Hours 0.00 0.00 3,357.70
- 6. Net Electrical energy Generated (MWHrs) 792,920.70 5,971,669.71 202,783,868.45 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Columbia operated at 100% throughout the month of September except for a planned downpower to 65% for Sequence Exchange and TGV/BPV Testing and an unplanned downpower to 90% for a control rod insertion. Additional unplanned losses were experienced throughout the month due to CW-P-1A being out of service.
OPERATING DATA REPORT DOCKET: 445 PREPARER NAME: G.D. Lytle UNIT_NME: Comanche Peak Unit 1 PREPARER TELEPHONE: 254-897-5455 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1218
- 2. Maximum Dependable Capacity (MWe-Net) 1205 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 732.18 4,562.93 181,729.16
- 4. Number of Hours Generator On-line 724.82 4,538.12 180,629.26
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 867,740.00 5,525,651.00 201,756,887.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1-13-2 7/27/2013 S 19.18 B 1 Enter MODE 3 to repair Reactor Coolant Pump 1-02 seal water injection drain valve 1-CS-8364B, leaking inside containment. Repairs successful.
SUMMARY
Unit 1 began the month at 100% reactor, 1266 MWe turbine power. On 7/26/13 at 22:00, licensed operators began ramping the unit to about 20% reactor, 200 MWe in preparation for a planned unit and reactor shutdown to conduct a maintenance outage to repair a leaking Reactor Coolant Pump (RCP 1-02) seal water injection line drain valve, 1-CS-8364B inside the containment building. On 7/27/13 at 00:59, licensed operators manually tripped the reactor from about 20% reactor, 200 MWe turbine power per station procedures to enter MODE 3 and commence the outage. Repairs to 1-CS-8364B were successful. On 7/27/13 at 12:20, Unit 1 entered MODE 2 and at 12:48 reactor operators declared the reactor critical. On 7/27/13 at 16:48, Unit 1 entered MODE 1. On 7/27/13 at 20:10, the main generator was synchronized to the grid ending the maintenance outage with a duration of about 19.18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br />. On 7/27/13 at 21:33, the unit began ramping up to return to full power operation. On 7/29/13 at 02:23, Unit 1 returned to full power operation at 100% reactor, 1257 MWE turbine power. Unit 1 ended the month at 100% reactor, 1263 MWe turbine power.
OPERATING DATA REPORT DOCKET: 445 PREPARER NAME: G.D. Lytle UNIT_NME: Comanche Peak Unit 1 PREPARER TELEPHONE: 254-897-5455 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1218
- 2. Maximum Dependable Capacity (MWe-Net) 1205 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,306.93 182,473.16
- 4. Number of Hours Generator On-line 744.00 5,282.12 181,373.26
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 904,799.00 6,430,450.00 202,661,686.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 1 began the month at 100% reactor, 1263 MWe turbine power. Unit 1 ended the month at 100% reactor, 1259 MWe turbine power.
OPERATING DATA REPORT DOCKET: 445 PREPARER NAME: G.D. Lytle UNIT_NME: Comanche Peak Unit 1 PREPARER TELEPHONE: 254-897-5455 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1218
- 2. Maximum Dependable Capacity (MWe-Net) 1205 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,026.93 183,193.16
- 4. Number of Hours Generator On-line 720.00 6,002.12 182,093.26
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 875,928.00 7,306,378.00 203,537,614.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 1 began the month at 100% reactor, 1259 MWe turbine power. Unit 1 ended the month at 100% reactor, 1269 MWe turbine power.
OPERATING DATA REPORT DOCKET: 446 PREPARER NAME: G.D. Lytle UNIT_NME: Comanche Peak Unit 2 PREPARER TELEPHONE: 254-897-5455 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1207
- 2. Maximum Dependable Capacity (MWe-Net) 1195 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 161,173.21
- 4. Number of Hours Generator On-line 744.00 5,087.00 160,442.96
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 896,889.00 6,198,317.00 181,366,598.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 2 began the month at 100% reactor, 1255 MWe turbine power. Unit 2 ended the month at 100% reactor, 1253 MWe turbine power.
OPERATING DATA REPORT DOCKET: 446 PREPARER NAME: G.D. Lytle UNIT_NME: Comanche Peak Unit 2 PREPARER TELEPHONE: 254-897-5455 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1207
- 2. Maximum Dependable Capacity (MWe-Net) 1195 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 161,917.21
- 4. Number of Hours Generator On-line 744.00 5,831.00 161,186.96
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 893,994.00 7,092,311.00 182,260,592.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 2 began the month at 100% reactor, 1253 MWe turbine power. Unit 2 ended the month at 100% reactor, 1250 MWe turbine power.
OPERATING DATA REPORT DOCKET: 446 PREPARER NAME: G.D. Lytle UNIT_NME: Comanche Peak Unit 2 PREPARER TELEPHONE: 254-897-5455 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1207
- 2. Maximum Dependable Capacity (MWe-Net) 1195 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 162,637.21
- 4. Number of Hours Generator On-line 720.00 6,551.00 161,906.96
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 866,198.00 7,958,509.00 183,126,790.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 2 began the month at 100% reactor 1250 MWe turbine power. Unit 2 ended the month at 100% reactor, 1258 MWe turbine power.
OPERATING DATA REPORT DOCKET: 315 PREPARER NAME: K. Kohn UNIT_NME: Cook Unit 1 PREPARER TELEPHONE: 269-465-5901 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1084
- 2. Maximum Dependable Capacity (MWe-Net) 1030 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 3,835.87 240,635.65
- 4. Number of Hours Generator On-line 744.00 3,796.85 237,550.83
- 5. Reserve Shutdown Hours 0.00 0.00 321.00
- 6. Net Electrical energy Generated (MWHrs) 774,142.00 4,003,034.00 227,935,430.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
None.
OPERATING DATA REPORT DOCKET: 315 PREPARER NAME: K. Kohn UNIT_NME: Cook Unit 1 PREPARER TELEPHONE: 269-465-5901 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1084
- 2. Maximum Dependable Capacity (MWe-Net) 1030 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,579.87 241,379.65
- 4. Number of Hours Generator On-line 744.00 4,540.85 238,294.83
- 5. Reserve Shutdown Hours 0.00 0.00 321.00
- 6. Net Electrical energy Generated (MWHrs) 767,138.00 4,770,172.00 228,702,568.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
None.
OPERATING DATA REPORT DOCKET: 315 PREPARER NAME: K. Kohn UNIT_NME: Cook Unit 1 PREPARER TELEPHONE: 269-465-5901 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1084
- 2. Maximum Dependable Capacity (MWe-Net) 1030 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,299.87 242,099.65
- 4. Number of Hours Generator On-line 720.00 5,260.85 239,014.83
- 5. Reserve Shutdown Hours 0.00 0.00 321.00
- 6. Net Electrical energy Generated (MWHrs) 739,244.00 5,509,416.00 229,441,812.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Planned Main Turbine Control Valve Testing performed on 9/15/13 @ 2230. Rx power was reduced to 91%.
OPERATING DATA REPORT DOCKET: 316 PREPARER NAME: K. Kohn UNIT_NME: Cook Unit 2 PREPARER TELEPHONE: 269-465-5901 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1107
- 2. Maximum Dependable Capacity (MWe-Net) 1077 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 697.07 5,040.07 224,938.52
- 4. Number of Hours Generator On-line 685.98 5,028.98 220,588.00
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 726,761.00 5,597,889.00 224,767,943.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 234 7/28/2013 F 58.02 A 2 U2F13A Rx/Gen trip on 7/28/2013 @ 1018 due to an incorrect controller setpoint on the Condensate Heater Bypass Control Valve. Rx taken critical on 7/30/2013 @ 0914 and Generator synch occurred on 7/30/2013 @ 2019.
SUMMARY
U2F13A Rx/Gen trip on 7/28/2013 @ 1018 due to an incorrect controller setpoint on the Condensate Heater Bypass Control Valve. Rx taken critical on 7/30/2013 @ 0914 and Generator synch occurred on 7/30/2013 @ 2019.
OPERATING DATA REPORT DOCKET: 316 PREPARER NAME: K. Kohn UNIT_NME: Cook Unit 2 PREPARER TELEPHONE: 269-465-5901 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1107
- 2. Maximum Dependable Capacity (MWe-Net) 1077 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,784.07 225,682.52
- 4. Number of Hours Generator On-line 744.00 5,772.98 221,332.00
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 800,022.00 6,397,911.00 225,567,965.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
U2F13A Rx/Gen trip due to an incorrect controller setpoint on the Condensate Heater Bypass Control Valve. Power ascension to 100% from 8/1/2013 @ 0000 to 8/1/2013 @ 0200.
OPERATING DATA REPORT DOCKET: 316 PREPARER NAME: K. Kohn UNIT_NME: Cook Unit 2 PREPARER TELEPHONE: 269-465-5901 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1107
- 2. Maximum Dependable Capacity (MWe-Net) 1077 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,504.07 226,402.52
- 4. Number of Hours Generator On-line 720.00 6,492.98 222,052.00
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 760,084.00 7,157,995.00 226,328,049.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Rx power reduction to 48% began on 9/29/2013 @ 2000 to support TREVI testing prior to the U2C21 Refueling Outage.
OPERATING DATA REPORT DOCKET: 298 PREPARER NAME: Brian Shryock UNIT_NME: Cooper Unit 1 PREPARER TELEPHONE: 402-825-2984 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 815
- 2. Maximum Dependable Capacity (MWe-Net) 768.88 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 276,237.77
- 4. Number of Hours Generator On-line 744.00 5,087.00 272,893.41
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 540,769.66 3,925,176.58 191,806,755.98 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
No information for this reporting period.
OPERATING DATA REPORT DOCKET: 298 PREPARER NAME: Brian Shryock UNIT_NME: Cooper Unit 1 PREPARER TELEPHONE: 402-825-2984 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 815
- 2. Maximum Dependable Capacity (MWe-Net) 768.88 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 276,981.77
- 4. Number of Hours Generator On-line 744.00 5,831.00 273,637.41
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 572,241.66 4,497,418.24 192,378,997.64 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
No information for this reporting period.
OPERATING DATA REPORT DOCKET: 298 PREPARER NAME: Brian Shryock UNIT_NME: Cooper Unit 1 PREPARER TELEPHONE: 402-825-2984 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 815
- 2. Maximum Dependable Capacity (MWe-Net) 768.88 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 277,701.77
- 4. Number of Hours Generator On-line 720.00 6,551.00 274,357.41
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 553,316.80 5,050,735.04 192,932,314.44 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
No information for this reporting period.
OPERATING DATA REPORT DOCKET: 346 PREPARER NAME: J. Syrowski UNIT_NME: Davis-Besse Unit 1 PREPARER TELEPHONE: 419-249-2417 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 908
- 2. Maximum Dependable Capacity (MWe-Net) 894 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 476.87 4,793.20 220,567.08
- 4. Number of Hours Generator On-line 462.10 4,778.43 217,267.18
- 5. Reserve Shutdown Hours 0.00 0.00 5,532.00
- 6. Net Electrical energy Generated (MWHrs) 399,908.00 4,339,570.50 183,626,883.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 6/29/2013 F 281.90 A 4 Reactor Trip on Reactor Protection System due to Flux/Delta Flux/Flow on trip of Reactor Coolant Pump 1-2 due to electrical problem.
SUMMARY
On July 12, 2013, the Reactor was taken critical and the Unit synchronized to the grid following completion of repair activities for the plant trip that occurred on June 29, 2013. Power ascension to 100% power was completed on July 14 following routine testing and emergent repairs to feedwater heater level controls. On July 22 and July 24, planned downpowers to approximately 99% power were conducted to support Reactor Trip Breaker testing. The plant remained at approximately 100% power the remainder of the month.
OPERATING DATA REPORT DOCKET: 346 PREPARER NAME: J. Syrowski UNIT_NME: Davis-Besse Unit 1 PREPARER TELEPHONE: 419-249-2417 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 908
- 2. Maximum Dependable Capacity (MWe-Net) 894 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,537.20 221,311.08
- 4. Number of Hours Generator On-line 744.00 5,522.43 218,011.18
- 5. Reserve Shutdown Hours 0.00 0.00 5,532.00
- 6. Net Electrical energy Generated (MWHrs) 672,378.60 5,011,949.10 184,299,261.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
On August 14, 2013, a planned downpower to approximately 99% power was conducted to support Reactor Trip Breaker testing. On August 29 a planned downpower to approximately 99% power was conducted to support Reactor Trip Breaker maintenance and testing. The plant remained at approximately 100% power the remainder of the month.
OPERATING DATA REPORT DOCKET: 346 PREPARER NAME: J. Syrowski UNIT_NME: Davis-Besse Unit 1 PREPARER TELEPHONE: 419-249-2417 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 908
- 2. Maximum Dependable Capacity (MWe-Net) 894 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,257.20 222,031.08
- 4. Number of Hours Generator On-line 720.00 6,242.43 218,731.18
- 5. Reserve Shutdown Hours 0.00 0.00 5,532.00
- 6. Net Electrical energy Generated (MWHrs) 652,537.10 5,664,486.20 184,951,798.70 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
On September 4 and 25, 2013, planned downpowers to approximately 99% power were conducted to support Reactor Trip Breaker testing. On September 7 a planned downpower to approximately 99% power was conducted to support Reactor Trip Breaker maintenance and testing. On September 18 a planned downpower to approximately 99% power was conducted to support Reactor Trip Breaker maintenance and testing and Integrated Control System maintenance. The plant remained at approximately 100% power the remainder of the month.
OPERATING DATA REPORT DOCKET: 275 PREPARER NAME: M. Padovan UNIT_NME: Diablo Canyon Unit 1 PREPARER TELEPHONE: (805) 545-4540 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1138
- 2. Maximum Dependable Capacity (MWe-Net) 1122 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 719.53 4,946.40 219,714.00
- 4. Number of Hours Generator On-line 705.72 4,932.59 217,725.36
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 781,724.00 5,604,961.00 231,763,888.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 6/26/2013 F 38.28 A 4 An inspection identified a thru wall crack in the socket weld at the half coupling attached to Line-985, upstream of RHR-1-RV-8708. Engineering accepted a fatigue resistant socket weld profile at socket welded half coupling and a weld repair was performed.
SUMMARY
Following a Residual Heat Removal system weld repair, Operations performed a ramp up in power, reaching full power at 0400 on July 4th, 2013. Unit 1 operated at approximately 100 percent power for the rest of the month of July, 2013.
OPERATING DATA REPORT DOCKET: 275 PREPARER NAME: (805) 545-4540 UNIT_NME: Diablo Canyon Unit 1 PREPARER TELEPHONE: M. Padovan RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1138
- 2. Maximum Dependable Capacity (MWe-Net) 1122 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,690.40 220,458.00
- 4. Number of Hours Generator On-line 744.00 5,676.59 218,469.36
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 848,141.00 6,453,102.00 232,612,029.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Diablo Canyon Unit One began and ended the month of August, 2013 in Mode 1 (Power Operation) at approximately 100 percent reactor power.
There were no significant operational occurrences.
OPERATING DATA REPORT DOCKET: 275 PREPARER NAME: Mark Padovan UNIT_NME: Diablo Canyon Unit 1 PREPARER TELEPHONE: 805-545-4540 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1138
- 2. Maximum Dependable Capacity (MWe-Net) 1122 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,410.40 221,178.00
- 4. Number of Hours Generator On-line 720.00 6,396.59 219,189.36
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 821,185.00 7,274,287.00 233,433,214.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 1 operated at approximately 100 percent power for the month of September 2013.
OPERATING DATA REPORT DOCKET: 323 PREPARER NAME: M. Padovan UNIT_NME: Diablo Canyon Unit 2 PREPARER TELEPHONE: (805) 545-4540 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1151
- 2. Maximum Dependable Capacity (MWe-Net) 1118 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 665.95 3,891.00 214,950.73
- 4. Number of Hours Generator On-line 656.13 3,826.46 213,036.92
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 721,930.00 4,278,799.00 228,014,080.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2 7/10/2013 F 87.87 A 3 A Licensee Event Report and Root Cause Evaluation are being prepared to determine the cause and corrective actions.
SUMMARY
Diablo Canyon Unit 2 began the month of July in Mode 1 (Power Operation) at approximately 100 percent reactor power. On July 10th, an apparent electrical flashover of a Unit 2 main bank transformer lightning arrestor resulted in a reactor trip. Preliminary investigation suggests that the electrical disturbance was experienced during routine "hot washing" an insulator. On July 13th, 2013, Unit 2 was returned to critical and entered Mode 1 (power operation). On July 15th, 2013, Unit 2 returned to full power and it remained there for the rest of the month.
OPERATING DATA REPORT DOCKET: 323 PREPARER NAME: (805) 545-4540 UNIT_NME: Diablo Canyon Unit 2 PREPARER TELEPHONE: M. Padovan RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1151
- 2. Maximum Dependable Capacity (MWe-Net) 1118 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,635.00 215,694.73
- 4. Number of Hours Generator On-line 744.00 4,570.46 213,780.92
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 843,997.00 5,122,796.00 228,858,077.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Diablo Canyon Unit Two began and ended the month of August, 2013 in Mode 1 (Power Operation) at approximately 100 percent reactor power.
There were no significant operational occurrences.
OPERATING DATA REPORT DOCKET: 323 PREPARER NAME: M. Padovan UNIT_NME: Diablo Canyon Unit 2 PREPARER TELEPHONE: 805-545-4540 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1151
- 2. Maximum Dependable Capacity (MWe-Net) 1118 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,355.00 216,414.73
- 4. Number of Hours Generator On-line 720.00 5,290.46 214,500.92
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 817,391.00 5,940,187.00 229,675,468.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Diablo Canyon Unit 2 operated at approximately 100 percent power for the month of September 2013.
OPERATING DATA REPORT DOCKET: 237 PREPARER NAME: Dave Kijowski UNIT_NME: Dresden Unit 2 PREPARER TELEPHONE: 815-416-4227 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 894
- 2. Maximum Dependable Capacity (MWe-Net) 870 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 303,765.74
- 4. Number of Hours Generator On-line 744.00 5,087.00 294,590.59
- 5. Reserve Shutdown Hours 0.00 0.00 4.00
- 6. Net Electrical energy Generated (MWHrs) 677,151.00 4,690,095.00 213,341,844.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
With the exception of short periods for routine maintenance and surveillances, Unit 2 operated at full power for the reporting period.
OPERATING DATA REPORT DOCKET: 237 PREPARER NAME: Dave Kijowski UNIT_NME: Dresden Unit 2 PREPARER TELEPHONE: 815-416-4227 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 894
- 2. Maximum Dependable Capacity (MWe-Net) 870 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 304,509.74
- 4. Number of Hours Generator On-line 744.00 5,831.00 295,334.59
- 5. Reserve Shutdown Hours 0.00 0.00 4.00
- 6. Net Electrical energy Generated (MWHrs) 672,326.00 5,362,421.00 214,014,170.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
On August 10, at approximately 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />, load was reduced to approximately 84% electrical for a planned control rod pattern adjustment. On August 11, at approximately 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />, the unit returned to full power operation.
On August 28, at approximately 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br />, load was reduced to approximately 98% electrical due to an unplanned trip of the 2B Circ Water Pump. On August 29, at approximately 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br />, load was further reduced due to condenser limitations with the combination of warm intake temperatures and two circ water pump operation. Load was reduced to as low as 89% electrical during this period of warm weather and two pump operation. The unit remained at approximately 89% electrical operation for the remainder of the reporting period.
OPERATING DATA REPORT DOCKET: 237 PREPARER NAME: Dave Kijowski UNIT_NME: Dresden Unit 2 PREPARER TELEPHONE: 815-416-4227 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 894
- 2. Maximum Dependable Capacity (MWe-Net) 870 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 305,229.74
- 4. Number of Hours Generator On-line 720.00 6,551.00 296,054.59
- 5. Reserve Shutdown Hours 0.00 0.00 4.00
- 6. Net Electrical energy Generated (MWHrs) 655,673.00 6,018,094.00 214,669,843.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Entering the month, unit load was at approximately 89% electrical due to an unplanned trip of the 2B Circ Water Pump. On September 1, at approximately 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br />, the unit was returned to full power operation.
On September 7, at approximately 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />, load was reduced to approximately 78% electrical for a planned control rod pattern adjustment.
On September 8, at approximately 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />, the unit returned to full power operation.
On September 21, at approximately 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />, load was reduced to approximately 86% electrical for a planned control rod pattern adjustment.
On September 22, at approximately 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />, the unit returned to full power operation.
With the exception of short periods for routine maintenance and surveillances, Unit 2 operated at full power for the remainder of the reporting period.
OPERATING DATA REPORT DOCKET: 249 PREPARER NAME: Dave Kijowski UNIT_NME: Dresden Unit 3 PREPARER TELEPHONE: 815-416-4227 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 879
- 2. Maximum Dependable Capacity (MWe-Net) 850 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 291,325.05
- 4. Number of Hours Generator On-line 744.00 5,087.00 282,828.15
- 5. Reserve Shutdown Hours 0.00 0.00 1.00
- 6. Net Electrical energy Generated (MWHrs) 676,259.00 4,672,982.00 204,775,455.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
With the exception of short periods for routine maintenance and surveillances, Unit 3 operated at full power for the reporting period.
OPERATING DATA REPORT DOCKET: 249 PREPARER NAME: Dave Kijowski UNIT_NME: Dresden Unit 3 PREPARER TELEPHONE: 815-416-4227 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 879
- 2. Maximum Dependable Capacity (MWe-Net) 850 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 292,069.05
- 4. Number of Hours Generator On-line 744.00 5,831.00 283,572.15
- 5. Reserve Shutdown Hours 0.00 0.00 1.00
- 6. Net Electrical energy Generated (MWHrs) 675,205.00 5,348,187.00 205,450,660.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
On August 31, at approximately 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />, load was reduced to approximately 66% electrical for planned turbine valve testing and control rod pattern adjustment. The unit was operating at approximately 70% electrical at the end of the reporting period.
OPERATING DATA REPORT DOCKET: 249 PREPARER NAME: Dave Kijowski UNIT_NME: Dresden Unit 3 PREPARER TELEPHONE: 815-416-4227 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 879
- 2. Maximum Dependable Capacity (MWe-Net) 850 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 292,789.05
- 4. Number of Hours Generator On-line 720.00 6,551.00 284,292.15
- 5. Reserve Shutdown Hours 0.00 0.00 1.00
- 6. Net Electrical energy Generated (MWHrs) 654,286.00 6,002,473.00 206,104,946.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Entering the month, unit load was at approximately 70% electrical for planned turbine valve testing and control rod pattern adjustment. On September 1, at approximately 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />, the unit was returned to full power operation.
With the exception of short periods for routine maintenance and surveillances, Unit 3 operated at full power for the remainder of the reporting period.
OPERATING DATA REPORT DOCKET: 331 PREPARER NAME: Wendell Horst UNIT_NME: Duane Arnold Unit 1 PREPARER TELEPHONE: 319 851-7359 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 621.9
- 2. Maximum Dependable Capacity (MWe-Net) 601.6 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 280,212.11
- 4. Number of Hours Generator On-line 744.00 5,087.00 275,254.47
- 5. Reserve Shutdown Hours 0.00 0.00 192.80
- 6. Net Electrical energy Generated (MWHrs) 447,623.96 3,097,483.69 138,115,281.87 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 331 PREPARER NAME: Wendell Horst UNIT_NME: Duane Arnold Unit 1 PREPARER TELEPHONE: 319 851-7359 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 621.9
- 2. Maximum Dependable Capacity (MWe-Net) 601.6 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 280,956.11
- 4. Number of Hours Generator On-line 744.00 5,831.00 275,998.47
- 5. Reserve Shutdown Hours 0.00 0.00 192.80
- 6. Net Electrical energy Generated (MWHrs) 447,146.62 3,544,630.31 138,562,428.49 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unplanned energy loss in August 2013 was due to problems with the feedwater LEFM flow indicators.
OPERATING DATA REPORT DOCKET: 331 PREPARER NAME: Wendell Horst UNIT_NME: Duane Arnold Unit 1 PREPARER TELEPHONE: 319 851-7359 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 621.9
- 2. Maximum Dependable Capacity (MWe-Net) 601.6 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 281,676.11
- 4. Number of Hours Generator On-line 720.00 6,551.00 276,718.47
- 5. Reserve Shutdown Hours 0.00 0.00 192.80
- 6. Net Electrical energy Generated (MWHrs) 430,065.00 3,974,695.31 138,992,493.49 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unplanned energy loss in September 2013 was a result of a minor downpower to restore Reactor Water Cleanup following repair of MO2701, RWCU Supply Outboard Isolation, which failed to close when demanded. PEL was due to the quarterly surveillance and control rod sequence exchange downpower, and repair of a lube oil leak on Reactor Feedwater Pump B.
OPERATING DATA REPORT DOCKET: 348 PREPARER NAME: Khris Miller UNIT_NME: Farley Unit 1 PREPARER TELEPHONE: 334-814-4549 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 854
- 2. Maximum Dependable Capacity (MWe-Net) 874 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,043.55 266,900.26
- 4. Number of Hours Generator On-line 744.00 5,033.30 264,172.00
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 648,345.00 4,438,273.00 214,655,579.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
There were no significant power reductions this period.
OPERATING DATA REPORT DOCKET: 348 PREPARER NAME: Khris Miller UNIT_NME: Farley Unit 1 PREPARER TELEPHONE: 334-814-4549 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 854
- 2. Maximum Dependable Capacity (MWe-Net) 874 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,787.55 267,644.26
- 4. Number of Hours Generator On-line 744.00 5,777.30 264,916.00
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 646,171.00 5,084,444.00 215,301,750.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
There were no significant power reductions this period.
OPERATING DATA REPORT DOCKET: 348 PREPARER NAME: Khris Miller UNIT_NME: Farley Unit 1 PREPARER TELEPHONE: 334-814-4549 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 854
- 2. Maximum Dependable Capacity (MWe-Net) 874 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 678.83 6,466.38 268,323.09
- 4. Number of Hours Generator On-line 677.78 6,455.08 265,593.78
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 558,087.00 5,642,531.00 215,859,837.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 25 9/29/2013 S 42.22 C 1 At 1359 on September 12, 2013 Unit 1 began to ramp down prior to the normal refueling outage U1R25. The Unit was removed from the grid at 0547 on September 29, 2013. The reactor was shut down at 0650 on September 29, 2013.
SUMMARY
At 1359 on September 12, 2013 Unit 1 began to ramp down prior to the normal refueling outage U1R25. The Unit was removed from the grid at 0547 on September 29, 2013. The reactor was shut down at 0650 on September 29, 2013.
OPERATING DATA REPORT DOCKET: 364 PREPARER NAME: Khris Miller UNIT_NME: Farley Unit 2 PREPARER TELEPHONE: 334-814-4549 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 855
- 2. Maximum Dependable Capacity (MWe-Net) 883 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,503.08 249,507.85
- 4. Number of Hours Generator On-line 744.00 4,469.25 247,004.56
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 652,036.00 3,818,528.00 202,647,981.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
There were no significant power reductions this period.
OPERATING DATA REPORT DOCKET: 364 PREPARER NAME: Khris Miller UNIT_NME: Farley Unit 2 PREPARER TELEPHONE: 334-814-4549 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 855
- 2. Maximum Dependable Capacity (MWe-Net) 883 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,247.08 250,251.85
- 4. Number of Hours Generator On-line 744.00 5,213.25 247,748.56
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 650,557.00 4,469,085.00 203,298,538.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
There were no significant power reductions this period.
OPERATING DATA REPORT DOCKET: 364 PREPARER NAME: Khris Miller UNIT_NME: Farley Unit 2 PREPARER TELEPHONE: 334-814-4549 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 855
- 2. Maximum Dependable Capacity (MWe-Net) 883 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,967.08 250,971.85
- 4. Number of Hours Generator On-line 720.00 5,933.25 248,468.56
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 632,876.00 5,101,961.00 203,931,414.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
There were no significant power reductions this period.
OPERATING DATA REPORT DOCKET: 341 PREPARER NAME: E. Sorg UNIT_NME: Fermi Unit 2 PREPARER TELEPHONE: 734-586-4294 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1150
- 2. Maximum Dependable Capacity (MWe-Net) 1037.3 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,783.68 180,842.43
- 4. Number of Hours Generator On-line 744.00 4,745.58 175,956.65
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 522,400.00 3,386,990.00 179,939,590.92 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit operated at 68% power the entire month.
OPERATING DATA REPORT DOCKET: 341 PREPARER NAME: E. Sorg UNIT_NME: Fermi Unit 2 PREPARER TELEPHONE: 734-586-4294 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1150
- 2. Maximum Dependable Capacity (MWe-Net) 1037.3 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,527.68 181,586.43
- 4. Number of Hours Generator On-line 744.00 5,489.58 176,700.65
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 526,801.00 3,913,791.00 180,466,391.92 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit operated at approximately 68% for the entire month of August with the following exceptions:
8/6/13 2057 to 2129: Planned power change from 68% to 62% for Turbine Control Valve vibration measurement.
8/27/13 0207 to 0225: Planned power change from 68% to 65% for HCU maintenance.
8/30/13 2330 to 8/31/13 0129: Planned power change from 68% to 62% for scram time testing.
OPERATING DATA REPORT DOCKET: 341 PREPARER NAME: E. Sorg UNIT_NME: Fermi Unit 2 PREPARER TELEPHONE: 734-586-4294 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1150
- 2. Maximum Dependable Capacity (MWe-Net) 1037.3 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 409.42 5,937.10 181,995.85
- 4. Number of Hours Generator On-line 364.48 5,854.06 177,065.13
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 280,255.00 4,194,046.00 180,746,646.92 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments PO 9/9/2013 S 355.52 B 1 Planned shutdown to restore the South Reactor 13-02 Feed Pump turbine following repair and refurbishment.
SUMMARY
The unit operated at 68% power until 9/8/2013 when a planned shutdown to Planned Outage (PO) 13-02 was commenced. The reactor was taken subcritical on 9/9/2013 at 0300. Following repairs the reactor was taken critical 9/22/13 at 0135, and the generator was synched to the Detroit Edison grid at 2231 on 9/23/13. Power ascension to 100% reactor power was completed on 9/30/2013 at 1440.
OPERATING DATA REPORT DOCKET: 333 PREPARER NAME: Ryan Perry UNIT_NME: FitzPatrick Unit 1 PREPARER TELEPHONE: 3153496218 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 816
- 2. Maximum Dependable Capacity (MWe-Net) 813 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,990.00 269,302.51
- 4. Number of Hours Generator On-line 744.00 4,884.05 263,346.39
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 605,447.00 3,920,964.00 202,779,795.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The plant operated at or near 100% power for the month of July with the exception of the following event:
The downpower event was from 7/18/2013-7/19/2013 to approximately 47% power for Condenser tube leaks of the A1 waterbox.
OPERATING DATA REPORT DOCKET: 333 PREPARER NAME: Ryan Perry UNIT_NME: FitzPatrick Unit 1 PREPARER TELEPHONE: 3153496218 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 816
- 2. Maximum Dependable Capacity (MWe-Net) 813 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,734.00 270,046.51
- 4. Number of Hours Generator On-line 744.00 5,628.05 264,090.39
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 591,499.00 4,512,463.00 203,371,294.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The plant operated at or near 100% power for the month of August with the exception of the following event:
The downpower event was from 8/23/2013-8/24/2013 to approximately 48.5% power for Condenser tube leaks.
OPERATING DATA REPORT DOCKET: 333 PREPARER NAME: Ryan Perry UNIT_NME: FitzPatrick Unit 1 PREPARER TELEPHONE: 315-349-6218 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 816
- 2. Maximum Dependable Capacity (MWe-Net) 813 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,454.00 270,766.51
- 4. Number of Hours Generator On-line 720.00 6,348.05 264,810.39
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 521,285.00 5,033,748.00 203,892,579.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The plant operated at or near 100% power for the month of September with the exception of the following event:
The downpower event was from 9/6/2013 to 9/13/2013 to approximately 48% for 'B' Reactor Feedpump repairs.
OPERATING DATA REPORT DOCKET: 285 PREPARER NAME: Jake Walker UNIT_NME: Fort Calhoun Unit 1 PREPARER TELEPHONE: 402-533-6693 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 502
- 2. Maximum Dependable Capacity (MWe-Net) 482 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 0.00 0.00 270,885.19
- 4. Number of Hours Generator On-line 0.00 0.00 269,363.34
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 0.00 0.00 119,655,821.80 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2011- 4/9/2011 S 744.00 C 4 Shutdown for Cycle 26 End of Cycle RFO. No corrective actions necessary.
SUMMARY
FCS remained shutdown through July 2013. Flood recovery and IMC 0350 activities are on-going. The plant will remain shutdown until flood recovery and NRC Inspection Manual Chapter 0350 activities are complete. Due to being placed in NRC Inspection Manual Chapter 0350, all hours spent shutdown are considered Unplanned Energy Loss - Outage Extension until Chapter 0350 activities are complete.
OPERATING DATA REPORT DOCKET: 285 PREPARER NAME: Jake Walker UNIT_NME: Fort Calhoun Unit 1 PREPARER TELEPHONE: 402-533-6693 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 502
- 2. Maximum Dependable Capacity (MWe-Net) 482 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 0.00 0.00 270,885.19
- 4. Number of Hours Generator On-line 0.00 0.00 269,363.34
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 0.00 0.00 119,655,821.80 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2011- 4/9/2011 S 744.00 C 4 Shutdown for Cycle 26 End of Cycle RFO. No corrective actions necessary.
SUMMARY
FCS remained shutdown through August 2013. Flood recovery and IMC 0350 activities are on-going. The plant will remain shutdown until flood recovery and NRC Inspection Manual Chapter 0350 activities are complete. Due to being placed in NRC Inspection Manual Chapter 0350, all hours spent shutdown are considered Unplanned Energy Loss - Outage Extension until Chapter 0350 activities are complete.
OPERATING DATA REPORT DOCKET: 285 PREPARER NAME: Jake Walker UNIT_NME: Fort Calhoun Unit 1 PREPARER TELEPHONE: 402-533-6693 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 502
- 2. Maximum Dependable Capacity (MWe-Net) 482 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 0.00 0.00 270,885.19
- 4. Number of Hours Generator On-line 0.00 0.00 269,363.34
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 0.00 0.00 119,655,821.80 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2011- 4/9/2011 S 720.00 C 4 Shutdown for Cycle 26 End of Cycle RFO. No corrective actions necessary.
SUMMARY
FCS remained shutdown through September 2013. Flood recovery and IMC 0350 activities are on-going. The plant will remain shutdown until flood recovery and NRC Inspection Manual Chapter 0350 activities are complete. Due to being placed in NRC Inspection Manual Chapter 0350, all hours spent shutdown are considered Unplanned Energy Loss - Outage Extension until Chapter 0350 activities are complete.
OPERATING DATA REPORT DOCKET: 244 PREPARER NAME: John V. Walden UNIT_NME: Ginna Unit 1 PREPARER TELEPHONE: 585-771-3588 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 585
- 2. Maximum Dependable Capacity (MWe-Net) 560 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 666.03 5,009.03 326,749.25
- 4. Number of Hours Generator On-line 651.78 4,994.78 323,285.39
- 5. Reserve Shutdown Hours 0.00 0.00 8.50
- 6. Net Electrical energy Generated (MWHrs) 363,934.79 2,886,433.68 154,693,996.11 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 7/24/2013 F 92.22 B 3 The reactor trip was caused by an unexpected generator trip during positive VAR testing. A generator protection relay trip setpoint was programmed incorrectly during the 2012 refueling outage. LER 2013-002 was submitted on this event. Reprogramming of the generator protection relay was performed to remove the trip function.
SUMMARY
The unit operated at full power from the beginning of the month until July 23, 2013 at 1419, when the main generator tripped during positive VAR testing. The generator trip caused a turbine trip and reactor trip from full power. The reactor criticality was achieved on July 27, 2013 at 2017 following generator protection relay reprogramming to remove the trip function. The unit was brought on-line on July 28, 2013 at 1032. Full power operations resumed on July 29, 2013 at 0500 and continued through the end of the month.
OPERATING DATA REPORT DOCKET: 244 PREPARER NAME: John V. Walden UNIT_NME: Ginna Unit 1 PREPARER TELEPHONE: 585-771-3588 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 585
- 2. Maximum Dependable Capacity (MWe-Net) 560 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,753.03 327,493.25
- 4. Number of Hours Generator On-line 744.00 5,738.78 324,029.39
- 5. Reserve Shutdown Hours 0.00 0.00 8.50
- 6. Net Electrical energy Generated (MWHrs) 418,662.66 3,305,096.34 155,112,658.77 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit operated at full power for the entire month of August. Average power for the month was 99.8%.
OPERATING DATA REPORT DOCKET: 244 PREPARER NAME: John V. Walden UNIT_NME: Ginna Unit 1 PREPARER TELEPHONE: 585-771-3588 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 585
- 2. Maximum Dependable Capacity (MWe-Net) 560 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,473.03 328,213.25
- 4. Number of Hours Generator On-line 720.00 6,458.78 324,749.39
- 5. Reserve Shutdown Hours 0.00 0.00 8.50
- 6. Net Electrical energy Generated (MWHrs) 407,739.32 3,712,835.66 155,520,398.09 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit operated at full power for the entire month of September. Average power for the month was 99.9%.
OPERATING DATA REPORT DOCKET: 416 PREPARER NAME: Allison Hughes UNIT_NME: Grand Gulf Unit 1 PREPARER TELEPHONE: 601-437-7341 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1279
- 2. Maximum Dependable Capacity (MWe-Net) 1266 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 710.53 4,675.43 221,880.84
- 4. Number of Hours Generator On-line 710.53 4,602.80 217,270.69
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 978,908.00 6,403,037.00 257,885,313.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2013- 7/30/2013 F 33.47 A 3 At 14:32 on July 30, 2012, GGNS experienced an 03 unexpected Reactor Scram. At the time, the plant was operating at 100% Rated Core Thermal Power. The scram occurred shortly after the Turbine Stress Evaluator (TSE) was turned on. I C turned the TSE on and the TSE-INFL alarm in the control room cleared. LOAD-LTD was noted to be dropping after the TSE was turned on.
Approximately one minute later, LOAD-ACTUAL was noted to be dropping and the reactor scrammed due to a turbine trip. The shift immediately entered EP-2 for Reactor Scram, the Reactor Scram ONEP, and Turbine Trip ONEP.
RCIC initiated and injected during the transient.
However, no Level 2 alarms were received.
Reactor levels were verified and RCIC was subsequently secured. All other systems operated as expected. The plant was stabilized with pressure control on the bypass valves, and level controlled on the startup level control valve.
SUMMARY
The plant continues to operate at EPU power. However a performance test has not been performed and a new Reference Unit Power (RUP) has not been determined. Losses during the month were corrected to the RUP using a ratio of the previous license power (3898) to the current license power (4408).
OPERATING DATA REPORT DOCKET: 416 PREPARER NAME: Andrew Fox UNIT_NME: Grand Gulf Unit 1 PREPARER TELEPHONE: 601 437-6204 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1279
- 2. Maximum Dependable Capacity (MWe-Net) 1266 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 688.77 5,364.20 222,569.61
- 4. Number of Hours Generator On-line 657.18 5,259.98 217,927.87
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 879,922.00 7,282,959.00 258,765,235.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2013- 7/30/2013 F 86.82 A 4 At 14:32 on July 30, 2012, GGNS experienced an 03 unexpected Reactor Scram. At the time, the plant was operating at 100% Rated Core Thermal Power. The scram occurred shortly after the Turbine Stress Evaluator (TSE) was turned on. I C turned the TSE on and the TSE-INFL alarm in the control room cleared. LOAD-LTD was noted to be dropping after the TSE was turned on.
Approximately one minute later, LOAD-ACTUAL was noted to be dropping and the reactor scrammed due to a turbine trip. The shift immediately entered EP-2 for Reactor Scram, the Reactor Scram ONEP, and Turbine Trip ONEP.
RCIC initiated and injected during the transient.
However, no Level 2 alarms were received.
Reactor levels were verified and RCIC was subsequently secured. All other systems operated as expected. The plant was stabilized with pressure control on the bypass valves, and level controlled on the startup level control valve.
SUMMARY
The plant continues to operate at EPU power. However a performance test has not been performed and a new Reference Unit Power (RUP) has not been determined. Losses during the month were corrected to the RUP using a ratio of the previous license power (3898) to the current license power (4408).
OPERATING DATA REPORT DOCKET: 416 PREPARER NAME: Andrew Fox UNIT_NME: Grand Gulf Unit 1 PREPARER TELEPHONE: 601 437-6204 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1279
- 2. Maximum Dependable Capacity (MWe-Net) 1266 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,084.20 223,289.61
- 4. Number of Hours Generator On-line 720.00 5,979.98 218,647.87
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 990,253.00 8,273,212.00 259,755,488.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The plant continues to operate at EPU power. However a performance test has not been performed and a new Reference Unit Power (RUP) has not been determined. Losses during the month were corrected to the RUP using a ratio of the previous license power (3898) to the current license power (4408).
OPERATING DATA REPORT DOCKET: 400 PREPARER NAME: John Kelly UNIT_NME: Harris Unit 1 PREPARER TELEPHONE: 9193622194 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 973
- 2. Maximum Dependable Capacity (MWe-Net) 928 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,559.77 204,056.66
- 4. Number of Hours Generator On-line 744.00 4,540.17 202,643.42
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 696,829.00 4,264,218.00 176,974,126.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
There were no unit shutdowns in July 2013.
OPERATING DATA REPORT DOCKET: 400 PREPARER NAME: John Kelly UNIT_NME: Harris Unit 1 PREPARER TELEPHONE: 9193622194 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 973
- 2. Maximum Dependable Capacity (MWe-Net) 928 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,303.77 204,800.66
- 4. Number of Hours Generator On-line 711.80 5,251.97 203,355.22
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 645,140.00 4,909,358.00 177,619,266.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 61704 8/3/2013 S 32.20 H 5 There was a planned unit shutdown to address 5 increased vibrations for Low Pressure Turbine 2 bearing #5. A balance weight was installed which reduced vibrations. Additional corrective actions to address the bearing vibration will be documented in NCR 00617045
SUMMARY
There was a planned unit shutdown to address increased vibrations for Low Pressure Turbine 2 Bearing #5. A balance weight was installed which reduced vibrations.
OPERATING DATA REPORT DOCKET: 400 PREPARER NAME: Dustin Martin UNIT_NME: Harris Unit 1 PREPARER TELEPHONE: 9193622679 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 973
- 2. Maximum Dependable Capacity (MWe-Net) 928 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,023.77 205,520.66
- 4. Number of Hours Generator On-line 709.25 5,961.22 204,064.47
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 656,853.00 5,566,211.00 178,276,119.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 62596 9/15/2013 S 10.75 H 5 There was a planned unit shutdown to address 0 increased vibrations for Low Pressure Turbine bearing #5. A balance weight was installed which reduced vibrations. Additional corrective actions to address the bearing vibration will be documented in NCR 00625960.
SUMMARY
There was a planned unit shutdown to address increased vibrations for Low Pressure Turbine 2 Bearing #5. A balance weight was installed which reduced vibrations.
OPERATING DATA REPORT DOCKET: 321 PREPARER NAME: Ben Mosley UNIT_NME: Hatch Unit 1 PREPARER TELEPHONE: 912-537-5872 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 885
- 2. Maximum Dependable Capacity (MWe-Net) 876 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,718.85 276,791.47
- 4. Number of Hours Generator On-line 744.00 4,683.02 269,977.64
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 616,685.00 3,996,097.00 207,945,108.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Power was reduced to 65% in order to perform a power suppression test, turbine valve testing, control rod drive exercises and a rod sequence exchange on 07/03/2013. Upon completion of these activities, power was increased and subsequently decreased to 77% to perform an additional rod pattern adjustment on 07/08/2013. The unit was returned to rated thermal power on 07/09/2013. There were no additional significant generation loss events (>20%) for the remainder of the month.
OPERATING DATA REPORT DOCKET: 321 PREPARER NAME: Ben Mosley UNIT_NME: Hatch Unit 1 PREPARER TELEPHONE: 912-537-5872 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 885
- 2. Maximum Dependable Capacity (MWe-Net) 876 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,462.85 277,535.47
- 4. Number of Hours Generator On-line 744.00 5,427.02 270,721.64
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 646,619.00 4,642,716.00 208,591,727.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
There were no significant generation loss events (>20%) this month.
OPERATING DATA REPORT DOCKET: 321 PREPARER NAME: Ben Mosley UNIT_NME: Hatch Unit 1 PREPARER TELEPHONE: 912-537-5872 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 885
- 2. Maximum Dependable Capacity (MWe-Net) 876 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,182.85 278,255.47
- 4. Number of Hours Generator On-line 720.00 6,147.02 271,441.64
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 631,777.00 5,274,493.00 209,223,504.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
There were no significant generation loss events (>20%) this month.
OPERATING DATA REPORT DOCKET: 366 PREPARER NAME: Ben Mosley UNIT_NME: Hatch Unit 2 PREPARER TELEPHONE: 912-537-5872 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 908
- 2. Maximum Dependable Capacity (MWe-Net) 883 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,275.08 251,551.46
- 4. Number of Hours Generator On-line 744.00 4,207.58 246,470.25
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 654,717.00 3,681,444.00 193,624,580.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
There were no significant generation loss events (>20%) this month.
OPERATING DATA REPORT DOCKET: 366 PREPARER NAME: Ben Mosley UNIT_NME: Hatch Unit 2 PREPARER TELEPHONE: 912-537-5872 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 908
- 2. Maximum Dependable Capacity (MWe-Net) 883 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,019.08 252,295.46
- 4. Number of Hours Generator On-line 744.00 4,951.58 247,214.25
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 653,432.00 4,334,876.00 194,278,012.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
There were no significant generation loss events (>20%) this month.
OPERATING DATA REPORT DOCKET: 366 PREPARER NAME: Ben Mosley UNIT_NME: Hatch Unit 2 PREPARER TELEPHONE: 912-537-5872 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 908
- 2. Maximum Dependable Capacity (MWe-Net) 883 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 603.98 5,623.06 252,899.44
- 4. Number of Hours Generator On-line 567.23 5,518.81 247,781.48
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 466,622.00 4,801,498.00 194,744,634.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 13- 9/15/2013 S 152.77 B 1 Unit was shutdown to perform maintenance on an MSIV which failed to close during testing on 09/14/2013.
SUMMARY
The unit began the month operating at rated thermal power. Power was reduced to 65% for Turbine Valve testing, CRD Exercise and Rod Pattern Adjustment on 09/14/2013. While at 65% and during testing of a Main Steam Isolation Valve (MSIV), the MSIV failed to close on demand on 09/14/2013. Power was reduced to 50% to support maintenance of the MSIV on 09/14/2013. The reactor was subsequently shutdown per the normal plant shutdown procedure via manual scram to repair the MSIV on 09/15/2013. Following the outage, the reactor was critical on 09/20/2013. Power was increased and the unit was returned to rated thermal power on 09/24/2013.
OPERATING DATA REPORT DOCKET: 354 PREPARER NAME: Walter Bischoff UNIT_NME: Hope Creek Unit 1 PREPARER TELEPHONE: 8563391037 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1228.1
- 2. Maximum Dependable Capacity (MWe-Net) 1172 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,966.57 205,565.17
- 4. Number of Hours Generator On-line 744.00 4,944.33 201,919.21
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 839,293.00 5,934,359.00 213,478,684.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The month started with the unit online and the reactor critical at 98.0% RTP due to main condenser pressures reaching the main turbine design back pressure limit as a result of: extreme environmental conditions, high dry bulb and wet bulb air temperatures. The unit returned to 100% RTP on 7/1/13 at 0147 One (1) planned power change greater than 15% occurred in July 2013.
A power decrease of approximately 26.2% (100% to 73.8%) occurred on 7/26/2013 at 2000 for Main Condenser waterbox cycling. Power was stabilized at 73.8% RCTP on 7/27/2013 at 0057. Power ascension started on 7/27/2013 at 0508. The unit returned to 100% on 7/27/2013 at 1050.
This is a planned power reduction IAW NEI 99-02.
Zero (0) unplanned power changes greater than 15% occurred in July 2013.
The month ended with the unit online and the reactor critical at 99.8% RTP.
The SRVs were not challenged by any over pressurization events or transients that would have required the valves to respond automatically.
OPERATING DATA REPORT DOCKET: 354 PREPARER NAME: Walter Bischoff UNIT_NME: Hope Creek Unit 1 PREPARER TELEPHONE: 8563391037 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1228.1
- 2. Maximum Dependable Capacity (MWe-Net) 1172 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,710.57 206,309.17
- 4. Number of Hours Generator On-line 744.00 5,688.33 202,663.21
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 857,101.00 6,791,460.00 214,335,785.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The month started with the unit online and the reactor critical at 99.8% RTP One (1) planned power change greater than 15% occurred in August 2013.
A power decrease of approximately 15.5% (100% to 84.5%) occurred on 8/10/2013 at 2007 for control rod pattern adjustments. Power was stabilized at 84.5% RCTP on 8/10/2013 at 2224. Power ascension started on 8/10/2013 at 2228. The unit returned to 100% on 8/11/2013 at 0248.
This is a planned power reduction IAW NEI 99-02. All control rod pattern changes are considered planned.
One (1) unplanned power change greater than 15% occurred in August 2013.
A power decrease of approximately 30.6% (100% to 69.4%) occurred on 8/1/2013 at 2334 due to a recirc runback to 45% cause by a trip of the B Circ water pump. Power was stabilized at 69.4% RCTP on 8/2/2013 at 0300. Power ascension started on 8/2/2013 at 0313. The unit returned to 100% on 8/5/2013 at 0157. This is an unplanned power reduction and is not excluded IAW NEI 99-02.
The month ended with the unit online and the reactor critical at 93.1% RTP due to main condenser pressures reaching the main turbine design back pressure limit as a result of: extreme environmental conditions, high dry bulb and wet bulb air temperatures.
The SRVs were not challenged by any over pressurization events or transients that would have required the valves to respond automatically.
OPERATING DATA REPORT DOCKET: 354 PREPARER NAME: Walter Bischoff UNIT_NME: Hope Creek Unit 1 PREPARER TELEPHONE: 8563391037 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1228.1
- 2. Maximum Dependable Capacity (MWe-Net) 1172 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,430.57 207,029.17
- 4. Number of Hours Generator On-line 720.00 6,408.33 203,383.21
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 826,175.00 7,617,635.00 215,161,960.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The month started with the unit online and the reactor critical at 93.1% RTP due to main condenser pressures reaching the main turbine design back pressure limit as a result of: extreme environmental conditions, high dry bulb and wet bulb air temperatures. The unit returned to 100% RTP on 9/3/13 at 2222.
One (1) planned power change greater than 15% occurred in September 2013.
A power decrease of approximately 24% (100% to 76%) occurred on 9/7/2013 at 0005 for main turbine valve testing. Power was stabilized at 76% RCTP on 9/7/2013 at 0303. Power ascension started on 9/7/2013 at 1401. The unit returned to 100% on 9/7/2013 at 1839. This is a planned power reduction IAW NEI 99-02.
One (1) unplanned power change greater than 15% occurred in September 2013.
A planned power decrease of approximately 12% (100% to 88%) occurred on 9/19/2013 at 2000 for planned control rod pattern adjustments.
Power was stabilized at 88% RTP but there was no power ascension. A power decrease of approximately 28% (88% to 60%) occurred on 9/19/2013 at 2142 due to the A recirc pump speed controller failing to 0% demand reducing the pump to minimum speed. Power was stabilized at 60% RCTP on 9/20/2013 at 0304. Power ascension started on 9/20/2013 at 1643. The unit returned to 100% on 9/21/2013 at 0542. This is an unplanned power reduction and is not excluded IAW NEI 99-02.
The month ended with the unit online and the reactor critical at 99.9% RTP The SRVs were not challenged by any over pressurization events or transients that would have required the valves to respond automatically.
OPERATING DATA REPORT DOCKET: 247 PREPARER NAME: Ron Macina UNIT_NME: Indian Point Unit 2 PREPARER TELEPHONE: (914)254-6839 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1035
- 2. Maximum Dependable Capacity (MWe-Net) 998 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 725.33 5,016.43 262,471.53
- 4. Number of Hours Generator On-line 717.78 5,001.46 257,919.40
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 650,352.89 5,039,852.63 231,358,352.07 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2 7/3/2013 F 26.22 A 2 IP2 Manually tripped at full power due to a loss of feedwater caused by a loss of instrument air to the main feeedwater regulating valves.
SUMMARY
Indian Point 2 was synchronized to the grid for a total of 717.78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br />, producing a gross generation of 675,255 MWhrs. The Unit began the month at full power. The Unit operated at full power until July 3, 2013 when at approximately 0747 hours0.00865 days <br />0.208 hours <br />0.00124 weeks <br />2.842335e-4 months <br /> the unit was manually tripped due to a loss of feedwater caused by a loss of instrument air to the Main Feedwater Regulating Valves (MFRV's). The Reactor was made critical on July 4, 2013 at approximately 0221 hours0.00256 days <br />0.0614 hours <br />3.654101e-4 weeks <br />8.40905e-5 months <br /> and the Unit was synchronized to the grid on July 4, 2013 at approximately 0954 hours0.011 days <br />0.265 hours <br />0.00158 weeks <br />3.62997e-4 months <br />. At approximately 1612 hours0.0187 days <br />0.448 hours <br />0.00267 weeks <br />6.13366e-4 months <br /> on July 4, 2013 when at about 60% Reactor Power an excessive oscillation was discovered in the 21 MFRV. It was also discovered that the 21 MFRV would not go full open and was placed in manual. On July 5, 2013 at approximately 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> Reactor Power was increased to approximately 80% on the low flow bypass. 80% Reactor Power was reached on July 5, 2013 at approximately 2118 hours0.0245 days <br />0.588 hours <br />0.0035 weeks <br />8.05899e-4 months <br />. On July 7, 2013 at approximately 1317 hours0.0152 days <br />0.366 hours <br />0.00218 weeks <br />5.011185e-4 months <br /> Reactor Power was reduced from approximately 80% to approximately 24% in order to repair the 21 MFRV. Power ascension recommenced on July 9, 2013 at approximately 0748 hours0.00866 days <br />0.208 hours <br />0.00124 weeks <br />2.84614e-4 months <br />. Full power was reached on July 9, 2013 at approximately 1602 hours0.0185 days <br />0.445 hours <br />0.00265 weeks <br />6.09561e-4 months <br />. The Unit remained at full power for the remainder of the month.
OPERATING DATA REPORT DOCKET: 247 PREPARER NAME: John Garry UNIT_NME: Indian Point Unit 2 PREPARER TELEPHONE: (914)254-6881 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1035
- 2. Maximum Dependable Capacity (MWe-Net) 998 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,760.43 263,215.53
- 4. Number of Hours Generator On-line 744.00 5,745.46 258,663.40
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 741,606.00 5,781,458.63 232,099,958.07 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Indian Point 2 was synchronized to the grid for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />, producing a gross generation of 766,990 MWhrs. The unit operated at full power for the entire month.
OPERATING DATA REPORT DOCKET: 247 PREPARER NAME: John Garry UNIT_NME: Indian Point Unit 2 PREPARER TELEPHONE: 914-254-6881 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1035
- 2. Maximum Dependable Capacity (MWe-Net) 998 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,480.43 263,935.53
- 4. Number of Hours Generator On-line 720.00 6,465.46 259,383.40
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 722,608.37 6,504,067.00 232,822,566.44 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Indian Point 2 was synchronized to the grid for a total of 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br />, producing a gross generation of 747100.36 MWhrs. The unit operated at full power for the entire month.
OPERATING DATA REPORT DOCKET: 286 PREPARER NAME: Ron Macina UNIT_NME: Indian Point Unit 3 PREPARER TELEPHONE: (914)254-6839 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1048
- 2. Maximum Dependable Capacity (MWe-Net) 1030 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 677.05 4,393.62 233,674.18
- 4. Number of Hours Generator On-line 677.05 4,359.20 230,295.53
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 695,525.00 4,476,199.00 216,728,208.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2 7/29/2013 S 66.95 B 1 Planned Shutdown to repair FCV-427, 32 Steam Generator Main Feed Reg Valve.
SUMMARY
Indian Point 3 was synchronized to the grid for a total of 677.05 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, producing a gross generation of 719,471 MWhrs. The unit began the month at full power. On July 29, 2013 at approximately 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />, a planned Reactor Power reduction to approximately 25% was made in order to perform diagnostics testing on the 32 Main Feedwater Regulating Valve (MFRV). It was determined to that in order to repair the 32 MFRV a shutdown was required in order to go internal to the valve. On July 29, 2013 at approximately 0503 hours0.00582 days <br />0.14 hours <br />8.316799e-4 weeks <br />1.913915e-4 months <br /> the unit was shutdown as part of the original plan as a contingency item. The unit remained shutdown for the rest of the month.
OPERATING DATA REPORT DOCKET: 286 PREPARER NAME: Ron Macina UNIT_NME: Indian Point Unit 3 PREPARER TELEPHONE: (914)254-6839 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1048
- 2. Maximum Dependable Capacity (MWe-Net) 1030 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 741.50 5,135.12 234,415.68
- 4. Number of Hours Generator On-line 736.95 5,096.15 231,032.48
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 753,115.00 5,229,314.00 217,481,323.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2 7/29/2013 S 7.05 B 4 Planned Shutdown to repair FCV-427, 32 Steam Generator Main Feed Reg Valve.
SUMMARY
Indian Point 3 was synchronized to the grid for a total of 739.95 hours0.0011 days <br />0.0264 hours <br />1.570767e-4 weeks <br />3.61475e-5 months <br />, producing a gross generation of 778,851 MWhrs. The unit began the month shutdown to repair the 32 Main Feedwater Regulating Valve (MFRV). The reactor was made critical on 8/1/2013 at approximately 02:30 hours and the Unit was synchronized to the grid on 8/1/2013 at approximately 07:03 hours. Full power was reached on 8/3/2013 at approximately 00:00 hours. The Unit remained at full power for the remainder of the month.
OPERATING DATA REPORT DOCKET: 286 PREPARER NAME: John Garry UNIT_NME: Indian Point Unit 3 PREPARER TELEPHONE: 914-254-6881 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1048
- 2. Maximum Dependable Capacity (MWe-Net) 1030 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,855.12 235,135.68
- 4. Number of Hours Generator On-line 720.00 5,816.15 231,752.48
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 749,006.00 5,978,320.00 218,230,329.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Indian Point 3 was synchronized to the grid for a total of 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br />, producing a gross generation of 774131.00 MWhrs. The unit operated at full power for the entire month.
OPERATING DATA REPORT DOCKET: 373 PREPARER NAME: S. Shields UNIT_NME: LaSalle Unit 1 PREPARER TELEPHONE: (815) 415-2811 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1178
- 2. Maximum Dependable Capacity (MWe-Net) 1111 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,799.47 204,703.33
- 4. Number of Hours Generator On-line 744.00 4,792.20 202,181.28
- 5. Reserve Shutdown Hours 0.00 0.00 1.00
- 6. Net Electrical energy Generated (MWHrs) 844,093.00 5,537,352.00 213,553,960.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 1 operated at or near full power for the month.
OPERATING DATA REPORT DOCKET: 373 PREPARER NAME: S. Shields UNIT_NME: LaSalle Unit 1 PREPARER TELEPHONE: (815) 415-2811 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1178
- 2. Maximum Dependable Capacity (MWe-Net) 1111 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,543.47 205,447.33
- 4. Number of Hours Generator On-line 744.00 5,536.20 202,925.28
- 5. Reserve Shutdown Hours 0.00 0.00 1.00
- 6. Net Electrical energy Generated (MWHrs) 844,884.00 6,382,236.00 214,398,844.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 1 operated at or near full power for the month. Planned energy losses for control rod maintenance.
OPERATING DATA REPORT DOCKET: 373 PREPARER NAME: S. Shields UNIT_NME: LaSalle Unit 1 PREPARER TELEPHONE: (815) 415-2811 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1178
- 2. Maximum Dependable Capacity (MWe-Net) 1111 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,263.47 206,167.33
- 4. Number of Hours Generator On-line 720.00 6,256.20 203,645.28
- 5. Reserve Shutdown Hours 0.00 0.00 1.00
- 6. Net Electrical energy Generated (MWHrs) 817,702.00 7,199,938.00 215,216,546.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 1 operated at or near full power for the month except for a planned control rod sequence exchange on 9/8/13 to approximately 720 MWe.
OPERATING DATA REPORT DOCKET: 374 PREPARER NAME: S. Shields UNIT_NME: LaSalle Unit 2 PREPARER TELEPHONE: (815) 415-2811 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1178
- 2. Maximum Dependable Capacity (MWe-Net) 1111 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,337.88 196,728.51
- 4. Number of Hours Generator On-line 744.00 4,289.44 195,378.39
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 846,467.00 4,778,730.00 208,458,848.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 2 operated at or near full power for the month.
OPERATING DATA REPORT DOCKET: 374 PREPARER NAME: S. Shields UNIT_NME: LaSalle Unit 2 PREPARER TELEPHONE: (815) 415-2811 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1178
- 2. Maximum Dependable Capacity (MWe-Net) 1111 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,081.88 197,472.51
- 4. Number of Hours Generator On-line 744.00 5,033.44 196,122.39
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 846,116.00 5,624,846.00 209,304,964.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 2 operated at or near full power for the month. Downpower for control rod maintenance and rod pattern exchange.
OPERATING DATA REPORT DOCKET: 374 PREPARER NAME: S. Shields UNIT_NME: LaSalle Unit 2 PREPARER TELEPHONE: (815) 415-2811 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1178
- 2. Maximum Dependable Capacity (MWe-Net) 1111 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,801.88 198,192.51
- 4. Number of Hours Generator On-line 720.00 5,753.44 196,842.39
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 790,713.00 6,415,559.00 210,095,677.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 2 operated at or near full power for the month except for a planned downpower for a control rod sequence exchange on 9/1/13 to approximately 720 MWe and an unplanned downpower for power suppression testing on 9/28/13 to approximately 700 MWe.
OPERATING DATA REPORT DOCKET: 352 PREPARER NAME: Leonard J. Maioriello UNIT_NME: Limerick Unit 1 PREPARER TELEPHONE: 610 718-3512 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1205
- 2. Maximum Dependable Capacity (MWe-Net) 1099 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 219,372.04
- 4. Number of Hours Generator On-line 744.00 5,087.00 216,833.76
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 836,756.00 5,894,387.00 233,165,100.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 1 began the month of July 2013 at 100.0% rated thermal power (RTP).
On July 5th at 15:32 hours, reactor power was reduced from 99.9% to 98.1% RTP due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.8% RTP at 22:39 hours.
On July 6th at 16:44 hours, reactor power was reduced from 99.9% to 98.1% RTP due to high condensate temperature caused by high ambient conditions.
On July 7th at 02:34 hours, reactor power was restored to 99.6% RTP.
On July 7th at 15:23 hours, reactor power was reduced from 100.0% to 98.0% RTP due to high condensate temperature caused by high ambient conditions. At 17:54 hours reactor power was further reduced down to 78.5% RTP due to loss of Instrument Air header pressure. Reactor power was restored to 99.5% RTP at 23:28 hours. (IR 1533093)
On July 15th at 17:38 hours, reactor power was reduced from 100.0% to 98.1% RTP due to high condensate temperature caused by high ambient conditions.
On July 16th at 03:20 hours, reactor power was restored to 99.8% RTP.
On July 17th at 15:03 hours, reactor power was reduced from 99.9% to 92.1% RTP due to high condensate temperature caused by high ambient conditions.
On July 20th at 01:25 hours, reactor power was restored to 99.5% RTP. Reactor power was reduced from 99.9% to 97.6% RTP at 13:49 hours due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.6% RTP at 23:51 hours.
Unit 1 ended the month of July 2013 at 100.0% RTP.
OPERATING DATA REPORT DOCKET: 352 PREPARER NAME: Leonard J. Maioriello UNIT_NME: Limerick Unit 1 PREPARER TELEPHONE: 610-718-3512 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1205
- 2. Maximum Dependable Capacity (MWe-Net) 1099 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 220,116.04
- 4. Number of Hours Generator On-line 744.00 5,831.00 217,577.76
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 848,376.00 6,742,763.00 234,013,476.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 1 began the month of August 2013 at 100.0% rated thermal power (RTP).
There were no reductions in power during the month of August.
Unit 1 ended the month of August 2013 at 100.0% RTP.
OPERATING DATA REPORT DOCKET: 352 PREPARER NAME: Leonard J. Maioriello UNIT_NME: Limerick Unit 1 PREPARER TELEPHONE: 610-718-3512 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1205
- 2. Maximum Dependable Capacity (MWe-Net) 1099 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 220,836.04
- 4. Number of Hours Generator On-line 720.00 6,551.00 218,297.76
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 824,036.00 7,566,799.00 234,837,512.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 1 began the month of September 2013 at 100.0% rated thermal power (RTP).
On September 11th at 12:26 hours, reactor power was reduced from 99.8% to 96.8% RTP due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.6% RTP at 20:11 hours.
On September 12th at 00:29 hours, reactor power was reduced from 100.0% to 95.0% RTP due to a planned load drop for online HCU testing.
Reactor power was restored to 99.6% RTP at 01:36 hours.
On September 15th at 01:00 hours, reactor power was reduced from 100.0% to 72.2% RTP due to a planned load drop to perform turbine valve testing.
On September 16th at 02:05 hours, reactor power was restored to 99.8% RTP.
On September 29th at 08:01 hours, reactor power was reduced from 100.0% to 76.4% RTP due to a planned load drop to perform control rod scram time testing. Reactor power was restored to 99.6% RTP at 12:23 hours.
Unit 1 ended the month of September 2013 at 99.9% RTP.
OPERATING DATA REPORT DOCKET: 353 PREPARER NAME: Leonard J. Maioriello UNIT_NME: Limerick Unit 2 PREPARER TELEPHONE: 610 718-3512 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1205
- 2. Maximum Dependable Capacity (MWe-Net) 1108 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,522.70 194,880.19
- 4. Number of Hours Generator On-line 744.00 4,469.81 192,493.11
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 847,594.00 5,141,350.00 211,839,191.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 2 began the month of June 2013 at 100% of rated thermal power (RTP).
On July 7th at 18:41 hours, reactor power was reduced from 100.0% to 98.4% RTP due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.6% RTP at 20:13 hours.
On July 15th at 18:50 hours, reactor power was reduced from 99.8% to 96.6% RTP due to high condensate temperature caused by high ambient conditions.
On July 16th at 00:37 hours reactor power was restored to 99.6% RTP.
On July 18th at 11:57 hours, reactor power was reduced from 100.0% to 96.4% RTP due to high condensate temperature caused by high ambient conditions.
On July 19th at 04:38 hours, reactor power was restored to 99.6% RTP. Reactor power was reduced from 100.0% to 92.9% RTP at 11:18 hours due to high condensate temperature caused by high ambient conditions.
On July 20th at 00:36 hours, reactor power was restored to 99.5% RTP. Reactor power was reduced from 99.8% to 96.8% RTP at 13:44 hours due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.7% RTP at 22:04 hours.
Unit 2 ended the month of July 2013 at 100.0% RTP.
OPERATING DATA REPORT DOCKET: 353 PREPARER NAME: Leonard J. Maioriello UNIT_NME: Limerick Unit 2 PREPARER TELEPHONE: 610-718-3512 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1205
- 2. Maximum Dependable Capacity (MWe-Net) 1108 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,266.70 195,624.19
- 4. Number of Hours Generator On-line 744.00 5,213.81 193,237.11
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 856,717.00 5,998,067.00 212,695,908.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 2 began the month of August 2013 at 100% of rated thermal power (RTP).
There were no reductions in power during the month of August.
Unit 2 ended the month of August 2013 at 99.9% RTP.
OPERATING DATA REPORT DOCKET: 353 PREPARER NAME: Leonard J. Maioriello UNIT_NME: Limerick Unit 2 PREPARER TELEPHONE: 610-718-3512 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1205
- 2. Maximum Dependable Capacity (MWe-Net) 1108 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,986.70 196,344.19
- 4. Number of Hours Generator On-line 720.00 5,933.81 193,957.11
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 831,404.00 6,829,471.00 213,527,312.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 2 began the month of September 2013 at 99.9% of rated thermal power (RTP).
On September 7th at 14:23 hours, reactor power was reduced from 99.9% to 99.2% RTP due to an unplanned double notching of a control rod.
Reactor power was restored to 99.7% RTP at 16:40 hours.
On September 8th at 10:30 hours, reactor power was reduced from 99.8% to 81.5% RTP due to a planned load drop to perform turbine valve testing.
On September 9th at 03:30 hours, reactor power was restored to 99.5% RTP.
On September 11th at 12:05 hours, reactor power was reduced from 99.9% to 95.4% RTP due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.7% RTP at 21:04 hours.
On September 16th at 03:59 hours, reactor power was reduced from 99.9% to 95.1% RTP due to a planned load drop to repair a feedwater heater instrument valve. Reactor power was restored to 99.6% RTP at 04:45 hours. Reactor power was again reduced from 100.0% to 93.8%
RTP at 20:00 hours in order to place the feedwater heater back into service. Reactor power was restored to 99.8% RTP at 20:50 hours.
Unit 2 ended the month of September 2013 at 99.9% RTP.
OPERATING DATA REPORT DOCKET: 369 PREPARER NAME: Kay Crane UNIT_NME: McGuire Unit 1 PREPARER TELEPHONE: (980) 875-4306 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1166
- 2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,151.52 227,774.78
- 4. Number of Hours Generator On-line 744.00 4,113.33 226,214.20
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 854,435.00 4,621,870.00 246,663,865.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 369 PREPARER NAME: Kay Crane UNIT_NME: McGuire Unit 1 PREPARER TELEPHONE: (980) 875-4306 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1166
- 2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,895.52 228,518.78
- 4. Number of Hours Generator On-line 744.00 4,857.33 226,958.20
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 852,685.00 5,474,555.00 247,516,550.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 369 PREPARER NAME: Kay Crane UNIT_NME: McGuire Unit 1 PREPARER TELEPHONE: (980) 875-4306 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1166
- 2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,615.52 229,238.78
- 4. Number of Hours Generator On-line 720.00 5,577.33 227,678.20
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 823,724.00 6,298,279.00 248,340,274.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 370 PREPARER NAME: Kay Crane UNIT_NME: McGuire Unit 2 PREPARER TELEPHONE: (980) 875-4306 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1170
- 2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 220,784.38
- 4. Number of Hours Generator On-line 744.00 5,087.00 219,148.04
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 856,552.00 5,847,496.00 244,561,128.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 370 PREPARER NAME: Kay Crane UNIT_NME: McGuire Unit 2 PREPARER TELEPHONE: (980) 875-4306 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1170
- 2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 221,528.38
- 4. Number of Hours Generator On-line 744.00 5,831.00 219,892.04
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 854,028.00 6,701,524.00 245,415,156.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 370 PREPARER NAME: Kay Crane UNIT_NME: McGuire Unit 2 PREPARER TELEPHONE: (980) 875-4306 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1170
- 2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 222,248.38
- 4. Number of Hours Generator On-line 720.00 6,551.00 220,612.04
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 825,544.00 7,527,068.00 246,240,700.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 336 PREPARER NAME: Stephen Claffey UNIT_NME: Millstone Unit 2 PREPARER TELEPHONE: 860-447-1791 x2456 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 877.2
- 2. Maximum Dependable Capacity (MWe-Net) 869.5 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 234,445.08
- 4. Number of Hours Generator On-line 744.00 5,087.00 228,358.30
- 5. Reserve Shutdown Hours 0.00 0.00 468.20
- 6. Net Electrical energy Generated (MWHrs) 647,403.70 4,453,762.90 191,248,055.90 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Millstone Unit 2 operated at or near 100% power throughout the month of July, 2013.
OPERATING DATA REPORT DOCKET: 336 PREPARER NAME: S. Claffey UNIT_NME: Millstone Unit 2 PREPARER TELEPHONE: 860-447-1791 x2456 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 877.2
- 2. Maximum Dependable Capacity (MWe-Net) 869.5 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 235,189.08
- 4. Number of Hours Generator On-line 744.00 5,831.00 229,102.30
- 5. Reserve Shutdown Hours 0.00 0.00 468.20
- 6. Net Electrical energy Generated (MWHrs) 645,986.00 5,099,748.90 191,894,041.90 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Millstone Unit 2 operated at or near 100% power throughout the month of August, 2013.
OPERATING DATA REPORT DOCKET: 336 PREPARER NAME: S. Claffey UNIT_NME: Millstone Unit 2 PREPARER TELEPHONE: 860-447-1791 x2456 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 877.2
- 2. Maximum Dependable Capacity (MWe-Net) 869.5 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 235,909.08
- 4. Number of Hours Generator On-line 720.00 6,551.00 229,822.30
- 5. Reserve Shutdown Hours 0.00 0.00 468.20
- 6. Net Electrical energy Generated (MWHrs) 624,487.80 5,724,236.70 192,518,529.70 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Millstone Unit 2 operated at or near 100% power from the beginning of the month until September 21, 2013. At 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> on September 21, 2013, the unit commenced a load reduction to approximately 90% power for Main Turbine Control Valve operability testing. At 1243 hours0.0144 days <br />0.345 hours <br />0.00206 weeks <br />4.729615e-4 months <br /> on September 21, 2013, commenced a power ascension and returned to 100% power at 1520 hours0.0176 days <br />0.422 hours <br />0.00251 weeks <br />5.7836e-4 months <br /> on September 21, 2013. Millstone Unit 2 operated at or near 100% power for the remainder of the month.
OPERATING DATA REPORT DOCKET: 423 PREPARER NAME: K. Cook UNIT_NME: Millstone Unit 3 PREPARER TELEPHONE: 860-447-1791X6572 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1229
- 2. Maximum Dependable Capacity (MWe-Net) 1210 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,275.23 188,036.56
- 4. Number of Hours Generator On-line 744.00 4,241.12 185,949.24
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 910,774.20 5,199,822.80 210,421,741.34 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Millstone Unit 3 operated at or near 100% power throughout the month of July, 2013.
OPERATING DATA REPORT DOCKET: 423 PREPARER NAME: K. Cook UNIT_NME: Millstone Unit 3 PREPARER TELEPHONE: 860-447-1791X6572 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1229
- 2. Maximum Dependable Capacity (MWe-Net) 1210 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 657.05 4,932.28 188,693.61
- 4. Number of Hours Generator On-line 632.78 4,873.90 186,582.02
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 753,567.10 5,953,389.90 211,175,308.44 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2013- 8/9/2013 F 111.22 A 3 Power to main feedwater pump recirculation valve loops has been temporarily moved from load center 32L to load center 32A.
SUMMARY
Millstone Unit 3 operated at or near 100% power through the month of August until August 9, 2013 at 2119 hours0.0245 days <br />0.589 hours <br />0.0035 weeks <br />8.062795e-4 months <br /> when the plant experienced an automatic reactor trip due to steam generator "C" low water levels caused by loss of a non-vital load center. After investigations were completed, the reactor was taken critical at 1216 hours0.0141 days <br />0.338 hours <br />0.00201 weeks <br />4.62688e-4 months <br /> on August 13, 2013. The unit phased to the grid at 1232 hours0.0143 days <br />0.342 hours <br />0.00204 weeks <br />4.68776e-4 months <br /> on August 14, 2013. The plant reached 100% power at 0810 hours0.00938 days <br />0.225 hours <br />0.00134 weeks <br />3.08205e-4 months <br /> on August 16, 2013. The unit operated at or near 100% power throughout the rest of August 2013.
OPERATING DATA REPORT DOCKET: 423 PREPARER NAME: K. Cook UNIT_NME: Millstone Unit 3 PREPARER TELEPHONE: 860-447-1791X6572 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1229
- 2. Maximum Dependable Capacity (MWe-Net) 1210 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,652.28 189,413.61
- 4. Number of Hours Generator On-line 720.00 5,593.90 187,302.02
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 879,854.70 6,833,244.60 212,055,163.14 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Millstone Unit 3 operated at or near 100% power throughout the month of September, 2013.
OPERATING DATA REPORT DOCKET: 263 PREPARER NAME: Kevin Austin UNIT_NME: Monticello Unit 1 PREPARER TELEPHONE: 763-271-5875 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 600
- 2. Maximum Dependable Capacity (MWe-Net) 578.1 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 362.77 1,805.39 310,874.23
- 4. Number of Hours Generator On-line 306.35 1,746.50 306,663.86
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 71,069.00 895,635.00 162,394,979.30 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 3/2/2013 S 437.65 C 4 RFO-26
SUMMARY
Reactor startup from RFO-26 commenced on 7/16/2013. There was one forced downpower from 7/23 to 7/26 during the startup due to feedwater control system oscillations. (AR 1391178)
OPERATING DATA REPORT DOCKET: 263 PREPARER NAME: Kevin Austin UNIT_NME: Monticello Unit 1 PREPARER TELEPHONE: 763-271-5875 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 600
- 2. Maximum Dependable Capacity (MWe-Net) 578.1 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 2,549.39 311,618.23
- 4. Number of Hours Generator On-line 744.00 2,490.50 307,407.86
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 412,756.00 1,308,391.00 162,807,735.30 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Reactor startup from RFO-26 continued and 100% power was reached on 8/3. There was one planned downpower on 8/24 for quarterly turbine valve testing and control rod timing, and one forced downpower from 8/27 to 8/30 due to an automatic runback on #12 recirc flow control.
OPERATING DATA REPORT DOCKET: 263 PREPARER NAME: Kevin Austin UNIT_NME: Monticello Unit 1 PREPARER TELEPHONE: 763-271-5875 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 600
- 2. Maximum Dependable Capacity (MWe-Net) 578.1 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 3,269.39 312,338.23
- 4. Number of Hours Generator On-line 720.00 3,210.50 308,127.86
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 408,379.00 1,716,770.00 163,216,114.30 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
There was one forced downpower from 9/1 to 9/11 due to an automatic runback on #11 recirc flow control.
OPERATING DATA REPORT DOCKET: 220 PREPARER NAME: Yvette Herrmann UNIT_NME: Nine Mile Point Unit 1 PREPARER TELEPHONE: 315-349-4501 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 613
- 2. Maximum Dependable Capacity (MWe-Net) 565 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 691.87 4,330.30 291,425.11
- 4. Number of Hours Generator On-line 678.55 4,260.20 286,280.48
- 5. Reserve Shutdown Hours 0.00 0.00 20.40
- 6. Net Electrical energy Generated (MWHrs) 397,414.81 2,608,621.14 163,576,328.56 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1P130 7/8/2013 S 65.45 B 1 Planned per INPO/NRC, Unplanned per WANO 1
SUMMARY
Outage due to Drywell leakage was Unplanned per WANO and Planned per INPO/NRC.
OPERATING DATA REPORT DOCKET: 220 PREPARER NAME: Yvette Herrmann UNIT_NME: Nine Mile Point Unit 1 PREPARER TELEPHONE: 315-349-4501 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 613
- 2. Maximum Dependable Capacity (MWe-Net) 565 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,074.30 292,169.11
- 4. Number of Hours Generator On-line 744.00 5,004.20 287,024.48
- 5. Reserve Shutdown Hours 0.00 0.00 20.40
- 6. Net Electrical energy Generated (MWHrs) 448,964.16 3,057,585.30 164,025,292.72 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
There were no unplanned losses in August 2013.
OPERATING DATA REPORT DOCKET: 220 PREPARER NAME: Yvette Herrmann UNIT_NME: Nine Mile Point Unit 1 PREPARER TELEPHONE: 315-349-4501 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 613
- 2. Maximum Dependable Capacity (MWe-Net) 565 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,794.30 292,889.11
- 4. Number of Hours Generator On-line 720.00 5,724.20 287,744.48
- 5. Reserve Shutdown Hours 0.00 0.00 20.40
- 6. Net Electrical energy Generated (MWHrs) 438,586.99 3,496,172.29 164,463,879.71 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unplanned Energy Loss due to Trip of MG-131 on 9/20/2013.
OPERATING DATA REPORT DOCKET: 410 PREPARER NAME: Yvette Herrmann UNIT_NME: Nine Mile Point Unit 2 PREPARER TELEPHONE: 315-349-4501 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1299.9
- 2. Maximum Dependable Capacity (MWe-Net) 1276.8 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 190,054.96
- 4. Number of Hours Generator On-line 744.00 5,087.00 186,661.02
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 942,769.73 6,537,099.77 203,525,206.21 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
There were no unplanned energy losses in the month of July 2013.
OPERATING DATA REPORT DOCKET: 410 PREPARER NAME: Yvette Herrmann UNIT_NME: Nine Mile Point Unit 2 PREPARER TELEPHONE: 315-349-4501 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1299.9
- 2. Maximum Dependable Capacity (MWe-Net) 1276.8 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 190,798.96
- 4. Number of Hours Generator On-line 744.00 5,831.00 187,405.02
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 946,127.28 7,483,227.05 204,471,333.49 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
There were no losses in August 2013.
OPERATING DATA REPORT DOCKET: 410 PREPARER NAME: Yvette Herrmann UNIT_NME: Nine Mile Point Unit 2 PREPARER TELEPHONE: 315-349-4501 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1299.9
- 2. Maximum Dependable Capacity (MWe-Net) 1276.8 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 191,518.96
- 4. Number of Hours Generator On-line 720.00 6,551.00 188,125.02
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 916,722.05 8,399,949.10 205,388,055.54 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
There were no unplanned power changes in September 2013.
OPERATING DATA REPORT DOCKET: 338 PREPARER NAME: W.C.BEASLEY UNIT_NME: North Anna Unit 1 PREPARER TELEPHONE: 540-894-2520 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 973
- 2. Maximum Dependable Capacity (MWe-Net) 943 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 258,880.17
- 4. Number of Hours Generator On-line 744.00 5,087.00 255,144.86
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 708,482.16 4,950,912.89 223,806,109.19 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Began the Month @ 100% Power, 1007 MWe. On 7-9-13 @ 0937, ramped down approx 3% IAW 1-PT-13.4 (MTC Test). On 7-9-13 @ 1001, ramped unit up 3%, IAW 1-PT-13.4 (MTC Test). Ended the Month @ 100% Power 1004 MWe.
OPERATING DATA REPORT DOCKET: 338 PREPARER NAME: W.C.Beasley UNIT_NME: North Anna Unit 1 PREPARER TELEPHONE: 540-894-2520 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 973
- 2. Maximum Dependable Capacity (MWe-Net) 943 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 259,624.17
- 4. Number of Hours Generator On-line 744.00 5,831.00 255,888.86
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 711,086.52 5,661,999.41 224,517,195.71 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Began the Month @ 100% Power, 1004 MWe. Ended the Month @ 100% Power, 1008 MWe.
OPERATING DATA REPORT DOCKET: 338 PREPARER NAME: W.C.Beasley UNIT_NME: North Anna Unit 1 PREPARER TELEPHONE: 540-894-2520 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 973
- 2. Maximum Dependable Capacity (MWe-Net) 943 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 169.52 6,000.52 259,793.69
- 4. Number of Hours Generator On-line 168.45 5,999.45 256,057.31
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 158,413.72 5,820,413.13 224,675,609.43 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments N1- 9/8/2013 S 551.55 C 1 Suutdown for scheduled refueling outage.
2013-001
SUMMARY
Began the Month @ 100% Power, 1008 MWe. On 9-7-13 @ 1933, commence rampdown for scheduled refueling outage. On 9-8-13 @ 0027, unit off line. Ended the Month in Mode 6.
OPERATING DATA REPORT DOCKET: 339 PREPARER NAME: W.C.BEASLEY UNIT_NME: North Anna Unit 2 PREPARER TELEPHONE: 540-894-2502 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 973
- 2. Maximum Dependable Capacity (MWe-Net) 943 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,002.06 246,182.61
- 4. Number of Hours Generator On-line 744.00 3,969.07 244,369.89
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 705,815.46 3,774,776.52 216,148,900.65 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Began the Month @ 100% Power, 1004 MWe. Ended the Month @ 100% Power, 1001 MWe.
OPERATING DATA REPORT DOCKET: 339 PREPARER NAME: W.C.Beasley UNIT_NME: North Anna Unit 2 PREPARER TELEPHONE: 540-894-2520 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 973
- 2. Maximum Dependable Capacity (MWe-Net) 943 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,746.06 246,926.61
- 4. Number of Hours Generator On-line 744.00 4,713.07 245,113.89
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 709,210.24 4,483,986.76 216,858,110.89 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Began the Month @ 100% Power, 1001 MWe. Ended the Month @ 100% Power, 1004 MWe.
OPERATING DATA REPORT DOCKET: 339 PREPARER NAME: W.C.Beasley UNIT_NME: North Anna Unit 2 PREPARER TELEPHONE: 540-894-2520 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 973
- 2. Maximum Dependable Capacity (MWe-Net) 943 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,466.06 247,646.61
- 4. Number of Hours Generator On-line 720.00 5,433.07 245,833.89
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 692,687.63 5,176,674.39 217,550,798.52 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Began the Month @ 100% Power, 1004 MWe. Ended the Month @ 100% Power, 1021 MWe.
OPERATING DATA REPORT DOCKET: 269 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 1 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 886
- 2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 285,811.98
- 4. Number of Hours Generator On-line 744.00 5,087.00 281,788.17
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 636,016.00 4,385,245.00 232,211,085.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 269 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 1 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 886
- 2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 286,555.98
- 4. Number of Hours Generator On-line 744.00 5,831.00 282,532.17
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 631,910.00 5,017,155.00 232,842,995.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 269 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 1 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 886
- 2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 287,275.98
- 4. Number of Hours Generator On-line 720.00 6,551.00 283,252.17
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 610,386.00 5,627,541.00 233,453,381.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 270 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 2 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 886
- 2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 287,271.45
- 4. Number of Hours Generator On-line 744.00 5,087.00 284,165.32
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 637,002.00 4,405,991.00 234,338,910.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 270 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 2 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 886
- 2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 288,015.45
- 4. Number of Hours Generator On-line 744.00 5,831.00 284,909.32
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 633,464.00 5,039,455.00 234,972,374.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 270 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 2 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 886
- 2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 288,735.45
- 4. Number of Hours Generator On-line 720.00 6,551.00 285,629.32
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 606,493.00 5,645,948.00 235,578,867.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 287 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 3 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 886
- 2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 279,425.95
- 4. Number of Hours Generator On-line 744.00 5,087.00 276,213.16
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 645,198.00 4,454,491.00 231,173,902.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 287 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 3 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 886
- 2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 280,169.95
- 4. Number of Hours Generator On-line 744.00 5,831.00 276,957.16
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 640,950.00 5,095,441.00 231,814,852.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 287 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 3 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 886
- 2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 280,889.95
- 4. Number of Hours Generator On-line 720.00 6,551.00 277,677.16
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 617,812.00 5,713,253.00 232,432,664.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 219 PREPARER NAME: C. Lefler Jr.
UNIT_NME: Oyster Creek Unit 1 PREPARER TELEPHONE: 609-971-2158 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 650
- 2. Maximum Dependable Capacity (MWe-Net) 619 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 297,319.96
- 4. Number of Hours Generator On-line 744.00 5,087.00 292,292.99
- 5. Reserve Shutdown Hours 0.00 0.00 918.20
- 6. Net Electrical energy Generated (MWHrs) 444,287.00 3,139,284.00 169,742,397.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unplanned loss generation for July was 0 MWh. The FLR was 0, which is below the Site goal of 0.31.
The Oyster Creek Planned Energy losses for the month of July are:
- 1) MC Backwash - 223.81 MWh - 7/2, 7/8-11, 7/13-18, 7/21, 7/24-30
- 2) Environmental Derate - 2,447.49 MWh - 7/3-7, 7/18-22 Assuming 0 FLR, this PI will be in goal in November 2013.
OPERATING DATA REPORT DOCKET: 219 PREPARER NAME: L. Velez UNIT_NME: Oyster Creek Unit 1 PREPARER TELEPHONE: 6099714410 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 650
- 2. Maximum Dependable Capacity (MWe-Net) 619 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 298,063.96
- 4. Number of Hours Generator On-line 744.00 5,831.00 293,036.99
- 5. Reserve Shutdown Hours 0.00 0.00 918.20
- 6. Net Electrical energy Generated (MWHrs) 453,796.00 3,593,080.00 170,196,193.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unplanned loss generation for August was 0 MWh. The FLR was 0..
The Oyster Creek Planned Energy losses for the month of August are:
- 1) MC Backwash - 222.8 MWh - 8/1, 8/4, 8/6, 8/8, 8/10, 8/13, 8/16, 8/20, 8/25 and 8/30.
OPERATING DATA REPORT DOCKET: 219 PREPARER NAME: L. Velez UNIT_NME: Oyster Creek Unit 1 PREPARER TELEPHONE: 609-971-4410 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 650
- 2. Maximum Dependable Capacity (MWe-Net) 619 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 713.95 6,544.95 298,777.91
- 4. Number of Hours Generator On-line 706.83 6,537.83 293,743.82
- 5. Reserve Shutdown Hours 0.00 0.00 918.20
- 6. Net Electrical energy Generated (MWHrs) 431,057.00 4,024,137.00 170,627,250.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1M30 9/30/2013 S 13.17 B 1 Turbine Controls Testing (Speed Load Changer) to 1M30 Outage
SUMMARY
The unplanned loss generation for September was 79.4 MWh, due to 1C3 FWH Normal Drain Valve causing FWH fluctuations, as documented under IR 1554558.
The Oyster Creek Planned Energy losses for the month of September are:
- 1) Rod for Flow Swap ??? 341.77 MWh ??? 9/1 and 9/2
- 2) Normal Load Maintenance ??? 34.09 MWh ??? 9/5
- 3) 1M30 ??? 12,972 MWh ??? 9/29 and 9/30
OPERATING DATA REPORT DOCKET: 255 PREPARER NAME: R. Levack UNIT_NME: Palisades Unit 1 PREPARER TELEPHONE: 269-764-2068 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 805
- 2. Maximum Dependable Capacity (MWe-Net) 744 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 3,919.33 251,837.72
- 4. Number of Hours Generator On-line 744.00 3,893.90 245,653.70
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 586,088.00 3,097,695.14 176,074,721.90 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Palisades operated at full power for the month of July 2013.
OPERATING DATA REPORT DOCKET: 255 PREPARER NAME: Eric Edwards UNIT_NME: Palisades Unit 1 PREPARER TELEPHONE: 269-764-2086 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 805
- 2. Maximum Dependable Capacity (MWe-Net) 744 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,663.33 252,581.72
- 4. Number of Hours Generator On-line 744.00 4,637.90 246,397.70
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 586,334.79 3,684,029.93 176,661,056.69 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Palisades operated at full power for the month of August 2013.
OPERATING DATA REPORT DOCKET: 255 PREPARER NAME: Eric Edwards UNIT_NME: Palisades Unit 1 PREPARER TELEPHONE: 269-764-2086 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 805
- 2. Maximum Dependable Capacity (MWe-Net) 744 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,383.33 253,301.72
- 4. Number of Hours Generator On-line 720.00 5,357.90 247,117.70
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 570,971.26 4,255,001.19 177,232,027.95 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Palisades operated at full power for the month of September 2013.
OPERATING DATA REPORT DOCKET: 528 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 1 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1333
- 2. Maximum Dependable Capacity (MWe-Net) 1311 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,402.22 193,525.03
- 4. Number of Hours Generator On-line 744.00 4,372.03 191,485.11
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 941,363.72 5,671,215.04 233,942,487.99 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit began the month at full power. On July 2nd at 20:26, the unit downpowered to 59% RX power after a 480 V load center fault caused a loss of Main Feedwater Pump B, initiating a reactor power cutback. The unit was returned to full power on July 6th at 02:00. The unit ended the month at full power.
OPERATING DATA REPORT DOCKET: 528 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 1 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1333
- 2. Maximum Dependable Capacity (MWe-Net) 1311 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,146.22 194,269.03
- 4. Number of Hours Generator On-line 744.00 5,116.03 192,229.11
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 972,874.58 6,644,089.62 234,915,362.57 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit began the month and ended the month in Mode 1 with the reactor at full power.
OPERATING DATA REPORT DOCKET: 528 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 1 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1333
- 2. Maximum Dependable Capacity (MWe-Net) 1311 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,866.22 194,989.03
- 4. Number of Hours Generator On-line 720.00 5,836.03 192,949.11
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 944,713.81 7,588,803.43 235,860,076.38 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit began the month and ended the month in Mode 1 with the reactor at full power.
OPERATING DATA REPORT DOCKET: 529 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 2 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1336
- 2. Maximum Dependable Capacity (MWe-Net) 1314 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,088.00 196,215.78
- 4. Number of Hours Generator On-line 744.00 5,088.00 194,295.23
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 978,759.52 6,765,089.30 243,574,251.94 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit began the month and ended the month in Mode 1 with the reactor at full power.
OPERATING DATA REPORT DOCKET: 529 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 2 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1336
- 2. Maximum Dependable Capacity (MWe-Net) 1314 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,832.00 196,959.78
- 4. Number of Hours Generator On-line 744.00 5,832.00 195,039.23
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 982,008.67 7,747,097.97 244,556,260.61 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit began the month and ended the month in Mode 1 with the reactor at full power.
OPERATING DATA REPORT DOCKET: 529 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 2 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1336
- 2. Maximum Dependable Capacity (MWe-Net) 1314 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,552.00 197,679.78
- 4. Number of Hours Generator On-line 720.00 6,552.00 195,759.23
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 952,196.36 8,699,294.33 245,508,456.97 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit began the month and ended the month in Mode 1 with the reactor at full power.
OPERATING DATA REPORT DOCKET: 530 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 3 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1334
- 2. Maximum Dependable Capacity (MWe-Net) 1312 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,088.00 191,259.73
- 4. Number of Hours Generator On-line 744.00 5,088.00 189,501.37
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 972,291.97 6,613,458.63 235,282,099.81 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit began the month and ended the month in Mode 1 with the reactor at full power.
OPERATING DATA REPORT DOCKET: 530 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 3 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1334
- 2. Maximum Dependable Capacity (MWe-Net) 1312 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,832.00 192,003.73
- 4. Number of Hours Generator On-line 744.00 5,832.00 190,245.37
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 975,605.20 7,589,063.83 236,257,705.01 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit began the month and ended the month in Mode 1 with the reactor at full power.
OPERATING DATA REPORT DOCKET: 530 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 3 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1334
- 2. Maximum Dependable Capacity (MWe-Net) 1312 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,552.00 192,723.73
- 4. Number of Hours Generator On-line 720.00 6,552.00 190,965.37
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 945,616.41 8,534,680.24 237,203,321.42 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit began the month and ended the month in Mode 1 with the reactor at full power.
OPERATING DATA REPORT DOCKET: 277 PREPARER NAME: Brad Deihl UNIT_NME: Peach Bottom Unit 2 PREPARER TELEPHONE: 717-456-4420 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1138
- 2. Maximum Dependable Capacity (MWe-Net) 1112 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 270,107.94
- 4. Number of Hours Generator On-line 744.00 5,087.00 265,370.29
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 828,630.90 5,890,056.10 272,959,125.30 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 2 began the month of July at 100% of maximum allowable power (3514 MWth).
There were no load reductions on Unit 2 for the month of July 2013.
Unit 2 ended the month of July at 100% of maximum allowable power (3514 MWth).
OPERATING DATA REPORT DOCKET: 277 PREPARER NAME: Brad Deihl UNIT_NME: Peach Bottom Unit 2 PREPARER TELEPHONE: 717-456-4420 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1138
- 2. Maximum Dependable Capacity (MWe-Net) 1112 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 270,851.94
- 4. Number of Hours Generator On-line 744.00 5,831.00 266,114.29
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 815,151.00 6,705,207.10 273,774,276.30 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 2 began the month of August at 100% of maximum allowable power (3514 MWth).
On August 30, 2013 at 21:02, Unit 2 commenced a planned load reduction to 60% CTP for Rod Pattern Adjustment, Turbine Testing, and waterbox cleaning. During the downpower, the 2B Recirc Pump tripped. Minimum power of 36.7% was reached on August 30th at 21:59. The unit ended the month at 48.5% power.
Unit 2 ended the month of August at 48.5% of maximum allowable power (3514 MWth).
OPERATING DATA REPORT DOCKET: 277 PREPARER NAME: Brad Deihl UNIT_NME: Peach Bottom Unit 2 PREPARER TELEPHONE: 717-456-4420 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1138
- 2. Maximum Dependable Capacity (MWe-Net) 1112 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 271,571.94
- 4. Number of Hours Generator On-line 720.00 6,551.00 266,834.29
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 801,512.10 7,506,719.20 274,575,788.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 2 began the month of September at 48.5% of maximum allowable power (3514 MWth) due to the 2B recirc pump trip event.
On September 1, 2013, Unit 2 continued the planned load reduction to 60% CTP for Rod Pattern Adjustment, Turbine Testing, waterbox cleaning, and recovery from the the 2B Recirc Pump trip. Minimum power of 32.7% was reached on September 2nd at 22:39. The unit was returned to full power on September 2, 2013 at 10:32.
On September 2, 2013 at 23:02, Unit 2 commenced a planned load reduction to 79.7% CTP for a follow up rod pattern adjustment. Minimum power was reached on September 2nd at 23:30. The unit was returned to 100%% power on September 3, 2013 at 06:02.
Unit 2 ended the month of September at 100% of maximum allowable power (3514 MWth).
OPERATING DATA REPORT DOCKET: 278 PREPARER NAME: Brad Deihl UNIT_NME: Peach Bottom Unit 3 PREPARER TELEPHONE: 717-456-4420 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1179
- 2. Maximum Dependable Capacity (MWe-Net) 1095 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 269,513.28
- 4. Number of Hours Generator On-line 744.00 5,087.00 265,262.72
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 808,844.90 5,853,314.10 271,990,373.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 3 began the month of July at 99.97% of maximum allowable power (3513 MWth).
On July 5, 2013 at 23:02, Unit 3 commenced a planned load reduction to 81.4% CTP to remove the 5A and 5C Feed Water Heater from service.
Min power was reached on July 6th at 01:01. The unit was returned to 99.97% power on July 6, 2013 at 04:18.
On July 26, 2013 at 23:01, Unit 3 commenced a planned load reduction to 94.4% CTP to remove the 5B Feed Water Heater from service. Min power was reached on July 26th at 23:08. The unit was returned to 99.97% power on July 27, 2013 at 01:26.
Unit 3 coasted to 99.0% CTP following the removal of the final 5th stage feed water heater.
Unit 3 ended the month of July at 99.0% of maximum allowable power (3513 MWth). Unit 3 is limited to a maximum allowable power level of 3513 MWth (99.97%) due to Leading Edge Flow Meter (LEFM) imposed restrictions.
OPERATING DATA REPORT DOCKET: 278 PREPARER NAME: Brad Deihl UNIT_NME: Peach Bottom Unit 3 PREPARER TELEPHONE: 717-456-4420 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1179
- 2. Maximum Dependable Capacity (MWe-Net) 1095 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 270,257.28
- 4. Number of Hours Generator On-line 744.00 5,831.00 266,006.72
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 752,754.00 6,606,068.10 272,743,127.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 3 began the month of August at 99.07% of maximum allowable power (3513 MWth).
On August 2, 2013 at 23:03, Unit 3 commenced a planned load reduction to 93.6% CTP to remove the 4B and 4C Feed Water Heater from service. Minimum power was reached on August 3rd at 01:47. The unit was returned to 98.1% power on August 3, 2013 at 09:02.
Unit 3 coasted to 88.7% CTP following the removal of the 4th stage feed water heaters.
Unit 3 ended the month of August at 88.7% of maximum allowable power (3513 MWth). Unit 3 is limited to a maximum allowable power level of 3513 MWth (99.97%) due to Leading Edge Flow Meter (LEFM) imposed restrictions.
OPERATING DATA REPORT DOCKET: 278 PREPARER NAME: Brad Deihl UNIT_NME: Peach Bottom Unit 3 PREPARER TELEPHONE: 717-456-4420 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1179
- 2. Maximum Dependable Capacity (MWe-Net) 1095 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 193.57 6,024.57 270,450.85
- 4. Number of Hours Generator On-line 192.03 6,023.03 266,198.75
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 168,170.10 6,774,238.20 272,911,297.10 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments P3R19 9/9/2013 S 527.97 C 1 On September 8, 2013 at 15:02, Unit 3 commenced a planned power reduction for P3R19 refueling outage. At 00:02 on September 9th, the Unit 3 generator was tripped. At 01:34 on September 9, 2013 the Unit 3 reactor was manually scrammed.
SUMMARY
Unit 3 began the month of September at 88.7% of maximum allowable power (3513 MWth) due to EOC coastdown.
On September 8, 2013 at 15:02, Unit 3 commenced a planned power reduction for P3R19 refueling outage. At 00:02 on September 9th, the Unit 3 generator was tripped. At 01:34 on September 9, 2013 the Unit 3 reactor was manually scrammed.
Unit 3 ended the month of September at 0% of maximum allowable power (3513 MWth). Unit 3 is limited to a maximum allowable power level of 3513 MWth (99.97%) due to Leading Edge Flow Meter (LEFM) imposed restrictions.
OPERATING DATA REPORT DOCKET: 440 PREPARER NAME: T. Phelps UNIT_NME: Perry Unit 1 PREPARER TELEPHONE: 440-280-7660 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1268
- 2. Maximum Dependable Capacity (MWe-Net) 1240 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 3,562.21 185,781.09
- 4. Number of Hours Generator On-line 744.00 3,371.12 182,035.21
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 928,048.10 3,965,388.60 213,503,198.10 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The Perry Nuclear Power Plant ran the entire month of July 2013.
OPERATING DATA REPORT DOCKET: 440 PREPARER NAME: T. Phelps UNIT_NME: Perry Unit 1 PREPARER TELEPHONE: 440-280-7660 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1268
- 2. Maximum Dependable Capacity (MWe-Net) 1240 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,306.21 186,525.09
- 4. Number of Hours Generator On-line 744.00 4,115.12 182,779.21
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 916,126.30 4,881,514.90 214,419,324.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The Perry Plant ran the entire month of August, 2013.
OPERATING DATA REPORT DOCKET: 440 PREPARER NAME: T. Phelps UNIT_NME: Perry Unit 1 PREPARER TELEPHONE: 440-280-7660 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1268
- 2. Maximum Dependable Capacity (MWe-Net) 1240 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 679.63 4,985.84 187,204.72
- 4. Number of Hours Generator On-line 657.47 4,772.59 183,436.68
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 777,536.50 5,659,051.40 215,196,860.90 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 4 9/6/2013 S 62.53 A 1 Replaced a non-safety related 120 VAC regulating transformer which services the digital feedwater control logic. The transformer was showing signs of degradation beginning on August 30, 2013.
SUMMARY
The Perry Nuclear Power Plant was on line for 657.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> during the month of September 2013. The plant performed a planned outage to troubleshoot and repair the high voltage on panel V-1-A . The unit returned to 100% on 9/13/13 @0349. The plant remained on line through the month's end.
OPERATING DATA REPORT DOCKET: 293 PREPARER NAME: Brent Lyons UNIT_NME: Pilgrim Unit 1 PREPARER TELEPHONE: 508-830-8270 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 690
- 2. Maximum Dependable Capacity (MWe-Net) 684.7 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 3,788.02 269,500.96
- 4. Number of Hours Generator On-line 744.00 3,627.37 266,778.95
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 499,579.00 2,306,909.00 164,466,482.53 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
At the beginning of the month, reactor power was 100%. On July 17th at 12:30, a power reduction commenced due to TS sea water inlet temp limitations (75F). Power was returned to 100% on July 18th at 02:08. The duration of the downpower was 13 hrs and 37 mins. The minimum power level achieved was 84.60%. On July 18th at 15:35, a power reduction commenced due to sea water inlet temp challenging the TS limit of 75F. Power was returned to 100% on July 18th at 20:41. The duration of the downpower was 5 hrs and 6 mins. The minimum power level achieved was 92.70%. On July 25th at 23:51, a power reduction commenced due to sea water inlet temp challenging the TS limit of 75F. Power was returned to 100% on July 26th at 07:58. The duration of the downpower was 8 hrs and 7 mins. The minimum power level achieved was 89.90%. The reactor remained at full power throughout the remainder of the month.
OPERATING DATA REPORT DOCKET: 293 PREPARER NAME: Brent Lyons UNIT_NME: Pilgrim Unit 1 PREPARER TELEPHONE: 508-830-8270 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 690
- 2. Maximum Dependable Capacity (MWe-Net) 684.7 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 657.88 4,445.90 270,158.84
- 4. Number of Hours Generator On-line 642.13 4,269.50 267,421.08
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 379,986.00 2,686,895.00 164,846,468.53 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 4 8/22/2013 F 101.87 A 2 On August 22, 2013 at 07:55, operators manually scrammed the reactor in response to a trip of all three (3) reactor feed pumps. This trip was the result of Instrument power panel Y1 breaker 24 tripping open on a ground fault condition. The power from this breaker supplies the seal cooling water flow switches to all reactor feed pumps. By design, a loss of cooling water flow or a loss of power to the flow switches will generate a signal to the trip the associated reactor feed pump after a sixty (60) second time delay. The reactor was made critical on August 25, 2013 at 22:02. The main generator was synchronized to the grid on August 26, 2013 at 13:47.
SUMMARY
At the beginning of the month, reactor power was 100%. On August 22, 2013 at 07:55, operators manually scrammed the reactor in response to a trip of all three (3) reactor feed pumps. This trip was the result of Instrument power panel Y1 breaker 24 tripping open on a ground fault condition.
The power from this breaker supplies the seal cooling water flow switches to all three reactor feed pumps. By design, a loss of cooling water flow or a loss of power to the flow switches will generate a signal to the trip the associated reactor feed pump after a sixty (60) second time delay. The reactor was made critical on August 25, 2013 at 22:02. The main generator was synchronized to the grid on August 26, 2013 at 13:47. Reactor power was raised to approximately 75% RCTP on August 28th, 2013 and remained at this level until the end of the month. Power ascension was limited due to the inability to start Reactor Feed Pump 'A'.
OPERATING DATA REPORT DOCKET: 293 PREPARER NAME: Brent Lyons UNIT_NME: Pilgrim Unit 1 PREPARER TELEPHONE: 508-830-8270 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 690
- 2. Maximum Dependable Capacity (MWe-Net) 684.7 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 568.42 5,014.32 270,727.26
- 4. Number of Hours Generator On-line 551.17 4,820.67 267,972.25
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 326,768.00 3,013,663.00 165,173,236.53 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 5 9/8/2013 F 168.83 A 1 On September 8th, 2013 at 14:03, a controlled shutdown commenced to allow repairs of leaks in the condenser bay. At 21:38, all control rods were fully inserted. Repairs in the condenser bay were completed and reactor startup commenced on September 15th, 2013 at 00:00. At 05:13, the reactor was made critical and at 19:27 the main generator was synchronized to the grid. Reactor power achieved approximately 75% on September 17th, 2013 at 07:40. At this time, reactor power was still limited due to RFP 'A'. A temporary modification that routed new cables to RFP 'A' was completed and the pump was placed into service. On September 17th, 2013 at 07:40, power ascension once again commenced and full reactor power was achieved at 13:00.
SUMMARY
At the beginning of the month, reactor power was 75% due to the inability to start Reactor Feed Pump 'A'. On September 8th, 2013 at 14:03, a controlled shutdown commenced to allow repairs of leaks in the condenser bay. At 21:38, all control rods were fully inserted. Repairs in the condenser bay were completed and reactor startup commenced on September 15th, 2013 at 00:00. At 05:13, the reactor was made critical and at 19:27 the main generator was synchronized to the grid. Reactor power achieved approximately 75% on September 17th, 2013 at 07:40. At this time, reactor power was still limited due to RFP 'A'. A temporary modification that routed new cables to RFP 'A' was completed and the pump was placed into service. On September 17th, 2013 at 07:40, power ascension once again commenced and full reactor power was achieved at 13:00.
On September 18th, 2013 at 10:04, a reactor downpower commenced to adjust the control rod pattern. The minimum power achieved during this evolution was 78%. At 14:40, reactor power once again achieved 100%. Reactor power was maintained at 100% throughout the remainder of the month.
OPERATING DATA REPORT DOCKET: 266 PREPARER NAME: Roger Clark UNIT_NME: Point Beach Unit 1 PREPARER TELEPHONE: 920-755-7464 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 615
- 2. Maximum Dependable Capacity (MWe-Net) 576 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,368.03 315,362.22
- 4. Number of Hours Generator On-line 744.00 4,339.62 311,388.74
- 5. Reserve Shutdown Hours 0.00 0.00 846.90
- 6. Net Electrical energy Generated (MWHrs) 445,303.30 2,559,039.80 148,553,421.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 266 PREPARER NAME: Roger Clark UNIT_NME: Point Beach Unit 1 PREPARER TELEPHONE: 920-755-7464 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 615
- 2. Maximum Dependable Capacity (MWe-Net) 576 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,112.03 316,106.22
- 4. Number of Hours Generator On-line 712.13 5,051.75 312,100.87
- 5. Reserve Shutdown Hours 0.00 0.00 846.90
- 6. Net Electrical energy Generated (MWHrs) 415,805.80 2,974,845.60 148,969,227.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 113 8/19/2013 F 31.87 A 5 Unit 1 main generator was taken offline due to a 1X-01C transformer cooling malfunction. Malfunction was repaired and the unit was placed back online.
SUMMARY
OPERATING DATA REPORT DOCKET: 266 PREPARER NAME: Roger Clark UNIT_NME: Point Beach Unit 1 PREPARER TELEPHONE: 920-755-7464 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 615
- 2. Maximum Dependable Capacity (MWe-Net) 576 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,832.03 316,826.22
- 4. Number of Hours Generator On-line 720.00 5,771.75 312,820.87
- 5. Reserve Shutdown Hours 0.00 0.00 846.90
- 6. Net Electrical energy Generated (MWHrs) 427,932.50 3,402,778.10 149,397,159.90 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 301 PREPARER NAME: Roger Clark UNIT_NME: Point Beach Unit 2 PREPARER TELEPHONE: 920-755-7464 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 615
- 2. Maximum Dependable Capacity (MWe-Net) 578 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 308,427.80
- 4. Number of Hours Generator On-line 744.00 5,087.00 304,910.83
- 5. Reserve Shutdown Hours 0.00 0.00 302.20
- 6. Net Electrical energy Generated (MWHrs) 444,540.30 3,048,117.30 148,127,427.90 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 301 PREPARER NAME: Roger Clark UNIT_NME: Point Beach Unit 2 PREPARER TELEPHONE: 920-755-7464 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 615
- 2. Maximum Dependable Capacity (MWe-Net) 578 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 309,171.80
- 4. Number of Hours Generator On-line 744.00 5,831.00 305,654.83
- 5. Reserve Shutdown Hours 0.00 0.00 302.20
- 6. Net Electrical energy Generated (MWHrs) 434,152.80 3,482,270.10 148,561,580.70 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 301 PREPARER NAME: Roger Clark UNIT_NME: Point Beach Unit 2 PREPARER TELEPHONE: 920-755-7464 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 615
- 2. Maximum Dependable Capacity (MWe-Net) 578 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 309,891.80
- 4. Number of Hours Generator On-line 720.00 6,551.00 306,374.83
- 5. Reserve Shutdown Hours 0.00 0.00 302.20
- 6. Net Electrical energy Generated (MWHrs) 427,615.50 3,909,885.60 148,989,196.20 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 282 PREPARER NAME: Thomas Scheibel UNIT_NME: Prairie Island Unit 1 PREPARER TELEPHONE: 651-267-6355 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 557
- 2. Maximum Dependable Capacity (MWe-Net) 522.1 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 304,383.84
- 4. Number of Hours Generator On-line 744.00 5,059.32 301,809.75
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 394,395.00 2,675,846.00 153,134,076.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 1 was base loaded during July 2013.
Unit 1 has a planned 2% down power of 7-22-13, to adjust the level in 12A Feedwater Heater. This was a planned loss of 133.3 MW-hr.
OPERATING DATA REPORT DOCKET: 282 PREPARER NAME: Thomas Scheibel UNIT_NME: Prairie Island Unit 1 PREPARER TELEPHONE: 651-267-6355 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 557
- 2. Maximum Dependable Capacity (MWe-Net) 522.1 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 305,127.84
- 4. Number of Hours Generator On-line 744.00 5,803.32 302,553.75
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 395,147.00 3,070,993.00 153,529,223.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 1 was base loaded during August 2013.
There was a planned 2% down power on Unit 1 to perform SP 1101, 12 MD AFW PP QTLY FLOW & VALVE TEST. This was a planned loss of 28.1 MW-hr.
OPERATING DATA REPORT DOCKET: 282 PREPARER NAME: Thomas Scheibel UNIT_NME: Prairie Island Unit 1 PREPARER TELEPHONE: 651-267-6355 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 557
- 2. Maximum Dependable Capacity (MWe-Net) 522.1 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 305,847.84
- 4. Number of Hours Generator On-line 720.00 6,523.32 303,273.75
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 372,576.00 3,443,569.00 153,901,799.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 1 was base loaded during September 2013.
There was a planned 60% down power on Unit 1 to perform SP 1054 Turbine Valve Testing. This was a planned loss of 11,704.4 MW.hr.
OPERATING DATA REPORT DOCKET: 306 PREPARER NAME: Thomas Scheibel UNIT_NME: Prairie Island Unit 2 PREPARER TELEPHONE: 651-267-6355 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 557
- 2. Maximum Dependable Capacity (MWe-Net) 518.8 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 302,909.38
- 4. Number of Hours Generator On-line 744.00 5,087.00 300,879.48
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 310,744.00 2,559,813.00 152,588,923.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 2 was base loaded during July 2013.
During July, Unit 2 was operated at 81%. This was an unplanned down power, due to increased vibration on the Turbine Generator. There was an unplanned foced loss of 83,378.8 MW-hr.
OPERATING DATA REPORT DOCKET: 306 PREPARER NAME: Thomas Scheibel UNIT_NME: Prairie Island Unit 2 PREPARER TELEPHONE: 651-267-6355 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 557
- 2. Maximum Dependable Capacity (MWe-Net) 518.8 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 303,653.38
- 4. Number of Hours Generator On-line 744.00 5,831.00 301,623.48
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 312,797.00 2,872,610.00 152,901,720.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 2 was base loaded during August 2013.
During August, Unit 2 was operated at 81%. There was an unplanned forced down power, due to increased vibration on the Turbine Generator.
There was a forced loss of 81,495.8 MW-hr.
OPERATING DATA REPORT DOCKET: 306 PREPARER NAME: Thomas Scheibel UNIT_NME: Prairie Island Unit 2 PREPARER TELEPHONE: 651-267-6355 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 557
- 2. Maximum Dependable Capacity (MWe-Net) 518.8 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 480.12 6,311.12 304,133.50
- 4. Number of Hours Generator On-line 480.02 6,311.02 302,103.50
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 197,102.00 3,069,712.00 153,098,822.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2R28 9/21/2013 S 239.98 C 1 Unit Shutdown impacting Prairie Island Unit 2 occurred this reporting period for commencement of 2R28 refueling outage.
SUMMARY
Unit 2 was base loaded during September.
During September, Unit 2 was operated at 81% due to increased vibration on the Turbine Generator. There was an unplanned forced loss of 50,353.0 MW-hr.
On September 21st, Unit 2 was taken off line for Scheduled Refueling Outage, 2R28. This was a planned loss of 142,601.9 MW-hr. During this outage the turbine vibration problem will be repaired and also the replacement of #21 and #22 Steam Generators.
OPERATING DATA REPORT DOCKET: 254 PREPARER NAME: Jason M. Smith UNIT_NME: Quad Cities Unit 1 PREPARER TELEPHONE: (309) 227-2813 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 866
- 2. Maximum Dependable Capacity (MWe-Net) 866 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,467.87 297,705.15
- 4. Number of Hours Generator On-line 744.00 4,399.78 291,797.46
- 5. Reserve Shutdown Hours 0.00 0.00 1,655.20
- 6. Net Electrical energy Generated (MWHrs) 681,310.00 4,080,949.00 208,823,063.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
U1 July 2013 Unit 1 started the month at approximately full reactor power and remained at full power for the rest of the month.
OPERATING DATA REPORT DOCKET: 254 PREPARER NAME: Jason M. Smith UNIT_NME: Quad Cities Unit 1 PREPARER TELEPHONE: (309) 227-2813 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 866
- 2. Maximum Dependable Capacity (MWe-Net) 866 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,211.87 298,449.15
- 4. Number of Hours Generator On-line 744.00 5,143.78 292,541.46
- 5. Reserve Shutdown Hours 0.00 0.00 1,655.20
- 6. Net Electrical energy Generated (MWHrs) 683,257.00 4,764,206.00 209,506,320.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
U1 August 2013 Unit 1 started the month at approximately full reactor power and remained at full power for the rest of the month.
OPERATING DATA REPORT DOCKET: 254 PREPARER NAME: Jason M. Smith UNIT_NME: Quad Cities Unit 1 PREPARER TELEPHONE: 309 227-2813 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 866
- 2. Maximum Dependable Capacity (MWe-Net) 866 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,931.87 299,169.15
- 4. Number of Hours Generator On-line 720.00 5,863.78 293,261.46
- 5. Reserve Shutdown Hours 0.00 0.00 1,655.20
- 6. Net Electrical energy Generated (MWHrs) 663,096.00 5,427,302.00 210,169,416.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
U1 September 2013 Unit 1 started the month at approximately full reactor power and remained at full power for the rest of the month with the following exceptions.
- 1. Short duration down power from 09/14/2013 to 09/15/2013 for planned Turbine Testing.
- 2. Short duration down power from 09/28/2013 to 09/29/2013 for planned Turbine Testing and CRD SCRAM Timing.
OPERATING DATA REPORT DOCKET: 265 PREPARER NAME: Jason M. Smith UNIT_NME: Quad Cities Unit 2 PREPARER TELEPHONE: (309) 227-2813 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 957.3
- 2. Maximum Dependable Capacity (MWe-Net) 888 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,061.87 290,552.57
- 4. Number of Hours Generator On-line 744.00 5,049.97 285,326.10
- 5. Reserve Shutdown Hours 0.00 0.00 2,312.90
- 6. Net Electrical energy Generated (MWHrs) 677,795.00 4,671,270.00 211,459,708.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
U2 July 2013 Unit 2 started the month at approximately full reactor power and remained at full power for the rest of the month.
OPERATING DATA REPORT DOCKET: 265 PREPARER NAME: Jason M. Smith UNIT_NME: Quad Cities Unit 2 PREPARER TELEPHONE: (309) 227-2813 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 957.3
- 2. Maximum Dependable Capacity (MWe-Net) 888 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,805.87 291,296.57
- 4. Number of Hours Generator On-line 744.00 5,793.97 286,070.10
- 5. Reserve Shutdown Hours 0.00 0.00 2,312.90
- 6. Net Electrical energy Generated (MWHrs) 678,658.00 5,349,928.00 212,138,366.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
U2 August 2013 Unit 2 started the month at approximately full reactor power and remained at full power for the rest of the month with the following exceptions.
- 1. Between 8/26/13 and continuing to the end of the month there was a 2 MWe unplanned energy loss due to a stuck open 2C2 Low Pressure Feedwater Heater Emergency Drain Valve - this resulted in a loss of 276 MWe-hr during August 2013.
OPERATING DATA REPORT DOCKET: 265 PREPARER NAME: Jason M. Smith UNIT_NME: Quad Cities Unit 2 PREPARER TELEPHONE: 309 227-2813 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 957.3
- 2. Maximum Dependable Capacity (MWe-Net) 888 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,525.87 292,016.57
- 4. Number of Hours Generator On-line 720.00 6,513.97 286,790.10
- 5. Reserve Shutdown Hours 0.00 0.00 2,312.90
- 6. Net Electrical energy Generated (MWHrs) 641,947.00 5,991,875.00 212,780,313.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
U2 September 2013 Unit 2 started the month at approximately full reactor power and remained at full power for the rest of the month with the following exceptions:
- 1. Ongoing small (approximate 2 MW) Unplanned power loss from the 2C2 Feed Water Heater - Emergency Level Control Valve (E-LCV) that failed open on 08/26/2013 and was repaired during the planned downpower on 09/7/2013.
- 2. Short duration Planned down power from 09/07/2013 to 09/08/13 to refill the MSDTs and correct the failed 2C2 E-LCV.
- 3. Short duration Planned down power on 09/09/2013 for CRD Pattern adjustment.
- 4. Short duration Planned down power on 09/21/2013 for CRD Pattern adjustment.
- 5. An Emergent Short duration downpower on 9/26/2013 to 9/27/2013 due to a loss of Feedwater heaters caused by a blown fuse.
- 6. An Emergent Short duration downpower on 9/28/2013 due to a failed RPIS indication on CRD G-13 that required that rod to be fully inserted.
OPERATING DATA REPORT DOCKET: 458 PREPARER NAME: Thomas J. Bolke UNIT_NME: River Bend Unit 1 PREPARER TELEPHONE: (225)381-3719 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 967
- 2. Maximum Dependable Capacity (MWe-Net) 967 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,284.89 204,720.87
- 4. Number of Hours Generator On-line 744.00 4,224.67 200,054.68
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 720,701.00 4,029,150.00 183,780,642.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 458 PREPARER NAME: Thomas J. Bolke UNIT_NME: River Bend Unit 1 PREPARER TELEPHONE: (225)381-3719 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 967
- 2. Maximum Dependable Capacity (MWe-Net) 967 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,028.89 205,464.87
- 4. Number of Hours Generator On-line 744.00 4,968.67 200,798.68
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 719,180.00 4,748,330.00 184,499,822.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 458 PREPARER NAME: Thomas J. Bolke UNIT_NME: River Bend Unit 1 PREPARER TELEPHONE: (225)381-3719 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 967
- 2. Maximum Dependable Capacity (MWe-Net) 967 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,748.89 206,184.87
- 4. Number of Hours Generator On-line 720.00 5,688.67 201,518.68
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 699,175.00 5,447,505.00 185,198,997.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 261 PREPARER NAME: Tim Surma UNIT_NME: Robinson Unit 2 PREPARER TELEPHONE: 843-857-1086 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 795
- 2. Maximum Dependable Capacity (MWe-Net) 741 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 294,973.79
- 4. Number of Hours Generator On-line 744.00 5,087.00 291,304.49
- 5. Reserve Shutdown Hours 0.00 0.00 23.20
- 6. Net Electrical energy Generated (MWHrs) 562,215.00 3,907,746.00 197,230,799.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 261 PREPARER NAME: Tim Surma UNIT_NME: Robinson Unit 2 PREPARER TELEPHONE: 843-857-1086 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 795
- 2. Maximum Dependable Capacity (MWe-Net) 741 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 295,717.79
- 4. Number of Hours Generator On-line 744.00 5,831.00 292,048.49
- 5. Reserve Shutdown Hours 0.00 0.00 23.20
- 6. Net Electrical energy Generated (MWHrs) 562,450.00 4,470,196.00 197,793,249.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 261 PREPARER NAME: Tim Surma UNIT_NME: Robinson Unit 2 PREPARER TELEPHONE: 843-857-1086 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 795
- 2. Maximum Dependable Capacity (MWe-Net) 741 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 316.33 6,147.33 296,034.12
- 4. Number of Hours Generator On-line 316.18 6,147.18 292,364.67
- 5. Reserve Shutdown Hours 0.00 0.00 23.20
- 6. Net Electrical energy Generated (MWHrs) 231,715.00 4,701,911.00 198,024,964.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 9/14/2013 S 403.82 C 1
SUMMARY
Planned shutdown for scheduled refueling outage RO-28 on 9-14-13 at 0419 hours0.00485 days <br />0.116 hours <br />6.92791e-4 weeks <br />1.594295e-4 months <br />.
OPERATING DATA REPORT DOCKET: 272 PREPARER NAME: Kevin Falciani UNIT_NME: Salem Unit 1 PREPARER TELEPHONE: 856-339-2017 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1169
- 2. Maximum Dependable Capacity (MWe-Net) 1116 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,184.57 228,032.55
- 4. Number of Hours Generator On-line 744.00 4,063.70 222,394.60
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 860,476.00 4,757,181.00 237,200,139.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 272 PREPARER NAME: Kevin Falciani UNIT_NME: Salem Unit 1 PREPARER TELEPHONE: 856-339-2017 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1169
- 2. Maximum Dependable Capacity (MWe-Net) 1116 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 709.50 4,894.07 228,742.05
- 4. Number of Hours Generator On-line 698.83 4,762.53 223,093.43
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 794,389.00 5,551,570.00 237,994,528.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments S1F13 8/22/2013 F 45.17 A 1 Unit 1 shutdown due to 1PS1 Pressurizer Valve
-01 Leak. ACE being tracked on order 70157547.
SUMMARY
Unit 1 shutdown due to 1PS1 leak on Pressurizer Spray Valve. ACE has been assigned and is being tacked on order 70157547.
OPERATING DATA REPORT DOCKET: 272 PREPARER NAME: Kevin Falciani UNIT_NME: Salem Unit 1 PREPARER TELEPHONE: 856-339-2017 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1169
- 2. Maximum Dependable Capacity (MWe-Net) 1116 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,614.07 229,462.05
- 4. Number of Hours Generator On-line 720.00 5,482.53 223,813.43
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 944,559.00 6,496,129.00 238,939,087.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 311 PREPARER NAME: Kevin Falciani UNIT_NME: Salem Unit 2 PREPARER TELEPHONE: 856-339-2017 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1181
- 2. Maximum Dependable Capacity (MWe-Net) 1134 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 205,731.90
- 4. Number of Hours Generator On-line 744.00 5,087.00 201,627.44
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 855,682.00 5,971,788.00 215,429,798.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 311 PREPARER NAME: Kevin Falciani UNIT_NME: Salem Unit 2 PREPARER TELEPHONE: 856-339-2017 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1181
- 2. Maximum Dependable Capacity (MWe-Net) 1134 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 206,475.90
- 4. Number of Hours Generator On-line 744.00 5,831.00 202,371.44
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 863,356.00 6,835,144.00 216,293,154.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 311 PREPARER NAME: Kevin Falciani UNIT_NME: Salem Unit 2 PREPARER TELEPHONE: 856-339-2017 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1181
- 2. Maximum Dependable Capacity (MWe-Net) 1134 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 207,195.90
- 4. Number of Hours Generator On-line 720.00 6,551.00 203,091.44
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 835,587.00 7,670,731.00 217,128,741.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 443 PREPARER NAME: Kevin Randall UNIT_NME: Seabrook Unit 1 PREPARER TELEPHONE: 603.773.7992 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1248
- 2. Maximum Dependable Capacity (MWe-Net) 1246 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 180,024.98
- 4. Number of Hours Generator On-line 744.00 5,087.00 176,440.43
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 926,830.27 6,346,479.82 204,219,773.54 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit operated at 100% power 744 out of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br /> this month. This yielded an availability factor of 100% and a capacity factor of 99.9791%
based on the MDC of 1246 MWe.
OPERATING DATA REPORT DOCKET: 443 PREPARER NAME: Kevin Randall UNIT_NME: Seabrook Unit 1 PREPARER TELEPHONE: 603.773.7992 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1248
- 2. Maximum Dependable Capacity (MWe-Net) 1246 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 180,768.98
- 4. Number of Hours Generator On-line 744.00 5,831.00 177,184.43
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 927,927.04 7,274,406.86 205,147,700.58 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit operated at 100% power 744 out of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br /> this month. This yielded an availability factor of 100% and a capacity factor of 100.0974%
based on the MDC of 1246 MWe.
OPERATING DATA REPORT DOCKET: 443 PREPARER NAME: Kevin Randall UNIT_NME: Seabrook Unit 1 PREPARER TELEPHONE: 603.773.7992 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1248
- 2. Maximum Dependable Capacity (MWe-Net) 1246 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 181,488.98
- 4. Number of Hours Generator On-line 720.00 6,551.00 177,904.43
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 896,941.44 8,171,348.30 206,044,642.02 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit operated at 100% power 709 out of 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> this month. This yielded an availability factor of 100% and a capacity factor of 99.9801%
based on the MDC of 1246 MWe.
OPERATING DATA REPORT DOCKET: 327 PREPARER NAME: Linda Williams UNIT_NME: Sequoyah Unit 1 PREPARER TELEPHONE: Linda Williams RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1184.37
- 2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 210,374.85
- 4. Number of Hours Generator On-line 744.00 5,087.00 207,973.89
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 844,719.00 5,864,997.00 231,136,300.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
U1 Gross Max Dependable Capacity Factor was 99.671 for the month of July 2013.
OPERATING DATA REPORT DOCKET: 327 PREPARER NAME: Linda Williams UNIT_NME: Sequoyah Unit 1 PREPARER TELEPHONE: Linda Williams RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1184.37
- 2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 211,118.85
- 4. Number of Hours Generator On-line 744.00 5,831.00 208,717.89
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 839,540.00 6,704,537.00 231,975,840.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
U1 Gross Max Dependable Capacity Factor was 99.075 for the month of August 2013.
OPERATING DATA REPORT DOCKET: 327 PREPARER NAME: Linda Williams UNIT_NME: Sequoyah Unit 1 PREPARER TELEPHONE: 423-843-7048 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1184.37
- 2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 211,838.85
- 4. Number of Hours Generator On-line 720.00 6,551.00 209,437.89
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 743,812.00 7,448,349.00 232,719,652.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
U1 Gross Max Dependable Capacity Factor was 91.059 for the month of September 2013.
OPERATING DATA REPORT DOCKET: 328 PREPARER NAME: Linda Williams UNIT_NME: Sequoyah Unit 2 PREPARER TELEPHONE: Linda Williams RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1177.46
- 2. Maximum Dependable Capacity (MWe-Net) 1139.5 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,983.34 213,983.45
- 4. Number of Hours Generator On-line 744.00 4,845.69 211,240.04
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 846,252.00 5,479,649.00 230,178,105.10 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
U2 Gross Max Dependable Capacity Factor was 101.549 for the month of July 2013.
OPERATING DATA REPORT DOCKET: 328 PREPARER NAME: Linda Williams UNIT_NME: Sequoyah Unit 2 PREPARER TELEPHONE: Linda Williams RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1177.46
- 2. Maximum Dependable Capacity (MWe-Net) 1139.5 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,727.34 214,727.45
- 4. Number of Hours Generator On-line 744.00 5,589.69 211,984.04
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 840,796.00 6,320,445.00 231,018,901.10 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
U2 Gross Max Dependable Capacity Factor was 101.951for the month of August 2013.
OPERATING DATA REPORT DOCKET: 328 PREPARER NAME: Linda Williams UNIT_NME: Sequoyah Unit 2 PREPARER TELEPHONE: 423-843-7048 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1177.46
- 2. Maximum Dependable Capacity (MWe-Net) 1139.5 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,447.34 215,447.45
- 4. Number of Hours Generator On-line 720.00 6,309.69 212,704.04
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 813,432.00 7,133,877.00 231,832,333.10 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
U2 Gross Max Dependable Capacity Factor was 103.095 for the month of September 2013.
OPERATING DATA REPORT DOCKET: 498 PREPARER NAME: R.L. Hill UNIT_NME: South Texas Unit 1 PREPARER TELEPHONE: 361.972.7667 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1250.6
- 2. Maximum Dependable Capacity (MWe-Net) 1250.6 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,981.80 185,618.50
- 4. Number of Hours Generator On-line 744.00 4,952.50 181,064.21
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 987,688.00 6,657,788.00 228,041,469.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Normal operation.
OPERATING DATA REPORT DOCKET: 498 PREPARER NAME: R.L. Hill UNIT_NME: South Texas Unit 1 PREPARER TELEPHONE: 361.972.7667 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1250.6
- 2. Maximum Dependable Capacity (MWe-Net) 1250.6 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,725.80 186,362.50
- 4. Number of Hours Generator On-line 744.00 5,696.50 181,808.21
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 947,644.00 7,605,432.00 228,989,113.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Precautionary reactor power reduction to 81% on 8/3/13 to allow LP Turbine 13S Extraction Steam bellows rupture damage analysis. Unit returned to 100% on 8/5/13. Reactor power reduction to 86.5% on 8/27/13 due to engineering recommendation for LP Turbine 13S Extraction Steam bellows damage.
OPERATING DATA REPORT DOCKET: 498 PREPARER NAME: R. L. Hill UNIT_NME: South Texas Unit 1 PREPARER TELEPHONE: 361.972.7667 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1250.6
- 2. Maximum Dependable Capacity (MWe-Net) 1250.6 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,445.80 187,082.50
- 4. Number of Hours Generator On-line 720.00 6,416.50 182,528.21
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 953,755.00 8,559,187.00 229,942,868.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Reactor power reduction to 86.5 % beginning on 8/27/13 due to engineering recommendation for LP Turbine 13S Extraction Steam bellows damage.
OPERATING DATA REPORT DOCKET: 499 PREPARER NAME: R.L. Hill UNIT_NME: South Texas Unit 2 PREPARER TELEPHONE: 361.972.766 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1250.6
- 2. Maximum Dependable Capacity (MWe-Net) 1250.6 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 2,598.29 174,566.63
- 4. Number of Hours Generator On-line 744.00 2,509.95 172,007.38
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 987,248.00 3,329,284.00 216,085,820.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Scheduled turbine valve testing/ Unplanned control rod issues.
OPERATING DATA REPORT DOCKET: 499 PREPARER NAME: R.L. Hill UNIT_NME: South Texas Unit 2 PREPARER TELEPHONE: 361.972.7667 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1250.6
- 2. Maximum Dependable Capacity (MWe-Net) 1250.6 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 3,342.29 175,310.63
- 4. Number of Hours Generator On-line 744.00 3,253.95 172,751.38
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 984,277.00 4,313,561.00 217,070,097.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Normal operation.
OPERATING DATA REPORT DOCKET: 499 PREPARER NAME: R.L. Hill UNIT_NME: South Texas Unit 2 PREPARER TELEPHONE: 361.972.7667 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1250.6
- 2. Maximum Dependable Capacity (MWe-Net) 1250.6 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 4,062.29 176,030.63
- 4. Number of Hours Generator On-line 720.00 3,973.95 173,471.38
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 953,755.00 5,267,316.00 218,023,852.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Scheduled reactor power reduction to 90% for turbine valve testing.
OPERATING DATA REPORT DOCKET: 335 PREPARER NAME: K R Boller UNIT_NME: St. Lucie Unit 1 PREPARER TELEPHONE: 772 467-7465 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1062
- 2. Maximum Dependable Capacity (MWe-Net) 981 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,626.58 266,702.21
- 4. Number of Hours Generator On-line 744.00 4,616.47 264,231.23
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 744,205.00 4,599,145.00 218,399,912.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
PSL 1 operated in mode 1 the entire report period.
OPERATING DATA REPORT DOCKET: 335 PREPARER NAME: K R Boller UNIT_NME: St. Lucie Unit 1 PREPARER TELEPHONE: 772 467-7465 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1062
- 2. Maximum Dependable Capacity (MWe-Net) 981 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,370.58 267,446.21
- 4. Number of Hours Generator On-line 744.00 5,360.47 264,975.23
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 738,402.00 5,337,547.00 219,138,314.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
PSL 1 operated in mode 1 the entire report period.
OPERATING DATA REPORT DOCKET: 335 PREPARER NAME: K R Boller UNIT_NME: St. Lucie Unit 1 PREPARER TELEPHONE: 774 467-7465 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1062
- 2. Maximum Dependable Capacity (MWe-Net) 981 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 696.02 6,066.60 268,142.23
- 4. Number of Hours Generator On-line 696.02 6,056.49 265,671.25
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 675,651.00 6,013,198.00 219,813,965.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 28 9/30/2013 S 23.98 C 1 PSL 1 manual shutdown for SL1-25 refueling and maintenance
SUMMARY
PSL 1 operated in mode 1 until 9/30/2013 at 00:01 when the unit was removed from service for scheduled refueling and maintenance. PSL 1 remained offline through the end of the report period.
OPERATING DATA REPORT DOCKET: 389 PREPARER NAME: K R Boller UNIT_NME: St. Lucie Unit 2 PREPARER TELEPHONE: 772 467-7465 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1074
- 2. Maximum Dependable Capacity (MWe-Net) 987 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,030.52 226,352.60
- 4. Number of Hours Generator On-line 744.00 4,967.78 223,871.34
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 753,741.00 5,018,606.00 185,724,043.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
PSL 2 operated in mode 1 the entire report period.
OPERATING DATA REPORT DOCKET: 389 PREPARER NAME: K R Boller UNIT_NME: St. Lucie Unit 2 PREPARER TELEPHONE: 772 467-7465 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1074
- 2. Maximum Dependable Capacity (MWe-Net) 987 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,774.52 227,096.60
- 4. Number of Hours Generator On-line 744.00 5,711.78 224,615.34
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 749,319.00 5,767,925.00 186,473,362.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
PSL 2 operated in mode 1 the entire report period.
OPERATING DATA REPORT DOCKET: 389 PREPARER NAME: K R Boller UNIT_NME: St. Lucie Unit 2 PREPARER TELEPHONE: 772 467-7465 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1074
- 2. Maximum Dependable Capacity (MWe-Net) 987 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,494.52 227,816.60
- 4. Number of Hours Generator On-line 720.00 6,431.78 225,335.34
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 718,003.00 6,485,928.00 187,191,365.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
PSL 2 operated in mode 1 the entire report period.
OPERATING DATA REPORT DOCKET: 395 PREPARER NAME: Wesley R. Higgins UNIT_NME: Summer Unit 1 PREPARER TELEPHONE: 8033454042 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 972.7
- 2. Maximum Dependable Capacity (MWe-Net) 966 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,846.00 223,081.25
- 4. Number of Hours Generator On-line 744.00 4,828.40 220,645.77
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 730,801.00 4,753,270.00 200,714,259.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The plant operated at full power during Juky 2013.
OPERATING DATA REPORT DOCKET: 395 PREPARER NAME: Wesley R. Higgins UNIT_NME: Summer Unit 1 PREPARER TELEPHONE: 8033454042 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 972.7
- 2. Maximum Dependable Capacity (MWe-Net) 966 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,590.00 223,825.25
- 4. Number of Hours Generator On-line 744.00 5,572.40 221,389.77
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 730,321.00 5,483,591.00 201,444,580.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
There were no Unit Shutdowns during June 2013. A power reduction commenced at approximately 23:45 on the 28th in support of main turbine valve testing (PTP-102.001). Power was reduced to approximately 90%. The plant was returned to 100% power at approximately 23:02 on the 29th.
OPERATING DATA REPORT DOCKET: 395 PREPARER NAME: Wesley R. Higgins UNIT_NME: Summer Unit 1 PREPARER TELEPHONE: 8033454042 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 972.7
- 2. Maximum Dependable Capacity (MWe-Net) 966 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,310.00 224,545.25
- 4. Number of Hours Generator On-line 720.00 6,292.40 222,109.77
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 705,365.00 6,188,956.00 202,149,945.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
There were no Unit Shutdowns during September 2013. A power reduction commenced at approximately 22:30 on the 27th in support of main turbine valve testing (PTP-102.001). Power was reduced to approximately 90%. The plant was returned to 100% power at approximately 10:15 on the 28th.
OPERATING DATA REPORT DOCKET: 280 PREPARER NAME: Marlene Haskett UNIT_NME: Surry Unit 1 PREPARER TELEPHONE: 757-365-2146 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 874
- 2. Maximum Dependable Capacity (MWe-Net) 838 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 279,910.04
- 4. Number of Hours Generator On-line 744.00 5,087.00 276,779.72
- 5. Reserve Shutdown Hours 0.00 0.00 3,736.20
- 6. Net Electrical energy Generated (MWHrs) 625,818.38 4,393,115.11 212,290,885.07 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 280 PREPARER NAME: Marlene Haskett UNIT_NME: Surry Unit 1 PREPARER TELEPHONE: 757-365-2146 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 874
- 2. Maximum Dependable Capacity (MWe-Net) 838 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 280,654.04
- 4. Number of Hours Generator On-line 744.00 5,831.00 277,523.72
- 5. Reserve Shutdown Hours 0.00 0.00 3,736.20
- 6. Net Electrical energy Generated (MWHrs) 629,992.00 5,023,107.11 212,920,877.07 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 280 PREPARER NAME: Marlene Haskett UNIT_NME: Surry Unit 1 PREPARER TELEPHONE: 757-365-2146 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 874
- 2. Maximum Dependable Capacity (MWe-Net) 838 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 281,374.04
- 4. Number of Hours Generator On-line 720.00 6,551.00 278,243.72
- 5. Reserve Shutdown Hours 0.00 0.00 3,736.20
- 6. Net Electrical energy Generated (MWHrs) 612,564.69 5,635,671.80 213,533,441.76 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 281 PREPARER NAME: Marlene Haskett UNIT_NME: Surry Unit 2 PREPARER TELEPHONE: 757-365-2146 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 874
- 2. Maximum Dependable Capacity (MWe-Net) 838 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 277,054.04
- 4. Number of Hours Generator On-line 744.00 5,087.00 274,305.15
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 627,488.24 4,393,876.82 210,700,644.77 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 281 PREPARER NAME: Marlene Haskett UNIT_NME: Surry Unit 2 PREPARER TELEPHONE: 757-365-2146 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 874
- 2. Maximum Dependable Capacity (MWe-Net) 838 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 277,798.04
- 4. Number of Hours Generator On-line 744.00 5,831.00 275,049.15
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 632,023.03 5,025,899.85 211,332,667.80 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 281 PREPARER NAME: Marlene Haskett UNIT_NME: Surry Unit 2 PREPARER TELEPHONE: 757-365-2146 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 874
- 2. Maximum Dependable Capacity (MWe-Net) 838 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 278,518.04
- 4. Number of Hours Generator On-line 720.00 6,551.00 275,769.15
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 613,258.26 5,639,158.11 211,945,926.07 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
OPERATING DATA REPORT DOCKET: 387 PREPARER NAME: J. Hennings UNIT_NME: Susquehanna Unit 1 PREPARER TELEPHONE: 570-542-3747 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1287
- 2. Maximum Dependable Capacity (MWe-Net) 1257 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,394.30 224,734.76
- 4. Number of Hours Generator On-line 722.68 4,187.42 221,535.98
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 841,199.00 5,240,133.00 238,562,989.70 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments U1 7/21/2013 S 21.32 B 5 07/21/13 01:51 Tripped Unit 1 Main Turbine for 2013- Turbine Control valve EHC Maintenance. The reactor was maintained at approximately 15%
power. 07/21/13 23:10 performed Auto Synchronization and loading of Main Generator.
Note: The shutdown was planned less than 10 days in advanced, but more than 72 hrs in advance. This is not a Forced Loss Event because this shutdown plan was implemented to address the initial condition associated with the cause for the FLE reduction of 23% on 7/16/13.
SUMMARY
There was one power reduction greater than 20%. The Unplanned Power reduction was initiated on 7/16/13. The reduction from 96%to 74%
power was required to reduce Turbine vibration experienced due to Turbine Control Valve position. The Turbine was taken off-line on July 21, after reducing power to 15%, to perform maintenance on the Turbine Control Valve servo valve that caused the intial reduction to 74%. The Reactor was maintained at approximately 15% power while the Turbine was off line. The Generator was put on line on 7/21/13, and the Reactor returned to full power on 7/24/13. There were no other power reductions greater than 20% this month.
OPERATING DATA REPORT DOCKET: 387 PREPARER NAME: J. Hennings UNIT_NME: Susquehanna Unit 1 PREPARER TELEPHONE: 570-542-3747 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1287
- 2. Maximum Dependable Capacity (MWe-Net) 1257 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,138.30 225,478.76
- 4. Number of Hours Generator On-line 744.00 4,931.42 222,279.98
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 933,837.00 6,173,970.00 239,496,826.70 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
There was one unplanned power reduction of greater than 20% in August. On 8/27/13 a Reactor Feed Pump tripped, resulting in a Reactor power reduction to 65%. On 08/28/13 power was increased to 100%. (This is considered an Unplanned Power Change for NRC Performance Indicators, and a Forced Loss Event for INPO).
OPERATING DATA REPORT DOCKET: 387 PREPARER NAME: J. Hennings UNIT_NME: Susquehanna Unit 1 PREPARER TELEPHONE: 570-542-3747 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1287
- 2. Maximum Dependable Capacity (MWe-Net) 1257 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,858.30 226,198.76
- 4. Number of Hours Generator On-line 720.00 5,651.42 222,999.98
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 905,554.00 7,079,524.00 240,402,380.70 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
On 09/12/13 a power reduction from 100% was performed for a planned control rod sequence exchange. The lowest power was 65%. On 09/13/13, power was returned to full power. There were no other power reductions greater than 20 % in September.
OPERATING DATA REPORT DOCKET: 388 PREPARER NAME: J. Hennings UNIT_NME: Susquehanna Unit 2 PREPARER TELEPHONE: 570-542-3747 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1287
- 2. Maximum Dependable Capacity (MWe-Net) 1257 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 3,996.33 220,543.15
- 4. Number of Hours Generator On-line 744.00 3,819.42 217,754.02
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 904,422.00 4,750,426.00 237,072,345.30 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
There were Two power reductions greater than 20% power this month. Both were in support of Transmission/Distribution Grid related maintnence:
On 07/06/13, reduced power from 99.8% to approximately 65% due to the loss of a 500KV line on the Distribution Grid. Returned to 100% on 07/08/13.
On 07/27/13 began a scheduled power reduction from 100%, for the support of Electric Utilities work on a 500KV Transmission line. Lowest power level was 63%. Returned to 99.9% power on 07/28/13.
OPERATING DATA REPORT DOCKET: 388 PREPARER NAME: J. Hennings UNIT_NME: Susquehanna Unit 2 PREPARER TELEPHONE: 570-542-3747 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1287
- 2. Maximum Dependable Capacity (MWe-Net) 1257 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,740.33 221,287.15
- 4. Number of Hours Generator On-line 744.00 4,563.42 218,498.02
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 939,578.00 5,690,004.00 238,011,923.30 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
There were no power reductions greater than 20% in the month of August.
OPERATING DATA REPORT DOCKET: 388 PREPARER NAME: J. Hennings UNIT_NME: Susquehanna Unit 2 PREPARER TELEPHONE: 570-542-3747 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1287
- 2. Maximum Dependable Capacity (MWe-Net) 1257 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 508.58 5,248.91 221,795.73
- 4. Number of Hours Generator On-line 483.52 5,046.94 218,981.54
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 556,871.00 6,246,875.00 238,568,794.30 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments U2 9/14/2013 S 236.48 B 2 Began power reduction at 09/13/13 22:00, from 2013- 100% to shut down for scheduled repair of (RBCCW) leakage into the Drywell and replacement of Turbine blades.
Breaker opened: 09/14/13 02:48.
Breaker closed: 09/23/13 23:17 Return to full power: 09/27/13 07:47
SUMMARY
The one power reduction greater than 20% in the month of September, was for a planned Control Rod Sequence Exchange. On 09/06/13, the power reduction began from 100%. Reactor Power reached as low as 53.7% and was returned to 99.8% power on 9/8/13.
There was one Unit shutdown in September, but there are 2 Reactor Shutdown entries impacting this occurrence, to accurately account for criticality time periods. The power reduction for scheduled shutdown to correct cooling water leaking into the Drywell, and for Main Turbine blade replacements, began at 09/13/13 22:00 from 100%.
The Generator Breaker was opened 09/14/13 02:48 when the Reactor was at 15.5%. The Reactor was taken Sub-Critical by means of an Unplanned Manual Scram from 14% power at 09/14/13 03:30.
Following the completion of the scheduled maintenance, during reactor startup. the Reactor was declared Critical at 09/22/13 22:02. Then, progressing through reactor start-up activities (re-ranging of IRM's), the Reactor was declared sub-critical at 09/22/13 23:13 (all rods not in, but also not critical during Reactor start-up). The Reactor was then declared critical at 09/23/13 00:06, and ramp-up activities continued. The generator was put on line 9/23/13 23:17. Full power was achieved at 09/27/13 07:47.
OPERATING DATA REPORT DOCKET: 289 PREPARER NAME: Mark Fauber UNIT_NME: Three Mile Island Unit 1 PREPARER TELEPHONE: (717) 948-8787 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 819
- 2. Maximum Dependable Capacity (MWe-Net) 802 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 254,203.85
- 4. Number of Hours Generator On-line 744.00 5,087.00 252,395.17
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 610,260.00 4,263,545.00 209,296,725.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit operated at nominal full power for the entire month of July.
OPERATING DATA REPORT DOCKET: 289 PREPARER NAME: Mark Fauber UNIT_NME: Three Mile Island Unit 1 PREPARER TELEPHONE: (717) 948-8787 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 819
- 2. Maximum Dependable Capacity (MWe-Net) 802 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 254,947.85
- 4. Number of Hours Generator On-line 744.00 5,831.00 253,139.17
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 614,906.00 4,878,451.00 209,911,631.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit operated at nominal full power for the entire month of August.
OPERATING DATA REPORT DOCKET: 289 PREPARER NAME: Mark Fauber UNIT_NME: Three Mile Island Unit 1 PREPARER TELEPHONE: (717) 948-8787 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 819
- 2. Maximum Dependable Capacity (MWe-Net) 802 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 255,667.85
- 4. Number of Hours Generator On-line 720.00 6,551.00 253,859.17
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 599,698.00 5,478,149.00 210,511,329.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit operated at nominal full power for the entire month of Septbember, with the exception of the period between 22:00 on 9/7/13 to 03:33 on 9/8/13, when a planned power reduction to approximately 89% power was completed.
OPERATING DATA REPORT DOCKET: 250 PREPARER NAME: Colleen Phillips UNIT_NME: Turkey Point Unit 3 PREPARER TELEPHONE: 305-246-7106 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 720
- 2. Maximum Dependable Capacity (MWe-Net) 693 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,371.26 274,527.90
- 4. Number of Hours Generator On-line 0.00 3,528.46 270,291.70
- 5. Reserve Shutdown Hours 0.00 0.00 121.80
- 6. Net Electrical energy Generated (MWHrs) 601,876.30 3,279,364.25 179,967,464.81 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 3 was approximately 100% for the month.
OPERATING DATA REPORT DOCKET: 250 PREPARER NAME: Colleen Phillips UNIT_NME: Turkey Point Unit 3 PREPARER TELEPHONE: 305-246-7106 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 720
- 2. Maximum Dependable Capacity (MWe-Net) 693 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,115.26 275,271.90
- 4. Number of Hours Generator On-line 0.00 3,528.46 270,291.70
- 5. Reserve Shutdown Hours 0.00 0.00 121.80
- 6. Net Electrical energy Generated (MWHrs) 597,500.50 3,876,864.75 180,564,965.31 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 3 was at approximately 100% for the month.
OPERATING DATA REPORT DOCKET: 250 PREPARER NAME: Colleen Phillips UNIT_NME: Turkey Point Unit 3 PREPARER TELEPHONE: 305-246-7106 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 720
- 2. Maximum Dependable Capacity (MWe-Net) 693 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,835.26 275,991.90
- 4. Number of Hours Generator On-line 0.00 3,528.46 270,291.70
- 5. Reserve Shutdown Hours 0.00 0.00 121.80
- 6. Net Electrical energy Generated (MWHrs) 577,747.62 4,454,612.37 181,142,712.93 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 3 was at approximately 100% power.
OPERATING DATA REPORT DOCKET: 251 PREPARER NAME: Colleen Phillips UNIT_NME: Turkey Point Unit 4 PREPARER TELEPHONE: 305-246-7106 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 720
- 2. Maximum Dependable Capacity (MWe-Net) 693 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 2,763.08 272,065.23
- 4. Number of Hours Generator On-line 744.00 2,483.30 266,828.80
- 5. Reserve Shutdown Hours 0.00 0.00 577.20
- 6. Net Electrical energy Generated (MWHrs) 609,626.23 1,666,814.45 178,915,449.26 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 4 was at approximately 100% for the month.
OPERATING DATA REPORT DOCKET: 251 PREPARER NAME: Colleen Phillips UNIT_NME: Turkey Point Unit 4 PREPARER TELEPHONE: 305-246-7106 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 720
- 2. Maximum Dependable Capacity (MWe-Net) 693 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 3,507.08 272,809.23
- 4. Number of Hours Generator On-line 744.00 3,227.30 267,572.80
- 5. Reserve Shutdown Hours 0.00 0.00 577.20
- 6. Net Electrical energy Generated (MWHrs) 605,877.39 2,272,691.84 179,521,326.65 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 4 was approximately 100% for the month.
OPERATING DATA REPORT DOCKET: 251 PREPARER NAME: Colleen Phillips UNIT_NME: Turkey Point Unit 4 PREPARER TELEPHONE: 305-246-7106 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 720
- 2. Maximum Dependable Capacity (MWe-Net) 693 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 4,227.08 273,529.23
- 4. Number of Hours Generator On-line 720.00 3,947.30 268,292.80
- 5. Reserve Shutdown Hours 0.00 0.00 577.20
- 6. Net Electrical energy Generated (MWHrs) 585,886.05 2,858,577.89 180,107,212.70 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 4 was at approximately 100% for the month.
OPERATING DATA REPORT DOCKET: 271 PREPARER NAME: Anthony L. Stevens UNIT_NME: Vermont Yankee Unit 1 PREPARER TELEPHONE: (802) 451-3176 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 617
- 2. Maximum Dependable Capacity (MWe-Net) 605 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,468.69 311,079.06
- 4. Number of Hours Generator On-line 744.00 4,449.65 307,167.81
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 446,584.00 2,648,399.00 156,051,746.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Dates Activity MW-hr S/F 07/02-07/03 CW System Chlorination 474 S 07/05-07/06 CW System Chlorination 382 S 07/07-07/09 Rod Sequence Exchange 4828 S 07/09 CW System Chlorination 132 S 07/09-07/10 2nd Pass Rod Pattern Adjustment 221 S 07/10-07/11 3rd Pass Rod Pattern Adjustment 106 S 07/12-07/13 CW System Chlorination 122 S 07/17 CW System Chlorination 348 S 07/21 CW System Chlorination 291 S 07/28 CW System Chlorination 24 S Total All Losses (Scheduled and Forced) = 6928 MW-hr
OPERATING DATA REPORT DOCKET: 271 PREPARER NAME: Anthony L. Stevens UNIT_NME: Vermont Yankee Unit 1 PREPARER TELEPHONE: (802) 451-3176 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 617
- 2. Maximum Dependable Capacity (MWe-Net) 605 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,212.69 311,823.06
- 4. Number of Hours Generator On-line 744.00 5,193.65 307,911.81
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 446,712.00 3,095,111.00 156,498,458.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Dates Activity MW-hr S/F 08/02-08/03 CW System Chlorination 146 S 08/08-08/09 CW System Chlorination 522 S 08/13-08/14 CW System Chlorination 123 S 08/20-08/21 CW System Chlorination 145 S 08/26 Delta V Power Supply Failure 61 F 08/27-08/28 CW System Chlorination 307 S 08/30-08/31 CW System Chlorination 273 S Total All Losses (Scheduled and Forced) = 1577 MW-hr
OPERATING DATA REPORT DOCKET: 271 PREPARER NAME: Anthony L. Stevens UNIT_NME: Vermont Yankee Unit 1 PREPARER TELEPHONE: (802) 451-3176 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 617
- 2. Maximum Dependable Capacity (MWe-Net) 605 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,932.69 312,543.06
- 4. Number of Hours Generator On-line 720.00 5,913.65 308,631.81
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 398,447.00 3,493,558.00 156,896,905.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Dates Activity MW-hr S/F 09/10-09/11 CW System Chlorination 283 S 09/23-09/30 B Recirc MG Set Repair (Oil Leak) & Assoc. Passes 33666 F < 10 days 09/26 Rod Sequence Exch. 767 S 09/26 Single Rod Scram Testing 1582 S 09/26 Quarterly MSIV Testing 897 S 09/26 Quarterly Turbine Valve Testing 2200 S Total All Losses (Scheduled and Forced) = 39395 MW-hr
OPERATING DATA REPORT DOCKET: 424 PREPARER NAME: Doug Holt UNIT_NME: Vogtle Unit 1 PREPARER TELEPHONE: 706-826-3467 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1169
- 2. Maximum Dependable Capacity (MWe-Net) 1150 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,087.00 209,224.49
- 4. Number of Hours Generator On-line 744.00 5,087.00 207,134.62
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 854,187.00 5,944,250.00 235,321,123.50 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Through July 1 at approximately 00:15, Unit 1 was at maximum operating power with no significant operating problems. On July 1 at approximately 00:15, Unit 1 began a planned derate to approximately 98% reactor power for turbine control valve testing. On July 1 at approximately 06:40, the Unit 1 reactor had returned to maximum operating power and remained there for the rest of the month.
OPERATING DATA REPORT DOCKET: 424 PREPARER NAME: Doug Holt UNIT_NME: Vogtle Unit 1 PREPARER TELEPHONE: 706-826-3467 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1169
- 2. Maximum Dependable Capacity (MWe-Net) 1150 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,831.00 209,968.49
- 4. Number of Hours Generator On-line 744.00 5,831.00 207,878.62
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 856,700.00 6,800,950.00 236,177,823.50 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 1 was at maximum operating power during the month of August.
OPERATING DATA REPORT DOCKET: 424 PREPARER NAME: Doug Holt UNIT_NME: Vogtle Unit 1 PREPARER TELEPHONE: 706-826-3467 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1169
- 2. Maximum Dependable Capacity (MWe-Net) 1150 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,551.00 210,688.49
- 4. Number of Hours Generator On-line 720.00 6,551.00 208,598.62
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 832,984.00 7,633,934.00 237,010,807.50 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Through September 29 at approximately 02:10, Unit 1 was at maximum operating power with no significant operating problems. On September 29 at approximately 02:10, Unit 1 began a planned derate to approximately 98% reactor power for turbine control valve testing. On September 29 at approximately 05:30, the Unit 1 reactor had returned to maximum operating power and remained there for the rest of the month.
OPERATING DATA REPORT DOCKET: 425 PREPARER NAME: Doug Holt UNIT_NME: Vogtle Unit 2 PREPARER TELEPHONE: 706-826-3467 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1169
- 2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,342.53 193,828.63
- 4. Number of Hours Generator On-line 744.00 4,279.80 192,478.97
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 865,534.00 4,907,076.00 219,334,749.50 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 2 was at maximum operating power during the month of July.
OPERATING DATA REPORT DOCKET: 425 PREPARER NAME: Doug Holt UNIT_NME: Vogtle Unit 2 PREPARER TELEPHONE: 706-826-3467 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1169
- 2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,086.53 194,572.63
- 4. Number of Hours Generator On-line 744.00 5,023.80 193,222.97
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 866,037.00 5,773,113.00 220,200,786.50 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unit 2 was at maximum operating power during the month of August.
OPERATING DATA REPORT DOCKET: 425 PREPARER NAME: Doug Holt UNIT_NME: Vogtle Unit 2 PREPARER TELEPHONE: 706-826-3467 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1169
- 2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 5,806.53 195,292.63
- 4. Number of Hours Generator On-line 720.00 5,743.80 193,942.97
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 841,624.00 6,614,737.00 221,042,410.50 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Through September 7 at approximately 22:28, Unit 2 was at maximum operating power with no significant operating problems. On September 7 at approximately 22:28, Unit 2 began a planned derate to approximately 98% reactor power for turbine control valve testing. On September 8 at approximately 02:41, the Unit 2 reactor had returned to maximum operating power and remained there for the rest of the month.
OPERATING DATA REPORT DOCKET: 382 PREPARER NAME: Jim Pollock UNIT_NME: Waterford Unit 3 PREPARER TELEPHONE: (504) 739-6561 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1173
- 2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,538.95 213,980.15
- 4. Number of Hours Generator On-line 744.00 4,502.46 212,316.66
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 861,067.00 5,130,234.00 233,079,566.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit operated at an average reactor power level of 99.6% and experienced no shutdowns or significant power reductions during the period.
OPERATING DATA REPORT DOCKET: 382 PREPARER NAME: Jim Pollock UNIT_NME: Waterford Unit 3 PREPARER TELEPHONE: (504) 739-6561 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1173
- 2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,282.95 214,724.15
- 4. Number of Hours Generator On-line 744.00 5,246.46 213,060.66
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 855,027.00 5,985,261.00 233,934,593.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit operated at an average reactor power level of 99.9% and experienced no shutdowns or significant power reductions during the period.
OPERATING DATA REPORT DOCKET: 382 PREPARER NAME: JIm Pollock UNIT_NME: Waterford Unit 3 PREPARER TELEPHONE: (504) 739-6561 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1173
- 2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,002.95 215,444.15
- 4. Number of Hours Generator On-line 720.00 5,966.46 213,780.66
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 819,910.00 6,805,171.00 234,754,503.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit operated at an average reactor power level of 99.7% and experienced no shutdowns or significant power reductions during the period.
OPERATING DATA REPORT DOCKET: 390 PREPARER NAME: Tiffany Bridges UNIT_NME: Watts Bar Unit 1 PREPARER TELEPHONE: 423-365-1434 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1160
- 2. Maximum Dependable Capacity (MWe-Net) 1123 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,047.00 136,364.07
- 4. Number of Hours Generator On-line 744.00 5,036.35 135,664.98
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 833,711.00 5,764,198.00 152,035,645.08 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Grid related energy loss due to Auto Tripfrom a 1A Mainbank Transformer Mismatch that was Energy Deliverys equipment.
Unplanned Losses are due to manageable losses.
OPERATING DATA REPORT DOCKET: 390 PREPARER NAME: Tiffany Bridges UNIT_NME: Watts Bar Unit 1 PREPARER TELEPHONE: 423-365-1434 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1160
- 2. Maximum Dependable Capacity (MWe-Net) 1123 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 5,791.00 137,108.07
- 4. Number of Hours Generator On-line 744.00 5,780.35 136,408.98
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 837,231.00 6,601,429.00 152,872,876.08 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unplanned Losses are Manageable Losses.
OPERATING DATA REPORT DOCKET: 390 PREPARER NAME: Tiffany Bridges UNIT_NME: Watts Bar Unit 1 PREPARER TELEPHONE: 423-365-1434 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1160
- 2. Maximum Dependable Capacity (MWe-Net) 1123 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 6,511.00 137,828.07
- 4. Number of Hours Generator On-line 720.00 6,500.35 137,128.98
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical energy Generated (MWHrs) 813,145.00 7,414,574.00 153,686,021.08 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
Unplanned Losses are Manageable Losses
OPERATING DATA REPORT DOCKET: 482 PREPARER NAME: W M Muilenburg UNIT_NME: Wolf Creek Unit 1 PREPARER TELEPHONE: 620 364-8831 RPT_PERIOD: 201307
- 1. Design Electrical Rating: 1200
- 2. Maximum Dependable Capacity (MWe-Net) 1164 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 3,309.08 210,656.06
- 4. Number of Hours Generator On-line 744.00 3,218.67 208,963.65
- 5. Reserve Shutdown Hours 0.00 0.00 339.80
- 6. Net Electrical energy Generated (MWHrs) 882,785.00 3,638,273.00 239,769,240.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit operated in Mode 1, at or near 100% power, from July 1, 2013 through July 31, 2013.
OPERATING DATA REPORT DOCKET: 482 PREPARER NAME: W M Muilenburg UNIT_NME: Wolf Creek Unit 1 PREPARER TELEPHONE: 620 364-8831 RPT_PERIOD: 201308
- 1. Design Electrical Rating: 1200
- 2. Maximum Dependable Capacity (MWe-Net) 1164 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 4,053.08 211,400.06
- 4. Number of Hours Generator On-line 744.00 3,962.67 209,707.65
- 5. Reserve Shutdown Hours 0.00 0.00 339.80
- 6. Net Electrical energy Generated (MWHrs) 883,930.00 4,522,203.00 240,653,170.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
The unit operating in Mode 1, at or near 100% power, from August 1, 2013 through August 31, 2013.
OPERATING DATA REPORT DOCKET: 482 PREPARER NAME: W M Muilenburg UNIT_NME: Wolf Creek Unit 1 PREPARER TELEPHONE: 620 364-8831 RPT_PERIOD: 201309
- 1. Design Electrical Rating: 1200
- 2. Maximum Dependable Capacity (MWe-Net) 1164 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 298.57 4,351.65 211,698.63
- 4. Number of Hours Generator On-line 270.58 4,233.25 209,978.23
- 5. Reserve Shutdown Hours 0.00 0.00 339.80
- 6. Net Electrical energy Generated (MWHrs) 292,148.00 4,814,351.00 240,945,318.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 13-3 9/11/2013 F 449.42 D 1 SGK05A Train A, class 1E air conditioning unit not capable of performing its cooling function.
SUMMARY
The unit operating in Mode 1, at or near 100% power, from September 1, 2013 through September 11, 2013, when the unit was shutdown (Tech.
Spec. 3.0.3) due to declaring SGK05A, Class 1E A/C unit nonfunctional. This resulted in Technical Specification equipment being declared inoperable. Replaced the A/C unit compresser and returned the unit to power on September 29, 2013. The unit continued to operate in Mode 1 at or near 100% power through September 30, 2013.