=Text=
=Text=
{{#Wiki_filter:RPT_PERIOD:201307UNIT_NME:ANO Unit 1                    DOCKET:313OPERATING DATA REPORTPREPARER NAME:Steven L. CoffmanPREPARER TELEPHONE:479-858-5560UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8502. Maximum Dependable Capacity (MWe-Net)8360.001,975.00275,328.17 0.001,975.00272,194.08 0.000.00817.50 0.001,631,945.00215,063,615.24This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
{{#Wiki_filter:OPERATING DATA REPORT DOCKET:             313                                                        PREPARER NAME:             Steven L. Coffman UNIT_NME:          ANO Unit 1                                                  PREPARER TELEPHONE: 479-858-5560 RPT_PERIOD:         201307
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                       850
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)           836 This Month        Yr-to-Date        Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical            0.00              1,975.00          275,328.17
: 4. Number of Hours Generator On-line                  0.00              1,975.00          272,194.08
: 5. Reserve Shutdown Hours                              0.00              0.00              817.50
: 6. Net Electrical energy Generated (MWHrs)            0.00              1,631,945.00      215,063,615.24 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting            Cause - Corrective Action No.       Date        S: Scheduled        (Hours)         Reason 1            Down 2                      Comments 2013-  3/24/2013            S              744.00              C                  4          1R24 Refueling Outage 01


==SUMMARY==
==SUMMARY==
ANO-1 remained shutdown for the entire month of July, continuing the 1R24 Refueling Outage.2013-013/24/2013S  744.00C41R24 Refueling Outage RPT_PERIOD:201308UNIT_NME:ANO Unit 1                    DOCKET:313OPERATING DATA REPORTPREPARER NAME:Steven L. CoffmanPREPARER TELEPHONE:479-858-5560UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8502. Maximum Dependable Capacity (MWe-Net)836568.582,543.58275,896.75 511.152,486.15272,705.23 0.000.00817.50 378,889.002,010,834.00215,442,504.24This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
ANO-1 remained shutdown for the entire month of July, continuing the 1R24 Refueling Outage.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:             313                                                                PREPARER NAME:             Steven L. Coffman UNIT_NME:          ANO Unit 1                                                        PREPARER TELEPHONE: 479-858-5560 RPT_PERIOD:         201308
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                             850
: 2. Maximum Dependable Capacity (MWe-Net)                 836 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                  568.58            2,543.58          275,896.75
: 4. Number of Hours Generator On-line                          511.15            2,486.15          272,705.23
: 5. Reserve Shutdown Hours                                    0.00              0.00              817.50
: 6. Net Electrical energy Generated (MWHrs)                    378,889.00        2,010,834.00      215,442,504.24 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                              Shutting            Cause - Corrective Action No.       Date          S: Scheduled          (Hours)            Reason 1            Down 2                        Comments 2013-   8/14/2013            F                  66.13                  F                  1        Required shutdown due to steam generator 02                                                                                                    feedwater chemistry action level exceeded.
2013-  3/24/2013            S                166.72                  C                  4        1R24 Refueling Outage 01


==SUMMARY==
==SUMMARY==
ANO-1 began the month in a continued shutdown for the 1R24 Refueling Outage. On 08/07/2013, the Unit was reconnected to the grid and commenced post-1R24 power escalation and testing. On 08/14/2013, the Unit was manually taken off line due exceeding steam generator feedwater chemistry action levels, and was reconnected to the grid on 08/17/2013. The Unit achieved full power on 08/19/2013, and operated at, or near full power for the remainder of the month. 2013-028/14/2013F  66.13F1Required shutdown due to steam generator feedwater chemistry action level exceeded.2013-013/24/2013S  166.72C41R24 Refueling Outage RPT_PERIOD:201309UNIT_NME:ANO Unit 1                    DOCKET:313OPERATING DATA REPORTPREPARER NAME:Steven L. CoffmanPREPARER TELEPHONE:479-858-5560UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8502. Maximum Dependable Capacity (MWe-Net)836720.003,263.58276,616.75 720.003,206.15273,425.23 0.000.00817.50 579,549.002,590,383.00216,022,053.24This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
ANO-1 began the month in a continued shutdown for the 1R24 Refueling Outage. On 08/07/2013, the Unit was reconnected to the grid and commenced post-1R24 power escalation and testing. On 08/14/2013, the Unit was manually taken off line due exceeding steam generator feedwater chemistry action levels, and was reconnected to the grid on 08/17/2013. The Unit achieved full power on 08/19/2013, and operated at, or near full power for the remainder of the month.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:               313                                                            PREPARER NAME:               Steven L. Coffman UNIT_NME:            ANO Unit 1                                                      PREPARER TELEPHONE: 479-858-5560 RPT_PERIOD:           201309
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                           850
: 2. Maximum Dependable Capacity (MWe-Net)               836 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                720.00            3,263.58            276,616.75
: 4. Number of Hours Generator On-line                        720.00            3,206.15            273,425.23
: 5. Reserve Shutdown Hours                                  0.00              0.00                817.50
: 6. Net Electrical energy Generated (MWHrs)                  579,549.00        2,590,383.00        216,022,053.24 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                              Shutting              Cause - Corrective Action No.       Date          S: Scheduled          (Hours)           Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
ANO-1 began the month at, or near full power. On 09/27/2013, power was decreased to approximately 71 percent due to a heater drain pump failure. Power was later increased to approximately 82 percent and remained there through the end of the month to facilitate heater drain pump replacement.
ANO-1 began the month at, or near full power. On 09/27/2013, power was decreased to approximately 71 percent due to a heater drain pump failure. Power was later increased to approximately 82 percent and remained there through the end of the month to facilitate heater drain pump replacement.
RPT_PERIOD:201307UNIT_NME:ANO Unit 2                    DOCKET:368OPERATING DATA REPORTPREPARER NAME:Steven L. CoffmanPREPARER TELEPHONE:479-858-5560UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:10322. Maximum Dependable Capacity (MWe-Net)988744.004,413.49248,272.53 744.004,407.82245,502.00 0.000.000.00 738,538.004,395,800.00221,708,068.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             368                                                      PREPARER NAME:           Steven L. Coffman UNIT_NME:          ANO Unit 2                                                PREPARER TELEPHONE: 479-858-5560 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1032
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         988 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          4,413.49        248,272.53
: 4. Number of Hours Generator On-line                  744.00          4,407.82        245,502.00
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            738,538.00      4,395,800.00    221,708,068.00 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
ANO-2 operated the entire month at, or near full power.
ANO-2 operated the entire month at, or near full power.
RPT_PERIOD:201308UNIT_NME:ANO Unit 2                    DOCKET:368OPERATING DATA REPORTPREPARER NAME:Steven L. CoffmanPREPARER TELEPHONE:479-858-5560UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:10322. Maximum Dependable Capacity (MWe-Net)988744.005,157.49249,016.53 744.005,151.82246,246.00 0.000.000.00 736,533.005,132,333.00222,444,601.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             368                                                      PREPARER NAME:           Steven L. Coffman UNIT_NME:          ANO Unit 2                                                PREPARER TELEPHONE: 479-858-5560 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1032
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         988 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          5,157.49        249,016.53
: 4. Number of Hours Generator On-line                  744.00          5,151.82        246,246.00
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            736,533.00      5,132,333.00    222,444,601.00 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
ANO-2 operated the entire month at, or near full power.
ANO-2 operated the entire month at, or near full power.
RPT_PERIOD:201309UNIT_NME:ANO Unit 2                    DOCKET:368OPERATING DATA REPORTPREPARER NAME:Steven L. CoffmanPREPARER TELEPHONE:479-858-5560UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:10322. Maximum Dependable Capacity (MWe-Net)988720.005,877.49249,736.53 720.005,871.82246,966.00 0.000.000.00 716,174.005,848,507.00223,160,775.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             368                                                      PREPARER NAME:           Steven L. Coffman UNIT_NME:          ANO Unit 2                                                PREPARER TELEPHONE: 479-858-5560 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1032
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         988 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          720.00          5,877.49        249,736.53
: 4. Number of Hours Generator On-line                  720.00          5,871.82        246,966.00
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            716,174.00      5,848,507.00    223,160,775.00 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
ANO-2 operated the entire month at, or near full power.
ANO-2 operated the entire month at, or near full power.
RPT_PERIOD:201307UNIT_NME:Beaver Valley Unit 1          DOCKET:334OPERATING DATA REPORTPREPARER NAME:David T. JonesPREPARER TELEPHONE:724-682-4962UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9112. Maximum Dependable Capacity (MWe-Net)892744.005,087.00246,600.54 744.005,087.00243,917.24 0.000.000.00 665,039.304,546,576.70193,439,329.50This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             334                                                            PREPARER NAME:           David T. Jones UNIT_NME:            Beaver Valley Unit 1                                          PREPARER TELEPHONE: 724-682-4962 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                         911
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)             892 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical              744.00            5,087.00          246,600.54
: 4. Number of Hours Generator On-line                      744.00            5,087.00          243,917.24
: 5. Reserve Shutdown Hours                                0.00              0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                665,039.30        4,546,576.70      193,439,329.50 UNIT SHUTDOWNS Type                                                  Method of F: Forced            Duration                              Shutting          Cause - Corrective Action No.       Date        S: Scheduled          (Hours)         Reason 1            Down 2                    Comments


==SUMMARY==
==SUMMARY==
BVPS-1 operated at a nominal value of 100% power for the entire month of July 2013, except for 50 minutes on 7/9/13 when power was reduced to approximately 98.2% during a planned Moderator Temperature Coefficient Test.
BVPS-1 operated at a nominal value of 100% power for the entire month of July 2013, except for 50 minutes on 7/9/13 when power was reduced to approximately 98.2% during a planned Moderator Temperature Coefficient Test.
RPT_PERIOD:201308UNIT_NME:Beaver Valley Unit 1         DOCKET:334OPERATING DATA REPORTPREPARER NAME:RJ HeppPREPARER TELEPHONE:724-682-7675UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9112. Maximum Dependable Capacity (MWe-Net)892744.005,831.00247,344.54 744.005,831.00244,661.24 0.000.000.00 667,820.905,214,397.60194,107,150.40This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            334                                                        PREPARER NAME:             RJ Hepp UNIT_NME:           Beaver Valley Unit 1                                       PREPARER TELEPHONE: 724-682-7675 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     911
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         892 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            5,831.00          247,344.54
: 4. Number of Hours Generator On-line                744.00            5,831.00          244,661.24
: 5. Reserve Shutdown Hours                            0.00              0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)          667,820.90        5,214,397.60      194,107,150.40 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
BVPS-1 operated at a nominal value of 100% power for the entire month of August 2013.
BVPS-1 operated at a nominal value of 100% power for the entire month of August 2013.
RPT_PERIOD:201309UNIT_NME:Beaver Valley Unit 1          DOCKET:334OPERATING DATA REPORTPREPARER NAME:R. J. HeppPREPARER TELEPHONE:724-682-7675UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9112. Maximum Dependable Capacity (MWe-Net)892696.476,527.47248,041.01 696.026,527.02245,357.26 0.000.000.00 600,261.605,814,659.20194,707,412.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             334                                                                PREPARER NAME:               R. J. Hepp UNIT_NME:            Beaver Valley Unit 1                                              PREPARER TELEPHONE: 724-682-7675 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                             911
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)                 892 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                  696.47            6,527.47            248,041.01
: 4. Number of Hours Generator On-line                        696.02            6,527.02            245,357.26
: 5. Reserve Shutdown Hours                                    0.00              0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)                  600,261.60        5,814,659.20        194,707,412.00 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                                Shutting              Cause - Corrective Action No.       Date          S: Scheduled            (Hours)           Reason 1            Down 2                        Comments 1      9/30/2013              S                23.98                  C                  1          The Unit was shutdown for its planned 22nd refueling outage on 9/30/13 at 0001 hours.


==SUMMARY==
==SUMMARY==
The Unit operated at a nominal value of 100% power until 9/7/13 when an end of cycle fuel coastdown was begun. The Unit continued to coastdown until 9/28/13 when output was reduced to approximately 50% for planned Main Steam Safety Valve testing. Following satisfactory testing the Unit was shutdown for its planned 22nd refueling outage on 9/30/13 at 0001 hours.19/30/2013S  23.98C1The Unit was shutdown for its planned 22nd refueling outage on 9/30/13 at 0001 hours.
The Unit operated at a nominal value of 100% power until 9/7/13 when an end of cycle fuel coastdown was begun. The Unit continued to coastdown until 9/28/13 when output was reduced to approximately 50% for planned Main Steam Safety Valve testing. Following satisfactory testing the Unit was shutdown for its planned 22nd refueling outage on 9/30/13 at 0001 hours.
RPT_PERIOD:201307UNIT_NME:Beaver Valley Unit 2          DOCKET:412OPERATING DATA REPORTPREPARER NAME:David T. JonesPREPARER TELEPHONE:724-682-4962UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9042. Maximum Dependable Capacity (MWe-Net)885744.004,797.15195,883.35 744.004,785.06194,942.21 0.000.000.00 677,398.304,420,654.20159,558,237.60This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             412                                                            PREPARER NAME:           David T. Jones UNIT_NME:          Beaver Valley Unit 2                                            PREPARER TELEPHONE: 724-682-4962 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           904
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               885 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical                744.00          4,797.15        195,883.35
: 4. Number of Hours Generator On-line                        744.00          4,785.06        194,942.21
: 5. Reserve Shutdown Hours                                  0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)                  677,398.30      4,420,654.20    159,558,237.60 UNIT SHUTDOWNS Type                                                  Method of F: Forced            Duration                              Shutting          Cause - Corrective Action No.       Date        S: Scheduled          (Hours)             Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
BVPS-2 operated at a nominal value at 100% power for the entire month of July 2013, except for 13.7 hours on 7/20/13 when Operations reduced power to approximately 98.5% in order to repair the LEFM.
BVPS-2 operated at a nominal value at 100% power for the entire month of July 2013, except for 13.7 hours on 7/20/13 when Operations reduced power to approximately 98.5% in order to repair the LEFM.
RPT_PERIOD:201308UNIT_NME:Beaver Valley Unit 2         DOCKET:412OPERATING DATA REPORTPREPARER NAME:RJ HeppPREPARER TELEPHONE:724-682-7675UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9042. Maximum Dependable Capacity (MWe-Net)885744.005,541.15196,627.35 744.005,529.06195,686.21 0.000.000.00 680,615.805,101,270.00160,238,853.40This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            412                                                        PREPARER NAME:             RJ Hepp UNIT_NME:           Beaver Valley Unit 2                                       PREPARER TELEPHONE: 724-682-7675 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     904
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         885 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            5,541.15          196,627.35
: 4. Number of Hours Generator On-line                744.00            5,529.06          195,686.21
: 5. Reserve Shutdown Hours                            0.00              0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)          680,615.80        5,101,270.00      160,238,853.40 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
BVPS-2 operated at a nominal value of 100% power for the entire month of August 2013.
BVPS-2 operated at a nominal value of 100% power for the entire month of August 2013.
RPT_PERIOD:201309UNIT_NME:Beaver Valley Unit 2          DOCKET:412OPERATING DATA REPORTPREPARER NAME:R. J. HeppPREPARER TELEPHONE:724-682-7675UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9042. Maximum Dependable Capacity (MWe-Net)885720.006,261.15197,347.35 720.006,249.06196,406.21 0.000.000.00 662,663.605,763,933.60160,901,517.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             412                                                                  PREPARER NAME:               R. J. Hepp UNIT_NME:          Beaver Valley Unit 2                                                PREPARER TELEPHONE: 724-682-7675 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           904
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               885 This Month            Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                720.00                6,261.15            197,347.35
: 4. Number of Hours Generator On-line                      720.00                6,249.06            196,406.21
: 5. Reserve Shutdown Hours                                  0.00                  0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)                662,663.60            5,763,933.60        160,901,517.00 UNIT SHUTDOWNS Type                                                        Method of F: Forced          Duration                                  Shutting            Cause - Corrective Action No.       Date        S: Scheduled          (Hours)           Reason 1                Down 2                        Comments


==SUMMARY==
==SUMMARY==
The Unit operated at a nominal value of 100% power for the entire month of September 2013 with the exception of a small reduction on 9/28/13. The Unit reduced output to approximately 97.5% in order to repair [2HDH-LCV103B2], 1st Point Heater Normal Level Control Valve. [Note: this event was planned 17 days in advance of the reduction, therefore, it is considered a planned event for INPO (>10 days), yet remains an unplanned event for WANO (<28 days).]
The Unit operated at a nominal value of 100% power for the entire month of September 2013 with the exception of a small reduction on 9/28/13.
RPT_PERIOD:201307UNIT_NME:Braidwood Unit 1             DOCKET:456OPERATING DATA REPORTPREPARER NAME:David JohnsonPREPARER TELEPHONE:815-417-2478UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11872. Maximum Dependable Capacity (MWe-Net)1151744.005,087.00195,066.31 744.005,087.00193,975.32 0.000.000.00 869,976.006,041,364.00217,376,359.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
The Unit reduced output to approximately 97.5% in order to repair [2HDH-LCV103B2], 1st Point Heater Normal Level Control Valve. [Note: this event was planned 17 days in advance of the reduction, therefore, it is considered a planned event for INPO (>10 days), yet remains an unplanned event for WANO (<28 days).]
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:            456                                                    PREPARER NAME:           David Johnson UNIT_NME:           Braidwood Unit 1                                       PREPARER TELEPHONE: 815-417-2478 RPT_PERIOD:         201307
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                     1187
: 2. Maximum Dependable Capacity (MWe-Net)         1151 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          5,087.00        195,066.31
: 4. Number of Hours Generator On-line                744.00          5,087.00        193,975.32
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          869,976.00      6,041,364.00    217,376,359.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
U-1 Operated at Full Power the entire month.
U-1 Operated at Full Power the entire month.
RPT_PERIOD:201308UNIT_NME:Braidwood Unit 1             DOCKET:456OPERATING DATA REPORTPREPARER NAME:David JohnsonPREPARER TELEPHONE:815-417-2478UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11872. Maximum Dependable Capacity (MWe-Net)1151744.005,831.00195,810.31 744.005,831.00194,719.32 0.000.000.00 870,970.006,912,334.00218,247,329.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            456                                                          PREPARER NAME:             David Johnson UNIT_NME:           Braidwood Unit 1                                             PREPARER TELEPHONE: 815-417-2478 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       1187
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           1151 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical            744.00            5,831.00          195,810.31
: 4. Number of Hours Generator On-line                  744.00            5,831.00          194,719.32
: 5. Reserve Shutdown Hours                              0.00              0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)            870,970.00        6,912,334.00      218,247,329.00 UNIT SHUTDOWNS Type                                                Method of F: Forced        Duration                              Shutting            Cause - Corrective Action No.       Date        S: Scheduled        (Hours)             Reason 1          Down 2                      Comments


==SUMMARY==
==SUMMARY==
The unit operated nornally at full power except for a planned CW Pp Forebay inspection.
The unit operated nornally at full power except for a planned CW Pp Forebay inspection.
RPT_PERIOD:201309UNIT_NME:Braidwood Unit 1             DOCKET:456OPERATING DATA REPORTPREPARER NAME:David JohnsonPREPARER TELEPHONE:815-417-2478UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11872. Maximum Dependable Capacity (MWe-Net)1151209.856,040.85196,020.16 197.806,028.80194,917.12 0.000.000.00 211,033.007,123,367.00218,458,362.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            456                                                      PREPARER NAME:             David Johnson UNIT_NME:           Braidwood Unit 1                                         PREPARER TELEPHONE: 815-417-2478 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       1187
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           1151 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          209.85          6,040.85        196,020.16
: 4. Number of Hours Generator On-line                  197.80          6,028.80        194,917.12
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            211,033.00      7,123,367.00    218,458,362.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.      Date        S: Scheduled        (Hours)        Reason 1          Down 2                      Comments A1R17 9/9/2013              S              522.20              C                1        Unit 1 entered a planned refueling outage on 9/9/2013 @ 00:00, with return of the unit occuring 9/30/2013 with Unit 1 Reactor critical at 06:09 and the Main Generator synched to the output grid at 18:12. Outage duration was 17 days, 18 hours and 12 minutes.


==SUMMARY==
==SUMMARY==
Refuel outage A1R17 started on 9/9/2013 and ended on 9/30/2013. A1R179/9/2013S  522.20C1Unit 1 entered a planned refueling outage on 9/9/2013 @ 00:00, with return of the unit occuring 9/30/2013 with Unit 1 Reactor critical at 06:09 and the Main Generator synched to the output grid at 18:12. Outage duration was 17 days, 18 hours and 12 minutes.
Refuel outage A1R17 started on 9/9/2013 and ended on 9/30/2013.
RPT_PERIOD:201307UNIT_NME:Braidwood Unit 2             DOCKET:457OPERATING DATA REPORTPREPARER NAME:David JohnsonPREPARER TELEPHONE:815-417-2478UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11552. Maximum Dependable Capacity (MWe-Net)1125652.104,923.13198,793.36 635.954,906.97197,928.49 0.000.000.00 708,926.005,664,300.00219,789,522.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             457                                                            PREPARER NAME:               David Johnson UNIT_NME:           Braidwood Unit 2                                               PREPARER TELEPHONE: 815-417-2478 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                         1155
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)             1125 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical              652.10            4,923.13            198,793.36
: 4. Number of Hours Generator On-line                    635.95            4,906.97            197,928.49
: 5. Reserve Shutdown Hours                                0.00              0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)              708,926.00        5,664,300.00        219,789,522.00 UNIT SHUTDOWNS Type                                                  Method of F: Forced          Duration                              Shutting            Cause - Corrective Action No.       Date        S: Scheduled          (Hours)        Reason 1              Down 2                        Comments A2M0    6/28/2013            S                108.05              B                    4          Unit 2 Shutdown for a planned 2A RCP seal 5                                                                                                  replacement.


==SUMMARY==
==SUMMARY==
U-2 began the month in a planned maintenance outage A2M05 to replace RCP seals (Planned Energy Loss 95638 MWh & Unplanned Energy Loss (Outage Extension) 30056 MWh). A FW valve issue, unrelated to the outage scope, occurred during the ramp to full power following the maintenance outage, delaying the ramp up (Unplanned Energy loss (Forced) of 8026 MWh and Unplanned Energy Loss (Forced - < 10days) of 8026 MWh).A2M0 56/28/2013S  108.05B4Unit 2 Shutdown for a planned 2A RCP seal replacement.
U-2 began the month in a planned maintenance outage A2M05 to replace RCP seals (Planned Energy Loss 95638 MWh & Unplanned Energy Loss (Outage Extension) 30056 MWh). A FW valve issue, unrelated to the outage scope, occurred during the ramp to full power following the maintenance outage, delaying the ramp up (Unplanned Energy loss (Forced) of 8026 MWh and Unplanned Energy Loss (Forced - < 10days) of 8026 MWh).
RPT_PERIOD:201308UNIT_NME:Braidwood Unit 2             DOCKET:457OPERATING DATA REPORTPREPARER NAME:David JohnsonPREPARER TELEPHONE:815-417-2478UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11552. Maximum Dependable Capacity (MWe-Net)1125744.005,667.13199,537.36 744.005,650.97198,672.49 0.000.000.00 843,581.006,507,881.00220,633,103.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            457                                                        PREPARER NAME:               David Johnson UNIT_NME:           Braidwood Unit 2                                           PREPARER TELEPHONE: 815-417-2478 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       1155
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           1125 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            5,667.13            199,537.36
: 4. Number of Hours Generator On-line                  744.00            5,650.97            198,672.49
: 5. Reserve Shutdown Hours                            0.00              0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)            843,581.00        6,507,881.00        220,633,103.00 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                              Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)             Reason 1          Down 2                      Comments


==SUMMARY==
==SUMMARY==
The unit operated normally at full power except for planned CW Pp forebay inspections. Unplanned losses due to emergent work during the 2B CW Pp forebay inspection.
The unit operated normally at full power except for planned CW Pp forebay inspections. Unplanned losses due to emergent work during the 2B CW Pp forebay inspection.
RPT_PERIOD:201309UNIT_NME:Braidwood Unit 2             DOCKET:457OPERATING DATA REPORTPREPARER NAME:David JohnsonPREPARER TELEPHONE:815-417-2478UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11552. Maximum Dependable Capacity (MWe-Net)1125720.006,387.13200,257.36 720.006,370.97199,392.49 0.000.000.00 825,692.007,333,573.00221,458,795.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            457                                                      PREPARER NAME:           David Johnson UNIT_NME:           Braidwood Unit 2                                         PREPARER TELEPHONE: 815-417-2478 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       1155
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           1125 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical            720.00          6,387.13        200,257.36
: 4. Number of Hours Generator On-line                  720.00          6,370.97        199,392.49
: 5. Reserve Shutdown Hours                              0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            825,692.00      7,333,573.00    221,458,795.00 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unit 2 operated at full power through out the month.
Unit 2 operated at full power through out the month.
RPT_PERIOD:201307UNIT_NME:Browns Ferry Unit 1           DOCKET:259OPERATING DATA REPORTPREPARER NAME:Amanda LedfordPREPARER TELEPHONE:729-7914UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11202. Maximum Dependable Capacity (MWe-Net)1101744.004,882.15109,074.13 744.004,869.37107,182.51 0.000.000.00 809,927.005,429,800.00106,021,803.11This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            259                                                    PREPARER NAME:           Amanda Ledford UNIT_NME:           Browns Ferry Unit 1                                     PREPARER TELEPHONE: 729-7914 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1120
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1101 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          4,882.15        109,074.13
: 4. Number of Hours Generator On-line                744.00          4,869.37        107,182.51
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          809,927.00      5,429,800.00    106,021,803.11 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                  Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201308UNIT_NME:Browns Ferry Unit 1           DOCKET:259OPERATING DATA REPORTPREPARER NAME:Amanda LedfordPREPARER TELEPHONE:729-7914UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11202. Maximum Dependable Capacity (MWe-Net)1101744.005,626.15109,818.13 744.005,613.37107,926.51 0.000.000.00 819,258.006,249,058.00106,841,061.11This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            259                                                    PREPARER NAME:           Amanda Ledford UNIT_NME:           Browns Ferry Unit 1                                     PREPARER TELEPHONE: 729-7914 RPT_PERIOD:         201308
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     1120
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         1101 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          5,626.15        109,818.13
: 4. Number of Hours Generator On-line                744.00          5,613.37        107,926.51
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          819,258.00      6,249,058.00    106,841,061.11 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                  Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201309UNIT_NME:Browns Ferry Unit 1           DOCKET:259OPERATING DATA REPORTPREPARER NAME:Amanda LedfordPREPARER TELEPHONE:729-7914UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11202. Maximum Dependable Capacity (MWe-Net)1101720.006,346.15110,538.13 720.006,333.37108,646.51 0.000.000.00 780,238.007,029,296.00107,621,299.11This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            259                                                    PREPARER NAME:           Amanda Ledford UNIT_NME:           Browns Ferry Unit 1                                     PREPARER TELEPHONE: 729-7914 RPT_PERIOD:         201309
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     1120
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         1101 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          720.00          6,346.15        110,538.13
: 4. Number of Hours Generator On-line                720.00          6,333.37        108,646.51
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          780,238.00      7,029,296.00    107,621,299.11 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                  Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201307UNIT_NME:Browns Ferry Unit 2           DOCKET:260OPERATING DATA REPORTPREPARER NAME:Amanda LedfordPREPARER TELEPHONE:729-7914UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11202. Maximum Dependable Capacity (MWe-Net)1104744.003,875.39233,177.84 744.003,854.32229,888.25 0.000.000.00 808,379.004,103,310.00236,428,757.91This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            260                                                    PREPARER NAME:           Amanda Ledford UNIT_NME:           Browns Ferry Unit 2                                     PREPARER TELEPHONE: 729-7914 RPT_PERIOD:         201307
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     1120
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         1104 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          3,875.39        233,177.84
: 4. Number of Hours Generator On-line                744.00          3,854.32        229,888.25
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          808,379.00      4,103,310.00    236,428,757.91 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                  Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201308UNIT_NME:Browns Ferry Unit 2           DOCKET:260OPERATING DATA REPORTPREPARER NAME:Amanda LedfordPREPARER TELEPHONE:729-7914UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11202. Maximum Dependable Capacity (MWe-Net)1104744.004,619.39233,921.84 744.004,598.32230,632.25 0.000.000.00 805,488.004,908,798.00237,234,245.91This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            260                                                    PREPARER NAME:           Amanda Ledford UNIT_NME:           Browns Ferry Unit 2                                     PREPARER TELEPHONE: 729-7914 RPT_PERIOD:         201308
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     1120
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         1104 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          4,619.39        233,921.84
: 4. Number of Hours Generator On-line                744.00          4,598.32        230,632.25
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          805,488.00      4,908,798.00    237,234,245.91 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                  Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201309UNIT_NME:Browns Ferry Unit 2           DOCKET:260OPERATING DATA REPORTPREPARER NAME:Amanda LedfordPREPARER TELEPHONE:729-7914UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11202. Maximum Dependable Capacity (MWe-Net)1104720.005,339.39234,641.84 720.005,318.32231,352.25 0.000.000.00 788,818.005,697,616.00238,023,063.91This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            260                                                    PREPARER NAME:           Amanda Ledford UNIT_NME:           Browns Ferry Unit 2                                     PREPARER TELEPHONE: 729-7914 RPT_PERIOD:         201309
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     1120
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         1104 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          720.00          5,339.39        234,641.84
: 4. Number of Hours Generator On-line                720.00          5,318.32        231,352.25
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          788,818.00      5,697,616.00    238,023,063.91 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                  Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201307UNIT_NME:Browns Ferry Unit 3           DOCKET:296OPERATING DATA REPORTPREPARER NAME:Amanda LedfordPREPARER TELEPHONE:729-7914UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11202. Maximum Dependable Capacity (MWe-Net)1105744.004,797.68189,857.15 744.004,769.55187,836.90 0.000.000.00 801,435.005,208,956.00196,881,501.54This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            296                                                    PREPARER NAME:           Amanda Ledford UNIT_NME:           Browns Ferry Unit 3                                     PREPARER TELEPHONE: 729-7914 RPT_PERIOD:         201307
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     1120
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         1105 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          4,797.68        189,857.15
: 4. Number of Hours Generator On-line                744.00          4,769.55        187,836.90
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          801,435.00      5,208,956.00    196,881,501.54 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                  Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201308UNIT_NME:Browns Ferry Unit 3           DOCKET:296OPERATING DATA REPORTPREPARER NAME:Amanda LedfordPREPARER TELEPHONE:729-2914UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11202. Maximum Dependable Capacity (MWe-Net)1105744.005,541.68190,601.15 744.005,513.55188,580.90 0.000.000.00 796,563.006,005,519.00197,678,064.54This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            296                                                    PREPARER NAME:           Amanda Ledford UNIT_NME:           Browns Ferry Unit 3                                     PREPARER TELEPHONE: 729-2914 RPT_PERIOD:         201308
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     1120
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         1105 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          5,541.68        190,601.15
: 4. Number of Hours Generator On-line                744.00          5,513.55        188,580.90
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          796,563.00      6,005,519.00    197,678,064.54 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                  Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201309UNIT_NME:Browns Ferry Unit 3           DOCKET:296OPERATING DATA REPORTPREPARER NAME:Amanda LedfordPREPARER TELEPHONE:729-7914UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11202. Maximum Dependable Capacity (MWe-Net)1105720.006,261.68191,321.15 720.006,233.55189,300.90 0.000.000.00 782,162.006,787,681.00198,460,226.54This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            296                                                    PREPARER NAME:           Amanda Ledford UNIT_NME:           Browns Ferry Unit 3                                     PREPARER TELEPHONE: 729-7914 RPT_PERIOD:         201309
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     1120
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         1105 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          720.00          6,261.68        191,321.15
: 4. Number of Hours Generator On-line                720.00          6,233.55        189,300.90
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          782,162.00      6,787,681.00    198,460,226.54 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                  Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201307UNIT_NME:Brunswick Unit 1             DOCKET:325OPERATING DATA REPORTPREPARER NAME:Adam FloraPREPARER TELEPHONE:910-457-2027UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9832. Maximum Dependable Capacity (MWe-Net)938744.004,838.25245,762.47 744.004,809.65240,585.46 0.000.000.00 700,370.004,571,060.00194,660,919.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            325                                                    PREPARER NAME:           Adam Flora UNIT_NME:           Brunswick Unit 1                                       PREPARER TELEPHONE: 910-457-2027 RPT_PERIOD:         201307
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     983
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         938 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          4,838.25        245,762.47
: 4. Number of Hours Generator On-line                744.00          4,809.65        240,585.46
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          700,370.00      4,571,060.00    194,660,919.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201308UNIT_NME:Brunswick Unit 1             DOCKET:325OPERATING DATA REPORTPREPARER NAME:Adam FloraPREPARER TELEPHONE:910-457-2027UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9832. Maximum Dependable Capacity (MWe-Net)938744.005,582.25246,506.47 744.005,553.65241,329.46 0.000.000.00 706,728.005,277,788.00195,367,647.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            325                                                    PREPARER NAME:           Adam Flora UNIT_NME:           Brunswick Unit 1                                       PREPARER TELEPHONE: 910-457-2027 RPT_PERIOD:         201308
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     983
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         938 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          5,582.25        246,506.47
: 4. Number of Hours Generator On-line                744.00          5,553.65        241,329.46
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          706,728.00      5,277,788.00    195,367,647.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201309UNIT_NME:Brunswick Unit 1             DOCKET:325OPERATING DATA REPORTPREPARER NAME:Adam FloraPREPARER TELEPHONE:910-457-2027UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9832. Maximum Dependable Capacity (MWe-Net)938720.006,302.25247,226.47 720.006,273.65242,049.46 0.000.000.00 677,673.005,955,461.00196,045,320.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            325                                                    PREPARER NAME:           Adam Flora UNIT_NME:           Brunswick Unit 1                                       PREPARER TELEPHONE: 910-457-2027 RPT_PERIOD:         201309
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     983
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         938 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          720.00          6,302.25        247,226.47
: 4. Number of Hours Generator On-line                720.00          6,273.65        242,049.46
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          677,673.00      5,955,461.00    196,045,320.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201307UNIT_NME:Brunswick Unit 2             DOCKET:324OPERATING DATA REPORTPREPARER NAME:Adam FloraPREPARER TELEPHONE:910-457-2027UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9802. Maximum Dependable Capacity (MWe-Net)920744.003,558.22254,501.61 744.003,475.14247,591.57 0.000.000.00 687,194.003,115,783.00192,798,238.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            324                                                    PREPARER NAME:           Adam Flora UNIT_NME:           Brunswick Unit 2                                       PREPARER TELEPHONE: 910-457-2027 RPT_PERIOD:         201307
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     980
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         920 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          3,558.22        254,501.61
: 4. Number of Hours Generator On-line                744.00          3,475.14        247,591.57
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          687,194.00      3,115,783.00    192,798,238.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201308UNIT_NME:Brunswick Unit 2             DOCKET:324OPERATING DATA REPORTPREPARER NAME:Adam FloraPREPARER TELEPHONE:910-457-2027UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9802. Maximum Dependable Capacity (MWe-Net)920744.004,302.22255,245.61 692.824,167.96248,284.39 0.000.000.00 591,407.003,707,190.00193,389,645.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            324                                                      PREPARER NAME:           Adam Flora UNIT_NME:           Brunswick Unit 2                                         PREPARER TELEPHONE: 910-457-2027 RPT_PERIOD:         201308
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     980
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         920 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          4,302.22        255,245.61
: 4. Number of Hours Generator On-line                  692.82          4,167.96        248,284.39
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            591,407.00      3,707,190.00    193,389,645.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                      Comments B221    8/9/2013            F              51.18              B                5        Unit shutdown when turbine/generator was M1                                                                                        disconnected from the grid to repair loose connection on the 2C main power transformer highside bushing.


==SUMMARY==
==SUMMARY==
B221 M18/9/2013F  51.18B5Unit shutdown when turbine/generator was disconnected from the grid to repair loose connection on the 2C main power transformer highside bushing.
 
RPT_PERIOD:201309UNIT_NME:Brunswick Unit 2             DOCKET:324OPERATING DATA REPORTPREPARER NAME:Adam FloraPREPARER TELEPHONE:910-457-2027UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9802. Maximum Dependable Capacity (MWe-Net)920720.005,022.22255,965.61 720.004,887.96249,004.39 0.000.000.00 672,595.004,379,785.00194,062,240.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            324                                                    PREPARER NAME:           Adam Flora UNIT_NME:           Brunswick Unit 2                                       PREPARER TELEPHONE: 910-457-2027 RPT_PERIOD:         201309
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     980
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         920 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          720.00          5,022.22        255,965.61
: 4. Number of Hours Generator On-line                720.00          4,887.96        249,004.39
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          672,595.00      4,379,785.00    194,062,240.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201307UNIT_NME:Byron Unit 1                 DOCKET:454OPERATING DATA REPORTPREPARER NAME:David EderPREPARER TELEPHONE:815 406-2194UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11872. Maximum Dependable Capacity (MWe-Net)1138744.005,087.00216,991.17 744.005,087.00215,812.70 0.000.000.00 863,574.005,972,899.00235,994,305.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            454                                                    PREPARER NAME:           David Eder UNIT_NME:           Byron Unit 1                                           PREPARER TELEPHONE: 815 406-2194 RPT_PERIOD:         201307
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     1187
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         1138 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          5,087.00        216,991.17
: 4. Number of Hours Generator On-line                744.00          5,087.00        215,812.70
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          863,574.00      5,972,899.00    235,994,305.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unit on line entire month.
Unit on line entire month.
RPT_PERIOD:201308UNIT_NME:Byron Unit 1                 DOCKET:454OPERATING DATA REPORTPREPARER NAME:David EderPREPARER TELEPHONE:815 406-2194UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11872. Maximum Dependable Capacity (MWe-Net)1138744.005,831.00217,735.17 744.005,831.00216,556.70 0.000.000.00 863,462.006,836,361.00236,857,767.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            454                                                    PREPARER NAME:           David Eder UNIT_NME:           Byron Unit 1                                           PREPARER TELEPHONE: 815 406-2194 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1187
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1138 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          5,831.00        217,735.17
: 4. Number of Hours Generator On-line                744.00          5,831.00        216,556.70
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          863,462.00      6,836,361.00    236,857,767.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unit 1 on line entire month.
Unit 1 on line entire month.
RPT_PERIOD:201309UNIT_NME:Byron Unit 1                 DOCKET:454OPERATING DATA REPORTPREPARER NAME:David EderPREPARER TELEPHONE:815 406-2194UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11872. Maximum Dependable Capacity (MWe-Net)1138720.006,551.00218,455.17 720.006,551.00217,276.70 0.000.000.00 842,914.007,679,275.00237,700,681.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            454                                                    PREPARER NAME:           David Eder UNIT_NME:           Byron Unit 1                                           PREPARER TELEPHONE: 815 406-2194 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1187
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1138 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          720.00          6,551.00        218,455.17
: 4. Number of Hours Generator On-line                720.00          6,551.00        217,276.70
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          842,914.00      7,679,275.00    237,700,681.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
unit was on line the entire month RPT_PERIOD:201307UNIT_NME:Byron Unit 2                 DOCKET:455OPERATING DATA REPORTPREPARER NAME:David EderPREPARER TELEPHONE:815 406-2194UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11552. Maximum Dependable Capacity (MWe-Net)1120744.004,527.30209,942.53 744.004,486.82208,914.82 0.000.000.00 842,490.005,065,533.00226,896,090.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
unit was on line the entire month
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:            455                                                    PREPARER NAME:           David Eder UNIT_NME:           Byron Unit 2                                           PREPARER TELEPHONE: 815 406-2194 RPT_PERIOD:         201307
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                     1155
: 2. Maximum Dependable Capacity (MWe-Net)         1120 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          4,527.30        209,942.53
: 4. Number of Hours Generator On-line                744.00          4,486.82        208,914.82
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          842,490.00      5,065,533.00    226,896,090.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unit on line entire month RPT_PERIOD:201308UNIT_NME:Byron Unit 2                 DOCKET:455OPERATING DATA REPORTPREPARER NAME:David EderPREPARER TELEPHONE:815 406-2194UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11552. Maximum Dependable Capacity (MWe-Net)1120744.005,271.30210,686.53 744.005,230.82209,658.82 0.000.000.00 843,483.005,909,016.00227,739,573.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
Unit on line entire month
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:            455                                                    PREPARER NAME:           David Eder UNIT_NME:           Byron Unit 2                                           PREPARER TELEPHONE: 815 406-2194 RPT_PERIOD:         201308
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                     1155
: 2. Maximum Dependable Capacity (MWe-Net)         1120 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          5,271.30        210,686.53
: 4. Number of Hours Generator On-line                744.00          5,230.82        209,658.82
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          843,483.00      5,909,016.00    227,739,573.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unit 2 on line entire month.
Unit 2 on line entire month.
RPT_PERIOD:201309UNIT_NME:Byron Unit 2                 DOCKET:455OPERATING DATA REPORTPREPARER NAME:David EderPREPARER TELEPHONE:815 406-2194UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11552. Maximum Dependable Capacity (MWe-Net)1120720.005,991.30211,406.53 720.005,950.82210,378.82 0.000.000.00 813,840.006,722,856.00228,553,413.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              455                                                              PREPARER NAME:           David Eder UNIT_NME:             Byron Unit 2                                                     PREPARER TELEPHONE: 815 406-2194 RPT_PERIOD:           201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                             1155
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)                 1120 This Month      Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                  720.00            5,991.30        211,406.53
: 4. Number of Hours Generator On-line                          720.00            5,950.82        210,378.82
: 5. Reserve Shutdown Hours                                    0.00              0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)                    813,840.00        6,722,856.00    228,553,413.00 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                              Shutting          Cause - Corrective Action No.       Date          S: Scheduled            (Hours)           Reason 1            Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unit was on line the entire month.
Unit was on line the entire month.
A 300 MWe down power was performed during the month at the request of the grid operator due to a 345 KV line issue that originated outside of the site switchyard. This event is not under "plant management control".
A 300 MWe down power was performed during the month at the request of the grid operator due to a 345 KV line issue that originated outside of the site switchyard. This event is not under "plant management control".
RPT_PERIOD:201307UNIT_NME:Callaway Unit 1              DOCKET:483OPERATING DATA REPORTPREPARER NAME:J. P. KovarPREPARER TELEPHONE:314-225-1478UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12282. Maximum Dependable Capacity (MWe-Net)1190623.553,790.64224,336.76 623.553,751.12221,852.48 0.000.000.00 724,274.004,471,797.00251,816,355.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             483                                                          PREPARER NAME:             J. P. Kovar UNIT_NME:          Callaway Unit 1                                              PREPARER TELEPHONE: 314-225-1478 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                         1228
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)             1190 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical              623.55          3,790.64        224,336.76
: 4. Number of Hours Generator On-line                    623.55          3,751.12        221,852.48
: 5. Reserve Shutdown Hours                                0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)              724,274.00      4,471,797.00    251,816,355.00 UNIT SHUTDOWNS Type                                              Method of F: Forced          Duration                            Shutting          Cause - Corrective Action No.      Date        S: Scheduled        (Hours)            Reason 1          Down 2                      Comments 2013-   7/26/2013            F              120.45                A                3        Faults in the isophase bus ducts.
02                                                                                            Repaired/replaced some isophase bus ducts and dampers in the cooling system for the isophase bus. Note: the plant was offline between late on 2013.07.26 and 2013.08.18.


==SUMMARY==
==SUMMARY==
Power reduction to 65% for 'B' Main Feedwater Pump repairs 1222 07/20/2013 to 1950 07/23/2013. Reactor/turbine trip from fire in 'B' isophase duct 2333 07/26/2013 - resumed generation 0922 08/18/2013.2013-027/26/2013F  120.45A3Faults in the isophase bus ducts. Repaired/replaced some isophase bus ducts and dampers in the cooling system for the isophase bus. Note:  the plant was offline between late on 2013.07.26 and 2013.08.18.
Power reduction to 65% for 'B' Main Feedwater Pump repairs 1222 07/20/2013 to 1950 07/23/2013. Reactor/turbine trip from fire in 'B' isophase duct 2333 07/26/2013 - resumed generation 0922 08/18/2013.
RPT_PERIOD:201308UNIT_NME:Callaway Unit 1              DOCKET:483OPERATING DATA REPORTPREPARER NAME:J. P. KovarPREPARER TELEPHONE:314-225-1478UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12282. Maximum Dependable Capacity (MWe-Net)1190370.424,161.06224,707.18 326.634,077.75222,179.11 0.000.000.00 336,782.004,808,579.00252,153,137.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             483                                                          PREPARER NAME:                 J. P. Kovar UNIT_NME:          Callaway Unit 1                                              PREPARER TELEPHONE: 314-225-1478 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                         1228
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)             1190 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical            370.42            4,161.06            224,707.18
: 4. Number of Hours Generator On-line                    326.63            4,077.75            222,179.11
: 5. Reserve Shutdown Hours                              0.00              0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)              336,782.00        4,808,579.00        252,153,137.00 UNIT SHUTDOWNS Type                                                Method of F: Forced          Duration                            Shutting                Cause - Corrective Action No.      Date        S: Scheduled          (Hours)          Reason 1            Down 2                            Comments 2013-   7/26/2013            F                417.37              A                  4            Faults in the isophase bus ducts.
02                                                                                                Repaired/replaced some isophase bus ducts and dampers in the cooling system for the isophase bus. Note: the plant was offline between late on 2013.07.26 and 2013.08.18.


==SUMMARY==
==SUMMARY==
Forced outage from B isophase bus duct fire continued into August - ended with breaker close at 0922 on 08/18/2013. Power hold at 65% to complete work on B main feedwater pump and tune A main feedwater pump settings (identified in July) began at 2249 same day . 100% power achieved at 1930 on 08/24/2013.2013-027/26/2013F  417.37A4Faults in the isophase bus ducts. Repaired/replaced some isophase bus ducts and dampers in the cooling system for the isophase bus. Note:  the plant was offline between late on 2013.07.26 and 2013.08.18.
Forced outage from B isophase bus duct fire continued into August - ended with breaker close at 0922 on 08/18/2013. Power hold at 65% to complete work on B main feedwater pump and tune A main feedwater pump settings (identified in July) began at 2249 same day . 100% power achieved at 1930 on 08/24/2013.
RPT_PERIOD:201309UNIT_NME:Callaway Unit 1              DOCKET:483OPERATING DATA REPORTPREPARER NAME:J. P. KovarPREPARER TELEPHONE:314-225-1478UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12282. Maximum Dependable Capacity (MWe-Net)1190720.004,881.06225,427.18 720.004,797.75222,899.11 0.000.000.00 872,034.005,680,613.00253,025,171.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             483                                                        PREPARER NAME:           J. P. Kovar UNIT_NME:          Callaway Unit 1                                            PREPARER TELEPHONE: 314-225-1478 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       1228
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           1190 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical            720.00          4,881.06        225,427.18
: 4. Number of Hours Generator On-line                    720.00          4,797.75        222,899.11
: 5. Reserve Shutdown Hours                              0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)              872,034.00      5,680,613.00    253,025,171.00 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)             Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
The plant operated at essentially full power for the month.
The plant operated at essentially full power for the month.
RPT_PERIOD:201307UNIT_NME:Calvert Cliffs Unit 1        DOCKET:317OPERATING DATA REPORTPREPARER NAME:Herman O. OlsenPREPARER TELEPHONE:(410) 495-6734UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8452. Maximum Dependable Capacity (MWe-Net)866744.005,087.00270,703.70 744.005,087.00267,188.26 0.000.000.00 643,961.004,555,169.00223,006,997.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             317                                                            PREPARER NAME:             Herman O. Olsen UNIT_NME:          Calvert Cliffs Unit 1                                          PREPARER TELEPHONE: (410) 495-6734 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           845
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               866 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                744.00            5,087.00          270,703.70
: 4. Number of Hours Generator On-line                      744.00            5,087.00          267,188.26
: 5. Reserve Shutdown Hours                                  0.00              0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                643,961.00        4,555,169.00      223,006,997.00 UNIT SHUTDOWNS Type                                                  Method of F: Forced          Duration                              Shutting            Cause - Corrective Action No.       Date        S: Scheduled          (Hours)           Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
Line 315: Line 479:
On 07/01/2013 at 1500, power was reduced to 85% for waterbox cleaning. Cleaning was completed on 07/02/2013 and power was increased at 1350. Power was returned to 100% at 1719.
On 07/01/2013 at 1500, power was reduced to 85% for waterbox cleaning. Cleaning was completed on 07/02/2013 and power was increased at 1350. Power was returned to 100% at 1719.
The unit operated at 100% power for the remainder month.
The unit operated at 100% power for the remainder month.
RPT_PERIOD:201308UNIT_NME:Calvert Cliffs Unit 1        DOCKET:317OPERATING DATA REPORTPREPARER NAME:Herman O. OlsenPREPARER TELEPHONE:410-495-6734UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8452. Maximum Dependable Capacity (MWe-Net)866744.005,831.00271,447.70 744.005,831.00267,932.26 0.000.000.00 635,267.005,190,436.00223,642,264.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             317                                                              PREPARER NAME:           Herman O. Olsen UNIT_NME:          Calvert Cliffs Unit 1                                            PREPARER TELEPHONE: 410-495-6734 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           845
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               866 This Month        Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical                744.00            5,831.00        271,447.70
: 4. Number of Hours Generator On-line                      744.00            5,831.00        267,932.26
: 5. Reserve Shutdown Hours                                  0.00              0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)                635,267.00        5,190,436.00    223,642,264.00 UNIT SHUTDOWNS Type                                                  Method of F: Forced          Duration                                Shutting          Cause - Corrective Action No.       Date        S: Scheduled          (Hours)             Reason 1            Down 2                    Comments


==SUMMARY==
==SUMMARY==
The unit began the month at 100%.
The unit began the month at 100%.
On 08/12/2013 at 1905 a rapid down power to 83% was performed due to reduced condenser vacuum caused by rapid fouling of a water box. The waterbox cleaning was completed on 08/13/2013 and power was increased at 2212. Power was returned to 100% on 08/14/2013 at 0330.On 08/15/2013 at 2359 power was reduced to 86% for waterbox cleaning. Cleaning was completed on 08/17/2013 and power was increased at 2050. Reactor power was returned to 100% on 08/18/2013 at 0443.The unit operated at 100% power for the remainder of the month.
On 08/12/2013 at 1905 a rapid down power to 83% was performed due to reduced condenser vacuum caused by rapid fouling of a water box. The waterbox cleaning was completed on 08/13/2013 and power was increased at 2212. Power was returned to 100% on 08/14/2013 at 0330.
RPT_PERIOD:201309UNIT_NME:Calvert Cliffs Unit 1        DOCKET:317OPERATING DATA REPORTPREPARER NAME:Herman O. OlsenPREPARER TELEPHONE:410-495-6734UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8452. Maximum Dependable Capacity (MWe-Net)866720.006,551.00272,167.70 720.006,551.00268,652.26 0.000.000.00 629,032.005,819,468.00224,271,296.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
On 08/15/2013 at 2359 power was reduced to 86% for waterbox cleaning. Cleaning was completed on 08/17/2013 and power was increased at 2050. Reactor power was returned to 100% on 08/18/2013 at 0443.
: 4. Number of Hours Generator On-line
The unit operated at 100% power for the remainder of the month.
: 5. Reserve Shutdown Hours
 
: 6. Net Electrical energy Generated (MWHrs)
OPERATING DATA REPORT DOCKET:             317                                                            PREPARER NAME:             Herman O. Olsen UNIT_NME:            Calvert Cliffs Unit 1                                          PREPARER TELEPHONE: 410-495-6734 RPT_PERIOD:         201309
: 1. Design Electrical Rating:                           845
: 2. Maximum Dependable Capacity (MWe-Net)               866 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                720.00            6,551.00          272,167.70
: 4. Number of Hours Generator On-line                      720.00            6,551.00          268,652.26
: 5. Reserve Shutdown Hours                                  0.00              0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                629,032.00        5,819,468.00      224,271,296.00 UNIT SHUTDOWNS Type                                                Method of F: Forced          Duration                              Shutting            Cause - Corrective Action No.       Date        S: Scheduled          (Hours)           Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
The unit began the month at 100%.
The unit began the month at 100%.
On 09/20/2013 at 0200 power was reduced to 83% for Main Turbine Valve testing and waterbox cleaning. Power was increased to 90% at 0900. Valve testing was completed and power was increased to 93% at 1121. Waterbox cleaning was completed on 09/21/2013 at 1422 and power was returned to 100% at 1745.
On 09/20/2013 at 0200 power was reduced to 83% for Main Turbine Valve testing and waterbox cleaning. Power was increased to 90% at 0900.
Valve testing was completed and power was increased to 93% at 1121. Waterbox cleaning was completed on 09/21/2013 at 1422 and power was returned to 100% at 1745.
The unit operated at 100% power for the remainder month.
The unit operated at 100% power for the remainder month.
RPT_PERIOD:201307UNIT_NME:Calvert Cliffs Unit 2        DOCKET:318OPERATING DATA REPORTPREPARER NAME:Herman O. OlsenPREPARER TELEPHONE:(410) 495-6734UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8452. Maximum Dependable Capacity (MWe-Net)850744.004,143.90264,898.95 744.004,090.12262,763.69 0.000.000.00 618,261.003,434,206.00219,053,519.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             318                                                            PREPARER NAME:           Herman O. Olsen UNIT_NME:            Calvert Cliffs Unit 2                                          PREPARER TELEPHONE: (410) 495-6734 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           845
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               850 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                744.00            4,143.90          264,898.95
: 4. Number of Hours Generator On-line                        744.00            4,090.12          262,763.69
: 5. Reserve Shutdown Hours                                  0.00              0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                  618,261.00        3,434,206.00      219,053,519.00 UNIT SHUTDOWNS Type                                                  Method of F: Forced            Duration                              Shutting          Cause - Corrective Action No.       Date        S: Scheduled            (Hours)           Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
The unit began the month at 99.5% reactor power.
The unit began the month at 99.5% reactor power.
On 07/11/2013 at 2106 power was reduced to 95% for Variable Temperature Average testing (PSTP-4). Testing was completed and power was increased on 07/12/2013 at 0110. Reactor power was returned to 99.5% at 0400.On 07/19/2013 at 2100 reactor power was reduced to 80.3% to perform waterbox cleaning. Cleaning was completed on 07/21/2013 at 0630 and power was restored to 99.5% at 1308.
On 07/11/2013 at 2106 power was reduced to 95% for Variable Temperature Average testing (PSTP-4). Testing was completed and power was increased on 07/12/2013 at 0110. Reactor power was returned to 99.5% at 0400.
On 07/19/2013 at 2100 reactor power was reduced to 80.3% to perform waterbox cleaning. Cleaning was completed on 07/21/2013 at 0630 and power was restored to 99.5% at 1308.
The unit operated at 99.5% for the remainder of the month.
The unit operated at 99.5% for the remainder of the month.
RPT_PERIOD:201308UNIT_NME:Calvert Cliffs Unit 2        DOCKET:318OPERATING DATA REPORTPREPARER NAME:Herman O. OlsenPREPARER TELEPHONE:410-495-6734UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8452. Maximum Dependable Capacity (MWe-Net)850744.004,887.90265,642.95 744.004,834.12263,507.69 0.000.000.00 622,950.004,057,156.00219,676,469.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             318                                                                PREPARER NAME:             Herman O. Olsen UNIT_NME:            Calvert Cliffs Unit 2                                              PREPARER TELEPHONE: 410-495-6734 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           845
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               850 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                744.00              4,887.90          265,642.95
: 4. Number of Hours Generator On-line                        744.00              4,834.12          263,507.69
: 5. Reserve Shutdown Hours                                  0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                  622,950.00          4,057,156.00      219,676,469.00 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                                Shutting            Cause - Corrective Action No.       Date        S: Scheduled            (Hours)           Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
The unit began the month at 99.5% reactor power.
The unit began the month at 99.5% reactor power.
On 08/01/2013 at 1128, 21 Circulating Water Pump tripped. An expeditious power reduction was commenced at 1131 and power was reduced to 85%. Troubleshooting identified a loose wire in the pump exciter cabinet. Repairs were performed and the pump was restored. Power was increased at 2015 and returned to 99.5% at 2335.
On 08/01/2013 at 1128, 21 Circulating Water Pump tripped. An expeditious power reduction was commenced at 1131 and power was reduced to 85%. Troubleshooting identified a loose wire in the pump exciter cabinet. Repairs were performed and the pump was restored. Power was increased at 2015 and returned to 99.5% at 2335.
On 08/09/2013 at 0515 power was reduced to 84% to clean waterboxes. Cleaning was completed and power was restored to 99.5% at 2225.On 08/12/2013 at 0735 power was reduced to 88% to clean 21B waterbox. Cleaning was completed and power was restored to 99.5% at 1915.On 08/17/2013 at 0027 power was reduced to 92% to clean waterboxes. Cleaning was completed and power was restored to 99.5% at 0945.The unit operated at 99.5% for the remainder of the month.
On 08/09/2013 at 0515 power was reduced to 84% to clean waterboxes. Cleaning was completed and power was restored to 99.5% at 2225.
RPT_PERIOD:201309UNIT_NME:Calvert Cliffs Unit 2        DOCKET:318OPERATING DATA REPORTPREPARER NAME:Herman O. OlsenPREPARER TELEPHONE:410-495-6734UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8452. Maximum Dependable Capacity (MWe-Net)850616.135,504.03266,259.08 608.725,442.84264,116.41 0.000.000.00 510,757.004,567,913.00220,187,226.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
On 08/12/2013 at 0735 power was reduced to 88% to clean 21B waterbox. Cleaning was completed and power was restored to 99.5% at 1915.
: 4. Number of Hours Generator On-line
On 08/17/2013 at 0027 power was reduced to 92% to clean waterboxes. Cleaning was completed and power was restored to 99.5% at 0945.
: 5. Reserve Shutdown Hours
The unit operated at 99.5% for the remainder of the month.
: 6. Net Electrical energy Generated (MWHrs)
 
OPERATING DATA REPORT DOCKET:               318                                                                  PREPARER NAME:               Herman O. Olsen UNIT_NME:            Calvert Cliffs Unit 2                                                PREPARER TELEPHONE: 410-495-6734 RPT_PERIOD:           201309
: 1. Design Electrical Rating:                             845
: 2. Maximum Dependable Capacity (MWe-Net)                 850 This Month          Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                  616.13              5,504.03            266,259.08
: 4. Number of Hours Generator On-line                          608.72              5,442.84            264,116.41
: 5. Reserve Shutdown Hours                                    0.00                0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)                    510,757.00          4,567,913.00        220,187,226.00 UNIT SHUTDOWNS Type                                                      Method of F: Forced            Duration                                  Shutting              Cause - Corrective Action No.      Date          S: Scheduled          (Hours)            Reason 1                Down 2                        Comments 004    9/5/2013              F                111.28                  A                    1          The unit began the month at 99.5% reactor power.
On 09/05/2013 at 1016, control element assembly (CEA) #27 dropped to the bottom of the core while performing surveillance test procedure O-29-2.
Reactor power stabilized at 91%. An abnormal operating procedure was entered and attempts to restore the CEA to the correct level were not successful. At 1207 reactor power was reduced in preparation for a reactor shutdown. This down power met the criteria for the NRC Unplanned Power Change per 7000 Critical Hours performance indicator. The unit was removed from the grid at 1651 and the reactor was shut down at 1735. The unit was cooled down to mode 5 on 09/06/2013 at 0752 to support troubleshooting and repairs. The cause of the dropped CEA was determined to be a ground due to degraded insulation. The ground was located at the coil stack connection at the reactor head. The coil stack was replaced, other connections inspected, and all control element drive mechanisms were electrically tested (meggered) during the shutdown and prior to startup to verify no other ground fault conditions existed. Resistance checks of individual coils were performed and all were verified to be within 10% of the mean. Plant heat up commenced on 09/08/2013 at 1730 and the reactor was taken critical on 09/10/2013 at 0127.
Power was increased and the unit was paralleled to the grid at 0808. Reactor power was restored to 99.5% at 2130.
The unit operated at 99.5% for the remainder of the month.


==SUMMARY==
==SUMMARY==
The unit began the month at 99.5% reactor power.
The unit began the month at 99.5% reactor power.
On 09/05/2013 at 1016, control element assembly (CEA) #27 dropped to the bottom of the core while performing surveillance test procedure O-29-2. Reactor power stabilized at 91%. An abnormal operating procedure was entered and attempts to restore the CEA to the correct level were not successful. At 1207 reactor power was reduced in preparation for a reactor shutdown. This down power met the criteria for the NRC Unplanned Power Change per 7000 Critical Hours performance indicator. The unit was removed from the grid at 1651 and the reactor was shut down at 1735. The unit was cooled down to mode 5 on 09/06/2013 at 0752 to support troubleshooting and repairs. The cause of the dropped CEA was determined to be a ground due to degraded insulation. The ground was located at the coil stack connection at the reactor head. The coil stack was replaced, other connections inspected, and all control element drive mechanisms were electrically tested (meggered) during the shutdown and prior to startup to verify no other ground fault conditions existed. Resistance checks of individual coils were performed and all were verified to be within 10% of the mean. Plant heat up commenced on 09/08/2013 at 1730 and the reactor was taken critical on 09/10/2013 at 0127. Power was increased and the unit was paralleled to the grid at 0808. Reactor power was restored to 99.5% at 2130.The unit operated at 99.5% for the remainder of the month.0049/5/2013F  111.28A1The unit began the month at 99.5% reactor power.On 09/05/2013 at 1016, control element assembly (CEA) #27 dropped to the bottom of the core while performing surveillance test procedure O-29-2.
On 09/05/2013 at 1016, control element assembly (CEA) #27 dropped to the bottom of the core while performing surveillance test procedure O-29-2. Reactor power stabilized at 91%. An abnormal operating procedure was entered and attempts to restore the CEA to the correct level were not successful. At 1207 reactor power was reduced in preparation for a reactor shutdown. This down power met the criteria for the NRC Unplanned Power Change per 7000 Critical Hours performance indicator. The unit was removed from the grid at 1651 and the reactor was shut down at 1735. The unit was cooled down to mode 5 on 09/06/2013 at 0752 to support troubleshooting and repairs. The cause of the dropped CEA was determined to be a ground due to degraded insulation. The ground was located at the coil stack connection at the reactor head. The coil stack was replaced, other connections inspected, and all control element drive mechanisms were electrically tested (meggered) during the shutdown and prior to startup to verify no other ground fault conditions existed. Resistance checks of individual coils were performed and all were verified to be within 10% of the mean. Plant heat up commenced on 09/08/2013 at 1730 and the reactor was taken critical on 09/10/2013 at 0127. Power was increased and the unit was paralleled to the grid at 0808. Reactor power was restored to 99.5% at 2130.
Reactor power stabilized at 91%. An abnormal operating procedure was entered and attempts to restore the CEA to the correct level were not successful. At 1207 reactor power was reduced in preparation for a reactor shutdown. This down power met the criteria for the NRC Unplanned Power Change per 7000 Critical Hours performance indicator. The unit was removed from the grid at 1651 and the reactor was shut down at 1735. The unit was cooled down to mode 5 on 09/06/2013 at 0752 to support troubleshooting and repairs. The cause of the dropped CEA was determined to be a ground due to degraded insulation. The ground was located at the coil stack connection at the reactor head. The coil stack was replaced, other connections inspected, and all control element drive mechanisms were electrically tested (meggered) during the shutdown and prior to startup to verify no other ground fault conditions existed. Resistance checks of individual coils were performed and all were verified to be within 10% of the mean. Plant heat up commenced on 09/08/2013 at 1730 and the reactor was taken critical on 09/10/2013 at 0127.
Power was increased and the unit was paralleled to the grid at 0808. Reactor power was restored to 99.5% at 2130.
The unit operated at 99.5% for the remainder of the month.
The unit operated at 99.5% for the remainder of the month.
RPT_PERIOD:201307UNIT_NME:Catawba Unit 1               DOCKET:413OPERATING DATA REPORTPREPARER NAME:Glenda HeltonPREPARER TELEPHONE:803-701-3352UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11452. Maximum Dependable Capacity (MWe-Net)1129744.005,087.00211,815.05 744.005,087.00209,645.86 0.000.000.00 838,923.005,867,132.00235,227,374.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              413                                                              PREPARER NAME:               Glenda Helton UNIT_NME:           Catawba Unit 1                                                   PREPARER TELEPHONE: 803-701-3352 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           1145
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               1129 This Month          Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                744.00              5,087.00            211,815.05
: 4. Number of Hours Generator On-line                        744.00              5,087.00            209,645.86
: 5. Reserve Shutdown Hours                                  0.00                0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)                  838,923.00          5,867,132.00        235,227,374.00 UNIT SHUTDOWNS Type                                                  Method of F: Forced            Duration                                Shutting              Cause - Corrective Action No.       Date          S: Scheduled            (Hours)           Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
Catawba Unit 1 began the month of July 2013 at a power level of 98.6% Full Power and increasing, recovering from an emergent power reduction necessitated by loss of numerous Cooling Tower fans following a lightning strike. 100% Full Power was ultimately reached at 0151 on 7/1/13.At 0140 on 7/27/13, a power reduction was initiated from 100% Full Power to allow replacement of a 1B Main Feedwater Pump Turbine control system processor card. At 0705 on 7/27/13, the power reduction was halted at 49.5% Full Power, to remove 1B Main Feedwater Pump from service for the processor card replacement. At 1735 on 7/27/13, following restoration of 1B Main Feedwater Pump, power escalation was commenced from 49.5% Full Power. At 2142 on 7/27/13, power escalation was suspended at 81% Full Power, for performance of Main Turbine Control Valve Movement periodic testing, and was subsequently resumed at 2220. 100% Full Power was ultimately reached at 0325 on 7/28/13 and Unit 1 operated at or near 100% Full Power for the remainder of the month.
Catawba Unit 1 began the month of July 2013 at a power level of 98.6% Full Power and increasing, recovering from an emergent power reduction necessitated by loss of numerous Cooling Tower fans following a lightning strike. 100% Full Power was ultimately reached at 0151 on 7/1/13.
RPT_PERIOD:201308UNIT_NME:Catawba Unit 1               DOCKET:413OPERATING DATA REPORTPREPARER NAME:Glenda HeltonPREPARER TELEPHONE:803-701-3352UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11452. Maximum Dependable Capacity (MWe-Net)1129744.005,831.00212,559.05 744.005,831.00210,389.86 0.000.000.00 851,199.006,718,331.00236,078,573.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
At 0140 on 7/27/13, a power reduction was initiated from 100% Full Power to allow replacement of a 1B Main Feedwater Pump Turbine control system processor card. At 0705 on 7/27/13, the power reduction was halted at 49.5% Full Power, to remove 1B Main Feedwater Pump from service for the processor card replacement. At 1735 on 7/27/13, following restoration of 1B Main Feedwater Pump, power escalation was commenced from 49.5% Full Power. At 2142 on 7/27/13, power escalation was suspended at 81% Full Power, for performance of Main Turbine Control Valve Movement periodic testing, and was subsequently resumed at 2220. 100% Full Power was ultimately reached at 0325 on 7/28/13 and Unit 1 operated at or near 100% Full Power for the remainder of the month.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:              413                                                        PREPARER NAME:           Glenda Helton UNIT_NME:           Catawba Unit 1                                             PREPARER TELEPHONE: 803-701-3352 RPT_PERIOD:         201308
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                           1145
: 2. Maximum Dependable Capacity (MWe-Net)               1129 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical              744.00          5,831.00        212,559.05
: 4. Number of Hours Generator On-line                      744.00          5,831.00        210,389.86
: 5. Reserve Shutdown Hours                                0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)                851,199.00      6,718,331.00    236,078,573.00 UNIT SHUTDOWNS Type                                              Method of F: Forced            Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled            (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Catawba Unit 1 began and concluded the month of August 2013 operating at or near 100% Full Power. No planned or unplanned power reductions were incurred during the month.
Catawba Unit 1 began and concluded the month of August 2013 operating at or near 100% Full Power. No planned or unplanned power reductions were incurred during the month.
RPT_PERIOD:201309UNIT_NME:Catawba Unit 1               DOCKET:413OPERATING DATA REPORTPREPARER NAME:Glenda HeltonPREPARER TELEPHONE:803-701-3352UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11452. Maximum Dependable Capacity (MWe-Net)1129720.006,551.00213,279.05 720.006,551.00211,109.86 0.000.000.00 824,856.007,543,187.00236,903,429.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              413                                                                PREPARER NAME:             Glenda Helton UNIT_NME:           Catawba Unit 1                                                     PREPARER TELEPHONE: 803-701-3352 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           1145
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               1129 This Month            Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                720.00                6,551.00          213,279.05
: 4. Number of Hours Generator On-line                      720.00                6,551.00          211,109.86
: 5. Reserve Shutdown Hours                                  0.00                  0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                824,856.00            7,543,187.00      236,903,429.00 UNIT SHUTDOWNS Type                                                    Method of F: Forced          Duration                                Shutting            Cause - Corrective Action No.       Date          S: Scheduled          (Hours)             Reason 1              Down 2                        Comments


==SUMMARY==
==SUMMARY==
Catawba Unit 1 began the month of September 2013 operating at or near 100% Full Power. At 1419 on 9/13/13, power reduction from 100% Full Power was commenced to support Unit 2's Auxiliary Steam demand for the 2EOC19 Refueling Outage Shutdown. Power reduction was halted at 98.5% Full Power at 2028 on 9/13/13. At 2204 on 9/14/13 power escalation was commenced from 98.5% Full Power. At 0100 on 9/15/13 power escalation was suspended at 99% Full Power. Power escalation was resumed from 99% Full Power at 1345 on 9/15/13. 100% Full Power was ultimately reached at 1555 on 9/15/13, and Unit 1 operated at or near 100% Full Power for the remainder of the month.
Catawba Unit 1 began the month of September 2013 operating at or near 100% Full Power. At 1419 on 9/13/13, power reduction from 100% Full Power was commenced to support Unit 2's Auxiliary Steam demand for the 2EOC19 Refueling Outage Shutdown. Power reduction was halted at 98.5% Full Power at 2028 on 9/13/13. At 2204 on 9/14/13 power escalation was commenced from 98.5% Full Power. At 0100 on 9/15/13 power escalation was suspended at 99% Full Power. Power escalation was resumed from 99% Full Power at 1345 on 9/15/13. 100% Full Power was ultimately reached at 1555 on 9/15/13, and Unit 1 operated at or near 100% Full Power for the remainder of the month.
RPT_PERIOD:201307UNIT_NME:Catawba Unit 2               DOCKET:414OPERATING DATA REPORTPREPARER NAME:Glenda HeltonPREPARER TELEPHONE:803-701-3352UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11452. Maximum Dependable Capacity (MWe-Net)1129744.005,087.00205,689.73 744.005,087.00203,968.28 0.000.000.00 854,042.005,877,661.00229,518,008.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              414                                                      PREPARER NAME:             Glenda Helton UNIT_NME:           Catawba Unit 2                                           PREPARER TELEPHONE: 803-701-3352 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       1145
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           1129 This Month      Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical            744.00          5,087.00            205,689.73
: 4. Number of Hours Generator On-line                  744.00          5,087.00            203,968.28
: 5. Reserve Shutdown Hours                              0.00            0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)            854,042.00      5,877,661.00        229,518,008.00 UNIT SHUTDOWNS Type                                            Method of F: Forced          Duration                          Shutting            Cause - Corrective Action No.       Date        S: Scheduled        (Hours)         Reason 1          Down 2                      Comments


==SUMMARY==
==SUMMARY==
Catawba Unit 2 began and concluded the month of July 2013 operating at or near 100% Full Power. No planned or unplanned power reductions were incurred during the month.
Catawba Unit 2 began and concluded the month of July 2013 operating at or near 100% Full Power. No planned or unplanned power reductions were incurred during the month.
RPT_PERIOD:201308UNIT_NME:Catawba Unit 2               DOCKET:414OPERATING DATA REPORTPREPARER NAME:Glenda HeltonPREPARER TELEPHONE:803-701-3352UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11452. Maximum Dependable Capacity (MWe-Net)1129744.005,831.00206,433.73 744.005,831.00204,712.28 0.000.000.00 856,114.006,733,775.00230,374,122.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              414                                                        PREPARER NAME:           Glenda Helton UNIT_NME:           Catawba Unit 2                                             PREPARER TELEPHONE: 803-701-3352 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           1145
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               1129 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical              744.00          5,831.00        206,433.73
: 4. Number of Hours Generator On-line                      744.00          5,831.00        204,712.28
: 5. Reserve Shutdown Hours                                0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)                856,114.00      6,733,775.00    230,374,122.00 UNIT SHUTDOWNS Type                                              Method of F: Forced            Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled            (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Catawba Unit 2 began and concluded the month of August 2013 operating at or near 100% Full Power. No planned or unplanned power reductions were incurred during the month RPT_PERIOD:201309UNIT_NME:Catawba Unit 2               DOCKET:414OPERATING DATA REPORTPREPARER NAME:Glenda HeltonPREPARER TELEPHONE:803-701-3352UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11452. Maximum Dependable Capacity (MWe-Net)1129316.206,147.20206,749.93 316.026,147.02205,028.30 0.000.000.00 343,203.007,076,978.00230,717,325.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
Catawba Unit 2 began and concluded the month of August 2013 operating at or near 100% Full Power. No planned or unplanned power reductions were incurred during the month
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:              414                                                              PREPARER NAME:               Glenda Helton UNIT_NME:           Catawba Unit 2                                                   PREPARER TELEPHONE: 803-701-3352 RPT_PERIOD:         201309
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                             1145
: 2. Maximum Dependable Capacity (MWe-Net)                 1129 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                  316.20            6,147.20          206,749.93
: 4. Number of Hours Generator On-line                        316.02            6,147.02          205,028.30
: 5. Reserve Shutdown Hours                                    0.00              0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                  343,203.00        7,076,978.00      230,717,325.00 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                              Shutting            Cause - Corrective Action No.       Date        S: Scheduled            (Hours)           Reason 1            Down 2                        Comments 1      9/14/2013            S                  403.98                  C                  1          2EOC19 Refueling Outage


==SUMMARY==
==SUMMARY==
Catawba Unit 2 began the month of September 2013 operating at or near 100% Full Power. At 1500 on 9/2/13, power reduction from 100% Full Power was commenced for 2EOC19 power coast-down (1st decrease). Power reduction was halted at 99% Full Power at 1700 on 9/2/13. At 0156 on 9/4/13, power reduction was commenced from 99% Full Power for 2EOC19 power coast-down (2nd decrease.) Power reduction was halted at 98% Full Power at 0430 on 9/4/13. At 1130 on 9/6/13, Power reduction was commenced from 97% Full Power for 2EOC19 power coast-down (3rd decrease.) Power reduction was halted at 96% full power at 1304 on 9/6/13. At 2145, on 9/8/13, power reduction was commenced from 95% full power for 2EOC19 power coast-down (4th decrease.) Power reduction was halted at 94% full power at 2325 on 9/8/13. At 1926 on 9/12/13, power reduction commenced from 93% full power for 2EOC19 power coast-down (5th decrease.) At 2028, on 9/12/13, power reduction halted at 92% full power. At 2101, on 9/13/13, Unit 2 shutdown commenced from 92% full power for entry into 2EOC19 Refueling Outage. The turbine/generator was taken offline at 0401 on 9/14/13. Mode 2 was entered at 0401 on 9/14/13. Mode 3 was entered at 0412 on 9/14/13. Mode 4 was entered at 0834 on 9/14/13. Mode 5 was entered at 1220 on 9/14/13. Mode 6 was entered at 1829 on 9/17/13. No Mode was entered at 1322 on 9/22/13 and Unit 2 remained in No Mode for the remainder of September 2013. 19/14/2013S  403.98C12EOC19 Refueling Outage RPT_PERIOD:201307UNIT_NME:Clinton Unit 1               DOCKET:461OPERATING DATA REPORTPREPARER NAME:Joe WemlingerPREPARER TELEPHONE:217-937-3846UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:10622. Maximum Dependable Capacity (MWe-Net)1022744.005,017.45177,782.27 744.004,926.22174,862.43 0.000.004.00 784,159.005,216,996.00167,945,519.48This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
Catawba Unit 2 began the month of September 2013 operating at or near 100% Full Power. At 1500 on 9/2/13, power reduction from 100% Full Power was commenced for 2EOC19 power coast-down (1st decrease). Power reduction was halted at 99% Full Power at 1700 on 9/2/13. At 0156 on 9/4/13, power reduction was commenced from 99% Full Power for 2EOC19 power coast-down (2nd decrease.) Power reduction was halted at 98% Full Power at 0430 on 9/4/13. At 1130 on 9/6/13, Power reduction was commenced from 97% Full Power for 2EOC19 power coast-down (3rd decrease.) Power reduction was halted at 96% full power at 1304 on 9/6/13. At 2145, on 9/8/13, power reduction was commenced from 95% full power for 2EOC19 power coast-down (4th decrease.) Power reduction was halted at 94% full power at 2325 on 9/8/13. At 1926 on 9/12/13, power reduction commenced from 93% full power for 2EOC19 power coast-down (5th decrease.) At 2028, on 9/12/13, power reduction halted at 92% full power. At 2101, on 9/13/13, Unit 2 shutdown commenced from 92% full power for entry into 2EOC19 Refueling Outage. The turbine/generator was taken offline at 0401 on 9/14/13. Mode 2 was entered at 0401 on 9/14/13. Mode 3 was entered at 0412 on 9/14/13. Mode 4 was entered at 0834 on 9/14/13. Mode 5 was entered at 1220 on 9/14/13. Mode 6 was entered at 1829 on 9/17/13. No Mode was entered at 1322 on 9/22/13 and Unit 2 remained in No Mode for the remainder of September 2013.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:             461                                                    PREPARER NAME:           Joe Wemlinger UNIT_NME:          Clinton Unit 1                                         PREPARER TELEPHONE: 217-937-3846 RPT_PERIOD:         201307
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                     1062
: 2. Maximum Dependable Capacity (MWe-Net)         1022 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          5,017.45        177,782.27
: 4. Number of Hours Generator On-line                744.00          4,926.22        174,862.43
: 5. Reserve Shutdown Hours                            0.00            0.00            4.00
: 6. Net Electrical energy Generated (MWHrs)          784,159.00      5,216,996.00    167,945,519.48 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
710 MWe-h planned loss for a control rod sequence exchange.
710 MWe-h planned loss for a control rod sequence exchange.
RPT_PERIOD:201308UNIT_NME:Clinton Unit 1               DOCKET:461OPERATING DATA REPORTPREPARER NAME:Joe WemlingerPREPARER TELEPHONE:217-937-3846UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:10622. Maximum Dependable Capacity (MWe-Net)1022744.005,761.45178,526.27 744.005,670.22175,606.43 0.000.004.00 780,993.005,997,989.00168,726,512.48This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            461                                                              PREPARER NAME:             Joe Wemlinger UNIT_NME:           Clinton Unit 1                                                   PREPARER TELEPHONE: 217-937-3846 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           1062
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               1022 This Month          Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical              744.00              5,761.45            178,526.27
: 4. Number of Hours Generator On-line                      744.00              5,670.22            175,606.43
: 5. Reserve Shutdown Hours                                0.00                0.00                4.00
: 6. Net Electrical energy Generated (MWHrs)                780,993.00          5,997,989.00        168,726,512.48 UNIT SHUTDOWNS Type                                                  Method of F: Forced          Duration                                Shutting            Cause - Corrective Action No.       Date        S: Scheduled            (Hours)         Reason 1              Down 2                      Comments


==SUMMARY==
==SUMMARY==
There was one forced loss and one planned loss in August, 2013.The planned loss for August 2013 of 2398 MWe-hr was due to a planned control rod patternadjustment on 8/17/13.
There was one forced loss and one planned loss in August, 2013.
The forced loss for August 2013 of 2198 MWe-hr was due to a loss of feedwater heating fromFeedwater Heaters 5B and 6B. The cause was a malfunctioning controller, which was replaced.
The planned loss for August 2013 of 2398 MWe-hr was due to a planned control rod pattern adjustment on 8/17/13.
RPT_PERIOD:201309UNIT_NME:Clinton Unit 1               DOCKET:461OPERATING DATA REPORTPREPARER NAME:Joe WemlingerPREPARER TELEPHONE:217-937-3846UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:10622. Maximum Dependable Capacity (MWe-Net)1022720.006,481.45179,246.27 720.006,390.22176,326.43 0.000.004.00 755,883.006,753,872.00169,482,395.48This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
The forced loss for August 2013 of 2198 MWe-hr was due to a loss of feedwater heating from Feedwater Heaters 5B and 6B. The cause was a malfunctioning controller, which was replaced.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:            461                                                                PREPARER NAME:               Joe Wemlinger UNIT_NME:           Clinton Unit 1                                                     PREPARER TELEPHONE: 217-937-3846 RPT_PERIOD:         201309
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                         1062
: 2. Maximum Dependable Capacity (MWe-Net)             1022 This Month          Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                720.00              6,481.45            179,246.27
: 4. Number of Hours Generator On-line                      720.00              6,390.22            176,326.43
: 5. Reserve Shutdown Hours                                  0.00                0.00                4.00
: 6. Net Electrical energy Generated (MWHrs)                755,883.00          6,753,872.00        169,482,395.48 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                                Shutting              Cause - Corrective Action No.       Date        S: Scheduled          (Hours)             Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
CPS had two forced losses. On 9/12/13 the 6A 'Feedwater Heater Emergency Drain valve failed open, resulting in a forced loss of 121 MWE-hr. The two planned losses were due to a control rod pattern adjustment and turbine surveillances, and implementation of Final Feedwater Temperature Reduction for unit coastdown into refueling outage C1R14.
CPS had two forced losses. On 9/12/13 the 6A 'Feedwater Heater Emergency Drain valve failed open, resulting in a forced loss of 121 MWE-hr.
RPT_PERIOD:201307UNIT_NME:Columbia Gen Sta Unit 2       DOCKET:397OPERATING DATA REPORTPREPARER NAME:Darla JohnsonPREPARER TELEPHONE:509-377-4570UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11532. Maximum Dependable Capacity (MWe-Net)1107744.004,066.75200,458.48 744.004,005.22195,983.99 0.000.003,357.70 806,046.174,357,682.64201,169,881.38This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
The two planned losses were due to a control rod pattern adjustment and turbine surveillances, and implementation of Final Feedwater Temperature Reduction for unit coastdown into refueling outage C1R14.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:              397                                                                PREPARER NAME:             Darla Johnson UNIT_NME:           Columbia Gen Sta Unit 2                                           PREPARER TELEPHONE: 509-377-4570 RPT_PERIOD:         201307
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                             1153
: 2. Maximum Dependable Capacity (MWe-Net)                 1107 This Month          Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                744.00              4,066.75            200,458.48
: 4. Number of Hours Generator On-line                        744.00              4,005.22            195,983.99
: 5. Reserve Shutdown Hours                                  0.00                0.00                3,357.70
: 6. Net Electrical energy Generated (MWHrs)                  806,046.17          4,357,682.64        201,169,881.38 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                                Shutting            Cause - Corrective Action No.       Date        S: Scheduled            (Hours)           Reason 1              Down 2                      Comments


==SUMMARY==
==SUMMARY==
Columbia operated at 100% power except for a downpower to 64% to fix a tube leak on COND-HX-3C. Columbia also downpowered to 98% for rod line maintenance. Additional forced losses were taken from a high level trip on COND-HX-4C although no downpower occurred.
Columbia operated at 100% power except for a downpower to 64% to fix a tube leak on COND-HX-3C. Columbia also downpowered to 98% for rod line maintenance. Additional forced losses were taken from a high level trip on COND-HX-4C although no downpower occurred.
RPT_PERIOD:201308UNIT_NME:Columbia Gen Sta Unit 2       DOCKET:397OPERATING DATA REPORTPREPARER NAME:Darla JohnsonPREPARER TELEPHONE:509-377-4570UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11532. Maximum Dependable Capacity (MWe-Net)1107744.004,810.75201,202.48 744.004,749.22196,727.99 0.000.003,357.70 821,066.375,178,749.01201,990,947.75This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            397                                                            PREPARER NAME:           Darla Johnson UNIT_NME:           Columbia Gen Sta Unit 2                                       PREPARER TELEPHONE: 509-377-4570 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       1153
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           1107 This Month        Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical              744.00            4,810.75        201,202.48
: 4. Number of Hours Generator On-line                    744.00            4,749.22        196,727.99
: 5. Reserve Shutdown Hours                                0.00              0.00            3,357.70
: 6. Net Electrical energy Generated (MWHrs)              821,066.37        5,178,749.01    201,990,947.75 UNIT SHUTDOWNS Type                                                Method of F: Forced          Duration                              Shutting          Cause - Corrective Action No.       Date        S: Scheduled          (Hours)           Reason 1            Down 2                    Comments


==SUMMARY==
==SUMMARY==
Columbia operated at 100% power except for a downpower to 97% for MT Bypass Valve Testing. Columbia downpowered to 80% for a single rod scram, to 98% for SJAE B Drain Temperature, and to 95% to shutdown CW-P-1A.
Columbia operated at 100% power except for a downpower to 97% for MT Bypass Valve Testing. Columbia downpowered to 80% for a single rod scram, to 98% for SJAE B Drain Temperature, and to 95% to shutdown CW-P-1A.
RPT_PERIOD:201309UNIT_NME:Columbia Gen Sta Unit 2       DOCKET:397OPERATING DATA REPORTPREPARER NAME:Darla JohnsonPREPARER TELEPHONE:509-377-4570UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11532. Maximum Dependable Capacity (MWe-Net)1107720.005,530.75201,922.48 720.005,469.22197,447.99 0.000.003,357.70 792,920.705,971,669.71202,783,868.45This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              397                                                              PREPARER NAME:               Darla Johnson UNIT_NME:           Columbia Gen Sta Unit 2                                         PREPARER TELEPHONE: 509-377-4570 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                         1153
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)             1107 This Month            Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical            720.00                5,530.75            201,922.48
: 4. Number of Hours Generator On-line                    720.00                5,469.22            197,447.99
: 5. Reserve Shutdown Hours                              0.00                  0.00                3,357.70
: 6. Net Electrical energy Generated (MWHrs)              792,920.70            5,971,669.71        202,783,868.45 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                                Shutting              Cause - Corrective Action No.       Date        S: Scheduled          (Hours)         Reason 1              Down 2                        Comments


==SUMMARY==
==SUMMARY==
Columbia operated at 100% throughout the month of September except for a planned downpower to 65% for Sequence Exchange and TGV/BPV Testing and an unplanned downpower to 90% for a control rod insertion. Additional unplanned losses were experienced throughout the month due to CW-P-1A being out of service.
Columbia operated at 100% throughout the month of September except for a planned downpower to 65% for Sequence Exchange and TGV/BPV Testing and an unplanned downpower to 90% for a control rod insertion. Additional unplanned losses were experienced throughout the month due to CW-P-1A being out of service.
RPT_PERIOD:201307UNIT_NME:Comanche Peak Unit 1          DOCKET:445OPERATING DATA REPORTPREPARER NAME:G.D. LytlePREPARER TELEPHONE:254-897-5455UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12182. Maximum Dependable Capacity (MWe-Net)1205732.184,562.93181,729.16 724.824,538.12180,629.26 0.000.000.00 867,740.005,525,651.00201,756,887.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             445                                                                  PREPARER NAME:             G.D. Lytle UNIT_NME:            Comanche Peak Unit 1                                                PREPARER TELEPHONE: 254-897-5455 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                             1218
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)                 1205 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                  732.18              4,562.93          181,729.16
: 4. Number of Hours Generator On-line                          724.82              4,538.12          180,629.26
: 5. Reserve Shutdown Hours                                    0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                    867,740.00          5,525,651.00      201,756,887.00 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                                Shutting          Cause - Corrective Action No.      Date          S: Scheduled          (Hours)            Reason 1            Down 2                        Comments 1-13-2 7/27/2013                S                19.18                  B                  1        Enter MODE 3 to repair Reactor Coolant Pump 1-02 seal water injection drain valve 1-CS-8364B, leaking inside containment. Repairs successful.


==SUMMARY==
==SUMMARY==
Unit 1 began the month at 100% reactor, 1266 MWe turbine power. On 7/26/13 at 22:00, licensed operators began ramping the unit to about 20% reactor, 200 MWe in preparation for a planned unit and reactor shutdown to conduct a maintenance outage to repair a leaking Reactor Coolant Pump (RCP 1-02) seal water injection line drain valve, 1-CS-8364B inside the containment building. On 7/27/13 at 00:59, licensed operators manually tripped the reactor from about 20% reactor, 200 MWe turbine power per station procedures to enter MODE 3 and commence the outage. Repairs to 1-CS-8364B were successful. On 7/27/13 at 12:20, Unit 1 entered MODE 2 and at 12:48 reactor operators declared the reactor critical. On 7/27/13 at 16:48, Unit 1 entered MODE 1. On 7/27/13 at 20:10, the main generator was synchronized to the grid ending the maintenance outage with a duration of about 19.18 hours. On 7/27/13 at 21:33, the unit began ramping up to return to full power operation. On 7/29/13 at 02:23, Unit 1 returned to full power operation at 100% reactor, 1257 MWE turbine power. Unit 1 ended the month at 100% reactor, 1263 MWe turbine power.1-13-27/27/2013S  19.18B1Enter MODE 3 to repair Reactor Coolant Pump 1-02 seal water injection drain valve 1-CS-8364B, leaking inside containment. Repairs successful.
Unit 1 began the month at 100% reactor, 1266 MWe turbine power. On 7/26/13 at 22:00, licensed operators began ramping the unit to about 20% reactor, 200 MWe in preparation for a planned unit and reactor shutdown to conduct a maintenance outage to repair a leaking Reactor Coolant Pump (RCP 1-02) seal water injection line drain valve, 1-CS-8364B inside the containment building. On 7/27/13 at 00:59, licensed operators manually tripped the reactor from about 20% reactor, 200 MWe turbine power per station procedures to enter MODE 3 and commence the outage. Repairs to 1-CS-8364B were successful. On 7/27/13 at 12:20, Unit 1 entered MODE 2 and at 12:48 reactor operators declared the reactor critical. On 7/27/13 at 16:48, Unit 1 entered MODE 1. On 7/27/13 at 20:10, the main generator was synchronized to the grid ending the maintenance outage with a duration of about 19.18 hours. On 7/27/13 at 21:33, the unit began ramping up to return to full power operation. On 7/29/13 at 02:23, Unit 1 returned to full power operation at 100% reactor, 1257 MWE turbine power. Unit 1 ended the month at 100% reactor, 1263 MWe turbine power.
RPT_PERIOD:201308UNIT_NME:Comanche Peak Unit 1          DOCKET:445OPERATING DATA REPORTPREPARER NAME:G.D. LytlePREPARER TELEPHONE:254-897-5455UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12182. Maximum Dependable Capacity (MWe-Net)1205744.005,306.93182,473.16 744.005,282.12181,373.26 0.000.000.00 904,799.006,430,450.00202,661,686.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             445                                                      PREPARER NAME:             G.D. Lytle UNIT_NME:          Comanche Peak Unit 1                                      PREPARER TELEPHONE: 254-897-5455 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1218
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1205 This Month      Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          5,306.93            182,473.16
: 4. Number of Hours Generator On-line                744.00          5,282.12            181,373.26
: 5. Reserve Shutdown Hours                            0.00            0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)          904,799.00      6,430,450.00        202,661,686.00 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
Unit 1 began the month at 100% reactor, 1263 MWe turbine power. Unit 1 ended the month at 100% reactor, 1259 MWe turbine power.
Unit 1 began the month at 100% reactor, 1263 MWe turbine power. Unit 1 ended the month at 100% reactor, 1259 MWe turbine power.
RPT_PERIOD:201309UNIT_NME:Comanche Peak Unit 1          DOCKET:445OPERATING DATA REPORTPREPARER NAME:G.D. LytlePREPARER TELEPHONE:254-897-5455UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12182. Maximum Dependable Capacity (MWe-Net)1205720.006,026.93183,193.16 720.006,002.12182,093.26 0.000.000.00 875,928.007,306,378.00203,537,614.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             445                                                      PREPARER NAME:             G.D. Lytle UNIT_NME:          Comanche Peak Unit 1                                      PREPARER TELEPHONE: 254-897-5455 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1218
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1205 This Month      Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical          720.00          6,026.93            183,193.16
: 4. Number of Hours Generator On-line                720.00          6,002.12            182,093.26
: 5. Reserve Shutdown Hours                            0.00            0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)          875,928.00      7,306,378.00        203,537,614.00 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
Unit 1 began the month at 100% reactor, 1259 MWe turbine power. Unit 1 ended the month at 100% reactor, 1269 MWe turbine power.
Unit 1 began the month at 100% reactor, 1259 MWe turbine power. Unit 1 ended the month at 100% reactor, 1269 MWe turbine power.
RPT_PERIOD:201307UNIT_NME:Comanche Peak Unit 2          DOCKET:446OPERATING DATA REPORTPREPARER NAME:G.D. LytlePREPARER TELEPHONE:254-897-5455UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12072. Maximum Dependable Capacity (MWe-Net)1195744.005,087.00161,173.21 744.005,087.00160,442.96 0.000.000.00 896,889.006,198,317.00181,366,598.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             446                                                      PREPARER NAME:             G.D. Lytle UNIT_NME:          Comanche Peak Unit 2                                      PREPARER TELEPHONE: 254-897-5455 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1207
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1195 This Month      Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          5,087.00            161,173.21
: 4. Number of Hours Generator On-line                744.00          5,087.00            160,442.96
: 5. Reserve Shutdown Hours                            0.00            0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)          896,889.00      6,198,317.00        181,366,598.00 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
Unit 2 began the month at 100% reactor, 1255 MWe turbine power. Unit 2 ended the month at 100% reactor, 1253 MWe turbine power.
Unit 2 began the month at 100% reactor, 1255 MWe turbine power. Unit 2 ended the month at 100% reactor, 1253 MWe turbine power.
RPT_PERIOD:201308UNIT_NME:Comanche Peak Unit 2          DOCKET:446OPERATING DATA REPORTPREPARER NAME:G.D. LytlePREPARER TELEPHONE:254-897-5455UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12072. Maximum Dependable Capacity (MWe-Net)1195744.005,831.00161,917.21 744.005,831.00161,186.96 0.000.000.00 893,994.007,092,311.00182,260,592.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             446                                                      PREPARER NAME:             G.D. Lytle UNIT_NME:          Comanche Peak Unit 2                                      PREPARER TELEPHONE: 254-897-5455 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1207
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1195 This Month      Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          5,831.00            161,917.21
: 4. Number of Hours Generator On-line                744.00          5,831.00            161,186.96
: 5. Reserve Shutdown Hours                            0.00            0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)          893,994.00      7,092,311.00        182,260,592.00 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
Unit 2 began the month at 100% reactor, 1253 MWe turbine power. Unit 2 ended the month at 100% reactor, 1250 MWe turbine power.
Unit 2 began the month at 100% reactor, 1253 MWe turbine power. Unit 2 ended the month at 100% reactor, 1250 MWe turbine power.
RPT_PERIOD:201309UNIT_NME:Comanche Peak Unit 2          DOCKET:446OPERATING DATA REPORTPREPARER NAME:G.D. LytlePREPARER TELEPHONE:254-897-5455UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12072. Maximum Dependable Capacity (MWe-Net)1195720.006,551.00162,637.21 720.006,551.00161,906.96 0.000.000.00 866,198.007,958,509.00183,126,790.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             446                                                      PREPARER NAME:             G.D. Lytle UNIT_NME:          Comanche Peak Unit 2                                      PREPARER TELEPHONE: 254-897-5455 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1207
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1195 This Month      Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical          720.00          6,551.00          162,637.21
: 4. Number of Hours Generator On-line                720.00          6,551.00          161,906.96
: 5. Reserve Shutdown Hours                            0.00            0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)          866,198.00      7,958,509.00      183,126,790.00 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                      Comments


==SUMMARY==
==SUMMARY==
Unit 2 began the month at 100% reactor 1250 MWe turbine power. Unit 2 ended the month at 100% reactor, 1258 MWe turbine power.
Unit 2 began the month at 100% reactor 1250 MWe turbine power. Unit 2 ended the month at 100% reactor, 1258 MWe turbine power.
RPT_PERIOD:201307UNIT_NME:Cook Unit 1                  DOCKET:315OPERATING DATA REPORTPREPARER NAME:K. KohnPREPARER TELEPHONE:269-465-5901UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:10842. Maximum Dependable Capacity (MWe-Net)1030744.003,835.87240,635.65 744.003,796.85237,550.83 0.000.00321.00 774,142.004,003,034.00227,935,430.40This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             315                                                    PREPARER NAME:           K. Kohn UNIT_NME:          Cook Unit 1                                            PREPARER TELEPHONE: 269-465-5901 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1084
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1030 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          3,835.87        240,635.65
: 4. Number of Hours Generator On-line                744.00          3,796.85        237,550.83
: 5. Reserve Shutdown Hours                            0.00            0.00            321.00
: 6. Net Electrical energy Generated (MWHrs)          774,142.00      4,003,034.00    227,935,430.40 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
None.
None.
RPT_PERIOD:201308UNIT_NME:Cook Unit 1                  DOCKET:315OPERATING DATA REPORTPREPARER NAME:K. KohnPREPARER TELEPHONE:269-465-5901UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:10842. Maximum Dependable Capacity (MWe-Net)1030744.004,579.87241,379.65 744.004,540.85238,294.83 0.000.00321.00 767,138.004,770,172.00228,702,568.40This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             315                                                    PREPARER NAME:           K. Kohn UNIT_NME:          Cook Unit 1                                            PREPARER TELEPHONE: 269-465-5901 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1084
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1030 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          4,579.87        241,379.65
: 4. Number of Hours Generator On-line                744.00          4,540.85        238,294.83
: 5. Reserve Shutdown Hours                            0.00            0.00            321.00
: 6. Net Electrical energy Generated (MWHrs)          767,138.00      4,770,172.00    228,702,568.40 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
None.
None.
RPT_PERIOD:201309UNIT_NME:Cook Unit 1                  DOCKET:315OPERATING DATA REPORTPREPARER NAME:K. KohnPREPARER TELEPHONE:269-465-5901UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:10842. Maximum Dependable Capacity (MWe-Net)1030720.005,299.87242,099.65 720.005,260.85239,014.83 0.000.00321.00 739,244.005,509,416.00229,441,812.40This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             315                                                      PREPARER NAME:             K. Kohn UNIT_NME:          Cook Unit 1                                              PREPARER TELEPHONE: 269-465-5901 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1084
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1030 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical          720.00            5,299.87          242,099.65
: 4. Number of Hours Generator On-line                720.00            5,260.85          239,014.83
: 5. Reserve Shutdown Hours                            0.00              0.00              321.00
: 6. Net Electrical energy Generated (MWHrs)          739,244.00        5,509,416.00      229,441,812.40 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
Planned Main Turbine Control Valve Testing performed on 9/15/13 @ 2230. Rx power was reduced to 91%.
Planned Main Turbine Control Valve Testing performed on 9/15/13 @ 2230. Rx power was reduced to 91%.
RPT_PERIOD:201307UNIT_NME:Cook Unit 2                  DOCKET:316OPERATING DATA REPORTPREPARER NAME:K. KohnPREPARER TELEPHONE:269-465-5901UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11072. Maximum Dependable Capacity (MWe-Net)1077697.075,040.07224,938.52 685.985,028.98220,588.00 0.000.000.00 726,761.005,597,889.00224,767,943.60This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:               316                                                            PREPARER NAME:             K. Kohn UNIT_NME:            Cook Unit 2                                                    PREPARER TELEPHONE: 269-465-5901 RPT_PERIOD:           201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                         1107
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)             1077 This Month        Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical                697.07            5,040.07        224,938.52
: 4. Number of Hours Generator On-line                      685.98            5,028.98        220,588.00
: 5. Reserve Shutdown Hours                                  0.00              0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)                726,761.00        5,597,889.00    224,767,943.60 UNIT SHUTDOWNS Type                                                Method of F: Forced        Duration                              Shutting          Cause - Corrective Action No.       Date          S: Scheduled        (Hours)          Reason 1            Down 2                      Comments 234    7/28/2013              F              58.02                A                  2        U2F13A Rx/Gen trip on 7/28/2013 @ 1018 due to an incorrect controller setpoint on the Condensate Heater Bypass Control Valve. Rx taken critical on 7/30/2013 @ 0914 and Generator synch occurred on 7/30/2013 @ 2019.


==SUMMARY==
==SUMMARY==
U2F13A Rx/Gen trip on 7/28/2013 @ 1018 due to an incorrect controller setpoint on the Condensate Heater Bypass Control Valve. Rx taken critical on 7/30/2013 @ 0914 and Generator synch occurred on 7/30/2013 @ 2019.2347/28/2013F  58.02A2U2F13A Rx/Gen trip on 7/28/2013 @ 1018 due to an incorrect controller setpoint on the Condensate Heater Bypass Control Valve. Rx taken critical on 7/30/2013 @ 0914 and Generator synch occurred on 7/30/2013 @ 2019.
U2F13A Rx/Gen trip on 7/28/2013 @ 1018 due to an incorrect controller setpoint on the Condensate Heater Bypass Control Valve. Rx taken critical on 7/30/2013 @ 0914 and Generator synch occurred on 7/30/2013 @ 2019.
RPT_PERIOD:201308UNIT_NME:Cook Unit 2                  DOCKET:316OPERATING DATA REPORTPREPARER NAME:K. KohnPREPARER TELEPHONE:269-465-5901UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11072. Maximum Dependable Capacity (MWe-Net)1077744.005,784.07225,682.52 744.005,772.98221,332.00 0.000.000.00 800,022.006,397,911.00225,567,965.60This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             316                                                          PREPARER NAME:           K. Kohn UNIT_NME:          Cook Unit 2                                                  PREPARER TELEPHONE: 269-465-5901 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       1107
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           1077 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical          744.00              5,784.07          225,682.52
: 4. Number of Hours Generator On-line                  744.00              5,772.98          221,332.00
: 5. Reserve Shutdown Hours                            0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)            800,022.00          6,397,911.00      225,567,965.60 UNIT SHUTDOWNS Type                                                Method of F: Forced          Duration                              Shutting          Cause - Corrective Action No.       Date        S: Scheduled        (Hours)         Reason 1              Down 2                      Comments


==SUMMARY==
==SUMMARY==
U2F13A Rx/Gen trip due to an incorrect controller setpoint on the Condensate Heater Bypass Control Valve. Power ascension to 100% from 8/1/2013 @ 0000 to 8/1/2013 @ 0200.
U2F13A Rx/Gen trip due to an incorrect controller setpoint on the Condensate Heater Bypass Control Valve. Power ascension to 100% from 8/1/2013 @ 0000 to 8/1/2013 @ 0200.
RPT_PERIOD:201309UNIT_NME:Cook Unit 2                  DOCKET:316OPERATING DATA REPORTPREPARER NAME:K. KohnPREPARER TELEPHONE:269-465-5901UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11072. Maximum Dependable Capacity (MWe-Net)1077720.006,504.07226,402.52 720.006,492.98222,052.00 0.000.000.00 760,084.007,157,995.00226,328,049.60This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             316                                                    PREPARER NAME:               K. Kohn UNIT_NME:          Cook Unit 2                                            PREPARER TELEPHONE: 269-465-5901 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1107
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1077 This Month      Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical          720.00          6,504.07            226,402.52
: 4. Number of Hours Generator On-line                720.00          6,492.98            222,052.00
: 5. Reserve Shutdown Hours                            0.00            0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)          760,084.00      7,157,995.00        226,328,049.60 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                          Shutting              Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                        Comments


==SUMMARY==
==SUMMARY==
Rx power reduction to 48% began on 9/29/2013 @ 2000 to support TREVI testing prior to the U2C21 Refueling Outage.
Rx power reduction to 48% began on 9/29/2013 @ 2000 to support TREVI testing prior to the U2C21 Refueling Outage.
RPT_PERIOD:201307UNIT_NME:Cooper Unit 1                 DOCKET:298OPERATING DATA REPORTPREPARER NAME:Brian ShryockPREPARER TELEPHONE:402-825-2984UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8152. Maximum Dependable Capacity (MWe-Net)768.88744.005,087.00276,237.77 744.005,087.00272,893.41 0.000.000.00 540,769.663,925,176.58191,806,755.98This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            298                                                      PREPARER NAME:           Brian Shryock UNIT_NME:           Cooper Unit 1                                             PREPARER TELEPHONE: 402-825-2984 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       815
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           768.88 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical            744.00          5,087.00        276,237.77
: 4. Number of Hours Generator On-line                  744.00          5,087.00        272,893.41
: 5. Reserve Shutdown Hours                              0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            540,769.66      3,925,176.58    191,806,755.98 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
No information for this reporting period.
No information for this reporting period.
RPT_PERIOD:201308UNIT_NME:Cooper Unit 1                 DOCKET:298OPERATING DATA REPORTPREPARER NAME:Brian ShryockPREPARER TELEPHONE:402-825-2984UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8152. Maximum Dependable Capacity (MWe-Net)768.88744.005,831.00276,981.77 744.005,831.00273,637.41 0.000.000.00 572,241.664,497,418.24192,378,997.64This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            298                                                      PREPARER NAME:           Brian Shryock UNIT_NME:           Cooper Unit 1                                             PREPARER TELEPHONE: 402-825-2984 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       815
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           768.88 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical            744.00          5,831.00        276,981.77
: 4. Number of Hours Generator On-line                  744.00          5,831.00        273,637.41
: 5. Reserve Shutdown Hours                              0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            572,241.66      4,497,418.24    192,378,997.64 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
No information for this reporting period.
No information for this reporting period.
RPT_PERIOD:201309UNIT_NME:Cooper Unit 1                 DOCKET:298OPERATING DATA REPORTPREPARER NAME:Brian ShryockPREPARER TELEPHONE:402-825-2984UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8152. Maximum Dependable Capacity (MWe-Net)768.88720.006,551.00277,701.77 720.006,551.00274,357.41 0.000.000.00 553,316.805,050,735.04192,932,314.44This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            298                                                      PREPARER NAME:           Brian Shryock UNIT_NME:           Cooper Unit 1                                             PREPARER TELEPHONE: 402-825-2984 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       815
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           768.88 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical            720.00          6,551.00        277,701.77
: 4. Number of Hours Generator On-line                  720.00          6,551.00        274,357.41
: 5. Reserve Shutdown Hours                              0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            553,316.80      5,050,735.04    192,932,314.44 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
No information for this reporting period.
No information for this reporting period.
RPT_PERIOD:201307UNIT_NME:Davis-Besse Unit 1           DOCKET:346OPERATING DATA REPORTPREPARER NAME:J. SyrowskiPREPARER TELEPHONE:419-249-2417UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9082. Maximum Dependable Capacity (MWe-Net)894476.874,793.20220,567.08 462.104,778.43217,267.18 0.000.005,532.00 399,908.004,339,570.50183,626,883.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              346                                                              PREPARER NAME:             J. Syrowski UNIT_NME:           Davis-Besse Unit 1                                               PREPARER TELEPHONE: 419-249-2417 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           908
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               894 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                476.87              4,793.20          220,567.08
: 4. Number of Hours Generator On-line                        462.10              4,778.43          217,267.18
: 5. Reserve Shutdown Hours                                  0.00                0.00              5,532.00
: 6. Net Electrical energy Generated (MWHrs)                  399,908.00          4,339,570.50      183,626,883.00 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                                Shutting            Cause - Corrective Action No.       Date        S: Scheduled            (Hours)            Reason 1            Down 2                        Comments 1      6/29/2013            F                281.90                  A                  4          Reactor Trip on Reactor Protection System due to Flux/Delta Flux/Flow on trip of Reactor Coolant Pump 1-2 due to electrical problem.


==SUMMARY==
==SUMMARY==
On July 12, 2013, the Reactor was taken critical and the Unit synchronized to the grid following completion of repair activities for the plant trip that occurred on June 29, 2013. Power ascension to 100% power was completed on July 14 following routine testing and emergent repairs to feedwater heater level controls. On July 22 and July 24, planned downpowers to approximately 99% power were conducted to support Reactor Trip Breaker testing. The plant remained at approximately 100% power the remainder of the month.16/29/2013F  281.90A4Reactor Trip on Reactor Protection System due to Flux/Delta Flux/Flow on trip of Reactor Coolant Pump 1-2 due to electrical problem.
On July 12, 2013, the Reactor was taken critical and the Unit synchronized to the grid following completion of repair activities for the plant trip that occurred on June 29, 2013. Power ascension to 100% power was completed on July 14 following routine testing and emergent repairs to feedwater heater level controls. On July 22 and July 24, planned downpowers to approximately 99% power were conducted to support Reactor Trip Breaker testing. The plant remained at approximately 100% power the remainder of the month.
RPT_PERIOD:201308UNIT_NME:Davis-Besse Unit 1           DOCKET:346OPERATING DATA REPORTPREPARER NAME:J. SyrowskiPREPARER TELEPHONE:419-249-2417UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9082. Maximum Dependable Capacity (MWe-Net)894744.005,537.20221,311.08 744.005,522.43218,011.18 0.000.005,532.00 672,378.605,011,949.10184,299,261.60This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              346                                                        PREPARER NAME:               J. Syrowski UNIT_NME:           Davis-Besse Unit 1                                         PREPARER TELEPHONE: 419-249-2417 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                         908
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)             894 This Month      Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical              744.00          5,537.20            221,311.08
: 4. Number of Hours Generator On-line                    744.00          5,522.43            218,011.18
: 5. Reserve Shutdown Hours                                0.00            0.00                5,532.00
: 6. Net Electrical energy Generated (MWHrs)              672,378.60      5,011,949.10        184,299,261.60 UNIT SHUTDOWNS Type                                              Method of F: Forced          Duration                            Shutting            Cause - Corrective Action No.       Date        S: Scheduled          (Hours)           Reason 1          Down 2                        Comments


==SUMMARY==
==SUMMARY==
On August 14, 2013, a planned downpower to approximately 99% power was conducted to support Reactor Trip Breaker testing. On August 29 a planned downpower to approximately 99% power was conducted to support Reactor Trip Breaker maintenance and testing. The plant remained at approximately 100% power the remainder of the month.
On August 14, 2013, a planned downpower to approximately 99% power was conducted to support Reactor Trip Breaker testing. On August 29 a planned downpower to approximately 99% power was conducted to support Reactor Trip Breaker maintenance and testing. The plant remained at approximately 100% power the remainder of the month.
RPT_PERIOD:201309UNIT_NME:Davis-Besse Unit 1           DOCKET:346OPERATING DATA REPORTPREPARER NAME:J. SyrowskiPREPARER TELEPHONE:419-249-2417UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9082. Maximum Dependable Capacity (MWe-Net)894720.006,257.20222,031.08 720.006,242.43218,731.18 0.000.005,532.00 652,537.105,664,486.20184,951,798.70This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              346                                                            PREPARER NAME:             J. Syrowski UNIT_NME:           Davis-Besse Unit 1                                             PREPARER TELEPHONE: 419-249-2417 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                         908
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)             894 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical              720.00              6,257.20          222,031.08
: 4. Number of Hours Generator On-line                    720.00              6,242.43          218,731.18
: 5. Reserve Shutdown Hours                                0.00                0.00              5,532.00
: 6. Net Electrical energy Generated (MWHrs)              652,537.10          5,664,486.20      184,951,798.70 UNIT SHUTDOWNS Type                                                  Method of F: Forced          Duration                              Shutting            Cause - Corrective Action No.       Date        S: Scheduled          (Hours)           Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
On September 4 and 25, 2013, planned downpowers to approximately 99% power were conducted to support Reactor Trip Breaker testing. On September 7 a planned downpower to approximately 99% power was conducted to support Reactor Trip Breaker maintenance and testing. On September 18 a planned downpower to approximately 99% power was conducted to support Reactor Trip Breaker maintenance and testing and Integrated Control System maintenance. The plant remained at approximately 100% power the remainder of the month.
On September 4 and 25, 2013, planned downpowers to approximately 99% power were conducted to support Reactor Trip Breaker testing. On September 7 a planned downpower to approximately 99% power was conducted to support Reactor Trip Breaker maintenance and testing. On September 18 a planned downpower to approximately 99% power was conducted to support Reactor Trip Breaker maintenance and testing and Integrated Control System maintenance. The plant remained at approximately 100% power the remainder of the month.
RPT_PERIOD:201307UNIT_NME:Diablo Canyon Unit 1         DOCKET:275OPERATING DATA REPORTPREPARER NAME:M. PadovanPREPARER TELEPHONE:(805) 545-4540UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11382. Maximum Dependable Capacity (MWe-Net)1122719.534,946.40219,714.00 705.724,932.59217,725.36 0.000.000.00 781,724.005,604,961.00231,763,888.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            275                                                                PREPARER NAME:               M. Padovan UNIT_NME:           Diablo Canyon Unit 1                                               PREPARER TELEPHONE: (805) 545-4540 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           1138
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               1122 This Month          Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical              719.53              4,946.40            219,714.00
: 4. Number of Hours Generator On-line                      705.72              4,932.59            217,725.36
: 5. Reserve Shutdown Hours                                0.00                0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)                781,724.00          5,604,961.00        231,763,888.00 UNIT SHUTDOWNS Type                                                      Method of F: Forced            Duration                                  Shutting              Cause - Corrective Action No.       Date        S: Scheduled          (Hours)            Reason 1                Down 2                        Comments 1      6/26/2013            F                38.28                A                      4            An inspection identified a thru wall crack in the socket weld at the half coupling attached to Line-985, upstream of RHR-1-RV-8708. Engineering accepted a fatigue resistant socket weld profile at socket welded half coupling and a weld repair was performed.


==SUMMARY==
==SUMMARY==
Following a Residual Heat Removal system weld repair, Operations performed a ramp up in power, reaching full power at 0400 on July 4th, 2013. Unit 1 operated at approximately 100 percent power for the rest of the month of July, 2013.16/26/2013F  38.28A4An inspection identified a thru wall crack in the socket weld at the half coupling attached to Line-985, upstream of RHR-1-RV-8708. Engineering accepted a fatigue resistant socket weld profile at socket welded half coupling and a weld repair was performed.
Following a Residual Heat Removal system weld repair, Operations performed a ramp up in power, reaching full power at 0400 on July 4th, 2013. Unit 1 operated at approximately 100 percent power for the rest of the month of July, 2013.
RPT_PERIOD:201308UNIT_NME:Diablo Canyon Unit 1          DOCKET:275OPERATING DATA REPORTPREPARER NAME:(805) 545-4540PREPARER TELEPHONE:M. PadovanUNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11382. Maximum Dependable Capacity (MWe-Net)1122744.005,690.40220,458.00 744.005,676.59218,469.36 0.000.000.00 848,141.006,453,102.00232,612,029.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             275                                                            PREPARER NAME:           (805) 545-4540 UNIT_NME:          Diablo Canyon Unit 1                                          PREPARER TELEPHONE: M. Padovan RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           1138
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               1122 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical                744.00          5,690.40        220,458.00
: 4. Number of Hours Generator On-line                        744.00          5,676.59        218,469.36
: 5. Reserve Shutdown Hours                                  0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)                  848,141.00      6,453,102.00    232,612,029.00 UNIT SHUTDOWNS Type                                                Method of F: Forced            Duration                            Shutting          Cause - Corrective Action No.       Date        S: Scheduled            (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Diablo Canyon Unit One began and ended the month of August, 2013 in Mode 1 (Power Operation) at approximately 100 percent reactor power. There were no significant operational occurrences.
Diablo Canyon Unit One began and ended the month of August, 2013 in Mode 1 (Power Operation) at approximately 100 percent reactor power.
RPT_PERIOD:201309UNIT_NME:Diablo Canyon Unit 1         DOCKET:275OPERATING DATA REPORTPREPARER NAME:Mark PadovanPREPARER TELEPHONE:805-545-4540UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11382. Maximum Dependable Capacity (MWe-Net)1122720.006,410.40221,178.00 720.006,396.59219,189.36 0.000.000.00 821,185.007,274,287.00233,433,214.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
There were no significant operational occurrences.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:            275                                                        PREPARER NAME:             Mark Padovan UNIT_NME:           Diablo Canyon Unit 1                                       PREPARER TELEPHONE: 805-545-4540 RPT_PERIOD:         201309
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                     1138
: 2. Maximum Dependable Capacity (MWe-Net)         1122 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical          720.00              6,410.40          221,178.00
: 4. Number of Hours Generator On-line                720.00              6,396.59          219,189.36
: 5. Reserve Shutdown Hours                            0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)          821,185.00          7,274,287.00      233,433,214.00 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
Unit 1 operated at approximately 100 percent power for the month of September 2013.
Unit 1 operated at approximately 100 percent power for the month of September 2013.
RPT_PERIOD:201307UNIT_NME:Diablo Canyon Unit 2         DOCKET:323OPERATING DATA REPORTPREPARER NAME:M. PadovanPREPARER TELEPHONE:(805) 545-4540UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11512. Maximum Dependable Capacity (MWe-Net)1118665.953,891.00214,950.73 656.133,826.46213,036.92 0.000.000.00 721,930.004,278,799.00228,014,080.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              323                                                                  PREPARER NAME:                   M. Padovan UNIT_NME:           Diablo Canyon Unit 2                                                 PREPARER TELEPHONE: (805) 545-4540 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                             1151
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)                 1118 This Month          Yr-to-Date            Cumulative
: 3. Number of Hours the Reactor was Critical                  665.95              3,891.00              214,950.73
: 4. Number of Hours Generator On-line                          656.13              3,826.46              213,036.92
: 5. Reserve Shutdown Hours                                    0.00                0.00                  0.00
: 6. Net Electrical energy Generated (MWHrs)                    721,930.00          4,278,799.00          228,014,080.00 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                                Shutting              Cause - Corrective Action No.       Date          S: Scheduled            (Hours)             Reason 1              Down 2                            Comments 2      7/10/2013              F                87.87                  A                    3            A Licensee Event Report and Root Cause Evaluation are being prepared to determine the cause and corrective actions.


==SUMMARY==
==SUMMARY==
Diablo Canyon Unit 2 began the month of July in Mode 1 (Power Operation) at approximately 100 percent reactor power. On July 10th, an apparent electrical flashover of a Unit 2 main bank transformer lightning arrestor resulted in a reactor trip. Preliminary investigation suggests that the electrical disturbance was experienced during routine "hot washing" an insulator. On July 13th, 2013, Unit 2 was returned to critical and entered Mode 1 (power operation). On July 15th, 2013, Unit 2 returned to full power and it remained there for the rest of the month. 27/10/2013F  87.87A3A Licensee Event Report and Root Cause Evaluation are being prepared to determine the cause and corrective actions.
Diablo Canyon Unit 2 began the month of July in Mode 1 (Power Operation) at approximately 100 percent reactor power. On July 10th, an apparent electrical flashover of a Unit 2 main bank transformer lightning arrestor resulted in a reactor trip. Preliminary investigation suggests that the electrical disturbance was experienced during routine "hot washing" an insulator. On July 13th, 2013, Unit 2 was returned to critical and entered Mode 1 (power operation). On July 15th, 2013, Unit 2 returned to full power and it remained there for the rest of the month.
RPT_PERIOD:201308UNIT_NME:Diablo Canyon Unit 2          DOCKET:323OPERATING DATA REPORTPREPARER NAME:(805) 545-4540PREPARER TELEPHONE:M. PadovanUNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11512. Maximum Dependable Capacity (MWe-Net)1118744.004,635.00215,694.73 744.004,570.46213,780.92 0.000.000.00 843,997.005,122,796.00228,858,077.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             323                                                            PREPARER NAME:           (805) 545-4540 UNIT_NME:          Diablo Canyon Unit 2                                          PREPARER TELEPHONE: M. Padovan RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           1151
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               1118 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical                744.00          4,635.00        215,694.73
: 4. Number of Hours Generator On-line                        744.00          4,570.46        213,780.92
: 5. Reserve Shutdown Hours                                  0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)                  843,997.00      5,122,796.00    228,858,077.00 UNIT SHUTDOWNS Type                                                Method of F: Forced            Duration                            Shutting          Cause - Corrective Action No.       Date        S: Scheduled            (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Diablo Canyon Unit Two began and ended the month of August, 2013 in Mode 1 (Power Operation) at approximately 100 percent reactor power. There were no significant operational occurrences.
Diablo Canyon Unit Two began and ended the month of August, 2013 in Mode 1 (Power Operation) at approximately 100 percent reactor power.
RPT_PERIOD:201309UNIT_NME:Diablo Canyon Unit 2         DOCKET:323OPERATING DATA REPORTPREPARER NAME:M. PadovanPREPARER TELEPHONE:805-545-4540UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11512. Maximum Dependable Capacity (MWe-Net)1118720.005,355.00216,414.73 720.005,290.46214,500.92 0.000.000.00 817,391.005,940,187.00229,675,468.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
There were no significant operational occurrences.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:            323                                                        PREPARER NAME:             M. Padovan UNIT_NME:           Diablo Canyon Unit 2                                       PREPARER TELEPHONE: 805-545-4540 RPT_PERIOD:         201309
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                     1151
: 2. Maximum Dependable Capacity (MWe-Net)         1118 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical          720.00            5,355.00            216,414.73
: 4. Number of Hours Generator On-line                720.00            5,290.46            214,500.92
: 5. Reserve Shutdown Hours                            0.00              0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)          817,391.00        5,940,187.00        229,675,468.00 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1              Down 2                      Comments


==SUMMARY==
==SUMMARY==
Diablo Canyon Unit 2 operated at approximately 100 percent power for the month of September 2013.
Diablo Canyon Unit 2 operated at approximately 100 percent power for the month of September 2013.
RPT_PERIOD:201307UNIT_NME:Dresden Unit 2               DOCKET:237OPERATING DATA REPORTPREPARER NAME:Dave KijowskiPREPARER TELEPHONE:815-416-4227UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8942. Maximum Dependable Capacity (MWe-Net)870744.005,087.00303,765.74 744.005,087.00294,590.59 0.000.004.00 677,151.004,690,095.00213,341,844.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            237                                                          PREPARER NAME:                 Dave Kijowski UNIT_NME:           Dresden Unit 2                                               PREPARER TELEPHONE: 815-416-4227 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       894
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           870 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical            744.00            5,087.00            303,765.74
: 4. Number of Hours Generator On-line                    744.00            5,087.00            294,590.59
: 5. Reserve Shutdown Hours                              0.00              0.00                4.00
: 6. Net Electrical energy Generated (MWHrs)              677,151.00        4,690,095.00        213,341,844.00 UNIT SHUTDOWNS Type                                                Method of F: Forced        Duration                              Shutting              Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1            Down 2                          Comments


==SUMMARY==
==SUMMARY==
With the exception of short periods for routine maintenance and surveillances, Unit 2 operated at full power for the reporting period.
With the exception of short periods for routine maintenance and surveillances, Unit 2 operated at full power for the reporting period.
RPT_PERIOD:201308UNIT_NME:Dresden Unit 2               DOCKET:237OPERATING DATA REPORTPREPARER NAME:Dave KijowskiPREPARER TELEPHONE:815-416-4227UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8942. Maximum Dependable Capacity (MWe-Net)870744.005,831.00304,509.74 744.005,831.00295,334.59 0.000.004.00 672,326.005,362,421.00214,014,170.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            237                                                                  PREPARER NAME:             Dave Kijowski UNIT_NME:           Dresden Unit 2                                                       PREPARER TELEPHONE: 815-416-4227 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           894
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               870 This Month            Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                744.00                5,831.00          304,509.74
: 4. Number of Hours Generator On-line                      744.00                5,831.00          295,334.59
: 5. Reserve Shutdown Hours                                  0.00                  0.00              4.00
: 6. Net Electrical energy Generated (MWHrs)                672,326.00            5,362,421.00      214,014,170.00 UNIT SHUTDOWNS Type                                                      Method of F: Forced            Duration                                  Shutting          Cause - Corrective Action No.       Date        S: Scheduled          (Hours)             Reason 1              Down 2                      Comments


==SUMMARY==
==SUMMARY==
On August 10, at approximately 2200 hours, load was reduced to approximately 84% electrical for a planned control rod pattern adjustment. On August 11, at approximately 0100 hours, the unit returned to full power operation.On August 28, at approximately 1600 hours, load was reduced to approximately 98% electrical due to an unplanned trip of the 2B Circ Water Pump. On August 29, at approximately 1200 hours, load was further reduced due to condenser limitations with the combination of warm intake temperatures and two circ water pump operation. Load was reduced to as low as 89% electrical during this period of warm weather and two pump operation. The unit remained at approximately 89% electrical operation for the remainder of the reporting period.
On August 10, at approximately 2200 hours, load was reduced to approximately 84% electrical for a planned control rod pattern adjustment. On August 11, at approximately 0100 hours, the unit returned to full power operation.
RPT_PERIOD:201309UNIT_NME:Dresden Unit 2               DOCKET:237OPERATING DATA REPORTPREPARER NAME:Dave KijowskiPREPARER TELEPHONE:815-416-4227UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8942. Maximum Dependable Capacity (MWe-Net)870720.006,551.00305,229.74 720.006,551.00296,054.59 0.000.004.00 655,673.006,018,094.00214,669,843.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
On August 28, at approximately 1600 hours, load was reduced to approximately 98% electrical due to an unplanned trip of the 2B Circ Water Pump. On August 29, at approximately 1200 hours, load was further reduced due to condenser limitations with the combination of warm intake temperatures and two circ water pump operation. Load was reduced to as low as 89% electrical during this period of warm weather and two pump operation. The unit remained at approximately 89% electrical operation for the remainder of the reporting period.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:              237                                                                PREPARER NAME:                 Dave Kijowski UNIT_NME:           Dresden Unit 2                                                     PREPARER TELEPHONE: 815-416-4227 RPT_PERIOD:         201309
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                             894
: 2. Maximum Dependable Capacity (MWe-Net)                 870 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                  720.00            6,551.00            305,229.74
: 4. Number of Hours Generator On-line                          720.00            6,551.00            296,054.59
: 5. Reserve Shutdown Hours                                    0.00              0.00                4.00
: 6. Net Electrical energy Generated (MWHrs)                    655,673.00        6,018,094.00        214,669,843.00 UNIT SHUTDOWNS Type                                                      Method of F: Forced            Duration                                Shutting              Cause - Corrective Action No.       Date        S: Scheduled            (Hours)             Reason 1            Down 2                          Comments


==SUMMARY==
==SUMMARY==
Entering the month, unit load was at approximately 89% electrical due to an unplanned trip of the 2B Circ Water Pump. On September 1, at approximately 1600 hours, the unit was returned to full power operation.On September 7, at approximately 2300 hours, load was reduced to approximately 78% electrical for a planned control rod pattern adjustment. On September 8, at approximately 1000 hours, the unit returned to full power operation.On September 21, at approximately 2200 hours, load was reduced to approximately 86% electrical for a planned control rod pattern adjustment. On September 22, at approximately 0100 hours, the unit returned to full power operation.With the exception of short periods for routine maintenance and surveillances, Unit 2 operated at full power for the remainder of the reporting period.
Entering the month, unit load was at approximately 89% electrical due to an unplanned trip of the 2B Circ Water Pump. On September 1, at approximately 1600 hours, the unit was returned to full power operation.
RPT_PERIOD:201307UNIT_NME:Dresden Unit 3               DOCKET:249OPERATING DATA REPORTPREPARER NAME:Dave KijowskiPREPARER TELEPHONE:815-416-4227UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8792. Maximum Dependable Capacity (MWe-Net)850744.005,087.00291,325.05 744.005,087.00282,828.15 0.000.001.00 676,259.004,672,982.00204,775,455.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
On September 7, at approximately 2300 hours, load was reduced to approximately 78% electrical for a planned control rod pattern adjustment.
: 4. Number of Hours Generator On-line
On September 8, at approximately 1000 hours, the unit returned to full power operation.
: 5. Reserve Shutdown Hours
On September 21, at approximately 2200 hours, load was reduced to approximately 86% electrical for a planned control rod pattern adjustment.
: 6. Net Electrical energy Generated (MWHrs)
On September 22, at approximately 0100 hours, the unit returned to full power operation.
With the exception of short periods for routine maintenance and surveillances, Unit 2 operated at full power for the remainder of the reporting period.
 
OPERATING DATA REPORT DOCKET:            249                                                          PREPARER NAME:                 Dave Kijowski UNIT_NME:           Dresden Unit 3                                               PREPARER TELEPHONE: 815-416-4227 RPT_PERIOD:         201307
: 1. Design Electrical Rating:                       879
: 2. Maximum Dependable Capacity (MWe-Net)           850 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical            744.00            5,087.00            291,325.05
: 4. Number of Hours Generator On-line                    744.00            5,087.00            282,828.15
: 5. Reserve Shutdown Hours                              0.00              0.00                1.00
: 6. Net Electrical energy Generated (MWHrs)              676,259.00        4,672,982.00        204,775,455.00 UNIT SHUTDOWNS Type                                                Method of F: Forced        Duration                              Shutting              Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1            Down 2                          Comments


==SUMMARY==
==SUMMARY==
With the exception of short periods for routine maintenance and surveillances, Unit 3 operated at full power for the reporting period.
With the exception of short periods for routine maintenance and surveillances, Unit 3 operated at full power for the reporting period.
RPT_PERIOD:201308UNIT_NME:Dresden Unit 3               DOCKET:249OPERATING DATA REPORTPREPARER NAME:Dave KijowskiPREPARER TELEPHONE:815-416-4227UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8792. Maximum Dependable Capacity (MWe-Net)850744.005,831.00292,069.05 744.005,831.00283,572.15 0.000.001.00 675,205.005,348,187.00205,450,660.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              249                                                              PREPARER NAME:                 Dave Kijowski UNIT_NME:           Dresden Unit 3                                                   PREPARER TELEPHONE: 815-416-4227 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           879
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               850 This Month        Yr-to-Date            Cumulative
: 3. Number of Hours the Reactor was Critical                744.00            5,831.00              292,069.05
: 4. Number of Hours Generator On-line                        744.00            5,831.00              283,572.15
: 5. Reserve Shutdown Hours                                  0.00              0.00                  1.00
: 6. Net Electrical energy Generated (MWHrs)                  675,205.00        5,348,187.00          205,450,660.00 UNIT SHUTDOWNS Type                                                    Method of F: Forced          Duration                                Shutting              Cause - Corrective Action No.       Date        S: Scheduled          (Hours)           Reason 1              Down 2                          Comments


==SUMMARY==
==SUMMARY==
On August 31, at approximately 2200 hours, load was reduced to approximately 66% electrical for planned turbine valve testing and control rod pattern adjustment. The unit was operating at approximately 70% electrical at the end of the reporting period.
On August 31, at approximately 2200 hours, load was reduced to approximately 66% electrical for planned turbine valve testing and control rod pattern adjustment. The unit was operating at approximately 70% electrical at the end of the reporting period.
RPT_PERIOD:201309UNIT_NME:Dresden Unit 3               DOCKET:249OPERATING DATA REPORTPREPARER NAME:Dave KijowskiPREPARER TELEPHONE:815-416-4227UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8792. Maximum Dependable Capacity (MWe-Net)850720.006,551.00292,789.05 720.006,551.00284,292.15 0.000.001.00 654,286.006,002,473.00206,104,946.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              249                                                                PREPARER NAME:                 Dave Kijowski UNIT_NME:           Dresden Unit 3                                                     PREPARER TELEPHONE: 815-416-4227 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                             879
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)                 850 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                  720.00            6,551.00            292,789.05
: 4. Number of Hours Generator On-line                          720.00            6,551.00            284,292.15
: 5. Reserve Shutdown Hours                                    0.00              0.00                1.00
: 6. Net Electrical energy Generated (MWHrs)                    654,286.00        6,002,473.00        206,104,946.00 UNIT SHUTDOWNS Type                                                      Method of F: Forced            Duration                                Shutting              Cause - Corrective Action No.       Date        S: Scheduled            (Hours)             Reason 1            Down 2                          Comments


==SUMMARY==
==SUMMARY==
Entering the month, unit load was at approximately 70% electrical for planned turbine valve testing and control rod pattern adjustment. On September 1, at approximately 1300 hours, the unit was returned to full power operation.With the exception of short periods for routine maintenance and surveillances, Unit 3 operated at full power for the remainder of the reporting period.
Entering the month, unit load was at approximately 70% electrical for planned turbine valve testing and control rod pattern adjustment. On September 1, at approximately 1300 hours, the unit was returned to full power operation.
RPT_PERIOD:201307UNIT_NME:Duane Arnold Unit 1           DOCKET:331OPERATING DATA REPORTPREPARER NAME:Wendell HorstPREPARER TELEPHONE:319 851-7359UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:621.92. Maximum Dependable Capacity (MWe-Net)601.6744.005,087.00280,212.11 744.005,087.00275,254.47 0.000.00192.80 447,623.963,097,483.69138,115,281.87This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
With the exception of short periods for routine maintenance and surveillances, Unit 3 operated at full power for the remainder of the reporting period.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:             331                                                    PREPARER NAME:           Wendell Horst UNIT_NME:          Duane Arnold Unit 1                                     PREPARER TELEPHONE: 319 851-7359 RPT_PERIOD:         201307
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                     621.9
: 2. Maximum Dependable Capacity (MWe-Net)         601.6 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          5,087.00        280,212.11
: 4. Number of Hours Generator On-line                744.00          5,087.00        275,254.47
: 5. Reserve Shutdown Hours                            0.00            0.00            192.80
: 6. Net Electrical energy Generated (MWHrs)          447,623.96      3,097,483.69    138,115,281.87 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                  Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201308UNIT_NME:Duane Arnold Unit 1           DOCKET:331OPERATING DATA REPORTPREPARER NAME:Wendell HorstPREPARER TELEPHONE:319 851-7359UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:621.92. Maximum Dependable Capacity (MWe-Net)601.6744.005,831.00280,956.11 744.005,831.00275,998.47 0.000.00192.80 447,146.623,544,630.31138,562,428.49This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            331                                                        PREPARER NAME:             Wendell Horst UNIT_NME:           Duane Arnold Unit 1                                       PREPARER TELEPHONE: 319 851-7359 RPT_PERIOD:         201308
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     621.9
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         601.6 This Month      Yr-to-Date          Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          5,831.00            280,956.11
: 4. Number of Hours Generator On-line                744.00          5,831.00            275,998.47
: 5. Reserve Shutdown Hours                            0.00            0.00                192.80
: 6. Net Electrical energy Generated (MWHrs)          447,146.62      3,544,630.31        138,562,428.49 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
The unplanned energy loss in August 2013 was due to problems with the feedwater LEFM flow indicators.
The unplanned energy loss in August 2013 was due to problems with the feedwater LEFM flow indicators.
RPT_PERIOD:201309UNIT_NME:Duane Arnold Unit 1           DOCKET:331OPERATING DATA REPORTPREPARER NAME:Wendell HorstPREPARER TELEPHONE:319 851-7359UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:621.92. Maximum Dependable Capacity (MWe-Net)601.6720.006,551.00281,676.11 720.006,551.00276,718.47 0.000.00192.80 430,065.003,974,695.31138,992,493.49This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            331                                                              PREPARER NAME:             Wendell Horst UNIT_NME:           Duane Arnold Unit 1                                             PREPARER TELEPHONE: 319 851-7359 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                         621.9
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)             601.6 This Month        Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical                720.00            6,551.00        281,676.11
: 4. Number of Hours Generator On-line                        720.00            6,551.00        276,718.47
: 5. Reserve Shutdown Hours                                  0.00              0.00            192.80
: 6. Net Electrical energy Generated (MWHrs)                  430,065.00        3,974,695.31    138,992,493.49 UNIT SHUTDOWNS Type                                                    Method of F: Forced          Duration                                Shutting          Cause - Corrective Action No.       Date        S: Scheduled        (Hours)             Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
Unplanned energy loss in September 2013 was a result of a minor downpower to restore Reactor Water Cleanup following repair of MO2701, RWCU Supply Outboard Isolation, which failed to close when demanded. PEL was due to the quarterly surveillance and control rod sequence exchange downpower, and repair of a lube oil leak on Reactor Feedwater Pump B.
Unplanned energy loss in September 2013 was a result of a minor downpower to restore Reactor Water Cleanup following repair of MO2701, RWCU Supply Outboard Isolation, which failed to close when demanded. PEL was due to the quarterly surveillance and control rod sequence exchange downpower, and repair of a lube oil leak on Reactor Feedwater Pump B.
RPT_PERIOD:201307UNIT_NME:Farley Unit 1                 DOCKET:348OPERATING DATA REPORTPREPARER NAME:Khris MillerPREPARER TELEPHONE:334-814-4549UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8542. Maximum Dependable Capacity (MWe-Net)874744.005,043.55266,900.26 744.005,033.30264,172.00 0.000.000.00 648,345.004,438,273.00214,655,579.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            348                                                        PREPARER NAME:           Khris Miller UNIT_NME:           Farley Unit 1                                             PREPARER TELEPHONE: 334-814-4549 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     854
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         874 This Month        Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            5,043.55        266,900.26
: 4. Number of Hours Generator On-line                  744.00            5,033.30        264,172.00
: 5. Reserve Shutdown Hours                            0.00              0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            648,345.00        4,438,273.00    214,655,579.00 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
There were no significant power reductions this period.
There were no significant power reductions this period.
RPT_PERIOD:201308UNIT_NME:Farley Unit 1                 DOCKET:348OPERATING DATA REPORTPREPARER NAME:Khris MillerPREPARER TELEPHONE:334-814-4549UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8542. Maximum Dependable Capacity (MWe-Net)874744.005,787.55267,644.26 744.005,777.30264,916.00 0.000.000.00 646,171.005,084,444.00215,301,750.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            348                                                        PREPARER NAME:           Khris Miller UNIT_NME:           Farley Unit 1                                             PREPARER TELEPHONE: 334-814-4549 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     854
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         874 This Month        Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            5,787.55        267,644.26
: 4. Number of Hours Generator On-line                  744.00            5,777.30        264,916.00
: 5. Reserve Shutdown Hours                            0.00              0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            646,171.00        5,084,444.00    215,301,750.00 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
There were no significant power reductions this period.
There were no significant power reductions this period.
RPT_PERIOD:201309UNIT_NME:Farley Unit 1                 DOCKET:348OPERATING DATA REPORTPREPARER NAME:Khris MillerPREPARER TELEPHONE:334-814-4549UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8542. Maximum Dependable Capacity (MWe-Net)874678.836,466.38268,323.09 677.786,455.08265,593.78 0.000.000.00 558,087.005,642,531.00215,859,837.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            348                                                          PREPARER NAME:             Khris Miller UNIT_NME:           Farley Unit 1                                                 PREPARER TELEPHONE: 334-814-4549 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       854
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           874 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical            678.83            6,466.38          268,323.09
: 4. Number of Hours Generator On-line                    677.78            6,455.08          265,593.78
: 5. Reserve Shutdown Hours                              0.00              0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)              558,087.00        5,642,531.00      215,859,837.00 UNIT SHUTDOWNS Type                                                Method of F: Forced        Duration                              Shutting            Cause - Corrective Action No.       Date        S: Scheduled        (Hours)            Reason 1            Down 2                      Comments 25      9/29/2013            S              42.22                C                  1          At 1359 on September 12, 2013 Unit 1 began to ramp down prior to the normal refueling outage U1R25. The Unit was removed from the grid at 0547 on September 29, 2013. The reactor was shut down at 0650 on September 29, 2013.


==SUMMARY==
==SUMMARY==
At 1359 on September 12, 2013 Unit 1 began to ramp down prior to the normal refueling outage U1R25. The Unit was removed from the grid at 0547 on September 29, 2013. The reactor was shut down at 0650 on September 29, 2013.259/29/2013S  42.22C1At 1359 on September 12, 2013 Unit 1 began to ramp down prior to the normal refueling outage U1R25. The Unit was removed from the grid at 0547 on September 29, 2013. The reactor was shut down at 0650 on September 29, 2013.
At 1359 on September 12, 2013 Unit 1 began to ramp down prior to the normal refueling outage U1R25. The Unit was removed from the grid at 0547 on September 29, 2013. The reactor was shut down at 0650 on September 29, 2013.
RPT_PERIOD:201307UNIT_NME:Farley Unit 2                 DOCKET:364OPERATING DATA REPORTPREPARER NAME:Khris MillerPREPARER TELEPHONE:334-814-4549UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8552. Maximum Dependable Capacity (MWe-Net)883744.004,503.08249,507.85 744.004,469.25247,004.56 0.000.000.00 652,036.003,818,528.00202,647,981.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            364                                                        PREPARER NAME:           Khris Miller UNIT_NME:           Farley Unit 2                                             PREPARER TELEPHONE: 334-814-4549 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     855
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         883 This Month        Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            4,503.08        249,507.85
: 4. Number of Hours Generator On-line                  744.00            4,469.25        247,004.56
: 5. Reserve Shutdown Hours                            0.00              0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            652,036.00        3,818,528.00    202,647,981.00 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
There were no significant power reductions this period.
There were no significant power reductions this period.
RPT_PERIOD:201308UNIT_NME:Farley Unit 2                 DOCKET:364OPERATING DATA REPORTPREPARER NAME:Khris MillerPREPARER TELEPHONE:334-814-4549UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8552. Maximum Dependable Capacity (MWe-Net)883744.005,247.08250,251.85 744.005,213.25247,748.56 0.000.000.00 650,557.004,469,085.00203,298,538.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            364                                                        PREPARER NAME:           Khris Miller UNIT_NME:           Farley Unit 2                                             PREPARER TELEPHONE: 334-814-4549 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     855
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         883 This Month        Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            5,247.08        250,251.85
: 4. Number of Hours Generator On-line                  744.00            5,213.25        247,748.56
: 5. Reserve Shutdown Hours                            0.00              0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            650,557.00        4,469,085.00    203,298,538.00 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
There were no significant power reductions this period.
There were no significant power reductions this period.
RPT_PERIOD:201309UNIT_NME:Farley Unit 2                 DOCKET:364OPERATING DATA REPORTPREPARER NAME:Khris MillerPREPARER TELEPHONE:334-814-4549UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8552. Maximum Dependable Capacity (MWe-Net)883720.005,967.08250,971.85 720.005,933.25248,468.56 0.000.000.00 632,876.005,101,961.00203,931,414.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            364                                                        PREPARER NAME:           Khris Miller UNIT_NME:           Farley Unit 2                                             PREPARER TELEPHONE: 334-814-4549 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     855
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         883 This Month        Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          720.00            5,967.08        250,971.85
: 4. Number of Hours Generator On-line                  720.00            5,933.25        248,468.56
: 5. Reserve Shutdown Hours                            0.00              0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            632,876.00        5,101,961.00    203,931,414.00 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
There were no significant power reductions this period.
There were no significant power reductions this period.
RPT_PERIOD:201307UNIT_NME:Fermi Unit 2                  DOCKET:341OPERATING DATA REPORTPREPARER NAME:E. SorgPREPARER TELEPHONE:734-586-4294UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11502. Maximum Dependable Capacity (MWe-Net)1037.3744.004,783.68180,842.43 744.004,745.58175,956.65 0.000.000.00 522,400.003,386,990.00179,939,590.92This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             341                                                    PREPARER NAME:           E. Sorg UNIT_NME:          Fermi Unit 2                                            PREPARER TELEPHONE: 734-586-4294 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1150
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1037.3 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          4,783.68        180,842.43
: 4. Number of Hours Generator On-line                744.00          4,745.58        175,956.65
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          522,400.00      3,386,990.00    179,939,590.92 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
The unit operated at 68% power the entire month.
The unit operated at 68% power the entire month.
RPT_PERIOD:201308UNIT_NME:Fermi Unit 2                  DOCKET:341OPERATING DATA REPORTPREPARER NAME:E. SorgPREPARER TELEPHONE:734-586-4294UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11502. Maximum Dependable Capacity (MWe-Net)1037.3744.005,527.68181,586.43 744.005,489.58176,700.65 0.000.000.00 526,801.003,913,791.00180,466,391.92This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             341                                                          PREPARER NAME:               E. Sorg UNIT_NME:            Fermi Unit 2                                                  PREPARER TELEPHONE: 734-586-4294 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                         1150
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)             1037.3 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical              744.00            5,527.68            181,586.43
: 4. Number of Hours Generator On-line                    744.00            5,489.58            176,700.65
: 5. Reserve Shutdown Hours                                0.00              0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)              526,801.00        3,913,791.00        180,466,391.92 UNIT SHUTDOWNS Type                                                Method of F: Forced          Duration                            Shutting              Cause - Corrective Action No.       Date        S: Scheduled          (Hours)         Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
The unit operated at approximately 68% for the entire month of August with the following exceptions:8/6/13 2057 to 2129: Planned power change from 68% to 62% for Turbine Control Valve vibration measurement.8/27/13 0207 to 0225: Planned power change from 68% to 65% for HCU maintenance.8/30/13 2330 to 8/31/13 0129: Planned power change from 68% to 62% for scram time testing.
The unit operated at approximately 68% for the entire month of August with the following exceptions:
RPT_PERIOD:201309UNIT_NME:Fermi Unit 2                  DOCKET:341OPERATING DATA REPORTPREPARER NAME:E. SorgPREPARER TELEPHONE:734-586-4294UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11502. Maximum Dependable Capacity (MWe-Net)1037.3409.425,937.10181,995.85 364.485,854.06177,065.13 0.000.000.00 280,255.004,194,046.00180,746,646.92This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
8/6/13 2057 to 2129: Planned power change from 68% to 62% for Turbine Control Valve vibration measurement.
: 4. Number of Hours Generator On-line
8/27/13 0207 to 0225: Planned power change from 68% to 65% for HCU maintenance.
: 5. Reserve Shutdown Hours
8/30/13 2330 to 8/31/13 0129: Planned power change from 68% to 62% for scram time testing.
: 6. Net Electrical energy Generated (MWHrs)
 
OPERATING DATA REPORT DOCKET:             341                                                                PREPARER NAME:                 E. Sorg UNIT_NME:            Fermi Unit 2                                                        PREPARER TELEPHONE: 734-586-4294 RPT_PERIOD:         201309
: 1. Design Electrical Rating:                           1150
: 2. Maximum Dependable Capacity (MWe-Net)               1037.3 This Month          Yr-to-Date            Cumulative
: 3. Number of Hours the Reactor was Critical                409.42              5,937.10              181,995.85
: 4. Number of Hours Generator On-line                        364.48              5,854.06              177,065.13
: 5. Reserve Shutdown Hours                                  0.00                0.00                  0.00
: 6. Net Electrical energy Generated (MWHrs)                  280,255.00          4,194,046.00          180,746,646.92 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                                Shutting                Cause - Corrective Action No.       Date        S: Scheduled            (Hours)            Reason 1            Down 2                          Comments PO      9/9/2013              S                355.52                  B                    1            Planned shutdown to restore the South Reactor 13-02                                                                                                      Feed Pump turbine following repair and refurbishment.


==SUMMARY==
==SUMMARY==
The unit operated at 68% power until 9/8/2013 when a planned shutdown to Planned Outage (PO) 13-02 was commenced. The reactor was taken subcritical on 9/9/2013 at 0300. Following repairs the reactor was taken critical 9/22/13 at 0135, and the generator was synched to the Detroit Edison grid at 2231 on 9/23/13. Power ascension to 100% reactor power was completed on 9/30/2013 at 1440.PO 13-029/9/2013S  355.52B1Planned shutdown to restore the South Reactor Feed Pump turbine following repair and refurbishment.
The unit operated at 68% power until 9/8/2013 when a planned shutdown to Planned Outage (PO) 13-02 was commenced. The reactor was taken subcritical on 9/9/2013 at 0300. Following repairs the reactor was taken critical 9/22/13 at 0135, and the generator was synched to the Detroit Edison grid at 2231 on 9/23/13. Power ascension to 100% reactor power was completed on 9/30/2013 at 1440.
RPT_PERIOD:201307UNIT_NME:FitzPatrick Unit 1           DOCKET:333OPERATING DATA REPORTPREPARER NAME:Ryan PerryPREPARER TELEPHONE:3153496218UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8162. Maximum Dependable Capacity (MWe-Net)813744.004,990.00269,302.51 744.004,884.05263,346.39 0.000.000.00 605,447.003,920,964.00202,779,795.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            333                                                          PREPARER NAME:               Ryan Perry UNIT_NME:           FitzPatrick Unit 1                                           PREPARER TELEPHONE: 3153496218 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       816
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           813 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical            744.00            4,990.00            269,302.51
: 4. Number of Hours Generator On-line                    744.00            4,884.05            263,346.39
: 5. Reserve Shutdown Hours                              0.00              0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)              605,447.00        3,920,964.00        202,779,795.00 UNIT SHUTDOWNS Type                                                Method of F: Forced          Duration                              Shutting              Cause - Corrective Action No.       Date        S: Scheduled        (Hours)           Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
The plant operated at or near 100% power for the month of July with the exception of the following event:The downpower event was from 7/18/2013-7/19/2013 to approximately 47% power for Condenser tube leaks of the A1 waterbox.
The plant operated at or near 100% power for the month of July with the exception of the following event:
RPT_PERIOD:201308UNIT_NME:FitzPatrick Unit 1           DOCKET:333OPERATING DATA REPORTPREPARER NAME:Ryan PerryPREPARER TELEPHONE:3153496218UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8162. Maximum Dependable Capacity (MWe-Net)813744.005,734.00270,046.51 744.005,628.05264,090.39 0.000.000.00 591,499.004,512,463.00203,371,294.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
The downpower event was from 7/18/2013-7/19/2013 to approximately 47% power for Condenser tube leaks of the A1 waterbox.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:            333                                                            PREPARER NAME:             Ryan Perry UNIT_NME:           FitzPatrick Unit 1                                             PREPARER TELEPHONE: 3153496218 RPT_PERIOD:         201308
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                       816
: 2. Maximum Dependable Capacity (MWe-Net)           813 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical            744.00            5,734.00          270,046.51
: 4. Number of Hours Generator On-line                    744.00            5,628.05          264,090.39
: 5. Reserve Shutdown Hours                              0.00              0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)              591,499.00        4,512,463.00      203,371,294.00 UNIT SHUTDOWNS Type                                                Method of F: Forced          Duration                              Shutting            Cause - Corrective Action No.       Date        S: Scheduled        (Hours)           Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
The plant operated at or near 100% power for the month of August with the exception of the following event:The downpower event was from 8/23/2013-8/24/2013 to approximately 48.5% power for Condenser tube leaks.
The plant operated at or near 100% power for the month of August with the exception of the following event:
RPT_PERIOD:201309UNIT_NME:FitzPatrick Unit 1           DOCKET:333OPERATING DATA REPORTPREPARER NAME:Ryan PerryPREPARER TELEPHONE:315-349-6218UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8162. Maximum Dependable Capacity (MWe-Net)813720.006,454.00270,766.51 720.006,348.05264,810.39 0.000.000.00 521,285.005,033,748.00203,892,579.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
The downpower event was from 8/23/2013-8/24/2013 to approximately 48.5% power for Condenser tube leaks.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:            333                                                            PREPARER NAME:             Ryan Perry UNIT_NME:           FitzPatrick Unit 1                                             PREPARER TELEPHONE: 315-349-6218 RPT_PERIOD:         201309
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                       816
: 2. Maximum Dependable Capacity (MWe-Net)           813 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical              720.00            6,454.00            270,766.51
: 4. Number of Hours Generator On-line                    720.00            6,348.05            264,810.39
: 5. Reserve Shutdown Hours                                0.00              0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)              521,285.00        5,033,748.00        203,892,579.00 UNIT SHUTDOWNS Type                                                Method of F: Forced          Duration                                Shutting            Cause - Corrective Action No.       Date        S: Scheduled        (Hours)           Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
The plant operated at or near 100% power for the month of September with the exception of the following event:The downpower event was from 9/6/2013 to 9/13/2013 to approximately 48% for 'B' Reactor Feedpump repairs.
The plant operated at or near 100% power for the month of September with the exception of the following event:
RPT_PERIOD:201307UNIT_NME:Fort Calhoun Unit 1           DOCKET:285OPERATING DATA REPORTPREPARER NAME:Jake WalkerPREPARER TELEPHONE:402-533-6693UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:5022. Maximum Dependable Capacity (MWe-Net)4820.000.00270,885.19 0.000.00269,363.34 0.000.000.00 0.000.00119,655,821.80This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
The downpower event was from 9/6/2013 to 9/13/2013 to approximately 48% for 'B' Reactor Feedpump repairs.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:            285                                                              PREPARER NAME:               Jake Walker UNIT_NME:           Fort Calhoun Unit 1                                             PREPARER TELEPHONE: 402-533-6693 RPT_PERIOD:         201307
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                         502
: 2. Maximum Dependable Capacity (MWe-Net)             482 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical             0.00                0.00              270,885.19
: 4. Number of Hours Generator On-line                     0.00                0.00              269,363.34
: 5. Reserve Shutdown Hours                               0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)               0.00                0.00              119,655,821.80 UNIT SHUTDOWNS Type                                                  Method of F: Forced          Duration                                Shutting              Cause - Corrective Action No.      Date        S: Scheduled          (Hours)          Reason 1              Down 2                          Comments 2011-  4/9/2011            S                744.00                C                    4            Shutdown for Cycle 26 End of Cycle RFO. No corrective actions necessary.


==SUMMARY==
==SUMMARY==
FCS remained shutdown through July 2013. Flood recovery and IMC 0350 activities are on-going. The plant will remain shutdown until flood recovery and NRC Inspection Manual Chapter 0350 activities are complete. Due to being placed in NRC Inspection Manual Chapter 0350, all hours spent shutdown are considered Unplanned Energy Loss - Outage Extension until Chapter 0350 activities are complete.2011-4/9/2011S  744.00C4Shutdown for Cycle 26 End of Cycle RFO. No corrective actions necessary.
FCS remained shutdown through July 2013. Flood recovery and IMC 0350 activities are on-going. The plant will remain shutdown until flood recovery and NRC Inspection Manual Chapter 0350 activities are complete. Due to being placed in NRC Inspection Manual Chapter 0350, all hours spent shutdown are considered Unplanned Energy Loss - Outage Extension until Chapter 0350 activities are complete.
RPT_PERIOD:201308UNIT_NME:Fort Calhoun Unit 1           DOCKET:285OPERATING DATA REPORTPREPARER NAME:Jake WalkerPREPARER TELEPHONE:402-533-6693UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:5022. Maximum Dependable Capacity (MWe-Net)4820.000.00270,885.19 0.000.00269,363.34 0.000.000.00 0.000.00119,655,821.80This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             285                                                              PREPARER NAME:               Jake Walker UNIT_NME:          Fort Calhoun Unit 1                                             PREPARER TELEPHONE: 402-533-6693 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                         502
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)             482 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical             0.00                0.00              270,885.19
: 4. Number of Hours Generator On-line                     0.00                0.00              269,363.34
: 5. Reserve Shutdown Hours                               0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)               0.00                0.00              119,655,821.80 UNIT SHUTDOWNS Type                                                  Method of F: Forced          Duration                                Shutting              Cause - Corrective Action No.      Date        S: Scheduled          (Hours)          Reason 1              Down 2                          Comments 2011-  4/9/2011            S                744.00                C                    4            Shutdown for Cycle 26 End of Cycle RFO. No corrective actions necessary.


==SUMMARY==
==SUMMARY==
FCS remained shutdown through August 2013. Flood recovery and IMC 0350 activities are on-going. The plant will remain shutdown until flood recovery and NRC Inspection Manual Chapter 0350 activities are complete. Due to being placed in NRC Inspection Manual Chapter 0350, all hours spent shutdown are considered Unplanned Energy Loss - Outage Extension until Chapter 0350 activities are complete.2011-4/9/2011S  744.00C4Shutdown for Cycle 26 End of Cycle RFO. No corrective actions necessary.
FCS remained shutdown through August 2013. Flood recovery and IMC 0350 activities are on-going. The plant will remain shutdown until flood recovery and NRC Inspection Manual Chapter 0350 activities are complete. Due to being placed in NRC Inspection Manual Chapter 0350, all hours spent shutdown are considered Unplanned Energy Loss - Outage Extension until Chapter 0350 activities are complete.
RPT_PERIOD:201309UNIT_NME:Fort Calhoun Unit 1           DOCKET:285OPERATING DATA REPORTPREPARER NAME:Jake WalkerPREPARER TELEPHONE:402-533-6693UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:5022. Maximum Dependable Capacity (MWe-Net)4820.000.00270,885.19 0.000.00269,363.34 0.000.000.00 0.000.00119,655,821.80This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              285                                                            PREPARER NAME:               Jake Walker UNIT_NME:           Fort Calhoun Unit 1                                             PREPARER TELEPHONE: 402-533-6693 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           502
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               482 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical               0.00              0.00                270,885.19
: 4. Number of Hours Generator On-line                       0.00              0.00                269,363.34
: 5. Reserve Shutdown Hours                                 0.00              0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)                 0.00              0.00                119,655,821.80 UNIT SHUTDOWNS Type                                                  Method of F: Forced          Duration                              Shutting              Cause - Corrective Action No.      Date          S: Scheduled          (Hours)          Reason 1            Down 2                          Comments 2011-  4/9/2011              S                720.00              C                    4          Shutdown for Cycle 26 End of Cycle RFO. No corrective actions necessary.


==SUMMARY==
==SUMMARY==
FCS remained shutdown through September 2013. Flood recovery and IMC 0350 activities are on-going. The plant will remain shutdown until flood recovery and NRC Inspection Manual Chapter 0350 activities are complete. Due to being placed in NRC Inspection Manual Chapter 0350, all hours spent shutdown are considered Unplanned Energy Loss - Outage Extension until Chapter 0350 activities are complete.2011-4/9/2011S  720.00C4Shutdown for Cycle 26 End of Cycle RFO. No corrective actions necessary.
FCS remained shutdown through September 2013. Flood recovery and IMC 0350 activities are on-going. The plant will remain shutdown until flood recovery and NRC Inspection Manual Chapter 0350 activities are complete. Due to being placed in NRC Inspection Manual Chapter 0350, all hours spent shutdown are considered Unplanned Energy Loss - Outage Extension until Chapter 0350 activities are complete.
RPT_PERIOD:201307UNIT_NME:Ginna Unit 1                  DOCKET:244OPERATING DATA REPORTPREPARER NAME:John V. WaldenPREPARER TELEPHONE:585-771-3588UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:5852. Maximum Dependable Capacity (MWe-Net)560666.035,009.03326,749.25 651.784,994.78323,285.39 0.000.008.50 363,934.792,886,433.68154,693,996.11This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             244                                                                    PREPARER NAME:               John V. Walden UNIT_NME:            Ginna Unit 1                                                          PREPARER TELEPHONE: 585-771-3588 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                             585
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)                 560 This Month            Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                  666.03                5,009.03            326,749.25
: 4. Number of Hours Generator On-line                        651.78                4,994.78            323,285.39
: 5. Reserve Shutdown Hours                                    0.00                  0.00                8.50
: 6. Net Electrical energy Generated (MWHrs)                  363,934.79            2,886,433.68        154,693,996.11 UNIT SHUTDOWNS Type                                                        Method of F: Forced            Duration                                    Shutting              Cause - Corrective Action No.       Date        S: Scheduled            (Hours)            Reason 1                Down 2                          Comments 1      7/24/2013            F                  92.22                  B                      3          The reactor trip was caused by an unexpected generator trip during positive VAR testing. A generator protection relay trip setpoint was programmed incorrectly during the 2012 refueling outage. LER 2013-002 was submitted on this event. Reprogramming of the generator protection relay was performed to remove the trip function.


==SUMMARY==
==SUMMARY==
The unit operated at full power from the beginning of the month until July 23, 2013 at 1419, when the main generator tripped during positive VAR testing. The generator trip caused a turbine trip and reactor trip from full power. The reactor criticality was achieved on July 27, 2013 at 2017 following generator protection relay reprogramming to remove the trip function. The unit was brought on-line on July 28, 2013 at 1032. Full power operations resumed on July 29, 2013 at 0500 and continued through the end of the month.17/24/2013F  92.22B3The reactor trip was caused by an unexpected generator trip during positive VAR testing. A generator protection relay trip setpoint was programmed incorrectly during the 2012 refueling outage. LER 2013-002 was submitted on this event. Reprogramming of the generator protection relay was performed to remove the trip function.
The unit operated at full power from the beginning of the month until July 23, 2013 at 1419, when the main generator tripped during positive VAR testing. The generator trip caused a turbine trip and reactor trip from full power. The reactor criticality was achieved on July 27, 2013 at 2017 following generator protection relay reprogramming to remove the trip function. The unit was brought on-line on July 28, 2013 at 1032. Full power operations resumed on July 29, 2013 at 0500 and continued through the end of the month.
RPT_PERIOD:201308UNIT_NME:Ginna Unit 1                  DOCKET:244OPERATING DATA REPORTPREPARER NAME:John V. WaldenPREPARER TELEPHONE:585-771-3588UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:5852. Maximum Dependable Capacity (MWe-Net)560744.005,753.03327,493.25 744.005,738.78324,029.39 0.000.008.50 418,662.663,305,096.34155,112,658.77This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             244                                                          PREPARER NAME:             John V. Walden UNIT_NME:          Ginna Unit 1                                                  PREPARER TELEPHONE: 585-771-3588 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                         585
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)             560 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical              744.00            5,753.03            327,493.25
: 4. Number of Hours Generator On-line                    744.00            5,738.78            324,029.39
: 5. Reserve Shutdown Hours                                0.00              0.00                8.50
: 6. Net Electrical energy Generated (MWHrs)              418,662.66        3,305,096.34        155,112,658.77 UNIT SHUTDOWNS Type                                                Method of F: Forced        Duration                              Shutting            Cause - Corrective Action No.       Date        S: Scheduled        (Hours)           Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
The unit operated at full power for the entire month of August. Average power for the month was 99.8%.
The unit operated at full power for the entire month of August. Average power for the month was 99.8%.
RPT_PERIOD:201309UNIT_NME:Ginna Unit 1                  DOCKET:244OPERATING DATA REPORTPREPARER NAME:John V. WaldenPREPARER TELEPHONE:585-771-3588UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:5852. Maximum Dependable Capacity (MWe-Net)560720.006,473.03328,213.25 720.006,458.78324,749.39 0.000.008.50 407,739.323,712,835.66155,520,398.09This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             244                                                          PREPARER NAME:             John V. Walden UNIT_NME:          Ginna Unit 1                                                  PREPARER TELEPHONE: 585-771-3588 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                         585
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)             560 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical              720.00            6,473.03          328,213.25
: 4. Number of Hours Generator On-line                    720.00            6,458.78          324,749.39
: 5. Reserve Shutdown Hours                                0.00              0.00              8.50
: 6. Net Electrical energy Generated (MWHrs)              407,739.32        3,712,835.66      155,520,398.09 UNIT SHUTDOWNS Type                                                Method of F: Forced        Duration                              Shutting            Cause - Corrective Action No.       Date        S: Scheduled        (Hours)           Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
The unit operated at full power for the entire month of September. Average power for the month was 99.9%.
The unit operated at full power for the entire month of September. Average power for the month was 99.9%.
RPT_PERIOD:201307UNIT_NME:Grand Gulf Unit 1            DOCKET:416OPERATING DATA REPORTPREPARER NAME:Allison HughesPREPARER TELEPHONE:601-437-7341UNIT SHUTDOWNSNo.DateTypeF:  ForcedS:  ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12792. Maximum Dependable Capacity (MWe-Net)1266710.534,675.43221,880.84 710.534,602.80217,270.69 0.000.000.00 978,908.006,403,037.00257,885,313.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
: 4. Number of Hours Generator On-line
: 5. Reserve Shutdown Hours
: 6. Net Electrical energy Generated (MWHrs)


==SUMMARY==
OPERATING DATA REPORT DOCKET:              416                                                            PREPARER NAME:                Allison Hughes UNIT_NME:            Grand Gulf Unit 1                                              PREPARER TELEPHONE: 601-437-7341 RPT_PERIOD:          201307
The plant continues to operate at EPU power. However a performance test has not been performed and a new Reference Unit Power (RUP) has not been determined. Losses during the month were corrected to the RUP using a ratio of the previous license power (3898) to the current license power (4408).2013-037/30/2013F  33.47A3At 14:32 on July 30, 2012, GGNS experienced an unexpected Reactor Scram. At the time, the plant was operating at 100% Rated Core Thermal Power. The scram occurred shortly after the Turbine Stress Evaluator (TSE) was turned on. I C turned the TSE on and the TSE-INFL alarm in the control room cleared. LOAD-LTD was noted to be dropping after the TSE was turned on.
: 1. Design Electrical Rating:                          1279
: 2. Maximum Dependable Capacity (MWe-Net)             1266 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical              710.53              4,675.43          221,880.84
: 4. Number of Hours Generator On-line                    710.53              4,602.80          217,270.69
: 5. Reserve Shutdown Hours                                0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)               978,908.00          6,403,037.00      257,885,313.00 UNIT SHUTDOWNS Type                                                  Method of F: Forced          Duration                                Shutting              Cause - Corrective Action No.      Date        S: Scheduled          (Hours)           Reason 1              Down 2                          Comments 2013-   7/30/2013            F              33.47                A                    3            At 14:32 on July 30, 2012, GGNS experienced an 03                                                                                                    unexpected Reactor Scram. At the time, the plant was operating at 100% Rated Core Thermal Power. The scram occurred shortly after the Turbine Stress Evaluator (TSE) was turned on. I C turned the TSE on and the TSE-INFL alarm in the control room cleared. LOAD-LTD was noted to be dropping after the TSE was turned on.
Approximately one minute later, LOAD-ACTUAL was noted to be dropping and the reactor scrammed due to a turbine trip. The shift immediately entered EP-2 for Reactor Scram, the Reactor Scram ONEP, and Turbine Trip ONEP.
Approximately one minute later, LOAD-ACTUAL was noted to be dropping and the reactor scrammed due to a turbine trip. The shift immediately entered EP-2 for Reactor Scram, the Reactor Scram ONEP, and Turbine Trip ONEP.
RCIC initiated and injected during the transient.
RCIC initiated and injected during the transient.
However, no Level 2 alarms were received.
However, no Level 2 alarms were received.
Reactor levels were verified and RCIC was subsequently secured. All other systems operated as expected. The plant was stabilized with pressure control on the bypass valves, and level controlled on the startup level control valve.
Reactor levels were verified and RCIC was subsequently secured. All other systems operated as expected. The plant was stabilized with pressure control on the bypass valves, and level controlled on the startup level control valve.
RPT_PERIOD:201308UNIT_NME:Grand Gulf Unit 1            DOCKET:416OPERATING DATA REPORTPREPARER NAME:Andrew FoxPREPARER TELEPHONE:601 437-6204UNIT SHUTDOWNSNo.DateTypeF:  ForcedS:  ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12792. Maximum Dependable Capacity (MWe-Net)1266688.775,364.20222,569.61 657.185,259.98217,927.87 0.000.000.00 879,922.007,282,959.00258,765,235.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
: 4. Number of Hours Generator On-line
: 5. Reserve Shutdown Hours
: 6. Net Electrical energy Generated (MWHrs)


==SUMMARY==
==SUMMARY==
The plant continues to operate at EPU power. However a performance test has not been performed and a new Reference Unit Power (RUP) has not been determined. Losses during the month were corrected to the RUP using a ratio of the previous license power (3898) to the current license power (4408).2013-037/30/2013F  86.82A4At 14:32 on July 30, 2012, GGNS experienced an unexpected Reactor Scram. At the time, the plant was operating at 100% Rated Core Thermal Power. The scram occurred shortly after the Turbine Stress Evaluator (TSE) was turned on. I C turned the TSE on and the TSE-INFL alarm in the control room cleared. LOAD-LTD was noted to be dropping after the TSE was turned on.
The plant continues to operate at EPU power. However a performance test has not been performed and a new Reference Unit Power (RUP) has not been determined. Losses during the month were corrected to the RUP using a ratio of the previous license power (3898) to the current license power (4408).
 
OPERATING DATA REPORT DOCKET:              416                                                            PREPARER NAME:                Andrew Fox UNIT_NME:            Grand Gulf Unit 1                                              PREPARER TELEPHONE: 601 437-6204 RPT_PERIOD:          201308
: 1. Design Electrical Rating:                          1279
: 2. Maximum Dependable Capacity (MWe-Net)              1266 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical              688.77              5,364.20          222,569.61
: 4. Number of Hours Generator On-line                    657.18              5,259.98          217,927.87
: 5. Reserve Shutdown Hours                                0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)              879,922.00          7,282,959.00      258,765,235.00 UNIT SHUTDOWNS Type                                                  Method of F: Forced          Duration                                Shutting              Cause - Corrective Action No.      Date        S: Scheduled          (Hours)          Reason 1              Down 2                          Comments 2013-   7/30/2013            F              86.82                A                    4            At 14:32 on July 30, 2012, GGNS experienced an 03                                                                                                    unexpected Reactor Scram. At the time, the plant was operating at 100% Rated Core Thermal Power. The scram occurred shortly after the Turbine Stress Evaluator (TSE) was turned on. I C turned the TSE on and the TSE-INFL alarm in the control room cleared. LOAD-LTD was noted to be dropping after the TSE was turned on.
Approximately one minute later, LOAD-ACTUAL was noted to be dropping and the reactor scrammed due to a turbine trip. The shift immediately entered EP-2 for Reactor Scram, the Reactor Scram ONEP, and Turbine Trip ONEP.
Approximately one minute later, LOAD-ACTUAL was noted to be dropping and the reactor scrammed due to a turbine trip. The shift immediately entered EP-2 for Reactor Scram, the Reactor Scram ONEP, and Turbine Trip ONEP.
RCIC initiated and injected during the transient.
RCIC initiated and injected during the transient.
However, no Level 2 alarms were received.
However, no Level 2 alarms were received.
Reactor levels were verified and RCIC was subsequently secured. All other systems operated as expected. The plant was stabilized with pressure control on the bypass valves, and level controlled on the startup level control valve.
Reactor levels were verified and RCIC was subsequently secured. All other systems operated as expected. The plant was stabilized with pressure control on the bypass valves, and level controlled on the startup level control valve.
RPT_PERIOD:201309UNIT_NME:Grand Gulf Unit 1            DOCKET:416OPERATING DATA REPORTPREPARER NAME:Andrew FoxPREPARER TELEPHONE:601 437-6204UNIT SHUTDOWNSNo.DateTypeF:  ForcedS:  ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12792. Maximum Dependable Capacity (MWe-Net)1266720.006,084.20223,289.61 720.005,979.98218,647.87 0.000.000.00 990,253.008,273,212.00259,755,488.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
: 4. Number of Hours Generator On-line
: 5. Reserve Shutdown Hours
: 6. Net Electrical energy Generated (MWHrs)


==SUMMARY==
==SUMMARY==
The plant continues to operate at EPU power. However a performance test has not been performed and a new Reference Unit Power (RUP) has not been determined. Losses during the month were corrected to the RUP using a ratio of the previous license power (3898) to the current license power (4408).
The plant continues to operate at EPU power. However a performance test has not been performed and a new Reference Unit Power (RUP) has not been determined. Losses during the month were corrected to the RUP using a ratio of the previous license power (3898) to the current license power (4408).
RPT_PERIOD:201307UNIT_NME:Harris Unit 1                 DOCKET:400OPERATING DATA REPORTPREPARER NAME:John KellyPREPARER TELEPHONE:9193622194UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9732. Maximum Dependable Capacity (MWe-Net)928744.004,559.77204,056.66 744.004,540.17202,643.42 0.000.000.00 696,829.004,264,218.00176,974,126.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              416                                                            PREPARER NAME:               Andrew Fox UNIT_NME:           Grand Gulf Unit 1                                               PREPARER TELEPHONE: 601 437-6204 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                         1279
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)             1266 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical              720.00              6,084.20          223,289.61
: 4. Number of Hours Generator On-line                    720.00              5,979.98          218,647.87
: 5. Reserve Shutdown Hours                                0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)              990,253.00          8,273,212.00      259,755,488.00 UNIT SHUTDOWNS Type                                                  Method of F: Forced          Duration                                Shutting              Cause - Corrective Action No.      Date        S: Scheduled          (Hours)          Reason 1              Down 2                          Comments
 
==SUMMARY==
The plant continues to operate at EPU power. However a performance test has not been performed and a new Reference Unit Power (RUP) has not been determined. Losses during the month were corrected to the RUP using a ratio of the previous license power (3898) to the current license power (4408).
 
OPERATING DATA REPORT DOCKET:            400                                                    PREPARER NAME:          John Kelly UNIT_NME:          Harris Unit 1                                          PREPARER TELEPHONE: 9193622194 RPT_PERIOD:        201307
: 1. Design Electrical Rating:                    973
: 2. Maximum Dependable Capacity (MWe-Net)        928 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical         744.00          4,559.77        204,056.66
: 4. Number of Hours Generator On-line                 744.00          4,540.17        202,643.42
: 5. Reserve Shutdown Hours                           0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)           696,829.00      4,264,218.00    176,974,126.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.      Date        S: Scheduled      (Hours)        Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
There were no unit shutdowns in July 2013.
There were no unit shutdowns in July 2013.
RPT_PERIOD:201308UNIT_NME:Harris Unit 1                 DOCKET:400OPERATING DATA REPORTPREPARER NAME:John KellyPREPARER TELEPHONE:9193622194UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9732. Maximum Dependable Capacity (MWe-Net)928744.005,303.77204,800.66 711.805,251.97203,355.22 0.000.000.00 645,140.004,909,358.00177,619,266.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            400                                                        PREPARER NAME:             John Kelly UNIT_NME:           Harris Unit 1                                               PREPARER TELEPHONE: 9193622194 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     973
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         928 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            5,303.77            204,800.66
: 4. Number of Hours Generator On-line                  711.80            5,251.97            203,355.22
: 5. Reserve Shutdown Hours                            0.00              0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)            645,140.00        4,909,358.00        177,619,266.00 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                            Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)          Reason 1            Down 2                        Comments 61704 8/3/2013                S            32.20              H                  5          There was a planned unit shutdown to address 5                                                                                              increased vibrations for Low Pressure Turbine 2 bearing #5. A balance weight was installed which reduced vibrations. Additional corrective actions to address the bearing vibration will be documented in NCR 00617045


==SUMMARY==
==SUMMARY==
There was a planned unit shutdown to address increased vibrations for Low Pressure Turbine 2 Bearing #5. A balance weight was installed which reduced vibrations.61704 58/3/2013S  32.20H5There was a planned unit shutdown to address increased vibrations for Low Pressure Turbine 2 bearing #5. A balance weight was installed which reduced vibrations. Additional corrective actions to address the bearing vibration will be documented in NCR 00617045 RPT_PERIOD:201309UNIT_NME:Harris Unit 1                 DOCKET:400OPERATING DATA REPORTPREPARER NAME:Dustin MartinPREPARER TELEPHONE:9193622679UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9732. Maximum Dependable Capacity (MWe-Net)928720.006,023.77205,520.66 709.255,961.22204,064.47 0.000.000.00 656,853.005,566,211.00178,276,119.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
There was a planned unit shutdown to address increased vibrations for Low Pressure Turbine 2 Bearing #5. A balance weight was installed which reduced vibrations.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:            400                                                        PREPARER NAME:             Dustin Martin UNIT_NME:           Harris Unit 1                                               PREPARER TELEPHONE: 9193622679 RPT_PERIOD:         201309
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                     973
: 2. Maximum Dependable Capacity (MWe-Net)         928 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical          720.00            6,023.77            205,520.66
: 4. Number of Hours Generator On-line                  709.25            5,961.22            204,064.47
: 5. Reserve Shutdown Hours                            0.00              0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)            656,853.00        5,566,211.00        178,276,119.00 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                            Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)          Reason 1            Down 2                        Comments 62596 9/15/2013              S            10.75              H                  5          There was a planned unit shutdown to address 0                                                                                              increased vibrations for Low Pressure Turbine bearing #5. A balance weight was installed which reduced vibrations. Additional corrective actions to address the bearing vibration will be documented in NCR 00625960.


==SUMMARY==
==SUMMARY==
There was a planned unit shutdown to address increased vibrations for Low Pressure Turbine 2 Bearing #5. A balance weight was installed which reduced vibrations.62596 09/15/2013S  10.75H5There was a planned unit shutdown to address increased vibrations for Low Pressure Turbine bearing #5. A balance weight was installed which reduced vibrations. Additional corrective actions to address the bearing vibration will be documented in NCR 00625960.
There was a planned unit shutdown to address increased vibrations for Low Pressure Turbine 2 Bearing #5. A balance weight was installed which reduced vibrations.
RPT_PERIOD:201307UNIT_NME:Hatch Unit 1                 DOCKET:321OPERATING DATA REPORTPREPARER NAME:Ben MosleyPREPARER TELEPHONE:912-537-5872UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8852. Maximum Dependable Capacity (MWe-Net)876744.004,718.85276,791.47 744.004,683.02269,977.64 0.000.000.00 616,685.003,996,097.00207,945,108.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              321                                                              PREPARER NAME:           Ben Mosley UNIT_NME:           Hatch Unit 1                                                     PREPARER TELEPHONE: 912-537-5872 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           885
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               876 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                744.00              4,718.85          276,791.47
: 4. Number of Hours Generator On-line                      744.00              4,683.02          269,977.64
: 5. Reserve Shutdown Hours                                  0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                616,685.00          3,996,097.00      207,945,108.00 UNIT SHUTDOWNS Type                                                  Method of F: Forced          Duration                                Shutting            Cause - Corrective Action No.       Date        S: Scheduled            (Hours)           Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
Power was reduced to 65% in order to perform a power suppression test, turbine valve testing, control rod drive exercises and a rod sequence exchange on 07/03/2013. Upon completion of these activities, power was increased and subsequently decreased to 77% to perform an additional rod pattern adjustment on 07/08/2013. The unit was returned to rated thermal power on 07/09/2013. There were no additional significant generation loss events (>20%) for the remainder of the month.
Power was reduced to 65% in order to perform a power suppression test, turbine valve testing, control rod drive exercises and a rod sequence exchange on 07/03/2013. Upon completion of these activities, power was increased and subsequently decreased to 77% to perform an additional rod pattern adjustment on 07/08/2013. The unit was returned to rated thermal power on 07/09/2013. There were no additional significant generation loss events (>20%) for the remainder of the month.
RPT_PERIOD:201308UNIT_NME:Hatch Unit 1                 DOCKET:321OPERATING DATA REPORTPREPARER NAME:Ben MosleyPREPARER TELEPHONE:912-537-5872UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8852. Maximum Dependable Capacity (MWe-Net)876744.005,462.85277,535.47 744.005,427.02270,721.64 0.000.000.00 646,619.004,642,716.00208,591,727.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            321                                                        PREPARER NAME:           Ben Mosley UNIT_NME:           Hatch Unit 1                                               PREPARER TELEPHONE: 912-537-5872 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     885
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         876 This Month        Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            5,462.85        277,535.47
: 4. Number of Hours Generator On-line                  744.00            5,427.02        270,721.64
: 5. Reserve Shutdown Hours                            0.00              0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            646,619.00        4,642,716.00    208,591,727.00 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                    Comments


==SUMMARY==
==SUMMARY==
There were no significant generation loss events (>20%) this month.
There were no significant generation loss events (>20%) this month.
RPT_PERIOD:201309UNIT_NME:Hatch Unit 1                 DOCKET:321OPERATING DATA REPORTPREPARER NAME:Ben MosleyPREPARER TELEPHONE:912-537-5872UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8852. Maximum Dependable Capacity (MWe-Net)876720.006,182.85278,255.47 720.006,147.02271,441.64 0.000.000.00 631,777.005,274,493.00209,223,504.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            321                                                        PREPARER NAME:           Ben Mosley UNIT_NME:           Hatch Unit 1                                               PREPARER TELEPHONE: 912-537-5872 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     885
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         876 This Month        Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          720.00            6,182.85        278,255.47
: 4. Number of Hours Generator On-line                  720.00            6,147.02        271,441.64
: 5. Reserve Shutdown Hours                            0.00              0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            631,777.00        5,274,493.00    209,223,504.00 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                    Comments


==SUMMARY==
==SUMMARY==
There were no significant generation loss events (>20%) this month.
There were no significant generation loss events (>20%) this month.
RPT_PERIOD:201307UNIT_NME:Hatch Unit 2                 DOCKET:366OPERATING DATA REPORTPREPARER NAME:Ben MosleyPREPARER TELEPHONE:912-537-5872UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9082. Maximum Dependable Capacity (MWe-Net)883744.004,275.08251,551.46 744.004,207.58246,470.25 0.000.000.00 654,717.003,681,444.00193,624,580.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            366                                                        PREPARER NAME:           Ben Mosley UNIT_NME:           Hatch Unit 2                                               PREPARER TELEPHONE: 912-537-5872 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     908
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         883 This Month        Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            4,275.08        251,551.46
: 4. Number of Hours Generator On-line                  744.00            4,207.58        246,470.25
: 5. Reserve Shutdown Hours                            0.00              0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            654,717.00        3,681,444.00    193,624,580.00 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                    Comments


==SUMMARY==
==SUMMARY==
There were no significant generation loss events (>20%) this month.
There were no significant generation loss events (>20%) this month.
RPT_PERIOD:201308UNIT_NME:Hatch Unit 2                 DOCKET:366OPERATING DATA REPORTPREPARER NAME:Ben MosleyPREPARER TELEPHONE:912-537-5872UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9082. Maximum Dependable Capacity (MWe-Net)883744.005,019.08252,295.46 744.004,951.58247,214.25 0.000.000.00 653,432.004,334,876.00194,278,012.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            366                                                        PREPARER NAME:           Ben Mosley UNIT_NME:           Hatch Unit 2                                               PREPARER TELEPHONE: 912-537-5872 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     908
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         883 This Month        Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            5,019.08        252,295.46
: 4. Number of Hours Generator On-line                  744.00            4,951.58        247,214.25
: 5. Reserve Shutdown Hours                            0.00              0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            653,432.00        4,334,876.00    194,278,012.00 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                    Comments


==SUMMARY==
==SUMMARY==
There were no significant generation loss events (>20%) this month.
There were no significant generation loss events (>20%) this month.
RPT_PERIOD:201309UNIT_NME:Hatch Unit 2                 DOCKET:366OPERATING DATA REPORTPREPARER NAME:Ben MosleyPREPARER TELEPHONE:912-537-5872UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9082. Maximum Dependable Capacity (MWe-Net)883603.985,623.06252,899.44 567.235,518.81247,781.48 0.000.000.00 466,622.004,801,498.00194,744,634.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              366                                                            PREPARER NAME:               Ben Mosley UNIT_NME:           Hatch Unit 2                                                   PREPARER TELEPHONE: 912-537-5872 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                         908
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)             883 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical              603.98              5,623.06          252,899.44
: 4. Number of Hours Generator On-line                      567.23              5,518.81          247,781.48
: 5. Reserve Shutdown Hours                                0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                466,622.00          4,801,498.00      194,744,634.00 UNIT SHUTDOWNS Type                                                  Method of F: Forced          Duration                                Shutting            Cause - Corrective Action No.       Date        S: Scheduled          (Hours)          Reason 1              Down 2                        Comments 13-     9/15/2013            S                152.77                B                    1          Unit was shutdown to perform maintenance on an MSIV which failed to close during testing on 09/14/2013.


==SUMMARY==
==SUMMARY==
The unit began the month operating at rated thermal power. Power was reduced to 65% for Turbine Valve testing, CRD Exercise and Rod Pattern Adjustment on 09/14/2013. While at 65% and during testing of a Main Steam Isolation Valve (MSIV), the MSIV failed to close on demand on 09/14/2013. Power was reduced to 50% to support maintenance of the MSIV on 09/14/2013. The reactor was subsequently shutdown per the normal plant shutdown procedure via manual scram to repair the MSIV on 09/15/2013. Following the outage, the reactor was critical on 09/20/2013. Power was increased and the unit was returned to rated thermal power on 09/24/2013.13-9/15/2013S  152.77B1Unit was shutdown to perform maintenance on an MSIV which failed to close during testing on 09/14/2013.
The unit began the month operating at rated thermal power. Power was reduced to 65% for Turbine Valve testing, CRD Exercise and Rod Pattern Adjustment on 09/14/2013. While at 65% and during testing of a Main Steam Isolation Valve (MSIV), the MSIV failed to close on demand on 09/14/2013. Power was reduced to 50% to support maintenance of the MSIV on 09/14/2013. The reactor was subsequently shutdown per the normal plant shutdown procedure via manual scram to repair the MSIV on 09/15/2013. Following the outage, the reactor was critical on 09/20/2013. Power was increased and the unit was returned to rated thermal power on 09/24/2013.
RPT_PERIOD:201307UNIT_NME:Hope Creek Unit 1             DOCKET:354OPERATING DATA REPORTPREPARER NAME:Walter BischoffPREPARER TELEPHONE:8563391037UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:1228.12. Maximum Dependable Capacity (MWe-Net)1172744.004,966.57205,565.17 744.004,944.33201,919.21 0.000.000.00 839,293.005,934,359.00213,478,684.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              354                                                                PREPARER NAME:               Walter Bischoff UNIT_NME:             Hope Creek Unit 1                                                 PREPARER TELEPHONE: 8563391037 RPT_PERIOD:           201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                             1228.1
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)                 1172 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                  744.00              4,966.57          205,565.17
: 4. Number of Hours Generator On-line                        744.00              4,944.33          201,919.21
: 5. Reserve Shutdown Hours                                    0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                  839,293.00          5,934,359.00      213,478,684.00 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                                Shutting              Cause - Corrective Action No.       Date          S: Scheduled            (Hours)         Reason 1              Down 2                        Comments


==SUMMARY==
==SUMMARY==
The month started with the unit online and the reactor critical at 98.0% RTP due to main condenser pressures reaching the main turbine design back pressure limit as a result of: extreme environmental conditions, high dry bulb and wet bulb air temperatures. The unit returned to 100% RTP on 7/1/13 at 0147 One (1) planned power change greater than 15% occurred in July 2013.A power decrease of approximately 26.2% (100% to 73.8%) occurred on 7/26/2013 at 2000 for Main Condenser waterbox cycling. Power was stabilized at 73.8% RCTP on 7/27/2013 at 0057. Power ascension started on 7/27/2013 at 0508. The unit returned to 100% on 7/27/2013 at 1050. This is a planned power reduction IAW NEI 99-02.
The month started with the unit online and the reactor critical at 98.0% RTP due to main condenser pressures reaching the main turbine design back pressure limit as a result of: extreme environmental conditions, high dry bulb and wet bulb air temperatures. The unit returned to 100% RTP on 7/1/13 at 0147 One (1) planned power change greater than 15% occurred in July 2013.
Zero (0) unplanned power changes greater than 15% occurred in July 2013.The month ended with the unit online and the reactor critical at 99.8% RTP. The SRVs were not challenged by any over pressurization events or transients that would have required the valves to respond automatically.
A power decrease of approximately 26.2% (100% to 73.8%) occurred on 7/26/2013 at 2000 for Main Condenser waterbox cycling. Power was stabilized at 73.8% RCTP on 7/27/2013 at 0057. Power ascension started on 7/27/2013 at 0508. The unit returned to 100% on 7/27/2013 at 1050.
RPT_PERIOD:201308UNIT_NME:Hope Creek Unit 1             DOCKET:354OPERATING DATA REPORTPREPARER NAME:Walter BischoffPREPARER TELEPHONE:8563391037UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:1228.12. Maximum Dependable Capacity (MWe-Net)1172744.005,710.57206,309.17 744.005,688.33202,663.21 0.000.000.00 857,101.006,791,460.00214,335,785.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
This is a planned power reduction IAW NEI 99-02.
: 4. Number of Hours Generator On-line
Zero (0) unplanned power changes greater than 15% occurred in July 2013.
: 5. Reserve Shutdown Hours
The month ended with the unit online and the reactor critical at 99.8% RTP.
: 6. Net Electrical energy Generated (MWHrs)
The SRVs were not challenged by any over pressurization events or transients that would have required the valves to respond automatically.
 
OPERATING DATA REPORT DOCKET:              354                                                                PREPARER NAME:               Walter Bischoff UNIT_NME:             Hope Creek Unit 1                                                 PREPARER TELEPHONE: 8563391037 RPT_PERIOD:           201308
: 1. Design Electrical Rating:                             1228.1
: 2. Maximum Dependable Capacity (MWe-Net)                 1172 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                  744.00              5,710.57          206,309.17
: 4. Number of Hours Generator On-line                        744.00              5,688.33          202,663.21
: 5. Reserve Shutdown Hours                                    0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                  857,101.00          6,791,460.00      214,335,785.00 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                                Shutting              Cause - Corrective Action No.       Date          S: Scheduled            (Hours)         Reason 1              Down 2                        Comments


==SUMMARY==
==SUMMARY==
The month started with the unit online and the reactor critical at 99.8% RTP One (1) planned power change greater than 15% occurred in August 2013.A power decrease of approximately 15.5% (100% to 84.5%) occurred on 8/10/2013 at 2007 for control rod pattern adjustments. Power was stabilized at 84.5% RCTP on 8/10/2013 at 2224. Power ascension started on 8/10/2013 at 2228. The unit returned to 100% on 8/11/2013 at 0248. This is a planned power reduction IAW NEI 99-02. All control rod pattern changes are considered planned.One (1) unplanned power change greater than 15% occurred in August 2013.A power decrease of approximately 30.6% (100% to 69.4%) occurred on 8/1/2013 at 2334 due to a recirc runback to 45% cause by a trip of the B Circ water pump. Power was stabilized at 69.4% RCTP on 8/2/2013 at 0300. Power ascension started on 8/2/2013 at 0313. The unit returned to 100% on 8/5/2013 at 0157. This is an unplanned power reduction and is not excluded IAW NEI 99-02.The month ended with the unit online and the reactor critical at 93.1% RTP due to main condenser pressures reaching the main turbine design back pressure limit as a result of: extreme environmental conditions, high dry bulb and wet bulb air temperatures. The SRVs were not challenged by any over pressurization events or transients that would have required the valves to respond automatically.
The month started with the unit online and the reactor critical at 99.8% RTP One (1) planned power change greater than 15% occurred in August 2013.
RPT_PERIOD:201309UNIT_NME:Hope Creek Unit 1             DOCKET:354OPERATING DATA REPORTPREPARER NAME:Walter BischoffPREPARER TELEPHONE:8563391037UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:1228.12. Maximum Dependable Capacity (MWe-Net)1172720.006,430.57207,029.17 720.006,408.33203,383.21 0.000.000.00 826,175.007,617,635.00215,161,960.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
A power decrease of approximately 15.5% (100% to 84.5%) occurred on 8/10/2013 at 2007 for control rod pattern adjustments. Power was stabilized at 84.5% RCTP on 8/10/2013 at 2224. Power ascension started on 8/10/2013 at 2228. The unit returned to 100% on 8/11/2013 at 0248.
: 4. Number of Hours Generator On-line
This is a planned power reduction IAW NEI 99-02. All control rod pattern changes are considered planned.
: 5. Reserve Shutdown Hours
One (1) unplanned power change greater than 15% occurred in August 2013.
: 6. Net Electrical energy Generated (MWHrs)
A power decrease of approximately 30.6% (100% to 69.4%) occurred on 8/1/2013 at 2334 due to a recirc runback to 45% cause by a trip of the B Circ water pump. Power was stabilized at 69.4% RCTP on 8/2/2013 at 0300. Power ascension started on 8/2/2013 at 0313. The unit returned to 100% on 8/5/2013 at 0157. This is an unplanned power reduction and is not excluded IAW NEI 99-02.
The month ended with the unit online and the reactor critical at 93.1% RTP due to main condenser pressures reaching the main turbine design back pressure limit as a result of: extreme environmental conditions, high dry bulb and wet bulb air temperatures.
The SRVs were not challenged by any over pressurization events or transients that would have required the valves to respond automatically.
 
OPERATING DATA REPORT DOCKET:              354                                                                PREPARER NAME:               Walter Bischoff UNIT_NME:           Hope Creek Unit 1                                                   PREPARER TELEPHONE: 8563391037 RPT_PERIOD:         201309
: 1. Design Electrical Rating:                             1228.1
: 2. Maximum Dependable Capacity (MWe-Net)                 1172 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                  720.00              6,430.57          207,029.17
: 4. Number of Hours Generator On-line                        720.00              6,408.33          203,383.21
: 5. Reserve Shutdown Hours                                    0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                  826,175.00          7,617,635.00      215,161,960.00 UNIT SHUTDOWNS Type                                                      Method of F: Forced              Duration                                Shutting              Cause - Corrective Action No.       Date        S: Scheduled              (Hours)         Reason 1              Down 2                        Comments


==SUMMARY==
==SUMMARY==
The month started with the unit online and the reactor critical at 93.1% RTP due to main condenser pressures reaching the main turbine design back pressure limit as a result of: extreme environmental conditions, high dry bulb and wet bulb air temperatures. The unit returned to 100% RTP on 9/3/13 at 2222.
The month started with the unit online and the reactor critical at 93.1% RTP due to main condenser pressures reaching the main turbine design back pressure limit as a result of: extreme environmental conditions, high dry bulb and wet bulb air temperatures. The unit returned to 100% RTP on 9/3/13 at 2222.
One (1) planned power change greater than 15% occurred in September 2013.A power decrease of approximately 24% (100% to 76%) occurred on 9/7/2013 at 0005 for main turbine valve testing. Power was stabilized at 76% RCTP on 9/7/2013 at 0303. Power ascension started on 9/7/2013 at 1401. The unit returned to 100% on 9/7/2013 at 1839. This is a planned power reduction IAW NEI 99-02.
One (1) planned power change greater than 15% occurred in September 2013.
One (1) unplanned power change greater than 15% occurred in September 2013.A planned power decrease of approximately 12% (100% to 88%) occurred on 9/19/2013 at 2000 for planned control rod pattern adjustments. Power was stabilized at 88% RTP but there was no power ascension. A power decrease of approximately 28% (88% to 60%) occurred on 9/19/2013 at 2142 due to the A recirc pump speed controller failing to 0% demand reducing the pump to minimum speed. Power was stabilized at 60% RCTP on 9/20/2013 at 0304. Power ascension started on 9/20/2013 at 1643. The unit returned to 100% on 9/21/2013 at 0542. This is an unplanned power reduction and is not excluded IAW NEI 99-02.The month ended with the unit online and the reactor critical at 99.9% RTP The SRVs were not challenged by any over pressurization events or transients that would have required the valves to respond automatically.
A power decrease of approximately 24% (100% to 76%) occurred on 9/7/2013 at 0005 for main turbine valve testing. Power was stabilized at 76% RCTP on 9/7/2013 at 0303. Power ascension started on 9/7/2013 at 1401. The unit returned to 100% on 9/7/2013 at 1839. This is a planned power reduction IAW NEI 99-02.
RPT_PERIOD:201307UNIT_NME:Indian Point Unit 2           DOCKET:247OPERATING DATA REPORTPREPARER NAME:Ron MacinaPREPARER TELEPHONE:(914)254-6839UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:10352. Maximum Dependable Capacity (MWe-Net)998725.335,016.43262,471.53 717.785,001.46257,919.40 0.000.000.00 650,352.895,039,852.63231,358,352.07This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
One (1) unplanned power change greater than 15% occurred in September 2013.
: 4. Number of Hours Generator On-line
A planned power decrease of approximately 12% (100% to 88%) occurred on 9/19/2013 at 2000 for planned control rod pattern adjustments.
: 5. Reserve Shutdown Hours
Power was stabilized at 88% RTP but there was no power ascension. A power decrease of approximately 28% (88% to 60%) occurred on 9/19/2013 at 2142 due to the A recirc pump speed controller failing to 0% demand reducing the pump to minimum speed. Power was stabilized at 60% RCTP on 9/20/2013 at 0304. Power ascension started on 9/20/2013 at 1643. The unit returned to 100% on 9/21/2013 at 0542. This is an unplanned power reduction and is not excluded IAW NEI 99-02.
: 6. Net Electrical energy Generated (MWHrs)
The month ended with the unit online and the reactor critical at 99.9% RTP The SRVs were not challenged by any over pressurization events or transients that would have required the valves to respond automatically.
 
OPERATING DATA REPORT DOCKET:             247                                                                  PREPARER NAME:             Ron Macina UNIT_NME:            Indian Point Unit 2                                                 PREPARER TELEPHONE: (914)254-6839 RPT_PERIOD:         201307
: 1. Design Electrical Rating:                             1035
: 2. Maximum Dependable Capacity (MWe-Net)                 998 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                  725.33              5,016.43          262,471.53
: 4. Number of Hours Generator On-line                          717.78              5,001.46          257,919.40
: 5. Reserve Shutdown Hours                                    0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                    650,352.89          5,039,852.63      231,358,352.07 UNIT SHUTDOWNS Type                                                      Method of F: Forced            Duration                                  Shutting            Cause - Corrective Action No.       Date        S: Scheduled              (Hours)           Reason 1              Down 2                        Comments 2      7/3/2013              F                  26.22                  A                    2          IP2 Manually tripped at full power due to a loss of feedwater caused by a loss of instrument air to the main feeedwater regulating valves.


==SUMMARY==
==SUMMARY==
Indian Point 2 was synchronized to the grid for a total of 717.78 hours, producing a gross generation of 675,255 MWhrs. The Unit began the month at full power. The Unit operated at full power until July 3, 2013 when at approximately 0747 hours the unit was manually tripped due to a loss of feedwater caused by a loss of instrument air to the Main Feedwater Regulating Valves (MFRV's). The Reactor was made critical on July 4, 2013 at approximately 0221 hours and the Unit was synchronized to the grid on July 4, 2013 at approximately 0954 hours. At approximately 1612 hours on July 4, 2013 when at about 60% Reactor Power an excessive oscillation was discovered in the 21 MFRV. It was also discovered that the 21 MFRV would not go full open and was placed in manual. On July 5, 2013 at approximately 1600 hours Reactor Power was increased to approximately 80% on the low flow bypass. 80% Reactor Power was reached on July 5, 2013 at approximately 2118 hours. On July 7, 2013 at approximately 1317 hours Reactor Power was reduced from approximately 80% to approximately 24% in order to repair the 21 MFRV. Power ascension recommenced on July 9, 2013 at approximately 0748 hours. Full power was reached on July 9, 2013 at approximately 1602 hours. The Unit remained at full power for the remainder of the month.27/3/2013F  26.22A2IP2 Manually tripped at full power due to a loss of feedwater caused by a loss of instrument air to the main feeedwater regulating valves.
Indian Point 2 was synchronized to the grid for a total of 717.78 hours, producing a gross generation of 675,255 MWhrs. The Unit began the month at full power. The Unit operated at full power until July 3, 2013 when at approximately 0747 hours the unit was manually tripped due to a loss of feedwater caused by a loss of instrument air to the Main Feedwater Regulating Valves (MFRV's). The Reactor was made critical on July 4, 2013 at approximately 0221 hours and the Unit was synchronized to the grid on July 4, 2013 at approximately 0954 hours. At approximately 1612 hours on July 4, 2013 when at about 60% Reactor Power an excessive oscillation was discovered in the 21 MFRV. It was also discovered that the 21 MFRV would not go full open and was placed in manual. On July 5, 2013 at approximately 1600 hours Reactor Power was increased to approximately 80% on the low flow bypass. 80% Reactor Power was reached on July 5, 2013 at approximately 2118 hours. On July 7, 2013 at approximately 1317 hours Reactor Power was reduced from approximately 80% to approximately 24% in order to repair the 21 MFRV. Power ascension recommenced on July 9, 2013 at approximately 0748 hours. Full power was reached on July 9, 2013 at approximately 1602 hours. The Unit remained at full power for the remainder of the month.
RPT_PERIOD:201308UNIT_NME:Indian Point Unit 2           DOCKET:247OPERATING DATA REPORTPREPARER NAME:John GarryPREPARER TELEPHONE:(914)254-6881UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:10352. Maximum Dependable Capacity (MWe-Net)998744.005,760.43263,215.53 744.005,745.46258,663.40 0.000.000.00 741,606.005,781,458.63232,099,958.07This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            247                                                            PREPARER NAME:               John Garry UNIT_NME:           Indian Point Unit 2                                             PREPARER TELEPHONE: (914)254-6881 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1035
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         998 This Month          Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical            744.00              5,760.43            263,215.53
: 4. Number of Hours Generator On-line                  744.00              5,745.46            258,663.40
: 5. Reserve Shutdown Hours                              0.00                0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)            741,606.00          5,781,458.63        232,099,958.07 UNIT SHUTDOWNS Type                                                Method of F: Forced        Duration                                Shutting              Cause - Corrective Action No.       Date        S: Scheduled      (Hours)             Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
Indian Point 2 was synchronized to the grid for a total of 744 hours, producing a gross generation of 766,990 MWhrs. The unit operated at full power for the entire month.
Indian Point 2 was synchronized to the grid for a total of 744 hours, producing a gross generation of 766,990 MWhrs. The unit operated at full power for the entire month.
RPT_PERIOD:201309UNIT_NME:Indian Point Unit 2           DOCKET:247OPERATING DATA REPORTPREPARER NAME:John GarryPREPARER TELEPHONE:914-254-6881UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:10352. Maximum Dependable Capacity (MWe-Net)998720.006,480.43263,935.53 720.006,465.46259,383.40 0.000.000.00 722,608.376,504,067.00232,822,566.44This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            247                                                            PREPARER NAME:               John Garry UNIT_NME:           Indian Point Unit 2                                             PREPARER TELEPHONE: 914-254-6881 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1035
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         998 This Month          Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical            720.00              6,480.43            263,935.53
: 4. Number of Hours Generator On-line                  720.00              6,465.46            259,383.40
: 5. Reserve Shutdown Hours                              0.00                0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)            722,608.37          6,504,067.00        232,822,566.44 UNIT SHUTDOWNS Type                                                Method of F: Forced        Duration                                Shutting              Cause - Corrective Action No.       Date        S: Scheduled      (Hours)             Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
Indian Point 2 was synchronized to the grid for a total of 720 hours, producing a gross generation of 747100.36 MWhrs. The unit operated at full power for the entire month.
Indian Point 2 was synchronized to the grid for a total of 720 hours, producing a gross generation of 747100.36 MWhrs. The unit operated at full power for the entire month.
RPT_PERIOD:201307UNIT_NME:Indian Point Unit 3           DOCKET:286OPERATING DATA REPORTPREPARER NAME:Ron MacinaPREPARER TELEPHONE:(914)254-6839UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:10482. Maximum Dependable Capacity (MWe-Net)1030677.054,393.62233,674.18 677.054,359.20230,295.53 0.000.000.00 695,525.004,476,199.00216,728,208.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              286                                                                PREPARER NAME:             Ron Macina UNIT_NME:           Indian Point Unit 3                                                 PREPARER TELEPHONE: (914)254-6839 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           1048
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               1030 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                  677.05              4,393.62          233,674.18
: 4. Number of Hours Generator On-line                          677.05              4,359.20          230,295.53
: 5. Reserve Shutdown Hours                                    0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                    695,525.00          4,476,199.00      216,728,208.00 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                                Shutting            Cause - Corrective Action No.       Date          S: Scheduled            (Hours)            Reason 1              Down 2                        Comments 2      7/29/2013              S                66.95                  B                    1          Planned Shutdown to repair FCV-427, 32 Steam Generator Main Feed Reg Valve.


==SUMMARY==
==SUMMARY==
Indian Point 3 was synchronized to the grid for a total of 677.05 hours, producing a gross generation of 719,471 MWhrs. The unit began the month at full power. On July 29, 2013 at approximately 2300 hours, a planned Reactor Power reduction to approximately 25% was made in order to perform diagnostics testing on the 32 Main Feedwater Regulating Valve (MFRV). It was determined to that in order to repair the 32 MFRV a shutdown was required in order to go internal to the valve. On July 29, 2013 at approximately 0503 hours the unit was shutdown as part of the original plan as a contingency item. The unit remained shutdown for the rest of the month.27/29/2013S  66.95B1Planned Shutdown to repair FCV-427, 32 Steam Generator Main Feed Reg Valve.
Indian Point 3 was synchronized to the grid for a total of 677.05 hours, producing a gross generation of 719,471 MWhrs. The unit began the month at full power. On July 29, 2013 at approximately 2300 hours, a planned Reactor Power reduction to approximately 25% was made in order to perform diagnostics testing on the 32 Main Feedwater Regulating Valve (MFRV). It was determined to that in order to repair the 32 MFRV a shutdown was required in order to go internal to the valve. On July 29, 2013 at approximately 0503 hours the unit was shutdown as part of the original plan as a contingency item. The unit remained shutdown for the rest of the month.
RPT_PERIOD:201308UNIT_NME:Indian Point Unit 3           DOCKET:286OPERATING DATA REPORTPREPARER NAME:Ron MacinaPREPARER TELEPHONE:(914)254-6839UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:10482. Maximum Dependable Capacity (MWe-Net)1030741.505,135.12234,415.68 736.955,096.15231,032.48 0.000.000.00 753,115.005,229,314.00217,481,323.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            286                                                                PREPARER NAME:             Ron Macina UNIT_NME:           Indian Point Unit 3                                                 PREPARER TELEPHONE: (914)254-6839 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           1048
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               1030 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                741.50              5,135.12          234,415.68
: 4. Number of Hours Generator On-line                        736.95              5,096.15          231,032.48
: 5. Reserve Shutdown Hours                                  0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                  753,115.00          5,229,314.00      217,481,323.00 UNIT SHUTDOWNS Type                                                      Method of F: Forced          Duration                                  Shutting            Cause - Corrective Action No.       Date        S: Scheduled          (Hours)              Reason 1            Down 2                        Comments 2      7/29/2013            S                  7.05                  B                    4          Planned Shutdown to repair FCV-427, 32 Steam Generator Main Feed Reg Valve.


==SUMMARY==
==SUMMARY==
Indian Point 3 was synchronized to the grid for a total of 739.95 hours, producing a gross generation of 778,851 MWhrs. The unit began the month shutdown to repair the 32 Main Feedwater Regulating Valve (MFRV). The reactor was made critical on 8/1/2013 at approximately 02:30 hours and the Unit was synchronized to the grid on 8/1/2013 at approximately 07:03 hours. Full power was reached on 8/3/2013 at approximately 00:00 hours. The Unit remained at full power for the remainder of the month.27/29/2013S  7.05B4Planned Shutdown to repair FCV-427, 32 Steam Generator Main Feed Reg Valve.
Indian Point 3 was synchronized to the grid for a total of 739.95 hours, producing a gross generation of 778,851 MWhrs. The unit began the month shutdown to repair the 32 Main Feedwater Regulating Valve (MFRV). The reactor was made critical on 8/1/2013 at approximately 02:30 hours and the Unit was synchronized to the grid on 8/1/2013 at approximately 07:03 hours. Full power was reached on 8/3/2013 at approximately 00:00 hours. The Unit remained at full power for the remainder of the month.
RPT_PERIOD:201309UNIT_NME:Indian Point Unit 3           DOCKET:286OPERATING DATA REPORTPREPARER NAME:John GarryPREPARER TELEPHONE:914-254-6881UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:10482. Maximum Dependable Capacity (MWe-Net)1030720.005,855.12235,135.68 720.005,816.15231,752.48 0.000.000.00 749,006.005,978,320.00218,230,329.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            286                                                            PREPARER NAME:               John Garry UNIT_NME:           Indian Point Unit 3                                             PREPARER TELEPHONE: 914-254-6881 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1048
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1030 This Month          Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical            720.00              5,855.12            235,135.68
: 4. Number of Hours Generator On-line                  720.00              5,816.15            231,752.48
: 5. Reserve Shutdown Hours                              0.00                0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)            749,006.00          5,978,320.00        218,230,329.00 UNIT SHUTDOWNS Type                                                Method of F: Forced        Duration                                Shutting              Cause - Corrective Action No.       Date        S: Scheduled      (Hours)             Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
Indian Point 3 was synchronized to the grid for a total of 720 hours, producing a gross generation of 774131.00 MWhrs. The unit operated at full power for the entire month.
Indian Point 3 was synchronized to the grid for a total of 720 hours, producing a gross generation of 774131.00 MWhrs. The unit operated at full power for the entire month.
RPT_PERIOD:201307UNIT_NME:LaSalle Unit 1                DOCKET:373OPERATING DATA REPORTPREPARER NAME:S. ShieldsPREPARER TELEPHONE:(815) 415-2811UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11782. Maximum Dependable Capacity (MWe-Net)1111744.004,799.47204,703.33 744.004,792.20202,181.28 0.000.001.00 844,093.005,537,352.00213,553,960.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             373                                                        PREPARER NAME:           S. Shields UNIT_NME:          LaSalle Unit 1                                            PREPARER TELEPHONE: (815) 415-2811 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       1178
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           1111 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical            744.00          4,799.47        204,703.33
: 4. Number of Hours Generator On-line                    744.00          4,792.20        202,181.28
: 5. Reserve Shutdown Hours                              0.00            0.00            1.00
: 6. Net Electrical energy Generated (MWHrs)              844,093.00      5,537,352.00    213,553,960.00 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unit 1 operated at or near full power for the month.
Unit 1 operated at or near full power for the month.
RPT_PERIOD:201308UNIT_NME:LaSalle Unit 1                DOCKET:373OPERATING DATA REPORTPREPARER NAME:S. ShieldsPREPARER TELEPHONE:(815) 415-2811UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11782. Maximum Dependable Capacity (MWe-Net)1111744.005,543.47205,447.33 744.005,536.20202,925.28 0.000.001.00 844,884.006,382,236.00214,398,844.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             373                                                          PREPARER NAME:               S. Shields UNIT_NME:          LaSalle Unit 1                                                PREPARER TELEPHONE: (815) 415-2811 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       1178
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           1111 This Month        Yr-to-Date            Cumulative
: 3. Number of Hours the Reactor was Critical            744.00            5,543.47              205,447.33
: 4. Number of Hours Generator On-line                    744.00            5,536.20              202,925.28
: 5. Reserve Shutdown Hours                              0.00              0.00                  1.00
: 6. Net Electrical energy Generated (MWHrs)              844,884.00        6,382,236.00          214,398,844.00 UNIT SHUTDOWNS Type                                                Method of F: Forced        Duration                              Shutting              Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
Unit 1 operated at or near full power for the month. Planned energy losses for control rod maintenance.
Unit 1 operated at or near full power for the month. Planned energy losses for control rod maintenance.
RPT_PERIOD:201309UNIT_NME:LaSalle Unit 1                DOCKET:373OPERATING DATA REPORTPREPARER NAME:S. ShieldsPREPARER TELEPHONE:(815) 415-2811UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11782. Maximum Dependable Capacity (MWe-Net)1111720.006,263.47206,167.33 720.006,256.20203,645.28 0.000.001.00 817,702.007,199,938.00215,216,546.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             373                                                            PREPARER NAME:             S. Shields UNIT_NME:          LaSalle Unit 1                                                PREPARER TELEPHONE: (815) 415-2811 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       1178
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           1111 This Month          Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical            720.00              6,263.47            206,167.33
: 4. Number of Hours Generator On-line                    720.00              6,256.20            203,645.28
: 5. Reserve Shutdown Hours                              0.00                0.00                1.00
: 6. Net Electrical energy Generated (MWHrs)              817,702.00          7,199,938.00        215,216,546.00 UNIT SHUTDOWNS Type                                                  Method of F: Forced        Duration                                Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1              Down 2                      Comments


==SUMMARY==
==SUMMARY==
Unit 1 operated at or near full power for the month except for a planned control rod sequence exchange on 9/8/13 to approximately 720 MWe.
Unit 1 operated at or near full power for the month except for a planned control rod sequence exchange on 9/8/13 to approximately 720 MWe.
RPT_PERIOD:201307UNIT_NME:LaSalle Unit 2                DOCKET:374OPERATING DATA REPORTPREPARER NAME:S. ShieldsPREPARER TELEPHONE:(815) 415-2811UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11782. Maximum Dependable Capacity (MWe-Net)1111744.004,337.88196,728.51 744.004,289.44195,378.39 0.000.000.00 846,467.004,778,730.00208,458,848.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             374                                                        PREPARER NAME:           S. Shields UNIT_NME:          LaSalle Unit 2                                            PREPARER TELEPHONE: (815) 415-2811 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       1178
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           1111 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical            744.00          4,337.88        196,728.51
: 4. Number of Hours Generator On-line                    744.00          4,289.44        195,378.39
: 5. Reserve Shutdown Hours                              0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)              846,467.00      4,778,730.00    208,458,848.00 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unit 2 operated at or near full power for the month.
Unit 2 operated at or near full power for the month.
RPT_PERIOD:201308UNIT_NME:LaSalle Unit 2                DOCKET:374OPERATING DATA REPORTPREPARER NAME:S. ShieldsPREPARER TELEPHONE:(815) 415-2811UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11782. Maximum Dependable Capacity (MWe-Net)1111744.005,081.88197,472.51 744.005,033.44196,122.39 0.000.000.00 846,116.005,624,846.00209,304,964.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             374                                                          PREPARER NAME:             S. Shields UNIT_NME:          LaSalle Unit 2                                                PREPARER TELEPHONE: (815) 415-2811 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       1178
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           1111 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical            744.00            5,081.88            197,472.51
: 4. Number of Hours Generator On-line                    744.00            5,033.44            196,122.39
: 5. Reserve Shutdown Hours                              0.00              0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)              846,116.00        5,624,846.00        209,304,964.00 UNIT SHUTDOWNS Type                                                Method of F: Forced        Duration                                Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
Unit 2 operated at or near full power for the month. Downpower for control rod maintenance and rod pattern exchange.
Unit 2 operated at or near full power for the month. Downpower for control rod maintenance and rod pattern exchange.
RPT_PERIOD:201309UNIT_NME:LaSalle Unit 2                DOCKET:374OPERATING DATA REPORTPREPARER NAME:S. ShieldsPREPARER TELEPHONE:(815) 415-2811UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11782. Maximum Dependable Capacity (MWe-Net)1111720.005,801.88198,192.51 720.005,753.44196,842.39 0.000.000.00 790,713.006,415,559.00210,095,677.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             374                                                            PREPARER NAME:               S. Shields UNIT_NME:          LaSalle Unit 2                                                PREPARER TELEPHONE: (815) 415-2811 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       1178
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           1111 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical            720.00              5,801.88          198,192.51
: 4. Number of Hours Generator On-line                    720.00              5,753.44          196,842.39
: 5. Reserve Shutdown Hours                              0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)              790,713.00          6,415,559.00      210,095,677.00 UNIT SHUTDOWNS Type                                                Method of F: Forced        Duration                                Shutting              Cause - Corrective Action No.       Date        S: Scheduled        (Hours)           Reason 1              Down 2                        Comments


==SUMMARY==
==SUMMARY==
Unit 2 operated at or near full power for the month except for a planned downpower for a control rod sequence exchange on 9/1/13 to approximately 720 MWe and an unplanned downpower for power suppression testing on 9/28/13 to approximately 700 MWe.
Unit 2 operated at or near full power for the month except for a planned downpower for a control rod sequence exchange on 9/1/13 to approximately 720 MWe and an unplanned downpower for power suppression testing on 9/28/13 to approximately 700 MWe.
RPT_PERIOD:201307UNIT_NME:Limerick Unit 1              DOCKET:352OPERATING DATA REPORTPREPARER NAME:Leonard J. MaiorielloPREPARER TELEPHONE:610 718-3512UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12052. Maximum Dependable Capacity (MWe-Net)1099744.005,087.00219,372.04 744.005,087.00216,833.76 0.000.000.00 836,756.005,894,387.00233,165,100.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             352                                                              PREPARER NAME:             Leonard J. Maioriello UNIT_NME:            Limerick Unit 1                                                  PREPARER TELEPHONE: 610 718-3512 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           1205
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               1099 This Month          Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical                744.00              5,087.00        219,372.04
: 4. Number of Hours Generator On-line                      744.00              5,087.00        216,833.76
: 5. Reserve Shutdown Hours                                  0.00                0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)                836,756.00          5,894,387.00    233,165,100.00 UNIT SHUTDOWNS Type                                                  Method of F: Forced            Duration                              Shutting            Cause - Corrective Action No.       Date          S: Scheduled          (Hours)           Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
Unit 1 began the month of July 2013 at 100.0% rated thermal power (RTP).On July 5th at 15:32 hours, reactor power was reduced from 99.9% to 98.1% RTP due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.8% RTP at 22:39 hours.On July 6th at 16:44 hours, reactor power was reduced from 99.9% to 98.1% RTP due to high condensate temperature caused by high ambient conditions.
Unit 1 began the month of July 2013 at 100.0% rated thermal power (RTP).
On July 7th at 02:34 hours, reactor power was restored to 99.6% RTP.On July 7th at 15:23 hours, reactor power was reduced from 100.0% to 98.0% RTP due to high condensate temperature caused by high ambient conditions. At 17:54 hours reactor power was further reduced down to 78.5% RTP due to loss of Instrument Air header pressure. Reactor power was restored to 99.5% RTP at 23:28 hours. (IR 1533093)On July 15th at 17:38 hours, reactor power was reduced from 100.0% to 98.1% RTP due to high condensate temperature caused by high ambient conditions.
On July 5th at 15:32 hours, reactor power was reduced from 99.9% to 98.1% RTP due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.8% RTP at 22:39 hours.
On July 16th at 03:20 hours, reactor power was restored to 99.8% RTP.On July 17th at 15:03 hours, reactor power was reduced from 99.9% to 92.1% RTP due to high condensate temperature caused by high ambient conditions.
On July 6th at 16:44 hours, reactor power was reduced from 99.9% to 98.1% RTP due to high condensate temperature caused by high ambient conditions.
On July 20th at 01:25 hours, reactor power was restored to 99.5% RTP. Reactor power was reduced from 99.9% to 97.6% RTP at 13:49 hours due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.6% RTP at 23:51 hours.Unit 1 ended the month of July 2013 at 100.0% RTP.
On July 7th at 02:34 hours, reactor power was restored to 99.6% RTP.
RPT_PERIOD:201308UNIT_NME:Limerick Unit 1              DOCKET:352OPERATING DATA REPORTPREPARER NAME:Leonard J. MaiorielloPREPARER TELEPHONE:610-718-3512UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12052. Maximum Dependable Capacity (MWe-Net)1099744.005,831.00220,116.04 744.005,831.00217,577.76 0.000.000.00 848,376.006,742,763.00234,013,476.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
On July 7th at 15:23 hours, reactor power was reduced from 100.0% to 98.0% RTP due to high condensate temperature caused by high ambient conditions. At 17:54 hours reactor power was further reduced down to 78.5% RTP due to loss of Instrument Air header pressure. Reactor power was restored to 99.5% RTP at 23:28 hours. (IR 1533093)
: 4. Number of Hours Generator On-line
On July 15th at 17:38 hours, reactor power was reduced from 100.0% to 98.1% RTP due to high condensate temperature caused by high ambient conditions.
: 5. Reserve Shutdown Hours
On July 16th at 03:20 hours, reactor power was restored to 99.8% RTP.
: 6. Net Electrical energy Generated (MWHrs)
On July 17th at 15:03 hours, reactor power was reduced from 99.9% to 92.1% RTP due to high condensate temperature caused by high ambient conditions.
On July 20th at 01:25 hours, reactor power was restored to 99.5% RTP. Reactor power was reduced from 99.9% to 97.6% RTP at 13:49 hours due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.6% RTP at 23:51 hours.
Unit 1 ended the month of July 2013 at 100.0% RTP.
 
OPERATING DATA REPORT DOCKET:             352                                                          PREPARER NAME:           Leonard J. Maioriello UNIT_NME:            Limerick Unit 1                                              PREPARER TELEPHONE: 610-718-3512 RPT_PERIOD:         201308
: 1. Design Electrical Rating:                           1205
: 2. Maximum Dependable Capacity (MWe-Net)               1099 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical                744.00          5,831.00        220,116.04
: 4. Number of Hours Generator On-line                      744.00          5,831.00        217,577.76
: 5. Reserve Shutdown Hours                                  0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)                848,376.00      6,742,763.00    234,013,476.00 UNIT SHUTDOWNS Type                                                Method of F: Forced          Duration                            Shutting          Cause - Corrective Action No.       Date        S: Scheduled          (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unit 1 began the month of August 2013 at 100.0% rated thermal power (RTP).There were no reductions in power during the month of August.Unit 1 ended the month of August 2013 at 100.0% RTP.
Unit 1 began the month of August 2013 at 100.0% rated thermal power (RTP).
RPT_PERIOD:201309UNIT_NME:Limerick Unit 1              DOCKET:352OPERATING DATA REPORTPREPARER NAME:Leonard J. MaiorielloPREPARER TELEPHONE:610-718-3512UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12052. Maximum Dependable Capacity (MWe-Net)1099720.006,551.00220,836.04 720.006,551.00218,297.76 0.000.000.00 824,036.007,566,799.00234,837,512.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
There were no reductions in power during the month of August.
: 4. Number of Hours Generator On-line
Unit 1 ended the month of August 2013 at 100.0% RTP.
: 5. Reserve Shutdown Hours
 
: 6. Net Electrical energy Generated (MWHrs)
OPERATING DATA REPORT DOCKET:             352                                                            PREPARER NAME:           Leonard J. Maioriello UNIT_NME:            Limerick Unit 1                                                PREPARER TELEPHONE: 610-718-3512 RPT_PERIOD:         201309
: 1. Design Electrical Rating:                         1205
: 2. Maximum Dependable Capacity (MWe-Net)             1099 This Month          Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical              720.00              6,551.00        220,836.04
: 4. Number of Hours Generator On-line                      720.00              6,551.00        218,297.76
: 5. Reserve Shutdown Hours                                0.00                0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)                824,036.00          7,566,799.00    234,837,512.00 UNIT SHUTDOWNS Type                                                  Method of F: Forced          Duration                              Shutting          Cause - Corrective Action No.       Date        S: Scheduled          (Hours)           Reason 1            Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unit 1 began the month of September 2013 at 100.0% rated thermal power (RTP).On September 11th at 12:26 hours, reactor power was reduced from 99.8% to 96.8% RTP due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.6% RTP at 20:11 hours.On September 12th at 00:29 hours, reactor power was reduced from 100.0% to 95.0% RTP due to a planned load drop for online HCU testing. Reactor power was restored to 99.6% RTP at 01:36 hours.On September 15th at 01:00 hours, reactor power was reduced from 100.0% to 72.2% RTP due to a planned load drop to perform turbine valve testing.                                                                                                     On September 16th at 02:05 hours, reactor power was restored to 99.8% RTP.On September 29th at 08:01 hours, reactor power was reduced from 100.0% to 76.4% RTP due to a planned load drop to perform control rod scram time testing. Reactor power was restored to 99.6% RTP at 12:23 hours.Unit 1 ended the month of September 2013 at 99.9% RTP.
Unit 1 began the month of September 2013 at 100.0% rated thermal power (RTP).
RPT_PERIOD:201307UNIT_NME:Limerick Unit 2              DOCKET:353OPERATING DATA REPORTPREPARER NAME:Leonard J. MaiorielloPREPARER TELEPHONE:610 718-3512UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12052. Maximum Dependable Capacity (MWe-Net)1108744.004,522.70194,880.19 744.004,469.81192,493.11 0.000.000.00 847,594.005,141,350.00211,839,191.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
On September 11th at 12:26 hours, reactor power was reduced from 99.8% to 96.8% RTP due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.6% RTP at 20:11 hours.
: 4. Number of Hours Generator On-line
On September 12th at 00:29 hours, reactor power was reduced from 100.0% to 95.0% RTP due to a planned load drop for online HCU testing.
: 5. Reserve Shutdown Hours
Reactor power was restored to 99.6% RTP at 01:36 hours.
: 6. Net Electrical energy Generated (MWHrs)
On September 15th at 01:00 hours, reactor power was reduced from 100.0% to 72.2% RTP due to a planned load drop to perform turbine valve testing.
On September 16th at 02:05 hours, reactor power was restored to 99.8% RTP.
On September 29th at 08:01 hours, reactor power was reduced from 100.0% to 76.4% RTP due to a planned load drop to perform control rod scram time testing. Reactor power was restored to 99.6% RTP at 12:23 hours.
Unit 1 ended the month of September 2013 at 99.9% RTP.
 
OPERATING DATA REPORT DOCKET:             353                                                              PREPARER NAME:             Leonard J. Maioriello UNIT_NME:            Limerick Unit 2                                                  PREPARER TELEPHONE: 610 718-3512 RPT_PERIOD:         201307
: 1. Design Electrical Rating:                           1205
: 2. Maximum Dependable Capacity (MWe-Net)               1108 This Month          Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical                744.00              4,522.70        194,880.19
: 4. Number of Hours Generator On-line                      744.00              4,469.81        192,493.11
: 5. Reserve Shutdown Hours                                  0.00                0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)                847,594.00          5,141,350.00    211,839,191.00 UNIT SHUTDOWNS Type                                                  Method of F: Forced            Duration                              Shutting          Cause - Corrective Action No.       Date          S: Scheduled          (Hours)           Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
Unit 2 began the month of June 2013 at 100% of rated thermal power (RTP).On July 7th at 18:41 hours, reactor power was reduced from 100.0% to 98.4% RTP due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.6% RTP at 20:13 hours.On July 15th at 18:50 hours, reactor power was reduced from 99.8% to 96.6% RTP due to high condensate temperature caused by high ambient conditions.
Unit 2 began the month of June 2013 at 100% of rated thermal power (RTP).
On July 16th at 00:37 hours reactor power was restored to 99.6% RTP.On July 18th at 11:57 hours, reactor power was reduced from 100.0% to 96.4% RTP due to high condensate temperature caused by high ambient conditions.
On July 7th at 18:41 hours, reactor power was reduced from 100.0% to 98.4% RTP due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.6% RTP at 20:13 hours.
On July 19th at 04:38 hours, reactor power was restored to 99.6% RTP. Reactor power was reduced from 100.0% to 92.9% RTP at 11:18 hours due to high condensate temperature caused by high ambient conditions. On July 20th at 00:36 hours, reactor power was restored to 99.5% RTP. Reactor power was reduced from 99.8% to 96.8% RTP at 13:44 hours due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.7% RTP at 22:04 hours.Unit 2 ended the month of July 2013 at 100.0% RTP.
On July 15th at 18:50 hours, reactor power was reduced from 99.8% to 96.6% RTP due to high condensate temperature caused by high ambient conditions.
RPT_PERIOD:201308UNIT_NME:Limerick Unit 2              DOCKET:353OPERATING DATA REPORTPREPARER NAME:Leonard J. MaiorielloPREPARER TELEPHONE:610-718-3512UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12052. Maximum Dependable Capacity (MWe-Net)1108744.005,266.70195,624.19 744.005,213.81193,237.11 0.000.000.00 856,717.005,998,067.00212,695,908.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
On July 16th at 00:37 hours reactor power was restored to 99.6% RTP.
: 4. Number of Hours Generator On-line
On July 18th at 11:57 hours, reactor power was reduced from 100.0% to 96.4% RTP due to high condensate temperature caused by high ambient conditions.
: 5. Reserve Shutdown Hours
On July 19th at 04:38 hours, reactor power was restored to 99.6% RTP. Reactor power was reduced from 100.0% to 92.9% RTP at 11:18 hours due to high condensate temperature caused by high ambient conditions.
: 6. Net Electrical energy Generated (MWHrs)
On July 20th at 00:36 hours, reactor power was restored to 99.5% RTP. Reactor power was reduced from 99.8% to 96.8% RTP at 13:44 hours due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.7% RTP at 22:04 hours.
Unit 2 ended the month of July 2013 at 100.0% RTP.
 
OPERATING DATA REPORT DOCKET:             353                                                          PREPARER NAME:           Leonard J. Maioriello UNIT_NME:            Limerick Unit 2                                              PREPARER TELEPHONE: 610-718-3512 RPT_PERIOD:         201308
: 1. Design Electrical Rating:                           1205
: 2. Maximum Dependable Capacity (MWe-Net)               1108 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical                744.00          5,266.70        195,624.19
: 4. Number of Hours Generator On-line                      744.00          5,213.81        193,237.11
: 5. Reserve Shutdown Hours                                  0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)                856,717.00      5,998,067.00    212,695,908.00 UNIT SHUTDOWNS Type                                                Method of F: Forced          Duration                            Shutting          Cause - Corrective Action No.       Date        S: Scheduled          (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unit 2 began the month of August 2013 at 100% of rated thermal power (RTP).There were no reductions in power during the month of August.Unit 2 ended the month of August 2013 at 99.9% RTP.
Unit 2 began the month of August 2013 at 100% of rated thermal power (RTP).
RPT_PERIOD:201309UNIT_NME:Limerick Unit 2              DOCKET:353OPERATING DATA REPORTPREPARER NAME:Leonard J. MaiorielloPREPARER TELEPHONE:610-718-3512UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12052. Maximum Dependable Capacity (MWe-Net)1108720.005,986.70196,344.19 720.005,933.81193,957.11 0.000.000.00 831,404.006,829,471.00213,527,312.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
There were no reductions in power during the month of August.
: 4. Number of Hours Generator On-line
Unit 2 ended the month of August 2013 at 99.9% RTP.
: 5. Reserve Shutdown Hours
 
: 6. Net Electrical energy Generated (MWHrs)
OPERATING DATA REPORT DOCKET:             353                                                                PREPARER NAME:             Leonard J. Maioriello UNIT_NME:            Limerick Unit 2                                                    PREPARER TELEPHONE: 610-718-3512 RPT_PERIOD:         201309
: 1. Design Electrical Rating:                             1205
: 2. Maximum Dependable Capacity (MWe-Net)                 1108 This Month          Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                720.00              5,986.70            196,344.19
: 4. Number of Hours Generator On-line                        720.00              5,933.81            193,957.11
: 5. Reserve Shutdown Hours                                  0.00                0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)                  831,404.00          6,829,471.00        213,527,312.00 UNIT SHUTDOWNS Type                                                      Method of F: Forced            Duration                                Shutting            Cause - Corrective Action No.       Date          S: Scheduled          (Hours)           Reason 1              Down 2                        Comments


==SUMMARY==
==SUMMARY==
Unit 2 began the month of September 2013 at 99.9% of rated thermal power (RTP).On September 7th at 14:23 hours, reactor power was reduced from 99.9% to 99.2% RTP due to an unplanned double notching of a control rod. Reactor power was restored to 99.7% RTP at 16:40 hours.On September 8th at 10:30 hours, reactor power was reduced from 99.8% to 81.5% RTP due to a planned load drop to perform turbine valve testing.                                                                                               On September 9th at 03:30 hours, reactor power was restored to 99.5% RTP.On September 11th at 12:05 hours, reactor power was reduced from 99.9% to 95.4% RTP due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.7% RTP at 21:04 hours. On September 16th at 03:59 hours, reactor power was reduced from 99.9% to 95.1% RTP due to a planned load drop to repair a feedwater heater instrument valve. Reactor power was restored to 99.6% RTP at 04:45 hours. Reactor power was again reduced from 100.0% to 93.8% RTP at 20:00 hours in order to place the feedwater heater back into service. Reactor power was restored to 99.8% RTP at 20:50 hours. Unit 2 ended the month of September 2013 at 99.9% RTP.
Unit 2 began the month of September 2013 at 99.9% of rated thermal power (RTP).
RPT_PERIOD:201307UNIT_NME:McGuire Unit 1               DOCKET:369OPERATING DATA REPORTPREPARER NAME:Kay CranePREPARER TELEPHONE:(980) 875-4306UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11662. Maximum Dependable Capacity (MWe-Net)1129744.004,151.52227,774.78 744.004,113.33226,214.20 0.000.000.00 854,435.004,621,870.00246,663,865.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
On September 7th at 14:23 hours, reactor power was reduced from 99.9% to 99.2% RTP due to an unplanned double notching of a control rod.
: 4. Number of Hours Generator On-line
Reactor power was restored to 99.7% RTP at 16:40 hours.
: 5. Reserve Shutdown Hours
On September 8th at 10:30 hours, reactor power was reduced from 99.8% to 81.5% RTP due to a planned load drop to perform turbine valve testing.
: 6. Net Electrical energy Generated (MWHrs)
On September 9th at 03:30 hours, reactor power was restored to 99.5% RTP.
On September 11th at 12:05 hours, reactor power was reduced from 99.9% to 95.4% RTP due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.7% RTP at 21:04 hours.
On September 16th at 03:59 hours, reactor power was reduced from 99.9% to 95.1% RTP due to a planned load drop to repair a feedwater heater instrument valve. Reactor power was restored to 99.6% RTP at 04:45 hours. Reactor power was again reduced from 100.0% to 93.8%
RTP at 20:00 hours in order to place the feedwater heater back into service. Reactor power was restored to 99.8% RTP at 20:50 hours.
Unit 2 ended the month of September 2013 at 99.9% RTP.
 
OPERATING DATA REPORT DOCKET:            369                                                    PREPARER NAME:           Kay Crane UNIT_NME:           McGuire Unit 1                                         PREPARER TELEPHONE: (980) 875-4306 RPT_PERIOD:         201307
: 1. Design Electrical Rating:                     1166
: 2. Maximum Dependable Capacity (MWe-Net)         1129 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          4,151.52        227,774.78
: 4. Number of Hours Generator On-line                744.00          4,113.33        226,214.20
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          854,435.00      4,621,870.00    246,663,865.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201308UNIT_NME:McGuire Unit 1               DOCKET:369OPERATING DATA REPORTPREPARER NAME:Kay CranePREPARER TELEPHONE:(980) 875-4306UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11662. Maximum Dependable Capacity (MWe-Net)1129744.004,895.52228,518.78 744.004,857.33226,958.20 0.000.000.00 852,685.005,474,555.00247,516,550.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            369                                                    PREPARER NAME:           Kay Crane UNIT_NME:           McGuire Unit 1                                         PREPARER TELEPHONE: (980) 875-4306 RPT_PERIOD:         201308
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     1166
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         1129 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          4,895.52        228,518.78
: 4. Number of Hours Generator On-line                744.00          4,857.33        226,958.20
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          852,685.00      5,474,555.00    247,516,550.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201309UNIT_NME:McGuire Unit 1               DOCKET:369OPERATING DATA REPORTPREPARER NAME:Kay CranePREPARER TELEPHONE:(980) 875-4306UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11662. Maximum Dependable Capacity (MWe-Net)1129720.005,615.52229,238.78 720.005,577.33227,678.20 0.000.000.00 823,724.006,298,279.00248,340,274.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            369                                                    PREPARER NAME:           Kay Crane UNIT_NME:           McGuire Unit 1                                         PREPARER TELEPHONE: (980) 875-4306 RPT_PERIOD:         201309
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     1166
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         1129 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          720.00          5,615.52        229,238.78
: 4. Number of Hours Generator On-line                720.00          5,577.33        227,678.20
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          823,724.00      6,298,279.00    248,340,274.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201307UNIT_NME:McGuire Unit 2               DOCKET:370OPERATING DATA REPORTPREPARER NAME:Kay CranePREPARER TELEPHONE:(980) 875-4306UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11702. Maximum Dependable Capacity (MWe-Net)1129744.005,087.00220,784.38 744.005,087.00219,148.04 0.000.000.00 856,552.005,847,496.00244,561,128.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            370                                                    PREPARER NAME:           Kay Crane UNIT_NME:           McGuire Unit 2                                         PREPARER TELEPHONE: (980) 875-4306 RPT_PERIOD:         201307
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     1170
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         1129 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          5,087.00        220,784.38
: 4. Number of Hours Generator On-line                744.00          5,087.00        219,148.04
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          856,552.00      5,847,496.00    244,561,128.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201308UNIT_NME:McGuire Unit 2               DOCKET:370OPERATING DATA REPORTPREPARER NAME:Kay CranePREPARER TELEPHONE:(980) 875-4306UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11702. Maximum Dependable Capacity (MWe-Net)1129744.005,831.00221,528.38 744.005,831.00219,892.04 0.000.000.00 854,028.006,701,524.00245,415,156.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            370                                                    PREPARER NAME:           Kay Crane UNIT_NME:           McGuire Unit 2                                         PREPARER TELEPHONE: (980) 875-4306 RPT_PERIOD:         201308
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     1170
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         1129 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          5,831.00        221,528.38
: 4. Number of Hours Generator On-line                744.00          5,831.00        219,892.04
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          854,028.00      6,701,524.00    245,415,156.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201309UNIT_NME:McGuire Unit 2               DOCKET:370OPERATING DATA REPORTPREPARER NAME:Kay CranePREPARER TELEPHONE:(980) 875-4306UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11702. Maximum Dependable Capacity (MWe-Net)1129720.006,551.00222,248.38 720.006,551.00220,612.04 0.000.000.00 825,544.007,527,068.00246,240,700.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            370                                                    PREPARER NAME:           Kay Crane UNIT_NME:           McGuire Unit 2                                         PREPARER TELEPHONE: (980) 875-4306 RPT_PERIOD:         201309
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     1170
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         1129 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          720.00          6,551.00        222,248.38
: 4. Number of Hours Generator On-line                720.00          6,551.00        220,612.04
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          825,544.00      7,527,068.00    246,240,700.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201307UNIT_NME:Millstone Unit 2             DOCKET:336OPERATING DATA REPORTPREPARER NAME:Stephen ClaffeyPREPARER TELEPHONE:860-447-1791 x2456UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:877.22. Maximum Dependable Capacity (MWe-Net)869.5744.005,087.00234,445.08 744.005,087.00228,358.30 0.000.00468.20 647,403.704,453,762.90191,248,055.90This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            336                                                        PREPARER NAME:             Stephen Claffey UNIT_NME:           Millstone Unit 2                                           PREPARER TELEPHONE: 860-447-1791 x2456 RPT_PERIOD:         201307
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     877.2
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         869.5 This Month        Yr-to-Date          Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00            5,087.00            234,445.08
: 4. Number of Hours Generator On-line                  744.00            5,087.00            228,358.30
: 5. Reserve Shutdown Hours                            0.00              0.00                468.20
: 6. Net Electrical energy Generated (MWHrs)            647,403.70        4,453,762.90        191,248,055.90 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
Millstone Unit 2 operated at or near 100% power throughout the month of July, 2013.
Millstone Unit 2 operated at or near 100% power throughout the month of July, 2013.
RPT_PERIOD:201308UNIT_NME:Millstone Unit 2              DOCKET:336OPERATING DATA REPORTPREPARER NAME:S. ClaffeyPREPARER TELEPHONE:860-447-1791 x2456UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:877.22. Maximum Dependable Capacity (MWe-Net)869.5744.005,831.00235,189.08 744.005,831.00229,102.30 0.000.00468.20 645,986.005,099,748.90191,894,041.90This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             336                                                        PREPARER NAME:             S. Claffey UNIT_NME:          Millstone Unit 2                                            PREPARER TELEPHONE: 860-447-1791 x2456 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     877.2
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         869.5 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            5,831.00            235,189.08
: 4. Number of Hours Generator On-line                  744.00            5,831.00            229,102.30
: 5. Reserve Shutdown Hours                            0.00              0.00                468.20
: 6. Net Electrical energy Generated (MWHrs)            645,986.00        5,099,748.90        191,894,041.90 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
Millstone Unit 2 operated at or near 100% power throughout the month of August, 2013.
Millstone Unit 2 operated at or near 100% power throughout the month of August, 2013.
RPT_PERIOD:201309UNIT_NME:Millstone Unit 2             DOCKET:336OPERATING DATA REPORTPREPARER NAME:S. ClaffeyPREPARER TELEPHONE:860-447-1791 x2456UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:877.22. Maximum Dependable Capacity (MWe-Net)869.5720.006,551.00235,909.08 720.006,551.00229,822.30 0.000.00468.20 624,487.805,724,236.70192,518,529.70This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              336                                                            PREPARER NAME:               S. Claffey UNIT_NME:            Millstone Unit 2                                              PREPARER TELEPHONE: 860-447-1791 x2456 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           877.2
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               869.5 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                720.00            6,551.00            235,909.08
: 4. Number of Hours Generator On-line                      720.00            6,551.00            229,822.30
: 5. Reserve Shutdown Hours                                  0.00              0.00                468.20
: 6. Net Electrical energy Generated (MWHrs)                624,487.80        5,724,236.70        192,518,529.70 UNIT SHUTDOWNS Type                                                Method of F: Forced        Duration                                Shutting            Cause - Corrective Action No.       Date          S: Scheduled        (Hours)             Reason 1          Down 2                        Comments


==SUMMARY==
==SUMMARY==
Millstone Unit 2 operated at or near 100% power from the beginning of the month until September 21, 2013. At 0900 hours on September 21, 2013, the unit commenced a load reduction to approximately 90% power for Main Turbine Control Valve operability testing. At 1243 hours on September 21, 2013, commenced a power ascension and returned to 100% power at 1520 hours on September 21, 2013. Millstone Unit 2 operated at or near 100% power for the remainder of the month.
Millstone Unit 2 operated at or near 100% power from the beginning of the month until September 21, 2013. At 0900 hours on September 21, 2013, the unit commenced a load reduction to approximately 90% power for Main Turbine Control Valve operability testing. At 1243 hours on September 21, 2013, commenced a power ascension and returned to 100% power at 1520 hours on September 21, 2013. Millstone Unit 2 operated at or near 100% power for the remainder of the month.
RPT_PERIOD:201307UNIT_NME:Millstone Unit 3              DOCKET:423OPERATING DATA REPORTPREPARER NAME:K. CookPREPARER TELEPHONE:860-447-1791X6572UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12292. Maximum Dependable Capacity (MWe-Net)1210744.004,275.23188,036.56 744.004,241.12185,949.24 0.000.000.00 910,774.205,199,822.80210,421,741.34This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             423                                                        PREPARER NAME:             K. Cook UNIT_NME:          Millstone Unit 3                                            PREPARER TELEPHONE: 860-447-1791X6572 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1229
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1210 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            4,275.23            188,036.56
: 4. Number of Hours Generator On-line                744.00            4,241.12            185,949.24
: 5. Reserve Shutdown Hours                            0.00              0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)          910,774.20        5,199,822.80        210,421,741.34 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
Millstone Unit 3 operated at or near 100% power throughout the month of July, 2013.
Millstone Unit 3 operated at or near 100% power throughout the month of July, 2013.
RPT_PERIOD:201308UNIT_NME:Millstone Unit 3             DOCKET:423OPERATING DATA REPORTPREPARER NAME:K. CookPREPARER TELEPHONE:860-447-1791X6572UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12292. Maximum Dependable Capacity (MWe-Net)1210657.054,932.28188,693.61 632.784,873.90186,582.02 0.000.000.00 753,567.105,953,389.90211,175,308.44This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              423                                                                PREPARER NAME:                 K. Cook UNIT_NME:            Millstone Unit 3                                                  PREPARER TELEPHONE: 860-447-1791X6572 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                             1229
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)                 1210 This Month          Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                  657.05              4,932.28            188,693.61
: 4. Number of Hours Generator On-line                        632.78              4,873.90            186,582.02
: 5. Reserve Shutdown Hours                                    0.00                0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)                  753,567.10          5,953,389.90        211,175,308.44 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                              Shutting                Cause - Corrective Action No.       Date          S: Scheduled            (Hours)          Reason 1            Down 2                          Comments 2013-   8/9/2013              F                  111.22                A                    3          Power to main feedwater pump recirculation valve loops has been temporarily moved from load center 32L to load center 32A.


==SUMMARY==
==SUMMARY==
Millstone Unit 3 operated at or near 100% power through the month of August until August 9, 2013 at 2119 hours when the plant experienced an automatic reactor trip due to steam generator "C" low water levels caused by loss of a non-vital load center. After investigations were completed, the reactor was taken critical at 1216 hours on August 13, 2013. The unit phased to the grid at 1232 hours on August 14, 2013. The plant reached 100% power at 0810 hours on August 16, 2013. The unit operated at or near 100% power throughout the rest of August 2013. 2013-8/9/2013F  111.22A3Power to main feedwater pump recirculation valve loops has been temporarily moved from load center 32L to load center 32A.
Millstone Unit 3 operated at or near 100% power through the month of August until August 9, 2013 at 2119 hours when the plant experienced an automatic reactor trip due to steam generator "C" low water levels caused by loss of a non-vital load center. After investigations were completed, the reactor was taken critical at 1216 hours on August 13, 2013. The unit phased to the grid at 1232 hours on August 14, 2013. The plant reached 100% power at 0810 hours on August 16, 2013. The unit operated at or near 100% power throughout the rest of August 2013.
RPT_PERIOD:201309UNIT_NME:Millstone Unit 3              DOCKET:423OPERATING DATA REPORTPREPARER NAME:K. CookPREPARER TELEPHONE:860-447-1791X6572UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12292. Maximum Dependable Capacity (MWe-Net)1210720.005,652.28189,413.61 720.005,593.90187,302.02 0.000.000.00 879,854.706,833,244.60212,055,163.14This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             423                                                        PREPARER NAME:             K. Cook UNIT_NME:          Millstone Unit 3                                            PREPARER TELEPHONE: 860-447-1791X6572 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1229
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1210 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical          720.00            5,652.28            189,413.61
: 4. Number of Hours Generator On-line                720.00            5,593.90            187,302.02
: 5. Reserve Shutdown Hours                            0.00              0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)          879,854.70        6,833,244.60        212,055,163.14 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
Millstone Unit 3 operated at or near 100% power throughout the month of September, 2013.
Millstone Unit 3 operated at or near 100% power throughout the month of September, 2013.
RPT_PERIOD:201307UNIT_NME:Monticello Unit 1             DOCKET:263OPERATING DATA REPORTPREPARER NAME:Kevin AustinPREPARER TELEPHONE:763-271-5875UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:6002. Maximum Dependable Capacity (MWe-Net)578.1362.771,805.39310,874.23 306.351,746.50306,663.86 0.000.000.00 71,069.00895,635.00162,394,979.30This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              263                                                          PREPARER NAME:           Kevin Austin UNIT_NME:           Monticello Unit 1                                             PREPARER TELEPHONE: 763-271-5875 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           600
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               578.1 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical                362.77          1,805.39        310,874.23
: 4. Number of Hours Generator On-line                        306.35          1,746.50        306,663.86
: 5. Reserve Shutdown Hours                                  0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)                  71,069.00      895,635.00      162,394,979.30 UNIT SHUTDOWNS Type                                                Method of F: Forced            Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled            (Hours)           Reason 1          Down 2                    Comments 1      3/2/2013              S                437.65                C                4        RFO-26


==SUMMARY==
==SUMMARY==
Reactor startup from RFO-26 commenced on 7/16/2013. There was one forced downpower from 7/23 to 7/26 during the startup due to feedwater control system oscillations. (AR 1391178)13/2/2013S  437.65C4RFO-26 RPT_PERIOD:201308UNIT_NME:Monticello Unit 1             DOCKET:263OPERATING DATA REPORTPREPARER NAME:Kevin AustinPREPARER TELEPHONE:763-271-5875UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:6002. Maximum Dependable Capacity (MWe-Net)578.1744.002,549.39311,618.23 744.002,490.50307,407.86 0.000.000.00 412,756.001,308,391.00162,807,735.30This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
Reactor startup from RFO-26 commenced on 7/16/2013. There was one forced downpower from 7/23 to 7/26 during the startup due to feedwater control system oscillations. (AR 1391178)
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:              263                                                              PREPARER NAME:               Kevin Austin UNIT_NME:           Monticello Unit 1                                                 PREPARER TELEPHONE: 763-271-5875 RPT_PERIOD:         201308
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                             600
: 2. Maximum Dependable Capacity (MWe-Net)                 578.1 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                  744.00            2,549.39            311,618.23
: 4. Number of Hours Generator On-line                          744.00            2,490.50            307,407.86
: 5. Reserve Shutdown Hours                                    0.00              0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)                    412,756.00        1,308,391.00        162,807,735.30 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                              Shutting              Cause - Corrective Action No.       Date          S: Scheduled            (Hours)           Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
Reactor startup from RFO-26 continued and 100% power was reached on 8/3. There was one planned downpower on 8/24 for quarterly turbine valve testing and control rod timing, and one forced downpower from 8/27 to 8/30 due to an automatic runback on #12 recirc flow control.
Reactor startup from RFO-26 continued and 100% power was reached on 8/3. There was one planned downpower on 8/24 for quarterly turbine valve testing and control rod timing, and one forced downpower from 8/27 to 8/30 due to an automatic runback on #12 recirc flow control.
RPT_PERIOD:201309UNIT_NME:Monticello Unit 1             DOCKET:263OPERATING DATA REPORTPREPARER NAME:Kevin AustinPREPARER TELEPHONE:763-271-5875UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:6002. Maximum Dependable Capacity (MWe-Net)578.1720.003,269.39312,338.23 720.003,210.50308,127.86 0.000.000.00 408,379.001,716,770.00163,216,114.30This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            263                                                        PREPARER NAME:               Kevin Austin UNIT_NME:           Monticello Unit 1                                         PREPARER TELEPHONE: 763-271-5875 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     600
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         578.1 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical          720.00            3,269.39          312,338.23
: 4. Number of Hours Generator On-line                720.00            3,210.50          308,127.86
: 5. Reserve Shutdown Hours                            0.00              0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)          408,379.00        1,716,770.00      163,216,114.30 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                            Shutting              Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                          Comments


==SUMMARY==
==SUMMARY==
There was one forced downpower from 9/1 to 9/11 due to an automatic runback on #11 recirc flow control.
There was one forced downpower from 9/1 to 9/11 due to an automatic runback on #11 recirc flow control.
RPT_PERIOD:201307UNIT_NME:Nine Mile Point Unit 1       DOCKET:220OPERATING DATA REPORTPREPARER NAME:Yvette HerrmannPREPARER TELEPHONE:315-349-4501UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:6132. Maximum Dependable Capacity (MWe-Net)565691.874,330.30291,425.11 678.554,260.20286,280.48 0.000.0020.40 397,414.812,608,621.14163,576,328.56This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            220                                                      PREPARER NAME:           Yvette Herrmann UNIT_NME:           Nine Mile Point Unit 1                                   PREPARER TELEPHONE: 315-349-4501 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     613
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         565 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          691.87          4,330.30        291,425.11
: 4. Number of Hours Generator On-line                  678.55          4,260.20        286,280.48
: 5. Reserve Shutdown Hours                            0.00            0.00            20.40
: 6. Net Electrical energy Generated (MWHrs)            397,414.81      2,608,621.14    163,576,328.56 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments 1P130 7/8/2013              S              65.45              B                1        Planned per INPO/NRC, Unplanned per WANO 1


==SUMMARY==
==SUMMARY==
Outage due to Drywell leakage was Unplanned per WANO and Planned per INPO/NRC.1P130 17/8/2013S  65.45B1Planned per INPO/NRC, Unplanned per WANO RPT_PERIOD:201308UNIT_NME:Nine Mile Point Unit 1       DOCKET:220OPERATING DATA REPORTPREPARER NAME:Yvette HerrmannPREPARER TELEPHONE:315-349-4501UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:6132. Maximum Dependable Capacity (MWe-Net)565744.005,074.30292,169.11 744.005,004.20287,024.48 0.000.0020.40 448,964.163,057,585.30164,025,292.72This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
Outage due to Drywell leakage was Unplanned per WANO and Planned per INPO/NRC.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:            220                                                    PREPARER NAME:           Yvette Herrmann UNIT_NME:           Nine Mile Point Unit 1                                 PREPARER TELEPHONE: 315-349-4501 RPT_PERIOD:         201308
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                     613
: 2. Maximum Dependable Capacity (MWe-Net)         565 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          5,074.30        292,169.11
: 4. Number of Hours Generator On-line                744.00          5,004.20        287,024.48
: 5. Reserve Shutdown Hours                            0.00            0.00            20.40
: 6. Net Electrical energy Generated (MWHrs)          448,964.16      3,057,585.30    164,025,292.72 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
There were no unplanned losses in August 2013.
There were no unplanned losses in August 2013.
RPT_PERIOD:201309UNIT_NME:Nine Mile Point Unit 1       DOCKET:220OPERATING DATA REPORTPREPARER NAME:Yvette HerrmannPREPARER TELEPHONE:315-349-4501UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:6132. Maximum Dependable Capacity (MWe-Net)565720.005,794.30292,889.11 720.005,724.20287,744.48 0.000.0020.40 438,586.993,496,172.29164,463,879.71This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            220                                                    PREPARER NAME:           Yvette Herrmann UNIT_NME:           Nine Mile Point Unit 1                                 PREPARER TELEPHONE: 315-349-4501 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     613
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         565 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          720.00          5,794.30        292,889.11
: 4. Number of Hours Generator On-line                720.00          5,724.20        287,744.48
: 5. Reserve Shutdown Hours                            0.00            0.00            20.40
: 6. Net Electrical energy Generated (MWHrs)          438,586.99      3,496,172.29    164,463,879.71 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unplanned Energy Loss due to Trip of MG-131 on 9/20/2013.
Unplanned Energy Loss due to Trip of MG-131 on 9/20/2013.
RPT_PERIOD:201307UNIT_NME:Nine Mile Point Unit 2       DOCKET:410OPERATING DATA REPORTPREPARER NAME:Yvette HerrmannPREPARER TELEPHONE:315-349-4501UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:1299.92. Maximum Dependable Capacity (MWe-Net)1276.8744.005,087.00190,054.96 744.005,087.00186,661.02 0.000.000.00 942,769.736,537,099.77203,525,206.21This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            410                                                        PREPARER NAME:           Yvette Herrmann UNIT_NME:           Nine Mile Point Unit 2                                     PREPARER TELEPHONE: 315-349-4501 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1299.9
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1276.8 This Month        Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            5,087.00        190,054.96
: 4. Number of Hours Generator On-line                744.00            5,087.00        186,661.02
: 5. Reserve Shutdown Hours                            0.00              0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          942,769.73        6,537,099.77    203,525,206.21 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                            Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                    Comments


==SUMMARY==
==SUMMARY==
There were no unplanned energy losses in the month of July 2013.
There were no unplanned energy losses in the month of July 2013.
RPT_PERIOD:201308UNIT_NME:Nine Mile Point Unit 2       DOCKET:410OPERATING DATA REPORTPREPARER NAME:Yvette HerrmannPREPARER TELEPHONE:315-349-4501UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:1299.92. Maximum Dependable Capacity (MWe-Net)1276.8744.005,831.00190,798.96 744.005,831.00187,405.02 0.000.000.00 946,127.287,483,227.05204,471,333.49This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            410                                                    PREPARER NAME:           Yvette Herrmann UNIT_NME:           Nine Mile Point Unit 2                                 PREPARER TELEPHONE: 315-349-4501 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1299.9
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1276.8 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          5,831.00        190,798.96
: 4. Number of Hours Generator On-line                744.00          5,831.00        187,405.02
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          946,127.28      7,483,227.05    204,471,333.49 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
There were no losses in August 2013.
There were no losses in August 2013.
RPT_PERIOD:201309UNIT_NME:Nine Mile Point Unit 2       DOCKET:410OPERATING DATA REPORTPREPARER NAME:Yvette HerrmannPREPARER TELEPHONE:315-349-4501UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:1299.92. Maximum Dependable Capacity (MWe-Net)1276.8720.006,551.00191,518.96 720.006,551.00188,125.02 0.000.000.00 916,722.058,399,949.10205,388,055.54This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            410                                                    PREPARER NAME:           Yvette Herrmann UNIT_NME:           Nine Mile Point Unit 2                                 PREPARER TELEPHONE: 315-349-4501 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1299.9
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1276.8 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          720.00          6,551.00        191,518.96
: 4. Number of Hours Generator On-line                720.00          6,551.00        188,125.02
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          916,722.05      8,399,949.10    205,388,055.54 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
There were no unplanned power changes in September 2013.
There were no unplanned power changes in September 2013.
RPT_PERIOD:201307UNIT_NME:North Anna Unit 1             DOCKET:338OPERATING DATA REPORTPREPARER NAME:W.C.BEASLEYPREPARER TELEPHONE:540-894-2520UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9732. Maximum Dependable Capacity (MWe-Net)943744.005,087.00258,880.17 744.005,087.00255,144.86 0.000.000.00 708,482.164,950,912.89223,806,109.19This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            338                                                          PREPARER NAME:           W.C.BEASLEY UNIT_NME:          North Anna Unit 1                                            PREPARER TELEPHONE: 540-894-2520 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       973
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           943 This Month        Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical            744.00            5,087.00        258,880.17
: 4. Number of Hours Generator On-line                    744.00            5,087.00        255,144.86
: 5. Reserve Shutdown Hours                              0.00              0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)              708,482.16        4,950,912.89    223,806,109.19 UNIT SHUTDOWNS Type                                                Method of F: Forced          Duration                              Shutting          Cause - Corrective Action No.       Date        S: Scheduled        (Hours)         Reason 1            Down 2                  Comments


==SUMMARY==
==SUMMARY==
Began the Month @ 100% Power, 1007 MWe. On 7-9-13 @ 0937, ramped down approx 3% IAW 1-PT-13.4 (MTC Test). On 7-9-13 @ 1001, ramped unit up 3%, IAW 1-PT-13.4 (MTC Test). Ended the Month @ 100% Power 1004 MWe.
Began the Month @ 100% Power, 1007 MWe. On 7-9-13 @ 0937, ramped down approx 3% IAW 1-PT-13.4 (MTC Test). On 7-9-13 @ 1001, ramped unit up 3%, IAW 1-PT-13.4 (MTC Test). Ended the Month @ 100% Power 1004 MWe.
RPT_PERIOD:201308UNIT_NME:North Anna Unit 1             DOCKET:338OPERATING DATA REPORTPREPARER NAME:W.C.BeasleyPREPARER TELEPHONE:540-894-2520UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9732. Maximum Dependable Capacity (MWe-Net)943744.005,831.00259,624.17 744.005,831.00255,888.86 0.000.000.00 711,086.525,661,999.41224,517,195.71This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            338                                                    PREPARER NAME:           W.C.Beasley UNIT_NME:          North Anna Unit 1                                      PREPARER TELEPHONE: 540-894-2520 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     973
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         943 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          5,831.00        259,624.17
: 4. Number of Hours Generator On-line                744.00          5,831.00        255,888.86
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          711,086.52      5,661,999.41    224,517,195.71 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                  Comments


==SUMMARY==
==SUMMARY==
Began the Month @ 100% Power, 1004 MWe. Ended the Month @ 100% Power, 1008 MWe.
Began the Month @ 100% Power, 1004 MWe. Ended the Month @ 100% Power, 1008 MWe.
RPT_PERIOD:201309UNIT_NME:North Anna Unit 1            DOCKET:338OPERATING DATA REPORTPREPARER NAME:W.C.BeasleyPREPARER TELEPHONE:540-894-2520UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9732. Maximum Dependable Capacity (MWe-Net)943169.526,000.52259,793.69 168.455,999.45256,057.31 0.000.000.00 158,413.725,820,413.13224,675,609.43This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:               338                                                        PREPARER NAME:           W.C.Beasley UNIT_NME:            North Anna Unit 1                                          PREPARER TELEPHONE: 540-894-2520 RPT_PERIOD:           201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                         973
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)             943 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical              169.52          6,000.52        259,793.69
: 4. Number of Hours Generator On-line                      168.45          5,999.45        256,057.31
: 5. Reserve Shutdown Hours                                0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)                158,413.72      5,820,413.13    224,675,609.43 UNIT SHUTDOWNS Type                                            Method of F: Forced          Duration                          Shutting          Cause - Corrective Action No.       Date          S: Scheduled          (Hours)          Reason 1          Down 2                    Comments N1-     9/8/2013              S              551.55              C                1        Suutdown for scheduled refueling outage.
2013-001


==SUMMARY==
==SUMMARY==
Began the Month @ 100% Power, 1008 MWe. On 9-7-13 @ 1933, commence rampdown for scheduled refueling outage. On 9-8-13 @ 0027, unit off line. Ended the Month in Mode 6.N1-2013-0019/8/2013S  551.55C1Suutdown for scheduled refueling outage.
Began the Month @ 100% Power, 1008 MWe. On 9-7-13 @ 1933, commence rampdown for scheduled refueling outage. On 9-8-13 @ 0027, unit off line. Ended the Month in Mode 6.
RPT_PERIOD:201307UNIT_NME:North Anna Unit 2             DOCKET:339OPERATING DATA REPORTPREPARER NAME:W.C.BEASLEYPREPARER TELEPHONE:540-894-2502UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9732. Maximum Dependable Capacity (MWe-Net)943744.004,002.06246,182.61 744.003,969.07244,369.89 0.000.000.00 705,815.463,774,776.52216,148,900.65This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            339                                                    PREPARER NAME:           W.C.BEASLEY UNIT_NME:          North Anna Unit 2                                      PREPARER TELEPHONE: 540-894-2502 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     973
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         943 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          4,002.06        246,182.61
: 4. Number of Hours Generator On-line                744.00          3,969.07        244,369.89
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          705,815.46      3,774,776.52    216,148,900.65 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                  Comments


==SUMMARY==
==SUMMARY==
Began the Month @ 100% Power, 1004 MWe. Ended the Month @ 100% Power, 1001 MWe.
Began the Month @ 100% Power, 1004 MWe. Ended the Month @ 100% Power, 1001 MWe.
RPT_PERIOD:201308UNIT_NME:North Anna Unit 2             DOCKET:339OPERATING DATA REPORTPREPARER NAME:W.C.BeasleyPREPARER TELEPHONE:540-894-2520UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9732. Maximum Dependable Capacity (MWe-Net)943744.004,746.06246,926.61 744.004,713.07245,113.89 0.000.000.00 709,210.244,483,986.76216,858,110.89This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            339                                                    PREPARER NAME:           W.C.Beasley UNIT_NME:          North Anna Unit 2                                      PREPARER TELEPHONE: 540-894-2520 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     973
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         943 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          4,746.06        246,926.61
: 4. Number of Hours Generator On-line                744.00          4,713.07        245,113.89
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          709,210.24      4,483,986.76    216,858,110.89 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                  Comments


==SUMMARY==
==SUMMARY==
Began the Month @ 100% Power, 1001 MWe. Ended the Month @ 100% Power, 1004 MWe.
Began the Month @ 100% Power, 1001 MWe. Ended the Month @ 100% Power, 1004 MWe.
RPT_PERIOD:201309UNIT_NME:North Anna Unit 2             DOCKET:339OPERATING DATA REPORTPREPARER NAME:W.C.BeasleyPREPARER TELEPHONE:540-894-2520UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9732. Maximum Dependable Capacity (MWe-Net)943720.005,466.06247,646.61 720.005,433.07245,833.89 0.000.000.00 692,687.635,176,674.39217,550,798.52This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            339                                                    PREPARER NAME:           W.C.Beasley UNIT_NME:          North Anna Unit 2                                      PREPARER TELEPHONE: 540-894-2520 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     973
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         943 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          720.00          5,466.06        247,646.61
: 4. Number of Hours Generator On-line                720.00          5,433.07        245,833.89
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          692,687.63      5,176,674.39    217,550,798.52 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                  Comments


==SUMMARY==
==SUMMARY==
Began the Month @ 100% Power, 1004 MWe. Ended the Month @ 100% Power, 1021 MWe.
Began the Month @ 100% Power, 1004 MWe. Ended the Month @ 100% Power, 1021 MWe.
RPT_PERIOD:201307UNIT_NME:Oconee Unit 1                 DOCKET:269OPERATING DATA REPORTPREPARER NAME:Judy SmithPREPARER TELEPHONE:864-873-4309UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8862. Maximum Dependable Capacity (MWe-Net)846744.005,087.00285,811.98 744.005,087.00281,788.17 0.000.000.00 636,016.004,385,245.00232,211,085.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            269                                                    PREPARER NAME:           Judy Smith UNIT_NME:           Oconee Unit 1                                           PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     886
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         846 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          5,087.00        285,811.98
: 4. Number of Hours Generator On-line                744.00          5,087.00        281,788.17
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          636,016.00      4,385,245.00    232,211,085.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201308UNIT_NME:Oconee Unit 1                 DOCKET:269OPERATING DATA REPORTPREPARER NAME:Judy SmithPREPARER TELEPHONE:864-873-4309UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8862. Maximum Dependable Capacity (MWe-Net)846744.005,831.00286,555.98 744.005,831.00282,532.17 0.000.000.00 631,910.005,017,155.00232,842,995.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            269                                                    PREPARER NAME:           Judy Smith UNIT_NME:           Oconee Unit 1                                           PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD:         201308
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     886
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         846 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          5,831.00        286,555.98
: 4. Number of Hours Generator On-line                744.00          5,831.00        282,532.17
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          631,910.00      5,017,155.00    232,842,995.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201309UNIT_NME:Oconee Unit 1                 DOCKET:269OPERATING DATA REPORTPREPARER NAME:Judy SmithPREPARER TELEPHONE:864-873-4309UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8862. Maximum Dependable Capacity (MWe-Net)846720.006,551.00287,275.98 720.006,551.00283,252.17 0.000.000.00 610,386.005,627,541.00233,453,381.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            269                                                    PREPARER NAME:           Judy Smith UNIT_NME:           Oconee Unit 1                                           PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD:         201309
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     886
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         846 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          720.00          6,551.00        287,275.98
: 4. Number of Hours Generator On-line                720.00          6,551.00        283,252.17
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          610,386.00      5,627,541.00    233,453,381.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201307UNIT_NME:Oconee Unit 2                 DOCKET:270OPERATING DATA REPORTPREPARER NAME:Judy SmithPREPARER TELEPHONE:864-873-4309UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8862. Maximum Dependable Capacity (MWe-Net)846744.005,087.00287,271.45 744.005,087.00284,165.32 0.000.000.00 637,002.004,405,991.00234,338,910.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            270                                                    PREPARER NAME:           Judy Smith UNIT_NME:           Oconee Unit 2                                           PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD:         201307
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     886
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         846 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          5,087.00        287,271.45
: 4. Number of Hours Generator On-line                744.00          5,087.00        284,165.32
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          637,002.00      4,405,991.00    234,338,910.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201308UNIT_NME:Oconee Unit 2                 DOCKET:270OPERATING DATA REPORTPREPARER NAME:Judy SmithPREPARER TELEPHONE:864-873-4309UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8862. Maximum Dependable Capacity (MWe-Net)846744.005,831.00288,015.45 744.005,831.00284,909.32 0.000.000.00 633,464.005,039,455.00234,972,374.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            270                                                    PREPARER NAME:           Judy Smith UNIT_NME:           Oconee Unit 2                                           PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD:         201308
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     886
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         846 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          5,831.00        288,015.45
: 4. Number of Hours Generator On-line                744.00          5,831.00        284,909.32
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          633,464.00      5,039,455.00    234,972,374.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201309UNIT_NME:Oconee Unit 2                 DOCKET:270OPERATING DATA REPORTPREPARER NAME:Judy SmithPREPARER TELEPHONE:864-873-4309UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8862. Maximum Dependable Capacity (MWe-Net)846720.006,551.00288,735.45 720.006,551.00285,629.32 0.000.000.00 606,493.005,645,948.00235,578,867.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            270                                                    PREPARER NAME:           Judy Smith UNIT_NME:           Oconee Unit 2                                           PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD:         201309
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     886
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         846 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          720.00          6,551.00        288,735.45
: 4. Number of Hours Generator On-line                720.00          6,551.00        285,629.32
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          606,493.00      5,645,948.00    235,578,867.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201307UNIT_NME:Oconee Unit 3                 DOCKET:287OPERATING DATA REPORTPREPARER NAME:Judy SmithPREPARER TELEPHONE:864-873-4309UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8862. Maximum Dependable Capacity (MWe-Net)846744.005,087.00279,425.95 744.005,087.00276,213.16 0.000.000.00 645,198.004,454,491.00231,173,902.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            287                                                    PREPARER NAME:           Judy Smith UNIT_NME:           Oconee Unit 3                                           PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD:         201307
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     886
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         846 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          5,087.00        279,425.95
: 4. Number of Hours Generator On-line                744.00          5,087.00        276,213.16
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          645,198.00      4,454,491.00    231,173,902.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201308UNIT_NME:Oconee Unit 3                 DOCKET:287OPERATING DATA REPORTPREPARER NAME:Judy SmithPREPARER TELEPHONE:864-873-4309UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8862. Maximum Dependable Capacity (MWe-Net)846744.005,831.00280,169.95 744.005,831.00276,957.16 0.000.000.00 640,950.005,095,441.00231,814,852.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            287                                                    PREPARER NAME:           Judy Smith UNIT_NME:           Oconee Unit 3                                           PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD:         201308
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     886
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         846 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          5,831.00        280,169.95
: 4. Number of Hours Generator On-line                744.00          5,831.00        276,957.16
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          640,950.00      5,095,441.00    231,814,852.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201309UNIT_NME:Oconee Unit 3                 DOCKET:287OPERATING DATA REPORTPREPARER NAME:Judy SmithPREPARER TELEPHONE:864-873-4309UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8862. Maximum Dependable Capacity (MWe-Net)846720.006,551.00280,889.95 720.006,551.00277,677.16 0.000.000.00 617,812.005,713,253.00232,432,664.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            287                                                    PREPARER NAME:           Judy Smith UNIT_NME:           Oconee Unit 3                                           PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD:         201309
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     886
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         846 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          720.00          6,551.00        280,889.95
: 4. Number of Hours Generator On-line                720.00          6,551.00        277,677.16
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          617,812.00      5,713,253.00    232,432,664.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201307UNIT_NME:Oyster Creek Unit 1          DOCKET:219OPERATING DATA REPORTPREPARER NAME:C. Lefler Jr.PREPARER TELEPHONE:609-971-2158UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:6502. Maximum Dependable Capacity (MWe-Net)619744.005,087.00297,319.96 744.005,087.00292,292.99 0.000.00918.20 444,287.003,139,284.00169,742,397.40This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:             219                                                              PREPARER NAME:           C. Lefler Jr.
: 4. Number of Hours Generator On-line
UNIT_NME:          Oyster Creek Unit 1                                              PREPARER TELEPHONE: 609-971-2158 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                             650
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)                 619 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical                  744.00          5,087.00        297,319.96
: 4. Number of Hours Generator On-line                        744.00          5,087.00        292,292.99
: 5. Reserve Shutdown Hours                                    0.00            0.00            918.20
: 6. Net Electrical energy Generated (MWHrs)                  444,287.00      3,139,284.00    169,742,397.40 UNIT SHUTDOWNS Type                                                    Method of F: Forced              Duration                            Shutting          Cause - Corrective Action No.       Date        S: Scheduled            (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
The unplanned loss generation for July was 0 MWh. The FLR was 0, which is below the Site goal of 0.31. The Oyster Creek Planned Energy losses for the month of July are:1) MC Backwash - 223.81 MWh - 7/2, 7/8-11, 7/13-18, 7/21, 7/24-30 2) Environmental Derate - 2,447.49 MWh - 7/3-7, 7/18-22Assuming 0 FLR, this PI will be in goal in November 2013.
The unplanned loss generation for July was 0 MWh. The FLR was 0, which is below the Site goal of 0.31.
RPT_PERIOD:201308UNIT_NME:Oyster Creek Unit 1           DOCKET:219OPERATING DATA REPORTPREPARER NAME:L. VelezPREPARER TELEPHONE:6099714410UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:6502. Maximum Dependable Capacity (MWe-Net)619744.005,831.00298,063.96 744.005,831.00293,036.99 0.000.00918.20 453,796.003,593,080.00170,196,193.40This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
The Oyster Creek Planned Energy losses for the month of July are:
: 4. Number of Hours Generator On-line
: 1) MC Backwash - 223.81 MWh - 7/2, 7/8-11, 7/13-18, 7/21, 7/24-30
: 5. Reserve Shutdown Hours
: 2) Environmental Derate - 2,447.49 MWh - 7/3-7, 7/18-22 Assuming 0 FLR, this PI will be in goal in November 2013.
: 6. Net Electrical energy Generated (MWHrs)
 
OPERATING DATA REPORT DOCKET:            219                                                                PREPARER NAME:             L. Velez UNIT_NME:           Oyster Creek Unit 1                                                 PREPARER TELEPHONE: 6099714410 RPT_PERIOD:         201308
: 1. Design Electrical Rating:                         650
: 2. Maximum Dependable Capacity (MWe-Net)             619 This Month            Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical              744.00                5,831.00            298,063.96
: 4. Number of Hours Generator On-line                      744.00                5,831.00            293,036.99
: 5. Reserve Shutdown Hours                                0.00                  0.00                918.20
: 6. Net Electrical energy Generated (MWHrs)                453,796.00            3,593,080.00        170,196,193.40 UNIT SHUTDOWNS Type                                                      Method of F: Forced          Duration                                    Shutting            Cause - Corrective Action No.       Date        S: Scheduled        (Hours)             Reason 1              Down 2                      Comments


==SUMMARY==
==SUMMARY==
The unplanned loss generation for August was 0 MWh. The FLR was 0.. The Oyster Creek Planned Energy losses for the month of August are: 1) MC Backwash - 222.8 MWh - 8/1, 8/4, 8/6, 8/8, 8/10, 8/13, 8/16, 8/20, 8/25 and 8/30.
The unplanned loss generation for August was 0 MWh. The FLR was 0..
RPT_PERIOD:201309UNIT_NME:Oyster Creek Unit 1           DOCKET:219OPERATING DATA REPORTPREPARER NAME:L. VelezPREPARER TELEPHONE:609-971-4410UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:6502. Maximum Dependable Capacity (MWe-Net)619713.956,544.95298,777.91 706.836,537.83293,743.82 0.000.00918.20 431,057.004,024,137.00170,627,250.40This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
The Oyster Creek Planned Energy losses for the month of August are:
: 4. Number of Hours Generator On-line
: 1) MC Backwash - 222.8 MWh - 8/1, 8/4, 8/6, 8/8, 8/10, 8/13, 8/16, 8/20, 8/25 and 8/30.
: 5. Reserve Shutdown Hours
 
: 6. Net Electrical energy Generated (MWHrs)
OPERATING DATA REPORT DOCKET:              219                                                            PREPARER NAME:           L. Velez UNIT_NME:           Oyster Creek Unit 1                                           PREPARER TELEPHONE: 609-971-4410 RPT_PERIOD:         201309
: 1. Design Electrical Rating:                         650
: 2. Maximum Dependable Capacity (MWe-Net)             619 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical              713.95            6,544.95          298,777.91
: 4. Number of Hours Generator On-line                      706.83            6,537.83          293,743.82
: 5. Reserve Shutdown Hours                                0.00              0.00              918.20
: 6. Net Electrical energy Generated (MWHrs)                431,057.00        4,024,137.00      170,627,250.40 UNIT SHUTDOWNS Type                                                Method of F: Forced          Duration                              Shutting          Cause - Corrective Action No.       Date        S: Scheduled        (Hours)            Reason 1            Down 2                      Comments 1M30    9/30/2013            S                13.17                B                  1          Turbine Controls Testing (Speed Load Changer) to 1M30 Outage


==SUMMARY==
==SUMMARY==
The unplanned loss generation for September was 79.4 MWh, due to 1C3 FWH Normal Drain Valve causing FWH fluctuations, as documented under IR 1554558.
The unplanned loss generation for September was 79.4 MWh, due to 1C3 FWH Normal Drain Valve causing FWH fluctuations, as documented under IR 1554558.
The Oyster Creek Planned Energy losses for the month of September are: 1) Rod for Flow Swap ??? 341.77 MWh ??? 9/1 and 9/2
The Oyster Creek Planned Energy losses for the month of September are:
: 1) Rod for Flow Swap ??? 341.77 MWh ??? 9/1 and 9/2
: 2) Normal Load Maintenance ??? 34.09 MWh ??? 9/5
: 2) Normal Load Maintenance ??? 34.09 MWh ??? 9/5
: 3) 1M30 ??? 12,972 MWh ??? 9/29 and 9/30 1M309/30/2013S  13.17B1Turbine Controls Testing (Speed Load Changer) to 1M30 Outage RPT_PERIOD:201307UNIT_NME:Palisades Unit 1              DOCKET:255OPERATING DATA REPORTPREPARER NAME:R. LevackPREPARER TELEPHONE:269-764-2068UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8052. Maximum Dependable Capacity (MWe-Net)744744.003,919.33251,837.72 744.003,893.90245,653.70 0.000.000.00 586,088.003,097,695.14176,074,721.90This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
: 3) 1M30 ??? 12,972 MWh ??? 9/29 and 9/30
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:             255                                                        PREPARER NAME:           R. Levack UNIT_NME:          Palisades Unit 1                                          PREPARER TELEPHONE: 269-764-2068 RPT_PERIOD:         201307
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                     805
: 2. Maximum Dependable Capacity (MWe-Net)         744 This Month        Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            3,919.33        251,837.72
: 4. Number of Hours Generator On-line                  744.00            3,893.90        245,653.70
: 5. Reserve Shutdown Hours                            0.00              0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            586,088.00        3,097,695.14    176,074,721.90 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Palisades operated at full power for the month of July 2013.
Palisades operated at full power for the month of July 2013.
RPT_PERIOD:201308UNIT_NME:Palisades Unit 1             DOCKET:255OPERATING DATA REPORTPREPARER NAME:Eric EdwardsPREPARER TELEPHONE:269-764-2086UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8052. Maximum Dependable Capacity (MWe-Net)744744.004,663.33252,581.72 744.004,637.90246,397.70 0.000.000.00 586,334.793,684,029.93176,661,056.69This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            255                                                      PREPARER NAME:           Eric Edwards UNIT_NME:           Palisades Unit 1                                         PREPARER TELEPHONE: 269-764-2086 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     805
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         744 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          4,663.33        252,581.72
: 4. Number of Hours Generator On-line                  744.00          4,637.90        246,397.70
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            586,334.79      3,684,029.93    176,661,056.69 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Palisades operated at full power for the month of August 2013.
Palisades operated at full power for the month of August 2013.
RPT_PERIOD:201309UNIT_NME:Palisades Unit 1             DOCKET:255OPERATING DATA REPORTPREPARER NAME:Eric EdwardsPREPARER TELEPHONE:269-764-2086UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8052. Maximum Dependable Capacity (MWe-Net)744720.005,383.33253,301.72 720.005,357.90247,117.70 0.000.000.00 570,971.264,255,001.19177,232,027.95This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            255                                                          PREPARER NAME:           Eric Edwards UNIT_NME:           Palisades Unit 1                                             PREPARER TELEPHONE: 269-764-2086 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     805
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         744 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical          720.00              5,383.33        253,301.72
: 4. Number of Hours Generator On-line                  720.00              5,357.90        247,117.70
: 5. Reserve Shutdown Hours                            0.00                0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            570,971.26          4,255,001.19    177,232,027.95 UNIT SHUTDOWNS Type                                                Method of F: Forced        Duration                              Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1            Down 2                    Comments


==SUMMARY==
==SUMMARY==
Palisades operated at full power for the month of September 2013.
Palisades operated at full power for the month of September 2013.
RPT_PERIOD:201307UNIT_NME:Palo Verde Unit 1             DOCKET:528OPERATING DATA REPORTPREPARER NAME:Tom MockPREPARER TELEPHONE:623-393-2656UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:13332. Maximum Dependable Capacity (MWe-Net)1311744.004,402.22193,525.03 744.004,372.03191,485.11 0.000.000.00 941,363.725,671,215.04233,942,487.99This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              528                                                              PREPARER NAME:                 Tom Mock UNIT_NME:           Palo Verde Unit 1                                               PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           1333
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               1311 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                744.00            4,402.22            193,525.03
: 4. Number of Hours Generator On-line                        744.00            4,372.03            191,485.11
: 5. Reserve Shutdown Hours                                  0.00              0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)                  941,363.72        5,671,215.04        233,942,487.99 UNIT SHUTDOWNS Type                                                  Method of F: Forced        Duration                                Shutting                Cause - Corrective Action No.       Date        S: Scheduled          (Hours)             Reason 1            Down 2                          Comments


==SUMMARY==
==SUMMARY==
The unit began the month at full power. On July 2nd at 20:26, the unit downpowered to 59% RX power after a 480 V load center fault caused a loss of Main Feedwater Pump B, initiating a reactor power cutback. The unit was returned to full power on July 6th at 02:00. The unit ended the month at full power.
The unit began the month at full power. On July 2nd at 20:26, the unit downpowered to 59% RX power after a 480 V load center fault caused a loss of Main Feedwater Pump B, initiating a reactor power cutback. The unit was returned to full power on July 6th at 02:00. The unit ended the month at full power.
RPT_PERIOD:201308UNIT_NME:Palo Verde Unit 1             DOCKET:528OPERATING DATA REPORTPREPARER NAME:Tom MockPREPARER TELEPHONE:623-393-2656UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:13332. Maximum Dependable Capacity (MWe-Net)1311744.005,146.22194,269.03 744.005,116.03192,229.11 0.000.000.00 972,874.586,644,089.62234,915,362.57This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            528                                                        PREPARER NAME:               Tom Mock UNIT_NME:           Palo Verde Unit 1                                         PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1333
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1311 This Month        Yr-to-Date            Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            5,146.22              194,269.03
: 4. Number of Hours Generator On-line                744.00            5,116.03              192,229.11
: 5. Reserve Shutdown Hours                            0.00              0.00                  0.00
: 6. Net Electrical energy Generated (MWHrs)          972,874.58        6,644,089.62          234,915,362.57 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                            Shutting              Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
The unit began the month and ended the month in Mode 1 with the reactor at full power.
The unit began the month and ended the month in Mode 1 with the reactor at full power.
RPT_PERIOD:201309UNIT_NME:Palo Verde Unit 1             DOCKET:528OPERATING DATA REPORTPREPARER NAME:Tom MockPREPARER TELEPHONE:623-393-2656UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:13332. Maximum Dependable Capacity (MWe-Net)1311720.005,866.22194,989.03 720.005,836.03192,949.11 0.000.000.00 944,713.817,588,803.43235,860,076.38This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            528                                                        PREPARER NAME:               Tom Mock UNIT_NME:           Palo Verde Unit 1                                         PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1333
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1311 This Month        Yr-to-Date            Cumulative
: 3. Number of Hours the Reactor was Critical          720.00            5,866.22              194,989.03
: 4. Number of Hours Generator On-line                720.00            5,836.03              192,949.11
: 5. Reserve Shutdown Hours                            0.00              0.00                  0.00
: 6. Net Electrical energy Generated (MWHrs)          944,713.81        7,588,803.43          235,860,076.38 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                            Shutting              Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
The unit began the month and ended the month in Mode 1 with the reactor at full power.
The unit began the month and ended the month in Mode 1 with the reactor at full power.
RPT_PERIOD:201307UNIT_NME:Palo Verde Unit 2             DOCKET:529OPERATING DATA REPORTPREPARER NAME:Tom MockPREPARER TELEPHONE:623-393-2656UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:13362. Maximum Dependable Capacity (MWe-Net)1314744.005,088.00196,215.78 744.005,088.00194,295.23 0.000.000.00 978,759.526,765,089.30243,574,251.94This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            529                                                        PREPARER NAME:               Tom Mock UNIT_NME:           Palo Verde Unit 2                                         PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1336
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1314 This Month        Yr-to-Date            Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            5,088.00              196,215.78
: 4. Number of Hours Generator On-line                744.00            5,088.00              194,295.23
: 5. Reserve Shutdown Hours                            0.00              0.00                  0.00
: 6. Net Electrical energy Generated (MWHrs)          978,759.52        6,765,089.30          243,574,251.94 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                            Shutting              Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
The unit began the month and ended the month in Mode 1 with the reactor at full power.
The unit began the month and ended the month in Mode 1 with the reactor at full power.
RPT_PERIOD:201308UNIT_NME:Palo Verde Unit 2             DOCKET:529OPERATING DATA REPORTPREPARER NAME:Tom MockPREPARER TELEPHONE:623-393-2656UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:13362. Maximum Dependable Capacity (MWe-Net)1314744.005,832.00196,959.78 744.005,832.00195,039.23 0.000.000.00 982,008.677,747,097.97244,556,260.61This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            529                                                        PREPARER NAME:               Tom Mock UNIT_NME:           Palo Verde Unit 2                                         PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1336
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1314 This Month        Yr-to-Date            Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            5,832.00              196,959.78
: 4. Number of Hours Generator On-line                744.00            5,832.00              195,039.23
: 5. Reserve Shutdown Hours                            0.00              0.00                  0.00
: 6. Net Electrical energy Generated (MWHrs)          982,008.67        7,747,097.97          244,556,260.61 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                            Shutting              Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
The unit began the month and ended the month in Mode 1 with the reactor at full power.
The unit began the month and ended the month in Mode 1 with the reactor at full power.
RPT_PERIOD:201309UNIT_NME:Palo Verde Unit 2             DOCKET:529OPERATING DATA REPORTPREPARER NAME:Tom MockPREPARER TELEPHONE:623-393-2656UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:13362. Maximum Dependable Capacity (MWe-Net)1314720.006,552.00197,679.78 720.006,552.00195,759.23 0.000.000.00 952,196.368,699,294.33245,508,456.97This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            529                                                        PREPARER NAME:               Tom Mock UNIT_NME:           Palo Verde Unit 2                                         PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1336
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1314 This Month        Yr-to-Date            Cumulative
: 3. Number of Hours the Reactor was Critical          720.00            6,552.00              197,679.78
: 4. Number of Hours Generator On-line                720.00            6,552.00              195,759.23
: 5. Reserve Shutdown Hours                            0.00              0.00                  0.00
: 6. Net Electrical energy Generated (MWHrs)          952,196.36        8,699,294.33          245,508,456.97 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                            Shutting              Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
The unit began the month and ended the month in Mode 1 with the reactor at full power.
The unit began the month and ended the month in Mode 1 with the reactor at full power.
RPT_PERIOD:201307UNIT_NME:Palo Verde Unit 3             DOCKET:530OPERATING DATA REPORTPREPARER NAME:Tom MockPREPARER TELEPHONE:623-393-2656UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:13342. Maximum Dependable Capacity (MWe-Net)1312744.005,088.00191,259.73 744.005,088.00189,501.37 0.000.000.00 972,291.976,613,458.63235,282,099.81This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            530                                                        PREPARER NAME:               Tom Mock UNIT_NME:           Palo Verde Unit 3                                         PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1334
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1312 This Month        Yr-to-Date            Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            5,088.00              191,259.73
: 4. Number of Hours Generator On-line                744.00            5,088.00              189,501.37
: 5. Reserve Shutdown Hours                            0.00              0.00                  0.00
: 6. Net Electrical energy Generated (MWHrs)          972,291.97        6,613,458.63          235,282,099.81 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                            Shutting              Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
The unit began the month and ended the month in Mode 1 with the reactor at full power.
The unit began the month and ended the month in Mode 1 with the reactor at full power.
RPT_PERIOD:201308UNIT_NME:Palo Verde Unit 3             DOCKET:530OPERATING DATA REPORTPREPARER NAME:Tom MockPREPARER TELEPHONE:623-393-2656UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:13342. Maximum Dependable Capacity (MWe-Net)1312744.005,832.00192,003.73 744.005,832.00190,245.37 0.000.000.00 975,605.207,589,063.83236,257,705.01This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            530                                                        PREPARER NAME:               Tom Mock UNIT_NME:           Palo Verde Unit 3                                         PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1334
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1312 This Month        Yr-to-Date            Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            5,832.00              192,003.73
: 4. Number of Hours Generator On-line                744.00            5,832.00              190,245.37
: 5. Reserve Shutdown Hours                            0.00              0.00                  0.00
: 6. Net Electrical energy Generated (MWHrs)          975,605.20        7,589,063.83          236,257,705.01 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                            Shutting              Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
The unit began the month and ended the month in Mode 1 with the reactor at full power.
The unit began the month and ended the month in Mode 1 with the reactor at full power.
RPT_PERIOD:201309UNIT_NME:Palo Verde Unit 3             DOCKET:530OPERATING DATA REPORTPREPARER NAME:Tom MockPREPARER TELEPHONE:623-393-2656UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:13342. Maximum Dependable Capacity (MWe-Net)1312720.006,552.00192,723.73 720.006,552.00190,965.37 0.000.000.00 945,616.418,534,680.24237,203,321.42This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            530                                                        PREPARER NAME:               Tom Mock UNIT_NME:           Palo Verde Unit 3                                         PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1334
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1312 This Month        Yr-to-Date            Cumulative
: 3. Number of Hours the Reactor was Critical          720.00            6,552.00              192,723.73
: 4. Number of Hours Generator On-line                720.00            6,552.00              190,965.37
: 5. Reserve Shutdown Hours                            0.00              0.00                  0.00
: 6. Net Electrical energy Generated (MWHrs)          945,616.41        8,534,680.24          237,203,321.42 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                            Shutting              Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
The unit began the month and ended the month in Mode 1 with the reactor at full power.
The unit began the month and ended the month in Mode 1 with the reactor at full power.
RPT_PERIOD:201307UNIT_NME:Peach Bottom Unit 2           DOCKET:277OPERATING DATA REPORTPREPARER NAME:Brad DeihlPREPARER TELEPHONE:717-456-4420UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11382. Maximum Dependable Capacity (MWe-Net)1112744.005,087.00270,107.94 744.005,087.00265,370.29 0.000.000.00 828,630.905,890,056.10272,959,125.30This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              277                                                              PREPARER NAME:           Brad Deihl UNIT_NME:           Peach Bottom Unit 2                                               PREPARER TELEPHONE: 717-456-4420 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           1138
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               1112 This Month          Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical                744.00              5,087.00        270,107.94
: 4. Number of Hours Generator On-line                        744.00              5,087.00        265,370.29
: 5. Reserve Shutdown Hours                                  0.00                0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)                  828,630.90          5,890,056.10    272,959,125.30 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                                Shutting          Cause - Corrective Action No.       Date        S: Scheduled            (Hours)           Reason 1            Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unit 2 began the month of July at 100% of maximum allowable power (3514 MWth). There were no load reductions on Unit 2 for the month of July 2013. Unit 2 ended the month of July at 100% of maximum allowable power (3514 MWth).
Unit 2 began the month of July at 100% of maximum allowable power (3514 MWth).
RPT_PERIOD:201308UNIT_NME:Peach Bottom Unit 2           DOCKET:277OPERATING DATA REPORTPREPARER NAME:Brad DeihlPREPARER TELEPHONE:717-456-4420UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11382. Maximum Dependable Capacity (MWe-Net)1112744.005,831.00270,851.94 744.005,831.00266,114.29 0.000.000.00 815,151.006,705,207.10273,774,276.30This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
There were no load reductions on Unit 2 for the month of July 2013.
: 4. Number of Hours Generator On-line
Unit 2 ended the month of July at 100% of maximum allowable power (3514 MWth).
: 5. Reserve Shutdown Hours
 
: 6. Net Electrical energy Generated (MWHrs)
OPERATING DATA REPORT DOCKET:              277                                                            PREPARER NAME:             Brad Deihl UNIT_NME:           Peach Bottom Unit 2                                           PREPARER TELEPHONE: 717-456-4420 RPT_PERIOD:         201308
: 1. Design Electrical Rating:                         1138
: 2. Maximum Dependable Capacity (MWe-Net)             1112 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                744.00            5,831.00          270,851.94
: 4. Number of Hours Generator On-line                      744.00            5,831.00          266,114.29
: 5. Reserve Shutdown Hours                                  0.00              0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                815,151.00        6,705,207.10      273,774,276.30 UNIT SHUTDOWNS Type                                                  Method of F: Forced          Duration                              Shutting            Cause - Corrective Action No.       Date        S: Scheduled          (Hours)           Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
Unit 2 began the month of August at 100% of maximum allowable power (3514 MWth). On August 30, 2013 at 21:02, Unit 2 commenced a planned load reduction to 60% CTP for Rod Pattern Adjustment, Turbine Testing, and waterbox cleaning. During the downpower, the 2B Recirc Pump tripped. Minimum power of 36.7% was reached on August 30th at 21:59. The unit ended the month at 48.5% power.
Unit 2 began the month of August at 100% of maximum allowable power (3514 MWth).
On August 30, 2013 at 21:02, Unit 2 commenced a planned load reduction to 60% CTP for Rod Pattern Adjustment, Turbine Testing, and waterbox cleaning. During the downpower, the 2B Recirc Pump tripped. Minimum power of 36.7% was reached on August 30th at 21:59. The unit ended the month at 48.5% power.
Unit 2 ended the month of August at 48.5% of maximum allowable power (3514 MWth).
Unit 2 ended the month of August at 48.5% of maximum allowable power (3514 MWth).
RPT_PERIOD:201309UNIT_NME:Peach Bottom Unit 2           DOCKET:277OPERATING DATA REPORTPREPARER NAME:Brad DeihlPREPARER TELEPHONE:717-456-4420UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11382. Maximum Dependable Capacity (MWe-Net)1112720.006,551.00271,571.94 720.006,551.00266,834.29 0.000.000.00 801,512.107,506,719.20274,575,788.40This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              277                                                            PREPARER NAME:             Brad Deihl UNIT_NME:           Peach Bottom Unit 2                                             PREPARER TELEPHONE: 717-456-4420 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           1138
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               1112 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                720.00            6,551.00          271,571.94
: 4. Number of Hours Generator On-line                      720.00            6,551.00          266,834.29
: 5. Reserve Shutdown Hours                                  0.00              0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                801,512.10        7,506,719.20      274,575,788.40 UNIT SHUTDOWNS Type                                                  Method of F: Forced          Duration                              Shutting            Cause - Corrective Action No.       Date          S: Scheduled          (Hours)           Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
Unit 2 began the month of September at 48.5% of maximum allowable power (3514 MWth) due to the 2B recirc pump trip event. On September 1, 2013, Unit 2 continued the planned load reduction to 60% CTP for Rod Pattern Adjustment, Turbine Testing, waterbox cleaning, and recovery from the the 2B Recirc Pump trip. Minimum power of 32.7% was reached on September 2nd at 22:39. The unit was returned to full power on September 2, 2013 at 10:32.
Unit 2 began the month of September at 48.5% of maximum allowable power (3514 MWth) due to the 2B recirc pump trip event.
On September 2, 2013 at 23:02, Unit 2 commenced a planned load reduction to 79.7% CTP for a follow up rod pattern adjustment. Minimum power was reached on September 2nd at 23:30. The unit was returned to 100%% power on September 3, 2013 at 06:02. Unit 2 ended the month of September at 100% of maximum allowable power (3514 MWth).
On September 1, 2013, Unit 2 continued the planned load reduction to 60% CTP for Rod Pattern Adjustment, Turbine Testing, waterbox cleaning, and recovery from the the 2B Recirc Pump trip. Minimum power of 32.7% was reached on September 2nd at 22:39. The unit was returned to full power on September 2, 2013 at 10:32.
RPT_PERIOD:201307UNIT_NME:Peach Bottom Unit 3           DOCKET:278OPERATING DATA REPORTPREPARER NAME:Brad DeihlPREPARER TELEPHONE:717-456-4420UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11792. Maximum Dependable Capacity (MWe-Net)1095744.005,087.00269,513.28 744.005,087.00265,262.72 0.000.000.00 808,844.905,853,314.10271,990,373.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
On September 2, 2013 at 23:02, Unit 2 commenced a planned load reduction to 79.7% CTP for a follow up rod pattern adjustment. Minimum power was reached on September 2nd at 23:30. The unit was returned to 100%% power on September 3, 2013 at 06:02.
: 4. Number of Hours Generator On-line
Unit 2 ended the month of September at 100% of maximum allowable power (3514 MWth).
: 5. Reserve Shutdown Hours
 
: 6. Net Electrical energy Generated (MWHrs)
OPERATING DATA REPORT DOCKET:              278                                                                PREPARER NAME:           Brad Deihl UNIT_NME:           Peach Bottom Unit 3                                                 PREPARER TELEPHONE: 717-456-4420 RPT_PERIOD:         201307
: 1. Design Electrical Rating:                           1179
: 2. Maximum Dependable Capacity (MWe-Net)               1095 This Month            Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                744.00                5,087.00          269,513.28
: 4. Number of Hours Generator On-line                      744.00                5,087.00          265,262.72
: 5. Reserve Shutdown Hours                                  0.00                  0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                808,844.90            5,853,314.10      271,990,373.00 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                                  Shutting          Cause - Corrective Action No.       Date        S: Scheduled            (Hours)           Reason 1              Down 2                      Comments


==SUMMARY==
==SUMMARY==
Unit 3 began the month of July at 99.97% of maximum allowable power (3513 MWth).On July 5, 2013 at 23:02, Unit 3 commenced a planned load reduction to 81.4% CTP to remove the 5A and 5C Feed Water Heater from service. Min power was reached on July 6th at 01:01. The unit was returned to 99.97% power on July 6, 2013 at 04:18. On July 26, 2013 at 23:01, Unit 3 commenced a planned load reduction to 94.4% CTP to remove the 5B Feed Water Heater from service. Min power was reached on July 26th at 23:08. The unit was returned to 99.97% power on July 27, 2013 at 01:26. Unit 3 coasted to 99.0% CTP following the removal of the final 5th stage feed water heater. Unit 3 ended the month of July at 99.0% of maximum allowable power (3513 MWth). Unit 3 is limited to a maximum allowable power level of 3513 MWth (99.97%) due to Leading Edge Flow Meter (LEFM) imposed restrictions.
Unit 3 began the month of July at 99.97% of maximum allowable power (3513 MWth).
RPT_PERIOD:201308UNIT_NME:Peach Bottom Unit 3           DOCKET:278OPERATING DATA REPORTPREPARER NAME:Brad DeihlPREPARER TELEPHONE:717-456-4420UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11792. Maximum Dependable Capacity (MWe-Net)1095744.005,831.00270,257.28 744.005,831.00266,006.72 0.000.000.00 752,754.006,606,068.10272,743,127.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
On July 5, 2013 at 23:02, Unit 3 commenced a planned load reduction to 81.4% CTP to remove the 5A and 5C Feed Water Heater from service.
: 4. Number of Hours Generator On-line
Min power was reached on July 6th at 01:01. The unit was returned to 99.97% power on July 6, 2013 at 04:18.
: 5. Reserve Shutdown Hours
On July 26, 2013 at 23:01, Unit 3 commenced a planned load reduction to 94.4% CTP to remove the 5B Feed Water Heater from service. Min power was reached on July 26th at 23:08. The unit was returned to 99.97% power on July 27, 2013 at 01:26.
: 6. Net Electrical energy Generated (MWHrs)
Unit 3 coasted to 99.0% CTP following the removal of the final 5th stage feed water heater.
Unit 3 ended the month of July at 99.0% of maximum allowable power (3513 MWth). Unit 3 is limited to a maximum allowable power level of 3513 MWth (99.97%) due to Leading Edge Flow Meter (LEFM) imposed restrictions.
 
OPERATING DATA REPORT DOCKET:              278                                                              PREPARER NAME:             Brad Deihl UNIT_NME:           Peach Bottom Unit 3                                               PREPARER TELEPHONE: 717-456-4420 RPT_PERIOD:         201308
: 1. Design Electrical Rating:                           1179
: 2. Maximum Dependable Capacity (MWe-Net)               1095 This Month          Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                744.00              5,831.00            270,257.28
: 4. Number of Hours Generator On-line                      744.00              5,831.00            266,006.72
: 5. Reserve Shutdown Hours                                  0.00                0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)                752,754.00          6,606,068.10        272,743,127.00 UNIT SHUTDOWNS Type                                                    Method of F: Forced          Duration                                Shutting            Cause - Corrective Action No.       Date        S: Scheduled          (Hours)           Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
Unit 3 began the month of August at 99.07% of maximum allowable power (3513 MWth).On August 2, 2013 at 23:03, Unit 3 commenced a planned load reduction to 93.6% CTP to remove the 4B and 4C Feed Water Heater from service. Minimum power was reached on August 3rd at 01:47. The unit was returned to 98.1% power on August 3, 2013 at 09:02. Unit 3 coasted to 88.7% CTP following the removal of the 4th stage feed water heaters. Unit 3 ended the month of August at 88.7% of maximum allowable power (3513 MWth). Unit 3 is limited to a maximum allowable power level of 3513 MWth (99.97%) due to Leading Edge Flow Meter (LEFM) imposed restrictions.
Unit 3 began the month of August at 99.07% of maximum allowable power (3513 MWth).
RPT_PERIOD:201309UNIT_NME:Peach Bottom Unit 3           DOCKET:278OPERATING DATA REPORTPREPARER NAME:Brad DeihlPREPARER TELEPHONE:717-456-4420UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11792. Maximum Dependable Capacity (MWe-Net)1095193.576,024.57270,450.85 192.036,023.03266,198.75 0.000.000.00 168,170.106,774,238.20272,911,297.10This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
On August 2, 2013 at 23:03, Unit 3 commenced a planned load reduction to 93.6% CTP to remove the 4B and 4C Feed Water Heater from service. Minimum power was reached on August 3rd at 01:47. The unit was returned to 98.1% power on August 3, 2013 at 09:02.
: 4. Number of Hours Generator On-line
Unit 3 coasted to 88.7% CTP following the removal of the 4th stage feed water heaters.
: 5. Reserve Shutdown Hours
Unit 3 ended the month of August at 88.7% of maximum allowable power (3513 MWth). Unit 3 is limited to a maximum allowable power level of 3513 MWth (99.97%) due to Leading Edge Flow Meter (LEFM) imposed restrictions.
: 6. Net Electrical energy Generated (MWHrs)
 
OPERATING DATA REPORT DOCKET:             278                                                              PREPARER NAME:             Brad Deihl UNIT_NME:            Peach Bottom Unit 3                                             PREPARER TELEPHONE: 717-456-4420 RPT_PERIOD:         201309
: 1. Design Electrical Rating:                           1179
: 2. Maximum Dependable Capacity (MWe-Net)               1095 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical              193.57              6,024.57          270,450.85
: 4. Number of Hours Generator On-line                      192.03              6,023.03          266,198.75
: 5. Reserve Shutdown Hours                                0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                168,170.10          6,774,238.20      272,911,297.10 UNIT SHUTDOWNS Type                                                    Method of F: Forced          Duration                                Shutting            Cause - Corrective Action No.       Date        S: Scheduled          (Hours)          Reason 1              Down 2                        Comments P3R19 9/9/2013              S                527.97                C                    1          On September 8, 2013 at 15:02, Unit 3 commenced a planned power reduction for P3R19 refueling outage. At 00:02 on September 9th, the Unit 3 generator was tripped. At 01:34 on September 9, 2013 the Unit 3 reactor was manually scrammed.


==SUMMARY==
==SUMMARY==
Unit 3 began the month of September at 88.7% of maximum allowable power (3513 MWth) due to EOC coastdown.On September 8, 2013 at 15:02, Unit 3 commenced a planned power reduction for P3R19 refueling outage. At 00:02 on September 9th, the Unit 3 generator was tripped. At 01:34 on September 9, 2013 the Unit 3 reactor was manually scrammed. Unit 3 ended the month of September at 0% of maximum allowable power (3513 MWth). Unit 3 is limited to a maximum allowable power level of 3513 MWth (99.97%) due to Leading Edge Flow Meter (LEFM) imposed restrictions.P3R199/9/2013S  527.97C1On September 8, 2013 at 15:02, Unit 3 commenced a planned power reduction for P3R19 refueling outage. At 00:02 on September 9th, the Unit 3 generator was tripped. At 01:34 on September 9, 2013 the Unit 3 reactor was manually scrammed.
Unit 3 began the month of September at 88.7% of maximum allowable power (3513 MWth) due to EOC coastdown.
RPT_PERIOD:201307UNIT_NME:Perry Unit 1                 DOCKET:440OPERATING DATA REPORTPREPARER NAME:T. PhelpsPREPARER TELEPHONE:440-280-7660UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12682. Maximum Dependable Capacity (MWe-Net)1240744.003,562.21185,781.09 744.003,371.12182,035.21 0.000.000.00 928,048.103,965,388.60213,503,198.10This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
On September 8, 2013 at 15:02, Unit 3 commenced a planned power reduction for P3R19 refueling outage. At 00:02 on September 9th, the Unit 3 generator was tripped. At 01:34 on September 9, 2013 the Unit 3 reactor was manually scrammed.
: 4. Number of Hours Generator On-line
Unit 3 ended the month of September at 0% of maximum allowable power (3513 MWth). Unit 3 is limited to a maximum allowable power level of 3513 MWth (99.97%) due to Leading Edge Flow Meter (LEFM) imposed restrictions.
: 5. Reserve Shutdown Hours
 
: 6. Net Electrical energy Generated (MWHrs)
OPERATING DATA REPORT DOCKET:             440                                                        PREPARER NAME:           T. Phelps UNIT_NME:           Perry Unit 1                                               PREPARER TELEPHONE: 440-280-7660 RPT_PERIOD:         201307
: 1. Design Electrical Rating:                     1268
: 2. Maximum Dependable Capacity (MWe-Net)         1240 This Month          Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00              3,562.21        185,781.09
: 4. Number of Hours Generator On-line                744.00              3,371.12        182,035.21
: 5. Reserve Shutdown Hours                            0.00                0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          928,048.10          3,965,388.60    213,503,198.10 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                    Comments


==SUMMARY==
==SUMMARY==
The Perry Nuclear Power Plant ran the entire month of July 2013.
The Perry Nuclear Power Plant ran the entire month of July 2013.
RPT_PERIOD:201308UNIT_NME:Perry Unit 1                  DOCKET:440OPERATING DATA REPORTPREPARER NAME:T. PhelpsPREPARER TELEPHONE:440-280-7660UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12682. Maximum Dependable Capacity (MWe-Net)1240744.004,306.21186,525.09 744.004,115.12182,779.21 0.000.000.00 916,126.304,881,514.90214,419,324.40This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             440                                                      PREPARER NAME:           T. Phelps UNIT_NME:          Perry Unit 1                                              PREPARER TELEPHONE: 440-280-7660 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1268
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1240 This Month        Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            4,306.21        186,525.09
: 4. Number of Hours Generator On-line                744.00            4,115.12        182,779.21
: 5. Reserve Shutdown Hours                            0.00              0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          916,126.30        4,881,514.90    214,419,324.40 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
The Perry Plant ran the entire month of August, 2013.
The Perry Plant ran the entire month of August, 2013.
RPT_PERIOD:201309UNIT_NME:Perry Unit 1                  DOCKET:440OPERATING DATA REPORTPREPARER NAME:T. PhelpsPREPARER TELEPHONE:440-280-7660UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12682. Maximum Dependable Capacity (MWe-Net)1240679.634,985.84187,204.72 657.474,772.59183,436.68 0.000.000.00 777,536.505,659,051.40215,196,860.90This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             440                                                                PREPARER NAME:               T. Phelps UNIT_NME:            Perry Unit 1                                                        PREPARER TELEPHONE: 440-280-7660 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           1268
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               1240 This Month            Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                679.63                4,985.84          187,204.72
: 4. Number of Hours Generator On-line                        657.47                4,772.59          183,436.68
: 5. Reserve Shutdown Hours                                  0.00                  0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                  777,536.50            5,659,051.40      215,196,860.90 UNIT SHUTDOWNS Type                                                      Method of F: Forced            Duration                                  Shutting            Cause - Corrective Action No.       Date        S: Scheduled            (Hours)            Reason 1              Down 2                          Comments 4       9/6/2013            S                  62.53                  A                    1          Replaced a non-safety related 120 VAC regulating transformer which services the digital feedwater control logic. The transformer was showing signs of degradation beginning on August 30, 2013.


==SUMMARY==
==SUMMARY==
The Perry Nuclear Power Plant was on line for 657.5 hours during the month of September 2013. The plant performed a planned outage to troubleshoot and repair the high voltage on panel V-1-A . The unit returned to 100% on 9/13/13 @0349. The plant remained on line through the month's end.49/6/2013S  62.53A1Replaced a non-safety related 120 VAC regulating transformer which services the digital feedwater control logic. The transformer was showing signs of degradation beginning on August 30, 2013.
The Perry Nuclear Power Plant was on line for 657.5 hours during the month of September 2013. The plant performed a planned outage to troubleshoot and repair the high voltage on panel V-1-A . The unit returned to 100% on 9/13/13 @0349. The plant remained on line through the month's end.
RPT_PERIOD:201307UNIT_NME:Pilgrim Unit 1               DOCKET:293OPERATING DATA REPORTPREPARER NAME:Brent LyonsPREPARER TELEPHONE:508-830-8270UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:6902. Maximum Dependable Capacity (MWe-Net)684.7744.003,788.02269,500.96 744.003,627.37266,778.95 0.000.000.00 499,579.002,306,909.00164,466,482.53This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              293                                                              PREPARER NAME:               Brent Lyons UNIT_NME:             Pilgrim Unit 1                                                   PREPARER TELEPHONE: 508-830-8270 RPT_PERIOD:           201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           690
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               684.7 This Month          Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                744.00              3,788.02            269,500.96
: 4. Number of Hours Generator On-line                        744.00              3,627.37            266,778.95
: 5. Reserve Shutdown Hours                                  0.00                0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)                  499,579.00          2,306,909.00        164,466,482.53 UNIT SHUTDOWNS Type                                                  Method of F: Forced          Duration                                Shutting              Cause - Corrective Action No.       Date          S: Scheduled          (Hours)           Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
At the beginning of the month, reactor power was 100%. On July 17th at 12:30, a power reduction commenced due to TS sea water inlet temp limitations (75F). Power was returned to 100% on July 18th at 02:08. The duration of the downpower was 13 hrs and 37 mins. The minimum power level achieved was 84.60%. On July 18th at 15:35, a power reduction commenced due to sea water inlet temp challenging the TS limit of 75F. Power was returned to 100% on July 18th at 20:41. The duration of the downpower was 5 hrs and 6 mins. The minimum power level achieved was 92.70%. On July 25th at 23:51, a power reduction commenced due to sea water inlet temp challenging the TS limit of 75F. Power was returned to 100% on July 26th at 07:58. The duration of the downpower was 8 hrs and 7 mins. The minimum power level achieved was 89.90%. The reactor remained at full power throughout the remainder of the month.
At the beginning of the month, reactor power was 100%. On July 17th at 12:30, a power reduction commenced due to TS sea water inlet temp limitations (75F). Power was returned to 100% on July 18th at 02:08. The duration of the downpower was 13 hrs and 37 mins. The minimum power level achieved was 84.60%. On July 18th at 15:35, a power reduction commenced due to sea water inlet temp challenging the TS limit of 75F. Power was returned to 100% on July 18th at 20:41. The duration of the downpower was 5 hrs and 6 mins. The minimum power level achieved was 92.70%. On July 25th at 23:51, a power reduction commenced due to sea water inlet temp challenging the TS limit of 75F. Power was returned to 100% on July 26th at 07:58. The duration of the downpower was 8 hrs and 7 mins. The minimum power level achieved was 89.90%. The reactor remained at full power throughout the remainder of the month.
RPT_PERIOD:201308UNIT_NME:Pilgrim Unit 1               DOCKET:293OPERATING DATA REPORTPREPARER NAME:Brent LyonsPREPARER TELEPHONE:508-830-8270UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:6902. Maximum Dependable Capacity (MWe-Net)684.7657.884,445.90270,158.84 642.134,269.50267,421.08 0.000.000.00 379,986.002,686,895.00164,846,468.53This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              293                                                                    PREPARER NAME:               Brent Lyons UNIT_NME:             Pilgrim Unit 1                                                         PREPARER TELEPHONE: 508-830-8270 RPT_PERIOD:           201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                               690
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)                   684.7 This Month            Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                    657.88                4,445.90          270,158.84
: 4. Number of Hours Generator On-line                            642.13                4,269.50          267,421.08
: 5. Reserve Shutdown Hours                                      0.00                  0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                      379,986.00            2,686,895.00      164,846,468.53 UNIT SHUTDOWNS Type                                                      Method of F: Forced            Duration                                  Shutting              Cause - Corrective Action No.      Date            S: Scheduled            (Hours)            Reason 1              Down 2                        Comments 4      8/22/2013                F                  101.87                A                    2          On August 22, 2013 at 07:55, operators manually scrammed the reactor in response to a trip of all three (3) reactor feed pumps. This trip was the result of Instrument power panel Y1 breaker 24 tripping open on a ground fault condition. The power from this breaker supplies the seal cooling water flow switches to all reactor feed pumps. By design, a loss of cooling water flow or a loss of power to the flow switches will generate a signal to the trip the associated reactor feed pump after a sixty (60) second time delay. The reactor was made critical on August 25, 2013 at 22:02. The main generator was synchronized to the grid on August 26, 2013 at 13:47.


==SUMMARY==
==SUMMARY==
At the beginning of the month, reactor power was 100%. On August 22, 2013 at 07:55, operators manually scrammed the reactor in response to a trip of all three (3) reactor feed pumps. This trip was the result of Instrument power panel Y1 breaker 24 tripping open on a ground fault condition. The power from this breaker supplies the seal cooling water flow switches to all three reactor feed pumps. By design, a loss of cooling water flow or a loss of power to the flow switches will generate a signal to the trip the associated reactor feed pump after a sixty (60) second time delay. The reactor was made critical on August 25, 2013 at 22:02. The main generator was synchronized to the grid on August 26, 2013 at 13:47. Reactor power was raised to approximately 75% RCTP on August 28th, 2013 and remained at this level until the end of the month. Power ascension was limited due to the inability to start Reactor Feed Pump 'A'.48/22/2013F  101.87A2On August 22, 2013 at 07:55, operators manually scrammed the reactor in response to a trip of all three (3) reactor feed pumps. This trip was the result of Instrument power panel Y1 breaker 24 tripping open on a ground fault condition. The power from this breaker supplies the seal cooling water flow switches to all reactor feed pumps. By design, a loss of cooling water flow or a loss of power to the flow switches will generate a signal to the trip the associated reactor feed pump after a sixty (60) second time delay. The reactor was made critical on August 25, 2013 at 22:02. The main generator was synchronized to the grid on August 26, 2013 at 13:47.
At the beginning of the month, reactor power was 100%. On August 22, 2013 at 07:55, operators manually scrammed the reactor in response to a trip of all three (3) reactor feed pumps. This trip was the result of Instrument power panel Y1 breaker 24 tripping open on a ground fault condition.
RPT_PERIOD:201309UNIT_NME:Pilgrim Unit 1               DOCKET:293OPERATING DATA REPORTPREPARER NAME:Brent LyonsPREPARER TELEPHONE:508-830-8270UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:6902. Maximum Dependable Capacity (MWe-Net)684.7568.425,014.32270,727.26 551.174,820.67267,972.25 0.000.000.00 326,768.003,013,663.00165,173,236.53This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
The power from this breaker supplies the seal cooling water flow switches to all three reactor feed pumps. By design, a loss of cooling water flow or a loss of power to the flow switches will generate a signal to the trip the associated reactor feed pump after a sixty (60) second time delay. The reactor was made critical on August 25, 2013 at 22:02. The main generator was synchronized to the grid on August 26, 2013 at 13:47. Reactor power was raised to approximately 75% RCTP on August 28th, 2013 and remained at this level until the end of the month. Power ascension was limited due to the inability to start Reactor Feed Pump 'A'.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:             293                                                                  PREPARER NAME:                 Brent Lyons UNIT_NME:           Pilgrim Unit 1                                                       PREPARER TELEPHONE: 508-830-8270 RPT_PERIOD:         201309
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                             690
: 2. Maximum Dependable Capacity (MWe-Net)                 684.7 This Month        Yr-to-Date            Cumulative
: 3. Number of Hours the Reactor was Critical                  568.42            5,014.32              270,727.26
: 4. Number of Hours Generator On-line                          551.17            4,820.67              267,972.25
: 5. Reserve Shutdown Hours                                    0.00              0.00                  0.00
: 6. Net Electrical energy Generated (MWHrs)                    326,768.00        3,013,663.00          165,173,236.53 UNIT SHUTDOWNS Type                                                      Method of F: Forced            Duration                                Shutting                Cause - Corrective Action No.      Date          S: Scheduled            (Hours)            Reason 1            Down 2                            Comments 5      9/8/2013              F                  168.83                A                    1          On September 8th, 2013 at 14:03, a controlled shutdown commenced to allow repairs of leaks in the condenser bay. At 21:38, all control rods were fully inserted. Repairs in the condenser bay were completed and reactor startup commenced on September 15th, 2013 at 00:00. At 05:13, the reactor was made critical and at 19:27 the main generator was synchronized to the grid. Reactor power achieved approximately 75% on September 17th, 2013 at 07:40. At this time, reactor power was still limited due to RFP 'A'. A temporary modification that routed new cables to RFP 'A' was completed and the pump was placed into service. On September 17th, 2013 at 07:40, power ascension once again commenced and full reactor power was achieved at 13:00.


==SUMMARY==
==SUMMARY==
At the beginning of the month, reactor power was 75% due to the inability to start Reactor Feed Pump 'A'. On September 8th, 2013 at 14:03, a controlled shutdown commenced to allow repairs of leaks in the condenser bay. At 21:38, all control rods were fully inserted. Repairs in the condenser bay were completed and reactor startup commenced on September 15th, 2013 at 00:00. At 05:13, the reactor was made critical and at 19:27 the main generator was synchronized to the grid. Reactor power achieved approximately 75% on September 17th, 2013 at 07:40. At this time, reactor power was still limited due to RFP 'A'. A temporary modification that routed new cables to RFP 'A' was completed and the pump was placed into service. On September 17th, 2013 at 07:40, power ascension once again commenced and full reactor power was achieved at 13:00. On September 18th, 2013 at 10:04, a reactor downpower commenced to adjust the control rod pattern. The minimum power achieved during this evolution was 78%. At 14:40, reactor power once again achieved 100%. Reactor power was maintained at 100% throughout the remainder of the month.59/8/2013F  168.83A1On September 8th, 2013 at 14:03, a controlled shutdown commenced to allow repairs of leaks in the condenser bay. At 21:38, all control rods were fully inserted. Repairs in the condenser bay were completed and reactor startup commenced on September 15th, 2013 at 00:00. At 05:13, the reactor was made critical and at 19:27 the main generator was synchronized to the grid. Reactor power achieved approximately 75% on September 17th, 2013 at 07:40. At this time, reactor power was still limited due to RFP 'A'. A temporary modification that routed new cables to RFP 'A' was completed and the pump was placed into service. On September 17th, 2013 at 07:40, power ascension once again commenced and full reactor power was achieved at 13:00.
At the beginning of the month, reactor power was 75% due to the inability to start Reactor Feed Pump 'A'. On September 8th, 2013 at 14:03, a controlled shutdown commenced to allow repairs of leaks in the condenser bay. At 21:38, all control rods were fully inserted. Repairs in the condenser bay were completed and reactor startup commenced on September 15th, 2013 at 00:00. At 05:13, the reactor was made critical and at 19:27 the main generator was synchronized to the grid. Reactor power achieved approximately 75% on September 17th, 2013 at 07:40. At this time, reactor power was still limited due to RFP 'A'. A temporary modification that routed new cables to RFP 'A' was completed and the pump was placed into service. On September 17th, 2013 at 07:40, power ascension once again commenced and full reactor power was achieved at 13:00.
RPT_PERIOD:201307UNIT_NME:Point Beach Unit 1           DOCKET:266OPERATING DATA REPORTPREPARER NAME:Roger ClarkPREPARER TELEPHONE:920-755-7464UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:6152. Maximum Dependable Capacity (MWe-Net)576744.004,368.03315,362.22 744.004,339.62311,388.74 0.000.00846.90 445,303.302,559,039.80148,553,421.60This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
On September 18th, 2013 at 10:04, a reactor downpower commenced to adjust the control rod pattern. The minimum power achieved during this evolution was 78%. At 14:40, reactor power once again achieved 100%. Reactor power was maintained at 100% throughout the remainder of the month.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:             266                                                    PREPARER NAME:           Roger Clark UNIT_NME:           Point Beach Unit 1                                     PREPARER TELEPHONE: 920-755-7464 RPT_PERIOD:         201307
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                     615
: 2. Maximum Dependable Capacity (MWe-Net)         576 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          4,368.03        315,362.22
: 4. Number of Hours Generator On-line                744.00          4,339.62        311,388.74
: 5. Reserve Shutdown Hours                            0.00            0.00            846.90
: 6. Net Electrical energy Generated (MWHrs)          445,303.30      2,559,039.80    148,553,421.60 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201308UNIT_NME:Point Beach Unit 1           DOCKET:266OPERATING DATA REPORTPREPARER NAME:Roger ClarkPREPARER TELEPHONE:920-755-7464UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:6152. Maximum Dependable Capacity (MWe-Net)576744.005,112.03316,106.22 712.135,051.75312,100.87 0.000.00846.90 415,805.802,974,845.60148,969,227.40This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            266                                                      PREPARER NAME:           Roger Clark UNIT_NME:           Point Beach Unit 1                                       PREPARER TELEPHONE: 920-755-7464 RPT_PERIOD:         201308
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     615
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         576 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          5,112.03        316,106.22
: 4. Number of Hours Generator On-line                  712.13          5,051.75        312,100.87
: 5. Reserve Shutdown Hours                            0.00            0.00            846.90
: 6. Net Electrical energy Generated (MWHrs)            415,805.80      2,974,845.60    148,969,227.40 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.      Date        S: Scheduled      (Hours)          Reason 1          Down 2                    Comments 113    8/19/2013            F              31.87              A                5        Unit 1 main generator was taken offline due to a 1X-01C transformer cooling malfunction. Malfunction was repaired and the unit was placed back online.


==SUMMARY==
==SUMMARY==
1138/19/2013F  31.87A5Unit 1 main generator was taken offline due to a 1X-01C transformer cooling malfunction. Malfunction was repaired and the unit was placed back online.
 
RPT_PERIOD:201309UNIT_NME:Point Beach Unit 1           DOCKET:266OPERATING DATA REPORTPREPARER NAME:Roger ClarkPREPARER TELEPHONE:920-755-7464UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:6152. Maximum Dependable Capacity (MWe-Net)576720.005,832.03316,826.22 720.005,771.75312,820.87 0.000.00846.90 427,932.503,402,778.10149,397,159.90This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            266                                                    PREPARER NAME:           Roger Clark UNIT_NME:           Point Beach Unit 1                                     PREPARER TELEPHONE: 920-755-7464 RPT_PERIOD:         201309
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     615
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         576 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          720.00          5,832.03        316,826.22
: 4. Number of Hours Generator On-line                720.00          5,771.75        312,820.87
: 5. Reserve Shutdown Hours                            0.00            0.00            846.90
: 6. Net Electrical energy Generated (MWHrs)          427,932.50      3,402,778.10    149,397,159.90 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201307UNIT_NME:Point Beach Unit 2           DOCKET:301OPERATING DATA REPORTPREPARER NAME:Roger ClarkPREPARER TELEPHONE:920-755-7464UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:6152. Maximum Dependable Capacity (MWe-Net)578744.005,087.00308,427.80 744.005,087.00304,910.83 0.000.00302.20 444,540.303,048,117.30148,127,427.90This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            301                                                    PREPARER NAME:           Roger Clark UNIT_NME:           Point Beach Unit 2                                     PREPARER TELEPHONE: 920-755-7464 RPT_PERIOD:         201307
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     615
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         578 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          5,087.00        308,427.80
: 4. Number of Hours Generator On-line                744.00          5,087.00        304,910.83
: 5. Reserve Shutdown Hours                            0.00            0.00            302.20
: 6. Net Electrical energy Generated (MWHrs)          444,540.30      3,048,117.30    148,127,427.90 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201308UNIT_NME:Point Beach Unit 2           DOCKET:301OPERATING DATA REPORTPREPARER NAME:Roger ClarkPREPARER TELEPHONE:920-755-7464UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:6152. Maximum Dependable Capacity (MWe-Net)578744.005,831.00309,171.80 744.005,831.00305,654.83 0.000.00302.20 434,152.803,482,270.10148,561,580.70This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            301                                                    PREPARER NAME:           Roger Clark UNIT_NME:           Point Beach Unit 2                                     PREPARER TELEPHONE: 920-755-7464 RPT_PERIOD:         201308
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     615
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         578 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          5,831.00        309,171.80
: 4. Number of Hours Generator On-line                744.00          5,831.00        305,654.83
: 5. Reserve Shutdown Hours                            0.00            0.00            302.20
: 6. Net Electrical energy Generated (MWHrs)          434,152.80      3,482,270.10    148,561,580.70 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201309UNIT_NME:Point Beach Unit 2           DOCKET:301OPERATING DATA REPORTPREPARER NAME:Roger ClarkPREPARER TELEPHONE:920-755-7464UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:6152. Maximum Dependable Capacity (MWe-Net)578720.006,551.00309,891.80 720.006,551.00306,374.83 0.000.00302.20 427,615.503,909,885.60148,989,196.20This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            301                                                    PREPARER NAME:           Roger Clark UNIT_NME:           Point Beach Unit 2                                     PREPARER TELEPHONE: 920-755-7464 RPT_PERIOD:         201309
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     615
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         578 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          720.00          6,551.00        309,891.80
: 4. Number of Hours Generator On-line                720.00          6,551.00        306,374.83
: 5. Reserve Shutdown Hours                            0.00            0.00            302.20
: 6. Net Electrical energy Generated (MWHrs)          427,615.50      3,909,885.60    148,989,196.20 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201307UNIT_NME:Prairie Island Unit 1         DOCKET:282OPERATING DATA REPORTPREPARER NAME:Thomas ScheibelPREPARER TELEPHONE:651-267-6355UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:5572. Maximum Dependable Capacity (MWe-Net)522.1744.005,087.00304,383.84 744.005,059.32301,809.75 0.000.000.00 394,395.002,675,846.00153,134,076.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:              282                                                              PREPARER NAME:             Thomas Scheibel UNIT_NME:           Prairie Island Unit 1                                             PREPARER TELEPHONE: 651-267-6355 RPT_PERIOD:         201307
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                         557
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)             522.1 This Month          Yr-to-Date        Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical              744.00              5,087.00            304,383.84
: 4. Number of Hours Generator On-line                      744.00              5,059.32            301,809.75
: 5. Reserve Shutdown Hours                                0.00                0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)                394,395.00          2,675,846.00        153,134,076.00 UNIT SHUTDOWNS Type                                                  Method of F: Forced        Duration                                  Shutting            Cause - Corrective Action No.       Date        S: Scheduled        (Hours)             Reason 1              Down 2                      Comments


==SUMMARY==
==SUMMARY==
Unit 1 was base loaded during July 2013.
Unit 1 was base loaded during July 2013.
Unit 1 has a planned 2% down power of 7-22-13, to adjust the level in 12A Feedwater Heater. This was a planned loss of 133.3 MW-hr.
Unit 1 has a planned 2% down power of 7-22-13, to adjust the level in 12A Feedwater Heater. This was a planned loss of 133.3 MW-hr.
RPT_PERIOD:201308UNIT_NME:Prairie Island Unit 1         DOCKET:282OPERATING DATA REPORTPREPARER NAME:Thomas ScheibelPREPARER TELEPHONE:651-267-6355UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:5572. Maximum Dependable Capacity (MWe-Net)522.1744.005,831.00305,127.84 744.005,803.32302,553.75 0.000.000.00 395,147.003,070,993.00153,529,223.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            282                                                          PREPARER NAME:           Thomas Scheibel UNIT_NME:           Prairie Island Unit 1                                         PREPARER TELEPHONE: 651-267-6355 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       557
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           522.1 This Month        Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical            744.00            5,831.00        305,127.84
: 4. Number of Hours Generator On-line                    744.00            5,803.32        302,553.75
: 5. Reserve Shutdown Hours                              0.00              0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)              395,147.00        3,070,993.00    153,529,223.00 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                              Shutting          Cause - Corrective Action No.       Date        S: Scheduled        (Hours)             Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unit 1 was base loaded during August 2013.
Unit 1 was base loaded during August 2013.
There was a planned 2% down power on Unit 1 to perform SP 1101, 12 MD AFW PP QTLY FLOW & VALVE TEST. This was a planned loss of 28.1 MW-hr.
There was a planned 2% down power on Unit 1 to perform SP 1101, 12 MD AFW PP QTLY FLOW & VALVE TEST. This was a planned loss of 28.1 MW-hr.
RPT_PERIOD:201309UNIT_NME:Prairie Island Unit 1         DOCKET:282OPERATING DATA REPORTPREPARER NAME:Thomas ScheibelPREPARER TELEPHONE:651-267-6355UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:5572. Maximum Dependable Capacity (MWe-Net)522.1720.006,551.00305,847.84 720.006,523.32303,273.75 0.000.000.00 372,576.003,443,569.00153,901,799.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            282                                                          PREPARER NAME:               Thomas Scheibel UNIT_NME:           Prairie Island Unit 1                                         PREPARER TELEPHONE: 651-267-6355 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       557
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           522.1 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical            720.00            6,551.00          305,847.84
: 4. Number of Hours Generator On-line                    720.00            6,523.32          303,273.75
: 5. Reserve Shutdown Hours                              0.00              0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)              372,576.00        3,443,569.00      153,901,799.00 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                                Shutting            Cause - Corrective Action No.       Date        S: Scheduled        (Hours)           Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
Unit 1 was base loaded during September 2013.
Unit 1 was base loaded during September 2013.
There was a planned 60% down power on Unit 1 to perform SP 1054 Turbine Valve Testing. This was a planned loss of 11,704.4 MW.hr.
There was a planned 60% down power on Unit 1 to perform SP 1054 Turbine Valve Testing. This was a planned loss of 11,704.4 MW.hr.
RPT_PERIOD:201307UNIT_NME:Prairie Island Unit 2         DOCKET:306OPERATING DATA REPORTPREPARER NAME:Thomas ScheibelPREPARER TELEPHONE:651-267-6355UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:5572. Maximum Dependable Capacity (MWe-Net)518.8744.005,087.00302,909.38 744.005,087.00300,879.48 0.000.000.00 310,744.002,559,813.00152,588,923.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            306                                                            PREPARER NAME:               Thomas Scheibel UNIT_NME:           Prairie Island Unit 2                                           PREPARER TELEPHONE: 651-267-6355 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           557
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               518.8 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                744.00            5,087.00            302,909.38
: 4. Number of Hours Generator On-line                      744.00            5,087.00            300,879.48
: 5. Reserve Shutdown Hours                                  0.00              0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)                310,744.00        2,559,813.00        152,588,923.00 UNIT SHUTDOWNS Type                                                Method of F: Forced            Duration                            Shutting            Cause - Corrective Action No.       Date        S: Scheduled            (Hours)         Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
Unit 2 was base loaded during July 2013.
Unit 2 was base loaded during July 2013.
During July, Unit 2 was operated at 81%. This was an unplanned down power, due to increased vibration on the Turbine Generator. There was an unplanned foced loss of 83,378.8 MW-hr.
During July, Unit 2 was operated at 81%. This was an unplanned down power, due to increased vibration on the Turbine Generator. There was an unplanned foced loss of 83,378.8 MW-hr.
RPT_PERIOD:201308UNIT_NME:Prairie Island Unit 2         DOCKET:306OPERATING DATA REPORTPREPARER NAME:Thomas ScheibelPREPARER TELEPHONE:651-267-6355UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:5572. Maximum Dependable Capacity (MWe-Net)518.8744.005,831.00303,653.38 744.005,831.00301,623.48 0.000.000.00 312,797.002,872,610.00152,901,720.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            306                                                            PREPARER NAME:             Thomas Scheibel UNIT_NME:           Prairie Island Unit 2                                           PREPARER TELEPHONE: 651-267-6355 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                         557
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)             518.8 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical              744.00            5,831.00          303,653.38
: 4. Number of Hours Generator On-line                      744.00            5,831.00          301,623.48
: 5. Reserve Shutdown Hours                                0.00              0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                312,797.00        2,872,610.00      152,901,720.00 UNIT SHUTDOWNS Type                                                Method of F: Forced          Duration                              Shutting            Cause - Corrective Action No.       Date        S: Scheduled          (Hours)         Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
Unit 2 was base loaded during August 2013.
Unit 2 was base loaded during August 2013.
During August, Unit 2 was operated at 81%. There was an unplanned forced down power, due to increased vibration on the Turbine Generator. There was a forced loss of 81,495.8 MW-hr.
During August, Unit 2 was operated at 81%. There was an unplanned forced down power, due to increased vibration on the Turbine Generator.
RPT_PERIOD:201309UNIT_NME:Prairie Island Unit 2         DOCKET:306OPERATING DATA REPORTPREPARER NAME:Thomas ScheibelPREPARER TELEPHONE:651-267-6355UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:5572. Maximum Dependable Capacity (MWe-Net)518.8480.126,311.12304,133.50 480.026,311.02302,103.50 0.000.000.00 197,102.003,069,712.00153,098,822.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
There was a forced loss of 81,495.8 MW-hr.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:            306                                                                  PREPARER NAME:               Thomas Scheibel UNIT_NME:           Prairie Island Unit 2                                               PREPARER TELEPHONE: 651-267-6355 RPT_PERIOD:         201309
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                             557
: 2. Maximum Dependable Capacity (MWe-Net)                 518.8 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                  480.12              6,311.12          304,133.50
: 4. Number of Hours Generator On-line                          480.02              6,311.02          302,103.50
: 5. Reserve Shutdown Hours                                    0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                    197,102.00          3,069,712.00      153,098,822.00 UNIT SHUTDOWNS Type                                                      Method of F: Forced            Duration                                Shutting            Cause - Corrective Action No.       Date        S: Scheduled            (Hours)            Reason 1            Down 2                        Comments 2R28    9/21/2013            S                  239.98                C                    1          Unit Shutdown impacting Prairie Island Unit 2 occurred this reporting period for commencement of 2R28 refueling outage.


==SUMMARY==
==SUMMARY==
Unit 2 was base loaded during September.
Unit 2 was base loaded during September.
During September, Unit 2 was operated at 81% due to increased vibration on the Turbine Generator. There was an unplanned forced loss of 50,353.0 MW-hr.
During September, Unit 2 was operated at 81% due to increased vibration on the Turbine Generator. There was an unplanned forced loss of 50,353.0 MW-hr.
On September 21st, Unit 2 was taken off line for Scheduled Refueling Outage, 2R28. This was a planned loss of 142,601.9 MW-hr. During this outage the turbine vibration problem will be repaired and also the replacement of #21 and #22 Steam Generators.2R289/21/2013S  239.98C1Unit Shutdown impacting Prairie Island Unit 2 occurred this reporting period for commencement of 2R28 refueling outage.
On September 21st, Unit 2 was taken off line for Scheduled Refueling Outage, 2R28. This was a planned loss of 142,601.9 MW-hr. During this outage the turbine vibration problem will be repaired and also the replacement of #21 and #22 Steam Generators.
RPT_PERIOD:201307UNIT_NME:Quad Cities Unit 1            DOCKET:254OPERATING DATA REPORTPREPARER NAME:Jason M. SmithPREPARER TELEPHONE:(309) 227-2813UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8662. Maximum Dependable Capacity (MWe-Net)866744.004,467.87297,705.15 744.004,399.78291,797.46 0.000.001,655.20 681,310.004,080,949.00208,823,063.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             254                                                                PREPARER NAME:                   Jason M. Smith UNIT_NME:            Quad Cities Unit 1                                                PREPARER TELEPHONE: (309) 227-2813 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           866
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               866 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                  744.00            4,467.87            297,705.15
: 4. Number of Hours Generator On-line                          744.00            4,399.78            291,797.46
: 5. Reserve Shutdown Hours                                    0.00              0.00                1,655.20
: 6. Net Electrical energy Generated (MWHrs)                    681,310.00        4,080,949.00        208,823,063.00 UNIT SHUTDOWNS Type                                                    Method of F: Forced          Duration                                Shutting                Cause - Corrective Action No.       Date          S: Scheduled          (Hours)             Reason 1            Down 2                            Comments


==SUMMARY==
==SUMMARY==
U1 July 2013 Unit 1 started the month at approximately full reactor power and remained at full power for the rest of the month.
U1 July 2013 Unit 1 started the month at approximately full reactor power and remained at full power for the rest of the month.
RPT_PERIOD:201308UNIT_NME:Quad Cities Unit 1            DOCKET:254OPERATING DATA REPORTPREPARER NAME:Jason M. SmithPREPARER TELEPHONE:(309) 227-2813UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8662. Maximum Dependable Capacity (MWe-Net)866744.005,211.87298,449.15 744.005,143.78292,541.46 0.000.001,655.20 683,257.004,764,206.00209,506,320.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             254                                                                PREPARER NAME:                   Jason M. Smith UNIT_NME:            Quad Cities Unit 1                                                PREPARER TELEPHONE: (309) 227-2813 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           866
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               866 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                  744.00            5,211.87            298,449.15
: 4. Number of Hours Generator On-line                          744.00            5,143.78            292,541.46
: 5. Reserve Shutdown Hours                                    0.00              0.00                1,655.20
: 6. Net Electrical energy Generated (MWHrs)                    683,257.00        4,764,206.00        209,506,320.00 UNIT SHUTDOWNS Type                                                    Method of F: Forced          Duration                                Shutting                Cause - Corrective Action No.       Date          S: Scheduled          (Hours)             Reason 1            Down 2                            Comments


==SUMMARY==
==SUMMARY==
U1 August 2013 Unit 1 started the month at approximately full reactor power and remained at full power for the rest of the month.
U1 August 2013 Unit 1 started the month at approximately full reactor power and remained at full power for the rest of the month.
RPT_PERIOD:201309UNIT_NME:Quad Cities Unit 1            DOCKET:254OPERATING DATA REPORTPREPARER NAME:Jason M. SmithPREPARER TELEPHONE:309 227-2813UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8662. Maximum Dependable Capacity (MWe-Net)866720.005,931.87299,169.15 720.005,863.78293,261.46 0.000.001,655.20 663,096.005,427,302.00210,169,416.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             254                                                                PREPARER NAME:                   Jason M. Smith UNIT_NME:            Quad Cities Unit 1                                                PREPARER TELEPHONE: 309 227-2813 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           866
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               866 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                  720.00            5,931.87            299,169.15
: 4. Number of Hours Generator On-line                          720.00            5,863.78            293,261.46
: 5. Reserve Shutdown Hours                                    0.00              0.00                1,655.20
: 6. Net Electrical energy Generated (MWHrs)                    663,096.00        5,427,302.00        210,169,416.00 UNIT SHUTDOWNS Type                                                    Method of F: Forced          Duration                                Shutting                Cause - Corrective Action No.       Date          S: Scheduled          (Hours)             Reason 1            Down 2                            Comments


==SUMMARY==
==SUMMARY==
U1 September 2013 Unit 1 started the month at approximately full reactor power and remained at full power for the rest of the month with the following exceptions.1. Short duration down power from 09/14/2013 to 09/15/2013 for planned Turbine Testing. 2. Short duration down power from 09/28/2013 to 09/29/2013 for planned Turbine Testing and CRD SCRAM Timing.
U1 September 2013 Unit 1 started the month at approximately full reactor power and remained at full power for the rest of the month with the following exceptions.
RPT_PERIOD:201307UNIT_NME:Quad Cities Unit 2            DOCKET:265OPERATING DATA REPORTPREPARER NAME:Jason M. SmithPREPARER TELEPHONE:(309) 227-2813UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:957.32. Maximum Dependable Capacity (MWe-Net)888744.005,061.87290,552.57 744.005,049.97285,326.10 0.000.002,312.90 677,795.004,671,270.00211,459,708.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
: 1. Short duration down power from 09/14/2013 to 09/15/2013 for planned Turbine Testing.
: 4. Number of Hours Generator On-line
: 2. Short duration down power from 09/28/2013 to 09/29/2013 for planned Turbine Testing and CRD SCRAM Timing.
: 5. Reserve Shutdown Hours
 
: 6. Net Electrical energy Generated (MWHrs)
OPERATING DATA REPORT DOCKET:             265                                                                PREPARER NAME:                   Jason M. Smith UNIT_NME:            Quad Cities Unit 2                                                PREPARER TELEPHONE: (309) 227-2813 RPT_PERIOD:         201307
: 1. Design Electrical Rating:                           957.3
: 2. Maximum Dependable Capacity (MWe-Net)               888 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                  744.00            5,061.87            290,552.57
: 4. Number of Hours Generator On-line                          744.00            5,049.97            285,326.10
: 5. Reserve Shutdown Hours                                    0.00              0.00                2,312.90
: 6. Net Electrical energy Generated (MWHrs)                    677,795.00        4,671,270.00        211,459,708.00 UNIT SHUTDOWNS Type                                                    Method of F: Forced          Duration                                Shutting                Cause - Corrective Action No.       Date          S: Scheduled          (Hours)             Reason 1            Down 2                            Comments


==SUMMARY==
==SUMMARY==
U2 July 2013 Unit 2 started the month at approximately full reactor power and remained at full power for the rest of the month.
U2 July 2013 Unit 2 started the month at approximately full reactor power and remained at full power for the rest of the month.
RPT_PERIOD:201308UNIT_NME:Quad Cities Unit 2            DOCKET:265OPERATING DATA REPORTPREPARER NAME:Jason M. SmithPREPARER TELEPHONE:(309) 227-2813UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:957.32. Maximum Dependable Capacity (MWe-Net)888744.005,805.87291,296.57 744.005,793.97286,070.10 0.000.002,312.90 678,658.005,349,928.00212,138,366.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             265                                                                PREPARER NAME:                   Jason M. Smith UNIT_NME:            Quad Cities Unit 2                                                PREPARER TELEPHONE: (309) 227-2813 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           957.3
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               888 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                  744.00            5,805.87            291,296.57
: 4. Number of Hours Generator On-line                          744.00            5,793.97            286,070.10
: 5. Reserve Shutdown Hours                                    0.00              0.00                2,312.90
: 6. Net Electrical energy Generated (MWHrs)                    678,658.00        5,349,928.00        212,138,366.00 UNIT SHUTDOWNS Type                                                    Method of F: Forced          Duration                                Shutting                Cause - Corrective Action No.       Date          S: Scheduled          (Hours)             Reason 1            Down 2                            Comments


==SUMMARY==
==SUMMARY==
U2 August 2013 Unit 2 started the month at approximately full reactor power and remained at full power for the rest of the month with the following exceptions.1. Between 8/26/13 and continuing to the end of the month there was a 2 MWe unplanned energy loss due to a stuck open 2C2 Low Pressure Feedwater Heater Emergency Drain Valve - this resulted in a loss of 276 MWe-hr during August 2013.
U2 August 2013 Unit 2 started the month at approximately full reactor power and remained at full power for the rest of the month with the following exceptions.
RPT_PERIOD:201309UNIT_NME:Quad Cities Unit 2            DOCKET:265OPERATING DATA REPORTPREPARER NAME:Jason M. SmithPREPARER TELEPHONE:309 227-2813UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:957.32. Maximum Dependable Capacity (MWe-Net)888720.006,525.87292,016.57 720.006,513.97286,790.10 0.000.002,312.90 641,947.005,991,875.00212,780,313.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
: 1. Between 8/26/13 and continuing to the end of the month there was a 2 MWe unplanned energy loss due to a stuck open 2C2 Low Pressure Feedwater Heater Emergency Drain Valve - this resulted in a loss of 276 MWe-hr during August 2013.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:               265                                                              PREPARER NAME:                   Jason M. Smith UNIT_NME:            Quad Cities Unit 2                                                PREPARER TELEPHONE: 309 227-2813 RPT_PERIOD:           201309
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                           957.3
: 2. Maximum Dependable Capacity (MWe-Net)               888 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                  720.00            6,525.87            292,016.57
: 4. Number of Hours Generator On-line                          720.00            6,513.97            286,790.10
: 5. Reserve Shutdown Hours                                    0.00              0.00                2,312.90
: 6. Net Electrical energy Generated (MWHrs)                    641,947.00        5,991,875.00        212,780,313.00 UNIT SHUTDOWNS Type                                                    Method of F: Forced          Duration                                Shutting                Cause - Corrective Action No.       Date          S: Scheduled          (Hours)             Reason 1            Down 2                            Comments


==SUMMARY==
==SUMMARY==
U2 September 2013 Unit 2 started the month at approximately full reactor power and remained at full power for the rest of the month with the following exceptions:1. Ongoing small (approximate 2 MW) Unplanned power loss from the 2C2 Feed Water Heater - Emergency Level Control Valve (E-LCV) that failed open on 08/26/2013 and was repaired during the planned downpower on 09/7/2013.2. Short duration Planned down power from 09/07/2013 to 09/08/13 to refill the MSDTs and correct the failed 2C2 E-LCV. 3. Short duration Planned down power on 09/09/2013 for CRD Pattern adjustment.4. Short duration Planned down power on 09/21/2013 for CRD Pattern adjustment.5. An Emergent Short duration downpower on 9/26/2013 to 9/27/2013 due to a loss of Feedwater heaters caused by a blown fuse.6. An Emergent Short duration downpower on 9/28/2013 due to a failed RPIS indication on CRD G-13 that required that rod to be fully inserted.
U2 September 2013 Unit 2 started the month at approximately full reactor power and remained at full power for the rest of the month with the following exceptions:
RPT_PERIOD:201307UNIT_NME:River Bend Unit 1             DOCKET:458OPERATING DATA REPORTPREPARER NAME:Thomas J. BolkePREPARER TELEPHONE:(225)381-3719UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9672. Maximum Dependable Capacity (MWe-Net)967744.004,284.89204,720.87 744.004,224.67200,054.68 0.000.000.00 720,701.004,029,150.00183,780,642.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
: 1. Ongoing small (approximate 2 MW) Unplanned power loss from the 2C2 Feed Water Heater - Emergency Level Control Valve (E-LCV) that failed open on 08/26/2013 and was repaired during the planned downpower on 09/7/2013.
: 4. Number of Hours Generator On-line
: 2. Short duration Planned down power from 09/07/2013 to 09/08/13 to refill the MSDTs and correct the failed 2C2 E-LCV.
: 5. Reserve Shutdown Hours
: 3. Short duration Planned down power on 09/09/2013 for CRD Pattern adjustment.
: 6. Net Electrical energy Generated (MWHrs)
: 4. Short duration Planned down power on 09/21/2013 for CRD Pattern adjustment.
: 5. An Emergent Short duration downpower on 9/26/2013 to 9/27/2013 due to a loss of Feedwater heaters caused by a blown fuse.
: 6. An Emergent Short duration downpower on 9/28/2013 due to a failed RPIS indication on CRD G-13 that required that rod to be fully inserted.
 
OPERATING DATA REPORT DOCKET:            458                                                    PREPARER NAME:           Thomas J. Bolke UNIT_NME:          River Bend Unit 1                                      PREPARER TELEPHONE: (225)381-3719 RPT_PERIOD:         201307
: 1. Design Electrical Rating:                     967
: 2. Maximum Dependable Capacity (MWe-Net)         967 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          4,284.89        204,720.87
: 4. Number of Hours Generator On-line                744.00          4,224.67        200,054.68
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          720,701.00      4,029,150.00    183,780,642.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201308UNIT_NME:River Bend Unit 1             DOCKET:458OPERATING DATA REPORTPREPARER NAME:Thomas J. BolkePREPARER TELEPHONE:(225)381-3719UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9672. Maximum Dependable Capacity (MWe-Net)967744.005,028.89205,464.87 744.004,968.67200,798.68 0.000.000.00 719,180.004,748,330.00184,499,822.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            458                                                    PREPARER NAME:           Thomas J. Bolke UNIT_NME:          River Bend Unit 1                                      PREPARER TELEPHONE: (225)381-3719 RPT_PERIOD:         201308
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     967
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         967 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          5,028.89        205,464.87
: 4. Number of Hours Generator On-line                744.00          4,968.67        200,798.68
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          719,180.00      4,748,330.00    184,499,822.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201309UNIT_NME:River Bend Unit 1             DOCKET:458OPERATING DATA REPORTPREPARER NAME:Thomas J. BolkePREPARER TELEPHONE:(225)381-3719UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:9672. Maximum Dependable Capacity (MWe-Net)967720.005,748.89206,184.87 720.005,688.67201,518.68 0.000.000.00 699,175.005,447,505.00185,198,997.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            458                                                    PREPARER NAME:           Thomas J. Bolke UNIT_NME:          River Bend Unit 1                                      PREPARER TELEPHONE: (225)381-3719 RPT_PERIOD:         201309
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     967
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         967 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          720.00          5,748.89        206,184.87
: 4. Number of Hours Generator On-line                720.00          5,688.67        201,518.68
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          699,175.00      5,447,505.00    185,198,997.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201307UNIT_NME:Robinson Unit 2               DOCKET:261OPERATING DATA REPORTPREPARER NAME:Tim SurmaPREPARER TELEPHONE:843-857-1086UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:7952. Maximum Dependable Capacity (MWe-Net)741744.005,087.00294,973.79 744.005,087.00291,304.49 0.000.0023.20 562,215.003,907,746.00197,230,799.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            261                                                    PREPARER NAME:           Tim Surma UNIT_NME:           Robinson Unit 2                                         PREPARER TELEPHONE: 843-857-1086 RPT_PERIOD:         201307
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     795
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         741 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          5,087.00        294,973.79
: 4. Number of Hours Generator On-line                744.00          5,087.00        291,304.49
: 5. Reserve Shutdown Hours                            0.00            0.00            23.20
: 6. Net Electrical energy Generated (MWHrs)          562,215.00      3,907,746.00    197,230,799.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201308UNIT_NME:Robinson Unit 2               DOCKET:261OPERATING DATA REPORTPREPARER NAME:Tim SurmaPREPARER TELEPHONE:843-857-1086UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:7952. Maximum Dependable Capacity (MWe-Net)741744.005,831.00295,717.79 744.005,831.00292,048.49 0.000.0023.20 562,450.004,470,196.00197,793,249.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            261                                                    PREPARER NAME:           Tim Surma UNIT_NME:           Robinson Unit 2                                         PREPARER TELEPHONE: 843-857-1086 RPT_PERIOD:         201308
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     795
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         741 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          5,831.00        295,717.79
: 4. Number of Hours Generator On-line                744.00          5,831.00        292,048.49
: 5. Reserve Shutdown Hours                            0.00            0.00            23.20
: 6. Net Electrical energy Generated (MWHrs)          562,450.00      4,470,196.00    197,793,249.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201309UNIT_NME:Robinson Unit 2               DOCKET:261OPERATING DATA REPORTPREPARER NAME:Tim SurmaPREPARER TELEPHONE:843-857-1086UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:7952. Maximum Dependable Capacity (MWe-Net)741316.336,147.33296,034.12 316.186,147.18292,364.67 0.000.0023.20 231,715.004,701,911.00198,024,964.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            261                                                      PREPARER NAME:           Tim Surma UNIT_NME:           Robinson Unit 2                                           PREPARER TELEPHONE: 843-857-1086 RPT_PERIOD:         201309
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                       795
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)           741 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical            316.33          6,147.33        296,034.12
: 4. Number of Hours Generator On-line                  316.18          6,147.18        292,364.67
: 5. Reserve Shutdown Hours                              0.00            0.00            23.20
: 6. Net Electrical energy Generated (MWHrs)            231,715.00      4,701,911.00    198,024,964.00 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled        (Hours)         Reason 1          Down 2                    Comments 1      9/14/2013            S              403.82              C                1


==SUMMARY==
==SUMMARY==
Planned shutdown for scheduled refueling outage RO-28 on 9-14-13 at 0419 hours.19/14/2013S  403.82C1 RPT_PERIOD:201307UNIT_NME:Salem Unit 1                 DOCKET:272OPERATING DATA REPORTPREPARER NAME:Kevin FalcianiPREPARER TELEPHONE:856-339-2017UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11692. Maximum Dependable Capacity (MWe-Net)1116744.004,184.57228,032.55 744.004,063.70222,394.60 0.000.000.00 860,476.004,757,181.00237,200,139.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
Planned shutdown for scheduled refueling outage RO-28 on 9-14-13 at 0419 hours.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:             272                                                    PREPARER NAME:           Kevin Falciani UNIT_NME:          Salem Unit 1                                           PREPARER TELEPHONE: 856-339-2017 RPT_PERIOD:         201307
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                     1169
: 2. Maximum Dependable Capacity (MWe-Net)         1116 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          4,184.57        228,032.55
: 4. Number of Hours Generator On-line                744.00          4,063.70        222,394.60
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          860,476.00      4,757,181.00    237,200,139.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201308UNIT_NME:Salem Unit 1                 DOCKET:272OPERATING DATA REPORTPREPARER NAME:Kevin FalcianiPREPARER TELEPHONE:856-339-2017UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11692. Maximum Dependable Capacity (MWe-Net)1116709.504,894.07228,742.05 698.834,762.53223,093.43 0.000.000.00 794,389.005,551,570.00237,994,528.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            272                                                      PREPARER NAME:             Kevin Falciani UNIT_NME:           Salem Unit 1                                             PREPARER TELEPHONE: 856-339-2017 RPT_PERIOD:         201308
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     1169
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         1116 This Month        Yr-to-Date        Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          709.50            4,894.07          228,742.05
: 4. Number of Hours Generator On-line                698.83            4,762.53          223,093.43
: 5. Reserve Shutdown Hours                            0.00              0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)          794,389.00        5,551,570.00      237,994,528.00 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)        Reason 1            Down 2                      Comments S1F13 8/22/2013              F              45.17              A                  1          Unit 1 shutdown due to 1PS1 Pressurizer Valve
-01                                                                                          Leak. ACE being tracked on order 70157547.


==SUMMARY==
==SUMMARY==
Unit 1 shutdown due to 1PS1 leak on Pressurizer Spray Valve. ACE has been assigned and is being tacked on order 70157547.S1F13
Unit 1 shutdown due to 1PS1 leak on Pressurizer Spray Valve. ACE has been assigned and is being tacked on order 70157547.
-018/22/2013F  45.17A1Unit 1 shutdown due to 1PS1 Pressurizer Valve Leak. ACE being tracked on order 70157547.
 
RPT_PERIOD:201309UNIT_NME:Salem Unit 1                 DOCKET:272OPERATING DATA REPORTPREPARER NAME:Kevin FalcianiPREPARER TELEPHONE:856-339-2017UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11692. Maximum Dependable Capacity (MWe-Net)1116720.005,614.07229,462.05 720.005,482.53223,813.43 0.000.000.00 944,559.006,496,129.00238,939,087.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            272                                                    PREPARER NAME:           Kevin Falciani UNIT_NME:           Salem Unit 1                                           PREPARER TELEPHONE: 856-339-2017 RPT_PERIOD:         201309
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     1169
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         1116 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          720.00          5,614.07        229,462.05
: 4. Number of Hours Generator On-line                720.00          5,482.53        223,813.43
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          944,559.00      6,496,129.00    238,939,087.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201307UNIT_NME:Salem Unit 2                 DOCKET:311OPERATING DATA REPORTPREPARER NAME:Kevin FalcianiPREPARER TELEPHONE:856-339-2017UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11812. Maximum Dependable Capacity (MWe-Net)1134744.005,087.00205,731.90 744.005,087.00201,627.44 0.000.000.00 855,682.005,971,788.00215,429,798.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            311                                                    PREPARER NAME:           Kevin Falciani UNIT_NME:           Salem Unit 2                                           PREPARER TELEPHONE: 856-339-2017 RPT_PERIOD:         201307
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     1181
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         1134 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          5,087.00        205,731.90
: 4. Number of Hours Generator On-line                744.00          5,087.00        201,627.44
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          855,682.00      5,971,788.00    215,429,798.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201308UNIT_NME:Salem Unit 2                 DOCKET:311OPERATING DATA REPORTPREPARER NAME:Kevin FalcianiPREPARER TELEPHONE:856-339-2017UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11812. Maximum Dependable Capacity (MWe-Net)1134744.005,831.00206,475.90 744.005,831.00202,371.44 0.000.000.00 863,356.006,835,144.00216,293,154.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            311                                                    PREPARER NAME:           Kevin Falciani UNIT_NME:           Salem Unit 2                                           PREPARER TELEPHONE: 856-339-2017 RPT_PERIOD:         201308
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     1181
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         1134 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          5,831.00        206,475.90
: 4. Number of Hours Generator On-line                744.00          5,831.00        202,371.44
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          863,356.00      6,835,144.00    216,293,154.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201309UNIT_NME:Salem Unit 2                 DOCKET:311OPERATING DATA REPORTPREPARER NAME:Kevin FalcianiPREPARER TELEPHONE:856-339-2017UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11812. Maximum Dependable Capacity (MWe-Net)1134720.006,551.00207,195.90 720.006,551.00203,091.44 0.000.000.00 835,587.007,670,731.00217,128,741.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            311                                                    PREPARER NAME:           Kevin Falciani UNIT_NME:           Salem Unit 2                                           PREPARER TELEPHONE: 856-339-2017 RPT_PERIOD:         201309
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     1181
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         1134 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          720.00          6,551.00        207,195.90
: 4. Number of Hours Generator On-line                720.00          6,551.00        203,091.44
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          835,587.00      7,670,731.00    217,128,741.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201307UNIT_NME:Seabrook Unit 1               DOCKET:443OPERATING DATA REPORTPREPARER NAME:Kevin RandallPREPARER TELEPHONE:603.773.7992UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12482. Maximum Dependable Capacity (MWe-Net)1246744.005,087.00180,024.98 744.005,087.00176,440.43 0.000.000.00 926,830.276,346,479.82204,219,773.54This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            443                                                        PREPARER NAME:                 Kevin Randall UNIT_NME:           Seabrook Unit 1                                             PREPARER TELEPHONE: 603.773.7992 RPT_PERIOD:         201307
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     1248
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         1246 This Month        Yr-to-Date          Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00            5,087.00            180,024.98
: 4. Number of Hours Generator On-line                744.00            5,087.00            176,440.43
: 5. Reserve Shutdown Hours                            0.00              0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)          926,830.27        6,346,479.82        204,219,773.54 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting                Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1              Down 2                          Comments


==SUMMARY==
==SUMMARY==
The unit operated at 100% power 744 out of 744 hours this month. This yielded an availability factor of 100% and a capacity factor of 99.9791% based on the MDC of 1246 MWe.
The unit operated at 100% power 744 out of 744 hours this month. This yielded an availability factor of 100% and a capacity factor of 99.9791%
RPT_PERIOD:201308UNIT_NME:Seabrook Unit 1               DOCKET:443OPERATING DATA REPORTPREPARER NAME:Kevin RandallPREPARER TELEPHONE:603.773.7992UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12482. Maximum Dependable Capacity (MWe-Net)1246744.005,831.00180,768.98 744.005,831.00177,184.43 0.000.000.00 927,927.047,274,406.86205,147,700.58This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
based on the MDC of 1246 MWe.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:            443                                                        PREPARER NAME:                 Kevin Randall UNIT_NME:           Seabrook Unit 1                                             PREPARER TELEPHONE: 603.773.7992 RPT_PERIOD:         201308
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                     1248
: 2. Maximum Dependable Capacity (MWe-Net)         1246 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            5,831.00            180,768.98
: 4. Number of Hours Generator On-line                744.00            5,831.00            177,184.43
: 5. Reserve Shutdown Hours                            0.00              0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)          927,927.04        7,274,406.86        205,147,700.58 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting                Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1              Down 2                          Comments


==SUMMARY==
==SUMMARY==
The unit operated at 100% power 744 out of 744 hours this month. This yielded an availability factor of 100% and a capacity factor of 100.0974% based on the MDC of 1246 MWe.
The unit operated at 100% power 744 out of 744 hours this month. This yielded an availability factor of 100% and a capacity factor of 100.0974%
RPT_PERIOD:201309UNIT_NME:Seabrook Unit 1               DOCKET:443OPERATING DATA REPORTPREPARER NAME:Kevin RandallPREPARER TELEPHONE:603.773.7992UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12482. Maximum Dependable Capacity (MWe-Net)1246720.006,551.00181,488.98 720.006,551.00177,904.43 0.000.000.00 896,941.448,171,348.30206,044,642.02This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
based on the MDC of 1246 MWe.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:            443                                                        PREPARER NAME:                 Kevin Randall UNIT_NME:           Seabrook Unit 1                                             PREPARER TELEPHONE: 603.773.7992 RPT_PERIOD:         201309
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                     1248
: 2. Maximum Dependable Capacity (MWe-Net)         1246 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical          720.00            6,551.00            181,488.98
: 4. Number of Hours Generator On-line                720.00            6,551.00            177,904.43
: 5. Reserve Shutdown Hours                            0.00              0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)          896,941.44        8,171,348.30        206,044,642.02 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting                Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1              Down 2                          Comments


==SUMMARY==
==SUMMARY==
The unit operated at 100% power 709 out of 720 hours this month. This yielded an availability factor of 100% and a capacity factor of 99.9801% based on the MDC of 1246 MWe.
The unit operated at 100% power 709 out of 720 hours this month. This yielded an availability factor of 100% and a capacity factor of 99.9801%
RPT_PERIOD:201307UNIT_NME:Sequoyah Unit 1               DOCKET:327OPERATING DATA REPORTPREPARER NAME:Linda WilliamsPREPARER TELEPHONE:Linda WilliamsUNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:1184.372. Maximum Dependable Capacity (MWe-Net)1152744.005,087.00210,374.85 744.005,087.00207,973.89 0.000.000.00 844,719.005,864,997.00231,136,300.60This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
based on the MDC of 1246 MWe.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:            327                                                      PREPARER NAME:           Linda Williams UNIT_NME:           Sequoyah Unit 1                                         PREPARER TELEPHONE: Linda Williams RPT_PERIOD:         201307
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                     1184.37
: 2. Maximum Dependable Capacity (MWe-Net)         1152 This Month      Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          5,087.00          210,374.85
: 4. Number of Hours Generator On-line                744.00          5,087.00          207,973.89
: 5. Reserve Shutdown Hours                            0.00            0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)          844,719.00      5,864,997.00      231,136,300.60 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
U1 Gross Max Dependable Capacity Factor was 99.671 for the month of July 2013.
U1 Gross Max Dependable Capacity Factor was 99.671 for the month of July 2013.
RPT_PERIOD:201308UNIT_NME:Sequoyah Unit 1               DOCKET:327OPERATING DATA REPORTPREPARER NAME:Linda WilliamsPREPARER TELEPHONE:Linda WilliamsUNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:1184.372. Maximum Dependable Capacity (MWe-Net)1152744.005,831.00211,118.85 744.005,831.00208,717.89 0.000.000.00 839,540.006,704,537.00231,975,840.60This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            327                                                      PREPARER NAME:             Linda Williams UNIT_NME:           Sequoyah Unit 1                                         PREPARER TELEPHONE: Linda Williams RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1184.37
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1152 This Month      Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          5,831.00            211,118.85
: 4. Number of Hours Generator On-line                744.00          5,831.00            208,717.89
: 5. Reserve Shutdown Hours                            0.00            0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)          839,540.00      6,704,537.00        231,975,840.60 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                      Comments


==SUMMARY==
==SUMMARY==
U1 Gross Max Dependable Capacity Factor was 99.075 for the month of August 2013.
U1 Gross Max Dependable Capacity Factor was 99.075 for the month of August 2013.
RPT_PERIOD:201309UNIT_NME:Sequoyah Unit 1               DOCKET:327OPERATING DATA REPORTPREPARER NAME:Linda WilliamsPREPARER TELEPHONE:423-843-7048UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:1184.372. Maximum Dependable Capacity (MWe-Net)1152720.006,551.00211,838.85 720.006,551.00209,437.89 0.000.000.00 743,812.007,448,349.00232,719,652.60This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            327                                                      PREPARER NAME:           Linda Williams UNIT_NME:           Sequoyah Unit 1                                         PREPARER TELEPHONE: 423-843-7048 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1184.37
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1152 This Month      Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical          720.00          6,551.00          211,838.85
: 4. Number of Hours Generator On-line                720.00          6,551.00          209,437.89
: 5. Reserve Shutdown Hours                            0.00            0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)          743,812.00      7,448,349.00      232,719,652.60 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
U1 Gross Max Dependable Capacity Factor was 91.059 for the month of September 2013.
U1 Gross Max Dependable Capacity Factor was 91.059 for the month of September 2013.
RPT_PERIOD:201307UNIT_NME:Sequoyah Unit 2               DOCKET:328OPERATING DATA REPORTPREPARER NAME:Linda WilliamsPREPARER TELEPHONE:Linda WilliamsUNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:1177.462. Maximum Dependable Capacity (MWe-Net)1139.5744.004,983.34213,983.45 744.004,845.69211,240.04 0.000.000.00 846,252.005,479,649.00230,178,105.10This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            328                                                      PREPARER NAME:           Linda Williams UNIT_NME:           Sequoyah Unit 2                                         PREPARER TELEPHONE: Linda Williams RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1177.46
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1139.5 This Month      Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          4,983.34          213,983.45
: 4. Number of Hours Generator On-line                744.00          4,845.69          211,240.04
: 5. Reserve Shutdown Hours                            0.00            0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)          846,252.00      5,479,649.00      230,178,105.10 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
U2 Gross Max Dependable Capacity Factor was 101.549 for the month of July 2013.
U2 Gross Max Dependable Capacity Factor was 101.549 for the month of July 2013.
RPT_PERIOD:201308UNIT_NME:Sequoyah Unit 2               DOCKET:328OPERATING DATA REPORTPREPARER NAME:Linda WilliamsPREPARER TELEPHONE:Linda WilliamsUNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:1177.462. Maximum Dependable Capacity (MWe-Net)1139.5744.005,727.34214,727.45 744.005,589.69211,984.04 0.000.000.00 840,796.006,320,445.00231,018,901.10This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            328                                                    PREPARER NAME:             Linda Williams UNIT_NME:           Sequoyah Unit 2                                         PREPARER TELEPHONE: Linda Williams RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1177.46
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1139.5 This Month      Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          5,727.34            214,727.45
: 4. Number of Hours Generator On-line                744.00          5,589.69            211,984.04
: 5. Reserve Shutdown Hours                            0.00            0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)          840,796.00      6,320,445.00        231,018,901.10 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                      Comments


==SUMMARY==
==SUMMARY==
U2 Gross Max Dependable Capacity Factor was 101.951for the month of August 2013.
U2 Gross Max Dependable Capacity Factor was 101.951for the month of August 2013.
RPT_PERIOD:201309UNIT_NME:Sequoyah Unit 2               DOCKET:328OPERATING DATA REPORTPREPARER NAME:Linda WilliamsPREPARER TELEPHONE:423-843-7048UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:1177.462. Maximum Dependable Capacity (MWe-Net)1139.5720.006,447.34215,447.45 720.006,309.69212,704.04 0.000.000.00 813,432.007,133,877.00231,832,333.10This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            328                                                    PREPARER NAME:           Linda Williams UNIT_NME:           Sequoyah Unit 2                                         PREPARER TELEPHONE: 423-843-7048 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1177.46
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1139.5 This Month      Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical          720.00          6,447.34          215,447.45
: 4. Number of Hours Generator On-line                720.00          6,309.69          212,704.04
: 5. Reserve Shutdown Hours                            0.00            0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)          813,432.00      7,133,877.00      231,832,333.10 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
U2 Gross Max Dependable Capacity Factor was 103.095 for the month of September 2013.
U2 Gross Max Dependable Capacity Factor was 103.095 for the month of September 2013.
RPT_PERIOD:201307UNIT_NME:South Texas Unit 1            DOCKET:498OPERATING DATA REPORTPREPARER NAME:R.L. HillPREPARER TELEPHONE:361.972.7667UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:1250.62. Maximum Dependable Capacity (MWe-Net)1250.6744.004,981.80185,618.50 744.004,952.50181,064.21 0.000.000.00 987,688.006,657,788.00228,041,469.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             498                                                    PREPARER NAME:           R.L. Hill UNIT_NME:          South Texas Unit 1                                      PREPARER TELEPHONE: 361.972.7667 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1250.6
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1250.6 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          4,981.80        185,618.50
: 4. Number of Hours Generator On-line                744.00          4,952.50        181,064.21
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          987,688.00      6,657,788.00    228,041,469.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Normal operation.
Normal operation.
RPT_PERIOD:201308UNIT_NME:South Texas Unit 1            DOCKET:498OPERATING DATA REPORTPREPARER NAME:R.L. HillPREPARER TELEPHONE:361.972.7667UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:1250.62. Maximum Dependable Capacity (MWe-Net)1250.6744.005,725.80186,362.50 744.005,696.50181,808.21 0.000.000.00 947,644.007,605,432.00228,989,113.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             498                                                            PREPARER NAME:             R.L. Hill UNIT_NME:            South Texas Unit 1                                              PREPARER TELEPHONE: 361.972.7667 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                         1250.6
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)             1250.6 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical              744.00            5,725.80            186,362.50
: 4. Number of Hours Generator On-line                      744.00            5,696.50            181,808.21
: 5. Reserve Shutdown Hours                                0.00              0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)                947,644.00        7,605,432.00        228,989,113.00 UNIT SHUTDOWNS Type                                                  Method of F: Forced          Duration                                Shutting              Cause - Corrective Action No.       Date        S: Scheduled          (Hours)           Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
Precautionary reactor power reduction to 81% on 8/3/13 to allow LP Turbine 13S Extraction Steam bellows rupture damage analysis. Unit returned to 100% on 8/5/13. Reactor power reduction to 86.5% on 8/27/13 due to engineering recommendation for LP Turbine 13S Extraction Steam bellows damage.
Precautionary reactor power reduction to 81% on 8/3/13 to allow LP Turbine 13S Extraction Steam bellows rupture damage analysis. Unit returned to 100% on 8/5/13. Reactor power reduction to 86.5% on 8/27/13 due to engineering recommendation for LP Turbine 13S Extraction Steam bellows damage.
RPT_PERIOD:201309UNIT_NME:South Texas Unit 1            DOCKET:498OPERATING DATA REPORTPREPARER NAME:R. L. HillPREPARER TELEPHONE:361.972.7667UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:1250.62. Maximum Dependable Capacity (MWe-Net)1250.6720.006,445.80187,082.50 720.006,416.50182,528.21 0.000.000.00 953,755.008,559,187.00229,942,868.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             498                                                        PREPARER NAME:             R. L. Hill UNIT_NME:          South Texas Unit 1                                          PREPARER TELEPHONE: 361.972.7667 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1250.6
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1250.6 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical          720.00            6,445.80          187,082.50
: 4. Number of Hours Generator On-line                720.00            6,416.50          182,528.21
: 5. Reserve Shutdown Hours                            0.00              0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)          953,755.00        8,559,187.00      229,942,868.00 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
Reactor power reduction to 86.5 % beginning on 8/27/13 due to engineering recommendation for LP Turbine 13S Extraction Steam bellows damage.
Reactor power reduction to 86.5 % beginning on 8/27/13 due to engineering recommendation for LP Turbine 13S Extraction Steam bellows damage.
RPT_PERIOD:201307UNIT_NME:South Texas Unit 2            DOCKET:499OPERATING DATA REPORTPREPARER NAME:R.L. HillPREPARER TELEPHONE:361.972.766UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:1250.62. Maximum Dependable Capacity (MWe-Net)1250.6744.002,598.29174,566.63 744.002,509.95172,007.38 0.000.000.00 987,248.003,329,284.00216,085,820.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             499                                                      PREPARER NAME:           R.L. Hill UNIT_NME:          South Texas Unit 2                                        PREPARER TELEPHONE: 361.972.766 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1250.6
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1250.6 This Month        Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            2,598.29        174,566.63
: 4. Number of Hours Generator On-line                744.00            2,509.95        172,007.38
: 5. Reserve Shutdown Hours                            0.00              0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          987,248.00        3,329,284.00    216,085,820.00 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Scheduled turbine valve testing/ Unplanned control rod issues.
Scheduled turbine valve testing/ Unplanned control rod issues.
RPT_PERIOD:201308UNIT_NME:South Texas Unit 2            DOCKET:499OPERATING DATA REPORTPREPARER NAME:R.L. HillPREPARER TELEPHONE:361.972.7667UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:1250.62. Maximum Dependable Capacity (MWe-Net)1250.6744.003,342.29175,310.63 744.003,253.95172,751.38 0.000.000.00 984,277.004,313,561.00217,070,097.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             499                                                    PREPARER NAME:           R.L. Hill UNIT_NME:          South Texas Unit 2                                      PREPARER TELEPHONE: 361.972.7667 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1250.6
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1250.6 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          3,342.29        175,310.63
: 4. Number of Hours Generator On-line                744.00          3,253.95        172,751.38
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          984,277.00      4,313,561.00    217,070,097.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Normal operation.
Normal operation.
RPT_PERIOD:201309UNIT_NME:South Texas Unit 2            DOCKET:499OPERATING DATA REPORTPREPARER NAME:R.L. HillPREPARER TELEPHONE:361.972.7667UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:1250.62. Maximum Dependable Capacity (MWe-Net)1250.6720.004,062.29176,030.63 720.003,973.95173,471.38 0.000.000.00 953,755.005,267,316.00218,023,852.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             499                                                          PREPARER NAME:           R.L. Hill UNIT_NME:          South Texas Unit 2                                          PREPARER TELEPHONE: 361.972.7667 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1250.6
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1250.6 This Month          Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          720.00              4,062.29        176,030.63
: 4. Number of Hours Generator On-line                720.00              3,973.95        173,471.38
: 5. Reserve Shutdown Hours                            0.00                0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          953,755.00          5,267,316.00    218,023,852.00 UNIT SHUTDOWNS Type                                                Method of F: Forced        Duration                              Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1              Down 2                    Comments


==SUMMARY==
==SUMMARY==
Scheduled reactor power reduction to 90% for turbine valve testing.
Scheduled reactor power reduction to 90% for turbine valve testing.
RPT_PERIOD:201307UNIT_NME:St. Lucie Unit 1             DOCKET:335OPERATING DATA REPORTPREPARER NAME:K R BollerPREPARER TELEPHONE:772 467-7465UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:10622. Maximum Dependable Capacity (MWe-Net)981744.004,626.58266,702.21 744.004,616.47264,231.23 0.000.000.00 744,205.004,599,145.00218,399,912.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            335                                                      PREPARER NAME:           K R Boller UNIT_NME:           St. Lucie Unit 1                                         PREPARER TELEPHONE: 772 467-7465 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1062
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         981 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          4,626.58        266,702.21
: 4. Number of Hours Generator On-line                  744.00          4,616.47        264,231.23
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            744,205.00      4,599,145.00    218,399,912.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
PSL 1 operated in mode 1 the entire report period.
PSL 1 operated in mode 1 the entire report period.
RPT_PERIOD:201308UNIT_NME:St. Lucie Unit 1             DOCKET:335OPERATING DATA REPORTPREPARER NAME:K R BollerPREPARER TELEPHONE:772 467-7465UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:10622. Maximum Dependable Capacity (MWe-Net)981744.005,370.58267,446.21 744.005,360.47264,975.23 0.000.000.00 738,402.005,337,547.00219,138,314.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            335                                                      PREPARER NAME:           K R Boller UNIT_NME:           St. Lucie Unit 1                                         PREPARER TELEPHONE: 772 467-7465 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1062
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         981 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          5,370.58        267,446.21
: 4. Number of Hours Generator On-line                  744.00          5,360.47        264,975.23
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            738,402.00      5,337,547.00    219,138,314.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
PSL 1 operated in mode 1 the entire report period.
PSL 1 operated in mode 1 the entire report period.
RPT_PERIOD:201309UNIT_NME:St. Lucie Unit 1             DOCKET:335OPERATING DATA REPORTPREPARER NAME:K R BollerPREPARER TELEPHONE:774 467-7465UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:10622. Maximum Dependable Capacity (MWe-Net)981696.026,066.60268,142.23 696.026,056.49265,671.25 0.000.000.00 675,651.006,013,198.00219,813,965.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            335                                                              PREPARER NAME:           K R Boller UNIT_NME:           St. Lucie Unit 1                                                 PREPARER TELEPHONE: 774 467-7465 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                             1062
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)                 981 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical                  696.02          6,066.60        268,142.23
: 4. Number of Hours Generator On-line                        696.02          6,056.49        265,671.25
: 5. Reserve Shutdown Hours                                    0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)                  675,651.00      6,013,198.00    219,813,965.00 UNIT SHUTDOWNS Type                                                  Method of F: Forced            Duration                              Shutting          Cause - Corrective Action No.       Date        S: Scheduled            (Hours)             Reason 1          Down 2                    Comments 28      9/30/2013            S                23.98                  C                1        PSL 1 manual shutdown for SL1-25 refueling and maintenance


==SUMMARY==
==SUMMARY==
PSL 1 operated in mode 1 until 9/30/2013 at 00:01 when the unit was removed from service for scheduled refueling and maintenance. PSL 1 remained offline through the end of the report period.289/30/2013S  23.98C1PSL 1 manual shutdown for SL1-25 refueling and maintenance RPT_PERIOD:201307UNIT_NME:St. Lucie Unit 2             DOCKET:389OPERATING DATA REPORTPREPARER NAME:K R BollerPREPARER TELEPHONE:772 467-7465UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:10742. Maximum Dependable Capacity (MWe-Net)987744.005,030.52226,352.60 744.004,967.78223,871.34 0.000.000.00 753,741.005,018,606.00185,724,043.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
PSL 1 operated in mode 1 until 9/30/2013 at 00:01 when the unit was removed from service for scheduled refueling and maintenance. PSL 1 remained offline through the end of the report period.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:            389                                                      PREPARER NAME:           K R Boller UNIT_NME:           St. Lucie Unit 2                                         PREPARER TELEPHONE: 772 467-7465 RPT_PERIOD:         201307
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                     1074
: 2. Maximum Dependable Capacity (MWe-Net)         987 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          5,030.52        226,352.60
: 4. Number of Hours Generator On-line                  744.00          4,967.78        223,871.34
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            753,741.00      5,018,606.00    185,724,043.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
PSL 2 operated in mode 1 the entire report period.
PSL 2 operated in mode 1 the entire report period.
RPT_PERIOD:201308UNIT_NME:St. Lucie Unit 2             DOCKET:389OPERATING DATA REPORTPREPARER NAME:K R BollerPREPARER TELEPHONE:772 467-7465UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:10742. Maximum Dependable Capacity (MWe-Net)987744.005,774.52227,096.60 744.005,711.78224,615.34 0.000.000.00 749,319.005,767,925.00186,473,362.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            389                                                      PREPARER NAME:           K R Boller UNIT_NME:           St. Lucie Unit 2                                         PREPARER TELEPHONE: 772 467-7465 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1074
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         987 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          5,774.52        227,096.60
: 4. Number of Hours Generator On-line                  744.00          5,711.78        224,615.34
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            749,319.00      5,767,925.00    186,473,362.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
PSL 2 operated in mode 1 the entire report period.
PSL 2 operated in mode 1 the entire report period.
RPT_PERIOD:201309UNIT_NME:St. Lucie Unit 2             DOCKET:389OPERATING DATA REPORTPREPARER NAME:K R BollerPREPARER TELEPHONE:772 467-7465UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:10742. Maximum Dependable Capacity (MWe-Net)987720.006,494.52227,816.60 720.006,431.78225,335.34 0.000.000.00 718,003.006,485,928.00187,191,365.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            389                                                      PREPARER NAME:           K R Boller UNIT_NME:           St. Lucie Unit 2                                         PREPARER TELEPHONE: 772 467-7465 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1074
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         987 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          720.00          6,494.52        227,816.60
: 4. Number of Hours Generator On-line                  720.00          6,431.78        225,335.34
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            718,003.00      6,485,928.00    187,191,365.00 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
PSL 2 operated in mode 1 the entire report period.
PSL 2 operated in mode 1 the entire report period.
RPT_PERIOD:201307UNIT_NME:Summer Unit 1                DOCKET:395OPERATING DATA REPORTPREPARER NAME:Wesley R. HigginsPREPARER TELEPHONE:8033454042UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:972.72. Maximum Dependable Capacity (MWe-Net)966744.004,846.00223,081.25 744.004,828.40220,645.77 0.000.000.00 730,801.004,753,270.00200,714,259.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             395                                                      PREPARER NAME:           Wesley R. Higgins UNIT_NME:          Summer Unit 1                                            PREPARER TELEPHONE: 8033454042 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     972.7
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         966 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          4,846.00        223,081.25
: 4. Number of Hours Generator On-line                  744.00          4,828.40        220,645.77
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            730,801.00      4,753,270.00    200,714,259.00 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                  Comments


==SUMMARY==
==SUMMARY==
The plant operated at full power during Juky 2013.
The plant operated at full power during Juky 2013.
RPT_PERIOD:201308UNIT_NME:Summer Unit 1                DOCKET:395OPERATING DATA REPORTPREPARER NAME:Wesley R. HigginsPREPARER TELEPHONE:8033454042UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:972.72. Maximum Dependable Capacity (MWe-Net)966744.005,590.00223,825.25 744.005,572.40221,389.77 0.000.000.00 730,321.005,483,591.00201,444,580.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             395                                                          PREPARER NAME:               Wesley R. Higgins UNIT_NME:            Summer Unit 1                                                PREPARER TELEPHONE: 8033454042 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                         972.7
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)             966 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical              744.00            5,590.00          223,825.25
: 4. Number of Hours Generator On-line                    744.00            5,572.40          221,389.77
: 5. Reserve Shutdown Hours                                0.00              0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)              730,321.00        5,483,591.00      201,444,580.00 UNIT SHUTDOWNS Type                                                Method of F: Forced          Duration                              Shutting            Cause - Corrective Action No.       Date          S: Scheduled        (Hours)           Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
There were no Unit Shutdowns during June 2013. A power reduction commenced at approximately 23:45 on the 28th in support of main turbine valve testing (PTP-102.001). Power was reduced to approximately 90%. The plant was returned to 100% power at approximately 23:02 on the 29th.
There were no Unit Shutdowns during June 2013. A power reduction commenced at approximately 23:45 on the 28th in support of main turbine valve testing (PTP-102.001). Power was reduced to approximately 90%. The plant was returned to 100% power at approximately 23:02 on the 29th.
RPT_PERIOD:201309UNIT_NME:Summer Unit 1                DOCKET:395OPERATING DATA REPORTPREPARER NAME:Wesley R. HigginsPREPARER TELEPHONE:8033454042UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:972.72. Maximum Dependable Capacity (MWe-Net)966720.006,310.00224,545.25 720.006,292.40222,109.77 0.000.000.00 705,365.006,188,956.00202,149,945.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             395                                                            PREPARER NAME:             Wesley R. Higgins UNIT_NME:            Summer Unit 1                                                  PREPARER TELEPHONE: 8033454042 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                         972.7
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)             966 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical              720.00              6,310.00          224,545.25
: 4. Number of Hours Generator On-line                      720.00              6,292.40          222,109.77
: 5. Reserve Shutdown Hours                                0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                705,365.00          6,188,956.00      202,149,945.00 UNIT SHUTDOWNS Type                                                  Method of F: Forced            Duration                              Shutting            Cause - Corrective Action No.       Date          S: Scheduled          (Hours)           Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
There were no Unit Shutdowns during September 2013. A power reduction commenced at approximately 22:30 on the 27th in support of main turbine valve testing (PTP-102.001). Power was reduced to approximately 90%. The plant was returned to 100% power at approximately 10:15 on the 28th.
There were no Unit Shutdowns during September 2013. A power reduction commenced at approximately 22:30 on the 27th in support of main turbine valve testing (PTP-102.001). Power was reduced to approximately 90%. The plant was returned to 100% power at approximately 10:15 on the 28th.
RPT_PERIOD:201307UNIT_NME:Surry Unit 1                 DOCKET:280OPERATING DATA REPORTPREPARER NAME:Marlene HaskettPREPARER TELEPHONE:757-365-2146UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8742. Maximum Dependable Capacity (MWe-Net)838744.005,087.00279,910.04 744.005,087.00276,779.72 0.000.003,736.20 625,818.384,393,115.11212,290,885.07This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            280                                                    PREPARER NAME:           Marlene Haskett UNIT_NME:           Surry Unit 1                                           PREPARER TELEPHONE: 757-365-2146 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     874
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         838 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          5,087.00        279,910.04
: 4. Number of Hours Generator On-line                744.00          5,087.00        276,779.72
: 5. Reserve Shutdown Hours                            0.00            0.00            3,736.20
: 6. Net Electrical energy Generated (MWHrs)          625,818.38      4,393,115.11    212,290,885.07 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201308UNIT_NME:Surry Unit 1                 DOCKET:280OPERATING DATA REPORTPREPARER NAME:Marlene HaskettPREPARER TELEPHONE:757-365-2146UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8742. Maximum Dependable Capacity (MWe-Net)838744.005,831.00280,654.04 744.005,831.00277,523.72 0.000.003,736.20 629,992.005,023,107.11212,920,877.07This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            280                                                    PREPARER NAME:           Marlene Haskett UNIT_NME:           Surry Unit 1                                           PREPARER TELEPHONE: 757-365-2146 RPT_PERIOD:         201308
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     874
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         838 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          5,831.00        280,654.04
: 4. Number of Hours Generator On-line                744.00          5,831.00        277,523.72
: 5. Reserve Shutdown Hours                            0.00            0.00            3,736.20
: 6. Net Electrical energy Generated (MWHrs)          629,992.00      5,023,107.11    212,920,877.07 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201309UNIT_NME:Surry Unit 1                 DOCKET:280OPERATING DATA REPORTPREPARER NAME:Marlene HaskettPREPARER TELEPHONE:757-365-2146UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8742. Maximum Dependable Capacity (MWe-Net)838720.006,551.00281,374.04 720.006,551.00278,243.72 0.000.003,736.20 612,564.695,635,671.80213,533,441.76This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            280                                                    PREPARER NAME:           Marlene Haskett UNIT_NME:           Surry Unit 1                                           PREPARER TELEPHONE: 757-365-2146 RPT_PERIOD:         201309
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     874
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         838 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          720.00          6,551.00        281,374.04
: 4. Number of Hours Generator On-line                720.00          6,551.00        278,243.72
: 5. Reserve Shutdown Hours                            0.00            0.00            3,736.20
: 6. Net Electrical energy Generated (MWHrs)          612,564.69      5,635,671.80    213,533,441.76 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201307UNIT_NME:Surry Unit 2                 DOCKET:281OPERATING DATA REPORTPREPARER NAME:Marlene HaskettPREPARER TELEPHONE:757-365-2146UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8742. Maximum Dependable Capacity (MWe-Net)838744.005,087.00277,054.04 744.005,087.00274,305.15 0.000.000.00 627,488.244,393,876.82210,700,644.77This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            281                                                    PREPARER NAME:           Marlene Haskett UNIT_NME:           Surry Unit 2                                           PREPARER TELEPHONE: 757-365-2146 RPT_PERIOD:         201307
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     874
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         838 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          5,087.00        277,054.04
: 4. Number of Hours Generator On-line                744.00          5,087.00        274,305.15
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          627,488.24      4,393,876.82    210,700,644.77 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201308UNIT_NME:Surry Unit 2                 DOCKET:281OPERATING DATA REPORTPREPARER NAME:Marlene HaskettPREPARER TELEPHONE:757-365-2146UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8742. Maximum Dependable Capacity (MWe-Net)838744.005,831.00277,798.04 744.005,831.00275,049.15 0.000.000.00 632,023.035,025,899.85211,332,667.80This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            281                                                    PREPARER NAME:           Marlene Haskett UNIT_NME:           Surry Unit 2                                           PREPARER TELEPHONE: 757-365-2146 RPT_PERIOD:         201308
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     874
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         838 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          744.00          5,831.00        277,798.04
: 4. Number of Hours Generator On-line                744.00          5,831.00        275,049.15
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          632,023.03      5,025,899.85    211,332,667.80 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201309UNIT_NME:Surry Unit 2                 DOCKET:281OPERATING DATA REPORTPREPARER NAME:Marlene HaskettPREPARER TELEPHONE:757-365-2146UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8742. Maximum Dependable Capacity (MWe-Net)838720.006,551.00278,518.04 720.006,551.00275,769.15 0.000.000.00 613,258.265,639,158.11211,945,926.07This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:            281                                                    PREPARER NAME:           Marlene Haskett UNIT_NME:           Surry Unit 2                                           PREPARER TELEPHONE: 757-365-2146 RPT_PERIOD:         201309
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                     874
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)         838 This Month      Yr-to-Date      Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical          720.00          6,551.00        278,518.04
: 4. Number of Hours Generator On-line                720.00          6,551.00        275,769.15
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          613,258.26      5,639,158.11    211,945,926.07 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==


RPT_PERIOD:201307UNIT_NME:Susquehanna Unit 1            DOCKET:387OPERATING DATA REPORTPREPARER NAME:J. HenningsPREPARER TELEPHONE:570-542-3747UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12872. Maximum Dependable Capacity (MWe-Net)1257744.004,394.30224,734.76 722.684,187.42221,535.98 0.000.000.00 841,199.005,240,133.00238,562,989.70This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:               387                                                              PREPARER NAME:               J. Hennings UNIT_NME:            Susquehanna Unit 1                                              PREPARER TELEPHONE: 570-542-3747 RPT_PERIOD:           201307
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                           1287
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)               1257 This Month        Yr-to-Date          Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical                744.00            4,394.30            224,734.76
: 4. Number of Hours Generator On-line                        722.68            4,187.42            221,535.98
: 5. Reserve Shutdown Hours                                  0.00              0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)                  841,199.00        5,240,133.00        238,562,989.70 UNIT SHUTDOWNS Type                                                  Method of F: Forced            Duration                              Shutting              Cause - Corrective Action No.      Date          S: Scheduled          (Hours)            Reason 1            Down 2                          Comments U1      7/21/2013              S                21.32                B                  5            07/21/13 01:51 Tripped Unit 1 Main Turbine for 2013-                                                                                                   Turbine Control valve EHC Maintenance. The reactor was maintained at approximately 15%
power. 07/21/13 23:10 performed Auto Synchronization and loading of Main Generator.
Note: The shutdown was planned less than 10 days in advanced, but more than 72 hrs in advance. This is not a Forced Loss Event because this shutdown plan was implemented to address the initial condition associated with the cause for the FLE reduction of 23% on 7/16/13.


==SUMMARY==
==SUMMARY==
There was one power reduction greater than 20%. The Unplanned Power reduction was initiated on 7/16/13. The reduction from 96%to 74% power was required to reduce Turbine vibration experienced due to Turbine Control Valve position. The Turbine was taken off-line on July 21, after reducing power to 15%, to perform maintenance on the Turbine Control Valve servo valve that caused the intial reduction to 74%. The Reactor was maintained at approximately 15% power while the Turbine was off line. The Generator was put on line on 7/21/13, and the Reactor returned to full power on 7/24/13. There were no other power reductions greater than 20% this month.U1 2013-7/21/2013S  21.32B507/21/13 01:51 Tripped Unit 1 Main Turbine for Turbine Control valve  EHC  Maintenance. The reactor was maintained at approximately 15%
There was one power reduction greater than 20%. The Unplanned Power reduction was initiated on 7/16/13. The reduction from 96%to 74%
power. 07/21/13 23:10 performed Auto Synchronization and loading of Main Generator.
power was required to reduce Turbine vibration experienced due to Turbine Control Valve position. The Turbine was taken off-line on July 21, after reducing power to 15%, to perform maintenance on the Turbine Control Valve servo valve that caused the intial reduction to 74%. The Reactor was maintained at approximately 15% power while the Turbine was off line. The Generator was put on line on 7/21/13, and the Reactor returned to full power on 7/24/13. There were no other power reductions greater than 20% this month.
Note: The shutdown was planned less than 10 days in advanced, but more than 72 hrs in advance. This is not a Forced Loss Event because this shutdown plan was implemented to address the initial condition associated with the cause for the FLE reduction of  23% on 7/16/13.
 
RPT_PERIOD:201308UNIT_NME:Susquehanna Unit 1           DOCKET:387OPERATING DATA REPORTPREPARER NAME:J. HenningsPREPARER TELEPHONE:570-542-3747UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12872. Maximum Dependable Capacity (MWe-Net)1257744.005,138.30225,478.76 744.004,931.42222,279.98 0.000.000.00 933,837.006,173,970.00239,496,826.70This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
OPERATING DATA REPORT DOCKET:             387                                                            PREPARER NAME:             J. Hennings UNIT_NME:           Susquehanna Unit 1                                             PREPARER TELEPHONE: 570-542-3747 RPT_PERIOD:         201308
: 4. Number of Hours Generator On-line
: 1. Design Electrical Rating:                         1287
: 5. Reserve Shutdown Hours
: 2. Maximum Dependable Capacity (MWe-Net)             1257 This Month        Yr-to-Date          Cumulative
: 6. Net Electrical energy Generated (MWHrs)
: 3. Number of Hours the Reactor was Critical              744.00            5,138.30            225,478.76
: 4. Number of Hours Generator On-line                      744.00            4,931.42            222,279.98
: 5. Reserve Shutdown Hours                                0.00              0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)                933,837.00        6,173,970.00        239,496,826.70 UNIT SHUTDOWNS Type                                                  Method of F: Forced          Duration                                Shutting            Cause - Corrective Action No.       Date        S: Scheduled          (Hours)           Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
There was one unplanned power reduction of greater than 20% in August. On 8/27/13 a Reactor Feed Pump tripped, resulting in a Reactor power reduction to 65%. On 08/28/13 power was increased to 100%. (This is considered an Unplanned Power Change for NRC Performance Indicators, and a Forced Loss Event for INPO).
There was one unplanned power reduction of greater than 20% in August. On 8/27/13 a Reactor Feed Pump tripped, resulting in a Reactor power reduction to 65%. On 08/28/13 power was increased to 100%. (This is considered an Unplanned Power Change for NRC Performance Indicators, and a Forced Loss Event for INPO).
RPT_PERIOD:201309UNIT_NME:Susquehanna Unit 1            DOCKET:387OPERATING DATA REPORTPREPARER NAME:J. HenningsPREPARER TELEPHONE:570-542-3747UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12872. Maximum Dependable Capacity (MWe-Net)1257720.005,858.30226,198.76 720.005,651.42222,999.98 0.000.000.00 905,554.007,079,524.00240,402,380.70This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             387                                                              PREPARER NAME:               J. Hennings UNIT_NME:          Susquehanna Unit 1                                                PREPARER TELEPHONE: 570-542-3747 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           1287
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               1257 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                720.00              5,858.30          226,198.76
: 4. Number of Hours Generator On-line                      720.00              5,651.42          222,999.98
: 5. Reserve Shutdown Hours                                  0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                905,554.00          7,079,524.00      240,402,380.70 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                                Shutting              Cause - Corrective Action No.       Date        S: Scheduled          (Hours)           Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
On 09/12/13 a power reduction from 100% was performed for a planned control rod sequence exchange. The lowest power was 65%. On 09/13/13, power was returned to full power. There were no other power reductions greater than 20 % in September.
On 09/12/13 a power reduction from 100% was performed for a planned control rod sequence exchange. The lowest power was 65%. On 09/13/13, power was returned to full power. There were no other power reductions greater than 20 % in September.
RPT_PERIOD:201307UNIT_NME:Susquehanna Unit 2            DOCKET:388OPERATING DATA REPORTPREPARER NAME:J. HenningsPREPARER TELEPHONE:570-542-3747UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12872. Maximum Dependable Capacity (MWe-Net)1257744.003,996.33220,543.15 744.003,819.42217,754.02 0.000.000.00 904,422.004,750,426.00237,072,345.30This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             388                                                            PREPARER NAME:                 J. Hennings UNIT_NME:          Susquehanna Unit 2                                              PREPARER TELEPHONE: 570-542-3747 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                         1287
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)             1257 This Month          Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical              744.00              3,996.33            220,543.15
: 4. Number of Hours Generator On-line                    744.00              3,819.42            217,754.02
: 5. Reserve Shutdown Hours                                0.00                0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)              904,422.00          4,750,426.00        237,072,345.30 UNIT SHUTDOWNS Type                                                  Method of F: Forced          Duration                              Shutting                Cause - Corrective Action No.       Date        S: Scheduled        (Hours)           Reason 1            Down 2                            Comments


==SUMMARY==
==SUMMARY==
There were Two power reductions greater than 20% power this month. Both were in support of Transmission/Distribution Grid related maintnence: On 07/06/13, reduced power from 99.8% to approximately 65% due to the loss of a 500KV line on the Distribution Grid. Returned to 100% on 07/08/13.
There were Two power reductions greater than 20% power this month. Both were in support of Transmission/Distribution Grid related maintnence:
On 07/27/13 began a scheduled power reduction from 100%, for the support of Electric Utilities work on a 500KV Transmission line. Lowest power level was 63%. Returned to 99.9% power on 07/28/13.
On 07/06/13, reduced power from 99.8% to approximately 65% due to the loss of a 500KV line on the Distribution Grid. Returned to 100% on 07/08/13.
RPT_PERIOD:201308UNIT_NME:Susquehanna Unit 2            DOCKET:388OPERATING DATA REPORTPREPARER NAME:J. HenningsPREPARER TELEPHONE:570-542-3747UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12872. Maximum Dependable Capacity (MWe-Net)1257744.004,740.33221,287.15 744.004,563.42218,498.02 0.000.000.00 939,578.005,690,004.00238,011,923.30This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
On 07/27/13 began a scheduled power reduction from 100%, for the support of Electric Utilities work on a 500KV Transmission line. Lowest power level was 63%. Returned to 99.9% power on 07/28/13.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:             388                                                        PREPARER NAME:           J. Hennings UNIT_NME:          Susquehanna Unit 2                                          PREPARER TELEPHONE: 570-542-3747 RPT_PERIOD:         201308
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                     1287
: 2. Maximum Dependable Capacity (MWe-Net)         1257 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            4,740.33          221,287.15
: 4. Number of Hours Generator On-line                744.00            4,563.42          218,498.02
: 5. Reserve Shutdown Hours                            0.00              0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)          939,578.00        5,690,004.00      238,011,923.30 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                      Comments


==SUMMARY==
==SUMMARY==
There were no power reductions greater than 20% in the month of August.
There were no power reductions greater than 20% in the month of August.
RPT_PERIOD:201309UNIT_NME:Susquehanna Unit 2            DOCKET:388OPERATING DATA REPORTPREPARER NAME:J. HenningsPREPARER TELEPHONE:570-542-3747UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12872. Maximum Dependable Capacity (MWe-Net)1257508.585,248.91221,795.73 483.525,046.94218,981.54 0.000.000.00 556,871.006,246,875.00238,568,794.30This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:               388                                                                PREPARER NAME:                 J. Hennings UNIT_NME:              Susquehanna Unit 2                                                  PREPARER TELEPHONE: 570-542-3747 RPT_PERIOD:           201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                               1287
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)                   1257 This Month          Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical                    508.58              5,248.91            221,795.73
: 4. Number of Hours Generator On-line                          483.52              5,046.94            218,981.54
: 5. Reserve Shutdown Hours                                      0.00                0.00                0.00
: 6. Net Electrical energy Generated (MWHrs)                    556,871.00          6,246,875.00        238,568,794.30 UNIT SHUTDOWNS Type                                                    Method of F: Forced          Duration                                  Shutting              Cause - Corrective Action No.      Date            S: Scheduled          (Hours)            Reason 1              Down 2                          Comments U2      9/14/2013              S                236.48                  B                    2            Began power reduction at 09/13/13 22:00, from 2013-                                                                                                       100% to shut down for scheduled repair of (RBCCW) leakage into the Drywell and replacement of Turbine blades.
Breaker opened: 09/14/13 02:48.
Breaker closed: 09/23/13 23:17 Return to full power: 09/27/13 07:47


==SUMMARY==
==SUMMARY==
The one power reduction greater than 20% in the month of September, was for a planned Control Rod Sequence Exchange. On 09/06/13, the power reduction began from 100%. Reactor Power reached as low as 53.7% and was returned to 99.8% power on 9/8/13.There was one Unit shutdown in September, but there are 2 Reactor Shutdown entries impacting this occurrence, to accurately account for criticality time periods. The power reduction for scheduled shutdown to correct cooling water leaking into the Drywell, and for Main Turbine blade replacements, began at 09/13/13 22:00 from 100%.
The one power reduction greater than 20% in the month of September, was for a planned Control Rod Sequence Exchange. On 09/06/13, the power reduction began from 100%. Reactor Power reached as low as 53.7% and was returned to 99.8% power on 9/8/13.
The Generator Breaker was opened 09/14/13 02:48 when the Reactor was at 15.5%. The Reactor was taken Sub-Critical by means of an Unplanned Manual Scram from 14% power at 09/14/13 03:30.Following the completion of the scheduled maintenance, during reactor startup. the Reactor was declared Critical at 09/22/13 22:02. Then, progressing through reactor start-up activities (re-ranging of IRM's), the Reactor was declared sub-critical at 09/22/13 23:13 (all rods not in, but also not critical during Reactor start-up). The Reactor was then declared critical at 09/23/13 00:06, and ramp-up activities continued. The generator was put on line 9/23/13 23:17. Full power was achieved at 09/27/13 07:47.U2 2013-9/14/2013S  236.48B2Began power reduction at 09/13/13 22:00, from 100% to shut down for scheduled repair of (RBCCW) leakage into the Drywell and replacement of Turbine blades.
There was one Unit shutdown in September, but there are 2 Reactor Shutdown entries impacting this occurrence, to accurately account for criticality time periods. The power reduction for scheduled shutdown to correct cooling water leaking into the Drywell, and for Main Turbine blade replacements, began at 09/13/13 22:00 from 100%.
Breaker opened: 09/14/13 02:48.
The Generator Breaker was opened 09/14/13 02:48 when the Reactor was at 15.5%. The Reactor was taken Sub-Critical by means of an Unplanned Manual Scram from 14% power at 09/14/13 03:30.
Breaker closed: 09/23/13 23:17 Return to full power: 09/27/13 07:47 RPT_PERIOD:201307UNIT_NME:Three Mile Island Unit 1     DOCKET:289OPERATING DATA REPORTPREPARER NAME:Mark FauberPREPARER TELEPHONE:(717) 948-8787UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8192. Maximum Dependable Capacity (MWe-Net)802744.005,087.00254,203.85 744.005,087.00252,395.17 0.000.000.00 610,260.004,263,545.00209,296,725.40This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
Following the completion of the scheduled maintenance, during reactor startup. the Reactor was declared Critical at 09/22/13 22:02. Then, progressing through reactor start-up activities (re-ranging of IRM's), the Reactor was declared sub-critical at 09/22/13 23:13 (all rods not in, but also not critical during Reactor start-up). The Reactor was then declared critical at 09/23/13 00:06, and ramp-up activities continued. The generator was put on line 9/23/13 23:17. Full power was achieved at 09/27/13 07:47.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:             289                                                            PREPARER NAME:           Mark Fauber UNIT_NME:           Three Mile Island Unit 1                                       PREPARER TELEPHONE: (717) 948-8787 RPT_PERIOD:         201307
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                       819
: 2. Maximum Dependable Capacity (MWe-Net)           802 This Month          Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical            744.00              5,087.00        254,203.85
: 4. Number of Hours Generator On-line                  744.00              5,087.00        252,395.17
: 5. Reserve Shutdown Hours                              0.00                0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            610,260.00          4,263,545.00    209,296,725.40 UNIT SHUTDOWNS Type                                                  Method of F: Forced          Duration                              Shutting          Cause - Corrective Action No.       Date        S: Scheduled        (Hours)           Reason 1            Down 2                    Comments


==SUMMARY==
==SUMMARY==
The unit operated at nominal full power for the entire month of July.
The unit operated at nominal full power for the entire month of July.
RPT_PERIOD:201308UNIT_NME:Three Mile Island Unit 1     DOCKET:289OPERATING DATA REPORTPREPARER NAME:Mark FauberPREPARER TELEPHONE:(717) 948-8787UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8192. Maximum Dependable Capacity (MWe-Net)802744.005,831.00254,947.85 744.005,831.00253,139.17 0.000.000.00 614,906.004,878,451.00209,911,631.40This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            289                                                          PREPARER NAME:           Mark Fauber UNIT_NME:           Three Mile Island Unit 1                                     PREPARER TELEPHONE: (717) 948-8787 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       819
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           802 This Month          Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical            744.00              5,831.00        254,947.85
: 4. Number of Hours Generator On-line                  744.00              5,831.00        253,139.17
: 5. Reserve Shutdown Hours                              0.00                0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)            614,906.00          4,878,451.00    209,911,631.40 UNIT SHUTDOWNS Type                                                Method of F: Forced          Duration                              Shutting          Cause - Corrective Action No.       Date        S: Scheduled        (Hours)           Reason 1            Down 2                    Comments


==SUMMARY==
==SUMMARY==
The unit operated at nominal full power for the entire month of August.
The unit operated at nominal full power for the entire month of August.
RPT_PERIOD:201309UNIT_NME:Three Mile Island Unit 1     DOCKET:289OPERATING DATA REPORTPREPARER NAME:Mark FauberPREPARER TELEPHONE:(717) 948-8787UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:8192. Maximum Dependable Capacity (MWe-Net)802720.006,551.00255,667.85 720.006,551.00253,859.17 0.000.000.00 599,698.005,478,149.00210,511,329.40This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              289                                                            PREPARER NAME:             Mark Fauber UNIT_NME:           Three Mile Island Unit 1                                       PREPARER TELEPHONE: (717) 948-8787 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           819
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               802 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                720.00            6,551.00          255,667.85
: 4. Number of Hours Generator On-line                      720.00            6,551.00          253,859.17
: 5. Reserve Shutdown Hours                                  0.00              0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                599,698.00        5,478,149.00      210,511,329.40 UNIT SHUTDOWNS Type                                                  Method of F: Forced          Duration                              Shutting            Cause - Corrective Action No.       Date        S: Scheduled          (Hours)           Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
The unit operated at nominal full power for the entire month of Septbember, with the exception of the period between 22:00 on 9/7/13 to 03:33 on 9/8/13, when a planned power reduction to approximately 89% power was completed.
The unit operated at nominal full power for the entire month of Septbember, with the exception of the period between 22:00 on 9/7/13 to 03:33 on 9/8/13, when a planned power reduction to approximately 89% power was completed.
RPT_PERIOD:201307UNIT_NME:Turkey Point Unit 3           DOCKET:250OPERATING DATA REPORTPREPARER NAME:Colleen PhillipsPREPARER TELEPHONE:305-246-7106UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:7202. Maximum Dependable Capacity (MWe-Net)693744.004,371.26274,527.90 0.003,528.46270,291.70 0.000.00121.80 601,876.303,279,364.25179,967,464.81This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            250                                                    PREPARER NAME:           Colleen Phillips UNIT_NME:           Turkey Point Unit 3                                     PREPARER TELEPHONE: 305-246-7106 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     720
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         693 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          4,371.26        274,527.90
: 4. Number of Hours Generator On-line                0.00            3,528.46        270,291.70
: 5. Reserve Shutdown Hours                            0.00            0.00            121.80
: 6. Net Electrical energy Generated (MWHrs)          601,876.30      3,279,364.25    179,967,464.81 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unit 3 was approximately 100% for the month.
Unit 3 was approximately 100% for the month.
RPT_PERIOD:201308UNIT_NME:Turkey Point Unit 3           DOCKET:250OPERATING DATA REPORTPREPARER NAME:Colleen PhillipsPREPARER TELEPHONE:305-246-7106UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:7202. Maximum Dependable Capacity (MWe-Net)693744.005,115.26275,271.90 0.003,528.46270,291.70 0.000.00121.80 597,500.503,876,864.75180,564,965.31This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            250                                                    PREPARER NAME:           Colleen Phillips UNIT_NME:           Turkey Point Unit 3                                     PREPARER TELEPHONE: 305-246-7106 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     720
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         693 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          5,115.26        275,271.90
: 4. Number of Hours Generator On-line                0.00            3,528.46        270,291.70
: 5. Reserve Shutdown Hours                            0.00            0.00            121.80
: 6. Net Electrical energy Generated (MWHrs)          597,500.50      3,876,864.75    180,564,965.31 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unit 3 was at approximately 100% for the month.
Unit 3 was at approximately 100% for the month.
RPT_PERIOD:201309UNIT_NME:Turkey Point Unit 3           DOCKET:250OPERATING DATA REPORTPREPARER NAME:Colleen PhillipsPREPARER TELEPHONE:305-246-7106UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:7202. Maximum Dependable Capacity (MWe-Net)693720.005,835.26275,991.90 0.003,528.46270,291.70 0.000.00121.80 577,747.624,454,612.37181,142,712.93This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            250                                                    PREPARER NAME:           Colleen Phillips UNIT_NME:           Turkey Point Unit 3                                     PREPARER TELEPHONE: 305-246-7106 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     720
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         693 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          720.00          5,835.26        275,991.90
: 4. Number of Hours Generator On-line                0.00            3,528.46        270,291.70
: 5. Reserve Shutdown Hours                            0.00            0.00            121.80
: 6. Net Electrical energy Generated (MWHrs)          577,747.62      4,454,612.37    181,142,712.93 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unit 3 was at approximately 100% power.
Unit 3 was at approximately 100% power.
RPT_PERIOD:201307UNIT_NME:Turkey Point Unit 4           DOCKET:251OPERATING DATA REPORTPREPARER NAME:Colleen PhillipsPREPARER TELEPHONE:305-246-7106UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:7202. Maximum Dependable Capacity (MWe-Net)693744.002,763.08272,065.23 744.002,483.30266,828.80 0.000.00577.20 609,626.231,666,814.45178,915,449.26This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            251                                                    PREPARER NAME:           Colleen Phillips UNIT_NME:           Turkey Point Unit 4                                     PREPARER TELEPHONE: 305-246-7106 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     720
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         693 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          2,763.08        272,065.23
: 4. Number of Hours Generator On-line                744.00          2,483.30        266,828.80
: 5. Reserve Shutdown Hours                            0.00            0.00            577.20
: 6. Net Electrical energy Generated (MWHrs)          609,626.23      1,666,814.45    178,915,449.26 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unit 4 was at approximately 100% for the month.
Unit 4 was at approximately 100% for the month.
RPT_PERIOD:201308UNIT_NME:Turkey Point Unit 4           DOCKET:251OPERATING DATA REPORTPREPARER NAME:Colleen PhillipsPREPARER TELEPHONE:305-246-7106UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:7202. Maximum Dependable Capacity (MWe-Net)693744.003,507.08272,809.23 744.003,227.30267,572.80 0.000.00577.20 605,877.392,272,691.84179,521,326.65This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            251                                                    PREPARER NAME:           Colleen Phillips UNIT_NME:           Turkey Point Unit 4                                     PREPARER TELEPHONE: 305-246-7106 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     720
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         693 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          3,507.08        272,809.23
: 4. Number of Hours Generator On-line                744.00          3,227.30        267,572.80
: 5. Reserve Shutdown Hours                            0.00            0.00            577.20
: 6. Net Electrical energy Generated (MWHrs)          605,877.39      2,272,691.84    179,521,326.65 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unit 4 was approximately 100% for the month.
Unit 4 was approximately 100% for the month.
RPT_PERIOD:201309UNIT_NME:Turkey Point Unit 4           DOCKET:251OPERATING DATA REPORTPREPARER NAME:Colleen PhillipsPREPARER TELEPHONE:305-246-7106UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:7202. Maximum Dependable Capacity (MWe-Net)693720.004,227.08273,529.23 720.003,947.30268,292.80 0.000.00577.20 585,886.052,858,577.89180,107,212.70This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            251                                                    PREPARER NAME:           Colleen Phillips UNIT_NME:           Turkey Point Unit 4                                     PREPARER TELEPHONE: 305-246-7106 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     720
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         693 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          720.00          4,227.08        273,529.23
: 4. Number of Hours Generator On-line                720.00          3,947.30        268,292.80
: 5. Reserve Shutdown Hours                            0.00            0.00            577.20
: 6. Net Electrical energy Generated (MWHrs)          585,886.05      2,858,577.89    180,107,212.70 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unit 4 was at approximately 100% for the month.
Unit 4 was at approximately 100% for the month.
RPT_PERIOD:201307UNIT_NME:Vermont Yankee Unit 1        DOCKET:271OPERATING DATA REPORTPREPARER NAME:Anthony L. StevensPREPARER TELEPHONE:(802) 451-3176UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:6172. Maximum Dependable Capacity (MWe-Net)605744.004,468.69311,079.06 744.004,449.65307,167.81 0.000.000.00 446,584.002,648,399.00156,051,746.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             271                                                          PREPARER NAME:           Anthony L. Stevens UNIT_NME:            Vermont Yankee Unit 1                                        PREPARER TELEPHONE: (802) 451-3176 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           617
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               605 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical                744.00          4,468.69        311,079.06
: 4. Number of Hours Generator On-line                      744.00          4,449.65        307,167.81
: 5. Reserve Shutdown Hours                                  0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)                446,584.00      2,648,399.00    156,051,746.00 UNIT SHUTDOWNS Type                                                Method of F: Forced          Duration                            Shutting          Cause - Corrective Action No.       Date          S: Scheduled        (Hours)             Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Dates           Activity                                           MW-hr S/F07/02-07/03 CW System Chlorination                 474   S07/05-07/06 CW System Chlorination                 382   S07/07-07/09 Rod Sequence Exchange             4828   S07/09           CW System Chlorination                   132   S07/09-07/10 2nd Pass Rod Pattern Adjustment   221   S07/10-07/11 3rd Pass Rod Pattern Adjustment   106   S07/12-07/13 CW System Chlorination                 122   S07/17           CW System Chlorination                 348   S07/21           CW System Chlorination                 291   S07/28           CW System Chlorination                   24   STotal All Losses (Scheduled and Forced) = 6928 MW-hr RPT_PERIOD:201308UNIT_NME:Vermont Yankee Unit 1        DOCKET:271OPERATING DATA REPORTPREPARER NAME:Anthony L. StevensPREPARER TELEPHONE:(802) 451-3176UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:6172. Maximum Dependable Capacity (MWe-Net)605744.005,212.69311,823.06 744.005,193.65307,911.81 0.000.000.00 446,712.003,095,111.00156,498,458.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
Dates             Activity                         MW-hr S/F 07/02-07/03 CW System Chlorination             474 S 07/05-07/06 CW System Chlorination             382 S 07/07-07/09 Rod Sequence Exchange             4828   S 07/09       CW System Chlorination             132 S 07/09-07/10 2nd Pass Rod Pattern Adjustment 221     S 07/10-07/11 3rd Pass Rod Pattern Adjustment 106     S 07/12-07/13 CW System Chlorination             122 S 07/17       CW System Chlorination             348 S 07/21       CW System Chlorination             291 S 07/28       CW System Chlorination               24 S Total All Losses (Scheduled and Forced) = 6928 MW-hr
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:             271                                                          PREPARER NAME:           Anthony L. Stevens UNIT_NME:            Vermont Yankee Unit 1                                        PREPARER TELEPHONE: (802) 451-3176 RPT_PERIOD:         201308
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                           617
: 2. Maximum Dependable Capacity (MWe-Net)               605 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical                744.00          5,212.69        311,823.06
: 4. Number of Hours Generator On-line                      744.00          5,193.65        307,911.81
: 5. Reserve Shutdown Hours                                  0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)                446,712.00      3,095,111.00    156,498,458.00 UNIT SHUTDOWNS Type                                              Method of F: Forced          Duration                            Shutting          Cause - Corrective Action No.       Date          S: Scheduled          (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Dates           Activity                                   MW-hr S/F08/02-08/03 CW System Chlorination         146     S08/08-08/09 CW System Chlorination         522     S08/13-08/14 CW System Chlorination         123     S08/20-08/21 CW System Chlorination         145     S08/26           Delta V Power Supply Failure   61     F08/27-08/28 CW System Chlorination         307     S08/30-08/31 CW System Chlorination         273     STotal All Losses (Scheduled and Forced) = 1577 MW-hr RPT_PERIOD:201309UNIT_NME:Vermont Yankee Unit 1        DOCKET:271OPERATING DATA REPORTPREPARER NAME:Anthony L. StevensPREPARER TELEPHONE:(802) 451-3176UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:6172. Maximum Dependable Capacity (MWe-Net)605720.005,932.69312,543.06 720.005,913.65308,631.81 0.000.000.00 398,447.003,493,558.00156,896,905.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
Dates             Activity                   MW-hr S/F 08/02-08/03 CW System Chlorination       146 S 08/08-08/09 CW System Chlorination       522 S 08/13-08/14 CW System Chlorination       123 S 08/20-08/21 CW System Chlorination       145 S 08/26       Delta V Power Supply Failure 61 F 08/27-08/28 CW System Chlorination       307 S 08/30-08/31 CW System Chlorination       273 S Total All Losses (Scheduled and Forced) = 1577 MW-hr
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:             271                                                            PREPARER NAME:           Anthony L. Stevens UNIT_NME:            Vermont Yankee Unit 1                                          PREPARER TELEPHONE: (802) 451-3176 RPT_PERIOD:         201309
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                           617
: 2. Maximum Dependable Capacity (MWe-Net)               605 This Month      Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                720.00          5,932.69          312,543.06
: 4. Number of Hours Generator On-line                        720.00          5,913.65          308,631.81
: 5. Reserve Shutdown Hours                                  0.00            0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                  398,447.00      3,493,558.00      156,896,905.00 UNIT SHUTDOWNS Type                                                Method of F: Forced            Duration                              Shutting          Cause - Corrective Action No.       Date          S: Scheduled          (Hours)           Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Dates           Activity                                                                       MW-hr S/F09/10-09/11 CW System Chlorination                                                 283 S09/23-09/30 B Recirc MG Set Repair (Oil Leak) & Assoc. Passes 33666 F < 10 days09/26           Rod Sequence Exch.                                                       767 S09/26           Single Rod Scram Testing                                             1582 S09/26           Quarterly MSIV Testing                                                   897 S09/26           Quarterly Turbine Valve Testing                                   2200 STotal All Losses (Scheduled and Forced) = 39395 MW-hr RPT_PERIOD:201307UNIT_NME:Vogtle Unit 1                 DOCKET:424OPERATING DATA REPORTPREPARER NAME:Doug HoltPREPARER TELEPHONE:706-826-3467UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11692. Maximum Dependable Capacity (MWe-Net)1150744.005,087.00209,224.49 744.005,087.00207,134.62 0.000.000.00 854,187.005,944,250.00235,321,123.50This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
Dates             Activity                                         MW-hr S/F 09/10-09/11 CW System Chlorination                               283 S 09/23-09/30 B Recirc MG Set Repair (Oil Leak) & Assoc. Passes 33666 F < 10 days 09/26       Rod Sequence Exch.                                   767 S 09/26       Single Rod Scram Testing                           1582 S 09/26       Quarterly MSIV Testing                             897 S 09/26       Quarterly Turbine Valve Testing                   2200 S Total All Losses (Scheduled and Forced) = 39395 MW-hr
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:            424                                                              PREPARER NAME:               Doug Holt UNIT_NME:           Vogtle Unit 1                                                     PREPARER TELEPHONE: 706-826-3467 RPT_PERIOD:         201307
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                           1169
: 2. Maximum Dependable Capacity (MWe-Net)               1150 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                  744.00            5,087.00          209,224.49
: 4. Number of Hours Generator On-line                        744.00            5,087.00          207,134.62
: 5. Reserve Shutdown Hours                                    0.00              0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                  854,187.00        5,944,250.00      235,321,123.50 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                              Shutting              Cause - Corrective Action No.       Date        S: Scheduled            (Hours)             Reason 1          Down 2                          Comments


==SUMMARY==
==SUMMARY==
Through July 1 at approximately 00:15, Unit 1 was at maximum operating power with no significant operating problems. On July 1 at approximately 00:15, Unit 1 began a planned derate to approximately 98% reactor power for turbine control valve testing. On July 1 at approximately 06:40, the Unit 1 reactor had returned to maximum operating power and remained there for the rest of the month.
Through July 1 at approximately 00:15, Unit 1 was at maximum operating power with no significant operating problems. On July 1 at approximately 00:15, Unit 1 began a planned derate to approximately 98% reactor power for turbine control valve testing. On July 1 at approximately 06:40, the Unit 1 reactor had returned to maximum operating power and remained there for the rest of the month.
RPT_PERIOD:201308UNIT_NME:Vogtle Unit 1                 DOCKET:424OPERATING DATA REPORTPREPARER NAME:Doug HoltPREPARER TELEPHONE:706-826-3467UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11692. Maximum Dependable Capacity (MWe-Net)1150744.005,831.00209,968.49 744.005,831.00207,878.62 0.000.000.00 856,700.006,800,950.00236,177,823.50This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            424                                                      PREPARER NAME:           Doug Holt UNIT_NME:           Vogtle Unit 1                                           PREPARER TELEPHONE: 706-826-3467 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1169
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1150 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          5,831.00        209,968.49
: 4. Number of Hours Generator On-line                744.00          5,831.00        207,878.62
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          856,700.00      6,800,950.00    236,177,823.50 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unit 1 was at maximum operating power during the month of August.
Unit 1 was at maximum operating power during the month of August.
RPT_PERIOD:201309UNIT_NME:Vogtle Unit 1                 DOCKET:424OPERATING DATA REPORTPREPARER NAME:Doug HoltPREPARER TELEPHONE:706-826-3467UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11692. Maximum Dependable Capacity (MWe-Net)1150720.006,551.00210,688.49 720.006,551.00208,598.62 0.000.000.00 832,984.007,633,934.00237,010,807.50This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              424                                                              PREPARER NAME:               Doug Holt UNIT_NME:           Vogtle Unit 1                                                     PREPARER TELEPHONE: 706-826-3467 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                             1169
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)                 1150 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                  720.00            6,551.00          210,688.49
: 4. Number of Hours Generator On-line                        720.00            6,551.00          208,598.62
: 5. Reserve Shutdown Hours                                    0.00              0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                  832,984.00        7,633,934.00      237,010,807.50 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                              Shutting            Cause - Corrective Action No.       Date        S: Scheduled            (Hours)           Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
Through September 29 at approximately 02:10, Unit 1 was at maximum operating power with no significant operating problems. On September 29 at approximately 02:10, Unit 1 began a planned derate to approximately 98% reactor power for turbine control valve testing. On September 29 at approximately 05:30, the Unit 1 reactor had returned to maximum operating power and remained there for the rest of the month.
Through September 29 at approximately 02:10, Unit 1 was at maximum operating power with no significant operating problems. On September 29 at approximately 02:10, Unit 1 began a planned derate to approximately 98% reactor power for turbine control valve testing. On September 29 at approximately 05:30, the Unit 1 reactor had returned to maximum operating power and remained there for the rest of the month.
RPT_PERIOD:201307UNIT_NME:Vogtle Unit 2                 DOCKET:425OPERATING DATA REPORTPREPARER NAME:Doug HoltPREPARER TELEPHONE:706-826-3467UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11692. Maximum Dependable Capacity (MWe-Net)1152744.004,342.53193,828.63 744.004,279.80192,478.97 0.000.000.00 865,534.004,907,076.00219,334,749.50This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            425                                                        PREPARER NAME:           Doug Holt UNIT_NME:           Vogtle Unit 2                                             PREPARER TELEPHONE: 706-826-3467 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1169
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1152 This Month        Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            4,342.53        193,828.63
: 4. Number of Hours Generator On-line                744.00            4,279.80        192,478.97
: 5. Reserve Shutdown Hours                            0.00              0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          865,534.00        4,907,076.00    219,334,749.50 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1            Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unit 2 was at maximum operating power during the month of July.
Unit 2 was at maximum operating power during the month of July.
RPT_PERIOD:201308UNIT_NME:Vogtle Unit 2                 DOCKET:425OPERATING DATA REPORTPREPARER NAME:Doug HoltPREPARER TELEPHONE:706-826-3467UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11692. Maximum Dependable Capacity (MWe-Net)1152744.005,086.53194,572.63 744.005,023.80193,222.97 0.000.000.00 866,037.005,773,113.00220,200,786.50This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            425                                                      PREPARER NAME:           Doug Holt UNIT_NME:           Vogtle Unit 2                                           PREPARER TELEPHONE: 706-826-3467 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1169
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1152 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          5,086.53        194,572.63
: 4. Number of Hours Generator On-line                744.00          5,023.80        193,222.97
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          866,037.00      5,773,113.00    220,200,786.50 UNIT SHUTDOWNS Type                                            Method of F: Forced        Duration                          Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unit 2 was at maximum operating power during the month of August.
Unit 2 was at maximum operating power during the month of August.
RPT_PERIOD:201309UNIT_NME:Vogtle Unit 2                 DOCKET:425OPERATING DATA REPORTPREPARER NAME:Doug HoltPREPARER TELEPHONE:706-826-3467UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11692. Maximum Dependable Capacity (MWe-Net)1152720.005,806.53195,292.63 720.005,743.80193,942.97 0.000.000.00 841,624.006,614,737.00221,042,410.50This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:              425                                                              PREPARER NAME:               Doug Holt UNIT_NME:           Vogtle Unit 2                                                     PREPARER TELEPHONE: 706-826-3467 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                           1169
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)               1152 This Month        Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical                  720.00            5,806.53          195,292.63
: 4. Number of Hours Generator On-line                        720.00            5,743.80          193,942.97
: 5. Reserve Shutdown Hours                                    0.00              0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)                  841,624.00        6,614,737.00      221,042,410.50 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                                Shutting            Cause - Corrective Action No.       Date        S: Scheduled            (Hours)             Reason 1          Down 2                          Comments


==SUMMARY==
==SUMMARY==
Through September 7 at approximately 22:28, Unit 2 was at maximum operating power with no significant operating problems. On September 7 at approximately 22:28, Unit 2 began a planned derate to approximately 98% reactor power for turbine control valve testing. On September 8 at approximately 02:41, the Unit 2 reactor had returned to maximum operating power and remained there for the rest of the month.
Through September 7 at approximately 22:28, Unit 2 was at maximum operating power with no significant operating problems. On September 7 at approximately 22:28, Unit 2 began a planned derate to approximately 98% reactor power for turbine control valve testing. On September 8 at approximately 02:41, the Unit 2 reactor had returned to maximum operating power and remained there for the rest of the month.
RPT_PERIOD:201307UNIT_NME:Waterford Unit 3             DOCKET:382OPERATING DATA REPORTPREPARER NAME:Jim PollockPREPARER TELEPHONE:(504) 739-6561UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11732. Maximum Dependable Capacity (MWe-Net)1152744.004,538.95213,980.15 744.004,502.46212,316.66 0.000.000.00 861,067.005,130,234.00233,079,566.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            382                                                        PREPARER NAME:               Jim Pollock UNIT_NME:           Waterford Unit 3                                           PREPARER TELEPHONE: (504) 739-6561 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1173
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1152 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical          744.00              4,538.95          213,980.15
: 4. Number of Hours Generator On-line                744.00              4,502.46          212,316.66
: 5. Reserve Shutdown Hours                            0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)          861,067.00          5,130,234.00      233,079,566.00 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
The unit operated at an average reactor power level of 99.6% and experienced no shutdowns or significant power reductions during the period.
The unit operated at an average reactor power level of 99.6% and experienced no shutdowns or significant power reductions during the period.
RPT_PERIOD:201308UNIT_NME:Waterford Unit 3             DOCKET:382OPERATING DATA REPORTPREPARER NAME:Jim PollockPREPARER TELEPHONE:(504) 739-6561UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11732. Maximum Dependable Capacity (MWe-Net)1152744.005,282.95214,724.15 744.005,246.46213,060.66 0.000.000.00 855,027.005,985,261.00233,934,593.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            382                                                        PREPARER NAME:               Jim Pollock UNIT_NME:           Waterford Unit 3                                           PREPARER TELEPHONE: (504) 739-6561 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1173
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1152 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical          744.00              5,282.95          214,724.15
: 4. Number of Hours Generator On-line                744.00              5,246.46          213,060.66
: 5. Reserve Shutdown Hours                            0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)          855,027.00          5,985,261.00      233,934,593.00 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
The unit operated at an average reactor power level of 99.9% and experienced no shutdowns or significant power reductions during the period.
The unit operated at an average reactor power level of 99.9% and experienced no shutdowns or significant power reductions during the period.
RPT_PERIOD:201309UNIT_NME:Waterford Unit 3             DOCKET:382OPERATING DATA REPORTPREPARER NAME:JIm PollockPREPARER TELEPHONE:(504) 739-6561UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11732. Maximum Dependable Capacity (MWe-Net)1152720.006,002.95215,444.15 720.005,966.46213,780.66 0.000.000.00 819,910.006,805,171.00234,754,503.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            382                                                        PREPARER NAME:               JIm Pollock UNIT_NME:           Waterford Unit 3                                           PREPARER TELEPHONE: (504) 739-6561 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1173
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1152 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical          720.00              6,002.95          215,444.15
: 4. Number of Hours Generator On-line                720.00              5,966.46          213,780.66
: 5. Reserve Shutdown Hours                            0.00                0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)          819,910.00          6,805,171.00      234,754,503.00 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1            Down 2                        Comments


==SUMMARY==
==SUMMARY==
The unit operated at an average reactor power level of 99.7% and experienced no shutdowns or significant power reductions during the period.
The unit operated at an average reactor power level of 99.7% and experienced no shutdowns or significant power reductions during the period.
RPT_PERIOD:201307UNIT_NME:Watts Bar Unit 1             DOCKET:390OPERATING DATA REPORTPREPARER NAME:Tiffany BridgesPREPARER TELEPHONE:423-365-1434UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11602. Maximum Dependable Capacity (MWe-Net)1123744.005,047.00136,364.07 744.005,036.35135,664.98 0.000.000.00 833,711.005,764,198.00152,035,645.08This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            390                                                        PREPARER NAME:             Tiffany Bridges UNIT_NME:           Watts Bar Unit 1                                           PREPARER TELEPHONE: 423-365-1434 RPT_PERIOD:         201307
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       1160
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           1123 This Month      Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical            744.00          5,047.00          136,364.07
: 4. Number of Hours Generator On-line                    744.00          5,036.35          135,664.98
: 5. Reserve Shutdown Hours                              0.00            0.00              0.00
: 6. Net Electrical energy Generated (MWHrs)              833,711.00      5,764,198.00      152,035,645.08 UNIT SHUTDOWNS Type                                              Method of F: Forced          Duration                          Shutting            Cause - Corrective Action No.       Date        S: Scheduled        (Hours)           Reason 1          Down 2                      Comments


==SUMMARY==
==SUMMARY==
Grid related energy loss due to Auto Tripfrom a 1A Mainbank Transformer Mismatch that was Energy Deliverys equipment.Unplanned Losses are due to manageable losses.
Grid related energy loss due to Auto Tripfrom a 1A Mainbank Transformer Mismatch that was Energy Deliverys equipment.
RPT_PERIOD:201308UNIT_NME:Watts Bar Unit 1             DOCKET:390OPERATING DATA REPORTPREPARER NAME:Tiffany BridgesPREPARER TELEPHONE:423-365-1434UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11602. Maximum Dependable Capacity (MWe-Net)1123744.005,791.00137,108.07 744.005,780.35136,408.98 0.000.000.00 837,231.006,601,429.00152,872,876.08This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
Unplanned Losses are due to manageable losses.
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:            390                                                    PREPARER NAME:           Tiffany Bridges UNIT_NME:           Watts Bar Unit 1                                       PREPARER TELEPHONE: 423-365-1434 RPT_PERIOD:         201308
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                     1160
: 2. Maximum Dependable Capacity (MWe-Net)         1123 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00          5,791.00        137,108.07
: 4. Number of Hours Generator On-line                744.00          5,780.35        136,408.98
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          837,231.00      6,601,429.00    152,872,876.08 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unplanned Losses are Manageable Losses.
Unplanned Losses are Manageable Losses.
RPT_PERIOD:201309UNIT_NME:Watts Bar Unit 1             DOCKET:390OPERATING DATA REPORTPREPARER NAME:Tiffany BridgesPREPARER TELEPHONE:423-365-1434UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:11602. Maximum Dependable Capacity (MWe-Net)1123720.006,511.00137,828.07 720.006,500.35137,128.98 0.000.000.00 813,145.007,414,574.00153,686,021.08This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:            390                                                    PREPARER NAME:           Tiffany Bridges UNIT_NME:           Watts Bar Unit 1                                       PREPARER TELEPHONE: 423-365-1434 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                     1160
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)         1123 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          720.00          6,511.00        137,828.07
: 4. Number of Hours Generator On-line                720.00          6,500.35        137,128.98
: 5. Reserve Shutdown Hours                            0.00            0.00            0.00
: 6. Net Electrical energy Generated (MWHrs)          813,145.00      7,414,574.00    153,686,021.08 UNIT SHUTDOWNS Type                                          Method of F: Forced        Duration                        Shutting          Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1          Down 2                    Comments


==SUMMARY==
==SUMMARY==
Unplanned Losses are Manageable Losses RPT_PERIOD:201307UNIT_NME:Wolf Creek Unit 1             DOCKET:482OPERATING DATA REPORTPREPARER NAME:W M MuilenburgPREPARER TELEPHONE:620 364-8831UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12002. Maximum Dependable Capacity (MWe-Net)1164744.003,309.08210,656.06 744.003,218.67208,963.65 0.000.00339.80 882,785.003,638,273.00239,769,240.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
Unplanned Losses are Manageable Losses
: 4. Number of Hours Generator On-line
 
: 5. Reserve Shutdown Hours
OPERATING DATA REPORT DOCKET:             482                                                          PREPARER NAME:             W M Muilenburg UNIT_NME:          Wolf Creek Unit 1                                           PREPARER TELEPHONE: 620 364-8831 RPT_PERIOD:         201307
: 6. Net Electrical energy Generated (MWHrs)
: 1. Design Electrical Rating:                     1200
: 2. Maximum Dependable Capacity (MWe-Net)         1164 This Month          Yr-to-Date        Cumulative
: 3. Number of Hours the Reactor was Critical          744.00              3,309.08          210,656.06
: 4. Number of Hours Generator On-line                744.00              3,218.67          208,963.65
: 5. Reserve Shutdown Hours                            0.00                0.00              339.80
: 6. Net Electrical energy Generated (MWHrs)          882,785.00          3,638,273.00      239,769,240.00 UNIT SHUTDOWNS Type                                                Method of F: Forced        Duration                              Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)         Reason 1              Down 2                    Comments


==SUMMARY==
==SUMMARY==
The unit operated in Mode 1, at or near 100% power, from July 1, 2013 through July 31, 2013.
The unit operated in Mode 1, at or near 100% power, from July 1, 2013 through July 31, 2013.
RPT_PERIOD:201308UNIT_NME:Wolf Creek Unit 1             DOCKET:482OPERATING DATA REPORTPREPARER NAME:W M MuilenburgPREPARER TELEPHONE:620 364-8831UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12002. Maximum Dependable Capacity (MWe-Net)1164744.004,053.08211,400.06 744.003,962.67209,707.65 0.000.00339.80 883,930.004,522,203.00240,653,170.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             482                                                        PREPARER NAME:             W M Muilenburg UNIT_NME:          Wolf Creek Unit 1                                           PREPARER TELEPHONE: 620 364-8831 RPT_PERIOD:         201308
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                       1200
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)           1164 This Month        Yr-to-Date          Cumulative
: 3. Number of Hours the Reactor was Critical          744.00            4,053.08          211,400.06
: 4. Number of Hours Generator On-line                  744.00            3,962.67          209,707.65
: 5. Reserve Shutdown Hours                            0.00              0.00              339.80
: 6. Net Electrical energy Generated (MWHrs)            883,930.00        4,522,203.00      240,653,170.00 UNIT SHUTDOWNS Type                                              Method of F: Forced        Duration                            Shutting            Cause - Corrective Action No.       Date        S: Scheduled      (Hours)           Reason 1            Down 2                    Comments


==SUMMARY==
==SUMMARY==
The unit operating in Mode 1, at or near 100% power, from August 1, 2013 through August 31, 2013.
The unit operating in Mode 1, at or near 100% power, from August 1, 2013 through August 31, 2013.
RPT_PERIOD:201309UNIT_NME:Wolf Creek Unit 1             DOCKET:482OPERATING DATA REPORTPREPARER NAME:W M MuilenburgPREPARER TELEPHONE:620 364-8831UNIT SHUTDOWNSNo.DateTypeF: ForcedS: ScheduledDuration(Hours)Reason 1Method of ShuttingDown 2Cause - Corrective ActionComments1. Design Electrical Rating:12002. Maximum Dependable Capacity (MWe-Net)1164298.574,351.65211,698.63 270.584,233.25209,978.23 0.000.00339.80 292,148.004,814,351.00240,945,318.00This MonthYr-to-DateCumulative3. Number of Hours the Reactor was Critical
 
: 4. Number of Hours Generator On-line
OPERATING DATA REPORT DOCKET:             482                                                                PREPARER NAME:               W M Muilenburg UNIT_NME:          Wolf Creek Unit 1                                                 PREPARER TELEPHONE: 620 364-8831 RPT_PERIOD:         201309
: 5. Reserve Shutdown Hours
: 1. Design Electrical Rating:                         1200
: 6. Net Electrical energy Generated (MWHrs)
: 2. Maximum Dependable Capacity (MWe-Net)             1164 This Month          Yr-to-Date            Cumulative
: 3. Number of Hours the Reactor was Critical              298.57              4,351.65              211,698.63
: 4. Number of Hours Generator On-line                      270.58              4,233.25              209,978.23
: 5. Reserve Shutdown Hours                                0.00                0.00                  339.80
: 6. Net Electrical energy Generated (MWHrs)                292,148.00          4,814,351.00          240,945,318.00 UNIT SHUTDOWNS Type                                                    Method of F: Forced            Duration                                Shutting            Cause - Corrective Action No.       Date        S: Scheduled            (Hours)          Reason 1              Down 2                          Comments 13-3    9/11/2013            F                449.42                D                    1            SGK05A Train A, class 1E air conditioning unit not capable of performing its cooling function.


==SUMMARY==
==SUMMARY==
The unit operating in Mode 1, at or near 100% power, from September 1, 2013 through September 11, 2013, when the unit was shutdown (Tech. Spec. 3.0.3) due to declaring SGK05A, Class 1E A/C unit nonfunctional. This resulted in Technical Specification equipment being declared inoperable. Replaced the A/C unit compresser and returned the unit to power on September 29, 2013. The unit continued to operate in Mode 1 at or near 100% power through September 30, 2013.13-39/11/2013F  449.42D1SGK05A Train A, class 1E air conditioning unit not capable of performing its cooling function.}}
The unit operating in Mode 1, at or near 100% power, from September 1, 2013 through September 11, 2013, when the unit was shutdown (Tech.
Spec. 3.0.3) due to declaring SGK05A, Class 1E A/C unit nonfunctional. This resulted in Technical Specification equipment being declared inoperable. Replaced the A/C unit compresser and returned the unit to power on September 29, 2013. The unit continued to operate in Mode 1 at or near 100% power through September 30, 2013.}}

Latest revision as of 12:15, 4 November 2019

Monthly Operating Data Report
ML13295A670
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 03/24/2013
From: Coffman S
Entergy Operations
To:
Office of Nuclear Reactor Regulation
References
Download: ML13295A670 (300)


Text

OPERATING DATA REPORT DOCKET: 313 PREPARER NAME: Steven L. Coffman UNIT_NME: ANO Unit 1 PREPARER TELEPHONE: 479-858-5560 RPT_PERIOD: 201307

1. Design Electrical Rating: 850
2. Maximum Dependable Capacity (MWe-Net) 836 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 0.00 1,975.00 275,328.17
4. Number of Hours Generator On-line 0.00 1,975.00 272,194.08
5. Reserve Shutdown Hours 0.00 0.00 817.50
6. Net Electrical energy Generated (MWHrs) 0.00 1,631,945.00 215,063,615.24 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2013- 3/24/2013 S 744.00 C 4 1R24 Refueling Outage 01

SUMMARY

ANO-1 remained shutdown for the entire month of July, continuing the 1R24 Refueling Outage.

OPERATING DATA REPORT DOCKET: 313 PREPARER NAME: Steven L. Coffman UNIT_NME: ANO Unit 1 PREPARER TELEPHONE: 479-858-5560 RPT_PERIOD: 201308

1. Design Electrical Rating: 850
2. Maximum Dependable Capacity (MWe-Net) 836 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 568.58 2,543.58 275,896.75
4. Number of Hours Generator On-line 511.15 2,486.15 272,705.23
5. Reserve Shutdown Hours 0.00 0.00 817.50
6. Net Electrical energy Generated (MWHrs) 378,889.00 2,010,834.00 215,442,504.24 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2013- 8/14/2013 F 66.13 F 1 Required shutdown due to steam generator 02 feedwater chemistry action level exceeded.

2013- 3/24/2013 S 166.72 C 4 1R24 Refueling Outage 01

SUMMARY

ANO-1 began the month in a continued shutdown for the 1R24 Refueling Outage. On 08/07/2013, the Unit was reconnected to the grid and commenced post-1R24 power escalation and testing. On 08/14/2013, the Unit was manually taken off line due exceeding steam generator feedwater chemistry action levels, and was reconnected to the grid on 08/17/2013. The Unit achieved full power on 08/19/2013, and operated at, or near full power for the remainder of the month.

OPERATING DATA REPORT DOCKET: 313 PREPARER NAME: Steven L. Coffman UNIT_NME: ANO Unit 1 PREPARER TELEPHONE: 479-858-5560 RPT_PERIOD: 201309

1. Design Electrical Rating: 850
2. Maximum Dependable Capacity (MWe-Net) 836 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 3,263.58 276,616.75
4. Number of Hours Generator On-line 720.00 3,206.15 273,425.23
5. Reserve Shutdown Hours 0.00 0.00 817.50
6. Net Electrical energy Generated (MWHrs) 579,549.00 2,590,383.00 216,022,053.24 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

ANO-1 began the month at, or near full power. On 09/27/2013, power was decreased to approximately 71 percent due to a heater drain pump failure. Power was later increased to approximately 82 percent and remained there through the end of the month to facilitate heater drain pump replacement.

OPERATING DATA REPORT DOCKET: 368 PREPARER NAME: Steven L. Coffman UNIT_NME: ANO Unit 2 PREPARER TELEPHONE: 479-858-5560 RPT_PERIOD: 201307

1. Design Electrical Rating: 1032
2. Maximum Dependable Capacity (MWe-Net) 988 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,413.49 248,272.53
4. Number of Hours Generator On-line 744.00 4,407.82 245,502.00
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 738,538.00 4,395,800.00 221,708,068.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

ANO-2 operated the entire month at, or near full power.

OPERATING DATA REPORT DOCKET: 368 PREPARER NAME: Steven L. Coffman UNIT_NME: ANO Unit 2 PREPARER TELEPHONE: 479-858-5560 RPT_PERIOD: 201308

1. Design Electrical Rating: 1032
2. Maximum Dependable Capacity (MWe-Net) 988 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,157.49 249,016.53
4. Number of Hours Generator On-line 744.00 5,151.82 246,246.00
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 736,533.00 5,132,333.00 222,444,601.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

ANO-2 operated the entire month at, or near full power.

OPERATING DATA REPORT DOCKET: 368 PREPARER NAME: Steven L. Coffman UNIT_NME: ANO Unit 2 PREPARER TELEPHONE: 479-858-5560 RPT_PERIOD: 201309

1. Design Electrical Rating: 1032
2. Maximum Dependable Capacity (MWe-Net) 988 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,877.49 249,736.53
4. Number of Hours Generator On-line 720.00 5,871.82 246,966.00
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 716,174.00 5,848,507.00 223,160,775.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

ANO-2 operated the entire month at, or near full power.

OPERATING DATA REPORT DOCKET: 334 PREPARER NAME: David T. Jones UNIT_NME: Beaver Valley Unit 1 PREPARER TELEPHONE: 724-682-4962 RPT_PERIOD: 201307

1. Design Electrical Rating: 911
2. Maximum Dependable Capacity (MWe-Net) 892 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 246,600.54
4. Number of Hours Generator On-line 744.00 5,087.00 243,917.24
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 665,039.30 4,546,576.70 193,439,329.50 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

BVPS-1 operated at a nominal value of 100% power for the entire month of July 2013, except for 50 minutes on 7/9/13 when power was reduced to approximately 98.2% during a planned Moderator Temperature Coefficient Test.

OPERATING DATA REPORT DOCKET: 334 PREPARER NAME: RJ Hepp UNIT_NME: Beaver Valley Unit 1 PREPARER TELEPHONE: 724-682-7675 RPT_PERIOD: 201308

1. Design Electrical Rating: 911
2. Maximum Dependable Capacity (MWe-Net) 892 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 247,344.54
4. Number of Hours Generator On-line 744.00 5,831.00 244,661.24
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 667,820.90 5,214,397.60 194,107,150.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

BVPS-1 operated at a nominal value of 100% power for the entire month of August 2013.

OPERATING DATA REPORT DOCKET: 334 PREPARER NAME: R. J. Hepp UNIT_NME: Beaver Valley Unit 1 PREPARER TELEPHONE: 724-682-7675 RPT_PERIOD: 201309

1. Design Electrical Rating: 911
2. Maximum Dependable Capacity (MWe-Net) 892 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 696.47 6,527.47 248,041.01
4. Number of Hours Generator On-line 696.02 6,527.02 245,357.26
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 600,261.60 5,814,659.20 194,707,412.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 9/30/2013 S 23.98 C 1 The Unit was shutdown for its planned 22nd refueling outage on 9/30/13 at 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

SUMMARY

The Unit operated at a nominal value of 100% power until 9/7/13 when an end of cycle fuel coastdown was begun. The Unit continued to coastdown until 9/28/13 when output was reduced to approximately 50% for planned Main Steam Safety Valve testing. Following satisfactory testing the Unit was shutdown for its planned 22nd refueling outage on 9/30/13 at 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

OPERATING DATA REPORT DOCKET: 412 PREPARER NAME: David T. Jones UNIT_NME: Beaver Valley Unit 2 PREPARER TELEPHONE: 724-682-4962 RPT_PERIOD: 201307

1. Design Electrical Rating: 904
2. Maximum Dependable Capacity (MWe-Net) 885 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,797.15 195,883.35
4. Number of Hours Generator On-line 744.00 4,785.06 194,942.21
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 677,398.30 4,420,654.20 159,558,237.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

BVPS-2 operated at a nominal value at 100% power for the entire month of July 2013, except for 13.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> on 7/20/13 when Operations reduced power to approximately 98.5% in order to repair the LEFM.

OPERATING DATA REPORT DOCKET: 412 PREPARER NAME: RJ Hepp UNIT_NME: Beaver Valley Unit 2 PREPARER TELEPHONE: 724-682-7675 RPT_PERIOD: 201308

1. Design Electrical Rating: 904
2. Maximum Dependable Capacity (MWe-Net) 885 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,541.15 196,627.35
4. Number of Hours Generator On-line 744.00 5,529.06 195,686.21
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 680,615.80 5,101,270.00 160,238,853.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

BVPS-2 operated at a nominal value of 100% power for the entire month of August 2013.

OPERATING DATA REPORT DOCKET: 412 PREPARER NAME: R. J. Hepp UNIT_NME: Beaver Valley Unit 2 PREPARER TELEPHONE: 724-682-7675 RPT_PERIOD: 201309

1. Design Electrical Rating: 904
2. Maximum Dependable Capacity (MWe-Net) 885 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,261.15 197,347.35
4. Number of Hours Generator On-line 720.00 6,249.06 196,406.21
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 662,663.60 5,763,933.60 160,901,517.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The Unit operated at a nominal value of 100% power for the entire month of September 2013 with the exception of a small reduction on 9/28/13.

The Unit reduced output to approximately 97.5% in order to repair [2HDH-LCV103B2], 1st Point Heater Normal Level Control Valve. [Note: this event was planned 17 days in advance of the reduction, therefore, it is considered a planned event for INPO (>10 days), yet remains an unplanned event for WANO (<28 days).]

OPERATING DATA REPORT DOCKET: 456 PREPARER NAME: David Johnson UNIT_NME: Braidwood Unit 1 PREPARER TELEPHONE: 815-417-2478 RPT_PERIOD: 201307

1. Design Electrical Rating: 1187
2. Maximum Dependable Capacity (MWe-Net) 1151 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 195,066.31
4. Number of Hours Generator On-line 744.00 5,087.00 193,975.32
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 869,976.00 6,041,364.00 217,376,359.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

U-1 Operated at Full Power the entire month.

OPERATING DATA REPORT DOCKET: 456 PREPARER NAME: David Johnson UNIT_NME: Braidwood Unit 1 PREPARER TELEPHONE: 815-417-2478 RPT_PERIOD: 201308

1. Design Electrical Rating: 1187
2. Maximum Dependable Capacity (MWe-Net) 1151 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 195,810.31
4. Number of Hours Generator On-line 744.00 5,831.00 194,719.32
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 870,970.00 6,912,334.00 218,247,329.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit operated nornally at full power except for a planned CW Pp Forebay inspection.

OPERATING DATA REPORT DOCKET: 456 PREPARER NAME: David Johnson UNIT_NME: Braidwood Unit 1 PREPARER TELEPHONE: 815-417-2478 RPT_PERIOD: 201309

1. Design Electrical Rating: 1187
2. Maximum Dependable Capacity (MWe-Net) 1151 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 209.85 6,040.85 196,020.16
4. Number of Hours Generator On-line 197.80 6,028.80 194,917.12
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 211,033.00 7,123,367.00 218,458,362.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments A1R17 9/9/2013 S 522.20 C 1 Unit 1 entered a planned refueling outage on 9/9/2013 @ 00:00, with return of the unit occuring 9/30/2013 with Unit 1 Reactor critical at 06:09 and the Main Generator synched to the output grid at 18:12. Outage duration was 17 days, 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> and 12 minutes.

SUMMARY

Refuel outage A1R17 started on 9/9/2013 and ended on 9/30/2013.

OPERATING DATA REPORT DOCKET: 457 PREPARER NAME: David Johnson UNIT_NME: Braidwood Unit 2 PREPARER TELEPHONE: 815-417-2478 RPT_PERIOD: 201307

1. Design Electrical Rating: 1155
2. Maximum Dependable Capacity (MWe-Net) 1125 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 652.10 4,923.13 198,793.36
4. Number of Hours Generator On-line 635.95 4,906.97 197,928.49
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 708,926.00 5,664,300.00 219,789,522.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments A2M0 6/28/2013 S 108.05 B 4 Unit 2 Shutdown for a planned 2A RCP seal 5 replacement.

SUMMARY

U-2 began the month in a planned maintenance outage A2M05 to replace RCP seals (Planned Energy Loss 95638 MWh & Unplanned Energy Loss (Outage Extension) 30056 MWh). A FW valve issue, unrelated to the outage scope, occurred during the ramp to full power following the maintenance outage, delaying the ramp up (Unplanned Energy loss (Forced) of 8026 MWh and Unplanned Energy Loss (Forced - < 10days) of 8026 MWh).

OPERATING DATA REPORT DOCKET: 457 PREPARER NAME: David Johnson UNIT_NME: Braidwood Unit 2 PREPARER TELEPHONE: 815-417-2478 RPT_PERIOD: 201308

1. Design Electrical Rating: 1155
2. Maximum Dependable Capacity (MWe-Net) 1125 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,667.13 199,537.36
4. Number of Hours Generator On-line 744.00 5,650.97 198,672.49
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 843,581.00 6,507,881.00 220,633,103.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit operated normally at full power except for planned CW Pp forebay inspections. Unplanned losses due to emergent work during the 2B CW Pp forebay inspection.

OPERATING DATA REPORT DOCKET: 457 PREPARER NAME: David Johnson UNIT_NME: Braidwood Unit 2 PREPARER TELEPHONE: 815-417-2478 RPT_PERIOD: 201309

1. Design Electrical Rating: 1155
2. Maximum Dependable Capacity (MWe-Net) 1125 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,387.13 200,257.36
4. Number of Hours Generator On-line 720.00 6,370.97 199,392.49
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 825,692.00 7,333,573.00 221,458,795.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 2 operated at full power through out the month.

OPERATING DATA REPORT DOCKET: 259 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 1 PREPARER TELEPHONE: 729-7914 RPT_PERIOD: 201307

1. Design Electrical Rating: 1120
2. Maximum Dependable Capacity (MWe-Net) 1101 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,882.15 109,074.13
4. Number of Hours Generator On-line 744.00 4,869.37 107,182.51
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 809,927.00 5,429,800.00 106,021,803.11 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 259 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 1 PREPARER TELEPHONE: 729-7914 RPT_PERIOD: 201308

1. Design Electrical Rating: 1120
2. Maximum Dependable Capacity (MWe-Net) 1101 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,626.15 109,818.13
4. Number of Hours Generator On-line 744.00 5,613.37 107,926.51
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 819,258.00 6,249,058.00 106,841,061.11 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 259 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 1 PREPARER TELEPHONE: 729-7914 RPT_PERIOD: 201309

1. Design Electrical Rating: 1120
2. Maximum Dependable Capacity (MWe-Net) 1101 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,346.15 110,538.13
4. Number of Hours Generator On-line 720.00 6,333.37 108,646.51
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 780,238.00 7,029,296.00 107,621,299.11 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 260 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 2 PREPARER TELEPHONE: 729-7914 RPT_PERIOD: 201307

1. Design Electrical Rating: 1120
2. Maximum Dependable Capacity (MWe-Net) 1104 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 3,875.39 233,177.84
4. Number of Hours Generator On-line 744.00 3,854.32 229,888.25
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 808,379.00 4,103,310.00 236,428,757.91 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 260 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 2 PREPARER TELEPHONE: 729-7914 RPT_PERIOD: 201308

1. Design Electrical Rating: 1120
2. Maximum Dependable Capacity (MWe-Net) 1104 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,619.39 233,921.84
4. Number of Hours Generator On-line 744.00 4,598.32 230,632.25
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 805,488.00 4,908,798.00 237,234,245.91 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 260 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 2 PREPARER TELEPHONE: 729-7914 RPT_PERIOD: 201309

1. Design Electrical Rating: 1120
2. Maximum Dependable Capacity (MWe-Net) 1104 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,339.39 234,641.84
4. Number of Hours Generator On-line 720.00 5,318.32 231,352.25
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 788,818.00 5,697,616.00 238,023,063.91 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 296 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 3 PREPARER TELEPHONE: 729-7914 RPT_PERIOD: 201307

1. Design Electrical Rating: 1120
2. Maximum Dependable Capacity (MWe-Net) 1105 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,797.68 189,857.15
4. Number of Hours Generator On-line 744.00 4,769.55 187,836.90
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 801,435.00 5,208,956.00 196,881,501.54 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 296 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 3 PREPARER TELEPHONE: 729-2914 RPT_PERIOD: 201308

1. Design Electrical Rating: 1120
2. Maximum Dependable Capacity (MWe-Net) 1105 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,541.68 190,601.15
4. Number of Hours Generator On-line 744.00 5,513.55 188,580.90
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 796,563.00 6,005,519.00 197,678,064.54 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 296 PREPARER NAME: Amanda Ledford UNIT_NME: Browns Ferry Unit 3 PREPARER TELEPHONE: 729-7914 RPT_PERIOD: 201309

1. Design Electrical Rating: 1120
2. Maximum Dependable Capacity (MWe-Net) 1105 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,261.68 191,321.15
4. Number of Hours Generator On-line 720.00 6,233.55 189,300.90
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 782,162.00 6,787,681.00 198,460,226.54 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 325 PREPARER NAME: Adam Flora UNIT_NME: Brunswick Unit 1 PREPARER TELEPHONE: 910-457-2027 RPT_PERIOD: 201307

1. Design Electrical Rating: 983
2. Maximum Dependable Capacity (MWe-Net) 938 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,838.25 245,762.47
4. Number of Hours Generator On-line 744.00 4,809.65 240,585.46
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 700,370.00 4,571,060.00 194,660,919.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 325 PREPARER NAME: Adam Flora UNIT_NME: Brunswick Unit 1 PREPARER TELEPHONE: 910-457-2027 RPT_PERIOD: 201308

1. Design Electrical Rating: 983
2. Maximum Dependable Capacity (MWe-Net) 938 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,582.25 246,506.47
4. Number of Hours Generator On-line 744.00 5,553.65 241,329.46
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 706,728.00 5,277,788.00 195,367,647.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 325 PREPARER NAME: Adam Flora UNIT_NME: Brunswick Unit 1 PREPARER TELEPHONE: 910-457-2027 RPT_PERIOD: 201309

1. Design Electrical Rating: 983
2. Maximum Dependable Capacity (MWe-Net) 938 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,302.25 247,226.47
4. Number of Hours Generator On-line 720.00 6,273.65 242,049.46
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 677,673.00 5,955,461.00 196,045,320.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 324 PREPARER NAME: Adam Flora UNIT_NME: Brunswick Unit 2 PREPARER TELEPHONE: 910-457-2027 RPT_PERIOD: 201307

1. Design Electrical Rating: 980
2. Maximum Dependable Capacity (MWe-Net) 920 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 3,558.22 254,501.61
4. Number of Hours Generator On-line 744.00 3,475.14 247,591.57
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 687,194.00 3,115,783.00 192,798,238.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 324 PREPARER NAME: Adam Flora UNIT_NME: Brunswick Unit 2 PREPARER TELEPHONE: 910-457-2027 RPT_PERIOD: 201308

1. Design Electrical Rating: 980
2. Maximum Dependable Capacity (MWe-Net) 920 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,302.22 255,245.61
4. Number of Hours Generator On-line 692.82 4,167.96 248,284.39
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 591,407.00 3,707,190.00 193,389,645.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments B221 8/9/2013 F 51.18 B 5 Unit shutdown when turbine/generator was M1 disconnected from the grid to repair loose connection on the 2C main power transformer highside bushing.

SUMMARY

OPERATING DATA REPORT DOCKET: 324 PREPARER NAME: Adam Flora UNIT_NME: Brunswick Unit 2 PREPARER TELEPHONE: 910-457-2027 RPT_PERIOD: 201309

1. Design Electrical Rating: 980
2. Maximum Dependable Capacity (MWe-Net) 920 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,022.22 255,965.61
4. Number of Hours Generator On-line 720.00 4,887.96 249,004.39
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 672,595.00 4,379,785.00 194,062,240.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 454 PREPARER NAME: David Eder UNIT_NME: Byron Unit 1 PREPARER TELEPHONE: 815 406-2194 RPT_PERIOD: 201307

1. Design Electrical Rating: 1187
2. Maximum Dependable Capacity (MWe-Net) 1138 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 216,991.17
4. Number of Hours Generator On-line 744.00 5,087.00 215,812.70
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 863,574.00 5,972,899.00 235,994,305.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit on line entire month.

OPERATING DATA REPORT DOCKET: 454 PREPARER NAME: David Eder UNIT_NME: Byron Unit 1 PREPARER TELEPHONE: 815 406-2194 RPT_PERIOD: 201308

1. Design Electrical Rating: 1187
2. Maximum Dependable Capacity (MWe-Net) 1138 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 217,735.17
4. Number of Hours Generator On-line 744.00 5,831.00 216,556.70
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 863,462.00 6,836,361.00 236,857,767.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 1 on line entire month.

OPERATING DATA REPORT DOCKET: 454 PREPARER NAME: David Eder UNIT_NME: Byron Unit 1 PREPARER TELEPHONE: 815 406-2194 RPT_PERIOD: 201309

1. Design Electrical Rating: 1187
2. Maximum Dependable Capacity (MWe-Net) 1138 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 218,455.17
4. Number of Hours Generator On-line 720.00 6,551.00 217,276.70
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 842,914.00 7,679,275.00 237,700,681.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

unit was on line the entire month

OPERATING DATA REPORT DOCKET: 455 PREPARER NAME: David Eder UNIT_NME: Byron Unit 2 PREPARER TELEPHONE: 815 406-2194 RPT_PERIOD: 201307

1. Design Electrical Rating: 1155
2. Maximum Dependable Capacity (MWe-Net) 1120 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,527.30 209,942.53
4. Number of Hours Generator On-line 744.00 4,486.82 208,914.82
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 842,490.00 5,065,533.00 226,896,090.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit on line entire month

OPERATING DATA REPORT DOCKET: 455 PREPARER NAME: David Eder UNIT_NME: Byron Unit 2 PREPARER TELEPHONE: 815 406-2194 RPT_PERIOD: 201308

1. Design Electrical Rating: 1155
2. Maximum Dependable Capacity (MWe-Net) 1120 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,271.30 210,686.53
4. Number of Hours Generator On-line 744.00 5,230.82 209,658.82
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 843,483.00 5,909,016.00 227,739,573.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 2 on line entire month.

OPERATING DATA REPORT DOCKET: 455 PREPARER NAME: David Eder UNIT_NME: Byron Unit 2 PREPARER TELEPHONE: 815 406-2194 RPT_PERIOD: 201309

1. Design Electrical Rating: 1155
2. Maximum Dependable Capacity (MWe-Net) 1120 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,991.30 211,406.53
4. Number of Hours Generator On-line 720.00 5,950.82 210,378.82
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 813,840.00 6,722,856.00 228,553,413.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit was on line the entire month.

A 300 MWe down power was performed during the month at the request of the grid operator due to a 345 KV line issue that originated outside of the site switchyard. This event is not under "plant management control".

OPERATING DATA REPORT DOCKET: 483 PREPARER NAME: J. P. Kovar UNIT_NME: Callaway Unit 1 PREPARER TELEPHONE: 314-225-1478 RPT_PERIOD: 201307

1. Design Electrical Rating: 1228
2. Maximum Dependable Capacity (MWe-Net) 1190 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 623.55 3,790.64 224,336.76
4. Number of Hours Generator On-line 623.55 3,751.12 221,852.48
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 724,274.00 4,471,797.00 251,816,355.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2013- 7/26/2013 F 120.45 A 3 Faults in the isophase bus ducts.

02 Repaired/replaced some isophase bus ducts and dampers in the cooling system for the isophase bus. Note: the plant was offline between late on 2013.07.26 and 2013.08.18.

SUMMARY

Power reduction to 65% for 'B' Main Feedwater Pump repairs 1222 07/20/2013 to 1950 07/23/2013. Reactor/turbine trip from fire in 'B' isophase duct 2333 07/26/2013 - resumed generation 0922 08/18/2013.

OPERATING DATA REPORT DOCKET: 483 PREPARER NAME: J. P. Kovar UNIT_NME: Callaway Unit 1 PREPARER TELEPHONE: 314-225-1478 RPT_PERIOD: 201308

1. Design Electrical Rating: 1228
2. Maximum Dependable Capacity (MWe-Net) 1190 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 370.42 4,161.06 224,707.18
4. Number of Hours Generator On-line 326.63 4,077.75 222,179.11
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 336,782.00 4,808,579.00 252,153,137.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2013- 7/26/2013 F 417.37 A 4 Faults in the isophase bus ducts.

02 Repaired/replaced some isophase bus ducts and dampers in the cooling system for the isophase bus. Note: the plant was offline between late on 2013.07.26 and 2013.08.18.

SUMMARY

Forced outage from B isophase bus duct fire continued into August - ended with breaker close at 0922 on 08/18/2013. Power hold at 65% to complete work on B main feedwater pump and tune A main feedwater pump settings (identified in July) began at 2249 same day . 100% power achieved at 1930 on 08/24/2013.

OPERATING DATA REPORT DOCKET: 483 PREPARER NAME: J. P. Kovar UNIT_NME: Callaway Unit 1 PREPARER TELEPHONE: 314-225-1478 RPT_PERIOD: 201309

1. Design Electrical Rating: 1228
2. Maximum Dependable Capacity (MWe-Net) 1190 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 4,881.06 225,427.18
4. Number of Hours Generator On-line 720.00 4,797.75 222,899.11
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 872,034.00 5,680,613.00 253,025,171.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The plant operated at essentially full power for the month.

OPERATING DATA REPORT DOCKET: 317 PREPARER NAME: Herman O. Olsen UNIT_NME: Calvert Cliffs Unit 1 PREPARER TELEPHONE: (410) 495-6734 RPT_PERIOD: 201307

1. Design Electrical Rating: 845
2. Maximum Dependable Capacity (MWe-Net) 866 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 270,703.70
4. Number of Hours Generator On-line 744.00 5,087.00 267,188.26
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 643,961.00 4,555,169.00 223,006,997.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit began the month at 100%.

On 07/01/2013 at 1500, power was reduced to 85% for waterbox cleaning. Cleaning was completed on 07/02/2013 and power was increased at 1350. Power was returned to 100% at 1719.

The unit operated at 100% power for the remainder month.

OPERATING DATA REPORT DOCKET: 317 PREPARER NAME: Herman O. Olsen UNIT_NME: Calvert Cliffs Unit 1 PREPARER TELEPHONE: 410-495-6734 RPT_PERIOD: 201308

1. Design Electrical Rating: 845
2. Maximum Dependable Capacity (MWe-Net) 866 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 271,447.70
4. Number of Hours Generator On-line 744.00 5,831.00 267,932.26
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 635,267.00 5,190,436.00 223,642,264.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit began the month at 100%.

On 08/12/2013 at 1905 a rapid down power to 83% was performed due to reduced condenser vacuum caused by rapid fouling of a water box. The waterbox cleaning was completed on 08/13/2013 and power was increased at 2212. Power was returned to 100% on 08/14/2013 at 0330.

On 08/15/2013 at 2359 power was reduced to 86% for waterbox cleaning. Cleaning was completed on 08/17/2013 and power was increased at 2050. Reactor power was returned to 100% on 08/18/2013 at 0443.

The unit operated at 100% power for the remainder of the month.

OPERATING DATA REPORT DOCKET: 317 PREPARER NAME: Herman O. Olsen UNIT_NME: Calvert Cliffs Unit 1 PREPARER TELEPHONE: 410-495-6734 RPT_PERIOD: 201309

1. Design Electrical Rating: 845
2. Maximum Dependable Capacity (MWe-Net) 866 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 272,167.70
4. Number of Hours Generator On-line 720.00 6,551.00 268,652.26
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 629,032.00 5,819,468.00 224,271,296.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit began the month at 100%.

On 09/20/2013 at 0200 power was reduced to 83% for Main Turbine Valve testing and waterbox cleaning. Power was increased to 90% at 0900.

Valve testing was completed and power was increased to 93% at 1121. Waterbox cleaning was completed on 09/21/2013 at 1422 and power was returned to 100% at 1745.

The unit operated at 100% power for the remainder month.

OPERATING DATA REPORT DOCKET: 318 PREPARER NAME: Herman O. Olsen UNIT_NME: Calvert Cliffs Unit 2 PREPARER TELEPHONE: (410) 495-6734 RPT_PERIOD: 201307

1. Design Electrical Rating: 845
2. Maximum Dependable Capacity (MWe-Net) 850 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,143.90 264,898.95
4. Number of Hours Generator On-line 744.00 4,090.12 262,763.69
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 618,261.00 3,434,206.00 219,053,519.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit began the month at 99.5% reactor power.

On 07/11/2013 at 2106 power was reduced to 95% for Variable Temperature Average testing (PSTP-4). Testing was completed and power was increased on 07/12/2013 at 0110. Reactor power was returned to 99.5% at 0400.

On 07/19/2013 at 2100 reactor power was reduced to 80.3% to perform waterbox cleaning. Cleaning was completed on 07/21/2013 at 0630 and power was restored to 99.5% at 1308.

The unit operated at 99.5% for the remainder of the month.

OPERATING DATA REPORT DOCKET: 318 PREPARER NAME: Herman O. Olsen UNIT_NME: Calvert Cliffs Unit 2 PREPARER TELEPHONE: 410-495-6734 RPT_PERIOD: 201308

1. Design Electrical Rating: 845
2. Maximum Dependable Capacity (MWe-Net) 850 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,887.90 265,642.95
4. Number of Hours Generator On-line 744.00 4,834.12 263,507.69
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 622,950.00 4,057,156.00 219,676,469.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit began the month at 99.5% reactor power.

On 08/01/2013 at 1128, 21 Circulating Water Pump tripped. An expeditious power reduction was commenced at 1131 and power was reduced to 85%. Troubleshooting identified a loose wire in the pump exciter cabinet. Repairs were performed and the pump was restored. Power was increased at 2015 and returned to 99.5% at 2335.

On 08/09/2013 at 0515 power was reduced to 84% to clean waterboxes. Cleaning was completed and power was restored to 99.5% at 2225.

On 08/12/2013 at 0735 power was reduced to 88% to clean 21B waterbox. Cleaning was completed and power was restored to 99.5% at 1915.

On 08/17/2013 at 0027 power was reduced to 92% to clean waterboxes. Cleaning was completed and power was restored to 99.5% at 0945.

The unit operated at 99.5% for the remainder of the month.

OPERATING DATA REPORT DOCKET: 318 PREPARER NAME: Herman O. Olsen UNIT_NME: Calvert Cliffs Unit 2 PREPARER TELEPHONE: 410-495-6734 RPT_PERIOD: 201309

1. Design Electrical Rating: 845
2. Maximum Dependable Capacity (MWe-Net) 850 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 616.13 5,504.03 266,259.08
4. Number of Hours Generator On-line 608.72 5,442.84 264,116.41
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 510,757.00 4,567,913.00 220,187,226.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 004 9/5/2013 F 111.28 A 1 The unit began the month at 99.5% reactor power.

On 09/05/2013 at 1016, control element assembly (CEA) #27 dropped to the bottom of the core while performing surveillance test procedure O-29-2.

Reactor power stabilized at 91%. An abnormal operating procedure was entered and attempts to restore the CEA to the correct level were not successful. At 1207 reactor power was reduced in preparation for a reactor shutdown. This down power met the criteria for the NRC Unplanned Power Change per 7000 Critical Hours performance indicator. The unit was removed from the grid at 1651 and the reactor was shut down at 1735. The unit was cooled down to mode 5 on 09/06/2013 at 0752 to support troubleshooting and repairs. The cause of the dropped CEA was determined to be a ground due to degraded insulation. The ground was located at the coil stack connection at the reactor head. The coil stack was replaced, other connections inspected, and all control element drive mechanisms were electrically tested (meggered) during the shutdown and prior to startup to verify no other ground fault conditions existed. Resistance checks of individual coils were performed and all were verified to be within 10% of the mean. Plant heat up commenced on 09/08/2013 at 1730 and the reactor was taken critical on 09/10/2013 at 0127.

Power was increased and the unit was paralleled to the grid at 0808. Reactor power was restored to 99.5% at 2130.

The unit operated at 99.5% for the remainder of the month.

SUMMARY

The unit began the month at 99.5% reactor power.

On 09/05/2013 at 1016, control element assembly (CEA) #27 dropped to the bottom of the core while performing surveillance test procedure O-29-2. Reactor power stabilized at 91%. An abnormal operating procedure was entered and attempts to restore the CEA to the correct level were not successful. At 1207 reactor power was reduced in preparation for a reactor shutdown. This down power met the criteria for the NRC Unplanned Power Change per 7000 Critical Hours performance indicator. The unit was removed from the grid at 1651 and the reactor was shut down at 1735. The unit was cooled down to mode 5 on 09/06/2013 at 0752 to support troubleshooting and repairs. The cause of the dropped CEA was determined to be a ground due to degraded insulation. The ground was located at the coil stack connection at the reactor head. The coil stack was replaced, other connections inspected, and all control element drive mechanisms were electrically tested (meggered) during the shutdown and prior to startup to verify no other ground fault conditions existed. Resistance checks of individual coils were performed and all were verified to be within 10% of the mean. Plant heat up commenced on 09/08/2013 at 1730 and the reactor was taken critical on 09/10/2013 at 0127. Power was increased and the unit was paralleled to the grid at 0808. Reactor power was restored to 99.5% at 2130.

The unit operated at 99.5% for the remainder of the month.

OPERATING DATA REPORT DOCKET: 413 PREPARER NAME: Glenda Helton UNIT_NME: Catawba Unit 1 PREPARER TELEPHONE: 803-701-3352 RPT_PERIOD: 201307

1. Design Electrical Rating: 1145
2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 211,815.05
4. Number of Hours Generator On-line 744.00 5,087.00 209,645.86
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 838,923.00 5,867,132.00 235,227,374.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Catawba Unit 1 began the month of July 2013 at a power level of 98.6% Full Power and increasing, recovering from an emergent power reduction necessitated by loss of numerous Cooling Tower fans following a lightning strike. 100% Full Power was ultimately reached at 0151 on 7/1/13.

At 0140 on 7/27/13, a power reduction was initiated from 100% Full Power to allow replacement of a 1B Main Feedwater Pump Turbine control system processor card. At 0705 on 7/27/13, the power reduction was halted at 49.5% Full Power, to remove 1B Main Feedwater Pump from service for the processor card replacement. At 1735 on 7/27/13, following restoration of 1B Main Feedwater Pump, power escalation was commenced from 49.5% Full Power. At 2142 on 7/27/13, power escalation was suspended at 81% Full Power, for performance of Main Turbine Control Valve Movement periodic testing, and was subsequently resumed at 2220. 100% Full Power was ultimately reached at 0325 on 7/28/13 and Unit 1 operated at or near 100% Full Power for the remainder of the month.

OPERATING DATA REPORT DOCKET: 413 PREPARER NAME: Glenda Helton UNIT_NME: Catawba Unit 1 PREPARER TELEPHONE: 803-701-3352 RPT_PERIOD: 201308

1. Design Electrical Rating: 1145
2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 212,559.05
4. Number of Hours Generator On-line 744.00 5,831.00 210,389.86
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 851,199.00 6,718,331.00 236,078,573.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Catawba Unit 1 began and concluded the month of August 2013 operating at or near 100% Full Power. No planned or unplanned power reductions were incurred during the month.

OPERATING DATA REPORT DOCKET: 413 PREPARER NAME: Glenda Helton UNIT_NME: Catawba Unit 1 PREPARER TELEPHONE: 803-701-3352 RPT_PERIOD: 201309

1. Design Electrical Rating: 1145
2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 213,279.05
4. Number of Hours Generator On-line 720.00 6,551.00 211,109.86
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 824,856.00 7,543,187.00 236,903,429.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Catawba Unit 1 began the month of September 2013 operating at or near 100% Full Power. At 1419 on 9/13/13, power reduction from 100% Full Power was commenced to support Unit 2's Auxiliary Steam demand for the 2EOC19 Refueling Outage Shutdown. Power reduction was halted at 98.5% Full Power at 2028 on 9/13/13. At 2204 on 9/14/13 power escalation was commenced from 98.5% Full Power. At 0100 on 9/15/13 power escalation was suspended at 99% Full Power. Power escalation was resumed from 99% Full Power at 1345 on 9/15/13. 100% Full Power was ultimately reached at 1555 on 9/15/13, and Unit 1 operated at or near 100% Full Power for the remainder of the month.

OPERATING DATA REPORT DOCKET: 414 PREPARER NAME: Glenda Helton UNIT_NME: Catawba Unit 2 PREPARER TELEPHONE: 803-701-3352 RPT_PERIOD: 201307

1. Design Electrical Rating: 1145
2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 205,689.73
4. Number of Hours Generator On-line 744.00 5,087.00 203,968.28
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 854,042.00 5,877,661.00 229,518,008.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Catawba Unit 2 began and concluded the month of July 2013 operating at or near 100% Full Power. No planned or unplanned power reductions were incurred during the month.

OPERATING DATA REPORT DOCKET: 414 PREPARER NAME: Glenda Helton UNIT_NME: Catawba Unit 2 PREPARER TELEPHONE: 803-701-3352 RPT_PERIOD: 201308

1. Design Electrical Rating: 1145
2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 206,433.73
4. Number of Hours Generator On-line 744.00 5,831.00 204,712.28
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 856,114.00 6,733,775.00 230,374,122.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Catawba Unit 2 began and concluded the month of August 2013 operating at or near 100% Full Power. No planned or unplanned power reductions were incurred during the month

OPERATING DATA REPORT DOCKET: 414 PREPARER NAME: Glenda Helton UNIT_NME: Catawba Unit 2 PREPARER TELEPHONE: 803-701-3352 RPT_PERIOD: 201309

1. Design Electrical Rating: 1145
2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 316.20 6,147.20 206,749.93
4. Number of Hours Generator On-line 316.02 6,147.02 205,028.30
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 343,203.00 7,076,978.00 230,717,325.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 9/14/2013 S 403.98 C 1 2EOC19 Refueling Outage

SUMMARY

Catawba Unit 2 began the month of September 2013 operating at or near 100% Full Power. At 1500 on 9/2/13, power reduction from 100% Full Power was commenced for 2EOC19 power coast-down (1st decrease). Power reduction was halted at 99% Full Power at 1700 on 9/2/13. At 0156 on 9/4/13, power reduction was commenced from 99% Full Power for 2EOC19 power coast-down (2nd decrease.) Power reduction was halted at 98% Full Power at 0430 on 9/4/13. At 1130 on 9/6/13, Power reduction was commenced from 97% Full Power for 2EOC19 power coast-down (3rd decrease.) Power reduction was halted at 96% full power at 1304 on 9/6/13. At 2145, on 9/8/13, power reduction was commenced from 95% full power for 2EOC19 power coast-down (4th decrease.) Power reduction was halted at 94% full power at 2325 on 9/8/13. At 1926 on 9/12/13, power reduction commenced from 93% full power for 2EOC19 power coast-down (5th decrease.) At 2028, on 9/12/13, power reduction halted at 92% full power. At 2101, on 9/13/13, Unit 2 shutdown commenced from 92% full power for entry into 2EOC19 Refueling Outage. The turbine/generator was taken offline at 0401 on 9/14/13. Mode 2 was entered at 0401 on 9/14/13. Mode 3 was entered at 0412 on 9/14/13. Mode 4 was entered at 0834 on 9/14/13. Mode 5 was entered at 1220 on 9/14/13. Mode 6 was entered at 1829 on 9/17/13. No Mode was entered at 1322 on 9/22/13 and Unit 2 remained in No Mode for the remainder of September 2013.

OPERATING DATA REPORT DOCKET: 461 PREPARER NAME: Joe Wemlinger UNIT_NME: Clinton Unit 1 PREPARER TELEPHONE: 217-937-3846 RPT_PERIOD: 201307

1. Design Electrical Rating: 1062
2. Maximum Dependable Capacity (MWe-Net) 1022 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,017.45 177,782.27
4. Number of Hours Generator On-line 744.00 4,926.22 174,862.43
5. Reserve Shutdown Hours 0.00 0.00 4.00
6. Net Electrical energy Generated (MWHrs) 784,159.00 5,216,996.00 167,945,519.48 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

710 MWe-h planned loss for a control rod sequence exchange.

OPERATING DATA REPORT DOCKET: 461 PREPARER NAME: Joe Wemlinger UNIT_NME: Clinton Unit 1 PREPARER TELEPHONE: 217-937-3846 RPT_PERIOD: 201308

1. Design Electrical Rating: 1062
2. Maximum Dependable Capacity (MWe-Net) 1022 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,761.45 178,526.27
4. Number of Hours Generator On-line 744.00 5,670.22 175,606.43
5. Reserve Shutdown Hours 0.00 0.00 4.00
6. Net Electrical energy Generated (MWHrs) 780,993.00 5,997,989.00 168,726,512.48 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

There was one forced loss and one planned loss in August, 2013.

The planned loss for August 2013 of 2398 MWe-hr was due to a planned control rod pattern adjustment on 8/17/13.

The forced loss for August 2013 of 2198 MWe-hr was due to a loss of feedwater heating from Feedwater Heaters 5B and 6B. The cause was a malfunctioning controller, which was replaced.

OPERATING DATA REPORT DOCKET: 461 PREPARER NAME: Joe Wemlinger UNIT_NME: Clinton Unit 1 PREPARER TELEPHONE: 217-937-3846 RPT_PERIOD: 201309

1. Design Electrical Rating: 1062
2. Maximum Dependable Capacity (MWe-Net) 1022 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,481.45 179,246.27
4. Number of Hours Generator On-line 720.00 6,390.22 176,326.43
5. Reserve Shutdown Hours 0.00 0.00 4.00
6. Net Electrical energy Generated (MWHrs) 755,883.00 6,753,872.00 169,482,395.48 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

CPS had two forced losses. On 9/12/13 the 6A 'Feedwater Heater Emergency Drain valve failed open, resulting in a forced loss of 121 MWE-hr.

The two planned losses were due to a control rod pattern adjustment and turbine surveillances, and implementation of Final Feedwater Temperature Reduction for unit coastdown into refueling outage C1R14.

OPERATING DATA REPORT DOCKET: 397 PREPARER NAME: Darla Johnson UNIT_NME: Columbia Gen Sta Unit 2 PREPARER TELEPHONE: 509-377-4570 RPT_PERIOD: 201307

1. Design Electrical Rating: 1153
2. Maximum Dependable Capacity (MWe-Net) 1107 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,066.75 200,458.48
4. Number of Hours Generator On-line 744.00 4,005.22 195,983.99
5. Reserve Shutdown Hours 0.00 0.00 3,357.70
6. Net Electrical energy Generated (MWHrs) 806,046.17 4,357,682.64 201,169,881.38 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Columbia operated at 100% power except for a downpower to 64% to fix a tube leak on COND-HX-3C. Columbia also downpowered to 98% for rod line maintenance. Additional forced losses were taken from a high level trip on COND-HX-4C although no downpower occurred.

OPERATING DATA REPORT DOCKET: 397 PREPARER NAME: Darla Johnson UNIT_NME: Columbia Gen Sta Unit 2 PREPARER TELEPHONE: 509-377-4570 RPT_PERIOD: 201308

1. Design Electrical Rating: 1153
2. Maximum Dependable Capacity (MWe-Net) 1107 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,810.75 201,202.48
4. Number of Hours Generator On-line 744.00 4,749.22 196,727.99
5. Reserve Shutdown Hours 0.00 0.00 3,357.70
6. Net Electrical energy Generated (MWHrs) 821,066.37 5,178,749.01 201,990,947.75 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Columbia operated at 100% power except for a downpower to 97% for MT Bypass Valve Testing. Columbia downpowered to 80% for a single rod scram, to 98% for SJAE B Drain Temperature, and to 95% to shutdown CW-P-1A.

OPERATING DATA REPORT DOCKET: 397 PREPARER NAME: Darla Johnson UNIT_NME: Columbia Gen Sta Unit 2 PREPARER TELEPHONE: 509-377-4570 RPT_PERIOD: 201309

1. Design Electrical Rating: 1153
2. Maximum Dependable Capacity (MWe-Net) 1107 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,530.75 201,922.48
4. Number of Hours Generator On-line 720.00 5,469.22 197,447.99
5. Reserve Shutdown Hours 0.00 0.00 3,357.70
6. Net Electrical energy Generated (MWHrs) 792,920.70 5,971,669.71 202,783,868.45 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Columbia operated at 100% throughout the month of September except for a planned downpower to 65% for Sequence Exchange and TGV/BPV Testing and an unplanned downpower to 90% for a control rod insertion. Additional unplanned losses were experienced throughout the month due to CW-P-1A being out of service.

OPERATING DATA REPORT DOCKET: 445 PREPARER NAME: G.D. Lytle UNIT_NME: Comanche Peak Unit 1 PREPARER TELEPHONE: 254-897-5455 RPT_PERIOD: 201307

1. Design Electrical Rating: 1218
2. Maximum Dependable Capacity (MWe-Net) 1205 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 732.18 4,562.93 181,729.16
4. Number of Hours Generator On-line 724.82 4,538.12 180,629.26
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 867,740.00 5,525,651.00 201,756,887.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1-13-2 7/27/2013 S 19.18 B 1 Enter MODE 3 to repair Reactor Coolant Pump 1-02 seal water injection drain valve 1-CS-8364B, leaking inside containment. Repairs successful.

SUMMARY

Unit 1 began the month at 100% reactor, 1266 MWe turbine power. On 7/26/13 at 22:00, licensed operators began ramping the unit to about 20% reactor, 200 MWe in preparation for a planned unit and reactor shutdown to conduct a maintenance outage to repair a leaking Reactor Coolant Pump (RCP 1-02) seal water injection line drain valve, 1-CS-8364B inside the containment building. On 7/27/13 at 00:59, licensed operators manually tripped the reactor from about 20% reactor, 200 MWe turbine power per station procedures to enter MODE 3 and commence the outage. Repairs to 1-CS-8364B were successful. On 7/27/13 at 12:20, Unit 1 entered MODE 2 and at 12:48 reactor operators declared the reactor critical. On 7/27/13 at 16:48, Unit 1 entered MODE 1. On 7/27/13 at 20:10, the main generator was synchronized to the grid ending the maintenance outage with a duration of about 19.18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br />. On 7/27/13 at 21:33, the unit began ramping up to return to full power operation. On 7/29/13 at 02:23, Unit 1 returned to full power operation at 100% reactor, 1257 MWE turbine power. Unit 1 ended the month at 100% reactor, 1263 MWe turbine power.

OPERATING DATA REPORT DOCKET: 445 PREPARER NAME: G.D. Lytle UNIT_NME: Comanche Peak Unit 1 PREPARER TELEPHONE: 254-897-5455 RPT_PERIOD: 201308

1. Design Electrical Rating: 1218
2. Maximum Dependable Capacity (MWe-Net) 1205 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,306.93 182,473.16
4. Number of Hours Generator On-line 744.00 5,282.12 181,373.26
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 904,799.00 6,430,450.00 202,661,686.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 1 began the month at 100% reactor, 1263 MWe turbine power. Unit 1 ended the month at 100% reactor, 1259 MWe turbine power.

OPERATING DATA REPORT DOCKET: 445 PREPARER NAME: G.D. Lytle UNIT_NME: Comanche Peak Unit 1 PREPARER TELEPHONE: 254-897-5455 RPT_PERIOD: 201309

1. Design Electrical Rating: 1218
2. Maximum Dependable Capacity (MWe-Net) 1205 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,026.93 183,193.16
4. Number of Hours Generator On-line 720.00 6,002.12 182,093.26
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 875,928.00 7,306,378.00 203,537,614.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 1 began the month at 100% reactor, 1259 MWe turbine power. Unit 1 ended the month at 100% reactor, 1269 MWe turbine power.

OPERATING DATA REPORT DOCKET: 446 PREPARER NAME: G.D. Lytle UNIT_NME: Comanche Peak Unit 2 PREPARER TELEPHONE: 254-897-5455 RPT_PERIOD: 201307

1. Design Electrical Rating: 1207
2. Maximum Dependable Capacity (MWe-Net) 1195 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 161,173.21
4. Number of Hours Generator On-line 744.00 5,087.00 160,442.96
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 896,889.00 6,198,317.00 181,366,598.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 2 began the month at 100% reactor, 1255 MWe turbine power. Unit 2 ended the month at 100% reactor, 1253 MWe turbine power.

OPERATING DATA REPORT DOCKET: 446 PREPARER NAME: G.D. Lytle UNIT_NME: Comanche Peak Unit 2 PREPARER TELEPHONE: 254-897-5455 RPT_PERIOD: 201308

1. Design Electrical Rating: 1207
2. Maximum Dependable Capacity (MWe-Net) 1195 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 161,917.21
4. Number of Hours Generator On-line 744.00 5,831.00 161,186.96
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 893,994.00 7,092,311.00 182,260,592.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 2 began the month at 100% reactor, 1253 MWe turbine power. Unit 2 ended the month at 100% reactor, 1250 MWe turbine power.

OPERATING DATA REPORT DOCKET: 446 PREPARER NAME: G.D. Lytle UNIT_NME: Comanche Peak Unit 2 PREPARER TELEPHONE: 254-897-5455 RPT_PERIOD: 201309

1. Design Electrical Rating: 1207
2. Maximum Dependable Capacity (MWe-Net) 1195 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 162,637.21
4. Number of Hours Generator On-line 720.00 6,551.00 161,906.96
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 866,198.00 7,958,509.00 183,126,790.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 2 began the month at 100% reactor 1250 MWe turbine power. Unit 2 ended the month at 100% reactor, 1258 MWe turbine power.

OPERATING DATA REPORT DOCKET: 315 PREPARER NAME: K. Kohn UNIT_NME: Cook Unit 1 PREPARER TELEPHONE: 269-465-5901 RPT_PERIOD: 201307

1. Design Electrical Rating: 1084
2. Maximum Dependable Capacity (MWe-Net) 1030 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 3,835.87 240,635.65
4. Number of Hours Generator On-line 744.00 3,796.85 237,550.83
5. Reserve Shutdown Hours 0.00 0.00 321.00
6. Net Electrical energy Generated (MWHrs) 774,142.00 4,003,034.00 227,935,430.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

None.

OPERATING DATA REPORT DOCKET: 315 PREPARER NAME: K. Kohn UNIT_NME: Cook Unit 1 PREPARER TELEPHONE: 269-465-5901 RPT_PERIOD: 201308

1. Design Electrical Rating: 1084
2. Maximum Dependable Capacity (MWe-Net) 1030 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,579.87 241,379.65
4. Number of Hours Generator On-line 744.00 4,540.85 238,294.83
5. Reserve Shutdown Hours 0.00 0.00 321.00
6. Net Electrical energy Generated (MWHrs) 767,138.00 4,770,172.00 228,702,568.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

None.

OPERATING DATA REPORT DOCKET: 315 PREPARER NAME: K. Kohn UNIT_NME: Cook Unit 1 PREPARER TELEPHONE: 269-465-5901 RPT_PERIOD: 201309

1. Design Electrical Rating: 1084
2. Maximum Dependable Capacity (MWe-Net) 1030 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,299.87 242,099.65
4. Number of Hours Generator On-line 720.00 5,260.85 239,014.83
5. Reserve Shutdown Hours 0.00 0.00 321.00
6. Net Electrical energy Generated (MWHrs) 739,244.00 5,509,416.00 229,441,812.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Planned Main Turbine Control Valve Testing performed on 9/15/13 @ 2230. Rx power was reduced to 91%.

OPERATING DATA REPORT DOCKET: 316 PREPARER NAME: K. Kohn UNIT_NME: Cook Unit 2 PREPARER TELEPHONE: 269-465-5901 RPT_PERIOD: 201307

1. Design Electrical Rating: 1107
2. Maximum Dependable Capacity (MWe-Net) 1077 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 697.07 5,040.07 224,938.52
4. Number of Hours Generator On-line 685.98 5,028.98 220,588.00
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 726,761.00 5,597,889.00 224,767,943.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 234 7/28/2013 F 58.02 A 2 U2F13A Rx/Gen trip on 7/28/2013 @ 1018 due to an incorrect controller setpoint on the Condensate Heater Bypass Control Valve. Rx taken critical on 7/30/2013 @ 0914 and Generator synch occurred on 7/30/2013 @ 2019.

SUMMARY

U2F13A Rx/Gen trip on 7/28/2013 @ 1018 due to an incorrect controller setpoint on the Condensate Heater Bypass Control Valve. Rx taken critical on 7/30/2013 @ 0914 and Generator synch occurred on 7/30/2013 @ 2019.

OPERATING DATA REPORT DOCKET: 316 PREPARER NAME: K. Kohn UNIT_NME: Cook Unit 2 PREPARER TELEPHONE: 269-465-5901 RPT_PERIOD: 201308

1. Design Electrical Rating: 1107
2. Maximum Dependable Capacity (MWe-Net) 1077 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,784.07 225,682.52
4. Number of Hours Generator On-line 744.00 5,772.98 221,332.00
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 800,022.00 6,397,911.00 225,567,965.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

U2F13A Rx/Gen trip due to an incorrect controller setpoint on the Condensate Heater Bypass Control Valve. Power ascension to 100% from 8/1/2013 @ 0000 to 8/1/2013 @ 0200.

OPERATING DATA REPORT DOCKET: 316 PREPARER NAME: K. Kohn UNIT_NME: Cook Unit 2 PREPARER TELEPHONE: 269-465-5901 RPT_PERIOD: 201309

1. Design Electrical Rating: 1107
2. Maximum Dependable Capacity (MWe-Net) 1077 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,504.07 226,402.52
4. Number of Hours Generator On-line 720.00 6,492.98 222,052.00
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 760,084.00 7,157,995.00 226,328,049.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Rx power reduction to 48% began on 9/29/2013 @ 2000 to support TREVI testing prior to the U2C21 Refueling Outage.

OPERATING DATA REPORT DOCKET: 298 PREPARER NAME: Brian Shryock UNIT_NME: Cooper Unit 1 PREPARER TELEPHONE: 402-825-2984 RPT_PERIOD: 201307

1. Design Electrical Rating: 815
2. Maximum Dependable Capacity (MWe-Net) 768.88 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 276,237.77
4. Number of Hours Generator On-line 744.00 5,087.00 272,893.41
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 540,769.66 3,925,176.58 191,806,755.98 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

No information for this reporting period.

OPERATING DATA REPORT DOCKET: 298 PREPARER NAME: Brian Shryock UNIT_NME: Cooper Unit 1 PREPARER TELEPHONE: 402-825-2984 RPT_PERIOD: 201308

1. Design Electrical Rating: 815
2. Maximum Dependable Capacity (MWe-Net) 768.88 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 276,981.77
4. Number of Hours Generator On-line 744.00 5,831.00 273,637.41
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 572,241.66 4,497,418.24 192,378,997.64 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

No information for this reporting period.

OPERATING DATA REPORT DOCKET: 298 PREPARER NAME: Brian Shryock UNIT_NME: Cooper Unit 1 PREPARER TELEPHONE: 402-825-2984 RPT_PERIOD: 201309

1. Design Electrical Rating: 815
2. Maximum Dependable Capacity (MWe-Net) 768.88 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 277,701.77
4. Number of Hours Generator On-line 720.00 6,551.00 274,357.41
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 553,316.80 5,050,735.04 192,932,314.44 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

No information for this reporting period.

OPERATING DATA REPORT DOCKET: 346 PREPARER NAME: J. Syrowski UNIT_NME: Davis-Besse Unit 1 PREPARER TELEPHONE: 419-249-2417 RPT_PERIOD: 201307

1. Design Electrical Rating: 908
2. Maximum Dependable Capacity (MWe-Net) 894 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 476.87 4,793.20 220,567.08
4. Number of Hours Generator On-line 462.10 4,778.43 217,267.18
5. Reserve Shutdown Hours 0.00 0.00 5,532.00
6. Net Electrical energy Generated (MWHrs) 399,908.00 4,339,570.50 183,626,883.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 6/29/2013 F 281.90 A 4 Reactor Trip on Reactor Protection System due to Flux/Delta Flux/Flow on trip of Reactor Coolant Pump 1-2 due to electrical problem.

SUMMARY

On July 12, 2013, the Reactor was taken critical and the Unit synchronized to the grid following completion of repair activities for the plant trip that occurred on June 29, 2013. Power ascension to 100% power was completed on July 14 following routine testing and emergent repairs to feedwater heater level controls. On July 22 and July 24, planned downpowers to approximately 99% power were conducted to support Reactor Trip Breaker testing. The plant remained at approximately 100% power the remainder of the month.

OPERATING DATA REPORT DOCKET: 346 PREPARER NAME: J. Syrowski UNIT_NME: Davis-Besse Unit 1 PREPARER TELEPHONE: 419-249-2417 RPT_PERIOD: 201308

1. Design Electrical Rating: 908
2. Maximum Dependable Capacity (MWe-Net) 894 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,537.20 221,311.08
4. Number of Hours Generator On-line 744.00 5,522.43 218,011.18
5. Reserve Shutdown Hours 0.00 0.00 5,532.00
6. Net Electrical energy Generated (MWHrs) 672,378.60 5,011,949.10 184,299,261.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

On August 14, 2013, a planned downpower to approximately 99% power was conducted to support Reactor Trip Breaker testing. On August 29 a planned downpower to approximately 99% power was conducted to support Reactor Trip Breaker maintenance and testing. The plant remained at approximately 100% power the remainder of the month.

OPERATING DATA REPORT DOCKET: 346 PREPARER NAME: J. Syrowski UNIT_NME: Davis-Besse Unit 1 PREPARER TELEPHONE: 419-249-2417 RPT_PERIOD: 201309

1. Design Electrical Rating: 908
2. Maximum Dependable Capacity (MWe-Net) 894 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,257.20 222,031.08
4. Number of Hours Generator On-line 720.00 6,242.43 218,731.18
5. Reserve Shutdown Hours 0.00 0.00 5,532.00
6. Net Electrical energy Generated (MWHrs) 652,537.10 5,664,486.20 184,951,798.70 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

On September 4 and 25, 2013, planned downpowers to approximately 99% power were conducted to support Reactor Trip Breaker testing. On September 7 a planned downpower to approximately 99% power was conducted to support Reactor Trip Breaker maintenance and testing. On September 18 a planned downpower to approximately 99% power was conducted to support Reactor Trip Breaker maintenance and testing and Integrated Control System maintenance. The plant remained at approximately 100% power the remainder of the month.

OPERATING DATA REPORT DOCKET: 275 PREPARER NAME: M. Padovan UNIT_NME: Diablo Canyon Unit 1 PREPARER TELEPHONE: (805) 545-4540 RPT_PERIOD: 201307

1. Design Electrical Rating: 1138
2. Maximum Dependable Capacity (MWe-Net) 1122 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 719.53 4,946.40 219,714.00
4. Number of Hours Generator On-line 705.72 4,932.59 217,725.36
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 781,724.00 5,604,961.00 231,763,888.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 6/26/2013 F 38.28 A 4 An inspection identified a thru wall crack in the socket weld at the half coupling attached to Line-985, upstream of RHR-1-RV-8708. Engineering accepted a fatigue resistant socket weld profile at socket welded half coupling and a weld repair was performed.

SUMMARY

Following a Residual Heat Removal system weld repair, Operations performed a ramp up in power, reaching full power at 0400 on July 4th, 2013. Unit 1 operated at approximately 100 percent power for the rest of the month of July, 2013.

OPERATING DATA REPORT DOCKET: 275 PREPARER NAME: (805) 545-4540 UNIT_NME: Diablo Canyon Unit 1 PREPARER TELEPHONE: M. Padovan RPT_PERIOD: 201308

1. Design Electrical Rating: 1138
2. Maximum Dependable Capacity (MWe-Net) 1122 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,690.40 220,458.00
4. Number of Hours Generator On-line 744.00 5,676.59 218,469.36
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 848,141.00 6,453,102.00 232,612,029.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Diablo Canyon Unit One began and ended the month of August, 2013 in Mode 1 (Power Operation) at approximately 100 percent reactor power.

There were no significant operational occurrences.

OPERATING DATA REPORT DOCKET: 275 PREPARER NAME: Mark Padovan UNIT_NME: Diablo Canyon Unit 1 PREPARER TELEPHONE: 805-545-4540 RPT_PERIOD: 201309

1. Design Electrical Rating: 1138
2. Maximum Dependable Capacity (MWe-Net) 1122 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,410.40 221,178.00
4. Number of Hours Generator On-line 720.00 6,396.59 219,189.36
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 821,185.00 7,274,287.00 233,433,214.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 1 operated at approximately 100 percent power for the month of September 2013.

OPERATING DATA REPORT DOCKET: 323 PREPARER NAME: M. Padovan UNIT_NME: Diablo Canyon Unit 2 PREPARER TELEPHONE: (805) 545-4540 RPT_PERIOD: 201307

1. Design Electrical Rating: 1151
2. Maximum Dependable Capacity (MWe-Net) 1118 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 665.95 3,891.00 214,950.73
4. Number of Hours Generator On-line 656.13 3,826.46 213,036.92
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 721,930.00 4,278,799.00 228,014,080.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2 7/10/2013 F 87.87 A 3 A Licensee Event Report and Root Cause Evaluation are being prepared to determine the cause and corrective actions.

SUMMARY

Diablo Canyon Unit 2 began the month of July in Mode 1 (Power Operation) at approximately 100 percent reactor power. On July 10th, an apparent electrical flashover of a Unit 2 main bank transformer lightning arrestor resulted in a reactor trip. Preliminary investigation suggests that the electrical disturbance was experienced during routine "hot washing" an insulator. On July 13th, 2013, Unit 2 was returned to critical and entered Mode 1 (power operation). On July 15th, 2013, Unit 2 returned to full power and it remained there for the rest of the month.

OPERATING DATA REPORT DOCKET: 323 PREPARER NAME: (805) 545-4540 UNIT_NME: Diablo Canyon Unit 2 PREPARER TELEPHONE: M. Padovan RPT_PERIOD: 201308

1. Design Electrical Rating: 1151
2. Maximum Dependable Capacity (MWe-Net) 1118 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,635.00 215,694.73
4. Number of Hours Generator On-line 744.00 4,570.46 213,780.92
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 843,997.00 5,122,796.00 228,858,077.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Diablo Canyon Unit Two began and ended the month of August, 2013 in Mode 1 (Power Operation) at approximately 100 percent reactor power.

There were no significant operational occurrences.

OPERATING DATA REPORT DOCKET: 323 PREPARER NAME: M. Padovan UNIT_NME: Diablo Canyon Unit 2 PREPARER TELEPHONE: 805-545-4540 RPT_PERIOD: 201309

1. Design Electrical Rating: 1151
2. Maximum Dependable Capacity (MWe-Net) 1118 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,355.00 216,414.73
4. Number of Hours Generator On-line 720.00 5,290.46 214,500.92
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 817,391.00 5,940,187.00 229,675,468.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Diablo Canyon Unit 2 operated at approximately 100 percent power for the month of September 2013.

OPERATING DATA REPORT DOCKET: 237 PREPARER NAME: Dave Kijowski UNIT_NME: Dresden Unit 2 PREPARER TELEPHONE: 815-416-4227 RPT_PERIOD: 201307

1. Design Electrical Rating: 894
2. Maximum Dependable Capacity (MWe-Net) 870 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 303,765.74
4. Number of Hours Generator On-line 744.00 5,087.00 294,590.59
5. Reserve Shutdown Hours 0.00 0.00 4.00
6. Net Electrical energy Generated (MWHrs) 677,151.00 4,690,095.00 213,341,844.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

With the exception of short periods for routine maintenance and surveillances, Unit 2 operated at full power for the reporting period.

OPERATING DATA REPORT DOCKET: 237 PREPARER NAME: Dave Kijowski UNIT_NME: Dresden Unit 2 PREPARER TELEPHONE: 815-416-4227 RPT_PERIOD: 201308

1. Design Electrical Rating: 894
2. Maximum Dependable Capacity (MWe-Net) 870 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 304,509.74
4. Number of Hours Generator On-line 744.00 5,831.00 295,334.59
5. Reserve Shutdown Hours 0.00 0.00 4.00
6. Net Electrical energy Generated (MWHrs) 672,326.00 5,362,421.00 214,014,170.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

On August 10, at approximately 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />, load was reduced to approximately 84% electrical for a planned control rod pattern adjustment. On August 11, at approximately 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />, the unit returned to full power operation.

On August 28, at approximately 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br />, load was reduced to approximately 98% electrical due to an unplanned trip of the 2B Circ Water Pump. On August 29, at approximately 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br />, load was further reduced due to condenser limitations with the combination of warm intake temperatures and two circ water pump operation. Load was reduced to as low as 89% electrical during this period of warm weather and two pump operation. The unit remained at approximately 89% electrical operation for the remainder of the reporting period.

OPERATING DATA REPORT DOCKET: 237 PREPARER NAME: Dave Kijowski UNIT_NME: Dresden Unit 2 PREPARER TELEPHONE: 815-416-4227 RPT_PERIOD: 201309

1. Design Electrical Rating: 894
2. Maximum Dependable Capacity (MWe-Net) 870 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 305,229.74
4. Number of Hours Generator On-line 720.00 6,551.00 296,054.59
5. Reserve Shutdown Hours 0.00 0.00 4.00
6. Net Electrical energy Generated (MWHrs) 655,673.00 6,018,094.00 214,669,843.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Entering the month, unit load was at approximately 89% electrical due to an unplanned trip of the 2B Circ Water Pump. On September 1, at approximately 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br />, the unit was returned to full power operation.

On September 7, at approximately 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />, load was reduced to approximately 78% electrical for a planned control rod pattern adjustment.

On September 8, at approximately 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />, the unit returned to full power operation.

On September 21, at approximately 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />, load was reduced to approximately 86% electrical for a planned control rod pattern adjustment.

On September 22, at approximately 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />, the unit returned to full power operation.

With the exception of short periods for routine maintenance and surveillances, Unit 2 operated at full power for the remainder of the reporting period.

OPERATING DATA REPORT DOCKET: 249 PREPARER NAME: Dave Kijowski UNIT_NME: Dresden Unit 3 PREPARER TELEPHONE: 815-416-4227 RPT_PERIOD: 201307

1. Design Electrical Rating: 879
2. Maximum Dependable Capacity (MWe-Net) 850 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 291,325.05
4. Number of Hours Generator On-line 744.00 5,087.00 282,828.15
5. Reserve Shutdown Hours 0.00 0.00 1.00
6. Net Electrical energy Generated (MWHrs) 676,259.00 4,672,982.00 204,775,455.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

With the exception of short periods for routine maintenance and surveillances, Unit 3 operated at full power for the reporting period.

OPERATING DATA REPORT DOCKET: 249 PREPARER NAME: Dave Kijowski UNIT_NME: Dresden Unit 3 PREPARER TELEPHONE: 815-416-4227 RPT_PERIOD: 201308

1. Design Electrical Rating: 879
2. Maximum Dependable Capacity (MWe-Net) 850 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 292,069.05
4. Number of Hours Generator On-line 744.00 5,831.00 283,572.15
5. Reserve Shutdown Hours 0.00 0.00 1.00
6. Net Electrical energy Generated (MWHrs) 675,205.00 5,348,187.00 205,450,660.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

On August 31, at approximately 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />, load was reduced to approximately 66% electrical for planned turbine valve testing and control rod pattern adjustment. The unit was operating at approximately 70% electrical at the end of the reporting period.

OPERATING DATA REPORT DOCKET: 249 PREPARER NAME: Dave Kijowski UNIT_NME: Dresden Unit 3 PREPARER TELEPHONE: 815-416-4227 RPT_PERIOD: 201309

1. Design Electrical Rating: 879
2. Maximum Dependable Capacity (MWe-Net) 850 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 292,789.05
4. Number of Hours Generator On-line 720.00 6,551.00 284,292.15
5. Reserve Shutdown Hours 0.00 0.00 1.00
6. Net Electrical energy Generated (MWHrs) 654,286.00 6,002,473.00 206,104,946.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Entering the month, unit load was at approximately 70% electrical for planned turbine valve testing and control rod pattern adjustment. On September 1, at approximately 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />, the unit was returned to full power operation.

With the exception of short periods for routine maintenance and surveillances, Unit 3 operated at full power for the remainder of the reporting period.

OPERATING DATA REPORT DOCKET: 331 PREPARER NAME: Wendell Horst UNIT_NME: Duane Arnold Unit 1 PREPARER TELEPHONE: 319 851-7359 RPT_PERIOD: 201307

1. Design Electrical Rating: 621.9
2. Maximum Dependable Capacity (MWe-Net) 601.6 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 280,212.11
4. Number of Hours Generator On-line 744.00 5,087.00 275,254.47
5. Reserve Shutdown Hours 0.00 0.00 192.80
6. Net Electrical energy Generated (MWHrs) 447,623.96 3,097,483.69 138,115,281.87 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 331 PREPARER NAME: Wendell Horst UNIT_NME: Duane Arnold Unit 1 PREPARER TELEPHONE: 319 851-7359 RPT_PERIOD: 201308

1. Design Electrical Rating: 621.9
2. Maximum Dependable Capacity (MWe-Net) 601.6 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 280,956.11
4. Number of Hours Generator On-line 744.00 5,831.00 275,998.47
5. Reserve Shutdown Hours 0.00 0.00 192.80
6. Net Electrical energy Generated (MWHrs) 447,146.62 3,544,630.31 138,562,428.49 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unplanned energy loss in August 2013 was due to problems with the feedwater LEFM flow indicators.

OPERATING DATA REPORT DOCKET: 331 PREPARER NAME: Wendell Horst UNIT_NME: Duane Arnold Unit 1 PREPARER TELEPHONE: 319 851-7359 RPT_PERIOD: 201309

1. Design Electrical Rating: 621.9
2. Maximum Dependable Capacity (MWe-Net) 601.6 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 281,676.11
4. Number of Hours Generator On-line 720.00 6,551.00 276,718.47
5. Reserve Shutdown Hours 0.00 0.00 192.80
6. Net Electrical energy Generated (MWHrs) 430,065.00 3,974,695.31 138,992,493.49 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unplanned energy loss in September 2013 was a result of a minor downpower to restore Reactor Water Cleanup following repair of MO2701, RWCU Supply Outboard Isolation, which failed to close when demanded. PEL was due to the quarterly surveillance and control rod sequence exchange downpower, and repair of a lube oil leak on Reactor Feedwater Pump B.

OPERATING DATA REPORT DOCKET: 348 PREPARER NAME: Khris Miller UNIT_NME: Farley Unit 1 PREPARER TELEPHONE: 334-814-4549 RPT_PERIOD: 201307

1. Design Electrical Rating: 854
2. Maximum Dependable Capacity (MWe-Net) 874 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,043.55 266,900.26
4. Number of Hours Generator On-line 744.00 5,033.30 264,172.00
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 648,345.00 4,438,273.00 214,655,579.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

There were no significant power reductions this period.

OPERATING DATA REPORT DOCKET: 348 PREPARER NAME: Khris Miller UNIT_NME: Farley Unit 1 PREPARER TELEPHONE: 334-814-4549 RPT_PERIOD: 201308

1. Design Electrical Rating: 854
2. Maximum Dependable Capacity (MWe-Net) 874 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,787.55 267,644.26
4. Number of Hours Generator On-line 744.00 5,777.30 264,916.00
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 646,171.00 5,084,444.00 215,301,750.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

There were no significant power reductions this period.

OPERATING DATA REPORT DOCKET: 348 PREPARER NAME: Khris Miller UNIT_NME: Farley Unit 1 PREPARER TELEPHONE: 334-814-4549 RPT_PERIOD: 201309

1. Design Electrical Rating: 854
2. Maximum Dependable Capacity (MWe-Net) 874 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 678.83 6,466.38 268,323.09
4. Number of Hours Generator On-line 677.78 6,455.08 265,593.78
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 558,087.00 5,642,531.00 215,859,837.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 25 9/29/2013 S 42.22 C 1 At 1359 on September 12, 2013 Unit 1 began to ramp down prior to the normal refueling outage U1R25. The Unit was removed from the grid at 0547 on September 29, 2013. The reactor was shut down at 0650 on September 29, 2013.

SUMMARY

At 1359 on September 12, 2013 Unit 1 began to ramp down prior to the normal refueling outage U1R25. The Unit was removed from the grid at 0547 on September 29, 2013. The reactor was shut down at 0650 on September 29, 2013.

OPERATING DATA REPORT DOCKET: 364 PREPARER NAME: Khris Miller UNIT_NME: Farley Unit 2 PREPARER TELEPHONE: 334-814-4549 RPT_PERIOD: 201307

1. Design Electrical Rating: 855
2. Maximum Dependable Capacity (MWe-Net) 883 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,503.08 249,507.85
4. Number of Hours Generator On-line 744.00 4,469.25 247,004.56
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 652,036.00 3,818,528.00 202,647,981.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

There were no significant power reductions this period.

OPERATING DATA REPORT DOCKET: 364 PREPARER NAME: Khris Miller UNIT_NME: Farley Unit 2 PREPARER TELEPHONE: 334-814-4549 RPT_PERIOD: 201308

1. Design Electrical Rating: 855
2. Maximum Dependable Capacity (MWe-Net) 883 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,247.08 250,251.85
4. Number of Hours Generator On-line 744.00 5,213.25 247,748.56
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 650,557.00 4,469,085.00 203,298,538.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

There were no significant power reductions this period.

OPERATING DATA REPORT DOCKET: 364 PREPARER NAME: Khris Miller UNIT_NME: Farley Unit 2 PREPARER TELEPHONE: 334-814-4549 RPT_PERIOD: 201309

1. Design Electrical Rating: 855
2. Maximum Dependable Capacity (MWe-Net) 883 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,967.08 250,971.85
4. Number of Hours Generator On-line 720.00 5,933.25 248,468.56
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 632,876.00 5,101,961.00 203,931,414.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

There were no significant power reductions this period.

OPERATING DATA REPORT DOCKET: 341 PREPARER NAME: E. Sorg UNIT_NME: Fermi Unit 2 PREPARER TELEPHONE: 734-586-4294 RPT_PERIOD: 201307

1. Design Electrical Rating: 1150
2. Maximum Dependable Capacity (MWe-Net) 1037.3 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,783.68 180,842.43
4. Number of Hours Generator On-line 744.00 4,745.58 175,956.65
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 522,400.00 3,386,990.00 179,939,590.92 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit operated at 68% power the entire month.

OPERATING DATA REPORT DOCKET: 341 PREPARER NAME: E. Sorg UNIT_NME: Fermi Unit 2 PREPARER TELEPHONE: 734-586-4294 RPT_PERIOD: 201308

1. Design Electrical Rating: 1150
2. Maximum Dependable Capacity (MWe-Net) 1037.3 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,527.68 181,586.43
4. Number of Hours Generator On-line 744.00 5,489.58 176,700.65
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 526,801.00 3,913,791.00 180,466,391.92 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit operated at approximately 68% for the entire month of August with the following exceptions:

8/6/13 2057 to 2129: Planned power change from 68% to 62% for Turbine Control Valve vibration measurement.

8/27/13 0207 to 0225: Planned power change from 68% to 65% for HCU maintenance.

8/30/13 2330 to 8/31/13 0129: Planned power change from 68% to 62% for scram time testing.

OPERATING DATA REPORT DOCKET: 341 PREPARER NAME: E. Sorg UNIT_NME: Fermi Unit 2 PREPARER TELEPHONE: 734-586-4294 RPT_PERIOD: 201309

1. Design Electrical Rating: 1150
2. Maximum Dependable Capacity (MWe-Net) 1037.3 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 409.42 5,937.10 181,995.85
4. Number of Hours Generator On-line 364.48 5,854.06 177,065.13
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 280,255.00 4,194,046.00 180,746,646.92 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments PO 9/9/2013 S 355.52 B 1 Planned shutdown to restore the South Reactor 13-02 Feed Pump turbine following repair and refurbishment.

SUMMARY

The unit operated at 68% power until 9/8/2013 when a planned shutdown to Planned Outage (PO) 13-02 was commenced. The reactor was taken subcritical on 9/9/2013 at 0300. Following repairs the reactor was taken critical 9/22/13 at 0135, and the generator was synched to the Detroit Edison grid at 2231 on 9/23/13. Power ascension to 100% reactor power was completed on 9/30/2013 at 1440.

OPERATING DATA REPORT DOCKET: 333 PREPARER NAME: Ryan Perry UNIT_NME: FitzPatrick Unit 1 PREPARER TELEPHONE: 3153496218 RPT_PERIOD: 201307

1. Design Electrical Rating: 816
2. Maximum Dependable Capacity (MWe-Net) 813 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,990.00 269,302.51
4. Number of Hours Generator On-line 744.00 4,884.05 263,346.39
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 605,447.00 3,920,964.00 202,779,795.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The plant operated at or near 100% power for the month of July with the exception of the following event:

The downpower event was from 7/18/2013-7/19/2013 to approximately 47% power for Condenser tube leaks of the A1 waterbox.

OPERATING DATA REPORT DOCKET: 333 PREPARER NAME: Ryan Perry UNIT_NME: FitzPatrick Unit 1 PREPARER TELEPHONE: 3153496218 RPT_PERIOD: 201308

1. Design Electrical Rating: 816
2. Maximum Dependable Capacity (MWe-Net) 813 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,734.00 270,046.51
4. Number of Hours Generator On-line 744.00 5,628.05 264,090.39
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 591,499.00 4,512,463.00 203,371,294.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The plant operated at or near 100% power for the month of August with the exception of the following event:

The downpower event was from 8/23/2013-8/24/2013 to approximately 48.5% power for Condenser tube leaks.

OPERATING DATA REPORT DOCKET: 333 PREPARER NAME: Ryan Perry UNIT_NME: FitzPatrick Unit 1 PREPARER TELEPHONE: 315-349-6218 RPT_PERIOD: 201309

1. Design Electrical Rating: 816
2. Maximum Dependable Capacity (MWe-Net) 813 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,454.00 270,766.51
4. Number of Hours Generator On-line 720.00 6,348.05 264,810.39
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 521,285.00 5,033,748.00 203,892,579.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The plant operated at or near 100% power for the month of September with the exception of the following event:

The downpower event was from 9/6/2013 to 9/13/2013 to approximately 48% for 'B' Reactor Feedpump repairs.

OPERATING DATA REPORT DOCKET: 285 PREPARER NAME: Jake Walker UNIT_NME: Fort Calhoun Unit 1 PREPARER TELEPHONE: 402-533-6693 RPT_PERIOD: 201307

1. Design Electrical Rating: 502
2. Maximum Dependable Capacity (MWe-Net) 482 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 0.00 0.00 270,885.19
4. Number of Hours Generator On-line 0.00 0.00 269,363.34
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 0.00 0.00 119,655,821.80 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2011- 4/9/2011 S 744.00 C 4 Shutdown for Cycle 26 End of Cycle RFO. No corrective actions necessary.

SUMMARY

FCS remained shutdown through July 2013. Flood recovery and IMC 0350 activities are on-going. The plant will remain shutdown until flood recovery and NRC Inspection Manual Chapter 0350 activities are complete. Due to being placed in NRC Inspection Manual Chapter 0350, all hours spent shutdown are considered Unplanned Energy Loss - Outage Extension until Chapter 0350 activities are complete.

OPERATING DATA REPORT DOCKET: 285 PREPARER NAME: Jake Walker UNIT_NME: Fort Calhoun Unit 1 PREPARER TELEPHONE: 402-533-6693 RPT_PERIOD: 201308

1. Design Electrical Rating: 502
2. Maximum Dependable Capacity (MWe-Net) 482 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 0.00 0.00 270,885.19
4. Number of Hours Generator On-line 0.00 0.00 269,363.34
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 0.00 0.00 119,655,821.80 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2011- 4/9/2011 S 744.00 C 4 Shutdown for Cycle 26 End of Cycle RFO. No corrective actions necessary.

SUMMARY

FCS remained shutdown through August 2013. Flood recovery and IMC 0350 activities are on-going. The plant will remain shutdown until flood recovery and NRC Inspection Manual Chapter 0350 activities are complete. Due to being placed in NRC Inspection Manual Chapter 0350, all hours spent shutdown are considered Unplanned Energy Loss - Outage Extension until Chapter 0350 activities are complete.

OPERATING DATA REPORT DOCKET: 285 PREPARER NAME: Jake Walker UNIT_NME: Fort Calhoun Unit 1 PREPARER TELEPHONE: 402-533-6693 RPT_PERIOD: 201309

1. Design Electrical Rating: 502
2. Maximum Dependable Capacity (MWe-Net) 482 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 0.00 0.00 270,885.19
4. Number of Hours Generator On-line 0.00 0.00 269,363.34
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 0.00 0.00 119,655,821.80 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2011- 4/9/2011 S 720.00 C 4 Shutdown for Cycle 26 End of Cycle RFO. No corrective actions necessary.

SUMMARY

FCS remained shutdown through September 2013. Flood recovery and IMC 0350 activities are on-going. The plant will remain shutdown until flood recovery and NRC Inspection Manual Chapter 0350 activities are complete. Due to being placed in NRC Inspection Manual Chapter 0350, all hours spent shutdown are considered Unplanned Energy Loss - Outage Extension until Chapter 0350 activities are complete.

OPERATING DATA REPORT DOCKET: 244 PREPARER NAME: John V. Walden UNIT_NME: Ginna Unit 1 PREPARER TELEPHONE: 585-771-3588 RPT_PERIOD: 201307

1. Design Electrical Rating: 585
2. Maximum Dependable Capacity (MWe-Net) 560 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 666.03 5,009.03 326,749.25
4. Number of Hours Generator On-line 651.78 4,994.78 323,285.39
5. Reserve Shutdown Hours 0.00 0.00 8.50
6. Net Electrical energy Generated (MWHrs) 363,934.79 2,886,433.68 154,693,996.11 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 7/24/2013 F 92.22 B 3 The reactor trip was caused by an unexpected generator trip during positive VAR testing. A generator protection relay trip setpoint was programmed incorrectly during the 2012 refueling outage. LER 2013-002 was submitted on this event. Reprogramming of the generator protection relay was performed to remove the trip function.

SUMMARY

The unit operated at full power from the beginning of the month until July 23, 2013 at 1419, when the main generator tripped during positive VAR testing. The generator trip caused a turbine trip and reactor trip from full power. The reactor criticality was achieved on July 27, 2013 at 2017 following generator protection relay reprogramming to remove the trip function. The unit was brought on-line on July 28, 2013 at 1032. Full power operations resumed on July 29, 2013 at 0500 and continued through the end of the month.

OPERATING DATA REPORT DOCKET: 244 PREPARER NAME: John V. Walden UNIT_NME: Ginna Unit 1 PREPARER TELEPHONE: 585-771-3588 RPT_PERIOD: 201308

1. Design Electrical Rating: 585
2. Maximum Dependable Capacity (MWe-Net) 560 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,753.03 327,493.25
4. Number of Hours Generator On-line 744.00 5,738.78 324,029.39
5. Reserve Shutdown Hours 0.00 0.00 8.50
6. Net Electrical energy Generated (MWHrs) 418,662.66 3,305,096.34 155,112,658.77 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit operated at full power for the entire month of August. Average power for the month was 99.8%.

OPERATING DATA REPORT DOCKET: 244 PREPARER NAME: John V. Walden UNIT_NME: Ginna Unit 1 PREPARER TELEPHONE: 585-771-3588 RPT_PERIOD: 201309

1. Design Electrical Rating: 585
2. Maximum Dependable Capacity (MWe-Net) 560 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,473.03 328,213.25
4. Number of Hours Generator On-line 720.00 6,458.78 324,749.39
5. Reserve Shutdown Hours 0.00 0.00 8.50
6. Net Electrical energy Generated (MWHrs) 407,739.32 3,712,835.66 155,520,398.09 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit operated at full power for the entire month of September. Average power for the month was 99.9%.

OPERATING DATA REPORT DOCKET: 416 PREPARER NAME: Allison Hughes UNIT_NME: Grand Gulf Unit 1 PREPARER TELEPHONE: 601-437-7341 RPT_PERIOD: 201307

1. Design Electrical Rating: 1279
2. Maximum Dependable Capacity (MWe-Net) 1266 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 710.53 4,675.43 221,880.84
4. Number of Hours Generator On-line 710.53 4,602.80 217,270.69
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 978,908.00 6,403,037.00 257,885,313.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2013- 7/30/2013 F 33.47 A 3 At 14:32 on July 30, 2012, GGNS experienced an 03 unexpected Reactor Scram. At the time, the plant was operating at 100% Rated Core Thermal Power. The scram occurred shortly after the Turbine Stress Evaluator (TSE) was turned on. I C turned the TSE on and the TSE-INFL alarm in the control room cleared. LOAD-LTD was noted to be dropping after the TSE was turned on.

Approximately one minute later, LOAD-ACTUAL was noted to be dropping and the reactor scrammed due to a turbine trip. The shift immediately entered EP-2 for Reactor Scram, the Reactor Scram ONEP, and Turbine Trip ONEP.

RCIC initiated and injected during the transient.

However, no Level 2 alarms were received.

Reactor levels were verified and RCIC was subsequently secured. All other systems operated as expected. The plant was stabilized with pressure control on the bypass valves, and level controlled on the startup level control valve.

SUMMARY

The plant continues to operate at EPU power. However a performance test has not been performed and a new Reference Unit Power (RUP) has not been determined. Losses during the month were corrected to the RUP using a ratio of the previous license power (3898) to the current license power (4408).

OPERATING DATA REPORT DOCKET: 416 PREPARER NAME: Andrew Fox UNIT_NME: Grand Gulf Unit 1 PREPARER TELEPHONE: 601 437-6204 RPT_PERIOD: 201308

1. Design Electrical Rating: 1279
2. Maximum Dependable Capacity (MWe-Net) 1266 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 688.77 5,364.20 222,569.61
4. Number of Hours Generator On-line 657.18 5,259.98 217,927.87
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 879,922.00 7,282,959.00 258,765,235.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2013- 7/30/2013 F 86.82 A 4 At 14:32 on July 30, 2012, GGNS experienced an 03 unexpected Reactor Scram. At the time, the plant was operating at 100% Rated Core Thermal Power. The scram occurred shortly after the Turbine Stress Evaluator (TSE) was turned on. I C turned the TSE on and the TSE-INFL alarm in the control room cleared. LOAD-LTD was noted to be dropping after the TSE was turned on.

Approximately one minute later, LOAD-ACTUAL was noted to be dropping and the reactor scrammed due to a turbine trip. The shift immediately entered EP-2 for Reactor Scram, the Reactor Scram ONEP, and Turbine Trip ONEP.

RCIC initiated and injected during the transient.

However, no Level 2 alarms were received.

Reactor levels were verified and RCIC was subsequently secured. All other systems operated as expected. The plant was stabilized with pressure control on the bypass valves, and level controlled on the startup level control valve.

SUMMARY

The plant continues to operate at EPU power. However a performance test has not been performed and a new Reference Unit Power (RUP) has not been determined. Losses during the month were corrected to the RUP using a ratio of the previous license power (3898) to the current license power (4408).

OPERATING DATA REPORT DOCKET: 416 PREPARER NAME: Andrew Fox UNIT_NME: Grand Gulf Unit 1 PREPARER TELEPHONE: 601 437-6204 RPT_PERIOD: 201309

1. Design Electrical Rating: 1279
2. Maximum Dependable Capacity (MWe-Net) 1266 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,084.20 223,289.61
4. Number of Hours Generator On-line 720.00 5,979.98 218,647.87
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 990,253.00 8,273,212.00 259,755,488.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The plant continues to operate at EPU power. However a performance test has not been performed and a new Reference Unit Power (RUP) has not been determined. Losses during the month were corrected to the RUP using a ratio of the previous license power (3898) to the current license power (4408).

OPERATING DATA REPORT DOCKET: 400 PREPARER NAME: John Kelly UNIT_NME: Harris Unit 1 PREPARER TELEPHONE: 9193622194 RPT_PERIOD: 201307

1. Design Electrical Rating: 973
2. Maximum Dependable Capacity (MWe-Net) 928 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,559.77 204,056.66
4. Number of Hours Generator On-line 744.00 4,540.17 202,643.42
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 696,829.00 4,264,218.00 176,974,126.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

There were no unit shutdowns in July 2013.

OPERATING DATA REPORT DOCKET: 400 PREPARER NAME: John Kelly UNIT_NME: Harris Unit 1 PREPARER TELEPHONE: 9193622194 RPT_PERIOD: 201308

1. Design Electrical Rating: 973
2. Maximum Dependable Capacity (MWe-Net) 928 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,303.77 204,800.66
4. Number of Hours Generator On-line 711.80 5,251.97 203,355.22
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 645,140.00 4,909,358.00 177,619,266.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 61704 8/3/2013 S 32.20 H 5 There was a planned unit shutdown to address 5 increased vibrations for Low Pressure Turbine 2 bearing #5. A balance weight was installed which reduced vibrations. Additional corrective actions to address the bearing vibration will be documented in NCR 00617045

SUMMARY

There was a planned unit shutdown to address increased vibrations for Low Pressure Turbine 2 Bearing #5. A balance weight was installed which reduced vibrations.

OPERATING DATA REPORT DOCKET: 400 PREPARER NAME: Dustin Martin UNIT_NME: Harris Unit 1 PREPARER TELEPHONE: 9193622679 RPT_PERIOD: 201309

1. Design Electrical Rating: 973
2. Maximum Dependable Capacity (MWe-Net) 928 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,023.77 205,520.66
4. Number of Hours Generator On-line 709.25 5,961.22 204,064.47
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 656,853.00 5,566,211.00 178,276,119.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 62596 9/15/2013 S 10.75 H 5 There was a planned unit shutdown to address 0 increased vibrations for Low Pressure Turbine bearing #5. A balance weight was installed which reduced vibrations. Additional corrective actions to address the bearing vibration will be documented in NCR 00625960.

SUMMARY

There was a planned unit shutdown to address increased vibrations for Low Pressure Turbine 2 Bearing #5. A balance weight was installed which reduced vibrations.

OPERATING DATA REPORT DOCKET: 321 PREPARER NAME: Ben Mosley UNIT_NME: Hatch Unit 1 PREPARER TELEPHONE: 912-537-5872 RPT_PERIOD: 201307

1. Design Electrical Rating: 885
2. Maximum Dependable Capacity (MWe-Net) 876 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,718.85 276,791.47
4. Number of Hours Generator On-line 744.00 4,683.02 269,977.64
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 616,685.00 3,996,097.00 207,945,108.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Power was reduced to 65% in order to perform a power suppression test, turbine valve testing, control rod drive exercises and a rod sequence exchange on 07/03/2013. Upon completion of these activities, power was increased and subsequently decreased to 77% to perform an additional rod pattern adjustment on 07/08/2013. The unit was returned to rated thermal power on 07/09/2013. There were no additional significant generation loss events (>20%) for the remainder of the month.

OPERATING DATA REPORT DOCKET: 321 PREPARER NAME: Ben Mosley UNIT_NME: Hatch Unit 1 PREPARER TELEPHONE: 912-537-5872 RPT_PERIOD: 201308

1. Design Electrical Rating: 885
2. Maximum Dependable Capacity (MWe-Net) 876 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,462.85 277,535.47
4. Number of Hours Generator On-line 744.00 5,427.02 270,721.64
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 646,619.00 4,642,716.00 208,591,727.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

There were no significant generation loss events (>20%) this month.

OPERATING DATA REPORT DOCKET: 321 PREPARER NAME: Ben Mosley UNIT_NME: Hatch Unit 1 PREPARER TELEPHONE: 912-537-5872 RPT_PERIOD: 201309

1. Design Electrical Rating: 885
2. Maximum Dependable Capacity (MWe-Net) 876 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,182.85 278,255.47
4. Number of Hours Generator On-line 720.00 6,147.02 271,441.64
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 631,777.00 5,274,493.00 209,223,504.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

There were no significant generation loss events (>20%) this month.

OPERATING DATA REPORT DOCKET: 366 PREPARER NAME: Ben Mosley UNIT_NME: Hatch Unit 2 PREPARER TELEPHONE: 912-537-5872 RPT_PERIOD: 201307

1. Design Electrical Rating: 908
2. Maximum Dependable Capacity (MWe-Net) 883 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,275.08 251,551.46
4. Number of Hours Generator On-line 744.00 4,207.58 246,470.25
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 654,717.00 3,681,444.00 193,624,580.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

There were no significant generation loss events (>20%) this month.

OPERATING DATA REPORT DOCKET: 366 PREPARER NAME: Ben Mosley UNIT_NME: Hatch Unit 2 PREPARER TELEPHONE: 912-537-5872 RPT_PERIOD: 201308

1. Design Electrical Rating: 908
2. Maximum Dependable Capacity (MWe-Net) 883 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,019.08 252,295.46
4. Number of Hours Generator On-line 744.00 4,951.58 247,214.25
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 653,432.00 4,334,876.00 194,278,012.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

There were no significant generation loss events (>20%) this month.

OPERATING DATA REPORT DOCKET: 366 PREPARER NAME: Ben Mosley UNIT_NME: Hatch Unit 2 PREPARER TELEPHONE: 912-537-5872 RPT_PERIOD: 201309

1. Design Electrical Rating: 908
2. Maximum Dependable Capacity (MWe-Net) 883 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 603.98 5,623.06 252,899.44
4. Number of Hours Generator On-line 567.23 5,518.81 247,781.48
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 466,622.00 4,801,498.00 194,744,634.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 13- 9/15/2013 S 152.77 B 1 Unit was shutdown to perform maintenance on an MSIV which failed to close during testing on 09/14/2013.

SUMMARY

The unit began the month operating at rated thermal power. Power was reduced to 65% for Turbine Valve testing, CRD Exercise and Rod Pattern Adjustment on 09/14/2013. While at 65% and during testing of a Main Steam Isolation Valve (MSIV), the MSIV failed to close on demand on 09/14/2013. Power was reduced to 50% to support maintenance of the MSIV on 09/14/2013. The reactor was subsequently shutdown per the normal plant shutdown procedure via manual scram to repair the MSIV on 09/15/2013. Following the outage, the reactor was critical on 09/20/2013. Power was increased and the unit was returned to rated thermal power on 09/24/2013.

OPERATING DATA REPORT DOCKET: 354 PREPARER NAME: Walter Bischoff UNIT_NME: Hope Creek Unit 1 PREPARER TELEPHONE: 8563391037 RPT_PERIOD: 201307

1. Design Electrical Rating: 1228.1
2. Maximum Dependable Capacity (MWe-Net) 1172 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,966.57 205,565.17
4. Number of Hours Generator On-line 744.00 4,944.33 201,919.21
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 839,293.00 5,934,359.00 213,478,684.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The month started with the unit online and the reactor critical at 98.0% RTP due to main condenser pressures reaching the main turbine design back pressure limit as a result of: extreme environmental conditions, high dry bulb and wet bulb air temperatures. The unit returned to 100% RTP on 7/1/13 at 0147 One (1) planned power change greater than 15% occurred in July 2013.

A power decrease of approximately 26.2% (100% to 73.8%) occurred on 7/26/2013 at 2000 for Main Condenser waterbox cycling. Power was stabilized at 73.8% RCTP on 7/27/2013 at 0057. Power ascension started on 7/27/2013 at 0508. The unit returned to 100% on 7/27/2013 at 1050.

This is a planned power reduction IAW NEI 99-02.

Zero (0) unplanned power changes greater than 15% occurred in July 2013.

The month ended with the unit online and the reactor critical at 99.8% RTP.

The SRVs were not challenged by any over pressurization events or transients that would have required the valves to respond automatically.

OPERATING DATA REPORT DOCKET: 354 PREPARER NAME: Walter Bischoff UNIT_NME: Hope Creek Unit 1 PREPARER TELEPHONE: 8563391037 RPT_PERIOD: 201308

1. Design Electrical Rating: 1228.1
2. Maximum Dependable Capacity (MWe-Net) 1172 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,710.57 206,309.17
4. Number of Hours Generator On-line 744.00 5,688.33 202,663.21
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 857,101.00 6,791,460.00 214,335,785.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The month started with the unit online and the reactor critical at 99.8% RTP One (1) planned power change greater than 15% occurred in August 2013.

A power decrease of approximately 15.5% (100% to 84.5%) occurred on 8/10/2013 at 2007 for control rod pattern adjustments. Power was stabilized at 84.5% RCTP on 8/10/2013 at 2224. Power ascension started on 8/10/2013 at 2228. The unit returned to 100% on 8/11/2013 at 0248.

This is a planned power reduction IAW NEI 99-02. All control rod pattern changes are considered planned.

One (1) unplanned power change greater than 15% occurred in August 2013.

A power decrease of approximately 30.6% (100% to 69.4%) occurred on 8/1/2013 at 2334 due to a recirc runback to 45% cause by a trip of the B Circ water pump. Power was stabilized at 69.4% RCTP on 8/2/2013 at 0300. Power ascension started on 8/2/2013 at 0313. The unit returned to 100% on 8/5/2013 at 0157. This is an unplanned power reduction and is not excluded IAW NEI 99-02.

The month ended with the unit online and the reactor critical at 93.1% RTP due to main condenser pressures reaching the main turbine design back pressure limit as a result of: extreme environmental conditions, high dry bulb and wet bulb air temperatures.

The SRVs were not challenged by any over pressurization events or transients that would have required the valves to respond automatically.

OPERATING DATA REPORT DOCKET: 354 PREPARER NAME: Walter Bischoff UNIT_NME: Hope Creek Unit 1 PREPARER TELEPHONE: 8563391037 RPT_PERIOD: 201309

1. Design Electrical Rating: 1228.1
2. Maximum Dependable Capacity (MWe-Net) 1172 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,430.57 207,029.17
4. Number of Hours Generator On-line 720.00 6,408.33 203,383.21
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 826,175.00 7,617,635.00 215,161,960.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The month started with the unit online and the reactor critical at 93.1% RTP due to main condenser pressures reaching the main turbine design back pressure limit as a result of: extreme environmental conditions, high dry bulb and wet bulb air temperatures. The unit returned to 100% RTP on 9/3/13 at 2222.

One (1) planned power change greater than 15% occurred in September 2013.

A power decrease of approximately 24% (100% to 76%) occurred on 9/7/2013 at 0005 for main turbine valve testing. Power was stabilized at 76% RCTP on 9/7/2013 at 0303. Power ascension started on 9/7/2013 at 1401. The unit returned to 100% on 9/7/2013 at 1839. This is a planned power reduction IAW NEI 99-02.

One (1) unplanned power change greater than 15% occurred in September 2013.

A planned power decrease of approximately 12% (100% to 88%) occurred on 9/19/2013 at 2000 for planned control rod pattern adjustments.

Power was stabilized at 88% RTP but there was no power ascension. A power decrease of approximately 28% (88% to 60%) occurred on 9/19/2013 at 2142 due to the A recirc pump speed controller failing to 0% demand reducing the pump to minimum speed. Power was stabilized at 60% RCTP on 9/20/2013 at 0304. Power ascension started on 9/20/2013 at 1643. The unit returned to 100% on 9/21/2013 at 0542. This is an unplanned power reduction and is not excluded IAW NEI 99-02.

The month ended with the unit online and the reactor critical at 99.9% RTP The SRVs were not challenged by any over pressurization events or transients that would have required the valves to respond automatically.

OPERATING DATA REPORT DOCKET: 247 PREPARER NAME: Ron Macina UNIT_NME: Indian Point Unit 2 PREPARER TELEPHONE: (914)254-6839 RPT_PERIOD: 201307

1. Design Electrical Rating: 1035
2. Maximum Dependable Capacity (MWe-Net) 998 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 725.33 5,016.43 262,471.53
4. Number of Hours Generator On-line 717.78 5,001.46 257,919.40
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 650,352.89 5,039,852.63 231,358,352.07 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2 7/3/2013 F 26.22 A 2 IP2 Manually tripped at full power due to a loss of feedwater caused by a loss of instrument air to the main feeedwater regulating valves.

SUMMARY

Indian Point 2 was synchronized to the grid for a total of 717.78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br />, producing a gross generation of 675,255 MWhrs. The Unit began the month at full power. The Unit operated at full power until July 3, 2013 when at approximately 0747 hours0.00865 days <br />0.208 hours <br />0.00124 weeks <br />2.842335e-4 months <br /> the unit was manually tripped due to a loss of feedwater caused by a loss of instrument air to the Main Feedwater Regulating Valves (MFRV's). The Reactor was made critical on July 4, 2013 at approximately 0221 hours0.00256 days <br />0.0614 hours <br />3.654101e-4 weeks <br />8.40905e-5 months <br /> and the Unit was synchronized to the grid on July 4, 2013 at approximately 0954 hours0.011 days <br />0.265 hours <br />0.00158 weeks <br />3.62997e-4 months <br />. At approximately 1612 hours0.0187 days <br />0.448 hours <br />0.00267 weeks <br />6.13366e-4 months <br /> on July 4, 2013 when at about 60% Reactor Power an excessive oscillation was discovered in the 21 MFRV. It was also discovered that the 21 MFRV would not go full open and was placed in manual. On July 5, 2013 at approximately 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> Reactor Power was increased to approximately 80% on the low flow bypass. 80% Reactor Power was reached on July 5, 2013 at approximately 2118 hours0.0245 days <br />0.588 hours <br />0.0035 weeks <br />8.05899e-4 months <br />. On July 7, 2013 at approximately 1317 hours0.0152 days <br />0.366 hours <br />0.00218 weeks <br />5.011185e-4 months <br /> Reactor Power was reduced from approximately 80% to approximately 24% in order to repair the 21 MFRV. Power ascension recommenced on July 9, 2013 at approximately 0748 hours0.00866 days <br />0.208 hours <br />0.00124 weeks <br />2.84614e-4 months <br />. Full power was reached on July 9, 2013 at approximately 1602 hours0.0185 days <br />0.445 hours <br />0.00265 weeks <br />6.09561e-4 months <br />. The Unit remained at full power for the remainder of the month.

OPERATING DATA REPORT DOCKET: 247 PREPARER NAME: John Garry UNIT_NME: Indian Point Unit 2 PREPARER TELEPHONE: (914)254-6881 RPT_PERIOD: 201308

1. Design Electrical Rating: 1035
2. Maximum Dependable Capacity (MWe-Net) 998 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,760.43 263,215.53
4. Number of Hours Generator On-line 744.00 5,745.46 258,663.40
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 741,606.00 5,781,458.63 232,099,958.07 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Indian Point 2 was synchronized to the grid for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />, producing a gross generation of 766,990 MWhrs. The unit operated at full power for the entire month.

OPERATING DATA REPORT DOCKET: 247 PREPARER NAME: John Garry UNIT_NME: Indian Point Unit 2 PREPARER TELEPHONE: 914-254-6881 RPT_PERIOD: 201309

1. Design Electrical Rating: 1035
2. Maximum Dependable Capacity (MWe-Net) 998 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,480.43 263,935.53
4. Number of Hours Generator On-line 720.00 6,465.46 259,383.40
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 722,608.37 6,504,067.00 232,822,566.44 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Indian Point 2 was synchronized to the grid for a total of 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br />, producing a gross generation of 747100.36 MWhrs. The unit operated at full power for the entire month.

OPERATING DATA REPORT DOCKET: 286 PREPARER NAME: Ron Macina UNIT_NME: Indian Point Unit 3 PREPARER TELEPHONE: (914)254-6839 RPT_PERIOD: 201307

1. Design Electrical Rating: 1048
2. Maximum Dependable Capacity (MWe-Net) 1030 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 677.05 4,393.62 233,674.18
4. Number of Hours Generator On-line 677.05 4,359.20 230,295.53
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 695,525.00 4,476,199.00 216,728,208.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2 7/29/2013 S 66.95 B 1 Planned Shutdown to repair FCV-427, 32 Steam Generator Main Feed Reg Valve.

SUMMARY

Indian Point 3 was synchronized to the grid for a total of 677.05 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, producing a gross generation of 719,471 MWhrs. The unit began the month at full power. On July 29, 2013 at approximately 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />, a planned Reactor Power reduction to approximately 25% was made in order to perform diagnostics testing on the 32 Main Feedwater Regulating Valve (MFRV). It was determined to that in order to repair the 32 MFRV a shutdown was required in order to go internal to the valve. On July 29, 2013 at approximately 0503 hours0.00582 days <br />0.14 hours <br />8.316799e-4 weeks <br />1.913915e-4 months <br /> the unit was shutdown as part of the original plan as a contingency item. The unit remained shutdown for the rest of the month.

OPERATING DATA REPORT DOCKET: 286 PREPARER NAME: Ron Macina UNIT_NME: Indian Point Unit 3 PREPARER TELEPHONE: (914)254-6839 RPT_PERIOD: 201308

1. Design Electrical Rating: 1048
2. Maximum Dependable Capacity (MWe-Net) 1030 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 741.50 5,135.12 234,415.68
4. Number of Hours Generator On-line 736.95 5,096.15 231,032.48
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 753,115.00 5,229,314.00 217,481,323.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2 7/29/2013 S 7.05 B 4 Planned Shutdown to repair FCV-427, 32 Steam Generator Main Feed Reg Valve.

SUMMARY

Indian Point 3 was synchronized to the grid for a total of 739.95 hours0.0011 days <br />0.0264 hours <br />1.570767e-4 weeks <br />3.61475e-5 months <br />, producing a gross generation of 778,851 MWhrs. The unit began the month shutdown to repair the 32 Main Feedwater Regulating Valve (MFRV). The reactor was made critical on 8/1/2013 at approximately 02:30 hours and the Unit was synchronized to the grid on 8/1/2013 at approximately 07:03 hours. Full power was reached on 8/3/2013 at approximately 00:00 hours. The Unit remained at full power for the remainder of the month.

OPERATING DATA REPORT DOCKET: 286 PREPARER NAME: John Garry UNIT_NME: Indian Point Unit 3 PREPARER TELEPHONE: 914-254-6881 RPT_PERIOD: 201309

1. Design Electrical Rating: 1048
2. Maximum Dependable Capacity (MWe-Net) 1030 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,855.12 235,135.68
4. Number of Hours Generator On-line 720.00 5,816.15 231,752.48
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 749,006.00 5,978,320.00 218,230,329.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Indian Point 3 was synchronized to the grid for a total of 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br />, producing a gross generation of 774131.00 MWhrs. The unit operated at full power for the entire month.

OPERATING DATA REPORT DOCKET: 373 PREPARER NAME: S. Shields UNIT_NME: LaSalle Unit 1 PREPARER TELEPHONE: (815) 415-2811 RPT_PERIOD: 201307

1. Design Electrical Rating: 1178
2. Maximum Dependable Capacity (MWe-Net) 1111 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,799.47 204,703.33
4. Number of Hours Generator On-line 744.00 4,792.20 202,181.28
5. Reserve Shutdown Hours 0.00 0.00 1.00
6. Net Electrical energy Generated (MWHrs) 844,093.00 5,537,352.00 213,553,960.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 1 operated at or near full power for the month.

OPERATING DATA REPORT DOCKET: 373 PREPARER NAME: S. Shields UNIT_NME: LaSalle Unit 1 PREPARER TELEPHONE: (815) 415-2811 RPT_PERIOD: 201308

1. Design Electrical Rating: 1178
2. Maximum Dependable Capacity (MWe-Net) 1111 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,543.47 205,447.33
4. Number of Hours Generator On-line 744.00 5,536.20 202,925.28
5. Reserve Shutdown Hours 0.00 0.00 1.00
6. Net Electrical energy Generated (MWHrs) 844,884.00 6,382,236.00 214,398,844.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 1 operated at or near full power for the month. Planned energy losses for control rod maintenance.

OPERATING DATA REPORT DOCKET: 373 PREPARER NAME: S. Shields UNIT_NME: LaSalle Unit 1 PREPARER TELEPHONE: (815) 415-2811 RPT_PERIOD: 201309

1. Design Electrical Rating: 1178
2. Maximum Dependable Capacity (MWe-Net) 1111 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,263.47 206,167.33
4. Number of Hours Generator On-line 720.00 6,256.20 203,645.28
5. Reserve Shutdown Hours 0.00 0.00 1.00
6. Net Electrical energy Generated (MWHrs) 817,702.00 7,199,938.00 215,216,546.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 1 operated at or near full power for the month except for a planned control rod sequence exchange on 9/8/13 to approximately 720 MWe.

OPERATING DATA REPORT DOCKET: 374 PREPARER NAME: S. Shields UNIT_NME: LaSalle Unit 2 PREPARER TELEPHONE: (815) 415-2811 RPT_PERIOD: 201307

1. Design Electrical Rating: 1178
2. Maximum Dependable Capacity (MWe-Net) 1111 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,337.88 196,728.51
4. Number of Hours Generator On-line 744.00 4,289.44 195,378.39
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 846,467.00 4,778,730.00 208,458,848.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 2 operated at or near full power for the month.

OPERATING DATA REPORT DOCKET: 374 PREPARER NAME: S. Shields UNIT_NME: LaSalle Unit 2 PREPARER TELEPHONE: (815) 415-2811 RPT_PERIOD: 201308

1. Design Electrical Rating: 1178
2. Maximum Dependable Capacity (MWe-Net) 1111 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,081.88 197,472.51
4. Number of Hours Generator On-line 744.00 5,033.44 196,122.39
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 846,116.00 5,624,846.00 209,304,964.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 2 operated at or near full power for the month. Downpower for control rod maintenance and rod pattern exchange.

OPERATING DATA REPORT DOCKET: 374 PREPARER NAME: S. Shields UNIT_NME: LaSalle Unit 2 PREPARER TELEPHONE: (815) 415-2811 RPT_PERIOD: 201309

1. Design Electrical Rating: 1178
2. Maximum Dependable Capacity (MWe-Net) 1111 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,801.88 198,192.51
4. Number of Hours Generator On-line 720.00 5,753.44 196,842.39
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 790,713.00 6,415,559.00 210,095,677.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 2 operated at or near full power for the month except for a planned downpower for a control rod sequence exchange on 9/1/13 to approximately 720 MWe and an unplanned downpower for power suppression testing on 9/28/13 to approximately 700 MWe.

OPERATING DATA REPORT DOCKET: 352 PREPARER NAME: Leonard J. Maioriello UNIT_NME: Limerick Unit 1 PREPARER TELEPHONE: 610 718-3512 RPT_PERIOD: 201307

1. Design Electrical Rating: 1205
2. Maximum Dependable Capacity (MWe-Net) 1099 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 219,372.04
4. Number of Hours Generator On-line 744.00 5,087.00 216,833.76
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 836,756.00 5,894,387.00 233,165,100.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 1 began the month of July 2013 at 100.0% rated thermal power (RTP).

On July 5th at 15:32 hours, reactor power was reduced from 99.9% to 98.1% RTP due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.8% RTP at 22:39 hours.

On July 6th at 16:44 hours, reactor power was reduced from 99.9% to 98.1% RTP due to high condensate temperature caused by high ambient conditions.

On July 7th at 02:34 hours, reactor power was restored to 99.6% RTP.

On July 7th at 15:23 hours, reactor power was reduced from 100.0% to 98.0% RTP due to high condensate temperature caused by high ambient conditions. At 17:54 hours reactor power was further reduced down to 78.5% RTP due to loss of Instrument Air header pressure. Reactor power was restored to 99.5% RTP at 23:28 hours. (IR 1533093)

On July 15th at 17:38 hours, reactor power was reduced from 100.0% to 98.1% RTP due to high condensate temperature caused by high ambient conditions.

On July 16th at 03:20 hours, reactor power was restored to 99.8% RTP.

On July 17th at 15:03 hours, reactor power was reduced from 99.9% to 92.1% RTP due to high condensate temperature caused by high ambient conditions.

On July 20th at 01:25 hours, reactor power was restored to 99.5% RTP. Reactor power was reduced from 99.9% to 97.6% RTP at 13:49 hours due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.6% RTP at 23:51 hours.

Unit 1 ended the month of July 2013 at 100.0% RTP.

OPERATING DATA REPORT DOCKET: 352 PREPARER NAME: Leonard J. Maioriello UNIT_NME: Limerick Unit 1 PREPARER TELEPHONE: 610-718-3512 RPT_PERIOD: 201308

1. Design Electrical Rating: 1205
2. Maximum Dependable Capacity (MWe-Net) 1099 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 220,116.04
4. Number of Hours Generator On-line 744.00 5,831.00 217,577.76
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 848,376.00 6,742,763.00 234,013,476.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 1 began the month of August 2013 at 100.0% rated thermal power (RTP).

There were no reductions in power during the month of August.

Unit 1 ended the month of August 2013 at 100.0% RTP.

OPERATING DATA REPORT DOCKET: 352 PREPARER NAME: Leonard J. Maioriello UNIT_NME: Limerick Unit 1 PREPARER TELEPHONE: 610-718-3512 RPT_PERIOD: 201309

1. Design Electrical Rating: 1205
2. Maximum Dependable Capacity (MWe-Net) 1099 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 220,836.04
4. Number of Hours Generator On-line 720.00 6,551.00 218,297.76
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 824,036.00 7,566,799.00 234,837,512.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 1 began the month of September 2013 at 100.0% rated thermal power (RTP).

On September 11th at 12:26 hours, reactor power was reduced from 99.8% to 96.8% RTP due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.6% RTP at 20:11 hours.

On September 12th at 00:29 hours, reactor power was reduced from 100.0% to 95.0% RTP due to a planned load drop for online HCU testing.

Reactor power was restored to 99.6% RTP at 01:36 hours.

On September 15th at 01:00 hours, reactor power was reduced from 100.0% to 72.2% RTP due to a planned load drop to perform turbine valve testing.

On September 16th at 02:05 hours, reactor power was restored to 99.8% RTP.

On September 29th at 08:01 hours, reactor power was reduced from 100.0% to 76.4% RTP due to a planned load drop to perform control rod scram time testing. Reactor power was restored to 99.6% RTP at 12:23 hours.

Unit 1 ended the month of September 2013 at 99.9% RTP.

OPERATING DATA REPORT DOCKET: 353 PREPARER NAME: Leonard J. Maioriello UNIT_NME: Limerick Unit 2 PREPARER TELEPHONE: 610 718-3512 RPT_PERIOD: 201307

1. Design Electrical Rating: 1205
2. Maximum Dependable Capacity (MWe-Net) 1108 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,522.70 194,880.19
4. Number of Hours Generator On-line 744.00 4,469.81 192,493.11
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 847,594.00 5,141,350.00 211,839,191.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 2 began the month of June 2013 at 100% of rated thermal power (RTP).

On July 7th at 18:41 hours, reactor power was reduced from 100.0% to 98.4% RTP due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.6% RTP at 20:13 hours.

On July 15th at 18:50 hours, reactor power was reduced from 99.8% to 96.6% RTP due to high condensate temperature caused by high ambient conditions.

On July 16th at 00:37 hours reactor power was restored to 99.6% RTP.

On July 18th at 11:57 hours, reactor power was reduced from 100.0% to 96.4% RTP due to high condensate temperature caused by high ambient conditions.

On July 19th at 04:38 hours, reactor power was restored to 99.6% RTP. Reactor power was reduced from 100.0% to 92.9% RTP at 11:18 hours due to high condensate temperature caused by high ambient conditions.

On July 20th at 00:36 hours, reactor power was restored to 99.5% RTP. Reactor power was reduced from 99.8% to 96.8% RTP at 13:44 hours due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.7% RTP at 22:04 hours.

Unit 2 ended the month of July 2013 at 100.0% RTP.

OPERATING DATA REPORT DOCKET: 353 PREPARER NAME: Leonard J. Maioriello UNIT_NME: Limerick Unit 2 PREPARER TELEPHONE: 610-718-3512 RPT_PERIOD: 201308

1. Design Electrical Rating: 1205
2. Maximum Dependable Capacity (MWe-Net) 1108 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,266.70 195,624.19
4. Number of Hours Generator On-line 744.00 5,213.81 193,237.11
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 856,717.00 5,998,067.00 212,695,908.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 2 began the month of August 2013 at 100% of rated thermal power (RTP).

There were no reductions in power during the month of August.

Unit 2 ended the month of August 2013 at 99.9% RTP.

OPERATING DATA REPORT DOCKET: 353 PREPARER NAME: Leonard J. Maioriello UNIT_NME: Limerick Unit 2 PREPARER TELEPHONE: 610-718-3512 RPT_PERIOD: 201309

1. Design Electrical Rating: 1205
2. Maximum Dependable Capacity (MWe-Net) 1108 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,986.70 196,344.19
4. Number of Hours Generator On-line 720.00 5,933.81 193,957.11
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 831,404.00 6,829,471.00 213,527,312.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 2 began the month of September 2013 at 99.9% of rated thermal power (RTP).

On September 7th at 14:23 hours, reactor power was reduced from 99.9% to 99.2% RTP due to an unplanned double notching of a control rod.

Reactor power was restored to 99.7% RTP at 16:40 hours.

On September 8th at 10:30 hours, reactor power was reduced from 99.8% to 81.5% RTP due to a planned load drop to perform turbine valve testing.

On September 9th at 03:30 hours, reactor power was restored to 99.5% RTP.

On September 11th at 12:05 hours, reactor power was reduced from 99.9% to 95.4% RTP due to high condensate temperature caused by high ambient conditions. Reactor power was restored to 99.7% RTP at 21:04 hours.

On September 16th at 03:59 hours, reactor power was reduced from 99.9% to 95.1% RTP due to a planned load drop to repair a feedwater heater instrument valve. Reactor power was restored to 99.6% RTP at 04:45 hours. Reactor power was again reduced from 100.0% to 93.8%

RTP at 20:00 hours in order to place the feedwater heater back into service. Reactor power was restored to 99.8% RTP at 20:50 hours.

Unit 2 ended the month of September 2013 at 99.9% RTP.

OPERATING DATA REPORT DOCKET: 369 PREPARER NAME: Kay Crane UNIT_NME: McGuire Unit 1 PREPARER TELEPHONE: (980) 875-4306 RPT_PERIOD: 201307

1. Design Electrical Rating: 1166
2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,151.52 227,774.78
4. Number of Hours Generator On-line 744.00 4,113.33 226,214.20
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 854,435.00 4,621,870.00 246,663,865.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 369 PREPARER NAME: Kay Crane UNIT_NME: McGuire Unit 1 PREPARER TELEPHONE: (980) 875-4306 RPT_PERIOD: 201308

1. Design Electrical Rating: 1166
2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,895.52 228,518.78
4. Number of Hours Generator On-line 744.00 4,857.33 226,958.20
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 852,685.00 5,474,555.00 247,516,550.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 369 PREPARER NAME: Kay Crane UNIT_NME: McGuire Unit 1 PREPARER TELEPHONE: (980) 875-4306 RPT_PERIOD: 201309

1. Design Electrical Rating: 1166
2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,615.52 229,238.78
4. Number of Hours Generator On-line 720.00 5,577.33 227,678.20
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 823,724.00 6,298,279.00 248,340,274.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 370 PREPARER NAME: Kay Crane UNIT_NME: McGuire Unit 2 PREPARER TELEPHONE: (980) 875-4306 RPT_PERIOD: 201307

1. Design Electrical Rating: 1170
2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 220,784.38
4. Number of Hours Generator On-line 744.00 5,087.00 219,148.04
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 856,552.00 5,847,496.00 244,561,128.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 370 PREPARER NAME: Kay Crane UNIT_NME: McGuire Unit 2 PREPARER TELEPHONE: (980) 875-4306 RPT_PERIOD: 201308

1. Design Electrical Rating: 1170
2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 221,528.38
4. Number of Hours Generator On-line 744.00 5,831.00 219,892.04
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 854,028.00 6,701,524.00 245,415,156.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 370 PREPARER NAME: Kay Crane UNIT_NME: McGuire Unit 2 PREPARER TELEPHONE: (980) 875-4306 RPT_PERIOD: 201309

1. Design Electrical Rating: 1170
2. Maximum Dependable Capacity (MWe-Net) 1129 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 222,248.38
4. Number of Hours Generator On-line 720.00 6,551.00 220,612.04
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 825,544.00 7,527,068.00 246,240,700.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 336 PREPARER NAME: Stephen Claffey UNIT_NME: Millstone Unit 2 PREPARER TELEPHONE: 860-447-1791 x2456 RPT_PERIOD: 201307

1. Design Electrical Rating: 877.2
2. Maximum Dependable Capacity (MWe-Net) 869.5 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 234,445.08
4. Number of Hours Generator On-line 744.00 5,087.00 228,358.30
5. Reserve Shutdown Hours 0.00 0.00 468.20
6. Net Electrical energy Generated (MWHrs) 647,403.70 4,453,762.90 191,248,055.90 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Millstone Unit 2 operated at or near 100% power throughout the month of July, 2013.

OPERATING DATA REPORT DOCKET: 336 PREPARER NAME: S. Claffey UNIT_NME: Millstone Unit 2 PREPARER TELEPHONE: 860-447-1791 x2456 RPT_PERIOD: 201308

1. Design Electrical Rating: 877.2
2. Maximum Dependable Capacity (MWe-Net) 869.5 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 235,189.08
4. Number of Hours Generator On-line 744.00 5,831.00 229,102.30
5. Reserve Shutdown Hours 0.00 0.00 468.20
6. Net Electrical energy Generated (MWHrs) 645,986.00 5,099,748.90 191,894,041.90 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Millstone Unit 2 operated at or near 100% power throughout the month of August, 2013.

OPERATING DATA REPORT DOCKET: 336 PREPARER NAME: S. Claffey UNIT_NME: Millstone Unit 2 PREPARER TELEPHONE: 860-447-1791 x2456 RPT_PERIOD: 201309

1. Design Electrical Rating: 877.2
2. Maximum Dependable Capacity (MWe-Net) 869.5 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 235,909.08
4. Number of Hours Generator On-line 720.00 6,551.00 229,822.30
5. Reserve Shutdown Hours 0.00 0.00 468.20
6. Net Electrical energy Generated (MWHrs) 624,487.80 5,724,236.70 192,518,529.70 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Millstone Unit 2 operated at or near 100% power from the beginning of the month until September 21, 2013. At 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> on September 21, 2013, the unit commenced a load reduction to approximately 90% power for Main Turbine Control Valve operability testing. At 1243 hours0.0144 days <br />0.345 hours <br />0.00206 weeks <br />4.729615e-4 months <br /> on September 21, 2013, commenced a power ascension and returned to 100% power at 1520 hours0.0176 days <br />0.422 hours <br />0.00251 weeks <br />5.7836e-4 months <br /> on September 21, 2013. Millstone Unit 2 operated at or near 100% power for the remainder of the month.

OPERATING DATA REPORT DOCKET: 423 PREPARER NAME: K. Cook UNIT_NME: Millstone Unit 3 PREPARER TELEPHONE: 860-447-1791X6572 RPT_PERIOD: 201307

1. Design Electrical Rating: 1229
2. Maximum Dependable Capacity (MWe-Net) 1210 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,275.23 188,036.56
4. Number of Hours Generator On-line 744.00 4,241.12 185,949.24
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 910,774.20 5,199,822.80 210,421,741.34 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Millstone Unit 3 operated at or near 100% power throughout the month of July, 2013.

OPERATING DATA REPORT DOCKET: 423 PREPARER NAME: K. Cook UNIT_NME: Millstone Unit 3 PREPARER TELEPHONE: 860-447-1791X6572 RPT_PERIOD: 201308

1. Design Electrical Rating: 1229
2. Maximum Dependable Capacity (MWe-Net) 1210 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 657.05 4,932.28 188,693.61
4. Number of Hours Generator On-line 632.78 4,873.90 186,582.02
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 753,567.10 5,953,389.90 211,175,308.44 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2013- 8/9/2013 F 111.22 A 3 Power to main feedwater pump recirculation valve loops has been temporarily moved from load center 32L to load center 32A.

SUMMARY

Millstone Unit 3 operated at or near 100% power through the month of August until August 9, 2013 at 2119 hours0.0245 days <br />0.589 hours <br />0.0035 weeks <br />8.062795e-4 months <br /> when the plant experienced an automatic reactor trip due to steam generator "C" low water levels caused by loss of a non-vital load center. After investigations were completed, the reactor was taken critical at 1216 hours0.0141 days <br />0.338 hours <br />0.00201 weeks <br />4.62688e-4 months <br /> on August 13, 2013. The unit phased to the grid at 1232 hours0.0143 days <br />0.342 hours <br />0.00204 weeks <br />4.68776e-4 months <br /> on August 14, 2013. The plant reached 100% power at 0810 hours0.00938 days <br />0.225 hours <br />0.00134 weeks <br />3.08205e-4 months <br /> on August 16, 2013. The unit operated at or near 100% power throughout the rest of August 2013.

OPERATING DATA REPORT DOCKET: 423 PREPARER NAME: K. Cook UNIT_NME: Millstone Unit 3 PREPARER TELEPHONE: 860-447-1791X6572 RPT_PERIOD: 201309

1. Design Electrical Rating: 1229
2. Maximum Dependable Capacity (MWe-Net) 1210 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,652.28 189,413.61
4. Number of Hours Generator On-line 720.00 5,593.90 187,302.02
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 879,854.70 6,833,244.60 212,055,163.14 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Millstone Unit 3 operated at or near 100% power throughout the month of September, 2013.

OPERATING DATA REPORT DOCKET: 263 PREPARER NAME: Kevin Austin UNIT_NME: Monticello Unit 1 PREPARER TELEPHONE: 763-271-5875 RPT_PERIOD: 201307

1. Design Electrical Rating: 600
2. Maximum Dependable Capacity (MWe-Net) 578.1 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 362.77 1,805.39 310,874.23
4. Number of Hours Generator On-line 306.35 1,746.50 306,663.86
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 71,069.00 895,635.00 162,394,979.30 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 3/2/2013 S 437.65 C 4 RFO-26

SUMMARY

Reactor startup from RFO-26 commenced on 7/16/2013. There was one forced downpower from 7/23 to 7/26 during the startup due to feedwater control system oscillations. (AR 1391178)

OPERATING DATA REPORT DOCKET: 263 PREPARER NAME: Kevin Austin UNIT_NME: Monticello Unit 1 PREPARER TELEPHONE: 763-271-5875 RPT_PERIOD: 201308

1. Design Electrical Rating: 600
2. Maximum Dependable Capacity (MWe-Net) 578.1 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 2,549.39 311,618.23
4. Number of Hours Generator On-line 744.00 2,490.50 307,407.86
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 412,756.00 1,308,391.00 162,807,735.30 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Reactor startup from RFO-26 continued and 100% power was reached on 8/3. There was one planned downpower on 8/24 for quarterly turbine valve testing and control rod timing, and one forced downpower from 8/27 to 8/30 due to an automatic runback on #12 recirc flow control.

OPERATING DATA REPORT DOCKET: 263 PREPARER NAME: Kevin Austin UNIT_NME: Monticello Unit 1 PREPARER TELEPHONE: 763-271-5875 RPT_PERIOD: 201309

1. Design Electrical Rating: 600
2. Maximum Dependable Capacity (MWe-Net) 578.1 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 3,269.39 312,338.23
4. Number of Hours Generator On-line 720.00 3,210.50 308,127.86
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 408,379.00 1,716,770.00 163,216,114.30 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

There was one forced downpower from 9/1 to 9/11 due to an automatic runback on #11 recirc flow control.

OPERATING DATA REPORT DOCKET: 220 PREPARER NAME: Yvette Herrmann UNIT_NME: Nine Mile Point Unit 1 PREPARER TELEPHONE: 315-349-4501 RPT_PERIOD: 201307

1. Design Electrical Rating: 613
2. Maximum Dependable Capacity (MWe-Net) 565 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 691.87 4,330.30 291,425.11
4. Number of Hours Generator On-line 678.55 4,260.20 286,280.48
5. Reserve Shutdown Hours 0.00 0.00 20.40
6. Net Electrical energy Generated (MWHrs) 397,414.81 2,608,621.14 163,576,328.56 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1P130 7/8/2013 S 65.45 B 1 Planned per INPO/NRC, Unplanned per WANO 1

SUMMARY

Outage due to Drywell leakage was Unplanned per WANO and Planned per INPO/NRC.

OPERATING DATA REPORT DOCKET: 220 PREPARER NAME: Yvette Herrmann UNIT_NME: Nine Mile Point Unit 1 PREPARER TELEPHONE: 315-349-4501 RPT_PERIOD: 201308

1. Design Electrical Rating: 613
2. Maximum Dependable Capacity (MWe-Net) 565 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,074.30 292,169.11
4. Number of Hours Generator On-line 744.00 5,004.20 287,024.48
5. Reserve Shutdown Hours 0.00 0.00 20.40
6. Net Electrical energy Generated (MWHrs) 448,964.16 3,057,585.30 164,025,292.72 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

There were no unplanned losses in August 2013.

OPERATING DATA REPORT DOCKET: 220 PREPARER NAME: Yvette Herrmann UNIT_NME: Nine Mile Point Unit 1 PREPARER TELEPHONE: 315-349-4501 RPT_PERIOD: 201309

1. Design Electrical Rating: 613
2. Maximum Dependable Capacity (MWe-Net) 565 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,794.30 292,889.11
4. Number of Hours Generator On-line 720.00 5,724.20 287,744.48
5. Reserve Shutdown Hours 0.00 0.00 20.40
6. Net Electrical energy Generated (MWHrs) 438,586.99 3,496,172.29 164,463,879.71 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unplanned Energy Loss due to Trip of MG-131 on 9/20/2013.

OPERATING DATA REPORT DOCKET: 410 PREPARER NAME: Yvette Herrmann UNIT_NME: Nine Mile Point Unit 2 PREPARER TELEPHONE: 315-349-4501 RPT_PERIOD: 201307

1. Design Electrical Rating: 1299.9
2. Maximum Dependable Capacity (MWe-Net) 1276.8 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 190,054.96
4. Number of Hours Generator On-line 744.00 5,087.00 186,661.02
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 942,769.73 6,537,099.77 203,525,206.21 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

There were no unplanned energy losses in the month of July 2013.

OPERATING DATA REPORT DOCKET: 410 PREPARER NAME: Yvette Herrmann UNIT_NME: Nine Mile Point Unit 2 PREPARER TELEPHONE: 315-349-4501 RPT_PERIOD: 201308

1. Design Electrical Rating: 1299.9
2. Maximum Dependable Capacity (MWe-Net) 1276.8 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 190,798.96
4. Number of Hours Generator On-line 744.00 5,831.00 187,405.02
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 946,127.28 7,483,227.05 204,471,333.49 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

There were no losses in August 2013.

OPERATING DATA REPORT DOCKET: 410 PREPARER NAME: Yvette Herrmann UNIT_NME: Nine Mile Point Unit 2 PREPARER TELEPHONE: 315-349-4501 RPT_PERIOD: 201309

1. Design Electrical Rating: 1299.9
2. Maximum Dependable Capacity (MWe-Net) 1276.8 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 191,518.96
4. Number of Hours Generator On-line 720.00 6,551.00 188,125.02
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 916,722.05 8,399,949.10 205,388,055.54 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

There were no unplanned power changes in September 2013.

OPERATING DATA REPORT DOCKET: 338 PREPARER NAME: W.C.BEASLEY UNIT_NME: North Anna Unit 1 PREPARER TELEPHONE: 540-894-2520 RPT_PERIOD: 201307

1. Design Electrical Rating: 973
2. Maximum Dependable Capacity (MWe-Net) 943 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 258,880.17
4. Number of Hours Generator On-line 744.00 5,087.00 255,144.86
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 708,482.16 4,950,912.89 223,806,109.19 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Began the Month @ 100% Power, 1007 MWe. On 7-9-13 @ 0937, ramped down approx 3% IAW 1-PT-13.4 (MTC Test). On 7-9-13 @ 1001, ramped unit up 3%, IAW 1-PT-13.4 (MTC Test). Ended the Month @ 100% Power 1004 MWe.

OPERATING DATA REPORT DOCKET: 338 PREPARER NAME: W.C.Beasley UNIT_NME: North Anna Unit 1 PREPARER TELEPHONE: 540-894-2520 RPT_PERIOD: 201308

1. Design Electrical Rating: 973
2. Maximum Dependable Capacity (MWe-Net) 943 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 259,624.17
4. Number of Hours Generator On-line 744.00 5,831.00 255,888.86
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 711,086.52 5,661,999.41 224,517,195.71 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Began the Month @ 100% Power, 1004 MWe. Ended the Month @ 100% Power, 1008 MWe.

OPERATING DATA REPORT DOCKET: 338 PREPARER NAME: W.C.Beasley UNIT_NME: North Anna Unit 1 PREPARER TELEPHONE: 540-894-2520 RPT_PERIOD: 201309

1. Design Electrical Rating: 973
2. Maximum Dependable Capacity (MWe-Net) 943 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 169.52 6,000.52 259,793.69
4. Number of Hours Generator On-line 168.45 5,999.45 256,057.31
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 158,413.72 5,820,413.13 224,675,609.43 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments N1- 9/8/2013 S 551.55 C 1 Suutdown for scheduled refueling outage.

2013-001

SUMMARY

Began the Month @ 100% Power, 1008 MWe. On 9-7-13 @ 1933, commence rampdown for scheduled refueling outage. On 9-8-13 @ 0027, unit off line. Ended the Month in Mode 6.

OPERATING DATA REPORT DOCKET: 339 PREPARER NAME: W.C.BEASLEY UNIT_NME: North Anna Unit 2 PREPARER TELEPHONE: 540-894-2502 RPT_PERIOD: 201307

1. Design Electrical Rating: 973
2. Maximum Dependable Capacity (MWe-Net) 943 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,002.06 246,182.61
4. Number of Hours Generator On-line 744.00 3,969.07 244,369.89
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 705,815.46 3,774,776.52 216,148,900.65 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Began the Month @ 100% Power, 1004 MWe. Ended the Month @ 100% Power, 1001 MWe.

OPERATING DATA REPORT DOCKET: 339 PREPARER NAME: W.C.Beasley UNIT_NME: North Anna Unit 2 PREPARER TELEPHONE: 540-894-2520 RPT_PERIOD: 201308

1. Design Electrical Rating: 973
2. Maximum Dependable Capacity (MWe-Net) 943 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,746.06 246,926.61
4. Number of Hours Generator On-line 744.00 4,713.07 245,113.89
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 709,210.24 4,483,986.76 216,858,110.89 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Began the Month @ 100% Power, 1001 MWe. Ended the Month @ 100% Power, 1004 MWe.

OPERATING DATA REPORT DOCKET: 339 PREPARER NAME: W.C.Beasley UNIT_NME: North Anna Unit 2 PREPARER TELEPHONE: 540-894-2520 RPT_PERIOD: 201309

1. Design Electrical Rating: 973
2. Maximum Dependable Capacity (MWe-Net) 943 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,466.06 247,646.61
4. Number of Hours Generator On-line 720.00 5,433.07 245,833.89
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 692,687.63 5,176,674.39 217,550,798.52 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Began the Month @ 100% Power, 1004 MWe. Ended the Month @ 100% Power, 1021 MWe.

OPERATING DATA REPORT DOCKET: 269 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 1 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201307

1. Design Electrical Rating: 886
2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 285,811.98
4. Number of Hours Generator On-line 744.00 5,087.00 281,788.17
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 636,016.00 4,385,245.00 232,211,085.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 269 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 1 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201308

1. Design Electrical Rating: 886
2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 286,555.98
4. Number of Hours Generator On-line 744.00 5,831.00 282,532.17
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 631,910.00 5,017,155.00 232,842,995.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 269 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 1 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201309

1. Design Electrical Rating: 886
2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 287,275.98
4. Number of Hours Generator On-line 720.00 6,551.00 283,252.17
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 610,386.00 5,627,541.00 233,453,381.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 270 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 2 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201307

1. Design Electrical Rating: 886
2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 287,271.45
4. Number of Hours Generator On-line 744.00 5,087.00 284,165.32
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 637,002.00 4,405,991.00 234,338,910.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 270 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 2 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201308

1. Design Electrical Rating: 886
2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 288,015.45
4. Number of Hours Generator On-line 744.00 5,831.00 284,909.32
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 633,464.00 5,039,455.00 234,972,374.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 270 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 2 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201309

1. Design Electrical Rating: 886
2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 288,735.45
4. Number of Hours Generator On-line 720.00 6,551.00 285,629.32
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 606,493.00 5,645,948.00 235,578,867.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 287 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 3 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201307

1. Design Electrical Rating: 886
2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 279,425.95
4. Number of Hours Generator On-line 744.00 5,087.00 276,213.16
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 645,198.00 4,454,491.00 231,173,902.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 287 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 3 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201308

1. Design Electrical Rating: 886
2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 280,169.95
4. Number of Hours Generator On-line 744.00 5,831.00 276,957.16
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 640,950.00 5,095,441.00 231,814,852.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 287 PREPARER NAME: Judy Smith UNIT_NME: Oconee Unit 3 PREPARER TELEPHONE: 864-873-4309 RPT_PERIOD: 201309

1. Design Electrical Rating: 886
2. Maximum Dependable Capacity (MWe-Net) 846 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 280,889.95
4. Number of Hours Generator On-line 720.00 6,551.00 277,677.16
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 617,812.00 5,713,253.00 232,432,664.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 219 PREPARER NAME: C. Lefler Jr.

UNIT_NME: Oyster Creek Unit 1 PREPARER TELEPHONE: 609-971-2158 RPT_PERIOD: 201307

1. Design Electrical Rating: 650
2. Maximum Dependable Capacity (MWe-Net) 619 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 297,319.96
4. Number of Hours Generator On-line 744.00 5,087.00 292,292.99
5. Reserve Shutdown Hours 0.00 0.00 918.20
6. Net Electrical energy Generated (MWHrs) 444,287.00 3,139,284.00 169,742,397.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unplanned loss generation for July was 0 MWh. The FLR was 0, which is below the Site goal of 0.31.

The Oyster Creek Planned Energy losses for the month of July are:

1) MC Backwash - 223.81 MWh - 7/2, 7/8-11, 7/13-18, 7/21, 7/24-30
2) Environmental Derate - 2,447.49 MWh - 7/3-7, 7/18-22 Assuming 0 FLR, this PI will be in goal in November 2013.

OPERATING DATA REPORT DOCKET: 219 PREPARER NAME: L. Velez UNIT_NME: Oyster Creek Unit 1 PREPARER TELEPHONE: 6099714410 RPT_PERIOD: 201308

1. Design Electrical Rating: 650
2. Maximum Dependable Capacity (MWe-Net) 619 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 298,063.96
4. Number of Hours Generator On-line 744.00 5,831.00 293,036.99
5. Reserve Shutdown Hours 0.00 0.00 918.20
6. Net Electrical energy Generated (MWHrs) 453,796.00 3,593,080.00 170,196,193.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unplanned loss generation for August was 0 MWh. The FLR was 0..

The Oyster Creek Planned Energy losses for the month of August are:

1) MC Backwash - 222.8 MWh - 8/1, 8/4, 8/6, 8/8, 8/10, 8/13, 8/16, 8/20, 8/25 and 8/30.

OPERATING DATA REPORT DOCKET: 219 PREPARER NAME: L. Velez UNIT_NME: Oyster Creek Unit 1 PREPARER TELEPHONE: 609-971-4410 RPT_PERIOD: 201309

1. Design Electrical Rating: 650
2. Maximum Dependable Capacity (MWe-Net) 619 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 713.95 6,544.95 298,777.91
4. Number of Hours Generator On-line 706.83 6,537.83 293,743.82
5. Reserve Shutdown Hours 0.00 0.00 918.20
6. Net Electrical energy Generated (MWHrs) 431,057.00 4,024,137.00 170,627,250.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1M30 9/30/2013 S 13.17 B 1 Turbine Controls Testing (Speed Load Changer) to 1M30 Outage

SUMMARY

The unplanned loss generation for September was 79.4 MWh, due to 1C3 FWH Normal Drain Valve causing FWH fluctuations, as documented under IR 1554558.

The Oyster Creek Planned Energy losses for the month of September are:

1) Rod for Flow Swap ??? 341.77 MWh ??? 9/1 and 9/2
2) Normal Load Maintenance ??? 34.09 MWh ??? 9/5
3) 1M30 ??? 12,972 MWh ??? 9/29 and 9/30

OPERATING DATA REPORT DOCKET: 255 PREPARER NAME: R. Levack UNIT_NME: Palisades Unit 1 PREPARER TELEPHONE: 269-764-2068 RPT_PERIOD: 201307

1. Design Electrical Rating: 805
2. Maximum Dependable Capacity (MWe-Net) 744 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 3,919.33 251,837.72
4. Number of Hours Generator On-line 744.00 3,893.90 245,653.70
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 586,088.00 3,097,695.14 176,074,721.90 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Palisades operated at full power for the month of July 2013.

OPERATING DATA REPORT DOCKET: 255 PREPARER NAME: Eric Edwards UNIT_NME: Palisades Unit 1 PREPARER TELEPHONE: 269-764-2086 RPT_PERIOD: 201308

1. Design Electrical Rating: 805
2. Maximum Dependable Capacity (MWe-Net) 744 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,663.33 252,581.72
4. Number of Hours Generator On-line 744.00 4,637.90 246,397.70
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 586,334.79 3,684,029.93 176,661,056.69 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Palisades operated at full power for the month of August 2013.

OPERATING DATA REPORT DOCKET: 255 PREPARER NAME: Eric Edwards UNIT_NME: Palisades Unit 1 PREPARER TELEPHONE: 269-764-2086 RPT_PERIOD: 201309

1. Design Electrical Rating: 805
2. Maximum Dependable Capacity (MWe-Net) 744 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,383.33 253,301.72
4. Number of Hours Generator On-line 720.00 5,357.90 247,117.70
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 570,971.26 4,255,001.19 177,232,027.95 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Palisades operated at full power for the month of September 2013.

OPERATING DATA REPORT DOCKET: 528 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 1 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201307

1. Design Electrical Rating: 1333
2. Maximum Dependable Capacity (MWe-Net) 1311 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,402.22 193,525.03
4. Number of Hours Generator On-line 744.00 4,372.03 191,485.11
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 941,363.72 5,671,215.04 233,942,487.99 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit began the month at full power. On July 2nd at 20:26, the unit downpowered to 59% RX power after a 480 V load center fault caused a loss of Main Feedwater Pump B, initiating a reactor power cutback. The unit was returned to full power on July 6th at 02:00. The unit ended the month at full power.

OPERATING DATA REPORT DOCKET: 528 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 1 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201308

1. Design Electrical Rating: 1333
2. Maximum Dependable Capacity (MWe-Net) 1311 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,146.22 194,269.03
4. Number of Hours Generator On-line 744.00 5,116.03 192,229.11
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 972,874.58 6,644,089.62 234,915,362.57 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit began the month and ended the month in Mode 1 with the reactor at full power.

OPERATING DATA REPORT DOCKET: 528 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 1 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201309

1. Design Electrical Rating: 1333
2. Maximum Dependable Capacity (MWe-Net) 1311 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,866.22 194,989.03
4. Number of Hours Generator On-line 720.00 5,836.03 192,949.11
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 944,713.81 7,588,803.43 235,860,076.38 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit began the month and ended the month in Mode 1 with the reactor at full power.

OPERATING DATA REPORT DOCKET: 529 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 2 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201307

1. Design Electrical Rating: 1336
2. Maximum Dependable Capacity (MWe-Net) 1314 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,088.00 196,215.78
4. Number of Hours Generator On-line 744.00 5,088.00 194,295.23
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 978,759.52 6,765,089.30 243,574,251.94 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit began the month and ended the month in Mode 1 with the reactor at full power.

OPERATING DATA REPORT DOCKET: 529 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 2 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201308

1. Design Electrical Rating: 1336
2. Maximum Dependable Capacity (MWe-Net) 1314 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,832.00 196,959.78
4. Number of Hours Generator On-line 744.00 5,832.00 195,039.23
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 982,008.67 7,747,097.97 244,556,260.61 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit began the month and ended the month in Mode 1 with the reactor at full power.

OPERATING DATA REPORT DOCKET: 529 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 2 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201309

1. Design Electrical Rating: 1336
2. Maximum Dependable Capacity (MWe-Net) 1314 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,552.00 197,679.78
4. Number of Hours Generator On-line 720.00 6,552.00 195,759.23
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 952,196.36 8,699,294.33 245,508,456.97 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit began the month and ended the month in Mode 1 with the reactor at full power.

OPERATING DATA REPORT DOCKET: 530 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 3 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201307

1. Design Electrical Rating: 1334
2. Maximum Dependable Capacity (MWe-Net) 1312 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,088.00 191,259.73
4. Number of Hours Generator On-line 744.00 5,088.00 189,501.37
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 972,291.97 6,613,458.63 235,282,099.81 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit began the month and ended the month in Mode 1 with the reactor at full power.

OPERATING DATA REPORT DOCKET: 530 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 3 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201308

1. Design Electrical Rating: 1334
2. Maximum Dependable Capacity (MWe-Net) 1312 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,832.00 192,003.73
4. Number of Hours Generator On-line 744.00 5,832.00 190,245.37
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 975,605.20 7,589,063.83 236,257,705.01 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit began the month and ended the month in Mode 1 with the reactor at full power.

OPERATING DATA REPORT DOCKET: 530 PREPARER NAME: Tom Mock UNIT_NME: Palo Verde Unit 3 PREPARER TELEPHONE: 623-393-2656 RPT_PERIOD: 201309

1. Design Electrical Rating: 1334
2. Maximum Dependable Capacity (MWe-Net) 1312 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,552.00 192,723.73
4. Number of Hours Generator On-line 720.00 6,552.00 190,965.37
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 945,616.41 8,534,680.24 237,203,321.42 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit began the month and ended the month in Mode 1 with the reactor at full power.

OPERATING DATA REPORT DOCKET: 277 PREPARER NAME: Brad Deihl UNIT_NME: Peach Bottom Unit 2 PREPARER TELEPHONE: 717-456-4420 RPT_PERIOD: 201307

1. Design Electrical Rating: 1138
2. Maximum Dependable Capacity (MWe-Net) 1112 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 270,107.94
4. Number of Hours Generator On-line 744.00 5,087.00 265,370.29
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 828,630.90 5,890,056.10 272,959,125.30 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 2 began the month of July at 100% of maximum allowable power (3514 MWth).

There were no load reductions on Unit 2 for the month of July 2013.

Unit 2 ended the month of July at 100% of maximum allowable power (3514 MWth).

OPERATING DATA REPORT DOCKET: 277 PREPARER NAME: Brad Deihl UNIT_NME: Peach Bottom Unit 2 PREPARER TELEPHONE: 717-456-4420 RPT_PERIOD: 201308

1. Design Electrical Rating: 1138
2. Maximum Dependable Capacity (MWe-Net) 1112 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 270,851.94
4. Number of Hours Generator On-line 744.00 5,831.00 266,114.29
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 815,151.00 6,705,207.10 273,774,276.30 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 2 began the month of August at 100% of maximum allowable power (3514 MWth).

On August 30, 2013 at 21:02, Unit 2 commenced a planned load reduction to 60% CTP for Rod Pattern Adjustment, Turbine Testing, and waterbox cleaning. During the downpower, the 2B Recirc Pump tripped. Minimum power of 36.7% was reached on August 30th at 21:59. The unit ended the month at 48.5% power.

Unit 2 ended the month of August at 48.5% of maximum allowable power (3514 MWth).

OPERATING DATA REPORT DOCKET: 277 PREPARER NAME: Brad Deihl UNIT_NME: Peach Bottom Unit 2 PREPARER TELEPHONE: 717-456-4420 RPT_PERIOD: 201309

1. Design Electrical Rating: 1138
2. Maximum Dependable Capacity (MWe-Net) 1112 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 271,571.94
4. Number of Hours Generator On-line 720.00 6,551.00 266,834.29
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 801,512.10 7,506,719.20 274,575,788.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 2 began the month of September at 48.5% of maximum allowable power (3514 MWth) due to the 2B recirc pump trip event.

On September 1, 2013, Unit 2 continued the planned load reduction to 60% CTP for Rod Pattern Adjustment, Turbine Testing, waterbox cleaning, and recovery from the the 2B Recirc Pump trip. Minimum power of 32.7% was reached on September 2nd at 22:39. The unit was returned to full power on September 2, 2013 at 10:32.

On September 2, 2013 at 23:02, Unit 2 commenced a planned load reduction to 79.7% CTP for a follow up rod pattern adjustment. Minimum power was reached on September 2nd at 23:30. The unit was returned to 100%% power on September 3, 2013 at 06:02.

Unit 2 ended the month of September at 100% of maximum allowable power (3514 MWth).

OPERATING DATA REPORT DOCKET: 278 PREPARER NAME: Brad Deihl UNIT_NME: Peach Bottom Unit 3 PREPARER TELEPHONE: 717-456-4420 RPT_PERIOD: 201307

1. Design Electrical Rating: 1179
2. Maximum Dependable Capacity (MWe-Net) 1095 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 269,513.28
4. Number of Hours Generator On-line 744.00 5,087.00 265,262.72
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 808,844.90 5,853,314.10 271,990,373.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 3 began the month of July at 99.97% of maximum allowable power (3513 MWth).

On July 5, 2013 at 23:02, Unit 3 commenced a planned load reduction to 81.4% CTP to remove the 5A and 5C Feed Water Heater from service.

Min power was reached on July 6th at 01:01. The unit was returned to 99.97% power on July 6, 2013 at 04:18.

On July 26, 2013 at 23:01, Unit 3 commenced a planned load reduction to 94.4% CTP to remove the 5B Feed Water Heater from service. Min power was reached on July 26th at 23:08. The unit was returned to 99.97% power on July 27, 2013 at 01:26.

Unit 3 coasted to 99.0% CTP following the removal of the final 5th stage feed water heater.

Unit 3 ended the month of July at 99.0% of maximum allowable power (3513 MWth). Unit 3 is limited to a maximum allowable power level of 3513 MWth (99.97%) due to Leading Edge Flow Meter (LEFM) imposed restrictions.

OPERATING DATA REPORT DOCKET: 278 PREPARER NAME: Brad Deihl UNIT_NME: Peach Bottom Unit 3 PREPARER TELEPHONE: 717-456-4420 RPT_PERIOD: 201308

1. Design Electrical Rating: 1179
2. Maximum Dependable Capacity (MWe-Net) 1095 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 270,257.28
4. Number of Hours Generator On-line 744.00 5,831.00 266,006.72
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 752,754.00 6,606,068.10 272,743,127.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 3 began the month of August at 99.07% of maximum allowable power (3513 MWth).

On August 2, 2013 at 23:03, Unit 3 commenced a planned load reduction to 93.6% CTP to remove the 4B and 4C Feed Water Heater from service. Minimum power was reached on August 3rd at 01:47. The unit was returned to 98.1% power on August 3, 2013 at 09:02.

Unit 3 coasted to 88.7% CTP following the removal of the 4th stage feed water heaters.

Unit 3 ended the month of August at 88.7% of maximum allowable power (3513 MWth). Unit 3 is limited to a maximum allowable power level of 3513 MWth (99.97%) due to Leading Edge Flow Meter (LEFM) imposed restrictions.

OPERATING DATA REPORT DOCKET: 278 PREPARER NAME: Brad Deihl UNIT_NME: Peach Bottom Unit 3 PREPARER TELEPHONE: 717-456-4420 RPT_PERIOD: 201309

1. Design Electrical Rating: 1179
2. Maximum Dependable Capacity (MWe-Net) 1095 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 193.57 6,024.57 270,450.85
4. Number of Hours Generator On-line 192.03 6,023.03 266,198.75
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 168,170.10 6,774,238.20 272,911,297.10 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments P3R19 9/9/2013 S 527.97 C 1 On September 8, 2013 at 15:02, Unit 3 commenced a planned power reduction for P3R19 refueling outage. At 00:02 on September 9th, the Unit 3 generator was tripped. At 01:34 on September 9, 2013 the Unit 3 reactor was manually scrammed.

SUMMARY

Unit 3 began the month of September at 88.7% of maximum allowable power (3513 MWth) due to EOC coastdown.

On September 8, 2013 at 15:02, Unit 3 commenced a planned power reduction for P3R19 refueling outage. At 00:02 on September 9th, the Unit 3 generator was tripped. At 01:34 on September 9, 2013 the Unit 3 reactor was manually scrammed.

Unit 3 ended the month of September at 0% of maximum allowable power (3513 MWth). Unit 3 is limited to a maximum allowable power level of 3513 MWth (99.97%) due to Leading Edge Flow Meter (LEFM) imposed restrictions.

OPERATING DATA REPORT DOCKET: 440 PREPARER NAME: T. Phelps UNIT_NME: Perry Unit 1 PREPARER TELEPHONE: 440-280-7660 RPT_PERIOD: 201307

1. Design Electrical Rating: 1268
2. Maximum Dependable Capacity (MWe-Net) 1240 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 3,562.21 185,781.09
4. Number of Hours Generator On-line 744.00 3,371.12 182,035.21
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 928,048.10 3,965,388.60 213,503,198.10 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The Perry Nuclear Power Plant ran the entire month of July 2013.

OPERATING DATA REPORT DOCKET: 440 PREPARER NAME: T. Phelps UNIT_NME: Perry Unit 1 PREPARER TELEPHONE: 440-280-7660 RPT_PERIOD: 201308

1. Design Electrical Rating: 1268
2. Maximum Dependable Capacity (MWe-Net) 1240 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,306.21 186,525.09
4. Number of Hours Generator On-line 744.00 4,115.12 182,779.21
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 916,126.30 4,881,514.90 214,419,324.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The Perry Plant ran the entire month of August, 2013.

OPERATING DATA REPORT DOCKET: 440 PREPARER NAME: T. Phelps UNIT_NME: Perry Unit 1 PREPARER TELEPHONE: 440-280-7660 RPT_PERIOD: 201309

1. Design Electrical Rating: 1268
2. Maximum Dependable Capacity (MWe-Net) 1240 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 679.63 4,985.84 187,204.72
4. Number of Hours Generator On-line 657.47 4,772.59 183,436.68
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 777,536.50 5,659,051.40 215,196,860.90 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 4 9/6/2013 S 62.53 A 1 Replaced a non-safety related 120 VAC regulating transformer which services the digital feedwater control logic. The transformer was showing signs of degradation beginning on August 30, 2013.

SUMMARY

The Perry Nuclear Power Plant was on line for 657.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> during the month of September 2013. The plant performed a planned outage to troubleshoot and repair the high voltage on panel V-1-A . The unit returned to 100% on 9/13/13 @0349. The plant remained on line through the month's end.

OPERATING DATA REPORT DOCKET: 293 PREPARER NAME: Brent Lyons UNIT_NME: Pilgrim Unit 1 PREPARER TELEPHONE: 508-830-8270 RPT_PERIOD: 201307

1. Design Electrical Rating: 690
2. Maximum Dependable Capacity (MWe-Net) 684.7 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 3,788.02 269,500.96
4. Number of Hours Generator On-line 744.00 3,627.37 266,778.95
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 499,579.00 2,306,909.00 164,466,482.53 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

At the beginning of the month, reactor power was 100%. On July 17th at 12:30, a power reduction commenced due to TS sea water inlet temp limitations (75F). Power was returned to 100% on July 18th at 02:08. The duration of the downpower was 13 hrs and 37 mins. The minimum power level achieved was 84.60%. On July 18th at 15:35, a power reduction commenced due to sea water inlet temp challenging the TS limit of 75F. Power was returned to 100% on July 18th at 20:41. The duration of the downpower was 5 hrs and 6 mins. The minimum power level achieved was 92.70%. On July 25th at 23:51, a power reduction commenced due to sea water inlet temp challenging the TS limit of 75F. Power was returned to 100% on July 26th at 07:58. The duration of the downpower was 8 hrs and 7 mins. The minimum power level achieved was 89.90%. The reactor remained at full power throughout the remainder of the month.

OPERATING DATA REPORT DOCKET: 293 PREPARER NAME: Brent Lyons UNIT_NME: Pilgrim Unit 1 PREPARER TELEPHONE: 508-830-8270 RPT_PERIOD: 201308

1. Design Electrical Rating: 690
2. Maximum Dependable Capacity (MWe-Net) 684.7 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 657.88 4,445.90 270,158.84
4. Number of Hours Generator On-line 642.13 4,269.50 267,421.08
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 379,986.00 2,686,895.00 164,846,468.53 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 4 8/22/2013 F 101.87 A 2 On August 22, 2013 at 07:55, operators manually scrammed the reactor in response to a trip of all three (3) reactor feed pumps. This trip was the result of Instrument power panel Y1 breaker 24 tripping open on a ground fault condition. The power from this breaker supplies the seal cooling water flow switches to all reactor feed pumps. By design, a loss of cooling water flow or a loss of power to the flow switches will generate a signal to the trip the associated reactor feed pump after a sixty (60) second time delay. The reactor was made critical on August 25, 2013 at 22:02. The main generator was synchronized to the grid on August 26, 2013 at 13:47.

SUMMARY

At the beginning of the month, reactor power was 100%. On August 22, 2013 at 07:55, operators manually scrammed the reactor in response to a trip of all three (3) reactor feed pumps. This trip was the result of Instrument power panel Y1 breaker 24 tripping open on a ground fault condition.

The power from this breaker supplies the seal cooling water flow switches to all three reactor feed pumps. By design, a loss of cooling water flow or a loss of power to the flow switches will generate a signal to the trip the associated reactor feed pump after a sixty (60) second time delay. The reactor was made critical on August 25, 2013 at 22:02. The main generator was synchronized to the grid on August 26, 2013 at 13:47. Reactor power was raised to approximately 75% RCTP on August 28th, 2013 and remained at this level until the end of the month. Power ascension was limited due to the inability to start Reactor Feed Pump 'A'.

OPERATING DATA REPORT DOCKET: 293 PREPARER NAME: Brent Lyons UNIT_NME: Pilgrim Unit 1 PREPARER TELEPHONE: 508-830-8270 RPT_PERIOD: 201309

1. Design Electrical Rating: 690
2. Maximum Dependable Capacity (MWe-Net) 684.7 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 568.42 5,014.32 270,727.26
4. Number of Hours Generator On-line 551.17 4,820.67 267,972.25
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 326,768.00 3,013,663.00 165,173,236.53 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 5 9/8/2013 F 168.83 A 1 On September 8th, 2013 at 14:03, a controlled shutdown commenced to allow repairs of leaks in the condenser bay. At 21:38, all control rods were fully inserted. Repairs in the condenser bay were completed and reactor startup commenced on September 15th, 2013 at 00:00. At 05:13, the reactor was made critical and at 19:27 the main generator was synchronized to the grid. Reactor power achieved approximately 75% on September 17th, 2013 at 07:40. At this time, reactor power was still limited due to RFP 'A'. A temporary modification that routed new cables to RFP 'A' was completed and the pump was placed into service. On September 17th, 2013 at 07:40, power ascension once again commenced and full reactor power was achieved at 13:00.

SUMMARY

At the beginning of the month, reactor power was 75% due to the inability to start Reactor Feed Pump 'A'. On September 8th, 2013 at 14:03, a controlled shutdown commenced to allow repairs of leaks in the condenser bay. At 21:38, all control rods were fully inserted. Repairs in the condenser bay were completed and reactor startup commenced on September 15th, 2013 at 00:00. At 05:13, the reactor was made critical and at 19:27 the main generator was synchronized to the grid. Reactor power achieved approximately 75% on September 17th, 2013 at 07:40. At this time, reactor power was still limited due to RFP 'A'. A temporary modification that routed new cables to RFP 'A' was completed and the pump was placed into service. On September 17th, 2013 at 07:40, power ascension once again commenced and full reactor power was achieved at 13:00.

On September 18th, 2013 at 10:04, a reactor downpower commenced to adjust the control rod pattern. The minimum power achieved during this evolution was 78%. At 14:40, reactor power once again achieved 100%. Reactor power was maintained at 100% throughout the remainder of the month.

OPERATING DATA REPORT DOCKET: 266 PREPARER NAME: Roger Clark UNIT_NME: Point Beach Unit 1 PREPARER TELEPHONE: 920-755-7464 RPT_PERIOD: 201307

1. Design Electrical Rating: 615
2. Maximum Dependable Capacity (MWe-Net) 576 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,368.03 315,362.22
4. Number of Hours Generator On-line 744.00 4,339.62 311,388.74
5. Reserve Shutdown Hours 0.00 0.00 846.90
6. Net Electrical energy Generated (MWHrs) 445,303.30 2,559,039.80 148,553,421.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 266 PREPARER NAME: Roger Clark UNIT_NME: Point Beach Unit 1 PREPARER TELEPHONE: 920-755-7464 RPT_PERIOD: 201308

1. Design Electrical Rating: 615
2. Maximum Dependable Capacity (MWe-Net) 576 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,112.03 316,106.22
4. Number of Hours Generator On-line 712.13 5,051.75 312,100.87
5. Reserve Shutdown Hours 0.00 0.00 846.90
6. Net Electrical energy Generated (MWHrs) 415,805.80 2,974,845.60 148,969,227.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 113 8/19/2013 F 31.87 A 5 Unit 1 main generator was taken offline due to a 1X-01C transformer cooling malfunction. Malfunction was repaired and the unit was placed back online.

SUMMARY

OPERATING DATA REPORT DOCKET: 266 PREPARER NAME: Roger Clark UNIT_NME: Point Beach Unit 1 PREPARER TELEPHONE: 920-755-7464 RPT_PERIOD: 201309

1. Design Electrical Rating: 615
2. Maximum Dependable Capacity (MWe-Net) 576 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,832.03 316,826.22
4. Number of Hours Generator On-line 720.00 5,771.75 312,820.87
5. Reserve Shutdown Hours 0.00 0.00 846.90
6. Net Electrical energy Generated (MWHrs) 427,932.50 3,402,778.10 149,397,159.90 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 301 PREPARER NAME: Roger Clark UNIT_NME: Point Beach Unit 2 PREPARER TELEPHONE: 920-755-7464 RPT_PERIOD: 201307

1. Design Electrical Rating: 615
2. Maximum Dependable Capacity (MWe-Net) 578 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 308,427.80
4. Number of Hours Generator On-line 744.00 5,087.00 304,910.83
5. Reserve Shutdown Hours 0.00 0.00 302.20
6. Net Electrical energy Generated (MWHrs) 444,540.30 3,048,117.30 148,127,427.90 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 301 PREPARER NAME: Roger Clark UNIT_NME: Point Beach Unit 2 PREPARER TELEPHONE: 920-755-7464 RPT_PERIOD: 201308

1. Design Electrical Rating: 615
2. Maximum Dependable Capacity (MWe-Net) 578 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 309,171.80
4. Number of Hours Generator On-line 744.00 5,831.00 305,654.83
5. Reserve Shutdown Hours 0.00 0.00 302.20
6. Net Electrical energy Generated (MWHrs) 434,152.80 3,482,270.10 148,561,580.70 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 301 PREPARER NAME: Roger Clark UNIT_NME: Point Beach Unit 2 PREPARER TELEPHONE: 920-755-7464 RPT_PERIOD: 201309

1. Design Electrical Rating: 615
2. Maximum Dependable Capacity (MWe-Net) 578 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 309,891.80
4. Number of Hours Generator On-line 720.00 6,551.00 306,374.83
5. Reserve Shutdown Hours 0.00 0.00 302.20
6. Net Electrical energy Generated (MWHrs) 427,615.50 3,909,885.60 148,989,196.20 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 282 PREPARER NAME: Thomas Scheibel UNIT_NME: Prairie Island Unit 1 PREPARER TELEPHONE: 651-267-6355 RPT_PERIOD: 201307

1. Design Electrical Rating: 557
2. Maximum Dependable Capacity (MWe-Net) 522.1 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 304,383.84
4. Number of Hours Generator On-line 744.00 5,059.32 301,809.75
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 394,395.00 2,675,846.00 153,134,076.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 1 was base loaded during July 2013.

Unit 1 has a planned 2% down power of 7-22-13, to adjust the level in 12A Feedwater Heater. This was a planned loss of 133.3 MW-hr.

OPERATING DATA REPORT DOCKET: 282 PREPARER NAME: Thomas Scheibel UNIT_NME: Prairie Island Unit 1 PREPARER TELEPHONE: 651-267-6355 RPT_PERIOD: 201308

1. Design Electrical Rating: 557
2. Maximum Dependable Capacity (MWe-Net) 522.1 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 305,127.84
4. Number of Hours Generator On-line 744.00 5,803.32 302,553.75
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 395,147.00 3,070,993.00 153,529,223.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 1 was base loaded during August 2013.

There was a planned 2% down power on Unit 1 to perform SP 1101, 12 MD AFW PP QTLY FLOW & VALVE TEST. This was a planned loss of 28.1 MW-hr.

OPERATING DATA REPORT DOCKET: 282 PREPARER NAME: Thomas Scheibel UNIT_NME: Prairie Island Unit 1 PREPARER TELEPHONE: 651-267-6355 RPT_PERIOD: 201309

1. Design Electrical Rating: 557
2. Maximum Dependable Capacity (MWe-Net) 522.1 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 305,847.84
4. Number of Hours Generator On-line 720.00 6,523.32 303,273.75
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 372,576.00 3,443,569.00 153,901,799.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 1 was base loaded during September 2013.

There was a planned 60% down power on Unit 1 to perform SP 1054 Turbine Valve Testing. This was a planned loss of 11,704.4 MW.hr.

OPERATING DATA REPORT DOCKET: 306 PREPARER NAME: Thomas Scheibel UNIT_NME: Prairie Island Unit 2 PREPARER TELEPHONE: 651-267-6355 RPT_PERIOD: 201307

1. Design Electrical Rating: 557
2. Maximum Dependable Capacity (MWe-Net) 518.8 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 302,909.38
4. Number of Hours Generator On-line 744.00 5,087.00 300,879.48
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 310,744.00 2,559,813.00 152,588,923.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 2 was base loaded during July 2013.

During July, Unit 2 was operated at 81%. This was an unplanned down power, due to increased vibration on the Turbine Generator. There was an unplanned foced loss of 83,378.8 MW-hr.

OPERATING DATA REPORT DOCKET: 306 PREPARER NAME: Thomas Scheibel UNIT_NME: Prairie Island Unit 2 PREPARER TELEPHONE: 651-267-6355 RPT_PERIOD: 201308

1. Design Electrical Rating: 557
2. Maximum Dependable Capacity (MWe-Net) 518.8 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 303,653.38
4. Number of Hours Generator On-line 744.00 5,831.00 301,623.48
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 312,797.00 2,872,610.00 152,901,720.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 2 was base loaded during August 2013.

During August, Unit 2 was operated at 81%. There was an unplanned forced down power, due to increased vibration on the Turbine Generator.

There was a forced loss of 81,495.8 MW-hr.

OPERATING DATA REPORT DOCKET: 306 PREPARER NAME: Thomas Scheibel UNIT_NME: Prairie Island Unit 2 PREPARER TELEPHONE: 651-267-6355 RPT_PERIOD: 201309

1. Design Electrical Rating: 557
2. Maximum Dependable Capacity (MWe-Net) 518.8 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 480.12 6,311.12 304,133.50
4. Number of Hours Generator On-line 480.02 6,311.02 302,103.50
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 197,102.00 3,069,712.00 153,098,822.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2R28 9/21/2013 S 239.98 C 1 Unit Shutdown impacting Prairie Island Unit 2 occurred this reporting period for commencement of 2R28 refueling outage.

SUMMARY

Unit 2 was base loaded during September.

During September, Unit 2 was operated at 81% due to increased vibration on the Turbine Generator. There was an unplanned forced loss of 50,353.0 MW-hr.

On September 21st, Unit 2 was taken off line for Scheduled Refueling Outage, 2R28. This was a planned loss of 142,601.9 MW-hr. During this outage the turbine vibration problem will be repaired and also the replacement of #21 and #22 Steam Generators.

OPERATING DATA REPORT DOCKET: 254 PREPARER NAME: Jason M. Smith UNIT_NME: Quad Cities Unit 1 PREPARER TELEPHONE: (309) 227-2813 RPT_PERIOD: 201307

1. Design Electrical Rating: 866
2. Maximum Dependable Capacity (MWe-Net) 866 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,467.87 297,705.15
4. Number of Hours Generator On-line 744.00 4,399.78 291,797.46
5. Reserve Shutdown Hours 0.00 0.00 1,655.20
6. Net Electrical energy Generated (MWHrs) 681,310.00 4,080,949.00 208,823,063.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

U1 July 2013 Unit 1 started the month at approximately full reactor power and remained at full power for the rest of the month.

OPERATING DATA REPORT DOCKET: 254 PREPARER NAME: Jason M. Smith UNIT_NME: Quad Cities Unit 1 PREPARER TELEPHONE: (309) 227-2813 RPT_PERIOD: 201308

1. Design Electrical Rating: 866
2. Maximum Dependable Capacity (MWe-Net) 866 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,211.87 298,449.15
4. Number of Hours Generator On-line 744.00 5,143.78 292,541.46
5. Reserve Shutdown Hours 0.00 0.00 1,655.20
6. Net Electrical energy Generated (MWHrs) 683,257.00 4,764,206.00 209,506,320.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

U1 August 2013 Unit 1 started the month at approximately full reactor power and remained at full power for the rest of the month.

OPERATING DATA REPORT DOCKET: 254 PREPARER NAME: Jason M. Smith UNIT_NME: Quad Cities Unit 1 PREPARER TELEPHONE: 309 227-2813 RPT_PERIOD: 201309

1. Design Electrical Rating: 866
2. Maximum Dependable Capacity (MWe-Net) 866 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,931.87 299,169.15
4. Number of Hours Generator On-line 720.00 5,863.78 293,261.46
5. Reserve Shutdown Hours 0.00 0.00 1,655.20
6. Net Electrical energy Generated (MWHrs) 663,096.00 5,427,302.00 210,169,416.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

U1 September 2013 Unit 1 started the month at approximately full reactor power and remained at full power for the rest of the month with the following exceptions.

1. Short duration down power from 09/14/2013 to 09/15/2013 for planned Turbine Testing.
2. Short duration down power from 09/28/2013 to 09/29/2013 for planned Turbine Testing and CRD SCRAM Timing.

OPERATING DATA REPORT DOCKET: 265 PREPARER NAME: Jason M. Smith UNIT_NME: Quad Cities Unit 2 PREPARER TELEPHONE: (309) 227-2813 RPT_PERIOD: 201307

1. Design Electrical Rating: 957.3
2. Maximum Dependable Capacity (MWe-Net) 888 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,061.87 290,552.57
4. Number of Hours Generator On-line 744.00 5,049.97 285,326.10
5. Reserve Shutdown Hours 0.00 0.00 2,312.90
6. Net Electrical energy Generated (MWHrs) 677,795.00 4,671,270.00 211,459,708.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

U2 July 2013 Unit 2 started the month at approximately full reactor power and remained at full power for the rest of the month.

OPERATING DATA REPORT DOCKET: 265 PREPARER NAME: Jason M. Smith UNIT_NME: Quad Cities Unit 2 PREPARER TELEPHONE: (309) 227-2813 RPT_PERIOD: 201308

1. Design Electrical Rating: 957.3
2. Maximum Dependable Capacity (MWe-Net) 888 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,805.87 291,296.57
4. Number of Hours Generator On-line 744.00 5,793.97 286,070.10
5. Reserve Shutdown Hours 0.00 0.00 2,312.90
6. Net Electrical energy Generated (MWHrs) 678,658.00 5,349,928.00 212,138,366.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

U2 August 2013 Unit 2 started the month at approximately full reactor power and remained at full power for the rest of the month with the following exceptions.

1. Between 8/26/13 and continuing to the end of the month there was a 2 MWe unplanned energy loss due to a stuck open 2C2 Low Pressure Feedwater Heater Emergency Drain Valve - this resulted in a loss of 276 MWe-hr during August 2013.

OPERATING DATA REPORT DOCKET: 265 PREPARER NAME: Jason M. Smith UNIT_NME: Quad Cities Unit 2 PREPARER TELEPHONE: 309 227-2813 RPT_PERIOD: 201309

1. Design Electrical Rating: 957.3
2. Maximum Dependable Capacity (MWe-Net) 888 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,525.87 292,016.57
4. Number of Hours Generator On-line 720.00 6,513.97 286,790.10
5. Reserve Shutdown Hours 0.00 0.00 2,312.90
6. Net Electrical energy Generated (MWHrs) 641,947.00 5,991,875.00 212,780,313.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

U2 September 2013 Unit 2 started the month at approximately full reactor power and remained at full power for the rest of the month with the following exceptions:

1. Ongoing small (approximate 2 MW) Unplanned power loss from the 2C2 Feed Water Heater - Emergency Level Control Valve (E-LCV) that failed open on 08/26/2013 and was repaired during the planned downpower on 09/7/2013.
2. Short duration Planned down power from 09/07/2013 to 09/08/13 to refill the MSDTs and correct the failed 2C2 E-LCV.
3. Short duration Planned down power on 09/09/2013 for CRD Pattern adjustment.
4. Short duration Planned down power on 09/21/2013 for CRD Pattern adjustment.
5. An Emergent Short duration downpower on 9/26/2013 to 9/27/2013 due to a loss of Feedwater heaters caused by a blown fuse.
6. An Emergent Short duration downpower on 9/28/2013 due to a failed RPIS indication on CRD G-13 that required that rod to be fully inserted.

OPERATING DATA REPORT DOCKET: 458 PREPARER NAME: Thomas J. Bolke UNIT_NME: River Bend Unit 1 PREPARER TELEPHONE: (225)381-3719 RPT_PERIOD: 201307

1. Design Electrical Rating: 967
2. Maximum Dependable Capacity (MWe-Net) 967 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,284.89 204,720.87
4. Number of Hours Generator On-line 744.00 4,224.67 200,054.68
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 720,701.00 4,029,150.00 183,780,642.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 458 PREPARER NAME: Thomas J. Bolke UNIT_NME: River Bend Unit 1 PREPARER TELEPHONE: (225)381-3719 RPT_PERIOD: 201308

1. Design Electrical Rating: 967
2. Maximum Dependable Capacity (MWe-Net) 967 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,028.89 205,464.87
4. Number of Hours Generator On-line 744.00 4,968.67 200,798.68
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 719,180.00 4,748,330.00 184,499,822.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 458 PREPARER NAME: Thomas J. Bolke UNIT_NME: River Bend Unit 1 PREPARER TELEPHONE: (225)381-3719 RPT_PERIOD: 201309

1. Design Electrical Rating: 967
2. Maximum Dependable Capacity (MWe-Net) 967 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,748.89 206,184.87
4. Number of Hours Generator On-line 720.00 5,688.67 201,518.68
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 699,175.00 5,447,505.00 185,198,997.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 261 PREPARER NAME: Tim Surma UNIT_NME: Robinson Unit 2 PREPARER TELEPHONE: 843-857-1086 RPT_PERIOD: 201307

1. Design Electrical Rating: 795
2. Maximum Dependable Capacity (MWe-Net) 741 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 294,973.79
4. Number of Hours Generator On-line 744.00 5,087.00 291,304.49
5. Reserve Shutdown Hours 0.00 0.00 23.20
6. Net Electrical energy Generated (MWHrs) 562,215.00 3,907,746.00 197,230,799.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 261 PREPARER NAME: Tim Surma UNIT_NME: Robinson Unit 2 PREPARER TELEPHONE: 843-857-1086 RPT_PERIOD: 201308

1. Design Electrical Rating: 795
2. Maximum Dependable Capacity (MWe-Net) 741 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 295,717.79
4. Number of Hours Generator On-line 744.00 5,831.00 292,048.49
5. Reserve Shutdown Hours 0.00 0.00 23.20
6. Net Electrical energy Generated (MWHrs) 562,450.00 4,470,196.00 197,793,249.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 261 PREPARER NAME: Tim Surma UNIT_NME: Robinson Unit 2 PREPARER TELEPHONE: 843-857-1086 RPT_PERIOD: 201309

1. Design Electrical Rating: 795
2. Maximum Dependable Capacity (MWe-Net) 741 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 316.33 6,147.33 296,034.12
4. Number of Hours Generator On-line 316.18 6,147.18 292,364.67
5. Reserve Shutdown Hours 0.00 0.00 23.20
6. Net Electrical energy Generated (MWHrs) 231,715.00 4,701,911.00 198,024,964.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 9/14/2013 S 403.82 C 1

SUMMARY

Planned shutdown for scheduled refueling outage RO-28 on 9-14-13 at 0419 hours0.00485 days <br />0.116 hours <br />6.92791e-4 weeks <br />1.594295e-4 months <br />.

OPERATING DATA REPORT DOCKET: 272 PREPARER NAME: Kevin Falciani UNIT_NME: Salem Unit 1 PREPARER TELEPHONE: 856-339-2017 RPT_PERIOD: 201307

1. Design Electrical Rating: 1169
2. Maximum Dependable Capacity (MWe-Net) 1116 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,184.57 228,032.55
4. Number of Hours Generator On-line 744.00 4,063.70 222,394.60
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 860,476.00 4,757,181.00 237,200,139.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 272 PREPARER NAME: Kevin Falciani UNIT_NME: Salem Unit 1 PREPARER TELEPHONE: 856-339-2017 RPT_PERIOD: 201308

1. Design Electrical Rating: 1169
2. Maximum Dependable Capacity (MWe-Net) 1116 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 709.50 4,894.07 228,742.05
4. Number of Hours Generator On-line 698.83 4,762.53 223,093.43
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 794,389.00 5,551,570.00 237,994,528.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments S1F13 8/22/2013 F 45.17 A 1 Unit 1 shutdown due to 1PS1 Pressurizer Valve

-01 Leak. ACE being tracked on order 70157547.

SUMMARY

Unit 1 shutdown due to 1PS1 leak on Pressurizer Spray Valve. ACE has been assigned and is being tacked on order 70157547.

OPERATING DATA REPORT DOCKET: 272 PREPARER NAME: Kevin Falciani UNIT_NME: Salem Unit 1 PREPARER TELEPHONE: 856-339-2017 RPT_PERIOD: 201309

1. Design Electrical Rating: 1169
2. Maximum Dependable Capacity (MWe-Net) 1116 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,614.07 229,462.05
4. Number of Hours Generator On-line 720.00 5,482.53 223,813.43
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 944,559.00 6,496,129.00 238,939,087.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 311 PREPARER NAME: Kevin Falciani UNIT_NME: Salem Unit 2 PREPARER TELEPHONE: 856-339-2017 RPT_PERIOD: 201307

1. Design Electrical Rating: 1181
2. Maximum Dependable Capacity (MWe-Net) 1134 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 205,731.90
4. Number of Hours Generator On-line 744.00 5,087.00 201,627.44
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 855,682.00 5,971,788.00 215,429,798.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 311 PREPARER NAME: Kevin Falciani UNIT_NME: Salem Unit 2 PREPARER TELEPHONE: 856-339-2017 RPT_PERIOD: 201308

1. Design Electrical Rating: 1181
2. Maximum Dependable Capacity (MWe-Net) 1134 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 206,475.90
4. Number of Hours Generator On-line 744.00 5,831.00 202,371.44
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 863,356.00 6,835,144.00 216,293,154.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 311 PREPARER NAME: Kevin Falciani UNIT_NME: Salem Unit 2 PREPARER TELEPHONE: 856-339-2017 RPT_PERIOD: 201309

1. Design Electrical Rating: 1181
2. Maximum Dependable Capacity (MWe-Net) 1134 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 207,195.90
4. Number of Hours Generator On-line 720.00 6,551.00 203,091.44
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 835,587.00 7,670,731.00 217,128,741.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 443 PREPARER NAME: Kevin Randall UNIT_NME: Seabrook Unit 1 PREPARER TELEPHONE: 603.773.7992 RPT_PERIOD: 201307

1. Design Electrical Rating: 1248
2. Maximum Dependable Capacity (MWe-Net) 1246 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 180,024.98
4. Number of Hours Generator On-line 744.00 5,087.00 176,440.43
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 926,830.27 6,346,479.82 204,219,773.54 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit operated at 100% power 744 out of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br /> this month. This yielded an availability factor of 100% and a capacity factor of 99.9791%

based on the MDC of 1246 MWe.

OPERATING DATA REPORT DOCKET: 443 PREPARER NAME: Kevin Randall UNIT_NME: Seabrook Unit 1 PREPARER TELEPHONE: 603.773.7992 RPT_PERIOD: 201308

1. Design Electrical Rating: 1248
2. Maximum Dependable Capacity (MWe-Net) 1246 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 180,768.98
4. Number of Hours Generator On-line 744.00 5,831.00 177,184.43
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 927,927.04 7,274,406.86 205,147,700.58 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit operated at 100% power 744 out of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br /> this month. This yielded an availability factor of 100% and a capacity factor of 100.0974%

based on the MDC of 1246 MWe.

OPERATING DATA REPORT DOCKET: 443 PREPARER NAME: Kevin Randall UNIT_NME: Seabrook Unit 1 PREPARER TELEPHONE: 603.773.7992 RPT_PERIOD: 201309

1. Design Electrical Rating: 1248
2. Maximum Dependable Capacity (MWe-Net) 1246 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 181,488.98
4. Number of Hours Generator On-line 720.00 6,551.00 177,904.43
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 896,941.44 8,171,348.30 206,044,642.02 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit operated at 100% power 709 out of 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> this month. This yielded an availability factor of 100% and a capacity factor of 99.9801%

based on the MDC of 1246 MWe.

OPERATING DATA REPORT DOCKET: 327 PREPARER NAME: Linda Williams UNIT_NME: Sequoyah Unit 1 PREPARER TELEPHONE: Linda Williams RPT_PERIOD: 201307

1. Design Electrical Rating: 1184.37
2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 210,374.85
4. Number of Hours Generator On-line 744.00 5,087.00 207,973.89
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 844,719.00 5,864,997.00 231,136,300.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

U1 Gross Max Dependable Capacity Factor was 99.671 for the month of July 2013.

OPERATING DATA REPORT DOCKET: 327 PREPARER NAME: Linda Williams UNIT_NME: Sequoyah Unit 1 PREPARER TELEPHONE: Linda Williams RPT_PERIOD: 201308

1. Design Electrical Rating: 1184.37
2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 211,118.85
4. Number of Hours Generator On-line 744.00 5,831.00 208,717.89
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 839,540.00 6,704,537.00 231,975,840.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

U1 Gross Max Dependable Capacity Factor was 99.075 for the month of August 2013.

OPERATING DATA REPORT DOCKET: 327 PREPARER NAME: Linda Williams UNIT_NME: Sequoyah Unit 1 PREPARER TELEPHONE: 423-843-7048 RPT_PERIOD: 201309

1. Design Electrical Rating: 1184.37
2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 211,838.85
4. Number of Hours Generator On-line 720.00 6,551.00 209,437.89
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 743,812.00 7,448,349.00 232,719,652.60 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

U1 Gross Max Dependable Capacity Factor was 91.059 for the month of September 2013.

OPERATING DATA REPORT DOCKET: 328 PREPARER NAME: Linda Williams UNIT_NME: Sequoyah Unit 2 PREPARER TELEPHONE: Linda Williams RPT_PERIOD: 201307

1. Design Electrical Rating: 1177.46
2. Maximum Dependable Capacity (MWe-Net) 1139.5 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,983.34 213,983.45
4. Number of Hours Generator On-line 744.00 4,845.69 211,240.04
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 846,252.00 5,479,649.00 230,178,105.10 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

U2 Gross Max Dependable Capacity Factor was 101.549 for the month of July 2013.

OPERATING DATA REPORT DOCKET: 328 PREPARER NAME: Linda Williams UNIT_NME: Sequoyah Unit 2 PREPARER TELEPHONE: Linda Williams RPT_PERIOD: 201308

1. Design Electrical Rating: 1177.46
2. Maximum Dependable Capacity (MWe-Net) 1139.5 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,727.34 214,727.45
4. Number of Hours Generator On-line 744.00 5,589.69 211,984.04
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 840,796.00 6,320,445.00 231,018,901.10 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

U2 Gross Max Dependable Capacity Factor was 101.951for the month of August 2013.

OPERATING DATA REPORT DOCKET: 328 PREPARER NAME: Linda Williams UNIT_NME: Sequoyah Unit 2 PREPARER TELEPHONE: 423-843-7048 RPT_PERIOD: 201309

1. Design Electrical Rating: 1177.46
2. Maximum Dependable Capacity (MWe-Net) 1139.5 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,447.34 215,447.45
4. Number of Hours Generator On-line 720.00 6,309.69 212,704.04
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 813,432.00 7,133,877.00 231,832,333.10 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

U2 Gross Max Dependable Capacity Factor was 103.095 for the month of September 2013.

OPERATING DATA REPORT DOCKET: 498 PREPARER NAME: R.L. Hill UNIT_NME: South Texas Unit 1 PREPARER TELEPHONE: 361.972.7667 RPT_PERIOD: 201307

1. Design Electrical Rating: 1250.6
2. Maximum Dependable Capacity (MWe-Net) 1250.6 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,981.80 185,618.50
4. Number of Hours Generator On-line 744.00 4,952.50 181,064.21
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 987,688.00 6,657,788.00 228,041,469.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Normal operation.

OPERATING DATA REPORT DOCKET: 498 PREPARER NAME: R.L. Hill UNIT_NME: South Texas Unit 1 PREPARER TELEPHONE: 361.972.7667 RPT_PERIOD: 201308

1. Design Electrical Rating: 1250.6
2. Maximum Dependable Capacity (MWe-Net) 1250.6 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,725.80 186,362.50
4. Number of Hours Generator On-line 744.00 5,696.50 181,808.21
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 947,644.00 7,605,432.00 228,989,113.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Precautionary reactor power reduction to 81% on 8/3/13 to allow LP Turbine 13S Extraction Steam bellows rupture damage analysis. Unit returned to 100% on 8/5/13. Reactor power reduction to 86.5% on 8/27/13 due to engineering recommendation for LP Turbine 13S Extraction Steam bellows damage.

OPERATING DATA REPORT DOCKET: 498 PREPARER NAME: R. L. Hill UNIT_NME: South Texas Unit 1 PREPARER TELEPHONE: 361.972.7667 RPT_PERIOD: 201309

1. Design Electrical Rating: 1250.6
2. Maximum Dependable Capacity (MWe-Net) 1250.6 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,445.80 187,082.50
4. Number of Hours Generator On-line 720.00 6,416.50 182,528.21
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 953,755.00 8,559,187.00 229,942,868.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Reactor power reduction to 86.5 % beginning on 8/27/13 due to engineering recommendation for LP Turbine 13S Extraction Steam bellows damage.

OPERATING DATA REPORT DOCKET: 499 PREPARER NAME: R.L. Hill UNIT_NME: South Texas Unit 2 PREPARER TELEPHONE: 361.972.766 RPT_PERIOD: 201307

1. Design Electrical Rating: 1250.6
2. Maximum Dependable Capacity (MWe-Net) 1250.6 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 2,598.29 174,566.63
4. Number of Hours Generator On-line 744.00 2,509.95 172,007.38
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 987,248.00 3,329,284.00 216,085,820.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Scheduled turbine valve testing/ Unplanned control rod issues.

OPERATING DATA REPORT DOCKET: 499 PREPARER NAME: R.L. Hill UNIT_NME: South Texas Unit 2 PREPARER TELEPHONE: 361.972.7667 RPT_PERIOD: 201308

1. Design Electrical Rating: 1250.6
2. Maximum Dependable Capacity (MWe-Net) 1250.6 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 3,342.29 175,310.63
4. Number of Hours Generator On-line 744.00 3,253.95 172,751.38
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 984,277.00 4,313,561.00 217,070,097.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Normal operation.

OPERATING DATA REPORT DOCKET: 499 PREPARER NAME: R.L. Hill UNIT_NME: South Texas Unit 2 PREPARER TELEPHONE: 361.972.7667 RPT_PERIOD: 201309

1. Design Electrical Rating: 1250.6
2. Maximum Dependable Capacity (MWe-Net) 1250.6 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 4,062.29 176,030.63
4. Number of Hours Generator On-line 720.00 3,973.95 173,471.38
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 953,755.00 5,267,316.00 218,023,852.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Scheduled reactor power reduction to 90% for turbine valve testing.

OPERATING DATA REPORT DOCKET: 335 PREPARER NAME: K R Boller UNIT_NME: St. Lucie Unit 1 PREPARER TELEPHONE: 772 467-7465 RPT_PERIOD: 201307

1. Design Electrical Rating: 1062
2. Maximum Dependable Capacity (MWe-Net) 981 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,626.58 266,702.21
4. Number of Hours Generator On-line 744.00 4,616.47 264,231.23
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 744,205.00 4,599,145.00 218,399,912.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

PSL 1 operated in mode 1 the entire report period.

OPERATING DATA REPORT DOCKET: 335 PREPARER NAME: K R Boller UNIT_NME: St. Lucie Unit 1 PREPARER TELEPHONE: 772 467-7465 RPT_PERIOD: 201308

1. Design Electrical Rating: 1062
2. Maximum Dependable Capacity (MWe-Net) 981 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,370.58 267,446.21
4. Number of Hours Generator On-line 744.00 5,360.47 264,975.23
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 738,402.00 5,337,547.00 219,138,314.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

PSL 1 operated in mode 1 the entire report period.

OPERATING DATA REPORT DOCKET: 335 PREPARER NAME: K R Boller UNIT_NME: St. Lucie Unit 1 PREPARER TELEPHONE: 774 467-7465 RPT_PERIOD: 201309

1. Design Electrical Rating: 1062
2. Maximum Dependable Capacity (MWe-Net) 981 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 696.02 6,066.60 268,142.23
4. Number of Hours Generator On-line 696.02 6,056.49 265,671.25
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 675,651.00 6,013,198.00 219,813,965.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 28 9/30/2013 S 23.98 C 1 PSL 1 manual shutdown for SL1-25 refueling and maintenance

SUMMARY

PSL 1 operated in mode 1 until 9/30/2013 at 00:01 when the unit was removed from service for scheduled refueling and maintenance. PSL 1 remained offline through the end of the report period.

OPERATING DATA REPORT DOCKET: 389 PREPARER NAME: K R Boller UNIT_NME: St. Lucie Unit 2 PREPARER TELEPHONE: 772 467-7465 RPT_PERIOD: 201307

1. Design Electrical Rating: 1074
2. Maximum Dependable Capacity (MWe-Net) 987 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,030.52 226,352.60
4. Number of Hours Generator On-line 744.00 4,967.78 223,871.34
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 753,741.00 5,018,606.00 185,724,043.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

PSL 2 operated in mode 1 the entire report period.

OPERATING DATA REPORT DOCKET: 389 PREPARER NAME: K R Boller UNIT_NME: St. Lucie Unit 2 PREPARER TELEPHONE: 772 467-7465 RPT_PERIOD: 201308

1. Design Electrical Rating: 1074
2. Maximum Dependable Capacity (MWe-Net) 987 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,774.52 227,096.60
4. Number of Hours Generator On-line 744.00 5,711.78 224,615.34
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 749,319.00 5,767,925.00 186,473,362.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

PSL 2 operated in mode 1 the entire report period.

OPERATING DATA REPORT DOCKET: 389 PREPARER NAME: K R Boller UNIT_NME: St. Lucie Unit 2 PREPARER TELEPHONE: 772 467-7465 RPT_PERIOD: 201309

1. Design Electrical Rating: 1074
2. Maximum Dependable Capacity (MWe-Net) 987 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,494.52 227,816.60
4. Number of Hours Generator On-line 720.00 6,431.78 225,335.34
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 718,003.00 6,485,928.00 187,191,365.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

PSL 2 operated in mode 1 the entire report period.

OPERATING DATA REPORT DOCKET: 395 PREPARER NAME: Wesley R. Higgins UNIT_NME: Summer Unit 1 PREPARER TELEPHONE: 8033454042 RPT_PERIOD: 201307

1. Design Electrical Rating: 972.7
2. Maximum Dependable Capacity (MWe-Net) 966 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,846.00 223,081.25
4. Number of Hours Generator On-line 744.00 4,828.40 220,645.77
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 730,801.00 4,753,270.00 200,714,259.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The plant operated at full power during Juky 2013.

OPERATING DATA REPORT DOCKET: 395 PREPARER NAME: Wesley R. Higgins UNIT_NME: Summer Unit 1 PREPARER TELEPHONE: 8033454042 RPT_PERIOD: 201308

1. Design Electrical Rating: 972.7
2. Maximum Dependable Capacity (MWe-Net) 966 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,590.00 223,825.25
4. Number of Hours Generator On-line 744.00 5,572.40 221,389.77
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 730,321.00 5,483,591.00 201,444,580.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

There were no Unit Shutdowns during June 2013. A power reduction commenced at approximately 23:45 on the 28th in support of main turbine valve testing (PTP-102.001). Power was reduced to approximately 90%. The plant was returned to 100% power at approximately 23:02 on the 29th.

OPERATING DATA REPORT DOCKET: 395 PREPARER NAME: Wesley R. Higgins UNIT_NME: Summer Unit 1 PREPARER TELEPHONE: 8033454042 RPT_PERIOD: 201309

1. Design Electrical Rating: 972.7
2. Maximum Dependable Capacity (MWe-Net) 966 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,310.00 224,545.25
4. Number of Hours Generator On-line 720.00 6,292.40 222,109.77
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 705,365.00 6,188,956.00 202,149,945.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

There were no Unit Shutdowns during September 2013. A power reduction commenced at approximately 22:30 on the 27th in support of main turbine valve testing (PTP-102.001). Power was reduced to approximately 90%. The plant was returned to 100% power at approximately 10:15 on the 28th.

OPERATING DATA REPORT DOCKET: 280 PREPARER NAME: Marlene Haskett UNIT_NME: Surry Unit 1 PREPARER TELEPHONE: 757-365-2146 RPT_PERIOD: 201307

1. Design Electrical Rating: 874
2. Maximum Dependable Capacity (MWe-Net) 838 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 279,910.04
4. Number of Hours Generator On-line 744.00 5,087.00 276,779.72
5. Reserve Shutdown Hours 0.00 0.00 3,736.20
6. Net Electrical energy Generated (MWHrs) 625,818.38 4,393,115.11 212,290,885.07 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 280 PREPARER NAME: Marlene Haskett UNIT_NME: Surry Unit 1 PREPARER TELEPHONE: 757-365-2146 RPT_PERIOD: 201308

1. Design Electrical Rating: 874
2. Maximum Dependable Capacity (MWe-Net) 838 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 280,654.04
4. Number of Hours Generator On-line 744.00 5,831.00 277,523.72
5. Reserve Shutdown Hours 0.00 0.00 3,736.20
6. Net Electrical energy Generated (MWHrs) 629,992.00 5,023,107.11 212,920,877.07 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 280 PREPARER NAME: Marlene Haskett UNIT_NME: Surry Unit 1 PREPARER TELEPHONE: 757-365-2146 RPT_PERIOD: 201309

1. Design Electrical Rating: 874
2. Maximum Dependable Capacity (MWe-Net) 838 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 281,374.04
4. Number of Hours Generator On-line 720.00 6,551.00 278,243.72
5. Reserve Shutdown Hours 0.00 0.00 3,736.20
6. Net Electrical energy Generated (MWHrs) 612,564.69 5,635,671.80 213,533,441.76 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 281 PREPARER NAME: Marlene Haskett UNIT_NME: Surry Unit 2 PREPARER TELEPHONE: 757-365-2146 RPT_PERIOD: 201307

1. Design Electrical Rating: 874
2. Maximum Dependable Capacity (MWe-Net) 838 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 277,054.04
4. Number of Hours Generator On-line 744.00 5,087.00 274,305.15
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 627,488.24 4,393,876.82 210,700,644.77 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 281 PREPARER NAME: Marlene Haskett UNIT_NME: Surry Unit 2 PREPARER TELEPHONE: 757-365-2146 RPT_PERIOD: 201308

1. Design Electrical Rating: 874
2. Maximum Dependable Capacity (MWe-Net) 838 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 277,798.04
4. Number of Hours Generator On-line 744.00 5,831.00 275,049.15
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 632,023.03 5,025,899.85 211,332,667.80 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 281 PREPARER NAME: Marlene Haskett UNIT_NME: Surry Unit 2 PREPARER TELEPHONE: 757-365-2146 RPT_PERIOD: 201309

1. Design Electrical Rating: 874
2. Maximum Dependable Capacity (MWe-Net) 838 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 278,518.04
4. Number of Hours Generator On-line 720.00 6,551.00 275,769.15
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 613,258.26 5,639,158.11 211,945,926.07 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

OPERATING DATA REPORT DOCKET: 387 PREPARER NAME: J. Hennings UNIT_NME: Susquehanna Unit 1 PREPARER TELEPHONE: 570-542-3747 RPT_PERIOD: 201307

1. Design Electrical Rating: 1287
2. Maximum Dependable Capacity (MWe-Net) 1257 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,394.30 224,734.76
4. Number of Hours Generator On-line 722.68 4,187.42 221,535.98
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 841,199.00 5,240,133.00 238,562,989.70 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments U1 7/21/2013 S 21.32 B 5 07/21/13 01:51 Tripped Unit 1 Main Turbine for 2013- Turbine Control valve EHC Maintenance. The reactor was maintained at approximately 15%

power. 07/21/13 23:10 performed Auto Synchronization and loading of Main Generator.

Note: The shutdown was planned less than 10 days in advanced, but more than 72 hrs in advance. This is not a Forced Loss Event because this shutdown plan was implemented to address the initial condition associated with the cause for the FLE reduction of 23% on 7/16/13.

SUMMARY

There was one power reduction greater than 20%. The Unplanned Power reduction was initiated on 7/16/13. The reduction from 96%to 74%

power was required to reduce Turbine vibration experienced due to Turbine Control Valve position. The Turbine was taken off-line on July 21, after reducing power to 15%, to perform maintenance on the Turbine Control Valve servo valve that caused the intial reduction to 74%. The Reactor was maintained at approximately 15% power while the Turbine was off line. The Generator was put on line on 7/21/13, and the Reactor returned to full power on 7/24/13. There were no other power reductions greater than 20% this month.

OPERATING DATA REPORT DOCKET: 387 PREPARER NAME: J. Hennings UNIT_NME: Susquehanna Unit 1 PREPARER TELEPHONE: 570-542-3747 RPT_PERIOD: 201308

1. Design Electrical Rating: 1287
2. Maximum Dependable Capacity (MWe-Net) 1257 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,138.30 225,478.76
4. Number of Hours Generator On-line 744.00 4,931.42 222,279.98
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 933,837.00 6,173,970.00 239,496,826.70 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

There was one unplanned power reduction of greater than 20% in August. On 8/27/13 a Reactor Feed Pump tripped, resulting in a Reactor power reduction to 65%. On 08/28/13 power was increased to 100%. (This is considered an Unplanned Power Change for NRC Performance Indicators, and a Forced Loss Event for INPO).

OPERATING DATA REPORT DOCKET: 387 PREPARER NAME: J. Hennings UNIT_NME: Susquehanna Unit 1 PREPARER TELEPHONE: 570-542-3747 RPT_PERIOD: 201309

1. Design Electrical Rating: 1287
2. Maximum Dependable Capacity (MWe-Net) 1257 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,858.30 226,198.76
4. Number of Hours Generator On-line 720.00 5,651.42 222,999.98
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 905,554.00 7,079,524.00 240,402,380.70 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

On 09/12/13 a power reduction from 100% was performed for a planned control rod sequence exchange. The lowest power was 65%. On 09/13/13, power was returned to full power. There were no other power reductions greater than 20 % in September.

OPERATING DATA REPORT DOCKET: 388 PREPARER NAME: J. Hennings UNIT_NME: Susquehanna Unit 2 PREPARER TELEPHONE: 570-542-3747 RPT_PERIOD: 201307

1. Design Electrical Rating: 1287
2. Maximum Dependable Capacity (MWe-Net) 1257 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 3,996.33 220,543.15
4. Number of Hours Generator On-line 744.00 3,819.42 217,754.02
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 904,422.00 4,750,426.00 237,072,345.30 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

There were Two power reductions greater than 20% power this month. Both were in support of Transmission/Distribution Grid related maintnence:

On 07/06/13, reduced power from 99.8% to approximately 65% due to the loss of a 500KV line on the Distribution Grid. Returned to 100% on 07/08/13.

On 07/27/13 began a scheduled power reduction from 100%, for the support of Electric Utilities work on a 500KV Transmission line. Lowest power level was 63%. Returned to 99.9% power on 07/28/13.

OPERATING DATA REPORT DOCKET: 388 PREPARER NAME: J. Hennings UNIT_NME: Susquehanna Unit 2 PREPARER TELEPHONE: 570-542-3747 RPT_PERIOD: 201308

1. Design Electrical Rating: 1287
2. Maximum Dependable Capacity (MWe-Net) 1257 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,740.33 221,287.15
4. Number of Hours Generator On-line 744.00 4,563.42 218,498.02
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 939,578.00 5,690,004.00 238,011,923.30 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

There were no power reductions greater than 20% in the month of August.

OPERATING DATA REPORT DOCKET: 388 PREPARER NAME: J. Hennings UNIT_NME: Susquehanna Unit 2 PREPARER TELEPHONE: 570-542-3747 RPT_PERIOD: 201309

1. Design Electrical Rating: 1287
2. Maximum Dependable Capacity (MWe-Net) 1257 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 508.58 5,248.91 221,795.73
4. Number of Hours Generator On-line 483.52 5,046.94 218,981.54
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 556,871.00 6,246,875.00 238,568,794.30 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments U2 9/14/2013 S 236.48 B 2 Began power reduction at 09/13/13 22:00, from 2013- 100% to shut down for scheduled repair of (RBCCW) leakage into the Drywell and replacement of Turbine blades.

Breaker opened: 09/14/13 02:48.

Breaker closed: 09/23/13 23:17 Return to full power: 09/27/13 07:47

SUMMARY

The one power reduction greater than 20% in the month of September, was for a planned Control Rod Sequence Exchange. On 09/06/13, the power reduction began from 100%. Reactor Power reached as low as 53.7% and was returned to 99.8% power on 9/8/13.

There was one Unit shutdown in September, but there are 2 Reactor Shutdown entries impacting this occurrence, to accurately account for criticality time periods. The power reduction for scheduled shutdown to correct cooling water leaking into the Drywell, and for Main Turbine blade replacements, began at 09/13/13 22:00 from 100%.

The Generator Breaker was opened 09/14/13 02:48 when the Reactor was at 15.5%. The Reactor was taken Sub-Critical by means of an Unplanned Manual Scram from 14% power at 09/14/13 03:30.

Following the completion of the scheduled maintenance, during reactor startup. the Reactor was declared Critical at 09/22/13 22:02. Then, progressing through reactor start-up activities (re-ranging of IRM's), the Reactor was declared sub-critical at 09/22/13 23:13 (all rods not in, but also not critical during Reactor start-up). The Reactor was then declared critical at 09/23/13 00:06, and ramp-up activities continued. The generator was put on line 9/23/13 23:17. Full power was achieved at 09/27/13 07:47.

OPERATING DATA REPORT DOCKET: 289 PREPARER NAME: Mark Fauber UNIT_NME: Three Mile Island Unit 1 PREPARER TELEPHONE: (717) 948-8787 RPT_PERIOD: 201307

1. Design Electrical Rating: 819
2. Maximum Dependable Capacity (MWe-Net) 802 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 254,203.85
4. Number of Hours Generator On-line 744.00 5,087.00 252,395.17
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 610,260.00 4,263,545.00 209,296,725.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit operated at nominal full power for the entire month of July.

OPERATING DATA REPORT DOCKET: 289 PREPARER NAME: Mark Fauber UNIT_NME: Three Mile Island Unit 1 PREPARER TELEPHONE: (717) 948-8787 RPT_PERIOD: 201308

1. Design Electrical Rating: 819
2. Maximum Dependable Capacity (MWe-Net) 802 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 254,947.85
4. Number of Hours Generator On-line 744.00 5,831.00 253,139.17
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 614,906.00 4,878,451.00 209,911,631.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit operated at nominal full power for the entire month of August.

OPERATING DATA REPORT DOCKET: 289 PREPARER NAME: Mark Fauber UNIT_NME: Three Mile Island Unit 1 PREPARER TELEPHONE: (717) 948-8787 RPT_PERIOD: 201309

1. Design Electrical Rating: 819
2. Maximum Dependable Capacity (MWe-Net) 802 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 255,667.85
4. Number of Hours Generator On-line 720.00 6,551.00 253,859.17
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 599,698.00 5,478,149.00 210,511,329.40 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit operated at nominal full power for the entire month of Septbember, with the exception of the period between 22:00 on 9/7/13 to 03:33 on 9/8/13, when a planned power reduction to approximately 89% power was completed.

OPERATING DATA REPORT DOCKET: 250 PREPARER NAME: Colleen Phillips UNIT_NME: Turkey Point Unit 3 PREPARER TELEPHONE: 305-246-7106 RPT_PERIOD: 201307

1. Design Electrical Rating: 720
2. Maximum Dependable Capacity (MWe-Net) 693 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,371.26 274,527.90
4. Number of Hours Generator On-line 0.00 3,528.46 270,291.70
5. Reserve Shutdown Hours 0.00 0.00 121.80
6. Net Electrical energy Generated (MWHrs) 601,876.30 3,279,364.25 179,967,464.81 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 3 was approximately 100% for the month.

OPERATING DATA REPORT DOCKET: 250 PREPARER NAME: Colleen Phillips UNIT_NME: Turkey Point Unit 3 PREPARER TELEPHONE: 305-246-7106 RPT_PERIOD: 201308

1. Design Electrical Rating: 720
2. Maximum Dependable Capacity (MWe-Net) 693 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,115.26 275,271.90
4. Number of Hours Generator On-line 0.00 3,528.46 270,291.70
5. Reserve Shutdown Hours 0.00 0.00 121.80
6. Net Electrical energy Generated (MWHrs) 597,500.50 3,876,864.75 180,564,965.31 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 3 was at approximately 100% for the month.

OPERATING DATA REPORT DOCKET: 250 PREPARER NAME: Colleen Phillips UNIT_NME: Turkey Point Unit 3 PREPARER TELEPHONE: 305-246-7106 RPT_PERIOD: 201309

1. Design Electrical Rating: 720
2. Maximum Dependable Capacity (MWe-Net) 693 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,835.26 275,991.90
4. Number of Hours Generator On-line 0.00 3,528.46 270,291.70
5. Reserve Shutdown Hours 0.00 0.00 121.80
6. Net Electrical energy Generated (MWHrs) 577,747.62 4,454,612.37 181,142,712.93 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 3 was at approximately 100% power.

OPERATING DATA REPORT DOCKET: 251 PREPARER NAME: Colleen Phillips UNIT_NME: Turkey Point Unit 4 PREPARER TELEPHONE: 305-246-7106 RPT_PERIOD: 201307

1. Design Electrical Rating: 720
2. Maximum Dependable Capacity (MWe-Net) 693 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 2,763.08 272,065.23
4. Number of Hours Generator On-line 744.00 2,483.30 266,828.80
5. Reserve Shutdown Hours 0.00 0.00 577.20
6. Net Electrical energy Generated (MWHrs) 609,626.23 1,666,814.45 178,915,449.26 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 4 was at approximately 100% for the month.

OPERATING DATA REPORT DOCKET: 251 PREPARER NAME: Colleen Phillips UNIT_NME: Turkey Point Unit 4 PREPARER TELEPHONE: 305-246-7106 RPT_PERIOD: 201308

1. Design Electrical Rating: 720
2. Maximum Dependable Capacity (MWe-Net) 693 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 3,507.08 272,809.23
4. Number of Hours Generator On-line 744.00 3,227.30 267,572.80
5. Reserve Shutdown Hours 0.00 0.00 577.20
6. Net Electrical energy Generated (MWHrs) 605,877.39 2,272,691.84 179,521,326.65 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 4 was approximately 100% for the month.

OPERATING DATA REPORT DOCKET: 251 PREPARER NAME: Colleen Phillips UNIT_NME: Turkey Point Unit 4 PREPARER TELEPHONE: 305-246-7106 RPT_PERIOD: 201309

1. Design Electrical Rating: 720
2. Maximum Dependable Capacity (MWe-Net) 693 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 4,227.08 273,529.23
4. Number of Hours Generator On-line 720.00 3,947.30 268,292.80
5. Reserve Shutdown Hours 0.00 0.00 577.20
6. Net Electrical energy Generated (MWHrs) 585,886.05 2,858,577.89 180,107,212.70 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 4 was at approximately 100% for the month.

OPERATING DATA REPORT DOCKET: 271 PREPARER NAME: Anthony L. Stevens UNIT_NME: Vermont Yankee Unit 1 PREPARER TELEPHONE: (802) 451-3176 RPT_PERIOD: 201307

1. Design Electrical Rating: 617
2. Maximum Dependable Capacity (MWe-Net) 605 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,468.69 311,079.06
4. Number of Hours Generator On-line 744.00 4,449.65 307,167.81
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 446,584.00 2,648,399.00 156,051,746.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Dates Activity MW-hr S/F 07/02-07/03 CW System Chlorination 474 S 07/05-07/06 CW System Chlorination 382 S 07/07-07/09 Rod Sequence Exchange 4828 S 07/09 CW System Chlorination 132 S 07/09-07/10 2nd Pass Rod Pattern Adjustment 221 S 07/10-07/11 3rd Pass Rod Pattern Adjustment 106 S 07/12-07/13 CW System Chlorination 122 S 07/17 CW System Chlorination 348 S 07/21 CW System Chlorination 291 S 07/28 CW System Chlorination 24 S Total All Losses (Scheduled and Forced) = 6928 MW-hr

OPERATING DATA REPORT DOCKET: 271 PREPARER NAME: Anthony L. Stevens UNIT_NME: Vermont Yankee Unit 1 PREPARER TELEPHONE: (802) 451-3176 RPT_PERIOD: 201308

1. Design Electrical Rating: 617
2. Maximum Dependable Capacity (MWe-Net) 605 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,212.69 311,823.06
4. Number of Hours Generator On-line 744.00 5,193.65 307,911.81
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 446,712.00 3,095,111.00 156,498,458.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Dates Activity MW-hr S/F 08/02-08/03 CW System Chlorination 146 S 08/08-08/09 CW System Chlorination 522 S 08/13-08/14 CW System Chlorination 123 S 08/20-08/21 CW System Chlorination 145 S 08/26 Delta V Power Supply Failure 61 F 08/27-08/28 CW System Chlorination 307 S 08/30-08/31 CW System Chlorination 273 S Total All Losses (Scheduled and Forced) = 1577 MW-hr

OPERATING DATA REPORT DOCKET: 271 PREPARER NAME: Anthony L. Stevens UNIT_NME: Vermont Yankee Unit 1 PREPARER TELEPHONE: (802) 451-3176 RPT_PERIOD: 201309

1. Design Electrical Rating: 617
2. Maximum Dependable Capacity (MWe-Net) 605 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,932.69 312,543.06
4. Number of Hours Generator On-line 720.00 5,913.65 308,631.81
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 398,447.00 3,493,558.00 156,896,905.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Dates Activity MW-hr S/F 09/10-09/11 CW System Chlorination 283 S 09/23-09/30 B Recirc MG Set Repair (Oil Leak) & Assoc. Passes 33666 F < 10 days 09/26 Rod Sequence Exch. 767 S 09/26 Single Rod Scram Testing 1582 S 09/26 Quarterly MSIV Testing 897 S 09/26 Quarterly Turbine Valve Testing 2200 S Total All Losses (Scheduled and Forced) = 39395 MW-hr

OPERATING DATA REPORT DOCKET: 424 PREPARER NAME: Doug Holt UNIT_NME: Vogtle Unit 1 PREPARER TELEPHONE: 706-826-3467 RPT_PERIOD: 201307

1. Design Electrical Rating: 1169
2. Maximum Dependable Capacity (MWe-Net) 1150 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 209,224.49
4. Number of Hours Generator On-line 744.00 5,087.00 207,134.62
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 854,187.00 5,944,250.00 235,321,123.50 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Through July 1 at approximately 00:15, Unit 1 was at maximum operating power with no significant operating problems. On July 1 at approximately 00:15, Unit 1 began a planned derate to approximately 98% reactor power for turbine control valve testing. On July 1 at approximately 06:40, the Unit 1 reactor had returned to maximum operating power and remained there for the rest of the month.

OPERATING DATA REPORT DOCKET: 424 PREPARER NAME: Doug Holt UNIT_NME: Vogtle Unit 1 PREPARER TELEPHONE: 706-826-3467 RPT_PERIOD: 201308

1. Design Electrical Rating: 1169
2. Maximum Dependable Capacity (MWe-Net) 1150 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,831.00 209,968.49
4. Number of Hours Generator On-line 744.00 5,831.00 207,878.62
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 856,700.00 6,800,950.00 236,177,823.50 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 1 was at maximum operating power during the month of August.

OPERATING DATA REPORT DOCKET: 424 PREPARER NAME: Doug Holt UNIT_NME: Vogtle Unit 1 PREPARER TELEPHONE: 706-826-3467 RPT_PERIOD: 201309

1. Design Electrical Rating: 1169
2. Maximum Dependable Capacity (MWe-Net) 1150 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,551.00 210,688.49
4. Number of Hours Generator On-line 720.00 6,551.00 208,598.62
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 832,984.00 7,633,934.00 237,010,807.50 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Through September 29 at approximately 02:10, Unit 1 was at maximum operating power with no significant operating problems. On September 29 at approximately 02:10, Unit 1 began a planned derate to approximately 98% reactor power for turbine control valve testing. On September 29 at approximately 05:30, the Unit 1 reactor had returned to maximum operating power and remained there for the rest of the month.

OPERATING DATA REPORT DOCKET: 425 PREPARER NAME: Doug Holt UNIT_NME: Vogtle Unit 2 PREPARER TELEPHONE: 706-826-3467 RPT_PERIOD: 201307

1. Design Electrical Rating: 1169
2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,342.53 193,828.63
4. Number of Hours Generator On-line 744.00 4,279.80 192,478.97
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 865,534.00 4,907,076.00 219,334,749.50 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 2 was at maximum operating power during the month of July.

OPERATING DATA REPORT DOCKET: 425 PREPARER NAME: Doug Holt UNIT_NME: Vogtle Unit 2 PREPARER TELEPHONE: 706-826-3467 RPT_PERIOD: 201308

1. Design Electrical Rating: 1169
2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,086.53 194,572.63
4. Number of Hours Generator On-line 744.00 5,023.80 193,222.97
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 866,037.00 5,773,113.00 220,200,786.50 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 2 was at maximum operating power during the month of August.

OPERATING DATA REPORT DOCKET: 425 PREPARER NAME: Doug Holt UNIT_NME: Vogtle Unit 2 PREPARER TELEPHONE: 706-826-3467 RPT_PERIOD: 201309

1. Design Electrical Rating: 1169
2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 5,806.53 195,292.63
4. Number of Hours Generator On-line 720.00 5,743.80 193,942.97
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 841,624.00 6,614,737.00 221,042,410.50 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Through September 7 at approximately 22:28, Unit 2 was at maximum operating power with no significant operating problems. On September 7 at approximately 22:28, Unit 2 began a planned derate to approximately 98% reactor power for turbine control valve testing. On September 8 at approximately 02:41, the Unit 2 reactor had returned to maximum operating power and remained there for the rest of the month.

OPERATING DATA REPORT DOCKET: 382 PREPARER NAME: Jim Pollock UNIT_NME: Waterford Unit 3 PREPARER TELEPHONE: (504) 739-6561 RPT_PERIOD: 201307

1. Design Electrical Rating: 1173
2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,538.95 213,980.15
4. Number of Hours Generator On-line 744.00 4,502.46 212,316.66
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 861,067.00 5,130,234.00 233,079,566.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit operated at an average reactor power level of 99.6% and experienced no shutdowns or significant power reductions during the period.

OPERATING DATA REPORT DOCKET: 382 PREPARER NAME: Jim Pollock UNIT_NME: Waterford Unit 3 PREPARER TELEPHONE: (504) 739-6561 RPT_PERIOD: 201308

1. Design Electrical Rating: 1173
2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,282.95 214,724.15
4. Number of Hours Generator On-line 744.00 5,246.46 213,060.66
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 855,027.00 5,985,261.00 233,934,593.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit operated at an average reactor power level of 99.9% and experienced no shutdowns or significant power reductions during the period.

OPERATING DATA REPORT DOCKET: 382 PREPARER NAME: JIm Pollock UNIT_NME: Waterford Unit 3 PREPARER TELEPHONE: (504) 739-6561 RPT_PERIOD: 201309

1. Design Electrical Rating: 1173
2. Maximum Dependable Capacity (MWe-Net) 1152 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,002.95 215,444.15
4. Number of Hours Generator On-line 720.00 5,966.46 213,780.66
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 819,910.00 6,805,171.00 234,754,503.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit operated at an average reactor power level of 99.7% and experienced no shutdowns or significant power reductions during the period.

OPERATING DATA REPORT DOCKET: 390 PREPARER NAME: Tiffany Bridges UNIT_NME: Watts Bar Unit 1 PREPARER TELEPHONE: 423-365-1434 RPT_PERIOD: 201307

1. Design Electrical Rating: 1160
2. Maximum Dependable Capacity (MWe-Net) 1123 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,047.00 136,364.07
4. Number of Hours Generator On-line 744.00 5,036.35 135,664.98
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 833,711.00 5,764,198.00 152,035,645.08 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Grid related energy loss due to Auto Tripfrom a 1A Mainbank Transformer Mismatch that was Energy Deliverys equipment.

Unplanned Losses are due to manageable losses.

OPERATING DATA REPORT DOCKET: 390 PREPARER NAME: Tiffany Bridges UNIT_NME: Watts Bar Unit 1 PREPARER TELEPHONE: 423-365-1434 RPT_PERIOD: 201308

1. Design Electrical Rating: 1160
2. Maximum Dependable Capacity (MWe-Net) 1123 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,791.00 137,108.07
4. Number of Hours Generator On-line 744.00 5,780.35 136,408.98
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 837,231.00 6,601,429.00 152,872,876.08 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unplanned Losses are Manageable Losses.

OPERATING DATA REPORT DOCKET: 390 PREPARER NAME: Tiffany Bridges UNIT_NME: Watts Bar Unit 1 PREPARER TELEPHONE: 423-365-1434 RPT_PERIOD: 201309

1. Design Electrical Rating: 1160
2. Maximum Dependable Capacity (MWe-Net) 1123 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,511.00 137,828.07
4. Number of Hours Generator On-line 720.00 6,500.35 137,128.98
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical energy Generated (MWHrs) 813,145.00 7,414,574.00 153,686,021.08 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unplanned Losses are Manageable Losses

OPERATING DATA REPORT DOCKET: 482 PREPARER NAME: W M Muilenburg UNIT_NME: Wolf Creek Unit 1 PREPARER TELEPHONE: 620 364-8831 RPT_PERIOD: 201307

1. Design Electrical Rating: 1200
2. Maximum Dependable Capacity (MWe-Net) 1164 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 3,309.08 210,656.06
4. Number of Hours Generator On-line 744.00 3,218.67 208,963.65
5. Reserve Shutdown Hours 0.00 0.00 339.80
6. Net Electrical energy Generated (MWHrs) 882,785.00 3,638,273.00 239,769,240.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit operated in Mode 1, at or near 100% power, from July 1, 2013 through July 31, 2013.

OPERATING DATA REPORT DOCKET: 482 PREPARER NAME: W M Muilenburg UNIT_NME: Wolf Creek Unit 1 PREPARER TELEPHONE: 620 364-8831 RPT_PERIOD: 201308

1. Design Electrical Rating: 1200
2. Maximum Dependable Capacity (MWe-Net) 1164 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,053.08 211,400.06
4. Number of Hours Generator On-line 744.00 3,962.67 209,707.65
5. Reserve Shutdown Hours 0.00 0.00 339.80
6. Net Electrical energy Generated (MWHrs) 883,930.00 4,522,203.00 240,653,170.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit operating in Mode 1, at or near 100% power, from August 1, 2013 through August 31, 2013.

OPERATING DATA REPORT DOCKET: 482 PREPARER NAME: W M Muilenburg UNIT_NME: Wolf Creek Unit 1 PREPARER TELEPHONE: 620 364-8831 RPT_PERIOD: 201309

1. Design Electrical Rating: 1200
2. Maximum Dependable Capacity (MWe-Net) 1164 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 298.57 4,351.65 211,698.63
4. Number of Hours Generator On-line 270.58 4,233.25 209,978.23
5. Reserve Shutdown Hours 0.00 0.00 339.80
6. Net Electrical energy Generated (MWHrs) 292,148.00 4,814,351.00 240,945,318.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause - Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 13-3 9/11/2013 F 449.42 D 1 SGK05A Train A, class 1E air conditioning unit not capable of performing its cooling function.

SUMMARY

The unit operating in Mode 1, at or near 100% power, from September 1, 2013 through September 11, 2013, when the unit was shutdown (Tech.

Spec. 3.0.3) due to declaring SGK05A, Class 1E A/C unit nonfunctional. This resulted in Technical Specification equipment being declared inoperable. Replaced the A/C unit compresser and returned the unit to power on September 29, 2013. The unit continued to operate in Mode 1 at or near 100% power through September 30, 2013.