ML17111A844: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION  
{{#Wiki_filter:UNITED STATES
REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257
                                  NUCLEAR REGULATORY COMMISSION
  April 20, 2017  
                                                  REGION II
Mr. Robert T. Simril  
                              245 PEACHTREE CENTER AVENUE NE, SUITE 1200
Site Vice President  
                                        ATLANTA, GEORGIA 30303-1257
                                              April 20, 2017
Mr. Robert T. Simril
Site Vice President
Duke Energy Carolinas, LLC
Catawba Nuclear Station
4800 Concord Road
York, SC 29745
SUBJECT: CATAWBA NUCLEAR STATION, UNITS 1 AND 2 - NOTIFICATION OF
              CONDUCT OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION AND
              REQUEST FOR INFORMATION (NRC INSPECTION REPORT NOS.
              05000413/2017009 AND 05000414/2017009)
Dear Mr. Simril:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
staff will conduct a triennial fire protection baseline inspection at Catawba Nuclear Plant, Units 1
and 2. The inspection team will be led by Mr. Rodney Fanner, a Senior Reactor Inspector from
the NRC Region II Office. The team will be composed of personnel from the NRC Region II
Office. The inspection will be conducted in accordance with IP 71111.05XT, Fire Protection -
NFPA 805 (Triennial), the NRC's baseline fire protection inspection procedure, dated
January 31, 2013.
On April 10, 2017, during a telephone conversation between Ms. Sherry Andrews, Catawba
Licensing, and Mr. Rodney Fanner, USNRC RII, our respective staff confirmed arrangements
for an information gathering onsite visit and a two-week onsite inspection. The schedule for the
inspection is as follows:
        *    Information gathering visit:      June 27 - 29, 2017
        *    Week 1 of onsite inspection:      July 24 - 28, 2017
        *    Week 2 of onsite inspection:      August 7 - 11, 2017
The purposes of the information gathering visit are to obtain information and documentation
needed to support the inspection, to become familiar with the Catawba Nuclear Plant fire
protection program, fire protection features, post-fire safe shutdown capabilities, plant layout,
mitigating strategies to address Title 10 of the Code of Federal Regulations (10 CFR) Section
50.54(hh)(2), and, as necessary, obtain plant specific site access training and badging for
unescorted site access.
An initial list of the documents the team will review during the conduct of the inspection is listed
in Enclosures 1 and 2. The team leader will contact you with any additional specific document
requests prior to the information gathering visit.


Duke Energy Carolinas, LLC
T. Simril                                      2
Catawba Nuclear Station
During the information gathering visit, the team will also discuss the following administrative
details: office space and location; specific documents requested to be made available to the
team in their office spaces; arrangements for reactor site access (including radiation protection
training, security, safety, and fitness for duty requirements); and the availability of
knowledgeable plant staff and licensing organization personnel to serve as points of contact
during the inspection.
We request that during the on-site inspection weeks you ensure that copies of analyses,
evaluations, or documentation regarding the implementation and maintenance of the station fire
protection program, including post-fire safe shutdown capability, be readily accessible to the
team for their review. Of specific interest for the fire protection portion of the inspection, are
those documents which establish that your fire protection program satisfies NRC regulatory
requirements and conforms to applicable NRC and industry fire protection guidance (i.e., fire
protection compliance assessment documents). For the 10 CFR 50.54(hh)(2) portion of the
inspection, those documents implementing your mitigating strategies and demonstrating the
management of your commitments for the strategies are of specific interest. Also, personnel
should be available at the site during the inspection who are knowledgeable regarding those
plant systems required to achieve and maintain safe shutdown conditions from inside and
outside the control room, including the electrical aspects of the relevant post-fire safe shutdown
analyses, reactor plant fire protection systems and features, and the station fire protection
program and its implementation.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, under control number
3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
a request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRC Rules and Practices, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records System (PARS) component of NRCs document
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).


4800 Concord Road
T. Simril                                    3
York, SC  29745
Your cooperation and support during this inspection will be appreciated. If you have questions
concerning this inspection, or the inspection team's information or logistical needs, please
SUBJECT:  CATAWBA NUCLEAR STATION, UNITS 1 AND 2 - NOTIFICATION OF
contact Rodney Fanner, the team leader in the Region II office at 404-997-4638 or me at
CONDUCT OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION AND REQUEST FOR INFORMATION (NRC INSPECTION REPORT NOS.  
404-997-4521.
05000413/2017009 AND 05000414/2017009) 
                                              Sincerely,
Dear Mr. Simril: 
                                              /RA: Jonathan Montgomery for/
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) staff will conduct a triennial fire protection baseline inspection at Catawba Nuclear Plant, Units 1 and 2.  The inspection team will be led by Mr. Rodney Fanner, a Senior Reactor Inspector from the NRC Region II Office.  The team will be composed of personnel from the NRC Region II  
                                              Scott M. Shaeffer, Chief
Office. The inspection will be conducted in accordance with IP 71111.05XT, "Fire Protection -
                                              Engineering Branch 2
NFPA 805 (Triennial)," the NRC's baseline fire protection inspection procedure, dated 
                                              Division of Reactor Safety
Docket Nos: 50-413; 50-414
License Nos: NPF-35 and NPF-52
Enclosures:
1. Triennial Fire Protection Inspection
    Supporting Documentation
2. Mitigating Strategies Supporting
    Documentation
cc: Distribution via Listserv


January 31, 2013.
On April 10, 2017, during a telephone conversation between Ms. Sherry Andrews, Catawba Licensing, and Mr. Rodney Fanner, USNRC RII, our respective staff confirmed arrangements for an information gathering onsite visit and a two-week onsite inspection.  The schedule for the
inspection is as follows: 
* Information gathering visit: June 27 - 29, 2017
* Week 1 of onsite inspection: July 24 - 28, 2017
* Week 2 of onsite inspection: August 7 - 11, 2017
The purposes of the information gathering visit are to obtain information and documentation needed to support the inspection, to become familiar with the Catawba Nuclear Plant fire protection program, fire protection features, post-fire safe shutdown capabilities, plant layout,
mitigating strategies to address Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(hh)(2), and, as necessary, obtain plant specific site access training and badging for
unescorted site access. 
An initial list of the documents the team will review during the conduct of the inspection is listed
in Enclosures 1 and 2.  The team leader will contact you with any additional specific document
requests prior to the information gathering visit.
T. Simril 2
During the information gathering visit, the team will also discuss the following administrative details: office space and location; specific documents requested to be made available to the
team in their office spaces; arrangements for reactor site access (including radiation protection training, security, safety, and fitness for duty requirements); and the availability of knowledgeable plant staff and licensing organization personnel to serve as points of contact
during the inspection. 


   
_________________________              SUNSI REVIEW COMPLETE    FORM 665 ATTACHED
We request that during the on-site inspection weeks you ensure that copies of analyses,  
OFFICE            RII:DRS      RII:DRS
evaluations, or documentation regarding the implementation and maintenance of the station fire protection program, including post-fire safe shutdown capability, be readily accessible to the team for their review. Of specific interest for the fire protection portion of the inspection, are
SIGNATURE        RJF2 VIA      JMM9 FOR
those documents which establish that your fire protection program satisfies NRC regulatory
                  EMAIL        SMS
requirements and conforms to applicable NRC and industry fire protection guidance (i.e., fire  
NAME              RFANNER      SSHAEFFER
protection compliance assessment documents).  For the 10 CFR 50.54(hh)(2) portion of the inspection, those documents implementing your mitigating strategies and demonstrating the management of your commitments for the strategies are of specific interest. Also, personnel
DATE                  4/20/2017    4/20/2017    4/ /2017    4/ /2017      4/ /2017    4/ /2017      4/  /2017
should be available at the site during the inspection who are knowledgeable regarding those
  E-MAIL COPY?        YES    NO  YES      NO  YES    NO    YES    NO      YES    NO    YES    NO    YES    NO
plant systems required to achieve and maintain safe shutdown conditions from inside and  
       
outside the control room, including the electrical aspects of the relevant post-fire safe shutdown analyses, reactor plant fire protection systems and features, and the station fire protection program and its implementation.
      TRIENNIAL FIRE PROTECTION INSPECTION SUPPORTING DOCUMENTATION
The documents and information requested below should generally be made available to the
inspection team during the on-site information gathering visit for the team's use both on-site and
off-site during the inspection. Electronic format is the preferred media, except where specifically
noted, if readily available. The preferred file format is readable and searchable PDF files. If
electronic media is made available via an internet based remote document management
system, then the remote document access must allow inspectors to download, save, and print
the documents in the NRC's regional office. Electronic media on compact disc or paper records
(hard copy) are acceptable. At the end of the inspection, the documents in the team's
possession will not be retained.
Approximately three weeks before the on-site information gathering visit, the following
documents should be made available to the team leader for review in the regional office:
    *    Post-fire Safe Shutdown and / or Alternative Shutdown Analysis (request A.1)
    *    Fire Hazards Analysis (request A.2)
    *    Fire Probabilistic Risk Assessment Summary Document or full PRA Document (If
        available)
    *    Fire Risk Evaluations (If available)
    *    Individual Plant Examination for External Events (Fire Chapter ONLY) (request A.3)
    *    Plant layout drawings that identify: C-size paper drawings and electronic copy (request
        B.6).
            o Plant fire area boundaries;
            o Combustible control zone drawings;
            o Areas protected by automatic fire suppression and detection; and
            o Locations of fire protection equipment.
Based on review of the above documents, the team leader will identify a preliminary list of fire
areas being considered for inspection prior to the on-site information gathering visit. During the
information gathering visit, or shortly thereafter, the fire areas selected for inspection will be
determined.
This document request is based on typical documents that a generic plant might have. As such,
this generic document request is not meant to imply that any specific plant is required to have all
of the listed documents. It is recognized that some documents listed below may not be
available for your plant. In addition, the document titles listed below are based on typical
industry document names; your plant specific document titles may vary.
A.  DESIGN AND LICENSING BASIS DOCUMENTS
    A.1    Post-fire Safe Shutdown and / or Alternative Shutdown Analysis.
    A.2    Fire Hazards Analysis.
    A.3    Individual Plant Examination for External Events (IPEEE) (Fire Chapter ONLY),
            including:
            * Results of any post-IPEEE reviews; and
            * List of actions taken or plant modifications performed in response to the IPEEE
              results.
                                                                                          Enclosure 1


   
                                                  2
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.)Existing information collection
  A.4 Fire Protection Program and/or Fire Protection Plan.
requirements were approved by the Office of Management and Budget, under control number 3150 0011The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting
  A.5  List of post-fire safe shutdown or alternative shutdown systems (i.e., safe shutdown
document displays a currently valid Offi
        equipment list).
ce of Management and Budget control number.
  A.6  Fire Protection Systems Design Basis Documents.
  A.7 Post-fire Safe Shutdown or Alternative Shutdown Design Basis Document.
In accordance with 10 CFR 2.390 of the NRC Rules and Practices, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Reco
  A.8  List of applicable NFPA codes and standards and issuance dates (i.e., codes of
rds System (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
        record).
T. Simril 3
  A.9 List of deviations from NFPA codes of record.
  Your cooperation and support during this inspection will be appreciatedIf you have questions concerning this inspection, or the inspection team's information or logistical needs, please
  A.10 NFPA Compliance Review Report.
contact Rodney Fanner, the team leader in the Region II office at 404-997-4638 or me at 
  A.11 Report or evaluation that compares the fire protection program to the NRC Branch
404-997-4521.  
        Technical Position (BTP) 9.5-1 Appendix A.
Sincerely,        /RA: Jonathan Montgomery for/
  A.12 Electronic copy of licensee submittals and NRC safety evaluation reports that are
Scott M. Shaeffer, Chief Engineering Branch 2
        specifically listed in the facility operating license for the approved fire protection
        program.
  A.13 NRC Safety Evaluation Reports for fire protection program and post-fire safe
        shutdown or alternative shutdown features.
  A.14 NRC approved exemptions for plant fire protection and post-fire safe shutdown or
        alternative shutdown features.
  A.15 Exemption requests submitted but not yet approved for plant fire protection and post-
        fire safe shutdown or alternative shutdown features.
  A.16 Facility Operating License (electronic format only).
  A.17 Technical Specifications (electronic format only).
  A.18 Technical Requirements Manual (electronic format only).
  A.19 Updated Final Safety Analysis Report (electronic format only).
B. GENERAL PLANT DESIGN DOCUMENTS
  B.1 Piping and instrumentation diagrams (P&IDs) and legend list for post-fire safe
        shutdown or alternative shutdown systems (C-size paper drawings and electronic
        copy).
  B.2 P&IDs and legend list for fire protection systems, including fire water supply, water
        suppression sprinklers & deluge, and CO2 and Halon systems (C-size paper drawings
        and electronic copy).


Division of Reactor Safety
                                                3
   
  B.3 AC and DC electrical system single line diagrams, from off-site power down to the
Docket Nos: 50-413; 50-414 License Nos: NPF-35 and NPF-52
        highest safety-related bus level (typically 4kV, EDG bus), (C-size paper drawings and
  Enclosures: 1. Triennial Fire Protection Inspection  
        electronic copy).
      Supporting Documentation  
  B.4  Single line diagrams for motor control centers (MCCs) that supply post-fire safe
2. Mitigating Strategies Supporting      Documentation  
        shutdown or alternative shutdown loads (only for selected fire areas) (C-size paper
   
        drawings and electronic copy ).
cc: Distribution via Listserv
  B.5  Equipment location drawings which identify the physical plant locations of post-fire
        safe shutdown or alternative shutdown equipment (C-size paper drawings and
        electronic copy).
  B.6 Plant layout drawings which identify: (C-size paper drawings and electronic copy)
        *  Plant fire area boundaries;
        *  Combustible control zone drawings;
        *  Areas protected by automatic fire suppression and detection; and
        *  Locations of fire protection equipment.
C. CLASSICAL FIRE PROTECTION
  C.1 Fire protection program implementing procedures (e.g., administrative controls,
        surveillance testing, fire brigade).
  C.2  List of calculations and engineering analyses, studies, or evaluations for the fire
        protection system, including the fire water system.
  C.3  Hydraulic calculation or analysis for fire protection water system in the selected fire
        areas.
  C.4 Last two completed surveillance records of fire protection features in the selected fire
        areas (detection, suppression, damper inspections, damper tests, penetration
        inspections, barrier inspections, etc.).
  C.5 List of routine tests, surveillances, and preventive maintenance on fire pumps,
        including pump controllers and batteries.
  C.6  Last two completed annual fire pump pressure and flow tests.
  C.7 Last two completed monthly and/or quarterly fire pump tests.
  C.8 Last two completed fire loop flow tests and loop flushes.
  C.9 CO2 and Halon initial discharge testing or calculation that determined appropriate
        concentrations and soak or hold times can be achieved (only for selected fire areas).
  C.10 Last five hot work permits (at power).
  C.11 Last five transient combustible permits (at power).


                                                4
 
C.12 For Fire Brigade Drills, provide the following:
    *  Last drill critique for a drill with off-site fire department support;
    *  Summary of any unsatisfactory drill performance items for last three years; and
    *  Last unannounced drill critique by a qualified individual independent of the
        licensee's staff.
C.13 For fire brigade equipment, provide the following:
    *  Procedure for inventory and inspection; and
    *  Most recent inspection and inventory results.
C.14 Fire Brigade Medical Evaluations and Qualifications, including self-contained
    breathing apparatus (SCBA) and training lesson plans.
C.15 Electronic copy of the mutual aid agreement for the first-due local fire department
    that is currently in effect.
C.16 Flooding analysis for selected fire areas, which demonstrates:
    * a fire water pipe break in the selected fire areas wont affect safe shutdown (SSD)
      capability for equipment in the selected fire areas;
    * a fire water pipe break in an adjacent fire area wont affect SSD capability for
      equipment in the selected fire areas;
    * hydrostatic rating of any floor penetration seals installed within the fire areas that
      are credited with keeping water from leaking into fire areas below.
C.17 Pre-fire plans for the selected fire areas and their adjacent fire areas.
C.18 For Emergency Lighting Units (ELU), provide the following:
    *  List of Preventive Maintenance tasks, frequencies, and bases;
    *  Most recently performed monthly or quarterly functional test;
    *  Most recently performed battery discharge performance test, if applicable;
    *  ELU battery loading analysis;
    *  vendor manual(s);
    *  results of black-out testing (if performed);
    *  Maintenance Rule program information related to the ELU, if applicable; and
    *  Compensatory measures taken when ELU are out of service.
C.19 Impairment Log (for period of 3 months before the start of inspection), for fire
    protection features that are out of service.
C.20 List of Fire Protection screening reviews since the last inspection for recent design
    changes, modifications, or temporary modifications (e.g., a Generic Letter 86-10
    review that screened out).
C.21 List of fire protection system design changes completed in the last three years
    (including their associated 10 CFR 50.59 and Generic Letter 86-10 evaluations).


_________________________  SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE RJF2 VIA EMAIL JMM9 FOR SMS    NAME RFANNER SSHAEFFER      DATE 4/20/2017 4/20/2017 4/   /2017 4/   /2017 4/    /2017 4/    /2017 4/    /2017 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO     
                                                  5
    Enclosure 1
   C.22 List of penetration seal work, re-work, or installation activities in the last three years.
TRIENNIAL FIRE PROTECTION INSPECTION SUPPORTING DOCUMENTATION
   C.23 List of fire wrap work, re-work, or installation activities in the last three years.
The documents and information requested below should generally be made available to the inspection team during the on-site information gathering visit for the team's use both on-site and off-site during the inspection. Electronic format
  C.24 Fire protection system health reports for the two most recent years.
is the preferred media, except where specifically noted, if readily available. The preferred file format is readable and searchable PDF files. If
  C.25 Fire protection program health report for the two most recent years.
electronic media is made available via an internet based remote document management
  C.26 Emergency lighting system health reports for the two most recent years.
system, then the remote document access must allow inspectors to download, save, and print
  C.27 Licensee evaluation of industry operating experience, related to the Fire Protection
the documents in the NRC's regional office. Electronic media on compact disc or paper records (hard copy) are acceptableAt the end of the inspection, the documents in the team's possession will not be retained. Approximately three weeks before the on-site information gathering visit, the following documents should be made available to the team leader for review in the regional office:
        Program for the three most recent years.
* Post-fire Safe Shutdown and / or Alternative Shutdown Analysis (request A.1)
D. ELECTRICAL
* Fire Hazards Analysis (request A.2)  
  D.1 Identify whether the cables in the selected fire areas are predominantly Thermoset or
* Fire Probabilistic Risk Assessment Summary Document or full PRA Document (If
        Thermoplastic. Specifically identify any Thermoplastic cable in the selected fire
available)
        areas.
* Fire Risk Evaluations (If available)
  D.2  Breaker and fuse coordination calculation for post-fire safe shutdown or alternative
* Individual Plant Examination for External Events (Fire Chapter ONLY) (request A.3)
        shutdown equipment (only for selected fire areas).
* Plant layout drawings that identify: C-size paper drawings and electronic copy (request
  D.3  Administrative or configuration control procedures that govern fuse replacement (e.g.,
B.6). o Plant fire area boundaries;
        fuse control procedures).
o Combustible control zone drawings;
  D.4  Maintenance procedures that verify breaker over-current trip settings to ensure
o Areas protected by automatic fire suppression and detection; and
        coordination remains functional, for post-fire safe shutdown or alternative shutdown
o Locations of fire protection equipment.  
        equipment.
  Based on review of the above documents, the team leader will identify a preliminary list of fire areas being considered for inspection prior to the on-site information gathering visitDuring the information gathering visit, or shortly thereafter, the fire areas selected for inspection will be
  D.5  Electrical system health reports for the two most recent years.
  D.6  Last completed preventive maintenance of those components as tested from the safe
        shutdown or alternative shutdown panel.
  D.7 Schematic or elementary diagrams for circuits to be reviewed, as requested by
        inspector (C-size paper drawings and electronic copy).
  D.8  Cable routing for components and equipment credited for post-fire safe shutdown or
        alternative shutdown (only for selected fire areas).
  D.9 List of post-fire safe shutdown or alternative shutdown design changes completed,
        since the last inspection.
E. SPURIOUS FIRE INDUCED CIRCUIT FAULTS
  E.1  List of identified fire induced circuit failure configurations (only for selected fire areas).
  E.2 Multiple Spurious Operation (MSO) Expert Panel Report.


determined.
                                                6
This document request is based on typical documents that a generic plant might haveAs such, this generic document request is not meant to imply that any specific plant is required to have all of the listed documents. It is recognized that some documents listed below may not be
  E.3 Corrective actions for fire-induced circuit failures, both single and multiple spurious
available for your plant. In addition, the document titles listed below are based on typical
        actuations for the selected fire areas.
industry document names; your plant specific document titles may vary.  
F. OPERATIONS
  A. DESIGN AND LICENSING BASIS DOCUMENTS A.1 Post-fire Safe Shutdown and / or Alternative Shutdown Analysis. A.2 Fire Hazards Analysis.
  F.1 List of calculations and engineering analyses, studies, or evaluations for the safe
A.3 Individual Plant Examination for External Events (IPEEE) (Fire Chapter ONLY), including:
        shutdown or alternative shutdown methodology.
* Results of any post-IPEEE reviews; and
  F.2  List of licensed operator Job Performance Measures (JPMs) for operator manual
* List of actions taken or plant modifications performed in response to the IPEEE
        actions required by post-fire safe shutdown or alternative shutdown.
results.  
  F.List of non-licensed operator training associated with post-fire safe shutdown or
2      A.4 Fire Protection Program and/or Fire Protection Plan. A.5 List of post-fire safe shutdown or alternative shutdown systems (i.e., safe shutdown
        alternative shutdown manual actions that would be performed by a non-licensed
equipment list). A.6 Fire Protection Systems Design Basis Documents.
        operator (including JPMs, in-field training walkdowns, simulations, or initial
A.7 Post-fire Safe Shutdown or Alternative Shutdown Design Basis Document.  
        qualification).
A.8 List of applicable NFPA codes and standards and issuance dates (i.e., codes of
  F.4  List of lesson plans for post-fire safe shutdown or alternative shutdown training for
record). A.9 List of deviations from NFPA codes of record. A.10 NFPA Compliance Review Report.   A.11 Report or evaluation that compares the fire protection program to the NRC Branch Technical Position (BTP) 9.5-1 Appendix A. A.12 Electronic copy of licensee submittals and NRC safety evaluation reports that are specifically listed in the facility operating license for the approved fire protection program. A.13 NRC Safety Evaluation Reports for fire protection program and post-fire safe shutdown or alternative shutdown features. A.14 NRC approved exemptions for plant fire protection and post-fire safe shutdown or alternative shutdown features. A.15 Exemption requests submitted but not yet approved for plant fire protection and post-fire safe shutdown or alternative shutdown features. A.16 Facility Operating License (electronic format only).  
        licensed and non-licensed operators.
A.17 Technical Specifications (electronic format only).  
  F.5  For operator manual actions (OMAs) provide the following:
A.18  Technical Requirements Manual (electronic format only).  
        *  Manual Action Feasibility Study;
A.19 Updated Final Safety Analysis Report (electronic format only).  
        *   Operator Time Critical Action Program;
B. GENERAL PLANT DESIGN DOCUMENTS B.1 Piping and instrumentation diagrams (P&IDs) and legend list for post-fire safe
        *  Time lines for time-critical OMAs; and
shutdown or alternative shutdown system
        *  Time line validations;
s (C-size paper drawings and electronic
        *  Environmental and habitability evaluations for post-fire operator manual actions
copy). B.2 P&IDs and legend list for fire protection systems, including fire water supply, water suppression sprinklers & deluge, and CO
            (temperature, smoke, humidity, SCBAs, etc.).
2 and Halon systems (C-size paper drawings and electronic copy).
  F.6  Thermal hydraulic calculation or analysis that determines the time requirements for
3      B.3 AC and DC electrical system single line di
        time-critical manual operator actions.
agrams, from off-site power down to the highest safety-related bus level (typically 4kV, EDG bus), (C-size paper drawings and electronic copy). B.4 Single line diagrams for motor control centers (MCCs) that supply post-fire safe shutdown or alternative shutdown loads (only for selected fire areas) (C-size paper drawings and electronic copy ). B.5 Equipment location drawings which identify the physical plant locations of post-fire safe shutdown or alternative shutdown equipment (C-size paper drawings and electronic copy). B.6 Plant layout drawings which identify:  (C-size paper drawings and electronic copy)
  F.7  Operating procedures for post-fire safe shutdown from the control room with a
* Plant fire area boundaries;
        postulated fire in the selected fire areas.
* Combustible control zone drawings;
  F.8  Operating procedures for post-fire safe shutdown or alternative shutdown from
* Areas protected by automatic fire suppression and detection; and
        outside the control room.
* Locations of fire protection equipment.  
  F.9  For safe shutdown equipment and tools, provide the following:
  C. CLASSICAL FIRE PROTECTION C.1 Fire protection program implementing procedures (e.g., administrative controls, surveillance testing, fire brigade). C.2 List of calculations and engineering analyses, studies, or evaluations for the fire protection system, including the fire water system. C.3 Hydraulic calculation or analysis for fire protection water system in the selected fire
        *  Procedure for inventory and inspection; and
areas. C.4 Last two completed surveillance records of fire protection features in the selected fire areas (detection, suppression, damper inspections, damper tests, penetration inspections, barrier inspections, etc.). C.5 List of routine tests, surveillances, and preventive maintenance on fire pumps, including pump controllers and batteries. C.6 Last two completed annual fire pump pressure and flow tests.  
        *  Most recent inspection and inventory results.
C.7 Last two completed monthly and/or quarterly fire pump tests.  
  F.10 List of procedures that implement Cold Shutdown Repairs.
C.8 Last two completed fire loop flow tests and loop flushes.  
  F.11 For Cold Shutdown Repairs, provide the following:
C.9 CO2 and Halon initial discharge testing or calculation that determined appropriate concentrations and soak or hold times can be achieved (only for selected fire areas). C.10 Last five hot work permits (at power).
        *  Procedure for inventory and inspection (i.e., needed tools, material, etc.); and
C.11 Last five transient combustible permits (at power)
        *  Most recent inspection and inventory results.
4      C.12 For Fire Brigade Drills, provide the following:
 
* Last drill critique for a drill with off-site fire department support;
                                                7
* Summary of any unsatisfactory drill performance items for last three years; and
  F.12 Calculation or analysis that demonstrates pressurizer level will remain within the
* Last unannounced drill critique by a qualified individual independent of the licensee's staff.
        indicating range for a PWR, or reactor water level will remain above the top of active
C.13 For fire brigade equipment, provide the following:
        fuel for a BWR, at the safe shutdown or alternative shutdown panel, in accordance
* Procedure for inventory and inspection; and  
        with the requirements of 10 CFR 50 Appendix R III.L performance goals.
* Most recent inspection and inventory results.  
  F.13 For Radio communications, provide the following:
  C.14 Fire Brigade Medical Evaluations and Qualifications, including self-contained breathing apparatus (SCBA) and training lesson plans. C.15 Electronic copy of the mutual aid agreement for the "first-due" local fire department that is currently in effect. C.16 Flooding analysis for selected fire areas, which demonstrates:
        *    Communications Plan for firefighting and post-fire safe shutdown manual actions;
* a fire water pipe break in the selected fire areas won't affect safe shutdown (SSD) capability for equipment in the selected fire areas;
        *    Repeater locations;
* a fire water pipe break in an adjacent fire area won't affect SSD capability for equipment in the selected fire areas
        *    Cable routing for repeater power supply cables;
* hydrostatic rating of any floor penetration seals installed within the fire areas that are credited with keeping water from leaking into fire areas below.
        *    Radio coverage test results; and
  C.17 Pre-fire plans for the selected fire areas and their adjacent fire areas. C.18 For Emergency Lighting Units (ELU), provide the following:
        *    Radio Dead Spot locations in the plant.
* List of Preventive Maintenance tasks, frequencies, and bases;
  F.14 NRC approved exemption requests for operator manual actions for
* Most recently performed monthly or quarterly functional test;
        10 CFR 50 Appendix R III.G.2 fire areas.
* Most recently performed battery discharge performance test, if applicable;
  F.15 Exemption requests submitted but not yet approved, for operator manual actions for
* ELU battery loading analysis;
        10 CFR 50 Appendix R III.G.2 fire areas.
* vendor manual(s)
G. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS
* results of black-out testing (if performed);
  G.1 Corrective actions for fire-induced circuit failures (including but not limited to NRC
* Maintenance Rule program information related to the ELU, if applicable; and
        IN 92-18), both single and multiple spurious actuations (only for selected fire areas).
* Compensatory measures taken when ELU are out of service.  
  G.2 Corrective actions associated with post-fire safe shutdown or alternative shutdown
C.19 Impairment Log (for period of 3 months before the start of inspection), for fire protection features that are out of service. C.20 List of Fire Protection screening reviews since the last inspection for recent design changes, modifications, or temporary modifications (e.g., a Generic Letter 86-10 review that screened out). C.21 List of fire protection system design changes completed in the last three years (including their associated 10 CFR 50.59 and Generic Letter 86-10 evaluations)
        operator manual actions.
5      C.22 List of penetration seal work, re-work, or installation activities in the last three years. C.23 List of fire wrap work, re-work, or installation activities in the last three years.  
  G.3  Internal and external self-assessments, peer assessments, and audits of fire
C.24 Fire protection system health repor
        protection activities for the last three years.
ts for the two most recent years. C.25 Fire protection program health report for the two most recent years.  
  G.4  Internal and external self-assessments, peer assessments, and audits of post-fire
C.26 Emergency lighting system health reports for the two most recent years. C.27 Licensee evaluation of industry operating experience, related to the Fire Protection Program for the three most recent years.  
        safe shutdown or alternative shutdown capabilities for the last three years.
   
  G.5  List of condition reports for the fire protection system for the last three years.
D. ELECTRICAL D.1 Identify whether the cables in the selected fire areas are predominantly Thermoset or Thermoplastic. Specifically identify any Thermoplastic cable in the selected fire
  G.6  List of condition reports for emergency lighting units for the last three years.
areas. D.2 Breaker and fuse coordination calculation for post-fire safe shutdown or alternative shutdown equipment (only for selected fire areas). D.3 Administrative or configuration control procedures that govern fuse replacement (e.g., fuse control procedures). D.4 Maintenance procedures that verify breaker over-current trip settings to ensure coordination remains functional, for post-fire safe shutdown or alternative shutdown
  G.7  List of condition reports for post-fire safe shutdown (SSD) or alternative shutdown
equipment. D.5 Electrical system health reports for the two most recent years.  
        (ASD) issues for the last three years. This includes issues affecting the SSD or ASD
D.6 Last completed preventive maintenance of those components as tested from the safe shutdown or alternative shutdown panel. D.7 Schematic or elementary diagrams for circuits to be reviewed, as requested by inspector (C-size paper drawings and electronic copy).  D.8 Cable routing for components and equipment credited for post-fire safe shutdown or alternative shutdown (only for selected fire areas). D.9 List of post-fire safe shutdown or alternative shutdown design changes completed, since the last inspection.
        analysis, fire hazards analysis, SSD or ASD operating procedures and/or training,
E. SPURIOUS FIRE INDUCED CIRCUIT FAULTS E.1 List of identified fire induced circuit failure configurations (only for selected fire areas). E.2 Multiple Spurious Operation (MSO) Expert Panel Report. 
        timeline evaluations for operator actions, and supporting engineering evaluations,
6      E.3 Corrective actions for fire-induced circuit failures, both single and multiple spurious actuations for the selected fire areas.  
        analysis, or calculations.
F. OPERATIONS F.1 List of calculations and engineering analyses, studies, or evaluations for the safe
  G.8 List of all Generic Letter 86 - 10 evaluations.
shutdown or alternative shutdown methodology. F.2 List of licensed operator Job Perform
  G.9  Copy of all Generic Letter 86 - 10 evaluations performed in the last three years.
ance Measures (JPMs) for operator manual actions required by post-fire safe shutdown or alternative shutdown. F.3 List of non-licensed operator training associated with post-fire safe shutdown or alternative shutdown manual actions that would be performed by a non-licensed operator (including JPMs, in-field training walkdowns, simulations, or initial qualification). F.4 List of lesson plans for post-fire safe shutdown or alternative shutdown training for licensed and non-licensed operators. F.5 For operator manual actions (OMAs) provide the following:
  G.10 All fire loading calculations and evaluations performed (only for selected fire areas
* Manual Action Feasibility Study;
        and their adjacent fire areas).
* Operator Time Critical Action Program;
 
* Time lines for time-critical OMAs; and
              MITIGATING STRATEGIES SUPPORTING DOCUMENTATION
* Time line validations;
H. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS
* Environmental and habitability evaluations for post-fire operator manual actions (temperature, smoke, humidity, SCBAs, etc.).
  H.1 List of all changes to regulatory commitments made to meet the requirements of Title
F.6 Thermal hydraulic calculation or analysis that determines the time requirements for time-critical manual operator actions. F.7 Operating procedures for post-fire safe shutdown from the control room with a postulated fire in the selected fire areas. F.8 Operating procedures for post-fire safe shutdown or alternative shutdown from outside the control room. F.9 For safe shutdown equipment and tools, provide the following:
        10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2).
* Procedure for inventory and inspection; and
  H.2  List of procedures and guidelines that were revised or generated to implement the
* Most recent inspection and inventory results.
        mitigating strategies. These could be extensive damage mitigation guidelines
F.10 List of procedures that implement Cold Shutdown Repairs. F.11 For Cold Shutdown Repairs, provide the following:
        (EDMGs), severe accident management guidelines (SAMGs), emergency operating
* Procedure for inventory and inspection (i.e., needed tools, material, etc.); and
        procedures (EOPs), abnormal operating procedures (AOPs), etc.
* Most recent inspection and inventory results.
  H.3 A matrix that shows the correlation between the mitigation strategies identified in
 
        Nuclear Energy Institute 06-12, Revision 2, "B.5.b Phase 2 & 3 Submittal Guideline,"
7      F.12 Calculation or analysis that demonstrates pressurizer level will remain within the indicating range for a PWR, or reactor water level will remain above the top of active fuel for a BWR, at the safe shutdown or alternative shutdown panel, in accordance with the requirements of 10 CFR 50 Appendix R III.L performance goals. F.13 For Radio communications, provide the following:
        issued December 2006, and the site-specific procedures or guidelines that are used
* Communications Plan for firefighting and post-fire safe shutdown manual actions;
        to implement each strategy.
* Repeater locations;
  H.List of engineering evaluations or calculations that were used to verify the
* Cable routing for repeater power supply cables;
        engineering bases for the mitigating strategies.
* Radio coverage test results; and
  H.5  Piping and instrumentation diagrams (P&ID) and legend list or simplified flow
* Radio Dead Spot locations in the plant.
        diagrams for systems relied upon in the mitigating strategies. These could be the
F.14  NRC approved exemption requests for operator manual actions for 10 CFR 50 Appendix R III.G.2 fire areas. F.15 Exemption requests submitted but not yet approved, for operator manual actions for 10 CFR 50 Appendix R III.G.2 fire areas.
        type used for training (C-size paper drawings and electronic copy).
G. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS G.1 Corrective actions for fire-induced circui
  H.6  List of modification packages or summary descriptions of modifications with simplified
t failures (including but not limited to NRC IN 92-18), both single and multiple spurious actuations (only for selected fire areas). G.2 Corrective actions associated with post-fire safe shutdown or alternative shutdown operator manual actions.
        drawings, for necessary facility changes to implement the mitigating strategies.
G.3 Internal and external self-assessments, peer assessments, and audits of fire protection activities for the last three years. G.4 Internal and external self-assessments, peer assessments, and audits of post-fire safe shutdown or alternative shutdown capabilities for the last three years. G.5 List of condition reports for the fire protection system for the last three years.
  H.7  List of routine tests, surveillances, and preventive maintenance for equipment and
G.6 List of condition reports for emergency lighting units for the last three years. G.7 List of condition reports for post-fire safe shutdown (SSD) or alternative shutdown (ASD) issues for the last three years.  This includes issues affecting the SSD or ASD
        tools needed to implement 10 CFR 50.54(hh)(2) strategies.
analysis, fire hazards analysis, SSD or ASD operating procedures and/or training, timeline evaluations for operator actions, and supporting engineering evaluations, analysis, or calculations. G.8 List of all Generic Letter 86 - 10 evaluations. G.9 Copy of all Generic Letter 86 - 10 evaluations performed in the last three years. G.10 All fire loading calculations and evaluations performed (only for selected fire areas and their adjacent fire areas).
  H.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies,
  Enclosure 2
        provide the following:
MITIGATING STRATEGIES SUPPORTING DOCUMENTATION
        *    Procedures for inventory, testing, and inspection; and
H. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS H.1 List of all changes to regulatory commitments made to meet the requirements of Title
        *    Most recent inspection, inventory, and testing results;
10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2). H.2 List of procedures and guidelines that were revised or generated to implement the mitigating strategies.  These could be extensive damage mitigation guidelines (EDMGs), severe accident management guidelines (SAMGs), emergency operating procedures (EOPs), abnormal operating procedures (AOPs), etc. H.3 A matrix that shows the correlation between the mitigation strategies identified in Nuclear Energy Institute 06-12, Revision 2, "B.5.b Phase 2 & 3 Submittal Guideline," issued December 2006, and the site-specific procedures or guidelines that are used to implement each strategy. H.4 List of engineering evaluations or calculations that were used to verify the engineering bases for the mitigating strategies. H.5 Piping and instrumentation diagrams (P&ID) and legend list or simplified flow diagrams for systems relied upon in the mitigating strategies.  These could be the type used for training (C-size paper drawings and electronic copy). H.6 List of modification packages or summary descriptions of modifications with simplified drawings, for necessary facility changes to implement the mitigating strategies. H.7 List of routine tests, surveillances, and preventive maintenance for equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies. H.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies, provide the following:
        *    Copies of the last two completed performance tests, surveillances, and
* Procedures for inventory, testing, and inspection; and
            preventative maintenance performed on the pumps, including the pump
* Most recent inspection, inventory, and testing results;
            controllers and batteries.
* Copies of the last two completed performance tests, surveillances, and preventative maintenance performed on the pumps, including the pump controllers and batteries.
  H.9  List of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that
H.9 List of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that
        differ from that documented in the submittals or the safety evaluation report.
differ from that documented in the submittals or the safety evaluation report. H.10 Site general arrangement drawings that show the majority of buildings and areas referenced in 10 CFR 50.54(hh)(2) documents (C-size paper drawings and electronic
  H.10 Site general arrangement drawings that show the majority of buildings and areas
copy).  H.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).
        referenced in 10 CFR 50.54(hh)(2) documents (C-size paper drawings and electronic
2        H.12 Copies of memoranda of understanding (MOU), (e.g., with local fire departments) required to implement any mitigating strategies.  H.13 Docketed correspondence for 10 CFR 50.54(hh) to include license amendment requests (LARS); Safety Evaluation Reports (SER); Request for Information (RFI)  
        copy).
and associated responses; and other pertinent documents.
  H.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).
                                                                                    Enclosure 2
 
                                          2
H.12 Copies of memoranda of understanding (MOU), (e.g., with local fire departments)
    required to implement any mitigating strategies.
H.13 Docketed correspondence for 10 CFR 50.54(hh) to include license amendment
    requests (LARS); Safety Evaluation Reports (SER); Request for Information (RFI)
    and associated responses; and other pertinent documents.
}}
}}

Revision as of 04:28, 30 October 2019

Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information (NRC Inspection Report Nos. 05000413/2017009 and 05000414/2017009)
ML17111A844
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/20/2017
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: Simril R
Duke Energy Carolinas
References
IR 2017009
Download: ML17111A844 (13)


See also: IR 05000413/2017009

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

April 20, 2017

Mr. Robert T. Simril

Site Vice President

Duke Energy Carolinas, LLC

Catawba Nuclear Station

4800 Concord Road

York, SC 29745

SUBJECT: CATAWBA NUCLEAR STATION, UNITS 1 AND 2 - NOTIFICATION OF

CONDUCT OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION AND

REQUEST FOR INFORMATION (NRC INSPECTION REPORT NOS.

05000413/2017009 AND 05000414/2017009)

Dear Mr. Simril:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

staff will conduct a triennial fire protection baseline inspection at Catawba Nuclear Plant, Units 1

and 2. The inspection team will be led by Mr. Rodney Fanner, a Senior Reactor Inspector from

the NRC Region II Office. The team will be composed of personnel from the NRC Region II

Office. The inspection will be conducted in accordance with IP 71111.05XT, Fire Protection -

NFPA 805 (Triennial), the NRC's baseline fire protection inspection procedure, dated

January 31, 2013.

On April 10, 2017, during a telephone conversation between Ms. Sherry Andrews, Catawba

Licensing, and Mr. Rodney Fanner, USNRC RII, our respective staff confirmed arrangements

for an information gathering onsite visit and a two-week onsite inspection. The schedule for the

inspection is as follows:

  • Information gathering visit: June 27 - 29, 2017
  • Week 1 of onsite inspection: July 24 - 28, 2017
  • Week 2 of onsite inspection: August 7 - 11, 2017

The purposes of the information gathering visit are to obtain information and documentation

needed to support the inspection, to become familiar with the Catawba Nuclear Plant fire

protection program, fire protection features, post-fire safe shutdown capabilities, plant layout,

mitigating strategies to address Title 10 of the Code of Federal Regulations (10 CFR) Section

50.54(hh)(2), and, as necessary, obtain plant specific site access training and badging for

unescorted site access.

An initial list of the documents the team will review during the conduct of the inspection is listed

in Enclosures 1 and 2. The team leader will contact you with any additional specific document

requests prior to the information gathering visit.

T. Simril 2

During the information gathering visit, the team will also discuss the following administrative

details: office space and location; specific documents requested to be made available to the

team in their office spaces; arrangements for reactor site access (including radiation protection

training, security, safety, and fitness for duty requirements); and the availability of

knowledgeable plant staff and licensing organization personnel to serve as points of contact

during the inspection.

We request that during the on-site inspection weeks you ensure that copies of analyses,

evaluations, or documentation regarding the implementation and maintenance of the station fire

protection program, including post-fire safe shutdown capability, be readily accessible to the

team for their review. Of specific interest for the fire protection portion of the inspection, are

those documents which establish that your fire protection program satisfies NRC regulatory

requirements and conforms to applicable NRC and industry fire protection guidance (i.e., fire

protection compliance assessment documents). For the 10 CFR 50.54(hh)(2) portion of the

inspection, those documents implementing your mitigating strategies and demonstrating the

management of your commitments for the strategies are of specific interest. Also, personnel

should be available at the site during the inspection who are knowledgeable regarding those

plant systems required to achieve and maintain safe shutdown conditions from inside and

outside the control room, including the electrical aspects of the relevant post-fire safe shutdown

analyses, reactor plant fire protection systems and features, and the station fire protection

program and its implementation.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, under control number

3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC Rules and Practices, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records System (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

T. Simril 3

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact Rodney Fanner, the team leader in the Region II office at 404-997-4638 or me at

404-997-4521.

Sincerely,

/RA: Jonathan Montgomery for/

Scott M. Shaeffer, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos: 50-413; 50-414

License Nos: NPF-35 and NPF-52

Enclosures:

1. Triennial Fire Protection Inspection

Supporting Documentation

2. Mitigating Strategies Supporting

Documentation

cc: Distribution via Listserv

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS

SIGNATURE RJF2 VIA JMM9 FOR

EMAIL SMS

NAME RFANNER SSHAEFFER

DATE 4/20/2017 4/20/2017 4/ /2017 4/ /2017 4/ /2017 4/ /2017 4/ /2017

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

TRIENNIAL FIRE PROTECTION INSPECTION SUPPORTING DOCUMENTATION

The documents and information requested below should generally be made available to the

inspection team during the on-site information gathering visit for the team's use both on-site and

off-site during the inspection. Electronic format is the preferred media, except where specifically

noted, if readily available. The preferred file format is readable and searchable PDF files. If

electronic media is made available via an internet based remote document management

system, then the remote document access must allow inspectors to download, save, and print

the documents in the NRC's regional office. Electronic media on compact disc or paper records

(hard copy) are acceptable. At the end of the inspection, the documents in the team's

possession will not be retained.

Approximately three weeks before the on-site information gathering visit, the following

documents should be made available to the team leader for review in the regional office:

  • Post-fire Safe Shutdown and / or Alternative Shutdown Analysis (request A.1)
  • Fire Hazards Analysis (request A.2)

available)

  • Fire Risk Evaluations (If available)
  • Individual Plant Examination for External Events (Fire Chapter ONLY) (request A.3)
  • Plant layout drawings that identify: C-size paper drawings and electronic copy (request

B.6).

o Plant fire area boundaries;

o Combustible control zone drawings;

o Areas protected by automatic fire suppression and detection; and

o Locations of fire protection equipment.

Based on review of the above documents, the team leader will identify a preliminary list of fire

areas being considered for inspection prior to the on-site information gathering visit. During the

information gathering visit, or shortly thereafter, the fire areas selected for inspection will be

determined.

This document request is based on typical documents that a generic plant might have. As such,

this generic document request is not meant to imply that any specific plant is required to have all

of the listed documents. It is recognized that some documents listed below may not be

available for your plant. In addition, the document titles listed below are based on typical

industry document names; your plant specific document titles may vary.

A. DESIGN AND LICENSING BASIS DOCUMENTS

A.1 Post-fire Safe Shutdown and / or Alternative Shutdown Analysis.

A.2 Fire Hazards Analysis.

A.3 Individual Plant Examination for External Events (IPEEE) (Fire Chapter ONLY),

including:

  • Results of any post-IPEEE reviews; and
  • List of actions taken or plant modifications performed in response to the IPEEE

results.

Enclosure 1

2

A.4 Fire Protection Program and/or Fire Protection Plan.

A.5 List of post-fire safe shutdown or alternative shutdown systems (i.e., safe shutdown

equipment list).

A.6 Fire Protection Systems Design Basis Documents.

A.7 Post-fire Safe Shutdown or Alternative Shutdown Design Basis Document.

A.8 List of applicable NFPA codes and standards and issuance dates (i.e., codes of

record).

A.9 List of deviations from NFPA codes of record.

A.10 NFPA Compliance Review Report.

A.11 Report or evaluation that compares the fire protection program to the NRC Branch

Technical Position (BTP) 9.5-1 Appendix A.

A.12 Electronic copy of licensee submittals and NRC safety evaluation reports that are

specifically listed in the facility operating license for the approved fire protection

program.

A.13 NRC Safety Evaluation Reports for fire protection program and post-fire safe

shutdown or alternative shutdown features.

A.14 NRC approved exemptions for plant fire protection and post-fire safe shutdown or

alternative shutdown features.

A.15 Exemption requests submitted but not yet approved for plant fire protection and post-

fire safe shutdown or alternative shutdown features.

A.16 Facility Operating License (electronic format only).

A.17 Technical Specifications (electronic format only).

A.18 Technical Requirements Manual (electronic format only).

A.19 Updated Final Safety Analysis Report (electronic format only).

B. GENERAL PLANT DESIGN DOCUMENTS

B.1 Piping and instrumentation diagrams (P&IDs) and legend list for post-fire safe

shutdown or alternative shutdown systems (C-size paper drawings and electronic

copy).

B.2 P&IDs and legend list for fire protection systems, including fire water supply, water

suppression sprinklers & deluge, and CO2 and Halon systems (C-size paper drawings

and electronic copy).

3

B.3 AC and DC electrical system single line diagrams, from off-site power down to the

highest safety-related bus level (typically 4kV, EDG bus), (C-size paper drawings and

electronic copy).

B.4 Single line diagrams for motor control centers (MCCs) that supply post-fire safe

shutdown or alternative shutdown loads (only for selected fire areas) (C-size paper

drawings and electronic copy ).

B.5 Equipment location drawings which identify the physical plant locations of post-fire

safe shutdown or alternative shutdown equipment (C-size paper drawings and

electronic copy).

B.6 Plant layout drawings which identify: (C-size paper drawings and electronic copy)

  • Plant fire area boundaries;
  • Combustible control zone drawings;
  • Areas protected by automatic fire suppression and detection; and
  • Locations of fire protection equipment.

C. CLASSICAL FIRE PROTECTION

C.1 Fire protection program implementing procedures (e.g., administrative controls,

surveillance testing, fire brigade).

C.2 List of calculations and engineering analyses, studies, or evaluations for the fire

protection system, including the fire water system.

C.3 Hydraulic calculation or analysis for fire protection water system in the selected fire

areas.

C.4 Last two completed surveillance records of fire protection features in the selected fire

areas (detection, suppression, damper inspections, damper tests, penetration

inspections, barrier inspections, etc.).

C.5 List of routine tests, surveillances, and preventive maintenance on fire pumps,

including pump controllers and batteries.

C.6 Last two completed annual fire pump pressure and flow tests.

C.7 Last two completed monthly and/or quarterly fire pump tests.

C.8 Last two completed fire loop flow tests and loop flushes.

C.9 CO2 and Halon initial discharge testing or calculation that determined appropriate

concentrations and soak or hold times can be achieved (only for selected fire areas).

C.10 Last five hot work permits (at power).

C.11 Last five transient combustible permits (at power).

4

C.12 For Fire Brigade Drills, provide the following:

  • Last drill critique for a drill with off-site fire department support;
  • Summary of any unsatisfactory drill performance items for last three years; and
  • Last unannounced drill critique by a qualified individual independent of the

licensee's staff.

C.13 For fire brigade equipment, provide the following:

  • Procedure for inventory and inspection; and
  • Most recent inspection and inventory results.

C.14 Fire Brigade Medical Evaluations and Qualifications, including self-contained

breathing apparatus (SCBA) and training lesson plans.

C.15 Electronic copy of the mutual aid agreement for the first-due local fire department

that is currently in effect.

C.16 Flooding analysis for selected fire areas, which demonstrates:

  • a fire water pipe break in the selected fire areas wont affect safe shutdown (SSD)

capability for equipment in the selected fire areas;

  • a fire water pipe break in an adjacent fire area wont affect SSD capability for

equipment in the selected fire areas;

are credited with keeping water from leaking into fire areas below.

C.17 Pre-fire plans for the selected fire areas and their adjacent fire areas.

C.18 For Emergency Lighting Units (ELU), provide the following:

  • List of Preventive Maintenance tasks, frequencies, and bases;
  • Most recently performed monthly or quarterly functional test;
  • Most recently performed battery discharge performance test, if applicable;
  • ELU battery loading analysis;
  • vendor manual(s);
  • results of black-out testing (if performed);
  • Compensatory measures taken when ELU are out of service.

C.19 Impairment Log (for period of 3 months before the start of inspection), for fire

protection features that are out of service.

C.20 List of Fire Protection screening reviews since the last inspection for recent design

changes, modifications, or temporary modifications (e.g., a Generic Letter 86-10

review that screened out).

C.21 List of fire protection system design changes completed in the last three years

(including their associated 10 CFR 50.59 and Generic Letter 86-10 evaluations).

5

C.22 List of penetration seal work, re-work, or installation activities in the last three years.

C.23 List of fire wrap work, re-work, or installation activities in the last three years.

C.24 Fire protection system health reports for the two most recent years.

C.25 Fire protection program health report for the two most recent years.

C.26 Emergency lighting system health reports for the two most recent years.

C.27 Licensee evaluation of industry operating experience, related to the Fire Protection

Program for the three most recent years.

D. ELECTRICAL

D.1 Identify whether the cables in the selected fire areas are predominantly Thermoset or

Thermoplastic. Specifically identify any Thermoplastic cable in the selected fire

areas.

D.2 Breaker and fuse coordination calculation for post-fire safe shutdown or alternative

shutdown equipment (only for selected fire areas).

D.3 Administrative or configuration control procedures that govern fuse replacement (e.g.,

fuse control procedures).

D.4 Maintenance procedures that verify breaker over-current trip settings to ensure

coordination remains functional, for post-fire safe shutdown or alternative shutdown

equipment.

D.5 Electrical system health reports for the two most recent years.

D.6 Last completed preventive maintenance of those components as tested from the safe

shutdown or alternative shutdown panel.

D.7 Schematic or elementary diagrams for circuits to be reviewed, as requested by

inspector (C-size paper drawings and electronic copy).

D.8 Cable routing for components and equipment credited for post-fire safe shutdown or

alternative shutdown (only for selected fire areas).

D.9 List of post-fire safe shutdown or alternative shutdown design changes completed,

since the last inspection.

E. SPURIOUS FIRE INDUCED CIRCUIT FAULTS

E.1 List of identified fire induced circuit failure configurations (only for selected fire areas).

E.2 Multiple Spurious Operation (MSO) Expert Panel Report.

6

E.3 Corrective actions for fire-induced circuit failures, both single and multiple spurious

actuations for the selected fire areas.

F. OPERATIONS

F.1 List of calculations and engineering analyses, studies, or evaluations for the safe

shutdown or alternative shutdown methodology.

F.2 List of licensed operator Job Performance Measures (JPMs) for operator manual

actions required by post-fire safe shutdown or alternative shutdown.

F.3 List of non-licensed operator training associated with post-fire safe shutdown or

alternative shutdown manual actions that would be performed by a non-licensed

operator (including JPMs, in-field training walkdowns, simulations, or initial

qualification).

F.4 List of lesson plans for post-fire safe shutdown or alternative shutdown training for

licensed and non-licensed operators.

F.5 For operator manual actions (OMAs) provide the following:

  • Manual Action Feasibility Study;
  • Operator Time Critical Action Program;
  • Time lines for time-critical OMAs; and
  • Time line validations;

(temperature, smoke, humidity, SCBAs, etc.).

F.6 Thermal hydraulic calculation or analysis that determines the time requirements for

time-critical manual operator actions.

F.7 Operating procedures for post-fire safe shutdown from the control room with a

postulated fire in the selected fire areas.

F.8 Operating procedures for post-fire safe shutdown or alternative shutdown from

outside the control room.

F.9 For safe shutdown equipment and tools, provide the following:

  • Procedure for inventory and inspection; and
  • Most recent inspection and inventory results.

F.10 List of procedures that implement Cold Shutdown Repairs.

F.11 For Cold Shutdown Repairs, provide the following:

  • Procedure for inventory and inspection (i.e., needed tools, material, etc.); and
  • Most recent inspection and inventory results.

7

F.12 Calculation or analysis that demonstrates pressurizer level will remain within the

indicating range for a PWR, or reactor water level will remain above the top of active

fuel for a BWR, at the safe shutdown or alternative shutdown panel, in accordance

with the requirements of 10 CFR 50 Appendix R III.L performance goals.

F.13 For Radio communications, provide the following:

  • Communications Plan for firefighting and post-fire safe shutdown manual actions;
  • Repeater locations;
  • Cable routing for repeater power supply cables;
  • Radio coverage test results; and
  • Radio Dead Spot locations in the plant.

F.14 NRC approved exemption requests for operator manual actions for

10 CFR 50 Appendix R III.G.2 fire areas.

F.15 Exemption requests submitted but not yet approved, for operator manual actions for

10 CFR 50 Appendix R III.G.2 fire areas.

G. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS

G.1 Corrective actions for fire-induced circuit failures (including but not limited to NRC

IN 92-18), both single and multiple spurious actuations (only for selected fire areas).

G.2 Corrective actions associated with post-fire safe shutdown or alternative shutdown

operator manual actions.

G.3 Internal and external self-assessments, peer assessments, and audits of fire

protection activities for the last three years.

G.4 Internal and external self-assessments, peer assessments, and audits of post-fire

safe shutdown or alternative shutdown capabilities for the last three years.

G.5 List of condition reports for the fire protection system for the last three years.

G.6 List of condition reports for emergency lighting units for the last three years.

G.7 List of condition reports for post-fire safe shutdown (SSD) or alternative shutdown

(ASD) issues for the last three years. This includes issues affecting the SSD or ASD

analysis, fire hazards analysis, SSD or ASD operating procedures and/or training,

timeline evaluations for operator actions, and supporting engineering evaluations,

analysis, or calculations.

G.8 List of all Generic Letter 86 - 10 evaluations.

G.9 Copy of all Generic Letter 86 - 10 evaluations performed in the last three years.

G.10 All fire loading calculations and evaluations performed (only for selected fire areas

and their adjacent fire areas).

MITIGATING STRATEGIES SUPPORTING DOCUMENTATION

H. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS

H.1 List of all changes to regulatory commitments made to meet the requirements of Title

10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2).

H.2 List of procedures and guidelines that were revised or generated to implement the

mitigating strategies. These could be extensive damage mitigation guidelines

(EDMGs), severe accident management guidelines (SAMGs), emergency operating

procedures (EOPs), abnormal operating procedures (AOPs), etc.

H.3 A matrix that shows the correlation between the mitigation strategies identified in

Nuclear Energy Institute 06-12, Revision 2, "B.5.b Phase 2 & 3 Submittal Guideline,"

issued December 2006, and the site-specific procedures or guidelines that are used

to implement each strategy.

H.4 List of engineering evaluations or calculations that were used to verify the

engineering bases for the mitigating strategies.

H.5 Piping and instrumentation diagrams (P&ID) and legend list or simplified flow

diagrams for systems relied upon in the mitigating strategies. These could be the

type used for training (C-size paper drawings and electronic copy).

H.6 List of modification packages or summary descriptions of modifications with simplified

drawings, for necessary facility changes to implement the mitigating strategies.

H.7 List of routine tests, surveillances, and preventive maintenance for equipment and

tools needed to implement 10 CFR 50.54(hh)(2) strategies.

H.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies,

provide the following:

  • Procedures for inventory, testing, and inspection; and
  • Most recent inspection, inventory, and testing results;
  • Copies of the last two completed performance tests, surveillances, and

preventative maintenance performed on the pumps, including the pump

controllers and batteries.

H.9 List of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that

differ from that documented in the submittals or the safety evaluation report.

H.10 Site general arrangement drawings that show the majority of buildings and areas

referenced in 10 CFR 50.54(hh)(2) documents (C-size paper drawings and electronic

copy).

H.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).

Enclosure 2

2

H.12 Copies of memoranda of understanding (MOU), (e.g., with local fire departments)

required to implement any mitigating strategies.

H.13 Docketed correspondence for 10 CFR 50.54(hh) to include license amendment

requests (LARS); Safety Evaluation Reports (SER); Request for Information (RFI)

and associated responses; and other pertinent documents.