ML17181A376: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:ES-201 Examination Preparation Checklist Form ES-201-1 Facility:
{{#Wiki_filter:ES-201                                 Examination Preparation Checklist                             Form ES-201-1 Facility:   VC .Svff1/J1 fE ~                                                  Date of Examination: /1JA Y ,?t'/
VC .Svff1/J1 fE Date of Examination
Developed by: Written - FacilityO NRC                 ~  II Operating - Facility     NRC D Target                                                                                                 Chief Date*                                   Task Description (Reference)                               Examiner's Initials
:/1JA Y ,?t'/ Developed by: Written -FacilityO NRC II Operating  
    -180         1. Examination administration date confirmed (C.1.a; C.2.a and b)
-Facility NRC D Target Date* Task Description (Reference)  
    -120         2. NRG examiners and facility contact assigned (C.1.d; C.2.e)
-180 1. Examination administration date confirmed (C.1.a; C.2.a and b) -120 2. NRG examiners and facility contact assigned (C.1.d; C.2.e) -120 3. Facility contact briefed on security and other requirements (C.2.c) -120 4. Corporate notification lette r sent (C.2.d) [-90] [5. Reference material due (C.1.e; C.3.c; Attachment 3)] {-75} 6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3 , {-70} {7. {-45} 8. -30 9. -14 10. -14 11. -14 12. -7 13. -7 14. -7 15. -7 16. ES-301-1 , ES-301-2 , ES-301-5 , ES-D-1's, ES-401-1/2, ES-401-3 , and ES-401-4 , as applicable (C.1.e and f; C.3.d) Examination outline(s) reviewed by NRG and feedback provided to fac i l i ty licensee (C.2.h; C.3.e)} Proposed examinations (including written, walk-through JPMs , and scenarios , as applicable), supporting documentation (including Forms ES-301-3, ES-301-4 , ES-301-5 , ES-301-6 , and ES-401-6 , and any Form ES-201-3 updates), and reference materials due (C.1.e , f , g and h; C.3.d) Preliminary license applications (NRG Form 398's) due (C.1.1; C.2.g; ES-202) Final license applications due and Form ES-201-4 prepared (C.1.1; C.2.i; ES-202) Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f) Examinations reviewed with facility license e (C.1.j; C.2.f and h; C.3.g) Written examinations and operating tests approved by NRC supervisor (C.2.i; C.3.h) Final applications reviewed; 1 or 2 (if >10) applications audited to confirm qualifications I eligibility
    -120         3. Facility contact briefed on security and other requirements (C.2.c)
; and examination approval and waiver letters sent (C.2.i; Attachment 5; E S-202 , C.2.e; E S-204) Proctor i ng/written exam administration guidelines reviewed with facility licensee (C.3.k) Approved scenarios , job performance measures, a nd questions distributed to NRC examiners (C.3.i) Chief Examiner's Initials
    -120         4. Corporate notification letter sent (C.2.d)
* Ta r get d a t es a r e g e n e rally b ase d on f ac ility-pr e p a r e d e x a min a tions a nd a r e k e y e d to th e e x a min a tion d a t e identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case basis in coord i nation with the facility licensee. [Applies only] {Does not apply} to examinations prepared by the NRC. ES-201 , Pag e 25 of 28 ES-201 Examination Outline Quality Checklist Form ES-201-2 Facility: Item 1. w R I T T E N 2. s I M u L A T 0 R 3. w I T 4. G E N E R A L a. b. c. d. a. b. c. a. Date of Examination
[-90]       [5. Reference material due (C.1.e; C.3.c; Attachment 3)]
: Task Description Verify that the ouUine(s) fit(s) the appropriate model , in accordance with ES-401. Assess whether the outline was systematically and randomly prepared in accordance with Section D.1 of ES-401 and whether all KJA categories are appropriately sampled. Assess whether the outline over-emphasizes any systems , evolutions, or generic topics. Assess whether the justifications for deselected or rejected KJA statements are appropriate. Using Form ES-301-5 , verify that the proposed scenario sets cover the required number of normal evolutions , instrument and component failures , technical specifications , and major transients. Assess whether there are enough scenario sets (and spares) to test the projected number and mix of applicants in accordance with the expected crew composition and rotation schedule without compromising exam integrity , and ensure that each applicant can be tested using at least one new or significantly modified scenario, that no scenarios are duplicated from the applicants
{-75}       6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3, ES-301-1 , ES-301-2, ES-301 -5, ES-D-1's, ES-401-1/2, ES-401-3, and ES-401-4, as applicable (C.1.e and f; C.3.d)
' audit test(s), and that scenarios will not be repeated on subsequent days. To the extent possible, assess whether the outline(s) conform(s) with the qualitative and quantitative criteria specified on Form ES-301-4 and described in Appendix D. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2: (1) the outline(s) contain(s) the required number of control room and in-plant tasks distributed among the safety functions as specified on the form (2) task repetition from the last two NRC examinations is within the limits specified on the form (3) no tasks are duplicated from the applicants
{-70}        {7. Examination outline(s) reviewed by NRG and feedback provided to facility licensee (C.2.h; C.3.e)}
' audit test(s) (4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path , low-power , emergency , and RCA tasks meet the criteria on the form. b. Verify that the administrative outline meets the criteria specified on Form ES-301-1: (1) the tasks are distributed among the topics as spe c ified on the form (2) at least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations
{-45}        8. Proposed examinations (including written, walk-through JPMs, and scenarios, as applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301 -5, ES-301-6, and ES-401-6, and any Form ES-201-3 updates), and reference materials due (C.1.e, f, g and h; C.3.d)
: c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days. a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the appropriate exam sections. b. Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate. c. Ensure that KJA importance ratings (except for plant-specific priorities) are at least 2.5. d. Check for duplication and overlap among exam sections. e. Check the entire exam for balance of coverage. f. a. Author b. Facility Reviewer (*) c. NRC Chief Examiner(#)
      -30        9. Preliminary license applications (NRG Form 398's) due (C.1.1; C.2.g; ES-202)
: d. NRC Supervisor Note: # Independent NRC reviewer initial items in Column " c"; chief examiner c oncurren c e required.
      -14        10. Final license applications due and Form ES-201-4 prepared (C.1 .1; C.2.i; ES-202)
* Not applicable for NRC-prepared examination outlines Initials ES-201 Facility: Item 1. w R I T T E N 2. s I M u L A T 0 R 3. w I T 4. G E N E R A L a. b. c. d. a. b. c. a. AffRoVAL-Examination Outline Quality Checklist Form ES-201-2 Date of Examination
      -14        11 . Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f)
: Task Description Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401. Assess whether the outline was systematically and randomly prepared In accordance with Section D.1 of ES-401 and whether all KIA cate ories are a ro riatel sam led. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics. Assess whether the justifications for deselected or rejected KIA statements are appropriate. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions , instrument and component failures , technical specifications, and major transients. Assess whether there are enough scenario sets (and spares) to test the projected number and mix of applicants in accordance with the expected crew composition and rotation schedule without compromising exam integrity, and ensure that each applicant can be tested using at least one new or significantly modified scenario, that no scenarios are duplicated from the a licants' audit test s , and that scenarios will not be re eated on subse uent da s. To the extent possible, assess whether the outllne(s) conform(s) with the qualitative and quantitative criteria specified on Form ES-301-4 and described in Appendix D. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2: (1) the outline(s) contain(s) the required number of control room and In-plant tasks distributed among the safety functions as specified on the form (2) task repetition from the last two NRC examinations is within the limits specified on the form (3) no tasks are duplicated from the applicants' audit test(s) ( 4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form. b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:
      -14        12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g)
(1) the tasks are distributed among the topics as specified on the form c. a. b. c. d. e. f. (2) at least one task Is new or significantly modified 3 no more than one task Is re eated from the last two NRC licensin examinations Determine if there are enough different outlines to test the projected number and mix of a licants and ensure that no Items are du licated on subse uent da s. Assess whether plant-specific priorities (including PRA and IPE Insights) are covered in the a ro riate exam sections. Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate. Ensure that KIA Importance ratings (except for plant-specific priorities) are at least 2.5. Check for duplication and overlap among exam sections. Check the entire exam for balance of coverage. Assess whether the exam fits the appropriate job level (RO or SRO). a. Author b. Facility Reviewer(')
      -7        13. Written examinations and operating tests approved by NRC supervisor (C.2.i; C.3.h)
      -7        14. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm qualifications I eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 5; ES-202, C.2.e; ES-204)
      -7        15. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k)
      -7        16. Approved scenarios, job performance measures, and questions distributed to NRC examiners (C.3.i)
* Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.
[Applies only] {Does not apply} to examinations prepared by the NRC.
ES-201 , Page 25 of 28
 
ES-201                                 Examination Outline Quality Checklist                                     Form ES-201-2 Facility:                                             Date of Examination :
Initials Item                                                 Task Description
: 1. a . Verify that the ouUine(s) fit(s) the appropriate model, in accordance with ES-401 .
w R     b. Assess whether the outline was systematically and randomly prepared in accordance with I        Section D.1 of ES-401 and whether all KJA categories are appropriately sampled.
T T      c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.
E N      d. Assess whether the justifications for deselected or rejected KJA statements are appropriate.
: 2. a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures , technical specifications, s          and major transients.
I M      b. Assess whether there are enough scenario sets (and spares) to test the projected number u          and mix of applicants in accordance with the expected crew composition and rotation schedule L        without compromising exam integrity, and ensure that each applicant can be tested using A          at least one new or significantly modified scenario, that no scenarios are duplicated T          from the applicants' audit test(s), and that scenarios will not be repeated on subsequent days.
0 c . To the extent possible, assess whether the outline(s) conform(s) with the qualitative R
and quantitative criteria specified on Form ES-301-4 and described in Appendix D.
: 3. a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:
(1) the outline(s) contain(s) the required number of control room and in-plant tasks w                distributed among the safety functions as specified on the form I        (2) task repetition from the last two NRC examinations is within the limits specified on the form T          (3) no tasks are duplicated from the applicants' audit test(s)
(4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form .
: b. Verify that the administrative outline meets the criteria specified on Form ES-301-1 :
(1) the tasks are distributed among the topics as specified on the form (2) at least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations
: c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.
: 4. a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the appropriate exam sections.
G E    b. Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate.
N
: c. Ensure that KJA importance ratings (except for plant-specific priorities) are at least 2.5.
E R    d. Check for duplication and overlap among exam sections.
A L      e. Check the entire exam for balance of coverage.
f.
: a. Author
: b. Facility Reviewer (*)
: c. NRC Chief Examiner(#)
: d. NRC Supervisor Note:                 # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.
* Not applicable for NRC-prepared examination outlines
 
AffRoVAL-ES-201                                    Examination Outline Quality Checklist                                    Form ES-201-2 Facility:                                                                                     Date of Examination:
Item                                                   Task Description
: 1.       a. Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401 .
w R       b. Assess whether the outline was systematically and randomly prepared In accordance with I            Section D.1 of ES-401 and whether all KIA cate ories are a ro riatel sam led .
T
: c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.
T E
N        d. Assess whether the justifications for deselected or rejected KIA statements are appropriate.
: 2.      a. Using Form ES-301 -5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, s            and major transients.
I M        b. Assess whether there are enough scenario sets (and spares) to test the projected number u          ~ without and mix of applicants in accordance with the expected crew composition and rotation schedule compromising exam integrity, and ensure that each applicant can be tested using L
A            at least one new or significantly modified scenario, that no scenarios are duplicated T            from the a licants' audit test s , and that scenarios will not be re eated on subse uent da s.
0        c. To the extent possible, assess whether the outllne(s) conform(s) with the qualitative R            and quantitative criteria specified on Form ES-301-4 and described in Appendix D.
: 3.        a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:
(1) the outline(s) contain(s) the required number of control room and In-plant tasks w                    distributed among the safety functions as specified on the form I            (2) task repetition from the last two NRC examinations is within the limits specified on the form T            (3) no tasks are duplicated from the applicants' audit test(s)
(4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form .
: b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:
(1) the tasks are distributed among the topics as specified on the form (2) at least one task Is new or significantly modified 3 no more than one task Is re eated from the last two NRC licensin examinations
: c. Determine if there are enough different outlines to test the projected number and mix of a   licants and ensure that no Items are du licated on subse uent da s.
: 4.      a. Assess whether plant-specific priorities (including PRA and IPE Insights) are covered in the a   ro riate exam sections.
G        b. Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate.
E N        c. Ensure that KIA Importance ratings (except for plant-specific priorities) are at least 2.5.
E
: d. Check for duplication and overlap among exam sections.
R A        e. Check the entire exam for balance of coverage.
L
: f. Assess whether the exam fits the appropriate job level (RO or SRO).
: a. Author
: b. Facility Reviewer(')
: c. NRC Chief Examiner(#)
: d. NRC Supervisor Note:                    # Independent NRC reviewer initial Items in Column "c"; chief examiner concurrence required .
* Not a licable for NRC- re ared examination outlines
(!)WRITTEN f!EXA/11                        s19/lll'LE          fMAI          4£vEul~                  ~        IY/?c
                -        F1NllL                ()ffRl17l~ £ti/II? !lfltfol/lfL -
ES-201, Page 26 of 28
 
IJ-!fRo VIJL ES-201                                  Examination Outline Quality Checklist                                    Form ES-201-2 Facility: V.C. S11mm                                    Date of Examination:    IJ1AY      ~tl      ;?tJ/)
Initials Item                                                  Task Description
: 1.      a. Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401.
w R      b. Assess whether the outline was systematically and randomly prepared in accordance with I          Section D.1 of ES-401 and whether all KJA categories are appropriately sampled.
T T      c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.
E N      d. Assess whether the justifications for deselected or rejected KJA statements are appropriate. *
: 2.      a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, s          and major transients.
I M      b. Assess whether there are enough scenario sets (and spares) to test the projected number u          and mix of applicants in accordance with the expected crew composition and rotation schedule L          without compromising exam integrity, and ensure that each applicant can be tested using A          at least one new or significantly modified scenario, that no scenarios are duplicated T          from the applicants' audit test(s), and that scenarios will not be repeated on subsequent days.
0      c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative R
and quantitative criteria specified on Form ES-301-4 and described in Appendix D.
: 3. a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:
(1) the outline(s) contain(s) the required number of control room and in-plant tasks w                distributed among the safety functions as specified on the form I          (2) task repetition from the last two NRC examinations is within the limits specified on the form T          (3) no tasks are duplicated from the applicants' audit test(s)
(4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form.
: b. Verify that the administrative outline meets the criteria specified on Form ES-301 -1:
(1) the tasks are distributed among the topics as specified on the form (2) at least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations
: c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.
: 4. a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the appropriate exam sections.
G E      b. Assess whether the 10 CFR 55.41 /43 and 55.45 sampling is appropriate.
N
: c. Ensure that KJA importance ratings (except for plant-specific priorities) are at least 2.5.
E R      d. Check for duplication and overlap among exam sections.
A L      e. Check the entire exam for balance of coverage.
: f. Assess whether the exam fits the appropriate job level (RO or SRO).
: a. Author
: b. Facility Reviewer (*)
: c. NRC Chief Examiner(#)
: c. NRC Chief Examiner(#)
: d. NRC Supervisor Note: # Independent NRC reviewer initial Items in Column "c"; chief examiner concurrence required.
: d. NRC Supervisor Note:                   # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.
* Not a licable for NRC-re ared examination outlines (!)WRITTEN f!EXA/11 s 19/lll'LE fMAI IY/?c -F1NllL
* Not applicable for NRG-prepared examination outlines l!rt,{'ovlJL -
£ti/II? !lfltfol/lfL
 
-ES-201, Page 26 of 28 IJ-!fRo VIJL ES-201 Examination Outline Quality Checklist Form ES-201-2 Facility: V.C. S11mm Date of Examination:
Mr. Gerald J. McCoy USNRC, Region II CR-14-01708 RC-15-0094 ENCLOSURE 2 Signed forms ES-201-3, Examination Security Agreement
IJ1AY ;?tJ/) Item 1. w R I T T E N 2. s I M u L A T 0 R 3. w I T 4. G E N E R A L Task Description
 
: a. Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401. b. Assess whether the outline was systematically and randomly prepared in accordance with Section D.1 of ES-401 and whether all KJA categories are appropriately sampled. c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics. d. Assess whether the justifications for deselected or rejected KJA statements are appropriate
ES-201                                                         Examination Security Agreement                                                Form ES-201-3
.* a. Using Form ES-301-5 , verify that the proposed scenario sets cover the required number of normal evolutions , instrument and component failures, technical specifications , and major transients. b. Assess whether there are enough scenario sets (and spares) to test the projected number and mix of applicants in accordance with the expected crew composition and rotation schedule without compromising exam integrity, and ensure that each applicant can be tested using at least one new or significantly modified scenario, that no scenarios are duplicated from the applicants' audit test(s), and that scenarios will not be repeated on subsequent days. c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative and quantitative criteria specified on Form ES-301-4 and described in Appendix D. a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:
: 1.       Pre-Examination I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of          ~~~ J,: ~-as    of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not b~en 1authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
(1) the outline(s) contain(s) the required number of control room and in-plant tasks distributed among the safety functions as specified on the form (2) task repetition from the last two NRC examinations is within the limits specified on the form (3) no tasks are duplicated from the applicants' audit test(s) (4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency , and RCA tasks meet the criteria on the form. b. Verify that the administrative outline meets the criteria specified on Form ES-301-1: (1) the tasks are distributed among the topics as specified on the form (2) at least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations
: 2.        Post-Examination To the best of my know~~9~ I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of ~f1llf;    r. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.
: c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days. a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the appropriate exam sections.
PRINTED NAME            JOB TITLE I RESPONSIBILITY                                              DATE ES-201, Page 27 of 28
: b. Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate. c. Ensure that KJA importance ratings (except for plant-specific priorities) are at least 2.5. d. Check for duplication and overlap among exam sections. e. Check the entire exam for balance of coverage. f. Assess whether the exam fits the appropriate job level (RO or SRO). a. Author b. Facility Reviewer (*) c. NRC Chief Examiner(#)
 
: d. NRC Supervisor Note: # Independent NRC reviewer initial items in Column " c"; chief examiner concurrence required.
ES-201                                                        Examination Security Agreement                                                Form ES-201-3
* Not applicable for NRG-prepared examination outlines l!rt,{'ovlJL
: 1.       Pre-Examination s:/'1/1;__
-Initials Mr. Gerald J. McCoy USNRC, Region II Enclosure 2 CR-14-01708 RC-15-0094 ENCLOSURE 2 Signed forms ES-201-3, Examination Security Agreement ES-201 Examination Security Agreement Form ES-201-3 1. Pre-Examination I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of J,:
I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of s-h, li e            as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not'be~n authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
of the date of my signature.
: 2.        Post-Examination To the best of my kno~~~~* I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of ~1fet ') . From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.
I agree that I will not knowingly divulge any information about these examinations to any persons who have not by the NRC chief examiner.
PRINTED NAME            JOB TITLE I RESPONSIBILITY                  SIGNATURE (1)
I understand that I am not to instruct, evaluate , or provide performance feedback to those applicants scheduled to be adm i nistered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by t he NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback).
ES-201, Page 27 of 28
Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action agains t me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
 
: 2. Post-Examination To the best of my I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations admin i stered during the week(s) of 1 llf; r. From the date that I entered into this security agreement until the completion of examination administration , I d i d not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations , except as specifically noted below and authorized by the NRC. PRINTED NAME JOB TITLE I RESPONSIBILITY DATE ES-201, Page 27 of 28 ES-201 Examination Security Agreement Form ES-201-3 1. Pre-Examination s:/'1/1;_ _ I acknowledge that I have acquired specialized knowledge about the NRC licensing examinat i ons schedu l ed for the week (s) o f s-h, li e as o f the date of my signature.
ES-201                                                        Examination Security Agreement                                                Form ES-201-3 l
I agree that I will not knowingly divulge any information about these examinations to any persons who have authorize d by the NRC chief examiner. I understand that I am not to instruct , evaluate , or provide performance feedback to those applicants scheduled to be adm in istered these licensing examinations from this date until completion of examination administration, except as speci fi cally noted below and authorized by th e NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct o r i ndirect feedback).
: 1.        Pre-Examination 5"/'l/1;-_
Furthermore, I am aware of the physical security measures and requirements (as documented i n the fac i lity licensee's procedures) an d understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action agains t me or the facility licensee.
I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of s-//t /1r as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not'be~n authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
I will immediately report to facility management o r the NRC chief examiner any indications or suggest i ons that exam i nation security may have been compromised. 2. Post-Examination To the best of my I did not divulge to any unauthorized persons any information concern i ng the NRC licensing examinations admi n is t ered during the week(s) of . From the date that I entered into this security agreement until the completion of examination administration , I d i d not instruct , evaluate, or provide performance feedback to those applicants who were administered these licensing examinations , except as specific all y noted below and authorized by the NRC. PRINTED NAME JOB TITLE I RESPONSIBILITY SIGNATURE (1) ES-201, Page 27 of 28 ES-201 Examination Security Agreement Form ES-201-3 1. Pre-Examination l 5"/'l/1;-_ I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of s-//t /1r as of the date of my signature.
: 2.        Post-Examination To the best of my kno'1(,,$f~e I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of    410iK- . From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provi~e performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.
I agree that I will not knowingly divulge any information about these examinations to any persons who have authorized by the NRC chief examiner.
PRINTED NAME            JOB TITLE I RESPONSIBILITY                  SIGNATURE (1)
I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback).
ES-201, Page 27 of 28
Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee.
 
I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
ES-201                                                        Examination Security Agreement                                                Form ES-201-3
: 2. Post-Examination To the best of my I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of 4 10 i K-. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC. PRINTED NAME JOB TITLE I RESPONSIBILITY SIGNATURE (1) ES-201, Page 27 of 28 ES-201 Examination Security Agreement Form ES-201-3 1. Pre-Examination 5/'1/ I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of 5/11/1S-as of the date of my signature.
: 1.       Pre-Examination 5/'1/ l~
I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner.
I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of 5 / 11 / 1S- as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback).
: 2.        Post-Examination To the best of my kno~led~~ I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of    -/i;.';.}: . From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.
Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee.
PRINTED NAME              JOB TITLE I RESPONSIBILITY                  SIGNATURE (1)              DATE        SIGN TURE (2)      DATE NOTE I)' 1J ES-201, Page 27 of 28
I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
 
: 2. Post-Examination To the best of my I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of -/i;.';.}: . From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC. PRINTED NAME JOB TITLE I RESPONSIBILITY SIGNATURE (1) DATE SIGN TURE (2) DATE NOTE I)' 1J ES-201, Page 27 of 28 ES-201 Examination Security Agreement Form ES-201-3 1. Pre-Examination I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of sJ li/t :>" as of the date of my signature.
ES-201                                                        Examination Security Agreement                                                Form ES-201-3
I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner.
: 1.        Pre-Examination SI" ( '~
I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be adminis t ered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or ind i rect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee.
I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of         sJli/ t  :>" as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination sec uri ty may have been compromised.
: 2.       Post-Examination To the best of my knowiep_p;, Ldid not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of   <ft,,  115-. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.
: 2. Post-Examination To the best of my knowiep_p;, Ldid not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of <ft,, 115-. From the date that I entered into this security agreement until the completion of examination administration, I did no t instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC. PRINTED NAME JOB TITLE I RESPONSIBILITY ES-201, Page 27 of 28 ES-201 Examination Security Agreement Form ES-201-3 1. Pre-Examination I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of f/{,'f f :;==-as of the date of my signature.
PRINTED NAME             JOB TITLE I RESPONSIBILITY ES-201, Page 27 of 28
I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner.
 
I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable ifthe individual does not select the training content or p r ovide direct or ind i rect feedback).
ES-201                                                         Examination Security Agreement                                               Form ES-201-3
Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee.
: 1.           Pre-Examination I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of       f/{,'ff:;==-as   of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable ifthe individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised. 2. Post-Examination To best of my not divulge to any information the during the week(s) of 1-:i
: 2.           Post-Examination To ~he best of my knowl~~~?~did not divulge to any unauthori~ed p~rsons a~y information co~cerning the ~RC licensi~g ~xamina~i~ns a?minist~red during the week(s) of ff,~ t 1-:i
* From the date that I entered into this security agreement until the completion of examination adm1rnstrat1on , I d i d not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC. JOB TITLE I RESPONSIBILITY SIGNATURE (1) DATE SIGNATURE (2) DATE NO T E 1 . .-Z: ... ;.s i/"'1.-, rc1 .. .s __ , _,,_ s--u< _ 2. ________________________________________
* From the date that I entered into this security agreement until the completion of examination adm1rnstrat1on, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.
_ PRINTED NAME 3. ______________________________________________________
PRINTED NAME         JOB TITLE I RESPONSIBILITY                 SIGNATURE (1)              DATE        SIGNATURE (2)      DATE NOTE 1..-Z:. . ; .s i/"'1.-, rc1 ...s ~ __  1"1_(.)------~~"-~--~------ , _,,_ ,;-4~ s--u<_
_ 4. ______________________________________________________
: 2. _________________________________________
_ 5. ______________________________________________________
: 3. _______________________________________________________
_ 6. ----------------
: 4. _______________________________________________________
----------------------------------------------
: 5. _______________________________________________________
: 7. -----------------
: 6. ---------------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
---------------------------------------------
: 7. ----------------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
: 8. -----------------
: 8. ----------------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
----------------------------------------------
: 9. ----------------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
: 9. -----------------
10 . _________________ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
---------------------------------------------
11.________________ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
10 .. _________________
12 . ________________              -------------------------------------                                                                   ----
-------------------------------------
13.________________                -------------------------------------                                                                   -----
-----11. ________________
14 . ________________              --------------------------------------                                                                   -----
--------------------------------------
15.________________                -------------------------------------                                                                   -----
----12 .. ________________
NOTES:
-------------------------------------
ES-201, Page 27 of 28
----13. ________________
 
-------------------------------------
JOHNSTON, ROBERT N From:                        O'KIMOSH, NIKOS L Sent:                        Monday, June 01, 2015 3:15 PM To:                         RICHARDSON, SCOTT ALAN Cc:                         JOHNSTON, ROBERT N; FISHER, DANIEL R
-----14 .. ________________
--------------------------------------
-----15. ________________
-------------------------------------
-----NOTES: ES-201, Page 27 of 28 JOHNSTON, ROBERT N From: Sent: To: O'KIMOSH, NIKOS L Monday, June 01, 2015 3:15 PM RICHARDSON, SCOTT ALAN Cc:  


==Subject:==
==Subject:==
JOHNSTON, ROBERT N; FISHER, DANIEL R Re: Post NRC Exam Security Sign-off I have complied with the security agreement for the 2015 NRC ILO exam. Nick O'Kimosh Sent from my BlackBerry 10 smartphone on the Verizon Wireless 4G l TE network. From: RICHARDSON, SCOTT ALAN Sent: Thursday, May 28, 2015 8:33 AM To: O'KIMOSH, NIKOS L Cc: JOHNSTON, ROBERT N  
Re: Post NRC Exam Security Sign-off I have complied with the security agreement for the 2015 NRC ILO exam.
Nick O'Kimosh Sent from my BlackBerry 10 smartphone on the Verizon Wireless 4G l TE network.
From: RICHARDSON, SCOTT ALAN Sent: Thursday, May 28, 2015 8:33 AM To: O'KIMOSH, NIKOS L Cc: JOHNSTON, ROBERT N


==Subject:==
==Subject:==
Post NRC Exam Security Sign-off The VC Summer 2015 NRC License Exam is complete.
Post NRC Exam Security Sign-off The VC Summer 2015 NRC License Exam is complete. NUREG 1021 Operator Licensing Examination Standards for Power Reactors, Form ES-201-3, Examination Security Agreement must be completed in order for the Station to close out the exam package. You have signed on the security agreement Pre-Examination portion and were issued a Red Badge to designate your status. In order to close out the security agreement please review the below statement:
NUREG 1021 Operator Licensing Examination Standards for Power Reactors, Form ES-201-3, Examination Security Agreement must be completed in order for the Station to close out the exam package. You have signed on the security agreement Pre-Examination portion and were issued a Red Badge to designate your status. In order to close out the security agreement please review the below statement:
: 2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of May 4-8, 2015 and May 18-22, 2015. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.
: 2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of May 4-8, 2015 and May 18-22, 2015. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC. Please reply electronically to this e-mail stating that you complied with the above to allow closure of the Security Agreement.
Please reply electronically to this e-mail stating that you complied with the above to allow closure of the Security Agreement.
If you have any questions, please call Robert Johnston at (803) 931-5173.
If you have any questions, please call Robert Johnston at (803) 931-5173. Thank you for your prompt reply and for your support of the examination process.
Thank you for your prompt reply and for your support of the examination process. 3 JOHNSTON,ROBERTN From: Sent: To: Cc:  
3
 
JOHNSTON,ROBERTN From:                       GOLDSTEIN, RICHARD Sent:                       Wednesday, June 03, 2015 9:52 AM To:                         JOHNSTON, ROBERT N Cc:                         RICHARDSON, SCOTT ALAN


==Subject:==
==Subject:==
GOLDSTEIN, RICHARD Wednesday, June 03, 2015 9:52 AM JOHNSTON, ROBERT N RICHARDSON, SCOTT ALAN FW: Post NRC Exam Security Sign-off From: Tara Tolbert [mailto:taratolbert2001@gmail.com]
FW: Post NRC Exam Security Sign-off From: Tara Tolbert [mailto:taratolbert2001@gmail.com]
Sent: Wednesday, June 03, 2015 9:46 AM To: GOLDSTEIN, RICHARD  
Sent: Wednesday, June 03, 2015 9:46 AM To: GOLDSTEIN, RICHARD


==Subject:==
==Subject:==
Re: Post NRC Exam Security Sign-off ***This is an EXTERNAL email. Please do not click on a link or open any attachments unless you are confident it is from a trusted source. Yes, I comply with the requirements.
Re: Post NRC Exam Security Sign-off
Thanks, Tara Tolbert On Jun 3, 2015 9:43 AM, "GOLDSTEIN, RICHARD" <Richard.Goldstein@scana.com>
***This is an EXTERNAL email. Please do not click on a link or open any attachments unless you are confident it is from a trusted source.
wrote: The VC Summer 2015 NRC License Exam is complete.
Yes, I comply with the requirements.
NUREG 1021 Operator Licensing Examination Standards for Power Reactors, Form ES-201-3, Examination Security Agreement must be completed in order for the Station to close out the exam package. You have signed on the security agreement Pre-Examination portion and were issued a Red Badge to designate your status. In order to close out the security agreement please review the below statement:
: Thanks, Tara Tolbert On Jun 3, 2015 9:43 AM, "GOLDSTEIN, RICHARD" <Richard.Goldstein@scana.com> wrote:
: 2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of May 4-8, 2015 and May 18-22, 2015. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC. Please reply electronically to this e-mail stating that you complied with the above to allow closure of the Security Agreement.
The VC Summer 2015 NRC License Exam is complete. NUREG 1021 Operator Licensing Examination Standards for Power Reactors, Form ES-201-3, Examination Security Agreement must be completed in order for the Station to close out the exam package. You have signed on the security agreement Pre-Examination portion and were issued a Red Badge to designate your status. In order to close out the security agreement please review the below statement:
1 JOHNSTON,ROBERTN From: Sent: To: RICHARDSON, SCOTT ALAN Thursday, May 28, 2015 9:46 AM JOHNSTON, ROBERT N  
: 2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of May 4-8, 2015 and May 18-22, 2015. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.
Please reply electronically to this e-mail stating that you complied with the above to allow closure of the Security Agreement.
1
 
JOHNSTON,ROBERTN From:                       RICHARDSON, SCOTT ALAN Sent:                        Thursday, May 28, 2015 9:46 AM To:                          JOHNSTON, ROBERT N


==Subject:==
==Subject:==
FW: Post NRC Exam Security Sign-off From: George.Marengo@aps.com
FW: Post NRC Exam Security Sign-off From: George.Marengo@aps.com [mailto :George.Marengo@aps.com]
[mailto :George.Marengo@aps.com]
Sent: Thursday, May 28, 2015 9:40 AM To: RICHARDSON, SCOTT ALAN
Sent: Thursday, May 28, 2015 9:40 AM To: RICHARDSON, SCOTT ALAN  


==Subject:==
==Subject:==
RE: Post NRC Exam Security Sign-off ***This is an EXTERNAL email. Please do not click on a link or open any attachments unless you are confident it is from a trusted source. Hello Scott, I agree with everything stated in "2. Post-Examination" George Marengo Licensed Operator Initial Training 5801 S. Wintersburg Road, Tonopah, AZ 85354, M.S. 7894 Work: 623-393-6363 Cell: 760-505-6376 E-Mail: George.Marengo@aps.com From: RICHARDSON, SCOTT ALAN [mailto:SCOTT.RICHARDSON@scana.com]
RE: Post NRC Exam Security Sign-off
Sent: Thursday, May 28, 2015 5:48 AM To: Marengo, George Cc: JOHNSTON, ROBERT N  
***This is an EXTERNAL email. Please do not click on a link or open any attachments unless you are confident it is from a trusted source.
Hello Scott, I agree with everything stated in "2. Post-Examination" George Marengo Licensed Operator Initial Training 5801 S. Wintersburg Road, Tonopah, AZ 85354, M.S. 7894 Work: 623-393-6363       Cell: 760-505-6376 E-Mail: George.Marengo@aps.com From: RICHARDSON, SCOTT ALAN [mailto:SCOTT.RICHARDSON@scana.com]
Sent: Thursday, May 28, 2015 5:48 AM To: Marengo, George Cc: JOHNSTON, ROBERT N


==Subject:==
==Subject:==
Post NRC Exam Security Sign-off USE CAUTION -EXTERNAL SENDER: (SCOTT.RICHARDSON@scana.com)
Post NRC Exam Security Sign-off USE CAUTION - EXTERNAL SENDER: (SCOTT.RICHARDSON@scana.com)
Do not click on links or open attachments that are not expected.
Do not click on links or open attachments that are not expected.
Never give out your User IDs or passwords.
Never give out your User IDs or passwords.
The VC Summer 2015 NRC License Exam is complete.
The VC Summer 2015 NRC License Exam is complete. NU REG 1021 Operator Licensing Examination Standards for Power Reactors, Form ES-201-3, Examination Security Agreement must be completed in order for the Station to close out the exam package. You have signed on the security agreement Pre-Examination portion and were issued a Red Badge to designate your status. In order to close out the security agreement please review the below statement:
NU REG 1021 Operator Licensing Examination Standards for Power Reactors, Form ES-201-3, Examination Security Agreement must be completed in order for the Station to close out the exam package. You have signed on the security agreement Pre-Examination portion and were issued a Red Badge to designate your status. In order to close out the security agreement please review the below statement:
: 2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of May 4-8, 2015 and May 18-22, 2015. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.
: 2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of May 4-8, 2015 and May 18-22, 2015. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC. 6 JOHNSTON,ROBERTN From: Sent: To: RICHARDSON, scon ALAN Thursday, May 28, 2015 9:18 AM JOHNSTON, ROBERT N  
6
 
JOHNSTON,ROBERTN From:                         RICHARDSON, scon ALAN Sent:                        Thursday, May 28, 2015 9:18 AM To:                          JOHNSTON, ROBERT N


==Subject:==
==Subject:==
FW: Post NRC Exam Security Sign-off From Youmans, . M. [mailto:X2EMYOUM@southernco.com]
FW: Post NRC Exam Security Sign-off From Youmans, . M. [mailto:X2EMYOUM@southernco.com]
Sent: T urs , May 28, 2015 8:58 AM To: RICHARDSON, SCOTT ALAN  
Sent: T urs     , May 28, 2015 8:58 AM To: RICHARDSON, SCOTT ALAN


==Subject:==
==Subject:==
RE: Post NRC Exam Security Sign-off ***This is an EXTERNAL email. Please do not click on a link or open any attachments unless you are confident it is from a trusted source. Hi Scott, I did comply with the security requirements for your 2015 NRC License Exam. I have not interacted with any of the students or initial license instructors before or after leaving V. C. Summer. Please remove me from your security agreement list. :Jvl itcne{{ 'KJvl icl(' rfoumans Site Project Lead GE Mk VI Turbine Digital Controls Group Southern Nuclear -Plant Vogtle Ul & U2 Phone: 706-848-2037 Cell: 706-830-1770 From: RICHARDSON, SCOTT ALAN [mailto:SCOTT.RICHARDSON@scana.com]
RE: Post NRC Exam Security Sign-off
Sent: Thursday, May 28, 2015 8:50 AM To: Youmans, E. M. Cc: JOHNSTON, ROBERT N  
***This is an EXTERNAL email. Please do not click on a link or open any attachments unless you are confident it is from a trusted source.
Hi Scott, I did comply with the security requirements for your 2015 NRC License Exam. I have not interacted with any of the students or initial license instructors before or after leaving V. C. Summer. Please remove me from your security agreement list.
:Jvlitcne{{ 'KJvlicl(' rfoumans Site Project Lead GE Mk VI Turbine Digital Controls Group Southern Nuclear - Plant Vogtle Ul & U2 Phone: 706-848-2037 Cell: 706-830-1770 From: RICHARDSON, SCOTT ALAN [mailto:SCOTT.RICHARDSON@scana.com]
Sent: Thursday, May 28, 2015 8:50 AM To: Youmans, E. M.
Cc: JOHNSTON, ROBERT N


==Subject:==
==Subject:==
Post NRC Exam Security Sign-off The VC Summer 2015 NRC License Exam is complete.
Post NRC Exam Security Sign-off The VC Summer 2015 NRC License Exam is complete. NU REG 1021 Operator Licensing Examination Standards for Power Reactors, Form ES-201-3, Examination Security Agreement must be completed in order for the Station to close out the exam package. You have signed on the security agreement Pre-Examination portion and were issued a Red Badge to designate your status. In order to close out the security agreement please review the below statement:
NU REG 1021 Operator Licensing Examination Standards for Power Reactors, Form ES-201-3, Examination Security Agreement must be completed in order for the Station to close out the exam package. You have signed on the security agreement Pre-Examination portion and were issued a Red Badge to designate your status. In order to close out the security agreement please review the below statement:
: 2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of May 4-8, 2015 and May 18-22, 2015. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.
: 2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of May 4-8, 2015 and May 18-22, 2015. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC. 8 JOHNSTON, ROBERT N From: Sent: To: RICHARDSON, SCOTT ALAN Monday, June 01, 2015 6:26 AM JOHNSTON, ROBERT N  
8
 
JOHNSTON, ROBERT N From:                       RICHARDSON, SCOTT ALAN Sent:                        Monday, June 01, 2015 6:26 AM To:                          JOHNSTON, ROBERT N


==Subject:==
==Subject:==
FW: Post NRG Exam Security Sign-off From: WAGNER, LARRY R Sent: Thursday, May 28, 2015 3:37 PM To: RICHARDSON, SCOTT ALAN  
FW: Post NRG Exam Security Sign-off From: WAGNER, LARRY R Sent: Thursday, May 28, 2015 3:37 PM To: RICHARDSON, SCOTT ALAN


==Subject:==
==Subject:==
RE: Post NRC Exam Security Sign-off I did comply with the requirements of item No. 2. From: RICHARDSON, SCOTT ALAN Sent: Thursday, May 28, 2015 8:43 AM To: WAGNER, LARRY R Cc: JOHNSTON, ROBERT N  
RE: Post NRC Exam Security Sign-off I did comply with the requirements of item No. 2.
From: RICHARDSON, SCOTT ALAN Sent: Thursday, May 28, 2015 8:43 AM To: WAGNER, LARRY R Cc: JOHNSTON, ROBERT N


==Subject:==
==Subject:==
Post NRC Exam Security Sign-off The VC Summer 2015 NRG License Exam is complete.
Post NRC Exam Security Sign-off The VC Summer 2015 NRG License Exam is complete. NUREG 1021 Operator Licensing Examination Standards for Power Reactors, Form ES-201-3, Examination Security Agreement must be completed in order for the Station to close out the exam package. You have signed on the security agreement Pre-Examination portion and were issued a Red Badge to designate your status. In order to close out the security agreement please review the below statement:
NUREG 1021 Operator Licensing Examination Standards for Power Reactors, Form ES-201-3, Examination Security Agreement must be completed in order for the Station to close out the exam package. You have signed on the security agreement Pre-Examination portion and were issued a Red Badge to designate your status. In order to close out the security agreement please review the below statement:
: 2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRG licensing examinations administered during the week(s) of May 4-8, 2015 and May 18-22, 2015. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRG.
: 2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRG licensing examinations administered during the week(s) of May 4-8, 2015 and May 18-22, 2015. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRG. Please reply electronically to this e-mail stating that you complied with the above to allow closure of the Security Agreement.
Please reply electronically to this e-mail stating that you complied with the above to allow closure of the Security Agreement.
If you have any questions, please call Robert Johnston at (803) 931-5173.
If you have any questions, please call Robert Johnston at (803) 931-5173. Thank you for your prompt reply and for your support of the examination process.
Thank you for your prompt reply and for your support of the examination process. 5 JOHNSTON, ROBERT N From: Sent: To: RICHARDSON, SCOTT ALAN Wednesday, June 03, 2015 8:50 AM JOHNSTON, ROBERT N  
5
 
JOHNSTON, ROBERT N From:                       RICHARDSON, SCOTT ALAN Sent:                        Wednesday, June 03, 2015 8:50 AM To:                          JOHNSTON, ROBERT N


==Subject:==
==Subject:==
FW: Post NRC Exam Security Sign-off From BALCH, KEVIN Sent: e , une 03, 2015 8:50 AM To: RICHARDSON, SCOTT ALAN  
FW: Post NRC Exam Security Sign-off From BALCH, KEVIN Sent:   e       , une 03, 2015 8:50 AM To: RICHARDSON, SCOTT ALAN


==Subject:==
==Subject:==
RE: Post NRC Exam Security Sign-off I have complied.
RE: Post NRC Exam Security Sign-off I have complied.
From: RICHARDSON, SCOTT ALAN Sent: Thursday, May 28, 2015 8:38 AM To: BALCH, KEVIN Cc: JOHNSTON, ROBERT N  
From: RICHARDSON, SCOTT ALAN Sent: Thursday, May 28, 2015 8:38 AM To: BALCH, KEVIN Cc: JOHNSTON, ROBERT N


==Subject:==
==Subject:==
Post NRC Exam Security Sign-off The VC Summer 2015 NRC License Exam is complete. NUREG 1021 Operator Licensing Examination Standards for Power Reactors, Form ES-201-3, Examination Security Agreement must be completed in order for the Station to close out the exam package. You have signed on the security agreement Pre-Examination portion and were issued a Red Badge to designate your status. In order to close out the security agreement please review the below statement:
Post NRC Exam Security Sign-off The VC Summer 2015 NRC License Exam is complete. NUREG 1021 Operator Licensing Examination Standards for Power Reactors, Form ES-201-3, Examination Security Agreement must be completed in order for the Station to close out the exam package. You have signed on the security agreement Pre-Examination portion and were issued a Red Badge to designate your status. In order to close out the security agreement please review the below statement:
: 2. Post-Examination To the best of my knowledge , I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of May 4-8, 2015 and May 18-22, 2015. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC. Please reply electronically to this e-mail stating that you complied with the above to allow closure of the Security Agreement.
: 2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of May 4-8, 2015 and May 18-22, 2015. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.
If you have any questions, please call Robert Johnston at (803) 931-5173.
Please reply electronically to this e-mail stating that you complied with the above to allow closure of the Security Agreement.
Thank you for your prompt reply and for your support of the examination process. 4 JOHNSTON, ROBERT N From: Sent: To: Cc: KING, JAMES ROBERT (ROBBIE) Saturday, May 30, 2015 8:17 PM RICHARDSON, SCOTT ALAN JOHNSTON, ROBERT N  
If you have any questions, please call Robert Johnston at (803) 931-5173. Thank you for your prompt reply and for your support of the examination process.
4
 
JOHNSTON, ROBERT N From:                       KING, JAMES ROBERT (ROBBIE)
Sent:                        Saturday, May 30, 2015 8:17 PM To:                          RICHARDSON, SCOTT ALAN Cc:                          JOHNSTON, ROBERT N


==Subject:==
==Subject:==
RE: Post NRC Exam Security Sign-off I complied with all statements in the attached email regarding the NRC Exam Security Agreement.
RE: Post NRC Exam Security Sign-off I complied with all statements in the attached email regarding the NRC Exam Security Agreement.
Robbie King From: RICHARDSON, SCOTT ALAN Sent: Thursday, May 28, 2015 8:35 AM To: KING, JAMES ROBERT (ROBBIE) Cc: JOHNSTON, ROBERT N  
Robbie King From: RICHARDSON, SCOTT ALAN Sent: Thursday, May 28, 2015 8:35 AM To: KING, JAMES ROBERT (ROBBIE)
Cc: JOHNSTON, ROBERT N


==Subject:==
==Subject:==
Post NRC Exam Security Sign-off The VC Summer 2015 NRC License Exam is complete. NUREG 1021 Operator Licensing Examination Standards for Power Reactors, Form ES-201-3, Examination Security Agreement must be completed in order for the Station to close out the exam package. You have signed on the security agreement Pre-Examination portion and were issued a Red Badge to designate your status. In order to close out the security agreement please review the below statement:
Post NRC Exam Security Sign-off The VC Summer 2015 NRC License Exam is complete. NUREG 1021 Operator Licensing Examination Standards for Power Reactors, Form ES-201-3, Examination Security Agreement must be completed in order for the Station to close out the exam package. You have signed on the security agreement Pre-Examination portion and were issued a Red Badge to designate your status. In order to close out the security agreement please review the below statement:
: 2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of May 4-8, 2015 and May 18-22, 2015. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct , evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC. Please reply electronically to this e-mail stating that you complied with the above to allow closure of the Security Agreement.
: 2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of May 4-8, 2015 and May 18-22, 2015. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.
If you have any questions , please call Robert Johnston at (803) 931-5173.
Please reply electronically to this e-mail stating that you complied with the above to allow closure of the Security Agreement.
Thank you for your prompt reply and for your support of the examination process. 2 JOHNSTON, ROBERT N From: Sent: To: Cc: EDWARDS, DOUGLAS J Thursday, May 28, 2015 10:35 AM RICHARDSON, SCOTT ALAN JOHNSTON, ROBERT N  
If you have any questions, please call Robert Johnston at (803) 931-5173. Thank you for your prompt reply and for your support of the examination process.
2
 
JOHNSTON, ROBERT N From:                       EDWARDS, DOUGLAS J Sent:                        Thursday, May 28, 2015 10:35 AM To:                          RICHARDSON, SCOTT ALAN Cc:                          JOHNSTON, ROBERT N


==Subject:==
==Subject:==
Re: Post NRC Exam Security Sign-off I have complied with the NRC security requirements.
Re: Post NRC Exam Security Sign-off I have complied with the NRC security requirements.
Doug Edwards 803-931-5712 office 803-201-4628 cell From: RICHARDSON, SCOTT ALAN Sent: Thursday, May 28, 2015 8:40 AM To: EDWARDS, DOUGLAS J Cc: JOHNSTON, ROBERT N  
Doug Edwards 803-931-5712 office 803-201-4628 cell From: RICHARDSON, SCOTT ALAN Sent: Thursday, May 28, 2015 8:40 AM To: EDWARDS, DOUGLAS J Cc: JOHNSTON, ROBERT N


==Subject:==
==Subject:==
Post NRC Exam Security Sign-off The VC Summer 2015 NRC License Exam is complete.
Post NRC Exam Security Sign-off The VC Summer 2015 NRC License Exam is complete. NU REG 1021 Operator Licensing Examination Standards for Power Reactors, Form ES-201-3, Examination Security Agreement must be completed in order for the Station to close out the exam package. You have signed on the security agreement Pre-Examination portion and were issued a Red Badge to designate your status. In order to close out the security agreement please review the below statement:
NU REG 1021 Operator Licensing Examination Standards for Power Reactors, Form ES-201-3, Examination Security Agreement must be completed in order for the Station to close out the exam package. You have signed on the security agreement Pre-Examination portion and were issued a Red Badge to designate your status. In order to close out the security agreement please review the below statement:
: 2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of May 4-8, 2015 and May 18-22, 2015. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.
: 2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of May 4-8, 2015 and May 18-22, 2015. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC. Please reply electronically to this e-mail stating that you complied with the above to allow closure of the Security Agreement.
Please reply electronically to this e-mail stating that you complied with the above to allow closure of the Security Agreement.
If you have any questions, please call Robert Johnston at (803) 931-5173.
If you have any questions, please call Robert Johnston at (803) 931-5173. Thank you for your prompt reply and for your support of the examination process.
Thank you for your prompt reply and for your support of the examination process. 1 ES-301 Operating Test Quality Checklist Form ES-301-3 Facilit : Date of Examination:
1
O eratin Test Number: 1. General Criteria a. The operating test conforms with the previously approved outline; changes are consistent with sam lin re uirements e ..* 10 CFR 55.45, o erational Im ortance, safet function distribution . b. There is no day-to-day repetition between this and other operating tests to be administered durin this examination.
 
: c. Theo eratin test shall not du licate items from the a licants' audit tests . see Section 0.1.a. d. Overlap with the written examination and between different parts of the operating test is within acce table limits. e. It appears that the operating test will differentiate between competent and less-than-competent a licants at the desi nated license level. 2. Walk*Throu h Criteria a. Each JPM Includes the following, as applicable:
ES-301                                         Operating Test Quality Checklist                                     Form ES-301-3 Facilit :                                                           Date of Examination:                   O eratin Test Number:
: b. Initial conditions Initiating cues references and tools, Including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee operationally important specific performance criteria that include: detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the se uence of ste s, If a llcable Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., Item distribution, bank use, repetition from the last 2 NRG examinations) specified on those forms and Form ES-201-2.
Initials
: 1. General Criteria b.
: a.         The operating test conforms with the previously approved outline; changes are consistent with sam lin re uirements e ..* 10 CFR 55.45, o erational Im ortance, safet function distribution .
: b.         There is no day-to-day repetition between this and other operating tests to be administered durin this examination.
: c.         Theo eratin test shall not du licate items from the a       licants' audit tests . see Section 0 .1.a.
: d.         Overlap with the written examination and between different parts of the operating test is within acce table limits.
: e.         It appears that the operating test will differentiate between competent and less-than-competent a licants at the desi nated license level.
: 2. Walk*Throu h Criteria
: a.         Each JPM Includes the following, as applicable:
Initial conditions Initiating cues references and tools, Including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee operationally important specific performance criteria that include:
detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the se uence of ste s, If a llcable
: b.        Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., Item distribution, bank use, repetition from the last 2 NRG examinations) specified on those forms and Form ES-201-2.
: 3. Simulator Criteria The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a co is attached.
: 3. Simulator Criteria The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a co is attached.
: a. Author b. Facility Reviewer(*)
: a. Author
: c. NRC Chief Examiner (#) d. NRC Supervisor NOTE: The facility signature Is not applicable for NRG-developed tests. # lnde endent NRC reviewer initial items in Column "c"; chief examiner concurrence re uired. ES-301. Page 24 of 27 Initials b.
: b. Facility Reviewer(*)
ES-301 Simulator Scenario Quality Checklist Form ES-301-4 --'';015 Scenario Numbers: 1/2 / 3 Operating Test No.: NRC ILO 13-01 QUALITATIVE ATTRIBUTES Initials a b* c# 1. The initial conditions are realistic , in that some equipment and/or instrumentation may be out Y<1 w 111 of service, but it does not cue the operators into expected events. 2. The scenarios consist mostly of related events. Clf 41/ , 3. Each event description consists of
: c. NRC Chief Examiner (#)
: d. NRC Supervisor NOTE:           The facility signature Is not applicable for NRG-developed tests.
            #     lnde endent NRC reviewer initial items in Column "c"; chief examiner concurrence re uired.
ES-301. Page 24 of 27
 
ES-301                                 Simulator Scenario Quality Checklist                                   Form ES-301-4
          - -             ~      ~
                                          ~~ *~, '';015 Scenario Numbers: 1/2 / 3       Operating Test No.: NRC ILO 13-01 QUALITATIVE ATTRIBUTES                                                       Initials a     b*       c#
: 1. The initial conditions are realistic, in that some equipment and/or instrumentation may be out of service, but it does not cue the operators into expected events.                                     Y<1    w 111
: 2. The scenarios consist mostly of related events.                                                           ~ ,Clf           41/
: 3. Each event description consists of
* the point in the scenario when it is to be initiated
* the point in the scenario when it is to be initiated
* the malfunction(s) that are entered to initiate the event N
* the malfunction(s) that are entered to initiate the event
* the symptoms/cues that will be visible to the crew
* the symptoms/cues that will be visible to the crew                                                           N
* the expected operator actions (by shift position)
* the expected operator actions (by shift position)
* the event termination point (if applicable)
* the event termination point (if applicable)                                                             ~                ~
: 4. No more than one non-mechanistic failure (e.g., pipe break) is incorporated into the scenario w without a credible preceding incident such as a seismic event. 5. The events are valid with regard to physics and thermodynamics. ,.w 6. Sequencing and timing of events is reasonable, and allows the examination team to obtain lr1IJ complete evaluation results commensurate with the scenario objectives. 7. If time compression techniques are used, the scenario summary clearly so indicates. Operators have sufficient time to carry out expected activities without undue time constraints. 1tf Cues are given. 8. The simulator modeling. is not altered. "fl (41 , . 9. The scenarios have been validated.
: 4. No more than one non-mechanistic failure (e.g., pipe break) is incorporated into the scenario
Pursuant to 10 CFR 55.46(d), any open simulator performance deficiencies or deviations from the referenced plant have been evaluated f1f to ensure that functional fidelity is maintained while running the planned scenarios. 10. Every operator will be evaluated using at least one new or significantly modified scenario. Yi' All other scenarios have been altered in accordance with Section D.5 of ES-301. 11. All individual operator competencies can be evaluated, as verified using Form ES-301-6 'f7{ (submit the form along with the simulator scenarios). 12. Each applicant will be significantly involved in the minimum number of transients and events rm specified on Form ES-301-5 (submit the form with the simulator scenarios). 13. The level of difficulty is appropriate to support licensing decisions for each crew position. d\ Target Quantitative Attributes (Per Scenario; See Section D.5.d) Actual Attributes  
                                                                                                                ~      w~
------1 / 2 / 3
5.
: 1. Total malfunctions (5--8) 9 171 9 WI 4Jf 2. Malfunctions after EOP entry (1-2) 4 121 3 ot 9z/ ,,,, 3. Abnormal events (2-4) 5 / 4 / 4 d\ "' 4. Major transients (1-2) 1 / 1 I 1 &deg;' c.L 'Ill 5. EOPs entered/requiring substantive actions (1-2) 3 121 1 CT? "t;tf "" 6. EOP contingencies requiring substantive actions (0-2) 1 I 0 I 1 t;# fJ'/ 7. Critical tasks (2-3) 3 / 3 / 4  
without a credible preceding incident such as a seismic event.
..Jt Ill ES-301 Transient and Event Checklist Form ES-301-5 Facility:
The events are valid with regard to physics and thermodynamics.                                         ~
VC SUMMER Date of Exam: 05/04/2015 Operating Test No.: NRC ILO 13-01 A E Scenarios p v 2 3 T p E L N CREW CREW CREW CREW 0 I T POSITION POSITION POSITION POSITION T MINIMUM(*)
                                                                                                                      ,.w       ~
c A A T s A B s A B s A B s A B L N y R T 0 R T 0 R T 0 R T b 0 c p 0 c p 0 c p 0 c p T p R I u E RX 0 0 0 1 1 0 RO NOR 3 2 D 2 *1 I 1 Q) SRO-I 1 2 1 4 8 4 4 2 :c l/C .0 D 45 56 0 0:: Gi SRO-U MAJ 6 7 2 2 2 1 c 181 <11 1 2 5 0 2 2 ... TS 1 4 (.) 4 RX 0 0 0 *1 -1 0 RO NOR 3 2 c D 2 *1 1 1 0 "' SRO-I 1 2 1 4 8 4 4 2 <11 l/C """') D 45 56 SRO-U MAJ 6 7 2 2 2 1 (ii 181 TS 1 2 1 4 5 0 2 2 (.') 4 RX 0 0 0 *1 -1 0 RO D NOR 3 2 2 1 1 1 SRO-I l/C 1 2 1 4 8 4 4 2 Q) D 45 56 ..l<: SRO-U MAJ 6 7 2 2 2 1 ,g 181 1 2 5 0 2 2 TS 4 1 4 RO RX 0 2 1 1 -1 0 181 NOR 3 0 1 1 1 1 c 1i$. SRO-I ::I D l/C 25 1 6 4 4 4 2 """') ,:,i SRO-U 0 MAJ 6 7 2 2 2 *1 ::I D co TS 0 0 0 0 2 2 Instructions:
: 6. Sequencing and timing of events is reasonable, and allows the examination team to obtain complete evaluation results commensurate with the scenario objectives.                                     ~      ~ lr1IJ
: 1. Check the applicant level and enter the operating test number and Form ES-0-1 event numbers for each event type; TS are not applicable for RO applicants.
: 7. If time compression techniques are used, the scenario summary clearly so indicates.
ROs must serve in both the " at-the-controls (ATC)" and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (l/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one l/C malfunction can be credited toward the two l/C malfunctions required for the ATC position.
                                                                                                                ~ 1tf ~
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*)Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
Operators have sufficient time to carry out expected activities without undue time constraints.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: VC SUMMER Date of Exam: 05/04/2015 Operating Test No.: NRC ILO 13-01 A E Scenarios p v 2 3 T p E L N CREW CREW CREW CREW 0 I T POSITION POSITION POSITION POSITION T MINIMUM(*)
Cues are given.
c A A T s A B s A B s A B s A B L N y R T 0 R T 0 R T 0 R T 0 0 c p 0 c p 0 c p 0 c p T p R I u E RO RX 3 0 1 1 *1 0 c: 181 :i NOR 0 2 1 1 *1 1 co ..r:: SRO-I I/) D l/C 1 4 34 4 4 4 2 co a:: -c SRO-U MAJ 6 7 2 2 2 1 .... 0 D TS 0 u. 0 0 0 2 2 RO RX 0 2 1 1 -1 0 181 NOR 3 0 1 1 1 *1 >; SRO-I 111 D l/C 25 1 6 4 4 4 2 3: c: 0 *-SRO-U MAJ 6 7 2 2 2 *1 =en 111 :i D C), TS 0 0 0 0 2 2 RO RX 3 0 1 1 *1 0 181 NOR 0 2 1 1 1 I "O !!! SRO-I ca D l/C 1 4 34 4 4 4 2 111" SRO-U MAJ 6 7 2 2 2 1 'E 111 D J: TS 0 0 0 0 2 2 RO RX 0 2 1 1 1 0 >. 181 "O NOR 3 0 1 1 I *1 c: <( SRO-I >; D l/C 25 1 6 4 4 4 2 Qi Q) SRO-U MAJ 6 7 2 2 2 *t z (.) D TS 0 0 0 0 2 2 Instructions
: 8. The simulator modeling. is not altered.                                                                   "fl ,.(41 ~
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants.
: 9. The scenarios have been validated. Pursuant to 10 CFR 55.46(d), any open simulator
ROs must serve in both the "at-the-controls (ATC)" and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (l/C) malfunctions and one major transient , in the ATC position. If an Instant SRO additionally serves in the BOP position, one l/C malfunction can be credited toward the two l/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum
                                                                                                                ~
performance deficiencies or deviations from the referenced plant have been evaluated to ensure that functional fidelity is maintained while running the planned scenarios.                           f1f ~
: 10. Every operator will be evaluated using at least one new or significantly modified scenario.
All other scenarios have been altered in accordance with Section D.5 of ES-301 .                         ~ Yi' ~
11 . All individual operator competencies can be evaluated, as verified using Form ES-301-6 (submit the form along with the simulator scenarios).                                                   'f7{  ~ ~~
: 12. Each applicant will be significantly involved in the minimum number of transients and events specified on Form ES-301-5 (submit the form with the simulator scenarios) .                             ~ ~            . rm
: 13. The level of difficulty is appropriate to support licensing decisions for each crew position.           d\ I~            ~
Target Quantitative Attributes (Per Scenario; See Section D.5.d)                     Actual Attributes     --     --       --
1 /2/ 3 1.
2.
Total malfunctions (5--8)
Malfunctions after EOP entry (1-2) 9 171 9 4 121 3
                                                                                                                ~
ot 9z/
WI 4Jf
                                                                                                                                  ,,,,
                                                                                                                        ~
3.
4.
5.
Abnormal events (2-4)
Major transients (1-2)
EOPs entered/requiring substantive actions (1-2) 5 /4/ 4 1 / 1I 1 3 121 1 d\
                                                                                                                &deg;' ""
CT?
c.L 'Ill "t;tf
                                                                                                                                  "'
: 6. EOP contingencies requiring substantive actions (0-2)                                     1 I0I 1         ~      t;# fJ'/
: 7. Critical tasks (2-3)                                                                       3 /3/ 4       ..Jt   ~        Ill
 
ES-301                                       Transient and Event Checklist                                     Form ES-301-5 Facility: VC SUMMER                       Date of Exam: 05/04/2015             Operating Test No.: NRC ILO 13-01 A           E                                                   Scenarios p           v p          E            2                   3                                                 T 0
L           N         CREW               CREW                 CREW               CREW I           T                                                                                   T     MINIMUM(*)
POSITION            POSITION            POSITION            POSITION c                   s                  s                  s A
A           T             A     B           A     B             A     B     s   A     B     L N           y     R     T     0     R     T     0     R       T     0     R   T     b T          p      0     c     p     0     c     p     0       c     p     0   c     p R     I   u E
RX       0                   0                                                         0   1     1     0 RO NOR     3                   2                                                         2   *1     I   1 Q)
D
:c      SRO-I             12                  14                                                        8   4     4     2
.0                  l/C 45                 56 0
0::     D Gi     SRO-U     MAJ     6                   7                                                         2   2     2     1 c
  ... 181
  <11
(.)                TS 12 14 5   0     2     2 4
RX       0                   0                                                         0   *1   -1   0 RO NOR     3                   2                                                         2   *1   1     1 c
0       D 12                  14                                                        8   4     4     2
  "'<11
"""')
SRO-I      l/C 45                   56
  ~
D SRO-U     MAJ     6                   7                                                         2   2     2     1
~ 181 (ii                         12                                                                              5   0     2     2
(.')               TS                          14 4
RX       0                   0                                                         0   *1   -1   0 RO NOR     3                   2                                                         2     1   1     1 D
SRO-I             12                  14                                                        8   4     4     2 l/C 45                  56 Q)
..l<:   D
~        SRO-U     MAJ     6                   7                                                         2   2     2     1
,g 181               12                                                                              5   0     2     2
~                  TS 4
14 RO         RX                     0             2                                                 1   1     -1   0 c
181       NOR                   3             0                                                 1   1     1   1 1i$   . SRO-I l/C                   25           16                                                  4   4     4     2
::I
"""')   D
,:,i     SRO-U     MAJ                   6             7                                                 2   2     2     *1 0
::I co      D         TS                     0             0                                                 0     0   2     2 Instructions:
: 1.       Check the applicant level and enter the operating test number and Form ES-0-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)"
and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (l/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one l/C malfunction can be credited toward the two l/C malfunctions required for the ATC position.
: 2.       Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*)Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
: 3.       Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
 
ES-301                                       Transient and Event Checklist                                     Form ES-301-5 Facility: VC SUMMER                         Date of Exam: 05/04/2015             Operating Test No. : NRC ILO 13-01 A           E                                                   Scenarios p           v             2                 3                                                 T p           E L           N                                                                                   0 CREW               CREW               CREW               CREW I           T                                                                                   T     MINIMUM(*)
POSITION            POSITION          POSITION            POSITION c                   s     A     B     s     A     B     s       A     B     s A
A            T                                                                        A    B     L y     R       T     0     R     T     0     R       T     0     R   T     0 N
p      0       c     p     0     c     p     0       c     p     0   c     p T                                                                                                     R     I   u E
RO         RX               3                         0                                           1   1     *1   0 c:
:i co 181        NOR             0                         2                                           1   1     *1   1
    ..r::
I/)
SRO-I co              l/C             14                        34                                           4   4     4     2 a:: D
    -c.... SRO-U     MAJ             6                         7                                           2   2     2     1 0
: u. D         TS               0                         0                                           0   0     2     2 RO         RX                     0           2                                                 1   1     -1   0 181       NOR                     3           0                                                 1   1     1     *1
  >;       SRO-I l/C                   25           16                                                  4   4     4     2 111 3: c:   D
  =en 0 *-     SRO-U     MAJ                     6           7                                                 2   2     2     *1 111 :i C),
D          TS                     0           0                                                 0   0     2     2 RO         RX               3                         0                                           1   1     *1   0 "O
181       NOR             0                         2                                           1   1     1     I
      !!! SRO-I ca               l/C             14                        34                                           4   4     4     2 111" D
    'E    SRO-U     MAJ             6                         7                                           2   2     2     1 111 J:     D          TS               0                         0                                           0   0     2     2 RO         RX                     0           2                                                 1   1     1     0
      >.
    "O c:  181        NOR                     3           0                                                 1   1     I   *1
      <(   SRO-I
      >;             l/C                   25           16                                                  4   4     4     2 Qi     D Q)
SRO-U     MAJ                     6           7                                                 2   2     2     *t z(.)
      ~    D         TS                     0           0                                                 0   0     2     2 Instructions:
: 1.       Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)"
and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (l/C) malfunctions and one major transient, in the ATC position . If an Instant SRO additionally serves in the BOP position, one l/C malfunction can be credited toward the two l/C malfunctions required for the ATC position.
: 2.       Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
: 3.       Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum
* requirements specified for the applicant's license level in the right-hand columns .
* requirements specified for the applicant's license level in the right-hand columns .
ES-301 Transient and Event Checklist Form ES-301-5 Facility:
 
VC SUMMER Date of Exam: 05/04/2015 Operating Test No.: NRC ILO 13-01 A E Scenarios p v 2 3 1 T p E L N CREW CREW CREW CREW 0 I T POSITION POSITION POSITION POSITION T MINIMUM(*)
ES-301                                     Transient and Event Checklist                                   Form ES-301-5 Facility: VC SUMMER                     Date of Exam: 05/04/2015             Operating Test No.: NRC ILO 13-01 A             E                                                   Scenarios p           v                                                                                   T p            E            2                   3                   1 0
c A A T s A B s A B s A B s A B L N y R T 0 R T 0 R T 0 R T 0 0 c p 0 c p 0 c p 0 c p T p R I u E RX 0 1 *1 0 RO NOR D 2 *1 1 ., SRO-I l/C 34 4 /,) 2* D 67 SRO-U MAJ 8 2 2 *1 181 TS 34 0 2 2 5 RO RX 2 *1 1 0 181 NOR 0 'j 1 1 SRO-I D l/C 67 4 4 2 SRO-U MAJ 8 2 2 *1 D TS 0 0 2 2 RO RX 0 1 1 0 181 NOR 1 1 'i *1 SRO-I l/C 34 4 4 2 D SRO-U MAJ 8 2 2 1 D TS 0 0 2 2 Instructions
L           N       CREW               CREW                 CREW               CREW           T      MINIMUM(*)
: 1. Check the applicant level and enter the operating test number and Form ES-0-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)" and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument o r component (l/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one l/C malfunction can be credited toward the two l/C malfunctions required for the ATC position.
I           T     POSITION             POSITION           POSITION             POSITION c                   s     A     B     s     A     B     s       A     B     s   A     B A
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section 0.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3. Whenever practical, both instrument and component malfunct i ons should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
A            T                                                                                    L y     R     T     0     R     T     0     R       T     0     R   T     0 N
* ES-301 Competencies Checklist Form ES-301-6 Facility:
T            p    0     c     p     0     c     p     0       c     p     0   c     p R     I   u E
VC SUMMER Date of Examination:
RX                                             0                                           1     *1   0 RO NOR                                             2                                           *1   1     .,
05/04/2015 Operating Test No.: NRC ILO 13-01 APPLICANTS Crane, Robbie Galloway, Jason Willis, Mike Buck, Justin RO D RO D RO D RO 181 SRO-I D SRO-I D SRO-I D SRO-I D SRO-U 181 SRO-U lgj SRO-U 181 SRO-U D SCENARIO SCENARIO SCENARIO SCENARIO SRO SRO SRO SRO SRO SRO BOP RO 2 3 2 3 2 3 2 3 Interpret/Diagnose 1 2 1 4 1 2 1 4 1 2 1 4 25 1 5 Events and Conditions 45 56 45 56 45 56 6 1 2 1 2 1 2 1 2 1 2 1 2 1 2 Comply With and 34 34 34 34 34 34 23 56 Use Procedures (1) 56 56 56 56 56 56 56 7 7 7 7 23 1 2 Operate Control ------45 67 Boards (2) 6 1 2 1 2 1 2 1 2 1 2 1 2 23 1 2 Communicate 34 34 34 34 34 34 45 56 and Interact 56 56 56 56 56 56 6 7 7 7 7 1 2 1 2 1 2 1 2 1 2 1 2 34 34 34 Demonstrate 34 34 34 --Supervisory Ability (3) 56 56 56 56 56 56 7 7 7 Comply With and 1 2 14 1 2 1 4 1 2 1 4 4 4 4 --Use Tech. Specs. (3) Notes: (1) Includes Technical Specification compliance for an RO. (2) Optional for an SRO-U. (3) Only applicable to SROs. Instructions:
D SRO-I                                                     34                                                 /,)   2
* l/C                                                                                        4 D                                                         67 SRO-U       MAJ                                             8                                           2     2     *1 181         TS 34 0     2     2 5
RO         RX                                                     2                                   *1   1     0 181         NOR                                                     0                                   'j     1     1 SRO-I l/C                                                   67                                   4     4     2 D
SRO-U       MAJ                                                     8                                   2     2     *1 D           TS                                                     0                                   0     2   2 RO         RX                                                             0                             1     1   0 181         NOR                                                           1                             1     'i   *1 SRO-I l/C                                                           34                           4     4     2 D
SRO-U       MAJ                                                           8                           2     2     1 D           TS                                                             0                             0     2   2 Instructions:
: 1.       Check the applicant level and enter the operating test number and Form ES-0-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)"
and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (l/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one l/C malfunction can be credited toward the two l/C malfunctions required for the ATC position.
: 2.       Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section 0 .5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
: 3.       Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
 
ES-301                                 Competencies Checklist                         Form ES-301-6 Facility: VC SUMMER               Date of Examination:   05/04/2015   Operating Test No.: NRC ILO 13-01
~                                                                  APPLICANTS Crane, Robbie       Galloway, Jason         Willis, Mike         Buck, Justin RO         D         RO         D       RO         D         RO         181 SRO-I     D         SRO-I       D       SRO-I       D         SRO-I     D SRO-U     181       SRO-U       lgj     SRO-U       181       SRO-U     D SCENARIO             SCENARIO             SCENARIO             SCENARIO SRO SRO             SRO   SRO           SRO SRO             BOP   RO 2   3               2     3             2   3               2   3 Interpret/Diagnose             12  14              12    14            12  14                    15 45  56                    56                  56              25 Events and Conditions                               45                   45                         6 12                    12                  12                    12 12                  12                  12 Comply With and               34 34             34 34             34 34               23 56 Use Procedures (1)             56   56             56   56             56   56               56 7 7                     7                   7 23 1 2 Operate Control                 -   -               -     -             -     -             45 Boards (2)                                                                                     6 67 12                    12                  12 12                  12 34            12 34              23 1 2 Communicate                   34 34             34                   34                   45 56
* and Interact                   56   56             56   56             56   56               6 7 7                     7                   7 12                    12                  12 12                  12                  12 34                   34                 34 Demonstrate                   34                   34                   34                     -     -
Supervisory Ability     (3)   56 56               56 56               56 56 7                     7                   7 12                  12                  12 Comply With and 4
14               4 14              4 14                -     -
Use Tech. Specs.       (3)
Notes:
(1)       Includes Technical Specification compliance for an RO.
(2)       Optional for an SRO-U.
(3)       Only applicable to SROs.
Instructions:
Check the applicants' license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.
Check the applicants' license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.
* ES-301 Competencies Checklist Form ES-301-6 Facility:
 
VC SUMMER Date of Examination:
ES-301                                 Competencies Checklist                         Form ES-301-6 Facility: VC SUMMER               Date of Examination:   05/04/2015     Operating Test No.: NRG ILO 13-01
05/04/2015 Operating Test No.: NRG ILO 13-01 APPLICANTS Ford, Rashaun Galloway, Justin Harris, Brad McNeely, Andy RO 181 RO 181 RO 181 RO 181 SRO-I D SRO-I D SRO-I D SRO-I D Competencies SRO-U D SRO-U D SRO-U D SRO-U D SCENARIO SCENARIO SCENARIO SCENARIO RO BOP BOP RO RO BOP BOP RO 2 3 2 3 2 3 2 3 I nterpreUDiagnose 1 4 34 25 1 5 1 4 34 25 1 5 Events and Conditions 6 6 1 3 23 23 1 2 1 3 23 23 1 2 Comply With and 56 56 Use Procedures (1) 46 47 56 7 46 47 56 7 1 3 23 23 1 2 1 3 23 23 1 2 Operate Control 45 45 Boards (2) 46 47 6 67 46 47 6 67 1 3 23 23 1 2 1 3 23 23 1 2 Communicate 45 56 45 56 and Interact 46 47 6 7 46 47 6 7 Demonstrate  
* Ford, Rashaun RO        181      RO APPLICANTS Galloway, Justin 181 Harris, Brad RO          181 McNeely, Andy RO       181 SRO-I     D         SRO-I       D       SRO-I       D         SRO-I     D Competencies               SRO-U     D         SRO-U       D       SRO-U       D         SRO-U     D SCENARIO             SCENARIO             SCENARIO             SCENARIO RO   BOP             BOP   RO           RO   BOP             BOP   RO 2     3               2     3             2   3               2   3 InterpreUDiagnose          1 4 34               25 1 5               1 4 34               25 1 5 Events and Conditions                                   6                                         6 1 3 23               23 56 12            1 3 23               23 1 2 Comply With and Use Procedures (1)         46 47                 56 7                 46 47                 56 56 7 1 3 23               23 1 2               1 3 23               23 Operate Control                                   45 67                                      45 6712 Boards (2)                 46 47                                     46 47                 6 6
--------Supervisory Ability (3) Comply With and --------Use Tech. Specs. (3) Notes: (1) Includes Technical Specification compliance for an RO. (2) Optional for an SRO-U. (3) Only applicable to SROs. Instructions:
1 3 23               23 1 2               1 3 23               23 1 2 Communicate                                       45 56                                     45 56 and Interact               46 47                 6 7                 46 47                 6 7 Demonstrate Supervisory Ability   (3)
                                -   -               -     -             -     -               -     -
Comply With and Use Tech. Specs.     (3)
                                -    -              -      -            -    -              -    -
Notes:
(1)     Includes Technical Specification compliance for an RO.
(2)     Optional for an SRO-U.
(3)     Only applicable to SROs.
Instructions:
Check the applicants' license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.
Check the applicants' license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.
ES-301 Competencies Checklist Form ES-301-6 Facility:
 
VC SUMMER Date of Examination:
ES-301                                 Competencies Checklist                       Form ES-301-6 Facility: VC SUMMER               Date of Examination:   05/04/2015   Operating Test No.: NRC ILO 13-01 APPLICANTS SRO-U                 ROATC              BOP RO           D       RO           181   RO         181     RO       D SRO-I       D       SRO-I       D     SRO-I       D       SRO-I     D SRO-U       181     SRO-U       D     SRO-U       D       SRO-U     D SCENARIO             SCENARIO           SCENARIO             SCENARIO SRO                   RO               BOP 1                     1                 1 34 I nterpreUDiagnose                       56                   57                 34 Events and Conditions                     7 23                                     12 Comply With and                         45                   25 67                  67                34 Use Procedures (1)                                                               8 8
05/04/2015 Operating Test No.: NRC ILO 13-01 APPLICANTS SRO-U ROA TC BOP RO D RO 181 RO 181 RO D SRO-I D SRO-I D SRO-I D SRO-I D SRO-U 181 SRO-U D SRO-U D SRO-U D SCENARIO SCENARIO SCENARIO SCENARIO SRO RO BOP 1 1 1 I nterpreUDiagnose 34 56 57 34 Events and Conditions 7 23 1 2 Comply With and 45 25 34 Use Procedures (1) 67 67 8 8 25 1 3 Operate Control -67 48 Boards (2) 8 1 2 25 Communicate 34 67 1 3 and Interact 56 8 48 78 23 Demonstrate 45 --Supervisory Ability (3) 67 8 Comply With and 34 5 --Use Tech. Specs. (3) Notes: (1) Includes Technical Specification compliance for an RO. (2) Optional for an SRO-U. (3) Only applicable to SROs. Instructions:
25 Operate Control                           -                   67                 13 Boards (2)                                                     8               48 12                  25 Communicate                             34                                     13 56 67                 48 and Interact                                                   8 78 23 45 Demonstrate Supervisory Ability     (3)             67                     -                -
8 34 Comply With and Use Tech. Specs.       (3)               5                    -                -
Notes:
(1)       Includes Technical Specification compliance for an RO.
(2)       Optional for an SRO-U.
(3)       Only applicable to SROs.
Instructions:
Check the applicants' license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.
Check the applicants' license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.
The 2015 V.C. Summer final written exam sample plan may be obtained by combining the draft written exam sample plan with the final ES-401-4 form.
The 2015 V.C. Summer final written exam sample plan may be obtained by combining the draft written exam sample plan with the final ES-401-4 form.
ES-403 Written Examination Grading Quality Checklist Item Descri tion 1. Clean answer sheets co ied before 2. Answer key changes and question deletions justified and documented
 
: 3. Applicants' scores checked for addition errors reviewers s ot check > 25% of examinations a 4. Grading for all borderline cases (80 +/-2% overall and 70 or 80, AVJ as a licable, +/-4% on the SRO-onl reviewed in detail //I 5. All other failing examinations checked to ensure that grades are *ustified
ES-403                           Written Examination Grading                       Form ES-403-1 Quality Checklist Initials Item Descri tion                                 a      b      c
: 6. Performance on missed questions checked for training deficiencies and wording problems; evaluate validity of questions missed by half or more of the applicants
: 1.     Clean answer sheets co ied before                                           N/,4
: a. Grader b. Facility Reviewer(*)
: 2.     Answer key changes and question deletions justified and documented                                                             Al};    J2
: c. NRC Chief Examiner(*)
                                                                                      ~ ~
: d. NRC Supervisor(*)
: 3.     Applicants' scores checked for addition errors reviewers s ot check > 25% of examinations 1% J
Form ES-403-1 Initials b c N/,4 Al}; J2 1% J &-Nd D'} n/u 1'j
: 4.     Grading for all borderline cases (80 +/-2% overall and 70 or 80,     AVJ as a licable, +/-4% on the SRO-onl reviewed in detail                 //I
(*) The facility reviewer's signature is not applicable for examinations graded by the NRC; two independent NRC reviews are required.
: 5.     All other failing examinations checked to ensure that grades are *ustified                                                               Al~    &-
FOR OFFICIAL USE ONLY Neil E. Constance Manager, Nuclear Tra i ning 803.345.4028 April 9, 2014 A SCANA COMPANY Mr. Malcolm T. Widmann, Chief Operations Branch 1 Division of Reactor Safety U.S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave. N.E., Suite 1200 Atlanta, GA 30303-1257  
: 6.     Performance on missed questions checked for training deficiencies and wording problems; evaluate validity of questions missed by half or more of the applicants Nd      ~
: a. Grader
: b. Facility Reviewer(*)
: c. NRC Chief Examiner(*)                                                               D'} n/u 1'j
: d. NRC Supervisor(*)                                                                   '1~1?6\,!
(*)   The facility reviewer's signature is not applicable for examinations graded by the NRC; two independent NRC reviews are required.
 
FOR OFFICIAL USE ONLY Neil E. Constance Manager, Nuclear Training 803.345.4028 April 9, 2014 A SCANA COMPANY Mr. Malcolm T. Widmann, Chief Operations Branch 1 Division of Reactor Safety U.S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave. N.E. , Suite 1200 Atlanta, GA 30303-1257


==Dear Mr. Widmann:==
==Dear Mr. Widmann:==


==Subject:==
==Subject:==
VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION OUTLINES Based on the guidelines in NUREG-1021 , " Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, in particular ES-201, "Initial Operator Licensing Examination Process" and ES-301, " Preparing Initial Operating Tests," South Carolina Electr i c & Gas Company (SCE&G) has enclosed the following information for your consideration
VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION OUTLINES Based on the guidelines in NUREG-1021 , "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, in particular ES-201, "Initial Operator Licensing Examination Process" and ES-301, "Preparing Initial Operating Tests," South Carolina Electric
:
& Gas Company (SCE&G) has enclosed the following information for your consideration:
* Enclosure 1 ES-201-2, Examination Outline Quality Checklist
* Enclosure 1     ES-201-2, Examination Outline Quality Checklist
* Enclosure 2 ES-201-3 , Examination Security Agreement
* Enclosure 2     ES-201-3, Examination Security Agreement
* Enclosure 3 ES-301-1, Administrative Topics Outl i ne
* Enclosure 3     ES-301-1, Administrative Topics Outline
* Enclosure 4 ES-301-2 , Control Room/In-Plant Systems Outline
* Enclosure 4     ES-301-2, Control Room/In-Plant Systems Outline
* Enclosure 5 ES-301-5, Transient and Event Checklist
* Enclosure 5     ES-301-5, Transient and Event Checklist
* Enclosure 6 ES-D-1s, Scenario Outlines The enclosed examination materials have been independently reviewed by Mr. Nikos L. O'Kimosh, Shift Supervisor , Operations.
* Enclosure 6     ES-D-1s, Scenario Outlines The enclosed examination materials have been independently reviewed by Mr. Nikos L.
In accordance with NUREG-1021 , this material must be withheld from public disclosure until the examinations are complete. Should there be any questions, please contact Mr. Robert N. Johnston, Nuclear Principle, at (803) 931-5173. TS/NEC/tc Enclosures c: (Without Enclosure unless noted) M. K. Meeks (NRC e-mail notification)
O'Kimosh, Shift Supervisor, Operations.
N. L. O'Kimosh NRC Resident Inspector Very truly yours, RTS (CR-14-01708)
In accordance with NUREG-1021 , this material must be withheld from public disclosure until the examinations are complete.
File (814.04 , RR 1050) PRSF (RC-14-0065)
Should there be any questions, please contact Mr. Robert N. Johnston, Nuclear Trainer-Principle, at (803) 931-5173.
Very truly yours,
                                                                                    ~E~
TS/NEC/tc Enclosures c:   (Without Enclosure unless noted)
M. K. Meeks (NRC e-mail notification)                                                 RTS (CR-14-01708)
N. L. O'Kimosh                                                                        File       (814.04, RR 1050)
NRC Resident Inspector                                                                PRSF (RC-14-0065)
Virgil C. Summer Station *Post Office Box 88
Virgil C. Summer Station *Post Office Box 88
* Jenkinsville , SC* 29065
* Jenkinsville, SC* 29065
* F (803) 941-9776 A SCANA COMPANY Mr. Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety FOR OFFICIAL USE ONLY U. S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave. N.E., Suite 1200 Atlanta, GA 30303-1257  
* F(803) 941-9776
 
FOR OFFICIAL USE ONLY Neil E. Constance Manager, Nuclear Training 803.345.4028 A SCANA COMPANY                                                                                               February 23, 2015 Mr. Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety U. S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave. N.E., Suite 1200 Atlanta, GA 30303-1257


==Dear Mr. McCoy:==
==Dear Mr. McCoy:==


==Subject:==
==Subject:==
VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 Neil E. Constance Manager, Nuclear Training 803.345.4028 February 23, 2015 REACTOR AND SENIOR REACTOR OPERATOR OPERATING TEST AND SUPPORTING REFERENCE MATERIAL Based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors", Revision 10, in particular ES-301, "Preparing Initial Operating Tests," South Carolina Electric & Gas Company is providing the following information for your consideration.
VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 REACTOR AND SENIOR REACTOR OPERATOR OPERATING TEST AND SUPPORTING REFERENCE MATERIAL Based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors", Revision 10, in particular ES-301, "Preparing Initial Operating Tests," South Carolina Electric & Gas Company is providing the following information for your consideration.
* ES-201-3, Examination Security Agreement
* ES-201-3, Examination Security Agreement
* ES-301-3, Operating Test Quality Checklist
* ES-301-3, Operating Test Quality Checklist
Line 279: Line 563:
* Operational Exam Hard Copy
* Operational Exam Hard Copy
* Operational Exam Electronic Files on DVD-ROM
* Operational Exam Electronic Files on DVD-ROM
* Supporting Reference Documentation Files on DVD-ROM The enclosed examination materials have been independently reviewed by Mr. Steven M. Billingsley, Senior Reactor Operator.
* Supporting Reference Documentation Files on DVD-ROM The enclosed examination materials have been independently reviewed by Mr. Steven M. Billingsley, Senior Reactor Operator. In accordance with NUREG-1021, this material must be withheld from public disclosure until the examinations are complete.
In accordance with NUREG-1021, this material must be withheld from public disclosure until the examinations are complete.
Should there be any questions, please contact Mr. Robert N. Johnston at (803) 931-5173.
Should there be any questions, please contact Mr. Robert N. Johnston at (803) 931-5173.
TS/NEC/sr Enclosures c: (Without Enclosures unless noted) E. F. Guthrie M. K. Meeks* R. N. Johnston truly yours, Neil E. Constance NRC Resident Inspector RTS (CR-14-01708)
Ve~ truly yours, r-;J~c.~~
File (814.04, RR 1050) OMS (RC-15-0029)
Neil E. Constance TS/NEC/sr Enclosures c:   (Without Enclosures unless noted)                                                 NRC Resident Inspector E. F. Guthrie                                                                     RTS         (CR-14-01708)
M. K. Meeks
* File       (814.04, RR 1050)
R. N. Johnston                                                                    OMS (RC-15-0029)
Virgil C. Summer Station* Post Office Box 88
Virgil C. Summer Station* Post Office Box 88
* Jenkinsville, SC* 29065
* Jenkinsville, SC* 29065
* F (803) 345-5209 FOR OFFICIAL USE ONLY Neil E. Constance Manage r, Nuclea r Training 803.345.4028 May 26 , 2015 A SCANA COMPANY Mr. Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety U. S. Nuclear Regulatory Commission, Reg i on II 245 Peachtree Center Ave. N.E., Suite 1200 Atlanta , GA 30303-1257  
* F(803) 345-5209
 
FOR OFFICIAL USE ONLY Neil E. Constance Manager, Nuclear Training 803.345.4028 May 26, 2015 A SCANA COMPANY Mr. Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety U. S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave. N.E., Suite 1200 Atlanta , GA 30303-1257


==Dear Mr. McCoy:==
==Dear Mr. McCoy:==


==Subject:==
==Subject:==
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 INITIAL OPERATOR LICENSE EXAMINATION POST EXAMINATION SUBMITTAL The V. C. Summer Initial Operator License Examination was administered in the weeks of May 4, 2015 and May 18 , 2015. The VCSNS Initial License Written Examination was administered on May 20, 2015. VCSNS is enclosing the following as required by Revision 10, of NU REG 1021, "Operator Licensing Examination Standards for Power Reactors:" 1. Each applicant's original answer and examination cover sheets plus two clean copies of each applicant's answer sheet; 2. The master examinations and answer keys; 3. Questions asked by and answers given to the applicants during the written examination;
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 INITIAL OPERATOR LICENSE EXAMINATION POST EXAMINATION SUBMITTAL The V. C. Summer Initial Operator License Examination was administered in the weeks of May 4, 2015 and May 18, 2015. The VCSNS Initial License Written Examination was administered on May 20, 2015. VCSNS is enclosing the following as required by Revision 10, of NU REG 1021, "Operator Licensing Examination Standards for Power Reactors:"
: 4. Written examination seating chart; 5. Post-examination comments and facility responses; and 6. Written examination performance analysis. As agreed , the examination security agreement will be sent via email at a later date. If you require any additional information or have any questions, please contact Robert Johnston at (803)931-5173. TS/NEC/dr Enclosures c: (Without Enclosure unless noted) V. M. Mccree M. K. Meeks (NRC e-mail notificat i on) NRC Resident Inspector Ne i l E. Constance RTS (CR-14-01708) File (814.04, RR 1050) PRSF (RC-15-0076)
: 1. Each applicant's original answer and examination cover sheets plus two clean copies of each applicant's answer sheet;
: 2. The master examinations and answer keys ;
: 3. Questions asked by and answers given to the applicants during the written examination;
: 4. Written examination seating chart;
: 5. Post-examination comments and facility responses; and
: 6. Written examination performance analysis.
As agreed, the examination security agreement will be sent via email at a later date.
If you require any additional information or have any questions, please contact Robert Johnston at (803)931-5173.
M"ICo~
Neil E. Constance TS/NEC/dr Enclosures c:   (Without Enclosure unless noted)
V. M. Mccree                                                                           RTS (CR-14-01708)
M. K. Meeks         (NRC e-mail notification)                                         File       (814.04, RR 1050)
NRC Resident Inspector                                                                PRSF (RC-15-0076)
V. C. Summer Nuclear Station* P. 0. Box 88
V. C. Summer Nuclear Station* P. 0. Box 88
* Jenkinsville, SC* 29065
* Jenkinsville, SC* 29065
* F (803) 941-9776 FOR OFFICIAL USE ONLY Neil E. Constance Manager, Nuclear Training A SCANA COMPANY Mr. Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety U.S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave. N.E., Suite 1200 Atlanta , GA 30303-1257  
* F(803) 941-9776
 
FOR OFFICIAL USE ONLY Neil E. Constance Manager, Nuclear Training 803.345.4028 June 4, 2015 A SCANA COMPANY Mr. Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety U. S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave. N.E. , Suite 1200 Atlanta, GA 30303-1257


==Dear Mr. McCoy:==
==Dear Mr. McCoy:==


==Subject:==
==Subject:==
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 INITIAL OPERATOR LICENSE EXAMINATION POST EXAMINATION SUBMITTAL ADDENDUMS 803.345.4028 June 4, 2015
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 INITIAL OPERATOR LICENSE EXAMINATION POST EXAMINATION SUBMITTAL ADDENDUMS


==Reference:==
==Reference:==
 
SCE&G Letter from Neil E. Constance to Gerald J. McCoy (NRC), "Initial Operator License Examination Post Examination Submittal," dated May 26, 2015 The enclosures that accompany this letter are addendums to the post examination package (Reference) that was submitted to the NRC on May 26, 2015. This submittal's enclosures are as follows:
SCE&G Letter from Neil E. Constance to Gerald J. McCoy (NRC), "Initial Operator License Examination Post Examination Subm i ttal," dated May 26, 2015 The enclosures that accompany this letter are addendums to the post examination package (Reference) that was submitted to the NRC on May 26, 2015. This submittal's enclosures are as follows: 1. One additional post examination comment for the Operating Test that was given during the week of May 4 , 2015. 2. Signed forms ES-201-3, Examination Security Agreement.
: 1. One additional post examination comment for the Operating Test that was given during the week of May 4, 2015.
If you require any additional information or have any questions, please contact Robert Johns t on at (803)931-5173.
: 2. Signed forms ES-201-3, Examination Security Agreement.
TS/NEC/sr Enclosures (2) c: (Without Enclosure unless noted) V. M. Mccree M. K. Meeks (NRC e-mail notification)
If you require any additional information or have any questions, please contact Robert Johnston at (803)931-5173.
Very truly yours,
                                                                                          ~;:~
Neil E. Constance TS/NEC/sr Enclosures (2) c:   (Without Enclosure unless noted)
V. M. Mccree M. K. Meeks         (NRC e-mail notification)
NRC Resident Inspector RTS (CR-14-01708)
NRC Resident Inspector RTS (CR-14-01708)
File (814.04, RR 1050) PRSF (RC-15-0094) Very truly yours ,
File   (814.04, RR 1050)
Neil E. Constance V. C. Summer Nuclear Station* P. 0. Box 88
PRSF (RC-15-0094)
V. C. Summer Nuclear Station* P. 0. Box 88
* Jenkinsville, SC* 29065
* Jenkinsville, SC* 29065
* F (803) 941-9776}}
* F(803) 941-9776}}

Revision as of 02:24, 30 October 2019

V.C. Summer 2015-301 Exam Administrative Items for ADAMS 2D
ML17181A376
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 06/30/2017
From:
NRC/RGN-II
To:
References
Download: ML17181A376 (33)


Text

{{#Wiki_filter:ES-201 Examination Preparation Checklist Form ES-201-1 Facility: VC .Svff1/J1 fE ~ Date of Examination: /1JA Y ,?t'/ Developed by: Written - FacilityO NRC ~ II Operating - Facility NRC D Target Chief Date* Task Description (Reference) Examiner's Initials

   -180         1. Examination administration date confirmed (C.1.a; C.2.a and b)
   -120         2. NRG examiners and facility contact assigned (C.1.d; C.2.e)
   -120         3. Facility contact briefed on security and other requirements (C.2.c)
   -120         4. Corporate notification letter sent (C.2.d)

[-90] [5. Reference material due (C.1.e; C.3.c; Attachment 3)] {-75} 6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3, ES-301-1 , ES-301-2, ES-301 -5, ES-D-1's, ES-401-1/2, ES-401-3, and ES-401-4, as applicable (C.1.e and f; C.3.d) {-70} {7. Examination outline(s) reviewed by NRG and feedback provided to facility licensee (C.2.h; C.3.e)} {-45} 8. Proposed examinations (including written, walk-through JPMs, and scenarios, as applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301 -5, ES-301-6, and ES-401-6, and any Form ES-201-3 updates), and reference materials due (C.1.e, f, g and h; C.3.d)

     -30        9. Preliminary license applications (NRG Form 398's) due (C.1.1; C.2.g; ES-202)
     -14        10. Final license applications due and Form ES-201-4 prepared (C.1 .1; C.2.i; ES-202)
     -14         11 . Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f)
     -14         12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g)
      -7         13. Written examinations and operating tests approved by NRC supervisor (C.2.i; C.3.h)
      -7         14. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm qualifications I eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 5; ES-202, C.2.e; ES-204)
      -7         15. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k)
      -7         16. Approved scenarios, job performance measures, and questions distributed to NRC examiners (C.3.i)
  • Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

[Applies only] {Does not apply} to examinations prepared by the NRC. ES-201 , Page 25 of 28

ES-201 Examination Outline Quality Checklist Form ES-201-2 Facility: Date of Examination : Initials Item Task Description

1. a . Verify that the ouUine(s) fit(s) the appropriate model, in accordance with ES-401 .

w R b. Assess whether the outline was systematically and randomly prepared in accordance with I Section D.1 of ES-401 and whether all KJA categories are appropriately sampled. T T c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics. E N d. Assess whether the justifications for deselected or rejected KJA statements are appropriate.

2. a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures , technical specifications, s and major transients.

I M b. Assess whether there are enough scenario sets (and spares) to test the projected number u and mix of applicants in accordance with the expected crew composition and rotation schedule L without compromising exam integrity, and ensure that each applicant can be tested using A at least one new or significantly modified scenario, that no scenarios are duplicated T from the applicants' audit test(s), and that scenarios will not be repeated on subsequent days. 0 c . To the extent possible, assess whether the outline(s) conform(s) with the qualitative R and quantitative criteria specified on Form ES-301-4 and described in Appendix D.

3. a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:

(1) the outline(s) contain(s) the required number of control room and in-plant tasks w distributed among the safety functions as specified on the form I (2) task repetition from the last two NRC examinations is within the limits specified on the form T (3) no tasks are duplicated from the applicants' audit test(s) (4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form .

b. Verify that the administrative outline meets the criteria specified on Form ES-301-1 :

(1) the tasks are distributed among the topics as specified on the form (2) at least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations

c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.
4. a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the appropriate exam sections.

G E b. Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate. N

c. Ensure that KJA importance ratings (except for plant-specific priorities) are at least 2.5.

E R d. Check for duplication and overlap among exam sections. A L e. Check the entire exam for balance of coverage. f.

a. Author
b. Facility Reviewer (*)
c. NRC Chief Examiner(#)
d. NRC Supervisor Note: # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.
  • Not applicable for NRC-prepared examination outlines

AffRoVAL-ES-201 Examination Outline Quality Checklist Form ES-201-2 Facility: Date of Examination: Item Task Description

1. a. Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401 .

w R b. Assess whether the outline was systematically and randomly prepared In accordance with I Section D.1 of ES-401 and whether all KIA cate ories are a ro riatel sam led . T

c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.

T E N d. Assess whether the justifications for deselected or rejected KIA statements are appropriate.

2. a. Using Form ES-301 -5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, s and major transients.

I M b. Assess whether there are enough scenario sets (and spares) to test the projected number u ~ without and mix of applicants in accordance with the expected crew composition and rotation schedule compromising exam integrity, and ensure that each applicant can be tested using L A at least one new or significantly modified scenario, that no scenarios are duplicated T from the a licants' audit test s , and that scenarios will not be re eated on subse uent da s. 0 c. To the extent possible, assess whether the outllne(s) conform(s) with the qualitative R and quantitative criteria specified on Form ES-301-4 and described in Appendix D.

3. a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:

(1) the outline(s) contain(s) the required number of control room and In-plant tasks w distributed among the safety functions as specified on the form I (2) task repetition from the last two NRC examinations is within the limits specified on the form T (3) no tasks are duplicated from the applicants' audit test(s) (4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form .

b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:

(1) the tasks are distributed among the topics as specified on the form (2) at least one task Is new or significantly modified 3 no more than one task Is re eated from the last two NRC licensin examinations

c. Determine if there are enough different outlines to test the projected number and mix of a licants and ensure that no Items are du licated on subse uent da s.
4. a. Assess whether plant-specific priorities (including PRA and IPE Insights) are covered in the a ro riate exam sections.

G b. Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate. E N c. Ensure that KIA Importance ratings (except for plant-specific priorities) are at least 2.5. E

d. Check for duplication and overlap among exam sections.

R A e. Check the entire exam for balance of coverage. L

f. Assess whether the exam fits the appropriate job level (RO or SRO).
a. Author
b. Facility Reviewer(')
c. NRC Chief Examiner(#)
d. NRC Supervisor Note: # Independent NRC reviewer initial Items in Column "c"; chief examiner concurrence required .
  • Not a licable for NRC- re ared examination outlines

(!)WRITTEN f!EXA/11 s19/lll'LE fMAI 4£vEul~ ~ IY/?c

                -        F1NllL                 ()ffRl17l~ £ti/II? !lfltfol/lfL -

ES-201, Page 26 of 28

IJ-!fRo VIJL ES-201 Examination Outline Quality Checklist Form ES-201-2 Facility: V.C. S11mm Date of Examination: IJ1AY ~tl  ;?tJ/) Initials Item Task Description

1. a. Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401.

w R b. Assess whether the outline was systematically and randomly prepared in accordance with I Section D.1 of ES-401 and whether all KJA categories are appropriately sampled. T T c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics. E N d. Assess whether the justifications for deselected or rejected KJA statements are appropriate. *

2. a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, s and major transients.

I M b. Assess whether there are enough scenario sets (and spares) to test the projected number u and mix of applicants in accordance with the expected crew composition and rotation schedule L without compromising exam integrity, and ensure that each applicant can be tested using A at least one new or significantly modified scenario, that no scenarios are duplicated T from the applicants' audit test(s), and that scenarios will not be repeated on subsequent days. 0 c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative R and quantitative criteria specified on Form ES-301-4 and described in Appendix D.

3. a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:

(1) the outline(s) contain(s) the required number of control room and in-plant tasks w distributed among the safety functions as specified on the form I (2) task repetition from the last two NRC examinations is within the limits specified on the form T (3) no tasks are duplicated from the applicants' audit test(s) (4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form.

b. Verify that the administrative outline meets the criteria specified on Form ES-301 -1:

(1) the tasks are distributed among the topics as specified on the form (2) at least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations

c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.
4. a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the appropriate exam sections.

G E b. Assess whether the 10 CFR 55.41 /43 and 55.45 sampling is appropriate. N

c. Ensure that KJA importance ratings (except for plant-specific priorities) are at least 2.5.

E R d. Check for duplication and overlap among exam sections. A L e. Check the entire exam for balance of coverage.

f. Assess whether the exam fits the appropriate job level (RO or SRO).
a. Author
b. Facility Reviewer (*)
c. NRC Chief Examiner(#)
d. NRC Supervisor Note: # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.
  • Not applicable for NRG-prepared examination outlines l!rt,{'ovlJL -

Mr. Gerald J. McCoy USNRC, Region II CR-14-01708 RC-15-0094 ENCLOSURE 2 Signed forms ES-201-3, Examination Security Agreement

ES-201 Examination Security Agreement Form ES-201-3

1. Pre-Examination I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of ~~~ J,: ~-as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not b~en 1authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
2. Post-Examination To the best of my know~~9~ I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of ~f1llf; r. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

PRINTED NAME JOB TITLE I RESPONSIBILITY DATE ES-201, Page 27 of 28

ES-201 Examination Security Agreement Form ES-201-3

1. Pre-Examination s:/'1/1;__

I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of s-h, li e as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not'be~n authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.

2. Post-Examination To the best of my kno~~~~* I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of ~1fet ') . From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

PRINTED NAME JOB TITLE I RESPONSIBILITY SIGNATURE (1) ES-201, Page 27 of 28

ES-201 Examination Security Agreement Form ES-201-3 l

1. Pre-Examination 5"/'l/1;-_

I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of s-//t /1r as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not'be~n authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.

2. Post-Examination To the best of my kno'1(,,$f~e I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of 410iK- . From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provi~e performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

PRINTED NAME JOB TITLE I RESPONSIBILITY SIGNATURE (1) ES-201, Page 27 of 28

ES-201 Examination Security Agreement Form ES-201-3

1. Pre-Examination 5/'1/ l~

I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of 5 / 11 / 1S- as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.

2. Post-Examination To the best of my kno~led~~ I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of -/i;.';.}: . From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

PRINTED NAME JOB TITLE I RESPONSIBILITY SIGNATURE (1) DATE SIGN TURE (2) DATE NOTE I)' 1J ES-201, Page 27 of 28

ES-201 Examination Security Agreement Form ES-201-3

1. Pre-Examination SI" ( '~

I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of sJli/ t  :>" as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.

2. Post-Examination To the best of my knowiep_p;, Ldid not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of <ft,, 115-. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

PRINTED NAME JOB TITLE I RESPONSIBILITY ES-201, Page 27 of 28

ES-201 Examination Security Agreement Form ES-201-3

1. Pre-Examination I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of f/{,'ff:;==-as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable ifthe individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
2. Post-Examination To ~he best of my knowl~~~?~did not divulge to any unauthori~ed p~rsons a~y information co~cerning the ~RC licensi~g ~xamina~i~ns a?minist~red during the week(s) of ff,~ t 1-:i
  • From the date that I entered into this security agreement until the completion of examination adm1rnstrat1on, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

PRINTED NAME JOB TITLE I RESPONSIBILITY SIGNATURE (1) DATE SIGNATURE (2) DATE NOTE 1..-Z:. . ; .s i/"'1.-, rc1 ...s ~ __ 1"1_(.)------~~"-~--~------ , _,,_ ,;-4~ s--u<_

2. _________________________________________
3. _______________________________________________________
4. _______________________________________________________
5. _______________________________________________________
6. ---------------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
7. ----------------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
8. ----------------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
9. ----------------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

10 . _________________ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 11.________________ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 12 . ________________ ------------------------------------- ---- 13.________________ ------------------------------------- ----- 14 . ________________ -------------------------------------- ----- 15.________________ ------------------------------------- ----- NOTES: ES-201, Page 27 of 28

JOHNSTON, ROBERT N From: O'KIMOSH, NIKOS L Sent: Monday, June 01, 2015 3:15 PM To: RICHARDSON, SCOTT ALAN Cc: JOHNSTON, ROBERT N; FISHER, DANIEL R

Subject:

Re: Post NRC Exam Security Sign-off I have complied with the security agreement for the 2015 NRC ILO exam. Nick O'Kimosh Sent from my BlackBerry 10 smartphone on the Verizon Wireless 4G l TE network. From: RICHARDSON, SCOTT ALAN Sent: Thursday, May 28, 2015 8:33 AM To: O'KIMOSH, NIKOS L Cc: JOHNSTON, ROBERT N

Subject:

Post NRC Exam Security Sign-off The VC Summer 2015 NRC License Exam is complete. NUREG 1021 Operator Licensing Examination Standards for Power Reactors, Form ES-201-3, Examination Security Agreement must be completed in order for the Station to close out the exam package. You have signed on the security agreement Pre-Examination portion and were issued a Red Badge to designate your status. In order to close out the security agreement please review the below statement:

2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of May 4-8, 2015 and May 18-22, 2015. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

Please reply electronically to this e-mail stating that you complied with the above to allow closure of the Security Agreement. If you have any questions, please call Robert Johnston at (803) 931-5173. Thank you for your prompt reply and for your support of the examination process. 3

JOHNSTON,ROBERTN From: GOLDSTEIN, RICHARD Sent: Wednesday, June 03, 2015 9:52 AM To: JOHNSTON, ROBERT N Cc: RICHARDSON, SCOTT ALAN

Subject:

FW: Post NRC Exam Security Sign-off From: Tara Tolbert [1] Sent: Wednesday, June 03, 2015 9:46 AM To: GOLDSTEIN, RICHARD

Subject:

Re: Post NRC Exam Security Sign-off

      • This is an EXTERNAL email. Please do not click on a link or open any attachments unless you are confident it is from a trusted source.

Yes, I comply with the requirements.

Thanks, Tara Tolbert On Jun 3, 2015 9:43 AM, "GOLDSTEIN, RICHARD" <Richard.Goldstein@scana.com> wrote:

The VC Summer 2015 NRC License Exam is complete. NUREG 1021 Operator Licensing Examination Standards for Power Reactors, Form ES-201-3, Examination Security Agreement must be completed in order for the Station to close out the exam package. You have signed on the security agreement Pre-Examination portion and were issued a Red Badge to designate your status. In order to close out the security agreement please review the below statement:

2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of May 4-8, 2015 and May 18-22, 2015. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

Please reply electronically to this e-mail stating that you complied with the above to allow closure of the Security Agreement. 1

JOHNSTON,ROBERTN From: RICHARDSON, SCOTT ALAN Sent: Thursday, May 28, 2015 9:46 AM To: JOHNSTON, ROBERT N

Subject:

FW: Post NRC Exam Security Sign-off From: George.Marengo@aps.com [mailto :George.Marengo@aps.com] Sent: Thursday, May 28, 2015 9:40 AM To: RICHARDSON, SCOTT ALAN

Subject:

RE: Post NRC Exam Security Sign-off

      • This is an EXTERNAL email. Please do not click on a link or open any attachments unless you are confident it is from a trusted source.

Hello Scott, I agree with everything stated in "2. Post-Examination" George Marengo Licensed Operator Initial Training 5801 S. Wintersburg Road, Tonopah, AZ 85354, M.S. 7894 Work: 623-393-6363 Cell: 760-505-6376 E-Mail: George.Marengo@aps.com From: RICHARDSON, SCOTT ALAN [2] Sent: Thursday, May 28, 2015 5:48 AM To: Marengo, George Cc: JOHNSTON, ROBERT N

Subject:

Post NRC Exam Security Sign-off USE CAUTION - EXTERNAL SENDER: (SCOTT.RICHARDSON@scana.com) Do not click on links or open attachments that are not expected. Never give out your User IDs or passwords. The VC Summer 2015 NRC License Exam is complete. NU REG 1021 Operator Licensing Examination Standards for Power Reactors, Form ES-201-3, Examination Security Agreement must be completed in order for the Station to close out the exam package. You have signed on the security agreement Pre-Examination portion and were issued a Red Badge to designate your status. In order to close out the security agreement please review the below statement:

2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of May 4-8, 2015 and May 18-22, 2015. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

6

JOHNSTON,ROBERTN From: RICHARDSON, scon ALAN Sent: Thursday, May 28, 2015 9:18 AM To: JOHNSTON, ROBERT N

Subject:

FW: Post NRC Exam Security Sign-off From Youmans, . M. [3] Sent: T urs , May 28, 2015 8:58 AM To: RICHARDSON, SCOTT ALAN

Subject:

RE: Post NRC Exam Security Sign-off

      • This is an EXTERNAL email. Please do not click on a link or open any attachments unless you are confident it is from a trusted source.

Hi Scott, I did comply with the security requirements for your 2015 NRC License Exam. I have not interacted with any of the students or initial license instructors before or after leaving V. C. Summer. Please remove me from your security agreement list.

Jvlitcne{{ 'KJvlicl(' rfoumans Site Project Lead GE Mk VI Turbine Digital Controls Group Southern Nuclear - Plant Vogtle Ul & U2 Phone: 706-848-2037 Cell: 706-830-1770 From: RICHARDSON, SCOTT ALAN [4]

Sent: Thursday, May 28, 2015 8:50 AM To: Youmans, E. M. Cc: JOHNSTON, ROBERT N

Subject:

Post NRC Exam Security Sign-off The VC Summer 2015 NRC License Exam is complete. NU REG 1021 Operator Licensing Examination Standards for Power Reactors, Form ES-201-3, Examination Security Agreement must be completed in order for the Station to close out the exam package. You have signed on the security agreement Pre-Examination portion and were issued a Red Badge to designate your status. In order to close out the security agreement please review the below statement:

2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of May 4-8, 2015 and May 18-22, 2015. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

8

JOHNSTON, ROBERT N From: RICHARDSON, SCOTT ALAN Sent: Monday, June 01, 2015 6:26 AM To: JOHNSTON, ROBERT N

Subject:

FW: Post NRG Exam Security Sign-off From: WAGNER, LARRY R Sent: Thursday, May 28, 2015 3:37 PM To: RICHARDSON, SCOTT ALAN

Subject:

RE: Post NRC Exam Security Sign-off I did comply with the requirements of item No. 2. From: RICHARDSON, SCOTT ALAN Sent: Thursday, May 28, 2015 8:43 AM To: WAGNER, LARRY R Cc: JOHNSTON, ROBERT N

Subject:

Post NRC Exam Security Sign-off The VC Summer 2015 NRG License Exam is complete. NUREG 1021 Operator Licensing Examination Standards for Power Reactors, Form ES-201-3, Examination Security Agreement must be completed in order for the Station to close out the exam package. You have signed on the security agreement Pre-Examination portion and were issued a Red Badge to designate your status. In order to close out the security agreement please review the below statement:

2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRG licensing examinations administered during the week(s) of May 4-8, 2015 and May 18-22, 2015. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRG.

Please reply electronically to this e-mail stating that you complied with the above to allow closure of the Security Agreement. If you have any questions, please call Robert Johnston at (803) 931-5173. Thank you for your prompt reply and for your support of the examination process. 5

JOHNSTON, ROBERT N From: RICHARDSON, SCOTT ALAN Sent: Wednesday, June 03, 2015 8:50 AM To: JOHNSTON, ROBERT N

Subject:

FW: Post NRC Exam Security Sign-off From BALCH, KEVIN Sent: e , une 03, 2015 8:50 AM To: RICHARDSON, SCOTT ALAN

Subject:

RE: Post NRC Exam Security Sign-off I have complied. From: RICHARDSON, SCOTT ALAN Sent: Thursday, May 28, 2015 8:38 AM To: BALCH, KEVIN Cc: JOHNSTON, ROBERT N

Subject:

Post NRC Exam Security Sign-off The VC Summer 2015 NRC License Exam is complete. NUREG 1021 Operator Licensing Examination Standards for Power Reactors, Form ES-201-3, Examination Security Agreement must be completed in order for the Station to close out the exam package. You have signed on the security agreement Pre-Examination portion and were issued a Red Badge to designate your status. In order to close out the security agreement please review the below statement:

2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of May 4-8, 2015 and May 18-22, 2015. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

Please reply electronically to this e-mail stating that you complied with the above to allow closure of the Security Agreement. If you have any questions, please call Robert Johnston at (803) 931-5173. Thank you for your prompt reply and for your support of the examination process. 4

JOHNSTON, ROBERT N From: KING, JAMES ROBERT (ROBBIE) Sent: Saturday, May 30, 2015 8:17 PM To: RICHARDSON, SCOTT ALAN Cc: JOHNSTON, ROBERT N

Subject:

RE: Post NRC Exam Security Sign-off I complied with all statements in the attached email regarding the NRC Exam Security Agreement. Robbie King From: RICHARDSON, SCOTT ALAN Sent: Thursday, May 28, 2015 8:35 AM To: KING, JAMES ROBERT (ROBBIE) Cc: JOHNSTON, ROBERT N

Subject:

Post NRC Exam Security Sign-off The VC Summer 2015 NRC License Exam is complete. NUREG 1021 Operator Licensing Examination Standards for Power Reactors, Form ES-201-3, Examination Security Agreement must be completed in order for the Station to close out the exam package. You have signed on the security agreement Pre-Examination portion and were issued a Red Badge to designate your status. In order to close out the security agreement please review the below statement:

2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of May 4-8, 2015 and May 18-22, 2015. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

Please reply electronically to this e-mail stating that you complied with the above to allow closure of the Security Agreement. If you have any questions, please call Robert Johnston at (803) 931-5173. Thank you for your prompt reply and for your support of the examination process. 2

JOHNSTON, ROBERT N From: EDWARDS, DOUGLAS J Sent: Thursday, May 28, 2015 10:35 AM To: RICHARDSON, SCOTT ALAN Cc: JOHNSTON, ROBERT N

Subject:

Re: Post NRC Exam Security Sign-off I have complied with the NRC security requirements. Doug Edwards 803-931-5712 office 803-201-4628 cell From: RICHARDSON, SCOTT ALAN Sent: Thursday, May 28, 2015 8:40 AM To: EDWARDS, DOUGLAS J Cc: JOHNSTON, ROBERT N

Subject:

Post NRC Exam Security Sign-off The VC Summer 2015 NRC License Exam is complete. NU REG 1021 Operator Licensing Examination Standards for Power Reactors, Form ES-201-3, Examination Security Agreement must be completed in order for the Station to close out the exam package. You have signed on the security agreement Pre-Examination portion and were issued a Red Badge to designate your status. In order to close out the security agreement please review the below statement:

2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of May 4-8, 2015 and May 18-22, 2015. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

Please reply electronically to this e-mail stating that you complied with the above to allow closure of the Security Agreement. If you have any questions, please call Robert Johnston at (803) 931-5173. Thank you for your prompt reply and for your support of the examination process. 1

ES-301 Operating Test Quality Checklist Form ES-301-3 Facilit : Date of Examination: O eratin Test Number: Initials

1. General Criteria b.
a. The operating test conforms with the previously approved outline; changes are consistent with sam lin re uirements e ..* 10 CFR 55.45, o erational Im ortance, safet function distribution .
b. There is no day-to-day repetition between this and other operating tests to be administered durin this examination.
c. Theo eratin test shall not du licate items from the a licants' audit tests . see Section 0 .1.a.
d. Overlap with the written examination and between different parts of the operating test is within acce table limits.
e. It appears that the operating test will differentiate between competent and less-than-competent a licants at the desi nated license level.
2. Walk*Throu h Criteria
a. Each JPM Includes the following, as applicable:

Initial conditions Initiating cues references and tools, Including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee operationally important specific performance criteria that include: detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the se uence of ste s, If a llcable

b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., Item distribution, bank use, repetition from the last 2 NRG examinations) specified on those forms and Form ES-201-2.
3. Simulator Criteria The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a co is attached.
a. Author
b. Facility Reviewer(*)
c. NRC Chief Examiner (#)
d. NRC Supervisor NOTE: The facility signature Is not applicable for NRG-developed tests.
           #      lnde endent NRC reviewer initial items in Column "c"; chief examiner concurrence re uired.

ES-301. Page 24 of 27

ES-301 Simulator Scenario Quality Checklist Form ES-301-4

          - -             ~       ~
                                          ~~ *~, ;015 Scenario Numbers: 1/2 / 3       Operating Test No.: NRC ILO 13-01 QUALITATIVE ATTRIBUTES                                                        Initials a     b*        c#
1. The initial conditions are realistic, in that some equipment and/or instrumentation may be out of service, but it does not cue the operators into expected events. Y<1 w 111
2. The scenarios consist mostly of related events. ~ ,Clf 41/
3. Each event description consists of
  • the point in the scenario when it is to be initiated
  • the malfunction(s) that are entered to initiate the event
  • the symptoms/cues that will be visible to the crew N
  • the expected operator actions (by shift position)
  • the event termination point (if applicable) ~ ~
4. No more than one non-mechanistic failure (e.g., pipe break) is incorporated into the scenario
                                                                                                                ~      w~

5. without a credible preceding incident such as a seismic event. The events are valid with regard to physics and thermodynamics. ~

                                                                                                                      ,.w        ~
6. Sequencing and timing of events is reasonable, and allows the examination team to obtain complete evaluation results commensurate with the scenario objectives. ~ ~ lr1IJ
7. If time compression techniques are used, the scenario summary clearly so indicates.
                                                                                                                ~ 1tf ~

Operators have sufficient time to carry out expected activities without undue time constraints. Cues are given.

8. The simulator modeling. is not altered. "fl ,.(41 ~
9. The scenarios have been validated. Pursuant to 10 CFR 55.46(d), any open simulator
                                                                                                                ~

performance deficiencies or deviations from the referenced plant have been evaluated to ensure that functional fidelity is maintained while running the planned scenarios. f1f ~

10. Every operator will be evaluated using at least one new or significantly modified scenario.

All other scenarios have been altered in accordance with Section D.5 of ES-301 . ~ Yi' ~ 11 . All individual operator competencies can be evaluated, as verified using Form ES-301-6 (submit the form along with the simulator scenarios). 'f7{ ~ ~~

12. Each applicant will be significantly involved in the minimum number of transients and events specified on Form ES-301-5 (submit the form with the simulator scenarios) . ~ ~ . rm
13. The level of difficulty is appropriate to support licensing decisions for each crew position. d\ I~ ~

Target Quantitative Attributes (Per Scenario; See Section D.5.d) Actual Attributes -- -- -- 1 /2/ 3 1. 2. Total malfunctions (5--8) Malfunctions after EOP entry (1-2) 9 171 9 4 121 3

                                                                                                                ~

ot 9z/ WI 4Jf

                                                                                                                                 ,,,,
                                                                                                                        ~

3. 4. 5. Abnormal events (2-4) Major transients (1-2) EOPs entered/requiring substantive actions (1-2) 5 /4/ 4 1 / 1I 1 3 121 1 d\

                                                                                                                °' ""

CT? c.L 'Ill "t;tf

                                                                                                                                 "'
6. EOP contingencies requiring substantive actions (0-2) 1 I0I 1 ~ t;# fJ'/
7. Critical tasks (2-3) 3 /3/ 4 ..Jt ~ Ill

ES-301 Transient and Event Checklist Form ES-301-5 Facility: VC SUMMER Date of Exam: 05/04/2015 Operating Test No.: NRC ILO 13-01 A E Scenarios p v p E 2 3 T 0 L N CREW CREW CREW CREW I T T MINIMUM(*) POSITION POSITION POSITION POSITION c s s s A A T A B A B A B s A B L N y R T 0 R T 0 R T 0 R T b T p 0 c p 0 c p 0 c p 0 c p R I u E RX 0 0 0 1 1 0 RO NOR 3 2 2 *1 I 1 Q) D

c SRO-I 12 14 8 4 4 2
.0                  l/C 45                  56 0

0:: D Gi SRO-U MAJ 6 7 2 2 2 1 c

 ... 181
 <11

(.) TS 12 14 5 0 2 2 4 RX 0 0 0 *1 -1 0 RO NOR 3 2 2 *1 1 1 c 0 D 12 14 8 4 4 2

 "'<11
"""')

SRO-I l/C 45 56

  ~

D SRO-U MAJ 6 7 2 2 2 1

~ 181 (ii                         12                                                                              5    0     2     2

(.') TS 14 4 RX 0 0 0 *1 -1 0 RO NOR 3 2 2 1 1 1 D SRO-I 12 14 8 4 4 2 l/C 45 56 Q)

..l<:    D
~        SRO-U      MAJ      6                    7                                                         2    2     2     1
,g 181                12                                                                              5    0     2     2
~                   TS 4

14 RO RX 0 2 1 1 -1 0 c 181 NOR 3 0 1 1 1 1 1i$ . SRO-I l/C 25 16 4 4 4 2

I
"""')    D
,:,i     SRO-U      MAJ                    6             7                                                  2    2     2     *1 0
I co D TS 0 0 0 0 2 2 Instructions:
1. Check the applicant level and enter the operating test number and Form ES-0-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)"

and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (l/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one l/C malfunction can be credited toward the two l/C malfunctions required for the ATC position.

2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*)Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: VC SUMMER Date of Exam: 05/04/2015 Operating Test No. : NRC ILO 13-01 A E Scenarios p v 2 3 T p E L N 0 CREW CREW CREW CREW I T T MINIMUM(*) POSITION POSITION POSITION POSITION c s A B s A B s A B s A A T A B L y R T 0 R T 0 R T 0 R T 0 N p 0 c p 0 c p 0 c p 0 c p T R I u E RO RX 3 0 1 1 *1 0 c:

i co 181 NOR 0 2 1 1 *1 1
    ..r::

I/) SRO-I co l/C 14 34 4 4 4 2 a:: D

    -c.... SRO-U      MAJ              6                         7                                            2    2     2     1 0
u. D TS 0 0 0 0 2 2 RO RX 0 2 1 1 -1 0 181 NOR 3 0 1 1 1 *1
  >;       SRO-I l/C                    25           16                                                  4    4     4     2 111 3: c:    D
 =en 0 *-     SRO-U      MAJ                     6            7                                                  2    2     2     *1 111 :i C),

D TS 0 0 0 0 2 2 RO RX 3 0 1 1 *1 0 "O 181 NOR 0 2 1 1 1 I

      !!!  SRO-I ca                l/C             14                        34                                            4    4     4     2 111" D
    'E     SRO-U      MAJ              6                         7                                            2    2     2     1 111 J:     D          TS               0                         0                                            0    0     2     2 RO         RX                      0            2                                                  1    1     1     0
      >.
    "O c:   181        NOR                     3            0                                                  1    1      I    *1
     <(    SRO-I
      >;              l/C                    25           16                                                  4    4     4     2 Qi     D Q)

SRO-U MAJ 6 7 2 2 2 *t z(.)

     ~     D          TS                      0            0                                                  0    0     2     2 Instructions:
1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)"

and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (l/C) malfunctions and one major transient, in the ATC position . If an Instant SRO additionally serves in the BOP position, one l/C malfunction can be credited toward the two l/C malfunctions required for the ATC position.

2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum
  • requirements specified for the applicant's license level in the right-hand columns .

ES-301 Transient and Event Checklist Form ES-301-5 Facility: VC SUMMER Date of Exam: 05/04/2015 Operating Test No.: NRC ILO 13-01 A E Scenarios p v T p E 2 3 1 0 L N CREW CREW CREW CREW T MINIMUM(*) I T POSITION POSITION POSITION POSITION c s A B s A B s A B s A B A A T L y R T 0 R T 0 R T 0 R T 0 N T p 0 c p 0 c p 0 c p 0 c p R I u E RX 0 1 *1 0 RO NOR 2 *1 1 ., D SRO-I 34 /,) 2

  • l/C 4 D 67 SRO-U MAJ 8 2 2 *1 181 TS 34 0 2 2 5

RO RX 2 *1 1 0 181 NOR 0 'j 1 1 SRO-I l/C 67 4 4 2 D SRO-U MAJ 8 2 2 *1 D TS 0 0 2 2 RO RX 0 1 1 0 181 NOR 1 1 'i *1 SRO-I l/C 34 4 4 2 D SRO-U MAJ 8 2 2 1 D TS 0 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-0-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)"

and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (l/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one l/C malfunction can be credited toward the two l/C malfunctions required for the ATC position.

2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section 0 .5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.

ES-301 Competencies Checklist Form ES-301-6 Facility: VC SUMMER Date of Examination: 05/04/2015 Operating Test No.: NRC ILO 13-01 ~ APPLICANTS Crane, Robbie Galloway, Jason Willis, Mike Buck, Justin RO D RO D RO D RO 181 SRO-I D SRO-I D SRO-I D SRO-I D SRO-U 181 SRO-U lgj SRO-U 181 SRO-U D SCENARIO SCENARIO SCENARIO SCENARIO SRO SRO SRO SRO SRO SRO BOP RO 2 3 2 3 2 3 2 3 Interpret/Diagnose 12 14 12 14 12 14 15 45 56 56 56 25 Events and Conditions 45 45 6 12 12 12 12 12 12 12 Comply With and 34 34 34 34 34 34 23 56 Use Procedures (1) 56 56 56 56 56 56 56 7 7 7 7 23 1 2 Operate Control - - - - - - 45 Boards (2) 6 67 12 12 12 12 12 34 12 34 23 1 2 Communicate 34 34 34 34 45 56

  • and Interact 56 56 56 56 56 56 6 7 7 7 7 12 12 12 12 12 12 34 34 34 Demonstrate 34 34 34 - -

Supervisory Ability (3) 56 56 56 56 56 56 7 7 7 12 12 12 Comply With and 4 14 4 14 4 14 - - Use Tech. Specs. (3) Notes: (1) Includes Technical Specification compliance for an RO. (2) Optional for an SRO-U. (3) Only applicable to SROs. Instructions: Check the applicants' license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.

ES-301 Competencies Checklist Form ES-301-6 Facility: VC SUMMER Date of Examination: 05/04/2015 Operating Test No.: NRG ILO 13-01

  • Ford, Rashaun RO 181 RO APPLICANTS Galloway, Justin 181 Harris, Brad RO 181 McNeely, Andy RO 181 SRO-I D SRO-I D SRO-I D SRO-I D Competencies SRO-U D SRO-U D SRO-U D SRO-U D SCENARIO SCENARIO SCENARIO SCENARIO RO BOP BOP RO RO BOP BOP RO 2 3 2 3 2 3 2 3 InterpreUDiagnose 1 4 34 25 1 5 1 4 34 25 1 5 Events and Conditions 6 6 1 3 23 23 56 12 1 3 23 23 1 2 Comply With and Use Procedures (1) 46 47 56 7 46 47 56 56 7 1 3 23 23 1 2 1 3 23 23 Operate Control 45 67 45 6712 Boards (2) 46 47 46 47 6 6

1 3 23 23 1 2 1 3 23 23 1 2 Communicate 45 56 45 56 and Interact 46 47 6 7 46 47 6 7 Demonstrate Supervisory Ability (3)

                               -    -               -      -             -     -               -     -

Comply With and Use Tech. Specs. (3)

                               -    -               -      -             -     -               -     -

Notes: (1) Includes Technical Specification compliance for an RO. (2) Optional for an SRO-U. (3) Only applicable to SROs. Instructions: Check the applicants' license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.

ES-301 Competencies Checklist Form ES-301-6 Facility: VC SUMMER Date of Examination: 05/04/2015 Operating Test No.: NRC ILO 13-01 APPLICANTS SRO-U ROATC BOP RO D RO 181 RO 181 RO D SRO-I D SRO-I D SRO-I D SRO-I D SRO-U 181 SRO-U D SRO-U D SRO-U D SCENARIO SCENARIO SCENARIO SCENARIO SRO RO BOP 1 1 1 34 I nterpreUDiagnose 56 57 34 Events and Conditions 7 23 12 Comply With and 45 25 67 67 34 Use Procedures (1) 8 8 25 Operate Control - 67 13 Boards (2) 8 48 12 25 Communicate 34 13 56 67 48 and Interact 8 78 23 45 Demonstrate Supervisory Ability (3) 67 - - 8 34 Comply With and Use Tech. Specs. (3) 5 - - Notes: (1) Includes Technical Specification compliance for an RO. (2) Optional for an SRO-U. (3) Only applicable to SROs. Instructions: Check the applicants' license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.

The 2015 V.C. Summer final written exam sample plan may be obtained by combining the draft written exam sample plan with the final ES-401-4 form.

ES-403 Written Examination Grading Form ES-403-1 Quality Checklist Initials Item Descri tion a b c

1. Clean answer sheets co ied before N/,4
2. Answer key changes and question deletions justified and documented Al}; J2
                                                                                     ~ ~
3. Applicants' scores checked for addition errors reviewers s ot check > 25% of examinations 1% J
4. Grading for all borderline cases (80 +/-2% overall and 70 or 80, AVJ as a licable, +/-4% on the SRO-onl reviewed in detail //I
5. All other failing examinations checked to ensure that grades are *ustified Al~ &-
6. Performance on missed questions checked for training deficiencies and wording problems; evaluate validity of questions missed by half or more of the applicants Nd ~
a. Grader
b. Facility Reviewer(*)
c. NRC Chief Examiner(*) D'} n/u 1'j
d. NRC Supervisor(*) '1~1?6\,!

(*) The facility reviewer's signature is not applicable for examinations graded by the NRC; two independent NRC reviews are required.

FOR OFFICIAL USE ONLY Neil E. Constance Manager, Nuclear Training 803.345.4028 April 9, 2014 A SCANA COMPANY Mr. Malcolm T. Widmann, Chief Operations Branch 1 Division of Reactor Safety U.S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave. N.E. , Suite 1200 Atlanta, GA 30303-1257

Dear Mr. Widmann:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION OUTLINES Based on the guidelines in NUREG-1021 , "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, in particular ES-201, "Initial Operator Licensing Examination Process" and ES-301, "Preparing Initial Operating Tests," South Carolina Electric & Gas Company (SCE&G) has enclosed the following information for your consideration:

  • Enclosure 1 ES-201-2, Examination Outline Quality Checklist
  • Enclosure 2 ES-201-3, Examination Security Agreement
  • Enclosure 3 ES-301-1, Administrative Topics Outline
  • Enclosure 4 ES-301-2, Control Room/In-Plant Systems Outline
  • Enclosure 5 ES-301-5, Transient and Event Checklist
  • Enclosure 6 ES-D-1s, Scenario Outlines The enclosed examination materials have been independently reviewed by Mr. Nikos L.

O'Kimosh, Shift Supervisor, Operations. In accordance with NUREG-1021 , this material must be withheld from public disclosure until the examinations are complete. Should there be any questions, please contact Mr. Robert N. Johnston, Nuclear Trainer-Principle, at (803) 931-5173. Very truly yours,

                                                                                   ~E~

TS/NEC/tc Enclosures c: (Without Enclosure unless noted) M. K. Meeks (NRC e-mail notification) RTS (CR-14-01708) N. L. O'Kimosh File (814.04, RR 1050) NRC Resident Inspector PRSF (RC-14-0065) Virgil C. Summer Station *Post Office Box 88

  • Jenkinsville, SC* 29065
  • F(803) 941-9776

FOR OFFICIAL USE ONLY Neil E. Constance Manager, Nuclear Training 803.345.4028 A SCANA COMPANY February 23, 2015 Mr. Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety U. S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave. N.E., Suite 1200 Atlanta, GA 30303-1257

Dear Mr. McCoy:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 REACTOR AND SENIOR REACTOR OPERATOR OPERATING TEST AND SUPPORTING REFERENCE MATERIAL Based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors", Revision 10, in particular ES-301, "Preparing Initial Operating Tests," South Carolina Electric & Gas Company is providing the following information for your consideration.

  • ES-201-3, Examination Security Agreement
  • ES-301-3, Operating Test Quality Checklist
  • ES-301-4, Simulator Scenario Quality Checklist
  • ES-301-5, Transient and Event Checklist
  • ES-301-6, Competencies Checklist
  • Operational Exam Hard Copy
  • Operational Exam Electronic Files on DVD-ROM
  • Supporting Reference Documentation Files on DVD-ROM The enclosed examination materials have been independently reviewed by Mr. Steven M. Billingsley, Senior Reactor Operator. In accordance with NUREG-1021, this material must be withheld from public disclosure until the examinations are complete.

Should there be any questions, please contact Mr. Robert N. Johnston at (803) 931-5173. Ve~ truly yours, r-;J~c.~~ Neil E. Constance TS/NEC/sr Enclosures c: (Without Enclosures unless noted) NRC Resident Inspector E. F. Guthrie RTS (CR-14-01708) M. K. Meeks

  • File (814.04, RR 1050)

R. N. Johnston OMS (RC-15-0029) Virgil C. Summer Station* Post Office Box 88

  • Jenkinsville, SC* 29065
  • F(803) 345-5209

FOR OFFICIAL USE ONLY Neil E. Constance Manager, Nuclear Training 803.345.4028 May 26, 2015 A SCANA COMPANY Mr. Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety U. S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave. N.E., Suite 1200 Atlanta , GA 30303-1257

Dear Mr. McCoy:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 INITIAL OPERATOR LICENSE EXAMINATION POST EXAMINATION SUBMITTAL The V. C. Summer Initial Operator License Examination was administered in the weeks of May 4, 2015 and May 18, 2015. The VCSNS Initial License Written Examination was administered on May 20, 2015. VCSNS is enclosing the following as required by Revision 10, of NU REG 1021, "Operator Licensing Examination Standards for Power Reactors:"

1. Each applicant's original answer and examination cover sheets plus two clean copies of each applicant's answer sheet;
2. The master examinations and answer keys ;
3. Questions asked by and answers given to the applicants during the written examination;
4. Written examination seating chart;
5. Post-examination comments and facility responses; and
6. Written examination performance analysis.

As agreed, the examination security agreement will be sent via email at a later date. If you require any additional information or have any questions, please contact Robert Johnston at (803)931-5173. M"ICo~ Neil E. Constance TS/NEC/dr Enclosures c: (Without Enclosure unless noted) V. M. Mccree RTS (CR-14-01708) M. K. Meeks (NRC e-mail notification) File (814.04, RR 1050) NRC Resident Inspector PRSF (RC-15-0076) V. C. Summer Nuclear Station* P. 0. Box 88

  • Jenkinsville, SC* 29065
  • F(803) 941-9776

FOR OFFICIAL USE ONLY Neil E. Constance Manager, Nuclear Training 803.345.4028 June 4, 2015 A SCANA COMPANY Mr. Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety U. S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave. N.E. , Suite 1200 Atlanta, GA 30303-1257

Dear Mr. McCoy:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 INITIAL OPERATOR LICENSE EXAMINATION POST EXAMINATION SUBMITTAL ADDENDUMS

Reference:

SCE&G Letter from Neil E. Constance to Gerald J. McCoy (NRC), "Initial Operator License Examination Post Examination Submittal," dated May 26, 2015 The enclosures that accompany this letter are addendums to the post examination package (Reference) that was submitted to the NRC on May 26, 2015. This submittal's enclosures are as follows:

1. One additional post examination comment for the Operating Test that was given during the week of May 4, 2015.
2. Signed forms ES-201-3, Examination Security Agreement.

If you require any additional information or have any questions, please contact Robert Johnston at (803)931-5173. Very truly yours,

                                                                                          ~;:~

Neil E. Constance TS/NEC/sr Enclosures (2) c: (Without Enclosure unless noted) V. M. Mccree M. K. Meeks (NRC e-mail notification) NRC Resident Inspector RTS (CR-14-01708) File (814.04, RR 1050) PRSF (RC-15-0094) V. C. Summer Nuclear Station* P. 0. Box 88

  • Jenkinsville, SC* 29065
  • F(803) 941-9776}}