ML17331B043: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:N.R.C.OPERATING DATA REPORT'OCKET NO.50-316 DATE 02/Nov/93 ,COMPLETED BY DG Turner TELEPHONE 616-465-5901 OPERATING STATUS l.Unit Name D.C.Cook Unit 2 2.Reporting Period December 92 3.Licensed Thermal Power (MWt)3411 4.Name Plate Rating (Gross MWe)1133 5.Design Electrical Rating (Net MWe)1090 6.Maximum Dependable Capacity (GROSS MWe)1100 7.Maximum Dependable Capacity (Net MWe)1060 | {{#Wiki_filter:N.R.C. OPERATING DATA REPORT'OCKET NO. 50-316 DATE 02/Nov/93 | ||
,COMPLETED BY DG Turner TELEPHONE 616-465-5901 OPERATING STATUS | |||
If Any: ll.Hours in Reporting Period 12.No.of Hrs.Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator on Line 15.Unit.Reserve Shutdown Hours 16.Gross Therm.Energy Gen.(MWH)17.Gross Elect.Energy Ge'n.(MWH)18.Net Elect:.Energy Gen.(MWH)19;Unit Service Factor 20.Unit Availability Factor 21.Unit.Capacity Factor (MDC Net)22.Unit Capacity Factor'(DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled over Next Six | : l. Unit Name D. C. Cook Unit 2 | ||
25.If Shut Down At End of Report Period, Estimated Date of Startup: 26.Units in Test Status (Prior to Commercial Operation): | : 2. Reporting Period December 92 notes | ||
Forcast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | : 3. Licensed Thermal Power (MWt) 3411 Rev. 1 Corrected | ||
93 PDR'DOC, ,PDR R 0 h'>~'E}} | : 4. Name Plate Rating (Gross MWe) 1133 UCFs to use MDC=1060 | ||
: 5. Design Electrical Rating (Net MWe) 1090 MWe Net year round. | |||
: 6. Maximum Dependable Capacity (GROSS MWe) 1100 02/Nov/93 DG Turner | |||
: 7. Maximum Dependable Capacity (Net MWe) 1060 | |||
: 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons See notes above. No longer using seasonall ad'usted values. | |||
: 9. Power Level To Which Restricted. | |||
: 10. Reasons For Restrictions. If If Any Any: | |||
(Net MWe) | |||
This Mo. Yr. to Date ll. Hours in Reporting Period | |||
: 12. No. of Hrs. Reactor Was Critical 744.0 8785.0 Cumm e 131497.0 863'57.5 744.0 3169.4 | |||
: 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 | |||
: 14. Hours Generator on Line 300.7 1716.3 83316.4 | |||
: 15. Unit .Reserve Shutdown Hours 0.0 . 0' 0.0 | |||
: 16. Gross Therm. Energy Gen. (MWH) 862331 4893139 257587772 | |||
: 17. Gross Elect. Energy Ge'n. (MWH) 256060 1485880 83754030 | |||
: 18. Net Elect:. Energy Gen. (MWH) 245846 1427300 80672172 19; Unit Service Factor 40.4 19 ' 64 ' | |||
: 20. Unit Availability Factor 40.4 19 ' 64 ' | |||
: 21. Unit. Capacity Factor (MDC Net) 31 2 15.3 58.9 | |||
: 22. Unit Capacity Factor '(DER Net) 30.3 14 ' 57 ' | |||
: 23. Unit Forced Outage Rate 59 ' 69.7 "16.4 | |||
: 24. Shutdowns Scheduled over Next Six Months (Type, Date,'and Duration): | |||
: 25. If Shut Down At End of Report Period, Estimated Date of Startup: | |||
: 26. Units in Test Status (Prior to Commercial Operation): | |||
Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 931118O~>~ 93 PDR'DOC, ,PDR R | |||
0 h '> | |||
~ | |||
'E}} | |||
Revision as of 13:06, 22 October 2019
| ML17331B043 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 12/31/1992 |
| From: | Doreen Turner INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | |
| Shared Package | |
| ML17331B040 | List: |
| References | |
| NUDOCS 9311150322 | |
| Download: ML17331B043 (2) | |
Text
N.R.C. OPERATING DATA REPORT'OCKET NO. 50-316 DATE 02/Nov/93
,COMPLETED BY DG Turner TELEPHONE 616-465-5901 OPERATING STATUS
- l. Unit Name D. C. Cook Unit 2
- 2. Reporting Period December 92 notes
- 3. Licensed Thermal Power (MWt) 3411 Rev. 1 Corrected
- 4. Name Plate Rating (Gross MWe) 1133 UCFs to use MDC=1060
- 5. Design Electrical Rating (Net MWe) 1090 MWe Net year round.
- 6. Maximum Dependable Capacity (GROSS MWe) 1100 02/Nov/93 DG Turner
- 7. Maximum Dependable Capacity (Net MWe) 1060
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons See notes above. No longer using seasonall ad'usted values.
- 9. Power Level To Which Restricted.
- 10. Reasons For Restrictions. If If Any Any:
(Net MWe)
This Mo. Yr. to Date ll. Hours in Reporting Period
- 12. No. of Hrs. Reactor Was Critical 744.0 8785.0 Cumm e 131497.0 863'57.5 744.0 3169.4
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator on Line 300.7 1716.3 83316.4
- 15. Unit .Reserve Shutdown Hours 0.0 . 0' 0.0
- 16. Gross Therm. Energy Gen. (MWH) 862331 4893139 257587772
- 17. Gross Elect. Energy Ge'n. (MWH) 256060 1485880 83754030
- 18. Net Elect:. Energy Gen. (MWH) 245846 1427300 80672172 19; Unit Service Factor 40.4 19 ' 64 '
- 20. Unit Availability Factor 40.4 19 ' 64 '
- 21. Unit. Capacity Factor (MDC Net) 31 2 15.3 58.9
- 22. Unit Capacity Factor '(DER Net) 30.3 14 ' 57 '
- 23. Unit Forced Outage Rate 59 ' 69.7 "16.4
- 24. Shutdowns Scheduled over Next Six Months (Type, Date,'and Duration):
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 931118O~>~ 93 PDR'DOC, ,PDR R
0 h '>
~
'E