{{#Wiki_filter:BFN-17 J.0-1 APPENDIX JREACTOR PRESSURE VESSEL DESIGN  
{{#Wiki_filter:BFN-17 APPENDIX J REACTOR PRESSURE VESSEL DESIGN  


==SUMMARY==
==SUMMARY==
REPORT - UNIT 1 J.1 INTRODUCTION During the general update of the FSAR in 1984, the original Appendices J, K, and L were deleted and replaced with short summaries. These appendices
REPORT - UNIT 1 J.1   INTRODUCTION During the general update of the FSAR in 1984, the original Appendices J, K, and L were deleted and replaced with short summaries. These appendices were redocketed June 23, 1989 by the reference letter. Section J.2 is an abbreviated summary of the Unit 1 design and fabrication requirement presented in the redocketed Appendix J.
 
J.2   DESIGN AND FABRICATION REQUIREMENTS -  
were redocketed June 23, 1989 by the reference letter. Section J.2 is an
 
abbreviated summary of the Unit 1 design and fabrication requirement
 
presented in the redocketed Appendix J.J.2 DESIGN AND FABRICATION REQUIREMENTS -  


==SUMMARY==
==SUMMARY==


The Browns Ferry reactor vessel, Unit No. 1, was designed, fabricated, inspected and tested in accordance with the American Society of Mechanical
The Browns Ferry reactor vessel, Unit No. 1, was designed, fabricated, inspected and tested in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section III Nuclear Vessels, 1965 Edition and Addenda to and including Summer 1965 Addenda, and the following additions:
 
: a.     Low alloy steel forgings for pressure parts in accordance with ASTM A-508 C1. 2 material, Code Case 1332-2.
Engineers Boiler and Pressure Vessel Code, Section III Nuclear Vessels, 1965 Edition and Addenda to and including Summer 1965 Addenda, and the
: b.     Inconel nozzles in accordance with SB-166 material, Code Case 1336, paragraph 1.
 
: c.     Nozzle ends for austenitic pipe and flange ends for low alloy steel nozzles in accordance with SA-105 GR-II material, Code Case 1332-1.
following additions:a.Low alloy steel forgings for pressure parts in accordance with ASTM A-508 C1. 2 material, Code Case 1332-2.b.Inconel nozzles in accordance with SB-166 material, Code Case 1336, paragraph 1.c.Nozzle ends for austenitic pipe and flange ends for low alloy steelnozzles in accordance with SA-105 GR-II material, Code Case 1332-1.d.Studs, nuts, bushings, and washers in accordance with ASTM A-540, GR. B23 or 24 material, Code Case 1335-2, paragraph 4, Class 3 or 5.e.Shroud support legs, baffle plate, and ring in accordance with SB-168 annealed material, Code Case 1336.f.Core spray brackets in accordance with ASTM A-276 TP 304 material, Code Case 1334.
: d.     Studs, nuts, bushings, and washers in accordance with ASTM A-540, GR. B23 or 24 material, Code Case 1335-2, paragraph 4, Class 3 or 5.
The date of the contract between the Buyer, General Electric Company, AtomicPower Equipment Department, San Jose, California, and the Seller, Babcock and
: e.     Shroud support legs, baffle plate, and ring in accordance with SB-168 annealed material, Code Case 1336.
: f.     Core spray brackets in accordance with ASTM A-276 TP 304 material, Code Case 1334.
The date of the contract between the Buyer, General Electric Company, Atomic Power Equipment Department, San Jose, California, and the Seller, Babcock and Wilcox Company, Barberton, Ohio, was May 5, 1966. There were no deviations J.0-1


Wilcox Company, Barberton, Ohio, was May 5, 1966. There were no deviations BFN-16 J.0-2 from the Code throughout the design, fabrication, inspection, and testing of the reactor vessels.
BFN-16 from the Code throughout the design, fabrication, inspection, and testing of the reactor vessels.
REFERENCE TVA Letter from M. J. Ray to U. S. Nuclear Regulatory Commission, Brown's Ferry Nuclear Plant, Unit 1, 2, 3, Original Final Safety Analysis Report (FSAR) Appendix J, K, and L submittals, June 23, 1989.}}
REFERENCE TVA Letter from M. J. Ray to U. S. Nuclear Regulatory Commission, Brown's Ferry Nuclear Plant, Unit 1, 2, 3, Original Final Safety Analysis Report (FSAR) Appendix J, K, and L submittals, June 23, 1989.
J.0-2}}

Latest revision as of 02:10, 22 October 2019

Updated Final Safety Analysis Report (Ufsar), Amendment 27, Appendix J - Reactor Pressure Vessel Design
ML18024A391
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 10/05/2017
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18018A778 List: ... further results
References
Download: ML18024A391 (2)


Text

BFN-17 APPENDIX J REACTOR PRESSURE VESSEL DESIGN

SUMMARY

REPORT - UNIT 1 J.1 INTRODUCTION During the general update of the FSAR in 1984, the original Appendices J, K, and L were deleted and replaced with short summaries. These appendices were redocketed June 23, 1989 by the reference letter. Section J.2 is an abbreviated summary of the Unit 1 design and fabrication requirement presented in the redocketed Appendix J.

J.2 DESIGN AND FABRICATION REQUIREMENTS -

SUMMARY

The Browns Ferry reactor vessel, Unit No. 1, was designed, fabricated, inspected and tested in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section III Nuclear Vessels, 1965 Edition and Addenda to and including Summer 1965 Addenda, and the following additions:

a. Low alloy steel forgings for pressure parts in accordance with ASTM A-508 C1. 2 material, Code Case 1332-2.
b. Inconel nozzles in accordance with SB-166 material, Code Case 1336, paragraph 1.
c. Nozzle ends for austenitic pipe and flange ends for low alloy steel nozzles in accordance with SA-105 GR-II material, Code Case 1332-1.
d. Studs, nuts, bushings, and washers in accordance with ASTM A-540, GR. B23 or 24 material, Code Case 1335-2, paragraph 4, Class 3 or 5.
e. Shroud support legs, baffle plate, and ring in accordance with SB-168 annealed material, Code Case 1336.
f. Core spray brackets in accordance with ASTM A-276 TP 304 material, Code Case 1334.

The date of the contract between the Buyer, General Electric Company, Atomic Power Equipment Department, San Jose, California, and the Seller, Babcock and Wilcox Company, Barberton, Ohio, was May 5, 1966. There were no deviations J.0-1

BFN-16 from the Code throughout the design, fabrication, inspection, and testing of the reactor vessels.

REFERENCE TVA Letter from M. J. Ray to U. S. Nuclear Regulatory Commission, Brown's Ferry Nuclear Plant, Unit 1, 2, 3, Original Final Safety Analysis Report (FSAR) Appendix J, K, and L submittals, June 23, 1989.

J.0-2