=Text=
=Text=
{{#Wiki_filter:ELICTBI¢AL PQWIR f\)0 0k11f/A fa. -tl,0 fa[JG? --r11 -fc; 0 /l ly. SURVSILLANCB REQUIRBMBNTS (Continued)
{{#Wiki_filter:f\)0   0k11f/A fa. -tl,0     fa[JG? -
: d. At l ... t once per 18 month* during *hutdown by: 1. Subjecting the die**l to an in*pection in accordance with procedures prepared in conjunction with it* manufacturer'*
ELICTBI¢AL PQWIR          SY~
recoamendation*
                                                      -r11 -fc; 0 /l ly.
for thi* cl*** of *tandby **rvice, 2. Verifying that, on rejection of a load greater than or equal to *a20 kw, the voltage and frequency are r**tored 3950 4580 volt* and 60 +/- 1.2 Hz within 4 **cond*. 3. Simulating a lo** of off*ite power by it**lf, and: a) Verifying de-energization of the vital bu* and load *bedding from the vital bu*. b) Verifying the di***l *tart* on the auto-*tart  
SURVSILLANCB REQUIRBMBNTS (Continued)
*ignal*, energize*
: d. At l ...t once per 18 month* during *hutdown by:
the vital bue with connect*d load* within 13 **cond*, energize*
: 1.         Subjecting the die**l to an in*pection in accordance with procedures prepared in conjunction with it* manufacturer'* recoamendation* for thi* cl*** of *tandby **rvice,
the auto-connected  
: 2.         Verifying that, on rejection of a load greater than or equal to
*hutdown load* through the load *equencer and operate* for greater than or equal to S minute* while it* g*nerator i* loaded with the *hutdown load*. The *t*ady *t*t* voltage and frequency of the vital bu* *hall be maintained at 3950 and 4580 volt* and 60 +/- 1.2 Hz during thi* t**t. 4. Verifying that on an !SF actuation teat *ignal without lo***of off *ite power the di***l generator  
                    *a20 kw, the voltage and frequency are r**tored to~ 3950 and~ 4580 volt* and 60 +/- 1.2 Hz within 4 **cond*.
*tart* on th* auto-*tart  
: 3.         Simulating a lo** of off*ite power by it**lf, and:
*ignal and operate* on *tandby for greater than or equal to 5 minute***
a)   Verifying de-energization of the vital bu* and load *bedding from the vital bu*.
The generator voltage and frequency  
b)   Verifying the di***l *tart* on the auto-*tart *ignal*,
*hall be 3950 and s 4580 volts and 60 +/- 1.2 Hz within 13 **cond* after the auto-*tart signal and *hall be maintained within the** limit* during thia t**t. S. Not Uaed. 6: Simulating a lo** of off*ite power in conjunction with an ESP actuation teat *ignal, and: .--.>. Verifying de-energization of the vital bu* and load *bedding from the vital bua. **-""' 9407260210 PDR ADOCK p b) Verifying the di***l *tart* on the auto-atart  
energize* the vital bue with ~,rmanently connect*d load* within 13 **cond*, energize* the auto-connected *hutdown load* through the load *equencer and operate* for greater than or equal to S minute* while it* g*nerator i* loaded with the *hutdown load*. The *t*ady *t*t* voltage and frequency of the vital bu*
*ignal*, energize*
                          *hall be maintained at ~ 3950 and ~ 4580 volt* and 60 +/- 1.2 Hz during thi* t**t.
the vital bu* with permanently connected loads within 13 *ec:onda, energize*
: 4.         Verifying that on an !SF actuation teat *ignal without lo***of off *ite power the di***l generator *tart* on th* auto-*tart *ignal and operate* on *tandby for greater than or equal to 5 minute***
the auto-connected emergency (accident) load* through the load **quencer and operate* for'greater than or to S minute* while it* generator i* loaded with the load*. Th*  
The generator voltage and frequency *hall be ~ 3950 and s 4580 volts and 60 +/- 1.2 Hz within 13 **cond* after the auto-*tart signal and
*tat* voltage and frequency of the vital bu* *hall be maintained 3950 458l>volt*
                    *hall be maintained within the** limit* during thia t**t.
and 60 +/- 1.2 Hz during thi* t**t., 940715 05000272 PDR SALEK -OHI'i' 1 3/4 8-4 Amendment No. 148
S.         Not Uaed.
-;r:-tJ E RT I e e POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) c) Verifying that all nonessential automatic diesel generator trip* (i.e., other than engine overapeed, lube oil preaaure low, 4 KV bua differential and generator differential), are automatically bypa***d upon lo** of voltage on the vital bua concurrent with a *afety injection actuation signal. 7. Verifying the die**l generator oper.&t**
6:         Simulating a lo** of off*ite power in conjunction with an ESP actuation teat *ignal, and:
for at lea*t 24 hours*. During the fir*t 2 hour* of thi* te*t, the di***l shall be loaded t.o 2760-2860 kw.** Dur-inq th* nmaininq 22 hours of thi* te*t, the di***l generator  
                  .--.>. Verifying de-energization of the vital bu* and load *bedding
*hall be loaded to 2500-2600 kw*** The *t*ady *tat* voltage and frequency
            *~*.iP.      from the vital bua.
*hall be maintained at 3950 and S 4580 volt* and 60 +/- 1.2 Hz during thi* te*t.
b)   Verifying the di***l *tart* on the auto-atart *ignal*,
S minueee 8ompletin9 thi* heuE te*t, perfal'llll 8Yr9eillanee ReEftiiremeftt 4,a.1.1.2.d.&.aa'''
energize* the vital bu* with permanently connected loads within 13 *ec:onda, energize* the auto-connected emergency (accident) load* through the load **quencer and operate* for'greater than
: 8. Verifying that the auto-connected load* to each die**l generator do not exceed the two hour rating of 2860 kw. 9. Verifying that with the di***l generator operating in a test mode (connected to ita bu*), a *imuleted  
            **-""'      or ~al to S minute* while it* generator i* loaded with the
*afety injection signal override*
                          ..e~gency load*. Th* *~~~~Y *tat* voltage and frequency of the vital bu* *hall be maintained at~ 3950 and~ 458l>volt* and 60 +/- 1.2 Hz during thi* t**t.,
the t'"est mode br (1) returning th* di***l generator to standby operation and (2) automatically energizing the emergency load* with offaite power. e. At lea*t once per ten year* or after any modification*
9407260210 940715 PDR    ADOCK 05000272 p                        PDR SALEK - OHI'i' 1                             3/4 8-4                 Amendment No. 148
which could di***l generator interdependence by *tarting all di***l generators  
 
*imultaneou*ly*, during shutdown, and verifying that all diesel generator*
e                               e ELEC~RICAL          POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
accelerate to at l*a*t 900 rpn in l*** than or equal to 10 *econd*. affect 4.8.l.l.3 The die*el fuel oil storage and transfer sy*tem shall be demon*trated OPERABLE:  
              ====2*********3****aa~a=*======2~~z==z======~=-~===ss***2==a*====z*===========
\ a. At lea*t once per 31 day* by: b. , *.. _ l. Verifying th* level in each of the above required 20,000 gallon fuel *torage tank*. 2. Verifying that both fuel tran*f*r pwnp* be *tarted and tran*f*r fuel from the 20,000 gallon *torage tank* to th* day tankm. At lea*t once per 92 day* by verifying that a *ample of diesel fuel from each of the above required 20,000 gallon atoraqe tank* i* within th* acceptable limit* *pecified in.Table l of ASTH 0915-77 when checked for water and *ediment.
c)    Verifying that all nonessential automatic diesel generator trip* (i.e., other than engine overapeed, lube oil preaaure low, 4 KV bua differential and generator differential), are automatically bypa***d upon lo** of voltage on the vital bua concurrent with a *afety injection actuation signal.
SALEM'-._
: 7.        Verifying the die**l generator oper.&t** for at lea*t 24 hours*.
UNIT l 3/4 8-5 Amendment No.
During the fir*t 2 hour* of thi* te*t, the di***l generat~~ shall be loaded t.o 2760-2860 kw.** Dur-inq th* nmaininq 22 hours of thi*
: f. Insert 1 At least once per 18 months, the foll ing test shall be performed within 5 minutes of diesel hutdown after the diesel has operated for at least at 2500-2600 kw**: Verifying the diesel starts and accelerates to 900 rpm in less than or equal to 10 seconds*.
te*t, the di***l generator *hall be loaded to 2500-2600 kw*** The
The generator voltage and frequency shall be 3950 volts and 4580 volts and 60 +/- 1.2 Hz within 13 seconds after the start signal. *-: .....
                                *t*ady *tat* voltage and frequency *hall be maintained at ~ 3950 and S 4580 volt* and 60 +/- 1.2 Hz during thi* te*t. Wi~hin S minueee aft*~ 8ompletin9 thi* ~4 heuE te*t, perfal'llll 8Yr9eillanee ReEftiiremeftt 4,a.1.1.2.d.&.aa'''
ELECTRICAL PQW1!jR SYSTEMS SURVBILLAHCZ REQUIREMENTS (Continued) 4.8.1.1.4 89port;1 -All di***l generator failur**, valid or non-valid, shall b* reported to the Commi11ion in a Special Report pur1uant to Specification 6.9.2 within JO day1. Report* of di***l generator failure* 1hall include the information recommended in R*gulatory Po1ition C.J.b of Requlatory Guide 1.108, Revi1ion 1, Auqu1t 1977. If the number of failure* in the la*t 100 valid te*t* (on a per nuclear unit ba*i*) i* greater than or equal to*1, the report *hall be *uppl ... nted to include th* additional information recommended in Regulatory Po*ition c.J.b of Requlatory Guide 1.108, Revi*ion l, Auqust 1977.
: 8.         Verifying that the auto-connected load* to each die**l generator do not exceed the two hour rating of 2860 kw.
* Surveillance te*tinq 1hall be conducted in accordance with the manufacturer'*
: 9.         Verifying that with the di***l generator operating in a test mode (connected to ita bu*), a *imuleted *afety injection signal override* the t'"est mode br (1) returning th* di***l generator to standby operation and (2) automatically energizing the emergency load* with offaite power.
recCX11Dendation1 reqarding engine prelube, warm-up and (unl*** loading time* are 1pecif ied in the individual surveillance  
: e. At lea*t once per ten year* or after any modification* which could affect di***l generator interdependence by *tarting all di***l generators
**
                    *imultaneou*ly*, during shutdown, and verifying that all diesel generator* accelerate to at l*a*t 900 rpn in l*** than or equal to
i* .. ant a* quidance to preclude routine exceedance*
-;r:-tJ ~ ERT        10 *econd*.
of the di-..& 99nerator manufacturer'*
I      4.8.l.l.3 The die*el fuel oil storage and transfer sy*tem shall be demon*trated OPERABLE:
de*ign rating*. Load* in exc*** of band for mpec:ial t**ting or momentary variation*
: a.         At lea*t once per 31 day* by:
du"* to changing bu* loadll 9ball not invalidate the t**t. *** Pailaee ef a ce1c pes luF1se111ance a.qu1s .. ene fQllQIWLA9 peefaeeanae et luFl>'*illanae R*ll'!ie.-*ft45 4,a.1.1.a.d.7,  
: l. Verifying th* level in each of the above required 20,000 gallon fuel *torage tank*.
*efifW*F*  
: 2. Verifying that both fuel tran*f*r pwnp* c~ be *tarted and tran*f*r fuel from the 20,000 gallon *torage tank* to th* day tankm.
*ha* *he 34 heur ***e ef 4w8olalw2ada7 repeabed1 Al an albernatt***  
: b.        At lea*t once per 92 day* by verifying that a *ample of diesel fuel from each of the above required 20,000 gallon fue~ atoraqe
*h*lk co 3i00=3i00 kw one hous, es une11 bemperaeur**
                      , *.. _
ha9e 1eabilimed, ReEfW*F.,,*ng 4,9,1,1.2.d.61!91 SALEM -UNIT 1 3/4 8-Sa Amendment No.
tank* i* within th* acceptable limit* *pecified in.Table l of ASTH 0915-77 when checked for vi*co~ity, water and *ediment.
--, ELEc*;RICAL PQWER SYSTEMS NG  
                  \
+o fit,'5  
SALEM'-._       UNIT l                       3/4 8-5                   Amendment No.   ~~3
-:r:f1 -F-o 0 YI I y. SURVJ:ILLAHCB REQUIREMENTS (Continued)
 
: d. At lea*t onee per lS month* during shutdown by: 1. Subj*cting the di***l to an in*pection in accordance with procedures prepared in conjunction with it* manufacturer'*
Insert 1
recommendations for thi* cl*** of *tandby **rvice, 2. verifying that, on rejection of a load of greater than or equal to 820 kw, th* voltage and frequency ar* r**tored to 3950 and s. 4580 volt* and 60 +/- 1.2 Hz within 4 **cond*. 3. Simulating a lo** of off*ite power by it*elf, ands a) Verifying de-energization of the vital bu* and load *hedding from the vital bu*. b) Verifying the die*el *tart* on the auto-*tart  
: f. At least once per 18 months, the foll ing test shall be performed within 5 minutes of diesel hutdown after the diesel has operated for at least '*'~~*¥.I~ at 2500-2600 kw**:
*ignal*, energize*
Verifying the diesel starts and accelerates to 900 rpm in less than or equal to 10 seconds*. The generator voltage and frequency shall be ~ 3950 volts and ~ 4580 volts and 60 +/- 1.2 Hz within 13 seconds after the start signal.
the vital bu* with permanently connected loada within 13 **cond*, energize*
    *-:.....
the  
 
*hutdown load* through the load **quencer and operate* for greater than or equal to 5 minute* while it* generator i* loaded with the shutdown load*. Th* *t*ady *tat* voltage and frequency of the vital bu* *hall be maintained at 3950 and S. 4580 volt* and 60 +/- 1.2 Hz during thi* t**t. 4. Verifying that on an ESF actuation te*t *ignal without leas of off*it* power the di***l generator  
ELECTRICAL PQW1!jR SYSTEMS SURVBILLAHCZ REQUIREMENTS (Continued) 4.8.1.1.4 89port;1 - All di***l generator failur**, valid or non-valid, shall b* reported to the Commi11ion in a Special Report pur1uant to Specification 6.9.2 within JO day1. Report* of di***l generator failure* 1hall include the information recommended in R*gulatory Po1ition C.J.b of Requlatory Guide 1.108, Revi1ion 1, Auqu1t 1977. If the number of failure* in the la*t 100 valid te*t* (on a per nuclear unit ba*i*) i* greater than or equal to*1, the report *hall be *uppl...nted to include th* additional information recommended in Regulatory Po*ition c.J.b of Requlatory Guide 1.108, Revi*ion l, Auqust 1977.
*tart* on th* auto-*tart aignal and operate* on *tandby for greater than or equal to 5 minutes*.
* Surveillance te*tinq 1hall be conducted in accordance with the manufacturer'* recCX11Dendation1 reqarding engine prelube, warm-up and l~a~ing (unl*** loading time* are 1pecif ied in the individual surveillance Requiremen~*>*
Th* g*n*rator voltage and frequency  
**   Tb~band    i* . .ant a* quidance to preclude routine exceedance* of the di-..& 99nerator manufacturer'* de*ign rating*. Load* in exc*** of th~*
*hall be 3950 and S. 4580 volts and 60 +/- 1.2 Hz within 13 seconde after the auto-start signal and shall be maintained within the** limit* during this test. 5. Deleted 6. Simulating a lo** of off*ite power in conjunction with an ESF -* actuation t**t *ignal, and , .. _,_ a) Verifying de-energization of the vital bu* and load shedding frcm the vital bu*. b) Verifying the di***l *tart* on the auto-*tart  
band for mpec:ial t**ting or momentary variation* du"* to changing bu*
*ignal*, energize*
loadll 9ball not invalidate the t**t.
th* vital bu* with permanently connected load* within *** 13 **cond*, energize*
*** Pailaee ef a ce1c pes luF1se111ance a.qu1s. .ene       4.1.1.1.a.d.i.~,  fQllQIWLA9 peefaeeanae et luFl>'*illanae R*ll'!ie.-*ft45 4,a.1.1.a.d.7, d***~n*c *efifW*F*
the auto-connected emergency (accident) load* through th* load **qu*ncer and operate* for greater than or oqual to 5 minute* while it* generator i* load9d with the emergency load*. Th* *t*ady *tat* voltage and frequency of the vital bu* *hall be maiot_a_ined at 3950 and S. 4580 volte and 60 +/- 1.2 Hz during thi* te*t. SALEK -UHIT 2 3/4 8-4 Amendment No. 126
      *ha* *he 34 heur ***e ef 4w8olalw2ada7 ~- repeabed1 Al an albernatt***
*. lU&.f.TRICAL POWER SYSTEMS SURVl:ILLAHCB REQUIREMENTS (Continued) c) Verifying that all noneaeential automatic dieael generator trip* (i.e., other than engine overnpeed, lube oil pr**oure low, 4 "KV Bu* differential and generator differential) are automatically bypa***d upon lo** of voltage on the vital bu* concurrent with a *afety injection actuation  
      *h~~BDG *h*lk ~*loaded co 3i00=3i00 kw ~os one hous, es une11 operag*R~
*ignal. 7. Verifying the di***l generator operate* for at lea*t 24 houra*. During the fir*t 2 hour* of thi* t**t, the di***l generator shall be loaded to 2760-2860 kw*** During the remaining 22 hour9--of thi* t**t, th* di***l generator  
bemperaeur** ha9e 1eabilimed, peiel"::::~e eepeat.l~9 8uF11eill*~* ReEfW*F.,,*ng 4,9,1,1.2.d.61!91 SALEM - UNIT 1                         3/4 8-Sa                   Amendment No.   ~.!3
*hall be loaded to 2500-2600 kw*** The *t*ady *tat* voltage and frequency  
 
*hall be maintained at 3950 and s 4580 volt* and 60 +/- 1.2 Hz during thi* te*t. Within i minute& aftes Gca11pletin9 chi* 24-hous t**t, lpeoifigation 4.8.1.1.2.d.6.b.***
NG Ja~s +o fit,'5 pq~e -
: 8. Verifying that th* auto-connected load* to each di***l generator do not exceed the two hour rating of 2860 9. Verifying that with the di***l geperator operating in a te*t mode (connected to it* bu*), a *imulated  
ELEc*;RICAL PQWER SYSTEMS
*afety injection signal override*
:r:f1 -F-o 0 YI I y.
the-t**t mode by (l) returning the di***l generator to *tandby operation and (2) automatically enerqizing th* emergency load* with off*it* power. ** At l*a*t once per 10 year* or after any modification*
SURVJ:ILLAHCB REQUIREMENTS (Continued)
which could affect di***l generator interdependence by *tarting all di***l generators  
: d. At lea*t onee per       lS month* during shutdown by:
*imultaneou*ly*, during *hutdown, and verifying that all diesel generator*
: 1.         Subj*cting the di***l to an in*pection in accordance with procedures prepared in conjunction with it* manufacturer'* recommendations for thi* cl*** of *tandby **rvice,
accelerate to at l*a*t 900 rpn in l*** than or equal to 10 **cond*. 4.8.1.1.3 Th* di***l fuel oil storage and transfer ey*tem shall be demon*trated OPBRABLB:
: 2.         verifying that, on rejection of a load of greater than or equal to 820 kw, th* voltage and frequency ar* r**tored to ~ 3950 and s. 4580 volt* and 60 +/- 1.2 Hz within 4 **cond*.
: a. At l*a*t once per 31 day* by: b. 1. Verifying th* level in each of the above required 20,000 gallon fuel *torage tank*. 2. Verifying that both fuel tran*f*r pump* can be *tarted and tran*f*r fuel from th* 20,000 gallon *torage tank* to the day tankm. At l***t once per 92 day* by verifying that a *ample of diesel fuel frcm each of the above required 20,000 gallon fuel *torage tank* i* within th* acceptable limit* *pecif ied in Tlabl* 1 of when checked for vi*co*ity, water and *ediment.
: 3.         Simulating a lo** of off*ite power by it*elf, ands a)   Verifying de-energization of the vital bu* and load *hedding from the vital bu*.
SALsH -UNIT 2 3/4 8-5 Amendment No. 126
b)   Verifying the die*el *tart* on the auto-*tart *ignal*,
: f. Insert 1 At least once per 18 months, the follc/wing test shall be performed within 5 minutes of after the diesel has operated for at least oBe aour at 2500-2600 kw**: Verifying the diesel starts and accelerates to 900 rpm in less than or equal to 10 seconds*.
energize* the vital bu* with permanently connected loada within 13 **cond*, energize* the auto~connected *hutdown load* through the load **quencer and operate* for greater than or equal to 5 minute* while it* generator i* loaded with the shutdown load*. Th* *t*ady *tat* voltage and frequency of the vital bu*
The generator voltage and frequency shall be 3950 volts and 5 4580 volts and 60 +/- 1.2 Hz within 13 seconds after the start signal . ..... .
                      *hall be maintained at ~ 3950 and S. 4580 volt* and 60 +/- 1.2 Hz during thi* t**t.
: 4.         Verifying that on an ESF actuation te*t *ignal without leas of off*it* power the di***l generator *tart* on th* auto-*tart aignal and operate* on *tandby for greater than or equal to 5 minutes*.
Th* g*n*rator voltage and frequency *hall be ~ 3950 and S. 4580 volts and 60 +/- 1.2 Hz within 13 seconde after the auto-start signal and shall be maintained within the** limit* during this test.
: 5.         Deleted
: 6.         Simulating a lo** of off*ite power in conjunction with an ESF
        -
* actuation t**t *ignal, and a)   Verifying de-energization of the vital bu* and load shedding frcm the vital bu*.
b)   Verifying the di***l *tart* on the auto-*tart *ignal*,
energize* th* vital bu* with permanently connected load* within ***
13 **cond*, energize* the auto-connected emergency (accident) load* through th* load **qu*ncer and operate* for greater than or oqual to 5 minute* while it* generator i* load9d with the
        , . _,_      emergency load*. Th* *t*ady *tat* voltage and frequency of the vital bu* *hall be maiot_a_ined at ~ 3950 and S. 4580 volte and 60 +/- 1.2 Hz during thi* te*t.
SALEK - UHIT 2                             3/4 8-4                   Amendment No. 126
 
*.
lU&.f.TRICAL POWER SYSTEMS SURVl:ILLAHCB REQUIREMENTS (Continued) c)   Verifying that all noneaeential automatic dieael generator trip* (i.e., other than engine overnpeed, lube oil pr**oure low, 4 "KV Bu* differential and generator differential) are automatically bypa***d upon lo** of voltage on the vital bu*
concurrent with a *afety injection actuation *ignal.
: 7. Verifying the di***l generator operate* for at lea*t 24 houra*.
During the fir*t 2 hour* of thi* t**t, the di***l generator shall be loaded to 2760-2860 kw*** During the remaining 22 hour9--of thi*
t**t, th* di***l generator *hall be loaded to 2500-2600 kw*** The
              *t*ady *tat* voltage and frequency *hall be maintained at ~ 3950 and s 4580 volt* and 60 +/- 1.2 Hz during thi* te*t. Within i minute&
aftes Gca11pletin9 chi* 24-hous t**t, pe~folR9 lpeoifigation 4.8.1.1.2.d.6.b.***
: 8. Verifying that th* auto-connected load* to each di***l generator do not exceed the two hour rating of 2860 kw~
: 9. Verifying that with the di***l geperator operating in a te*t mode (connected to it* bu*), a *imulated *afety injection signal override* the- t**t mode by (l) returning the di***l generator to
              *tandby operation and (2) automatically enerqizing th* emergency load* with off*it* power.
  **     At l*a*t once per 10 year* or after any modification* which could affect di***l generator interdependence by *tarting all di***l generators
          *imultaneou*ly*, during *hutdown, and verifying that all diesel generator* accelerate to at l*a*t 900 rpn in l*** than or equal to 10 **cond*.
4.8.1.1.3 Th* di***l fuel oil storage and transfer ey*tem shall be demon*trated OPBRABLB:
: a. At l*a*t once per 31 day* by:
: 1. Verifying th* level in each of the above required 20,000 gallon fuel *torage tank*.
: 2. Verifying that both fuel tran*f*r pump* can be *tarted and tran*f*r fuel from th* 20,000 gallon *torage tank* to the day tankm.
: b. At l***t once per 92 day* by verifying that a *ample of diesel fuel frcm each of the above required 20,000 gallon fuel *torage tank* i* within th* acceptable limit* *pecif ied in Tlabl* 1 of AS~_p975-77 when checked for vi*co*ity, water and *ediment.
SALsH - UNIT 2                       3/4 8-5                 Amendment No. 126
 
                                        ~
Insert 1
: f. At least once per 18 months, the
                                        ~
follc/wing test shall be performed within 5 minutes of diesel~~utdown after the diesel has operated for at least oBe aour at 2500-2600 kw**:
Verifying the diesel starts and accelerates to 900 rpm in less than or equal to 10 seconds*. The generator voltage and frequency shall be ~ 3950 volts and 5 4580 volts and 60 +/- 1.2 Hz within 13 seconds after the start signal .
    .....
            . -*~
 
*
*
* e e ELECTRICAL POWER SYSTEMS SURVZILLANCX REQUIREMENTS (Continued) . 4.8.1.1.4 BeP9rt* -All diesel generator failures, valid or non-valid, ahall be reported to the cemmi11ion in a Special Report purauant to Specification 6.9.2 within 30 day1. Report* of di***l generator failure* 1hall the information recoanended in RequlAtory Po1ition C.3.b of Regulatory Guide 1.108, Revi1ion 1, Auqu1t 1977. If the number of failure* in the laat 100 valid te1t1 (on a per nuclear unit ba1i1) i1 greater than or equal to 7, the report *hall be 1upplmnented to include the additional information recommended in Regulatory Po1ition C.3.b of Requlatory Guide l.108, R*vi1.ion 1, .-. Auqu1t 1977.
* e                               e ELECTRICAL POWER SYSTEMS SURVZILLANCX REQUIREMENTS (Continued)
* Surveillance te1ting *hall be conducted in accordance with the manufacturer'*
    ********---*********************3*****2******a***~***********************2aaa2 4.8.1.1.4
recoanendation*
                      .
reqarding engine prelube, warm-up and loading (unle11 loading time* are 1pecified in the individual  
BeP9rt* - All diesel generator failures, valid or non-valid, ahall be reported to the cemmi11ion in a Special Report purauant to Specification 6.9.2 within 30 day1. Report* of di***l generator failure* 1hall in~lude the information recoanended in RequlAtory Po1ition C.3.b of Regulatory Guide 1.108, Revi1ion 1, Auqu1t 1977. If the number of failure* in the laat 100 valid te1t1 (on a per nuclear unit ba1i1) i1 greater than or equal to 7, the report *hall be 1upplmnented to include the additional information recommended in Regulatory Po1ition C.3.b of Requlatory Guide l.108, R*vi1.ion 1, .-.
*surveillance Requirement*)*  
Auqu1t 1977.
** Thia band i* meant a1 guidance to preclude routine exceedance1 of the di ... l generator manufacturer'*
* Surveillance te1ting *hall be conducted in accordance with the manufacturer'* recoanendation* reqarding engine prelube, warm-up and loading (unle11 loading time* are 1pecified in the individual
de1ign rating*. Load* in exc*** of thia band for 1pecial te1ting or momentary variation*
        *surveillance Requirement*)*
due to changing bua loade *hall not invalidate th* te1t. *** Pailwr* ef a **** per  
    **   Thia band i* meant a1 guidance to preclude routine exceedance1 of the di. . .l generator manufacturer'* de1ign rating*. Load* in exc*** of thia band for 1pecial te1ting or momentary variation* due to changing bua loade *hall not invalidate th* te1t.
..
    *** Pailwr* ef a **** per     Sur\~eillanee R*~ir. .*~ 4.1.1.1.~.~.&.b,  fellewiRq perfeJRBaRe* ef Su!A"eillanee Re~irement 4.9.1.1.2.d.1, does. not reqnire.
fellewiRq perfeJRBaRe*
                                                                        ~
ef Su!A"eillanee 4.9.1.1.2.d.1, does. not reqnire. th** eh* 24 heur ee1e ef 4,9,1,1,2.*.1 r*pe*****
th** eh* 24 heur ee1e ef 4,9,1,1,2.*.1 ~* r*pe***** A* aft aleerftaei~e, ehe~BDG 1na1} ~. leaded sa 25QO 2&00 kw fer an* naur, er unsil gpe*a~iRq
A* aft 1na1} leaded sa 25QO 2&00 kw fer an* naur, er unsil  
          *empe*a*u*** ha¥* **&aailiaed, pri~*e rep*a*in9 lurveill~~* R*~iEemeR~
*empe*a*u***
          £A   '-'-'-~-~-h-SALEM -   UHIT 2                         3/4 8-6                 Amendment No. 126}}
ha¥* **&aailiaed, rep*a*in9  
£A SALEM -UHIT 2 3/4 8-6 Amendment No. 126}}

Revision as of 09:26, 21 October 2019

Proposed Tech Specs Re EDG Hot Restart Test
ML18100B221
Person / Time
Site: Salem  
Issue date: 07/15/1994
From:
Public Service Enterprise Group
To:
Shared Package
ML18100B220 List:
References
NUDOCS 9407260210
Download: ML18100B221 (8)


Text

f\)0 0k11f/A fa. -tl,0 fa[JG? -

ELICTBI¢AL PQWIR SY~

-r11 -fc; 0 /l ly.

SURVSILLANCB REQUIRBMBNTS (Continued)

d. At l ...t once per 18 month* during *hutdown by:
1. Subjecting the die**l to an in*pection in accordance with procedures prepared in conjunction with it* manufacturer'* recoamendation* for thi* cl*** of *tandby **rvice,
2. Verifying that, on rejection of a load greater than or equal to
  • a20 kw, the voltage and frequency are r**tored to~ 3950 and~ 4580 volt* and 60 +/- 1.2 Hz within 4 **cond*.
3. Simulating a lo** of off*ite power by it**lf, and:

a) Verifying de-energization of the vital bu* and load *bedding from the vital bu*.

b) Verifying the di***l *tart* on the auto-*tart *ignal*,

energize* the vital bue with ~,rmanently connect*d load* within 13 **cond*, energize* the auto-connected *hutdown load* through the load *equencer and operate* for greater than or equal to S minute* while it* g*nerator i* loaded with the *hutdown load*. The *t*ady *t*t* voltage and frequency of the vital bu*

  • hall be maintained at ~ 3950 and ~ 4580 volt* and 60 +/- 1.2 Hz during thi* t**t.
4. Verifying that on an !SF actuation teat *ignal without lo***of off *ite power the di***l generator *tart* on th* auto-*tart *ignal and operate* on *tandby for greater than or equal to 5 minute***

The generator voltage and frequency *hall be ~ 3950 and s 4580 volts and 60 +/- 1.2 Hz within 13 **cond* after the auto-*tart signal and

  • hall be maintained within the** limit* during thia t**t.

S. Not Uaed.

6: Simulating a lo** of off*ite power in conjunction with an ESP actuation teat *ignal, and:

.--.>. Verifying de-energization of the vital bu* and load *bedding

  • ~*.iP. from the vital bua.

b) Verifying the di***l *tart* on the auto-atart *ignal*,

energize* the vital bu* with permanently connected loads within 13 *ec:onda, energize* the auto-connected emergency (accident) load* through the load **quencer and operate* for'greater than

    • -""' or ~al to S minute* while it* generator i* loaded with the

..e~gency load*. Th* *~~~~Y *tat* voltage and frequency of the vital bu* *hall be maintained at~ 3950 and~ 458l>volt* and 60 +/- 1.2 Hz during thi* t**t.,

9407260210 940715 PDR ADOCK 05000272 p PDR SALEK - OHI'i' 1 3/4 8-4 Amendment No. 148

e e ELEC~RICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

2*********3****aa~a=*======2~~z==z======~=-~===ss***2==a*====z*=======

c) Verifying that all nonessential automatic diesel generator trip* (i.e., other than engine overapeed, lube oil preaaure low, 4 KV bua differential and generator differential), are automatically bypa***d upon lo** of voltage on the vital bua concurrent with a *afety injection actuation signal.

7. Verifying the die**l generator oper.&t** for at lea*t 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s*.

During the fir*t 2 hour* of thi* te*t, the di***l generat~~ shall be loaded t.o 2760-2860 kw.** Dur-inq th* nmaininq 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of thi*

te*t, the di***l generator *hall be loaded to 2500-2600 kw*** The

  • t*ady *tat* voltage and frequency *hall be maintained at ~ 3950 and S 4580 volt* and 60 +/- 1.2 Hz during thi* te*t. Wi~hin S minueee aft*~ 8ompletin9 thi* ~4 heuE te*t, perfal'llll 8Yr9eillanee ReEftiiremeftt 4,a.1.1.2.d.&.aa
8. Verifying that the auto-connected load* to each die**l generator do not exceed the two hour rating of 2860 kw.
9. Verifying that with the di***l generator operating in a test mode (connected to ita bu*), a *imuleted *afety injection signal override* the t'"est mode br (1) returning th* di***l generator to standby operation and (2) automatically energizing the emergency load* with offaite power.
e. At lea*t once per ten year* or after any modification* which could affect di***l generator interdependence by *tarting all di***l generators
  • imultaneou*ly*, during shutdown, and verifying that all diesel generator* accelerate to at l*a*t 900 rpn in l*** than or equal to

-;r:-tJ ~ ERT 10 *econd*.

I 4.8.l.l.3 The die*el fuel oil storage and transfer sy*tem shall be demon*trated OPERABLE:

a. At lea*t once per 31 day* by:
l. Verifying th* level in each of the above required 20,000 gallon fuel *torage tank*.
2. Verifying that both fuel tran*f*r pwnp* c~ be *tarted and tran*f*r fuel from the 20,000 gallon *torage tank* to th* day tankm.
b. At lea*t once per 92 day* by verifying that a *ample of diesel fuel from each of the above required 20,000 gallon fue~ atoraqe

, *.. _

tank* i* within th* acceptable limit* *pecified in.Table l of ASTH 0915-77 when checked for vi*co~ity, water and *ediment.

\

SALEM'-._ UNIT l 3/4 8-5 Amendment No. ~~3

Insert 1

f. At least once per 18 months, the foll ing test shall be performed within 5 minutes of diesel hutdown after the diesel has operated for at least '*'~~*¥.I~ at 2500-2600 kw**:

Verifying the diesel starts and accelerates to 900 rpm in less than or equal to 10 seconds*. The generator voltage and frequency shall be ~ 3950 volts and ~ 4580 volts and 60 +/- 1.2 Hz within 13 seconds after the start signal.

  • -:.....

ELECTRICAL PQW1!jR SYSTEMS SURVBILLAHCZ REQUIREMENTS (Continued) 4.8.1.1.4 89port;1 - All di***l generator failur**, valid or non-valid, shall b* reported to the Commi11ion in a Special Report pur1uant to Specification 6.9.2 within JO day1. Report* of di***l generator failure* 1hall include the information recommended in R*gulatory Po1ition C.J.b of Requlatory Guide 1.108, Revi1ion 1, Auqu1t 1977. If the number of failure* in the la*t 100 valid te*t* (on a per nuclear unit ba*i*) i* greater than or equal to*1, the report *hall be *uppl...nted to include th* additional information recommended in Regulatory Po*ition c.J.b of Requlatory Guide 1.108, Revi*ion l, Auqust 1977.

  • Surveillance te*tinq 1hall be conducted in accordance with the manufacturer'* recCX11Dendation1 reqarding engine prelube, warm-up and l~a~ing (unl*** loading time* are 1pecif ied in the individual surveillance Requiremen~*>*
    • Tb~band i* . .ant a* quidance to preclude routine exceedance* of the di-..& 99nerator manufacturer'* de*ign rating*. Load* in exc*** of th~*

band for mpec:ial t**ting or momentary variation* du"* to changing bu*

loadll 9ball not invalidate the t**t.

      • Pailaee ef a ce1c pes luF1se111ance a.qu1s. .ene 4.1.1.1.a.d.i.~, fQllQIWLA9 peefaeeanae et luFl>'*illanae R*ll'!ie.-*ft45 4,a.1.1.a.d.7, d***~n*c *efifW*F*
  • ha* *he 34 heur ***e ef 4w8olalw2ada7 ~- repeabed1 Al an albernatt***
  • h~~BDG *h*lk ~*loaded co 3i00=3i00 kw ~os one hous, es une11 operag*R~

bemperaeur** ha9e 1eabilimed, peiel"::::~e eepeat.l~9 8uF11eill*~* ReEfW*F.,,*ng 4,9,1,1.2.d.61!91 SALEM - UNIT 1 3/4 8-Sa Amendment No. ~.!3

NG Ja~s +o fit,'5 pq~e -

ELEc*;RICAL PQWER SYSTEMS

r:f1 -F-o 0 YI I y.

SURVJ:ILLAHCB REQUIREMENTS (Continued)

d. At lea*t onee per lS month* during shutdown by:
1. Subj*cting the di***l to an in*pection in accordance with procedures prepared in conjunction with it* manufacturer'* recommendations for thi* cl*** of *tandby **rvice,
2. verifying that, on rejection of a load of greater than or equal to 820 kw, th* voltage and frequency ar* r**tored to ~ 3950 and s. 4580 volt* and 60 +/- 1.2 Hz within 4 **cond*.
3. Simulating a lo** of off*ite power by it*elf, ands a) Verifying de-energization of the vital bu* and load *hedding from the vital bu*.

b) Verifying the die*el *tart* on the auto-*tart *ignal*,

energize* the vital bu* with permanently connected loada within 13 **cond*, energize* the auto~connected *hutdown load* through the load **quencer and operate* for greater than or equal to 5 minute* while it* generator i* loaded with the shutdown load*. Th* *t*ady *tat* voltage and frequency of the vital bu*

  • hall be maintained at ~ 3950 and S. 4580 volt* and 60 +/- 1.2 Hz during thi* t**t.
4. Verifying that on an ESF actuation te*t *ignal without leas of off*it* power the di***l generator *tart* on th* auto-*tart aignal and operate* on *tandby for greater than or equal to 5 minutes*.

Th* g*n*rator voltage and frequency *hall be ~ 3950 and S. 4580 volts and 60 +/- 1.2 Hz within 13 seconde after the auto-start signal and shall be maintained within the** limit* during this test.

5. Deleted
6. Simulating a lo** of off*ite power in conjunction with an ESF

-

  • actuation t**t *ignal, and a) Verifying de-energization of the vital bu* and load shedding frcm the vital bu*.

b) Verifying the di***l *tart* on the auto-*tart *ignal*,

energize* th* vital bu* with permanently connected load* within ***

13 **cond*, energize* the auto-connected emergency (accident) load* through th* load **qu*ncer and operate* for greater than or oqual to 5 minute* while it* generator i* load9d with the

, . _,_ emergency load*. Th* *t*ady *tat* voltage and frequency of the vital bu* *hall be maiot_a_ined at ~ 3950 and S. 4580 volte and 60 +/- 1.2 Hz during thi* te*t.

SALEK - UHIT 2 3/4 8-4 Amendment No. 126

  • .

lU&.f.TRICAL POWER SYSTEMS SURVl:ILLAHCB REQUIREMENTS (Continued) c) Verifying that all noneaeential automatic dieael generator trip* (i.e., other than engine overnpeed, lube oil pr**oure low, 4 "KV Bu* differential and generator differential) are automatically bypa***d upon lo** of voltage on the vital bu*

concurrent with a *afety injection actuation *ignal.

7. Verifying the di***l generator operate* for at lea*t 24 houra*.

During the fir*t 2 hour* of thi* t**t, the di***l generator shall be loaded to 2760-2860 kw*** During the remaining 22 hour9--of thi*

t**t, th* di***l generator *hall be loaded to 2500-2600 kw*** The

  • t*ady *tat* voltage and frequency *hall be maintained at ~ 3950 and s 4580 volt* and 60 +/- 1.2 Hz during thi* te*t. Within i minute&

aftes Gca11pletin9 chi* 24-hous t**t, pe~folR9 lpeoifigation 4.8.1.1.2.d.6.b.***

8. Verifying that th* auto-connected load* to each di***l generator do not exceed the two hour rating of 2860 kw~
9. Verifying that with the di***l geperator operating in a te*t mode (connected to it* bu*), a *imulated *afety injection signal override* the- t**t mode by (l) returning the di***l generator to
  • tandby operation and (2) automatically enerqizing th* emergency load* with off*it* power.
    • At l*a*t once per 10 year* or after any modification* which could affect di***l generator interdependence by *tarting all di***l generators
  • imultaneou*ly*, during *hutdown, and verifying that all diesel generator* accelerate to at l*a*t 900 rpn in l*** than or equal to 10 **cond*.

4.8.1.1.3 Th* di***l fuel oil storage and transfer ey*tem shall be demon*trated OPBRABLB:

a. At l*a*t once per 31 day* by:
1. Verifying th* level in each of the above required 20,000 gallon fuel *torage tank*.
2. Verifying that both fuel tran*f*r pump* can be *tarted and tran*f*r fuel from th* 20,000 gallon *torage tank* to the day tankm.
b. At l***t once per 92 day* by verifying that a *ample of diesel fuel frcm each of the above required 20,000 gallon fuel *torage tank* i* within th* acceptable limit* *pecif ied in Tlabl* 1 of AS~_p975-77 when checked for vi*co*ity, water and *ediment.

SALsH - UNIT 2 3/4 8-5 Amendment No. 126

~

Insert 1

f. At least once per 18 months, the

~

follc/wing test shall be performed within 5 minutes of diesel~~utdown after the diesel has operated for at least oBe aour at 2500-2600 kw**:

Verifying the diesel starts and accelerates to 900 rpm in less than or equal to 10 seconds*. The generator voltage and frequency shall be ~ 3950 volts and 5 4580 volts and 60 +/- 1.2 Hz within 13 seconds after the start signal .

.....

. -*~

  • e e ELECTRICAL POWER SYSTEMS SURVZILLANCX REQUIREMENTS (Continued)
                • ---*********************3*****2******a***~***********************2aaa2 4.8.1.1.4

.

BeP9rt* - All diesel generator failures, valid or non-valid, ahall be reported to the cemmi11ion in a Special Report purauant to Specification 6.9.2 within 30 day1. Report* of di***l generator failure* 1hall in~lude the information recoanended in RequlAtory Po1ition C.3.b of Regulatory Guide 1.108, Revi1ion 1, Auqu1t 1977. If the number of failure* in the laat 100 valid te1t1 (on a per nuclear unit ba1i1) i1 greater than or equal to 7, the report *hall be 1upplmnented to include the additional information recommended in Regulatory Po1ition C.3.b of Requlatory Guide l.108, R*vi1.ion 1, .-.

Auqu1t 1977.

  • Surveillance te1ting *hall be conducted in accordance with the manufacturer'* recoanendation* reqarding engine prelube, warm-up and loading (unle11 loading time* are 1pecified in the individual
  • surveillance Requirement*)*
    • Thia band i* meant a1 guidance to preclude routine exceedance1 of the di. . .l generator manufacturer'* de1ign rating*. Load* in exc*** of thia band for 1pecial te1ting or momentary variation* due to changing bua loade *hall not invalidate th* te1t.
      • Pailwr* ef a **** per Sur\~eillanee R*~ir. .*~ 4.1.1.1.~.~.&.b, fellewiRq perfeJRBaRe* ef Su!A"eillanee Re~irement 4.9.1.1.2.d.1, does. not reqnire.

~

th** eh* 24 heur ee1e ef 4,9,1,1,2.*.1 ~* r*pe***** A* aft aleerftaei~e, ehe~BDG 1na1} ~. leaded sa 25QO 2&00 kw fer an* naur, er unsil gpe*a~iRq

  • empe*a*u*** ha¥* **&aailiaed, pri~*e rep*a*in9 lurveill~~* R*~iEemeR~

£A '-'-'-~-~-h-SALEM - UHIT 2 3/4 8-6 Amendment No. 126