: d. At l ... t once per 18 month* during *hutdown by: 1. Subjecting the die**l to an in*pection in accordance with procedures prepared in conjunction with it* manufacturer'* | ELICTBI¢AL PQWIR SY~ | ||
recoamendation* | -r11 -fc; 0 /l ly. | ||
for thi* cl*** of *tandby **rvice, 2. Verifying that, on rejection of a load greater than or equal to *a20 kw, the voltage and frequency are r**tored 3950 4580 volt* and 60 +/- 1.2 Hz within 4 **cond*. 3. Simulating a lo** of off*ite power by it**lf, and: a) Verifying de-energization of the vital bu* and load *bedding from the vital bu*. b) Verifying the di***l *tart* on the auto-*tart | SURVSILLANCB REQUIRBMBNTS (Continued) | ||
*ignal*, energize* | : d. At l ...t once per 18 month* during *hutdown by: | ||
the vital bue with connect*d load* within 13 **cond*, energize* | : 1. Subjecting the die**l to an in*pection in accordance with procedures prepared in conjunction with it* manufacturer'* recoamendation* for thi* cl*** of *tandby **rvice, | ||
the auto-connected | : 2. Verifying that, on rejection of a load greater than or equal to | ||
*hutdown load* through the load *equencer and operate* for greater than or equal to S minute* while it* g*nerator i* loaded with the *hutdown load*. The *t*ady *t*t* voltage and frequency of the vital bu* *hall be maintained at 3950 and 4580 volt* and 60 +/- 1.2 Hz during thi* t**t. 4. Verifying that on an !SF actuation teat *ignal without lo***of off *ite power the di***l generator | *a20 kw, the voltage and frequency are r**tored to~ 3950 and~ 4580 volt* and 60 +/- 1.2 Hz within 4 **cond*. | ||
*tart* on th* auto-*tart | : 3. Simulating a lo** of off*ite power by it**lf, and: | ||
*ignal and operate* on *tandby for greater than or equal to 5 minute*** | a) Verifying de-energization of the vital bu* and load *bedding from the vital bu*. | ||
The generator voltage and frequency | b) Verifying the di***l *tart* on the auto-*tart *ignal*, | ||
*hall be 3950 and s 4580 volts and 60 +/- 1.2 Hz within 13 **cond* after the auto-*tart signal and *hall be maintained within the** limit* during thia t**t. S. Not Uaed. 6: Simulating a lo** of off*ite power in conjunction with an ESP actuation teat *ignal, and: .--.>. Verifying de-energization of the vital bu* and load *bedding from the vital bua. | energize* the vital bue with ~,rmanently connect*d load* within 13 **cond*, energize* the auto-connected *hutdown load* through the load *equencer and operate* for greater than or equal to S minute* while it* g*nerator i* loaded with the *hutdown load*. The *t*ady *t*t* voltage and frequency of the vital bu* | ||
*ignal*, energize* | *hall be maintained at ~ 3950 and ~ 4580 volt* and 60 +/- 1.2 Hz during thi* t**t. | ||
the vital bu* with permanently connected loads within 13 *ec:onda, energize* | : 4. Verifying that on an !SF actuation teat *ignal without lo***of off *ite power the di***l generator *tart* on th* auto-*tart *ignal and operate* on *tandby for greater than or equal to 5 minute*** | ||
the auto-connected emergency (accident) load* through the load **quencer and operate* for'greater than or to S minute* while it* generator i* loaded with the | The generator voltage and frequency *hall be ~ 3950 and s 4580 volts and 60 +/- 1.2 Hz within 13 **cond* after the auto-*tart signal and | ||
*tat* voltage and frequency of the vital bu* *hall be maintained 3950 458l>volt* | *hall be maintained within the** limit* during thia t**t. | ||
and 60 +/- 1.2 Hz during thi* t**t., 940715 05000272 PDR SALEK -OHI'i' 1 3/4 8-4 Amendment No. 148 | S. Not Uaed. | ||
6: Simulating a lo** of off*ite power in conjunction with an ESP actuation teat *ignal, and: | |||
.--.>. Verifying de-energization of the vital bu* and load *bedding | |||
* | *~*.iP. from the vital bua. | ||
b) Verifying the di***l *tart* on the auto-atart *ignal*, | |||
energize* the vital bu* with permanently connected loads within 13 *ec:onda, energize* the auto-connected emergency (accident) load* through the load **quencer and operate* for'greater than | |||
: 8. Verifying that the auto-connected load* to each die**l generator do not exceed the two hour rating of 2860 kw. 9. Verifying that with the di***l generator operating in a test mode (connected to ita bu*), a *imuleted | **-""' or ~al to S minute* while it* generator i* loaded with the | ||
*afety injection signal override* | ..e~gency load*. Th* *~~~~Y *tat* voltage and frequency of the vital bu* *hall be maintained at~ 3950 and~ 458l>volt* and 60 +/- 1.2 Hz during thi* t**t., | ||
the t'"est mode br (1) returning th* di***l generator to standby operation and (2) automatically energizing the emergency load* with offaite power. e. At lea*t once per ten year* or after any modification* | 9407260210 940715 PDR ADOCK 05000272 p PDR SALEK - OHI'i' 1 3/4 8-4 Amendment No. 148 | ||
which could di***l generator interdependence by *tarting all di***l generators | |||
*imultaneou*ly*, during shutdown, and verifying that all diesel generator* | e e ELEC~RICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) | ||
accelerate to at l*a*t 900 rpn in l*** than or equal to | ====2*********3****aa~a=*======2~~z==z======~=-~===ss***2==a*====z*=========== | ||
c) Verifying that all nonessential automatic diesel generator trip* (i.e., other than engine overapeed, lube oil preaaure low, 4 KV bua differential and generator differential), are automatically bypa***d upon lo** of voltage on the vital bua concurrent with a *afety injection actuation signal. | |||
SALEM'-._ | : 7. Verifying the die**l generator oper.&t** for at lea*t 24 hours*. | ||
UNIT l 3/4 8-5 Amendment No. | During the fir*t 2 hour* of thi* te*t, the di***l generat~~ shall be loaded t.o 2760-2860 kw.** Dur-inq th* nmaininq 22 hours of thi* | ||
: f. | te*t, the di***l generator *hall be loaded to 2500-2600 kw*** The | ||
The generator voltage and frequency shall be 3950 volts and 4580 volts and 60 +/- 1.2 Hz within 13 seconds after the start signal. *-: ..... | *t*ady *tat* voltage and frequency *hall be maintained at ~ 3950 and S 4580 volt* and 60 +/- 1.2 Hz during thi* te*t. Wi~hin S minueee aft*~ 8ompletin9 thi* ~4 heuE te*t, perfal'llll 8Yr9eillanee ReEftiiremeftt 4,a.1.1.2.d.&.aa''' | ||
ELECTRICAL PQW1!jR SYSTEMS SURVBILLAHCZ REQUIREMENTS (Continued) 4.8.1.1.4 89port;1 -All di***l generator failur**, valid or non-valid, shall b* reported to the Commi11ion in a Special Report pur1uant to Specification 6.9.2 within JO day1. Report* of di***l generator failure* 1hall include the information recommended in R*gulatory Po1ition C.J.b of Requlatory Guide 1.108, Revi1ion 1, Auqu1t 1977. If the number of failure* in the la*t 100 valid te*t* (on a per nuclear unit ba*i*) i* greater than or equal to*1, the report *hall be *uppl ... nted to include th* additional information recommended in Regulatory Po*ition c.J.b of Requlatory Guide 1.108, Revi*ion l, Auqust 1977. | : 8. Verifying that the auto-connected load* to each die**l generator do not exceed the two hour rating of 2860 kw. | ||
* Surveillance te*tinq 1hall be conducted in accordance with the manufacturer'* | : 9. Verifying that with the di***l generator operating in a test mode (connected to ita bu*), a *imuleted *afety injection signal override* the t'"est mode br (1) returning th* di***l generator to standby operation and (2) automatically energizing the emergency load* with offaite power. | ||
recCX11Dendation1 reqarding engine prelube, warm-up and (unl*** loading time* are 1pecif ied in the individual surveillance | : e. At lea*t once per ten year* or after any modification* which could affect di***l generator interdependence by *tarting all di***l generators | ||
** | *imultaneou*ly*, during shutdown, and verifying that all diesel generator* accelerate to at l*a*t 900 rpn in l*** than or equal to | ||
i* .. ant a* quidance to preclude routine exceedance* | -;r:-tJ ~ ERT 10 *econd*. | ||
of the di-..& 99nerator manufacturer'* | I 4.8.l.l.3 The die*el fuel oil storage and transfer sy*tem shall be demon*trated OPERABLE: | ||
de*ign rating*. Load* in exc*** of band for mpec:ial t**ting or momentary variation* | : a. At lea*t once per 31 day* by: | ||
du"* to changing bu* loadll 9ball not invalidate the t**t. *** Pailaee ef a ce1c pes luF1se111ance a.qu1s .. ene fQllQIWLA9 peefaeeanae et luFl>'*illanae R*ll'!ie.-*ft45 4,a.1.1.a.d.7, | : l. Verifying th* level in each of the above required 20,000 gallon fuel *torage tank*. | ||
*efifW*F* | : 2. Verifying that both fuel tran*f*r pwnp* c~ be *tarted and tran*f*r fuel from the 20,000 gallon *torage tank* to th* day tankm. | ||
*ha* *he 34 heur ***e ef 4w8olalw2ada7 repeabed1 Al an albernatt*** | : b. At lea*t once per 92 day* by verifying that a *ample of diesel fuel from each of the above required 20,000 gallon fue~ atoraqe | ||
*h*lk co 3i00=3i00 kw one hous, es une11 | , *.. _ | ||
ha9e 1eabilimed, ReEfW*F.,,*ng 4,9,1,1.2.d.61!91 SALEM -UNIT 1 3/4 8-Sa Amendment No. | tank* i* within th* acceptable limit* *pecified in.Table l of ASTH 0915-77 when checked for vi*co~ity, water and *ediment. | ||
\ | |||
+o fit,'5 | SALEM'-._ UNIT l 3/4 8-5 Amendment No. ~~3 | ||
: d. At lea*t onee per lS month* during shutdown by: 1. Subj*cting the di***l to an in*pection in accordance with procedures prepared in conjunction with it* manufacturer'* | Insert 1 | ||
recommendations for thi* cl*** of *tandby **rvice, 2. verifying that, on rejection of a load of greater than or equal to 820 kw, th* voltage and frequency ar* r**tored to 3950 and s. 4580 volt* and 60 +/- 1.2 Hz within 4 **cond*. 3. Simulating a lo** of off*ite power by it*elf, ands a) Verifying de-energization of the vital bu* and load *hedding from the vital bu*. b) Verifying the die*el *tart* on the auto-*tart | : f. At least once per 18 months, the foll ing test shall be performed within 5 minutes of diesel hutdown after the diesel has operated for at least '*'~~*¥.I~ at 2500-2600 kw**: | ||
*ignal*, energize* | Verifying the diesel starts and accelerates to 900 rpm in less than or equal to 10 seconds*. The generator voltage and frequency shall be ~ 3950 volts and ~ 4580 volts and 60 +/- 1.2 Hz within 13 seconds after the start signal. | ||
the vital bu* with permanently connected loada within 13 **cond*, energize* | *-:..... | ||
the | |||
*hutdown load* through the load **quencer and operate* for greater than or equal to 5 minute* while it* generator i* loaded with the shutdown load*. Th* *t*ady *tat* voltage and frequency of the vital bu* *hall be maintained at 3950 and S. 4580 volt* and 60 +/- 1.2 Hz during thi* t**t. 4. Verifying that on an ESF actuation te*t *ignal without leas of off*it* power the di***l generator | ELECTRICAL PQW1!jR SYSTEMS SURVBILLAHCZ REQUIREMENTS (Continued) 4.8.1.1.4 89port;1 - All di***l generator failur**, valid or non-valid, shall b* reported to the Commi11ion in a Special Report pur1uant to Specification 6.9.2 within JO day1. Report* of di***l generator failure* 1hall include the information recommended in R*gulatory Po1ition C.J.b of Requlatory Guide 1.108, Revi1ion 1, Auqu1t 1977. If the number of failure* in the la*t 100 valid te*t* (on a per nuclear unit ba*i*) i* greater than or equal to*1, the report *hall be *uppl...nted to include th* additional information recommended in Regulatory Po*ition c.J.b of Requlatory Guide 1.108, Revi*ion l, Auqust 1977. | ||
*tart* on th* auto-*tart aignal and operate* on *tandby for greater than or equal to 5 minutes*. | * Surveillance te*tinq 1hall be conducted in accordance with the manufacturer'* recCX11Dendation1 reqarding engine prelube, warm-up and l~a~ing (unl*** loading time* are 1pecif ied in the individual surveillance Requiremen~*>* | ||
Th* g*n*rator voltage and frequency | ** Tb~band i* . .ant a* quidance to preclude routine exceedance* of the di-..& 99nerator manufacturer'* de*ign rating*. Load* in exc*** of th~* | ||
*hall be 3950 and S. 4580 volts and 60 +/- 1.2 Hz within 13 seconde after the auto-start signal and shall be maintained within the** limit* during this test. 5. Deleted 6. Simulating a lo** of off*ite power in conjunction with an ESF -* actuation t**t *ignal, and | band for mpec:ial t**ting or momentary variation* du"* to changing bu* | ||
*ignal*, energize* | loadll 9ball not invalidate the t**t. | ||
th* vital bu* with permanently connected load* within *** 13 **cond*, energize* | *** Pailaee ef a ce1c pes luF1se111ance a.qu1s. .ene 4.1.1.1.a.d.i.~, fQllQIWLA9 peefaeeanae et luFl>'*illanae R*ll'!ie.-*ft45 4,a.1.1.a.d.7, d***~n*c *efifW*F* | ||
the auto-connected emergency (accident) load* through th* load **qu*ncer and operate* for greater than or oqual to 5 minute* while it* generator i* load9d with the emergency load*. Th* *t*ady *tat* voltage and frequency of the vital bu* *hall be maiot_a_ined at 3950 and S. 4580 volte and 60 +/- 1.2 Hz during thi* te*t. SALEK -UHIT 2 3/4 8-4 Amendment No. 126 | *ha* *he 34 heur ***e ef 4w8olalw2ada7 ~- repeabed1 Al an albernatt*** | ||
*. lU&.f.TRICAL POWER SYSTEMS SURVl:ILLAHCB REQUIREMENTS (Continued) c) Verifying that all noneaeential automatic dieael generator trip* (i.e., other than engine overnpeed, lube oil pr**oure low, 4 "KV Bu* differential and generator differential) are automatically bypa***d upon lo** of voltage on the vital bu* concurrent with a *afety injection actuation | *h~~BDG *h*lk ~*loaded co 3i00=3i00 kw ~os one hous, es une11 operag*R~ | ||
*ignal. 7. Verifying the di***l generator operate* for at lea*t 24 houra*. During the fir*t 2 hour* of thi* t**t, the di***l generator shall be loaded to 2760-2860 kw*** During the remaining 22 hour9--of thi* t**t, th* di***l generator | bemperaeur** ha9e 1eabilimed, peiel"::::~e eepeat.l~9 8uF11eill*~* ReEfW*F.,,*ng 4,9,1,1.2.d.61!91 SALEM - UNIT 1 3/4 8-Sa Amendment No. ~.!3 | ||
*hall be loaded to 2500-2600 kw*** The *t*ady *tat* voltage and frequency | |||
*hall be maintained at 3950 and s 4580 volt* and 60 +/- 1.2 Hz during thi* te*t. Within i minute& aftes Gca11pletin9 chi* 24-hous t**t, lpeoifigation 4.8.1.1.2.d.6.b.*** | NG Ja~s +o fit,'5 pq~e - | ||
: 8. Verifying that th* auto-connected load* to each di***l generator do not exceed the two hour rating of 2860 9. Verifying that with the di***l geperator operating in a te*t mode (connected to it* bu*), a *imulated | ELEc*;RICAL PQWER SYSTEMS | ||
*afety injection signal override* | :r:f1 -F-o 0 YI I y. | ||
the-t**t mode by (l) returning the di***l generator to *tandby operation and (2) automatically enerqizing th* emergency load* with off*it* power. ** At l*a*t once per 10 year* or after any modification* | SURVJ:ILLAHCB REQUIREMENTS (Continued) | ||
which could affect di***l generator interdependence by *tarting all di***l generators | : d. At lea*t onee per lS month* during shutdown by: | ||
*imultaneou*ly*, during *hutdown, and verifying that all diesel generator* | : 1. Subj*cting the di***l to an in*pection in accordance with procedures prepared in conjunction with it* manufacturer'* recommendations for thi* cl*** of *tandby **rvice, | ||
accelerate to at l*a*t 900 rpn in l*** than or equal to 10 **cond*. 4.8.1.1.3 Th* di***l fuel oil storage and transfer ey*tem shall be demon*trated OPBRABLB: | : 2. verifying that, on rejection of a load of greater than or equal to 820 kw, th* voltage and frequency ar* r**tored to ~ 3950 and s. 4580 volt* and 60 +/- 1.2 Hz within 4 **cond*. | ||
: a. At l*a*t once per 31 day* by: | : 3. Simulating a lo** of off*ite power by it*elf, ands a) Verifying de-energization of the vital bu* and load *hedding from the vital bu*. | ||
SALsH -UNIT 2 3/4 8-5 Amendment No. 126 | b) Verifying the die*el *tart* on the auto-*tart *ignal*, | ||
: f. | energize* the vital bu* with permanently connected loada within 13 **cond*, energize* the auto~connected *hutdown load* through the load **quencer and operate* for greater than or equal to 5 minute* while it* generator i* loaded with the shutdown load*. Th* *t*ady *tat* voltage and frequency of the vital bu* | ||
The generator voltage and frequency shall be 3950 volts and 5 4580 volts and 60 +/- 1.2 Hz within 13 seconds after the start signal . ..... . | *hall be maintained at ~ 3950 and S. 4580 volt* and 60 +/- 1.2 Hz during thi* t**t. | ||
: 4. Verifying that on an ESF actuation te*t *ignal without leas of off*it* power the di***l generator *tart* on th* auto-*tart aignal and operate* on *tandby for greater than or equal to 5 minutes*. | |||
Th* g*n*rator voltage and frequency *hall be ~ 3950 and S. 4580 volts and 60 +/- 1.2 Hz within 13 seconde after the auto-start signal and shall be maintained within the** limit* during this test. | |||
: 5. Deleted | |||
: 6. Simulating a lo** of off*ite power in conjunction with an ESF | |||
- | |||
* actuation t**t *ignal, and a) Verifying de-energization of the vital bu* and load shedding frcm the vital bu*. | |||
b) Verifying the di***l *tart* on the auto-*tart *ignal*, | |||
energize* th* vital bu* with permanently connected load* within *** | |||
13 **cond*, energize* the auto-connected emergency (accident) load* through th* load **qu*ncer and operate* for greater than or oqual to 5 minute* while it* generator i* load9d with the | |||
, . _,_ emergency load*. Th* *t*ady *tat* voltage and frequency of the vital bu* *hall be maiot_a_ined at ~ 3950 and S. 4580 volte and 60 +/- 1.2 Hz during thi* te*t. | |||
SALEK - UHIT 2 3/4 8-4 Amendment No. 126 | |||
*. | |||
lU&.f.TRICAL POWER SYSTEMS SURVl:ILLAHCB REQUIREMENTS (Continued) c) Verifying that all noneaeential automatic dieael generator trip* (i.e., other than engine overnpeed, lube oil pr**oure low, 4 "KV Bu* differential and generator differential) are automatically bypa***d upon lo** of voltage on the vital bu* | |||
concurrent with a *afety injection actuation *ignal. | |||
: 7. Verifying the di***l generator operate* for at lea*t 24 houra*. | |||
During the fir*t 2 hour* of thi* t**t, the di***l generator shall be loaded to 2760-2860 kw*** During the remaining 22 hour9--of thi* | |||
t**t, th* di***l generator *hall be loaded to 2500-2600 kw*** The | |||
*t*ady *tat* voltage and frequency *hall be maintained at ~ 3950 and s 4580 volt* and 60 +/- 1.2 Hz during thi* te*t. Within i minute& | |||
aftes Gca11pletin9 chi* 24-hous t**t, pe~folR9 lpeoifigation 4.8.1.1.2.d.6.b.*** | |||
: 8. Verifying that th* auto-connected load* to each di***l generator do not exceed the two hour rating of 2860 kw~ | |||
: 9. Verifying that with the di***l geperator operating in a te*t mode (connected to it* bu*), a *imulated *afety injection signal override* the- t**t mode by (l) returning the di***l generator to | |||
*tandby operation and (2) automatically enerqizing th* emergency load* with off*it* power. | |||
** At l*a*t once per 10 year* or after any modification* which could affect di***l generator interdependence by *tarting all di***l generators | |||
*imultaneou*ly*, during *hutdown, and verifying that all diesel generator* accelerate to at l*a*t 900 rpn in l*** than or equal to 10 **cond*. | |||
4.8.1.1.3 Th* di***l fuel oil storage and transfer ey*tem shall be demon*trated OPBRABLB: | |||
: a. At l*a*t once per 31 day* by: | |||
: 1. Verifying th* level in each of the above required 20,000 gallon fuel *torage tank*. | |||
: 2. Verifying that both fuel tran*f*r pump* can be *tarted and tran*f*r fuel from th* 20,000 gallon *torage tank* to the day tankm. | |||
: b. At l***t once per 92 day* by verifying that a *ample of diesel fuel frcm each of the above required 20,000 gallon fuel *torage tank* i* within th* acceptable limit* *pecif ied in Tlabl* 1 of AS~_p975-77 when checked for vi*co*ity, water and *ediment. | |||
SALsH - UNIT 2 3/4 8-5 Amendment No. 126 | |||
~ | |||
Insert 1 | |||
: f. At least once per 18 months, the | |||
~ | |||
follc/wing test shall be performed within 5 minutes of diesel~~utdown after the diesel has operated for at least oBe aour at 2500-2600 kw**: | |||
Verifying the diesel starts and accelerates to 900 rpm in less than or equal to 10 seconds*. The generator voltage and frequency shall be ~ 3950 volts and 5 4580 volts and 60 +/- 1.2 Hz within 13 seconds after the start signal . | |||
..... | |||
. -*~ | |||
* | * | ||
* e e ELECTRICAL POWER SYSTEMS SURVZILLANCX REQUIREMENTS (Continued) | * e e ELECTRICAL POWER SYSTEMS SURVZILLANCX REQUIREMENTS (Continued) | ||
* Surveillance te1ting *hall be conducted in accordance with the manufacturer'* | ********---*********************3*****2******a***~***********************2aaa2 4.8.1.1.4 | ||
recoanendation* | . | ||
reqarding engine prelube, warm-up and loading (unle11 loading time* are 1pecified in the individual | BeP9rt* - All diesel generator failures, valid or non-valid, ahall be reported to the cemmi11ion in a Special Report purauant to Specification 6.9.2 within 30 day1. Report* of di***l generator failure* 1hall in~lude the information recoanended in RequlAtory Po1ition C.3.b of Regulatory Guide 1.108, Revi1ion 1, Auqu1t 1977. If the number of failure* in the laat 100 valid te1t1 (on a per nuclear unit ba1i1) i1 greater than or equal to 7, the report *hall be 1upplmnented to include the additional information recommended in Regulatory Po1ition C.3.b of Requlatory Guide l.108, R*vi1.ion 1, .-. | ||
*surveillance Requirement*)* | Auqu1t 1977. | ||
** Thia band i* meant a1 guidance to preclude routine exceedance1 of the di ... l generator manufacturer'* | * Surveillance te1ting *hall be conducted in accordance with the manufacturer'* recoanendation* reqarding engine prelube, warm-up and loading (unle11 loading time* are 1pecified in the individual | ||
de1ign rating*. Load* in exc*** of thia band for 1pecial te1ting or momentary variation* | *surveillance Requirement*)* | ||
due to changing bua loade *hall not invalidate th* te1t. *** Pailwr* ef a **** per | ** Thia band i* meant a1 guidance to preclude routine exceedance1 of the di. . .l generator manufacturer'* de1ign rating*. Load* in exc*** of thia band for 1pecial te1ting or momentary variation* due to changing bua loade *hall not invalidate th* te1t. | ||
.. | *** Pailwr* ef a **** per Sur\~eillanee R*~ir. .*~ 4.1.1.1.~.~.&.b, fellewiRq perfeJRBaRe* ef Su!A"eillanee Re~irement 4.9.1.1.2.d.1, does. not reqnire. | ||
fellewiRq perfeJRBaRe* | ~ | ||
ef Su!A"eillanee 4.9.1.1.2.d.1, does. not reqnire. th** eh* 24 heur ee1e ef 4,9,1,1,2.*.1 r*pe***** | th** eh* 24 heur ee1e ef 4,9,1,1,2.*.1 ~* r*pe***** A* aft aleerftaei~e, ehe~BDG 1na1} ~. leaded sa 25QO 2&00 kw fer an* naur, er unsil gpe*a~iRq | ||
A* aft 1na1} leaded sa 25QO 2&00 kw fer an* naur, er unsil | *empe*a*u*** ha¥* **&aailiaed, pri~*e rep*a*in9 lurveill~~* R*~iEemeR~ | ||
*empe*a*u*** | £A '-'-'-~-~-h-SALEM - UHIT 2 3/4 8-6 Amendment No. 126}} | ||
ha¥* **&aailiaed, rep*a*in9 | |||
£A SALEM -UHIT 2 3/4 8-6 Amendment No. 126}} | |||
Revision as of 09:26, 21 October 2019
| ML18100B221 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 07/15/1994 |
| From: | Public Service Enterprise Group |
| To: | |
| Shared Package | |
| ML18100B220 | List: |
| References | |
| NUDOCS 9407260210 | |
| Download: ML18100B221 (8) | |
Text
f\)0 0k11f/A fa. -tl,0 fa[JG? -
ELICTBI¢AL PQWIR SY~
-r11 -fc; 0 /l ly.
SURVSILLANCB REQUIRBMBNTS (Continued)
- d. At l ...t once per 18 month* during *hutdown by:
- 1. Subjecting the die**l to an in*pection in accordance with procedures prepared in conjunction with it* manufacturer'* recoamendation* for thi* cl*** of *tandby **rvice,
- 2. Verifying that, on rejection of a load greater than or equal to
- a20 kw, the voltage and frequency are r**tored to~ 3950 and~ 4580 volt* and 60 +/- 1.2 Hz within 4 **cond*.
- 3. Simulating a lo** of off*ite power by it**lf, and:
a) Verifying de-energization of the vital bu* and load *bedding from the vital bu*.
b) Verifying the di***l *tart* on the auto-*tart *ignal*,
energize* the vital bue with ~,rmanently connect*d load* within 13 **cond*, energize* the auto-connected *hutdown load* through the load *equencer and operate* for greater than or equal to S minute* while it* g*nerator i* loaded with the *hutdown load*. The *t*ady *t*t* voltage and frequency of the vital bu*
- hall be maintained at ~ 3950 and ~ 4580 volt* and 60 +/- 1.2 Hz during thi* t**t.
- 4. Verifying that on an !SF actuation teat *ignal without lo***of off *ite power the di***l generator *tart* on th* auto-*tart *ignal and operate* on *tandby for greater than or equal to 5 minute***
The generator voltage and frequency *hall be ~ 3950 and s 4580 volts and 60 +/- 1.2 Hz within 13 **cond* after the auto-*tart signal and
- hall be maintained within the** limit* during thia t**t.
S. Not Uaed.
6: Simulating a lo** of off*ite power in conjunction with an ESP actuation teat *ignal, and:
.--.>. Verifying de-energization of the vital bu* and load *bedding
- ~*.iP. from the vital bua.
b) Verifying the di***l *tart* on the auto-atart *ignal*,
energize* the vital bu* with permanently connected loads within 13 *ec:onda, energize* the auto-connected emergency (accident) load* through the load **quencer and operate* for'greater than
- -""' or ~al to S minute* while it* generator i* loaded with the
..e~gency load*. Th* *~~~~Y *tat* voltage and frequency of the vital bu* *hall be maintained at~ 3950 and~ 458l>volt* and 60 +/- 1.2 Hz during thi* t**t.,
9407260210 940715 PDR ADOCK 05000272 p PDR SALEK - OHI'i' 1 3/4 8-4 Amendment No. 148
e e ELEC~RICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
2*********3****aa~a=*======2~~z==z======~=-~===ss***2==a*====z*=======
c) Verifying that all nonessential automatic diesel generator trip* (i.e., other than engine overapeed, lube oil preaaure low, 4 KV bua differential and generator differential), are automatically bypa***d upon lo** of voltage on the vital bua concurrent with a *afety injection actuation signal.
- 7. Verifying the die**l generator oper.&t** for at lea*t 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s*.
During the fir*t 2 hour* of thi* te*t, the di***l generat~~ shall be loaded t.o 2760-2860 kw.** Dur-inq th* nmaininq 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of thi*
te*t, the di***l generator *hall be loaded to 2500-2600 kw*** The
- t*ady *tat* voltage and frequency *hall be maintained at ~ 3950 and S 4580 volt* and 60 +/- 1.2 Hz during thi* te*t. Wi~hin S minueee aft*~ 8ompletin9 thi* ~4 heuE te*t, perfal'llll 8Yr9eillanee ReEftiiremeftt 4,a.1.1.2.d.&.aa
- 8. Verifying that the auto-connected load* to each die**l generator do not exceed the two hour rating of 2860 kw.
- 9. Verifying that with the di***l generator operating in a test mode (connected to ita bu*), a *imuleted *afety injection signal override* the t'"est mode br (1) returning th* di***l generator to standby operation and (2) automatically energizing the emergency load* with offaite power.
- e. At lea*t once per ten year* or after any modification* which could affect di***l generator interdependence by *tarting all di***l generators
- imultaneou*ly*, during shutdown, and verifying that all diesel generator* accelerate to at l*a*t 900 rpn in l*** than or equal to
-;r:-tJ ~ ERT 10 *econd*.
I 4.8.l.l.3 The die*el fuel oil storage and transfer sy*tem shall be demon*trated OPERABLE:
- a. At lea*t once per 31 day* by:
- l. Verifying th* level in each of the above required 20,000 gallon fuel *torage tank*.
- 2. Verifying that both fuel tran*f*r pwnp* c~ be *tarted and tran*f*r fuel from the 20,000 gallon *torage tank* to th* day tankm.
- b. At lea*t once per 92 day* by verifying that a *ample of diesel fuel from each of the above required 20,000 gallon fue~ atoraqe
, *.. _
tank* i* within th* acceptable limit* *pecified in.Table l of ASTH 0915-77 when checked for vi*co~ity, water and *ediment.
\
SALEM'-._ UNIT l 3/4 8-5 Amendment No. ~~3
Insert 1
- f. At least once per 18 months, the foll ing test shall be performed within 5 minutes of diesel hutdown after the diesel has operated for at least '*'~~*¥.I~ at 2500-2600 kw**:
Verifying the diesel starts and accelerates to 900 rpm in less than or equal to 10 seconds*. The generator voltage and frequency shall be ~ 3950 volts and ~ 4580 volts and 60 +/- 1.2 Hz within 13 seconds after the start signal.
- -:.....
ELECTRICAL PQW1!jR SYSTEMS SURVBILLAHCZ REQUIREMENTS (Continued) 4.8.1.1.4 89port;1 - All di***l generator failur**, valid or non-valid, shall b* reported to the Commi11ion in a Special Report pur1uant to Specification 6.9.2 within JO day1. Report* of di***l generator failure* 1hall include the information recommended in R*gulatory Po1ition C.J.b of Requlatory Guide 1.108, Revi1ion 1, Auqu1t 1977. If the number of failure* in the la*t 100 valid te*t* (on a per nuclear unit ba*i*) i* greater than or equal to*1, the report *hall be *uppl...nted to include th* additional information recommended in Regulatory Po*ition c.J.b of Requlatory Guide 1.108, Revi*ion l, Auqust 1977.
- Surveillance te*tinq 1hall be conducted in accordance with the manufacturer'* recCX11Dendation1 reqarding engine prelube, warm-up and l~a~ing (unl*** loading time* are 1pecif ied in the individual surveillance Requiremen~*>*
- Tb~band i* . .ant a* quidance to preclude routine exceedance* of the di-..& 99nerator manufacturer'* de*ign rating*. Load* in exc*** of th~*
band for mpec:ial t**ting or momentary variation* du"* to changing bu*
loadll 9ball not invalidate the t**t.
- Pailaee ef a ce1c pes luF1se111ance a.qu1s. .ene 4.1.1.1.a.d.i.~, fQllQIWLA9 peefaeeanae et luFl>'*illanae R*ll'!ie.-*ft45 4,a.1.1.a.d.7, d***~n*c *efifW*F*
- ha* *he 34 heur ***e ef 4w8olalw2ada7 ~- repeabed1 Al an albernatt***
- h~~BDG *h*lk ~*loaded co 3i00=3i00 kw ~os one hous, es une11 operag*R~
bemperaeur** ha9e 1eabilimed, peiel"::::~e eepeat.l~9 8uF11eill*~* ReEfW*F.,,*ng 4,9,1,1.2.d.61!91 SALEM - UNIT 1 3/4 8-Sa Amendment No. ~.!3
NG Ja~s +o fit,'5 pq~e -
ELEc*;RICAL PQWER SYSTEMS
- r:f1 -F-o 0 YI I y.
SURVJ:ILLAHCB REQUIREMENTS (Continued)
- d. At lea*t onee per lS month* during shutdown by:
- 1. Subj*cting the di***l to an in*pection in accordance with procedures prepared in conjunction with it* manufacturer'* recommendations for thi* cl*** of *tandby **rvice,
- 2. verifying that, on rejection of a load of greater than or equal to 820 kw, th* voltage and frequency ar* r**tored to ~ 3950 and s. 4580 volt* and 60 +/- 1.2 Hz within 4 **cond*.
- 3. Simulating a lo** of off*ite power by it*elf, ands a) Verifying de-energization of the vital bu* and load *hedding from the vital bu*.
b) Verifying the die*el *tart* on the auto-*tart *ignal*,
energize* the vital bu* with permanently connected loada within 13 **cond*, energize* the auto~connected *hutdown load* through the load **quencer and operate* for greater than or equal to 5 minute* while it* generator i* loaded with the shutdown load*. Th* *t*ady *tat* voltage and frequency of the vital bu*
- hall be maintained at ~ 3950 and S. 4580 volt* and 60 +/- 1.2 Hz during thi* t**t.
- 4. Verifying that on an ESF actuation te*t *ignal without leas of off*it* power the di***l generator *tart* on th* auto-*tart aignal and operate* on *tandby for greater than or equal to 5 minutes*.
Th* g*n*rator voltage and frequency *hall be ~ 3950 and S. 4580 volts and 60 +/- 1.2 Hz within 13 seconde after the auto-start signal and shall be maintained within the** limit* during this test.
- 5. Deleted
- 6. Simulating a lo** of off*ite power in conjunction with an ESF
-
- actuation t**t *ignal, and a) Verifying de-energization of the vital bu* and load shedding frcm the vital bu*.
b) Verifying the di***l *tart* on the auto-*tart *ignal*,
energize* th* vital bu* with permanently connected load* within ***
13 **cond*, energize* the auto-connected emergency (accident) load* through th* load **qu*ncer and operate* for greater than or oqual to 5 minute* while it* generator i* load9d with the
, . _,_ emergency load*. Th* *t*ady *tat* voltage and frequency of the vital bu* *hall be maiot_a_ined at ~ 3950 and S. 4580 volte and 60 +/- 1.2 Hz during thi* te*t.
SALEK - UHIT 2 3/4 8-4 Amendment No. 126
- .
lU&.f.TRICAL POWER SYSTEMS SURVl:ILLAHCB REQUIREMENTS (Continued) c) Verifying that all noneaeential automatic dieael generator trip* (i.e., other than engine overnpeed, lube oil pr**oure low, 4 "KV Bu* differential and generator differential) are automatically bypa***d upon lo** of voltage on the vital bu*
concurrent with a *afety injection actuation *ignal.
- 7. Verifying the di***l generator operate* for at lea*t 24 houra*.
During the fir*t 2 hour* of thi* t**t, the di***l generator shall be loaded to 2760-2860 kw*** During the remaining 22 hour9--of thi*
t**t, th* di***l generator *hall be loaded to 2500-2600 kw*** The
- t*ady *tat* voltage and frequency *hall be maintained at ~ 3950 and s 4580 volt* and 60 +/- 1.2 Hz during thi* te*t. Within i minute&
aftes Gca11pletin9 chi* 24-hous t**t, pe~folR9 lpeoifigation 4.8.1.1.2.d.6.b.***
- 8. Verifying that th* auto-connected load* to each di***l generator do not exceed the two hour rating of 2860 kw~
- 9. Verifying that with the di***l geperator operating in a te*t mode (connected to it* bu*), a *imulated *afety injection signal override* the- t**t mode by (l) returning the di***l generator to
- tandby operation and (2) automatically enerqizing th* emergency load* with off*it* power.
- At l*a*t once per 10 year* or after any modification* which could affect di***l generator interdependence by *tarting all di***l generators
- imultaneou*ly*, during *hutdown, and verifying that all diesel generator* accelerate to at l*a*t 900 rpn in l*** than or equal to 10 **cond*.
4.8.1.1.3 Th* di***l fuel oil storage and transfer ey*tem shall be demon*trated OPBRABLB:
- a. At l*a*t once per 31 day* by:
- 1. Verifying th* level in each of the above required 20,000 gallon fuel *torage tank*.
- 2. Verifying that both fuel tran*f*r pump* can be *tarted and tran*f*r fuel from th* 20,000 gallon *torage tank* to the day tankm.
- b. At l***t once per 92 day* by verifying that a *ample of diesel fuel frcm each of the above required 20,000 gallon fuel *torage tank* i* within th* acceptable limit* *pecif ied in Tlabl* 1 of AS~_p975-77 when checked for vi*co*ity, water and *ediment.
SALsH - UNIT 2 3/4 8-5 Amendment No. 126
~
Insert 1
- f. At least once per 18 months, the
~
follc/wing test shall be performed within 5 minutes of diesel~~utdown after the diesel has operated for at least oBe aour at 2500-2600 kw**:
Verifying the diesel starts and accelerates to 900 rpm in less than or equal to 10 seconds*. The generator voltage and frequency shall be ~ 3950 volts and 5 4580 volts and 60 +/- 1.2 Hz within 13 seconds after the start signal .
.....
. -*~
- e e ELECTRICAL POWER SYSTEMS SURVZILLANCX REQUIREMENTS (Continued)
- ---*********************3*****2******a***~***********************2aaa2 4.8.1.1.4
.
BeP9rt* - All diesel generator failures, valid or non-valid, ahall be reported to the cemmi11ion in a Special Report purauant to Specification 6.9.2 within 30 day1. Report* of di***l generator failure* 1hall in~lude the information recoanended in RequlAtory Po1ition C.3.b of Regulatory Guide 1.108, Revi1ion 1, Auqu1t 1977. If the number of failure* in the laat 100 valid te1t1 (on a per nuclear unit ba1i1) i1 greater than or equal to 7, the report *hall be 1upplmnented to include the additional information recommended in Regulatory Po1ition C.3.b of Requlatory Guide l.108, R*vi1.ion 1, .-.
Auqu1t 1977.
- Surveillance te1ting *hall be conducted in accordance with the manufacturer'* recoanendation* reqarding engine prelube, warm-up and loading (unle11 loading time* are 1pecified in the individual
- surveillance Requirement*)*
- Thia band i* meant a1 guidance to preclude routine exceedance1 of the di. . .l generator manufacturer'* de1ign rating*. Load* in exc*** of thia band for 1pecial te1ting or momentary variation* due to changing bua loade *hall not invalidate th* te1t.
- Pailwr* ef a **** per Sur\~eillanee R*~ir. .*~ 4.1.1.1.~.~.&.b, fellewiRq perfeJRBaRe* ef Su!A"eillanee Re~irement 4.9.1.1.2.d.1, does. not reqnire.
~
th** eh* 24 heur ee1e ef 4,9,1,1,2.*.1 ~* r*pe***** A* aft aleerftaei~e, ehe~BDG 1na1} ~. leaded sa 25QO 2&00 kw fer an* naur, er unsil gpe*a~iRq
- empe*a*u*** ha¥* **&aailiaed, pri~*e rep*a*in9 lurveill~~* R*~iEemeR~