ML062970060: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 05/18/2006
| issue date = 05/18/2006
| title = Yankee Nuclear Power Station - Generic ALARA Evaluation Comparison Worksheet
| title = Yankee Nuclear Power Station - Generic ALARA Evaluation Comparison Worksheet
| author name = Smith D C
| author name = Smith D
| author affiliation = Yankee Atomic Electric Co
| author affiliation = Yankee Atomic Electric Co
| addressee name =  
| addressee name =  
Line 20: Line 20:
X Generic ALARA AL I$ satisfied. Generic ALARA AL IS NOT satisfied.
X Generic ALARA AL I$ satisfied. Generic ALARA AL IS NOT satisfied.
I Reviewed by:% & 0 , / Date: d-LkhA -I ' ~ PSS krojectdGlanager DPF-8867.1 Rev. 2 Page 1 of 1 Generic ALARA Evaluation Comparison Worksheet Survey Area: NOL-05 Survey Unit:
I Reviewed by:% & 0 , / Date: d-LkhA -I ' ~ PSS krojectdGlanager DPF-8867.1 Rev. 2 Page 1 of 1 Generic ALARA Evaluation Comparison Worksheet Survey Area: NOL-05 Survey Unit:
02 Reference Generic ALARA Evaluation No.: YA-REPT-00-003-05 Applicable Generic ALARA AL: 165 Radionuclide Average Concentration DCGL fraction DCGL  
02 Reference Generic ALARA Evaluation No.: YA-REPT-00-003-05 Applicable Generic ALARA AL: 165 Radionuclide Average Concentration DCGL fraction DCGL
: 3. 4. C(fraction DCGL) = _-0.19 ___ If the C(fraction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit. Check one:
: 3. 4. C(fraction DCGL) = _-0.19 ___ If the C(fraction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit. Check one:
X Generic ALARA AL IS satisfied. Generic ALARA AL IS NOT satisfied, Prepared by: Date: /!.A/ \ Reviewed by: &fiC h,~mm Date: 1. ,/!!;/OJ/
X Generic ALARA AL IS satisfied. Generic ALARA AL IS NOT satisfied, Prepared by: Date: /!.A/ \ Reviewed by: &fiC h,~mm Date: 1. ,/!!;/OJ/

Revision as of 10:58, 13 July 2019

Yankee Nuclear Power Station - Generic ALARA Evaluation Comparison Worksheet
ML062970060
Person / Time
Site: Yankee Rowe
Issue date: 05/18/2006
From: Danni Smith
Yankee Atomic Electric Co
To:
NRC/FSME
References
YA-REPT-00-003-05
Download: ML062970060 (3)


Text

Generic ALARA Evaluation Comparison Worksheet Survey Area: NOL-05 Surveyunit:

01 Reference Generic ALARA Evaluation No.: YA-REPT-00-003-05 Applicable Generic ALARA AL: 165 ---- - Radionuclide Average Concentration DCGL fraction DCGL Co-60 0.04 1.4 0.03 CS-137 0.11 -- 3 .O 0.04 0.016 2 -5 0.00 b 4. X(fraction DCGL) = 0.076 If the C(fraction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit. Check one:

X Generic ALARA AL I$ satisfied. Generic ALARA AL IS NOT satisfied.

I Reviewed by:% & 0 , / Date: d-LkhA -I ' ~ PSS krojectdGlanager DPF-8867.1 Rev. 2 Page 1 of 1 Generic ALARA Evaluation Comparison Worksheet Survey Area: NOL-05 Survey Unit:

02 Reference Generic ALARA Evaluation No.: YA-REPT-00-003-05 Applicable Generic ALARA AL: 165 Radionuclide Average Concentration DCGL fraction DCGL

3. 4. C(fraction DCGL) = _-0.19 ___ If the C(fraction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit. Check one:

X Generic ALARA AL IS satisfied. Generic ALARA AL IS NOT satisfied, Prepared by: Date: /!.A/ \ Reviewed by: &fiC h,~mm Date: 1. ,/!!;/OJ/

DPF-8867.

I Rev. 2 Page 1 of 1 ALARA Analysis Worksheet 1 1. Decision Criteria: If the sum of the DCGL fractions

< AL, then additional remediation is not cost beneficial.

If the sum of the fractions

> AL, then additional remediation is cost beneficial. Check one: Additional remediation IS NOT cost beneficial Additional remediation IS cost beneficial - Prepared by:

.( - Date: !Ah-- FSS Radiological Engineer

+OK b. 3h-L LYFf u - Independent Review by:

r&LC&2L Date: ,&/;A, 5y FSS Project Man&er/ Radiat'on Protection Manager DPF-8867.2 Rev. 2 Page 3 of 3