ML062970060
| ML062970060 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 05/18/2006 |
| From: | Danni Smith Yankee Atomic Electric Co |
| To: | NRC/FSME |
| References | |
| YA-REPT-00-003-05 | |
| Download: ML062970060 (3) | |
Text
Generic ALARA Evaluation Comparison Worksheet Survey Area:
NOL-05 Surveyunit:
01 Reference Generic ALARA Evaluation No.:
YA-REPT-00-003-05 Applicable Generic ALARA AL:
165 Radionuclide Average Concentration DCGL fraction DCGL Co-60 0.04 1.4 0.03 CS-137 0.11 3.O 0.04 0.016 2 -5 0. 0 0 b
- 4.
X(fraction DCGL) =
0.076 If the C(fraction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit.
Check one:
X Generic ALARA AL I$ satisfied.
Generic ALARA AL IS NOT satisfied.
I Reviewed by:%
& 0
/
Date: d-LkhA
-I '
~
PSS krojectdGlanager DPF-8867.1 Rev. 2 Page 1 of 1
Generic ALARA Evaluation Comparison Worksheet Survey Area:
NOL-05 Survey Unit:
02 Reference Generic ALARA Evaluation No.:
YA-REPT-00-003-05 Applicable Generic ALARA AL:
165 Radionuclide Average Concentration DCGL fraction DCGL
- 3.
- 4.
C(fraction DCGL) = _-0.19 If the C(fraction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit.
Check one:
X Generic ALARA AL IS satisfied.
Generic ALARA AL IS NOT satisfied, Prepared by:
Date: /!.A/
\\
Reviewed by:
&fiC h, ~ m m Date: 1.
,/!!;/OJ/
DPF-8867. I Rev. 2 Page 1 of 1
ALARA Analysis Worksheet 1 1. Decision Criteria:
If the sum of the DCGL fractions < AL, then additional remediation is not cost beneficial. If the sum of the fractions > AL, then additional remediation is cost beneficial.
Check one:
Additional remediation IS NOT cost beneficial Additional remediation IS cost beneficial -
Prepared by:.( -
Date: !Ah--
FSS Radiological Engineer
+OK b.
3 h - L L Y F f u
Independent Review by:
r&LC&2L Date:,&/;A, 5y FSS Project Man&er/ Radiat'on Protection Manager DPF-8867.2 Rev. 2 Page 3 of 3