|
|
Line 3: |
Line 3: |
| | issue date = 10/01/2010 | | | issue date = 10/01/2010 |
| | title = Notification Letter Designating Balance of Plant Systems within the Cyber Security Rule Scope | | | title = Notification Letter Designating Balance of Plant Systems within the Cyber Security Rule Scope |
| | author name = Krich R M | | | author name = Krich R |
| | author affiliation = Tennessee Valley Authority | | | author affiliation = Tennessee Valley Authority |
| | addressee name = | | | addressee name = |
|
---|
Category:Letter
MONTHYEARML24289A1232024-10-24024 October 2024 Letter to James Barstow Re Environmental Scoping Summary Report for Browns Ferry CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20243012024-10-17017 October 2024 Operator Licensing Examination Approval 05000390/2024301 and 05000391/2024301 ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 CNL-24-077, Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 12024-10-0909 October 2024 Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24261C0062024-10-0404 October 2024 Correction to Amendment No. 134 to Facility Operating License No. NPF-90 and Amendment No. 38 to Facility Operating License No. NPF-96 ML24270A2162024-09-27027 September 2024 Notice of Intentions Regarding Preliminary Finding from NRC Inspection Report 05000260/2024090, EA-24-075 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 05000328/LER-2024-001, Reactor Trip Due to an Electrical Trouble Turbine Trip2024-09-25025 September 2024 Reactor Trip Due to an Electrical Trouble Turbine Trip CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A1502024-09-24024 September 2024 Requalification Program Inspection - Browns Ferry Nuclear Plant CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24263A2952024-09-19019 September 2024 Site Emergency Plan Implementing Procedure Revision ML24267A0402024-09-19019 September 2024 Cycle 27 Core Operating Limits Report Revision 0 ML24185A1742024-09-18018 September 2024 Cover Letter - Issuance of Exemption Related to Non-Destructive Examination Compliance Regarding Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 CNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024 Cycle 16 Reload Analysis Report ML24255A8862024-09-10010 September 2024 Core Operating Limits Report for Cycle 16 Operation, Revision 0 ML24253A0152024-09-0808 September 2024 Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation ML24239A3332024-09-0303 September 2024 Full Audit Plan IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter ML24247A2212024-08-29029 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24225A1682024-08-16016 August 2024 – Notification of Inspection and Request ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 ML24219A0272024-08-0606 August 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter ML24183A4142024-07-10010 July 2024 – License Renewal Regulatory Limited Scope Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-SLE-0000) (Docket Numbers: 50-259, 50-260, and 50-296) 2024-09-08
[Table view] |
Text
Tennessee Valley Authority 1101 Market Street, LP 3R Chattanooga, Tennessee 37402-2801 R. M. Krich Vice President Nuclear Licensing October 1, 2010 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 Watts Bar Nuclear Plant, Unit 1 Facility Operating License No. NPF-90 NRC Docket No. 50-390 Watts Bar Nuclear Plant, Unit 2 Construction Permit No. CPPR-92 NRC Docket No. 50-391
Subject:
Notification Letter Designating Balance of Plant Systems within the Cyber Security Rule Scope
References:
(1) Letter from the North American Electrical Reliability Corporation to the Tennessee Valley Authority, "Request for Data or Information:
Nuclear Power Plant 'Bright-Line' Survey," dated June 15, 2010 (2) Letter from the North American Electrical Reliability Corporation to Richard
Dearman,
Tennessee Valley Authority, "NERC's Response to the Completed Bright Line Survey," dated August 31, 2010 printed on recycled paper U.S. Nuclear Regulatory Commission Page 2 October 1, 2010 By Order dated March 19, 20091, the Federal Energy Regulatory Commission (FERC)clarified that the "balance of plant" equipment within a nuclear power plant is subject to compliance with the FERC approved Critical Infrastructure Protection (CIP) Reliability Standards.
Paragraph 50 of the Order provides for an exception from the CIP Reliability Standards for equipment in the balance of plant that is subject to the NRC cyber security regulations.
Pursuant to paragraph 50 of the Order, the North American Electric Reliability Corporation (NERC) has been engaging in a "Bright-Line" determination process (Reference
- 1) to clarify the systems that would be subject to the NRC cyber security rule (10 CFR 73.54), and those that would be subject to the CIP Reliability Standards.
In the Reference 2 letter, NERC is requiring that Tennessee Valley Authority (TVA)provide the NRC with a letter identifying all balance of plant Systems, Structures, and Components (SSCs) considered important to safety with respect to the NRC's cyber security regulation.
As documented in our response to the Bright Line survey, the balance of plant SSCs in Attachment 1 of the Survey are important to safety, and thus, are within the scope of 10 CFR 73.54.In accordance with the requirements of 10 CFR 73.54 (b)(1), a comprehensive identification of SSCs subject to the requirements of 10 CFR 73.54 will be developed during the implementation of the cyber security program. The program is implemented in accordance with the schedule submitted to the NRC by three letters dated July 23, 2010 from TVA for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants that include transmittal of the latest updated Cyber Security Plans. This identification of SSCs will be available for inspection upon completion and will contain those SSCs as identified in Attachment 1 of the Bright-Line Survey. Providing the requested information in this alternate matter satisfies the intent of the NERC letter.In the Reference letters, NERC is also requiring that each nuclear power plant submit a revised cyber security plan to the NRC for its review and approval.
On or before November 30, 2010, TVA will supplement our Cyber Security Plan to clarify the scope of systems described in Section 2.1, "Scope and Purpose." Section 2.1 will be amended to clarify the balance of plant SSCs that will be included in the scope of the cyber security program.Mandatory Reliability Standards for Critical Infrastructure Protection, order on clarification, Order No. 706-B, 126 FERC paragraph 61,229 (2009).
U.S. Nuclear Regulatory Commission Page 3 October 1, 2010 TVA received Reference 2 on September 1, 2010. Accordingly, this letter is due to NRC on October 1, 2010.The enclosure to this letter lists the regulatory commitment made by this letter. Should you have any questions concerning this letter, or require additional information, please contact Rob Brown at (423) 751-7228.Respectfuly R. M. Krich
Enclosure:
Commitment List cc (Enclosure):
NRC Director, Office of Nuclear Reactor Regulation NRC Director, Office of Nuclear Security and Incident Response NRC Regional Administrator
-Region II NRC Senior Resident Inspector
-Browns Ferry Nuclear Plant NRC Senior Resident Inspector
-Sequoyah Nuclear Plant NRC Senior Resident Inspector
-Watts Bar Nuclear Plant, Unit 1 NRC Senior Resident Inspector
-Watts Bar Nuclear Plant, Unit 2 NERC, Michael Moon, Director of Compliance Operations NERC, Jim Hughes, Compliance and Certification Auditor Enclosure Commitment List On or before November 30, 2010, the Tennessee Valley Authority will supplement our Cyber Security.
Plans to clarify the scope of systems described in Section 2.1,"Scope and Purpose." Section 2.1, will be amended to clarify the balance of plant SSCs that will be included in the scope of the cyber security program.E1-1