Line 3: |
Line 3: |
| | issue date = 11/04/1976 | | | issue date = 11/04/1976 |
| | title = Letter Submitting Reportable Occurrence Number 050-249/1976-23 in Accordance with Technical Specifications, Section 6.6.B | | | title = Letter Submitting Reportable Occurrence Number 050-249/1976-23 in Accordance with Technical Specifications, Section 6.6.B |
| | author name = Stephenson B B | | | author name = Stephenson B |
| | author affiliation = Commonwealth Edison Co | | | author affiliation = Commonwealth Edison Co |
| | addressee name = Keppler J G | | | addressee name = Keppler J |
| | addressee affiliation = NRC/RGN-III | | | addressee affiliation = NRC/RGN-III |
| | docket = 05000237, 05000249 | | | docket = 05000237, 05000249 |
Line 14: |
Line 14: |
| | page count = 3 | | | page count = 3 |
| }} | | }} |
| See also: [[followed by::IR 05000249/2019076]] | | See also: [[see also::IR 05000249/2019076]] |
|
| |
|
| =Text= | | =Text= |
|
---|
Category:Letter
MONTHYEARML24303A0712024-11-0404 November 2024 Letter to K. Meshigaud, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0692024-11-0101 November 2024 Letter to J.A. Crawford, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0302024-11-0101 November 2024 Letter to D.G. Lankford, Chief Request to Initiate Section 106 Consultation for SLR of DNP Station RS-24-104, Nuclear Radiological Emergency Plan Document Revision2024-11-0101 November 2024 Nuclear Radiological Emergency Plan Document Revision ML24303A0492024-11-0101 November 2024 Letter G. Kakkak, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0552024-11-0101 November 2024 Letter to J. Keys, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station IR 05000237/20254012024-11-0101 November 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000237/2025401 05000249/2025401 ML24303A1462024-11-0101 November 2024 Letter to W. Gravelle, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0992024-11-0101 November 2024 Lett to R. Carter, Principal Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0242024-11-0101 November 2024 Letter to D. Kaskaske, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1422024-11-0101 November 2024 Letter to V. Jefferson, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24291A0252024-11-0101 November 2024 Letter to R. Blanchard Tribal Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0272024-11-0101 November 2024 Letter to D. Rios, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0532024-11-0101 November 2024 Letter to J. Greendeer, President Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0432024-11-0101 November 2024 Letter to E. Elizondo, Sr. Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0512024-11-0101 November 2024 Letter to J. Barrett, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0472024-11-0101 November 2024 Letter to G. Cheatham, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0892024-11-0101 November 2024 Letter to M. J. Wesaw, Chair Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0152024-11-0101 November 2024 Letter to C. Harper, Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1442024-11-0101 November 2024 Letter to V. Kitcheyna, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1342024-11-0101 November 2024 Letter to T. Carnes, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1102024-11-0101 November 2024 Letter to R. Gasco, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0132024-11-0101 November 2024 Letter to B. Barnes, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0202024-11-0101 November 2024 Letter to C. Chavers, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0172024-11-0101 November 2024 Letter to B. Peters, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0642024-11-0101 November 2024 Letter to J. Rupnick, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1352024-11-0101 November 2024 Letter to T. Rhodd, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1172024-11-0101 November 2024 Letter to R. Yob, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0602024-11-0101 November 2024 Letter to J. R. Shotton, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24291A0202024-10-31031 October 2024 NRC Letter to J. Loichinger Achp Request for Comments Concerning the Environmental Review of DNPS Units 2 and 3 Subsequent License Renewal Application ML24291A0272024-10-31031 October 2024 NRC Letter to C. Mayer Illinois SHPO Request to Initiate Section 106 Consultation for Subsequent License Renewal of Units 2 and 3 IR 05000237/20240032024-10-29029 October 2024 Integrated Inspection Report 05000237/2024003 and 05000249/2024003 RS-24-102, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-5912024-10-21021 October 2024 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-591 RS-24-103, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-10-21021 October 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24225A2132024-09-26026 September 2024 Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval ML24253A0942024-09-23023 September 2024 License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID L-2024-Sle-0002) (Docket Numbers: 50-237 and 50-249) SVPLTR 24-0030, ISFSI Annual Effluent Release Report2024-09-20020 September 2024 ISFSI Annual Effluent Release Report ML24270A0332024-09-20020 September 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report IR 05000237/20244022024-09-19019 September 2024 – Security Baseline Inspection Report 05000237/2024402 and 05000249/2024402 - (Public) ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2152024-09-16016 September 2024 Confirmation of Initial License Examination ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24215A2912024-08-14014 August 2024 Request for Withholding Information from Public Disclosure Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations IR 05000237/20240022024-08-14014 August 2024 Integrated Inspection Report 05000237/2024002 and 05000249/2024002 IR 05000237/20240102024-08-0909 August 2024 NRC Age-Related Degradation Inspection Report 05000237/2024010 and 05000249/2024010 2024-09-06
[Table view] Category:Licensee 30-Day Written Event Report
MONTHYEARRS-11-124, Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 30-Day Report for Fuel Type GE142011-07-28028 July 2011 Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 30-Day Report for Fuel Type GE14 SVPLTR 09-0044, Day Response on Inadvertent Control Rod Withdrawal2009-09-21021 September 2009 Day Response on Inadvertent Control Rod Withdrawal SVPLTR 09-0027, Written Follow Up Report on Release of Radionuclide2009-07-0606 July 2009 Written Follow Up Report on Release of Radionuclide RS-08-073, Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 30-Day Report for Fuel Type SVEA-96 Optima22008-05-23023 May 2008 Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 30-Day Report for Fuel Type SVEA-96 Optima2 ML0216407762002-06-0707 June 2002 Offsite Dose Calculation Manual (OCDM) Required Action Not Met During Units 2/3 Main Chimney Particulate, Iodine, and Noble Gas Sampling System Inoperability ML17252A3201977-11-23023 November 1977 LER 77-047/03L-0 for Dresden Unit 3 Regarding During Normal Unit 3 Operation, Surveillance Program Review Revealed Violation of T.S.1.0.CC.b Maximum Combined Interval Time by 3.5 Days for HPCI Monthly Valve and Pump Operability ML17252A2881977-05-0303 May 1977 Transmittal of Reportable Occurrence Report No. 50-249/1977-8 ML17252A2911977-04-22022 April 1977 License Event Report - Rod Withdrawal at Approx. 44% Power, Discovered Rod Block Monitor Channels 7 and 8 Automatically Bypassed ML17252A2901977-04-21021 April 1977 Transmittal of Reportable Occurrence Report No. 50-249/1977-10 ML17252A2711977-04-21021 April 1977 Transmittal of Reportable Occurrence Report No. 50-249/1977-9 ML17252A2721977-04-20020 April 1977 Transmittal of Reportable Occurrence Report No. 50-249/1977-7 ML17252A2751977-03-23023 March 1977 Transmittal of Reportable Occurrence Report No. 50-249/1977-4 ML17252A2821977-03-0202 March 1977 Transmittal of Reportable Occurrence Report No. 50-249/1977-4 ML17252A2581977-01-20020 January 1977 Transmittal of Reportable Occurrence Report No. 50-249/1976-36 ML17252A2701976-12-0202 December 1976 Transmittal of Reportable Occurrence Report No. 50-249/1976-34 IR 05000249/20190761976-12-0202 December 1976 Transmittal of Reportable Occurrence Report No. 50-249/1976-34 ML17252A2461976-11-0404 November 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-23 in Accordance with Technical Specifications, Section 6.6.B ML17252A2451976-11-0404 November 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-25 in Accordance with Technical Specifications, Section 6.6.B ML17252A2391976-10-22022 October 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-20 in Accordance with Technical Specifications, Section 6.6.B ML17252A2411976-10-21021 October 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-18 in Accordance with Technical Specifications, Section 6.6.B ML17252A2401976-10-21021 October 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-19 in Accordance with Technical Specifications, Section 6.6.B ML17252A2231976-10-12012 October 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-15 in Accordance with Technical Specifications, Section 6.6.B ML17252A2261976-09-30030 September 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-17 in Accordance with Technical Specifications, Section 6.6.B ML17252A2361976-07-0101 July 1976 Transmittal of Reportable Occurrence Report No. 50-249/1976-1 ML17252A2101976-02-0505 February 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-3 in Accordance with Technical Specifications, Section 6.6.B IR 05000249/19750361975-09-0202 September 1975 Report of Abnormal Occurrence 50-249/75-36 Per Section 6.6.A of the Technical Specifications Re Reactor High Pressure Sensor Setpoint Drift ML17252A1761975-09-0202 September 1975 Report of Abnormal Occurrence 50-249/75-36 Per Section 6.6.A of the Technical Specifications Re Reactor High Pressure Sensor Setpoint Drift ML17252A1711975-08-15015 August 1975 Report of A.O. Per Section 6.6.A of the Technical Specifications Isolation Condenser High Flow Sensor Setpoint Drift IR 05000249/19750321975-07-31031 July 1975 Report of Abnormal Occurrence 50-249/75-32 Per Section 6.6.A of the Technical Specifications Failure of Restrainer Clamp Bolt Keeper on Jet Pumps ML17252A1741975-07-31031 July 1975 Report of Abnormal Occurrence 50-249/75-32 Per Section 6.6.A of the Technical Specifications Failure of Restrainer Clamp Bolt Keeper on Jet Pumps ML17252A4471975-07-0303 July 1975 Report of Abnormal Occurrence 50-249/75-31 for Dresden, Unit 3, Regarding Cracks in Control Rod Drive Collet Housings IR 05000249/19750311975-07-0303 July 1975 Report of Abnormal Occurrence 50-249/75-31 for Dresden, Unit 3, Regarding Cracks in Control Rod Drive Collet Housings ML17252A7861975-03-27027 March 1975 Report of Abnormal Occurrence Per Section 6.6.a of the Technical Specification - Exceeding Set-point on Main Stream Line Hi Hi Rad ML17252A8271975-02-14014 February 1975 Report of Abnormal Occurrence Per Section 6.6.A of the Technical Specification - Reactor Feed Pump 3C Pump Casting Vent Line Weld Leak ML17252A8361975-01-14014 January 1975 Report of 4 Inch Recirculation Bypass Line Inspection 2011-07-28
[Table view] |
See also: IR 05000249/2019076
Text
.**. Comrnonv.h
Edison * Dresde,1 Nuclear Power Station R.R. #i Morris, Illinois 60450 Telephone
815/942-2920
BBS Ltr. #76-775 November 4, 1976 Mr. James Keppler, Regional Director Directorate
of
Operations
-.Region III U. S. Nuclear Regulatory
Commission
799 Roosevelt
Road Glen Ellyn, Illinois 60137 Enclosed please find Reportable
Occurrence
report number 50-249/1976-23.
This report is being submitted
to your office in accordance
with the Dresden Nuclear
Station Techriical
Section 6.6.B. A n n . : . *1Y) _/) .. * -I-. .. . B. Stephensori
- tation Superintendent. . Dresden Nuclear Power Station BBS :jo Enclosure
cc: Director of Inspection
& *Enforcement . Direct'or
of Management
Information
& Program Control File/NRC
. LICENSEE EVd\JT REPOR. *. -. . * .. ' CONTROL BLOCK: I ' I *.1 1. I I (PLEASE PRll'JT ALL REQUIRED INFORMATION)
' 1 6 .* '*. LICENSEE * < NAME .@El I I I L. ID IR I s 13 I 7 8 9 ' 14 CATEGORY REPORT TYPE. LICENSE NUMBER 10101-10101010101-10101
15 25 REPORT SOURCE OOCl\ET NUM6ER * LICENSE TYPE 1!1111111111
26 ' 30 EVENT TYPE 10131 '31 ' 32' EVENT* DATE REPORT DATE lof1 I coN1 I I I 7 8 57 58' llJ 59 LLl 60
61 68 11 IOIOl?l71(,l
.*II II 1014171(, L 69 74 75 80 EVENT DESCRIPTION . (filg].lD!JRtAJ.G-
REFUELING-
OUTAGE LDC.AL l.t:Ak-:-RATE
TESTING; *LPC/ PRtrnARV I 7* 8' 9 . ' 80. lol31 ltSO.L..ATION'.
CA*IE:CI<
VfU;V* 3-!S-O/-J.5&
£XHtBtT£.D
A l...EAr<AC-£
RAT£. ... U!J' I, 7 Ei' 9 ' . ,. ' ' ' ' 80 IEXC£$$'0F
/HT:; T£CH SP£.C. /_JM/{ OF
SC'l="H. TH*
VAL.VE: I 7 8 9 ' ' ' ' ' ' 80 10'51 lusED VO f6R<YYI THE. 4'?'-Psf(:;
DECAY 7EST BouJVDl1R..Y
.. fYlANuALf
7 8 9 i ' ' ' ' ' ' ' " 80 lolsl I VAt..VE'.'
3-15°0! -:Y,,B J 1-lfJD A $ IGNI FICA NT WATER HC/IJ) PR£s£NTj CONSEQLJOJT1..y,, I 7 8 9. * . . . PRIME * . (5,£* /IT!FICHEV
-<;;ft£GT)
80 . * SYSTEM CAUSE COMPONENT
COMPON!:NT
-. . CODE CODE * COMPONENT
CODE SUPPLIER MANUFACTURER
VIOLATION
@0 ISIFLlsJ 1v1AIL1v1£1x1
lt!J
L'Ll 7 8 9 10 ' 11 12 17 ' 43 44 4 7 48 . CAUSE DES.CA!PTION l::TJ1£ VA/..-1/E
f:fll L-UR.6
CAUSED Bi EXCESS I 116 ])15C-To -SEAi
J 7 8 9 ' 80 lo'91 l1r1cs J.£AK-fK-G:
A77R.t8UIED, .. To TH£ PREsEl'JCG.*
OE DtRTA*No *
I 7 8 9 ' ', ' ' ' 80. ' (iE1 .I S:CRATc.HC:S
OtJ THE
$£fl'0 APPARENTLY
IHE REs()t,..T
oF.Jv'ORWl,fiL .W£AR. J ' 7 ;*, 8 9 ,: FACILllY ' METHOD OF ' . co ' STATUS * % .. POWER OTHER STATUS -OISCOVEAY
DESC.RIPTION
EE] , lHJ * l O 16 l 61 *1..__"'""-'.AJ'--A
_ ___,I . lBJ ,__,,..-.N-.;,..11'-'--.
_ ___,! . 7. ** 0** 9* * .10 * * 12 13 44 ** 45 **. 46 so FORM OF ACTIVITY CONTENT *RELEASED
OF RELEASE AMOUNT OF ACTIVITY rn . lZJ * *I.__*
__ ______. I LOCATION OF RELEASE 7 8 9 10 11 44 45 ' 80 PERSONNEL
EXPOSURES
NUMBER * * TYPE DESCRIPTION lo Io JO I : .
7 * *a s 11 * 12.. 13 ea. '. PERS'ONNEL
INJURIES NUMBER . OESCRIPTION
v. [EJ*1n10.l.ol
L--..;. .. _**-* _A_f1_. _* --------------------J 7 8 11 12 80 OFFSITE CONSEQUENCES .Elfil I A/A 7 8 9 80 . LOSS
DAMAGE . TO FACILITY TYPE .DESCRIPTION
- A)ff' 7 8 9 10 80 PUBLICITY
l:illl 7 8
ADDITIONAL
FACTOfiS (1JUJ /v*>0' 7 89 80 EEi 7 89 BC NAME: __ R;._A_/i_V_])_o_'-_*
- _?_1: ...... 1 _c_.* _w_c._:-_r_D_M_'E----'R"-.
PHONE: £xT. d...G 5
, . . ... .. ,. '* .. ;; . . ; ** EVENT DESCRIPTION (Continued)
the as-found leakage of 61.0 SCFH was attributed
entirely to leakage through check valve 1501-25B.
A second leak test using valves 1501-26B, i501-22B, and 1001-SB as boundaries
yielded a leakage rate of 4.2 SCFH: Since .the second test volume included the volume of the previous test, total through-leakage
for the penetration
was well under the Tech Spec limit. A similar valve on Unit-2 failed 16cal
testing in early 1975. (50-249/1976-23)
CAUSE DESCRIPTION. (Continued)
The valve was disassembled, the seat was lapped, and the packing and _Flexitallic
gasket were replaced.
Leak-rate
testing of the reassembled
valve was satisfactory.
In 1975, a test/drain
line was installed
on this penetration
which permitted
leak-rate
testing of check valve 3-1501-25B
for the first time since unit oper-ation began. Since this valve has performed*
satisfactorily
over a period of . several years, testing of this vaLve on an approximately
annual basis should permit timely identification
of a recurring
problem. * Valve 3-15.0l-25B
is a 16-inch tilting disc check valve, manufactured
by.Atwood
and Morrill Company, Inc.