ML17255A277: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 08/01/1983
| issue date = 08/01/1983
| title = Application for Amend to License DPR-18,revising Tech Specs Re Overpressure Protection Sys Requirements,Regenerant Water Treatment Subsystem & Deleting process-to-actuator Response Time Testing Requirements
| title = Application for Amend to License DPR-18,revising Tech Specs Re Overpressure Protection Sys Requirements,Regenerant Water Treatment Subsystem & Deleting process-to-actuator Response Time Testing Requirements
| author name = MAIER J E
| author name = Maier J
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name =  
| addressee name =  

Revision as of 04:52, 19 June 2019

Application for Amend to License DPR-18,revising Tech Specs Re Overpressure Protection Sys Requirements,Regenerant Water Treatment Subsystem & Deleting process-to-actuator Response Time Testing Requirements
ML17255A277
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/01/1983
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17255A274 List:
References
NUDOCS 8308050485
Download: ML17255A277 (4)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of Rochester Gas and Electric Corporation (R.E.Ginna Nuclear Power Plant, Unit No.1))))Docket No.50-244))APPLICATION FOR AMENDMENT TO OPERATING LICENSE Pursuant to Section 50.90 of the regulations of the U.S.Nuclear Regulatory Commission (the"Commission"), Rochester Gas and Electric Corporation

("RG&E"), holder of Provisional Operating License No.DPR-18, hereby requests that the Technical Specifica-tions set forth in Appendix A to that license be amended to in-corporate changes in the overpressure protection system opera-bility requirements, RWST water volume requirements, response time testing requirements, service water pump power alignment, and battery testing.The proposed technical specification changes are set forth in Attachment A to this Application.

A safety evaluations are set forth in Attachment B.The proposed changes do not involve a Il significant change in the types, or a significant increase in the amounts, of effluents, or any change in the authorized power level of the facility.As demonstrated by Attachment C, the proposed change does not involve a significant hazards consideration.

No fee is required since these changes have previously been reviewed by the NRC Staff as part of the Systematic Evaluation Program.8308050485 8308olPDR ADOCK 05000244 P,...,,.PDR P Lt W r k J l WHEREFORE, Applicant respectfully requests that Appendix A to Provisional Operating Licensee No.DPR-18 be amended in the form attached hereto as Attachment A.Rochester~Gas and Electric Corporation By John E.Maier Vice President, Electric and Steam Production Subscribed and sworn to before me on this~day of August, 1983.LYNN I.HAUCK NOTARY PUBLIC.State of N.Y., Monroe Cgupty My Commission Expires March 30, 19tYf.

1("t 1'v lh (ll