|
|
Line 3: |
Line 3: |
| | issue date = 12/05/2017 | | | issue date = 12/05/2017 |
| | title = TS 3.8.1 CSCS LAR Markup | | | title = TS 3.8.1 CSCS LAR Markup |
| | author name = Green K M | | | author name = Green K |
| | author affiliation = NRC/NRR/DORL/LPLIII | | | author affiliation = NRC/NRR/DORL/LPLIII |
| | addressee name = | | | addressee name = |
Revision as of 11:44, 18 June 2019
|
---|
Category:Meeting Agenda
MONTHYEARPMNS20241276, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Alternative for Reactor Pressure Vessel Stud Examinations2024-10-0909 October 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Alternative for Reactor Pressure Vessel Stud Examinations PMNS20240456, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Alternative to Implement Code Case OMN-322024-04-10010 April 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Alternative to Implement Code Case OMN-32 PMNS20240360, Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Hooded Masks2024-03-14014 March 2024 Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Hooded Masks PMNS20240007, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-9322024-01-29029 January 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-932 PMNS20231227, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-5912023-11-13013 November 2023 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591 PMNS20230917, Meeting with Constellation Energy Generation, LLC (Constellation) Regarding the June 30, 2023 Supplement to the License Amendment Request Related to the Pressure Temperature Limits Report for LaSalle County Station, Units 1 and 22023-08-0808 August 2023 Meeting with Constellation Energy Generation, LLC (Constellation) Regarding the June 30, 2023 Supplement to the License Amendment Request Related to the Pressure Temperature Limits Report for LaSalle County Station, Units 1 and 2 PMNS20230129, Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Revision of the Emergency Action Levels2023-02-22022 February 2023 Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Revision of the Emergency Action Levels PMNS20221123, Pre-Application Meeting with Constellation Energy Generation, LLC Regarding Planned License Amendment Request to Revise the Design Basis for Certain Suppression Pool Structures and Components at LaSalle County Station, Units 1 and 22022-10-28028 October 2022 Pre-Application Meeting with Constellation Energy Generation, LLC Regarding Planned License Amendment Request to Revise the Design Basis for Certain Suppression Pool Structures and Components at LaSalle County Station, Units 1 and 2 PMNS20220971, Pre-Application Meeting with Constellation Energy Generation, LLC Regarding Planned License Amendment Request to Revise the Design Basis for Certain Suppression Pool Structures and Components at LaSalle County Station, Units 1 and 22022-09-14014 September 2022 Pre-Application Meeting with Constellation Energy Generation, LLC Regarding Planned License Amendment Request to Revise the Design Basis for Certain Suppression Pool Structures and Components at LaSalle County Station, Units 1 and 2 ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval PMNS20211231, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals2021-10-0505 October 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals PMNS20211084, a Closed Meeting with Exelon Generation Company, LLC Regarding Proprietary Information in the Request for the Amendments to Renewed Facility Operating Licenses for LaSalle County Station, Units 1 and 22021-08-31031 August 2021 a Closed Meeting with Exelon Generation Company, LLC Regarding Proprietary Information in the Request for the Amendments to Renewed Facility Operating Licenses for LaSalle County Station, Units 1 and 2 PMNS20210759, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2021-06-0404 June 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20210635, Public Meeting Regarding Pre-submittal for Proposed License Amendment Requests Associated with Transition to New Fuel Type and Vendor at LaSalle Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 22021-05-24024 May 2021 Public Meeting Regarding Pre-submittal for Proposed License Amendment Requests Associated with Transition to New Fuel Type and Vendor at LaSalle Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 PMNS20210550, Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2021-04-28028 April 2021 Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201359, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2020-12-14014 December 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20201291, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2020-10-30030 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201224, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards2020-10-20020 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards ML20178A4282020-06-30030 June 2020 NEI Questions for June 30, 2020 Public Meeting ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML17339A1812017-12-0707 December 2017 NRC Hq Pre-Submittal LaSalle CSCS LAR 12-7-2017 Final ML17339A1792017-12-0505 December 2017 TS 3.8.1 CSCS LAR Markup ML17339A1802017-12-0505 December 2017 TS 3.7.2 CSCS LAR Markup ML17136A0032017-05-16016 May 2017 Agenda for Pwrog/Bwrog 05/16/2017 Call ML16162A7672016-06-14014 June 2016 Agenda - 635th ACRS Meeting, July 6-8, 2016 ML15183A4842015-07-0101 July 2015 Ltr. 07/01/15 Davis-Besse U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4792015-07-0101 July 2015 Ltr. 07/01/15 D.C. Cook U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting)(Drm) ML15183A4782015-07-0101 July 2015 Ltr. 07/01/15 Duane Arnold U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4722015-07-0101 July 2015 Ltr. 07/01/2015 Fermi U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4632015-07-0101 July 2015 Ltr. 07/01/15 Monticello U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4452015-07-0101 July 2015 Ltr. 07/01/15 Perry U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3992015-07-0101 July 2015 Ltr. 07/01/15 Point Beach U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3862015-07-0101 July 2015 Ltr. 07/01/15 Prairie Island U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15182A4412015-07-0101 July 2015 Notice and Agenda - 2015 Operator Licensing Workshop ML15182A4292015-07-0101 July 2015 Bra BYR Cli DRE Lasa Qua Operator License Workshop Invitation ML14169A4542014-06-13013 June 2014 Ltr 6/13/14 Bra BYR Cli DRE LAS Qua Operator License Workshop ML13190A3522013-07-10010 July 2013 Notice of Forthcoming Teleconference with Exelon Generation Company, LLC ML13123A3432013-05-0202 May 2013 Ltr 5/2/13 Bra BYR Cli Dres LAS Qua 2013 Operator Licensing Workshop ML13097A0022013-04-17017 April 2013 Forthcoming Meeting with Exelon Generation Company, LLC Regarding Deferred Implementation of Proposed Extended Power Uprate License Amendment Request for LaSalle County Station, Units 1 and 2 ML12348A6962012-12-17017 December 2012 1/3/2013 - Notice of Forthcoming Meeting with Exelon Generation Company, LLC, to Discuss Requests for Additional Information Regarding Exelon Physical Security Plans ML12167A1292012-06-18018 June 2012 6/28/2012 Forthcoming Pre-Application Meeting with Exelon Generating Company, LLC, to Discuss Licensing Amendment Request for LaSalle County Station Unit 1 and 2 Ultimate Heat Sink ML12159A2662012-06-11011 June 2012 County Generating Station Pre-Application Meeting Extended Power Uprate: Replacement Steam Dryers. June 11, 2012 ML12137A1792012-05-17017 May 2012 Forthcoming Pre-submittal Public Meeting with Exelon Generation Company, LLC Regarding LaSalle Extended Power Uprate Replacement Steam Dryer ML12138A3312012-05-17017 May 2012 05/31/2012, Notice of Significant Licensee Meeting (non-public) Regarding Operator Licensing Workshop and Meeting ML1208602902012-03-26026 March 2012 Notice of Forthcoming Public Meeting with Exelon Generation to Discuss Future Fleet Submittal Regarding Licensed Operator Eligibility Requirements ML1207505722012-03-20020 March 2012 4/4/2012 - Forthcoming Meeting with Exelon Generation Company, LLC Regarding the Proposed Extended Power Uprate License Amendment Request for LaSalle County Station, Units 1 and 2 ML1206807332012-03-20020 March 2012 Forthcoming Public Meeting with Exelon Generation Company, LLC Regarding Proposed License Amendment Request to Install Power Range Neutron Monitor ML1129114092011-10-18018 October 2011 Notice of Meeting with Exelon and NEI, to Discuss Application of Nuclear Energy Institute Pilot for Pre-Submittal Meetings to LaSalle Nuclear Power Station Extended Power Uprate Submittal ML1114409852011-05-26026 May 2011 Notice of Meeting with Exelon to Discuss Proposed License Amendment Request Related to the Installation of a Power Range Neutron Monitoring System for LaSalle Units 1 and 2 ML1105407242011-02-23023 February 2011 2/23/11 Ltr to F. Schiffley Re Participation in Commission Meeting on 50.46a Risk-informed Emergency Core Cooling System Rule on 3/24/11 2024-04-10
[Table view] |
Text
LaSalle 1 and 2 3.8.1-4 Amendment No.
194/181 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. --------NOTES-------- 1. Not applic able during installation of the Unit 2 Division 2 CSCS isolation valve during Unit 2 Refueling 1 7 while Unit 2 is in MODE 4, 5, or defueled. 2. Not ap plicable during installation of the Unit 1 Division 2 CSCS isolation valve during Unit 1 Refueling 19 whi le Unit 1 is in MODE 4, 5, or defueled. ---------------------
Required Division 3 DG inoperable.
OR One required Division
1, 2, or 3 DG inoperable and the required opposite unit Division 2 DG
inoperable.
C.1 Perform SR 3.8.1.1 for OPERABLE requ ired offsite circuit(s).
AND C.2 Declare required feature(s), supported by the inoperable DG(s), inoperable when the redundant required feature(s) are inoperable.
AND C.3.1 Determine OPERABLE DG(s) are not
inoperable due to common cause failure.
OR C.3.2 Perform SR 3.8.1.2 for OPERABLE DG(s).
AND C.4 Restore required DG(s) to OPERABLE status. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter
4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery of Condition C concurrent with inoperability of redundant required feature(s)
24 ho urs 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 72 hours AND 17 days from discovery of failure to meet LCO 3.8.1.a or b (continued)
LaSalle 1 and 2 3.8.1-6 Amendment No.
200/187 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME F. --------NOTES-------- 1. Not applicable during installation of the Unit 2 Division 2 CSCS isolation valve during Unit 2 Refueling 1 7 while Unit 2 is in MODE 4, 5, or defueled. 2. Not ap plicable during installation of the Unit 1 Divisi on 2 CSCS isolation valve during Unit 1 Refueling 19 while Unit 1 is in MODE 4, 5, or defueled. ---------------------
Two required Division 1, 2, or 3 DGs
inoperable.
OR Division 2 DG and the required opposite unit Division 2 DG inoperable.
F.1 Restore one required DG to OPERABLE status. 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> OR 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> if Division 3 DG is inoperable (continued)
LaSalle 1 and 2 3.8.1-7 Amendment No.
200/187 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME G. --------NOTES--------- 1. Only applicable during installation of the Unit 2 Division 2 CS CS isolation valve during Unit 2 Refueling 17 while Unit 2 is in MODE 4,5, or defueled.
- 2. Only applicable during installation of the Unit 1 Division 2 CSCS isolation valve during Unit 1 Refueling 19 while Unit 1 is in MODE 4,5, or defueled.
Division 2 DG and the required opposite unit Division 2 DG inoperable.
G.1 Restore required Division 2 DG to OPERABLE status.
7 days H. Required Action and associated Completion Time of Condition A, B, C, D, E, F or G not met. H.1 Be in MODE
- 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> I. Three or more required AC sources inoperable.
I.1 Enter LCO 3.0.3.
Immediately