DGCW System 3.7.2 LaSalle 1 and 2 3.7.2-1 Amendment No. 200/187 3.7 PLANT SYSTEMS 3.7.2 Diesel Generator Cooling Water (DGCW) System LCO 3.7.2 The following DGCW subsystems shall be OPERABLE:
- a.
Three DGCW subsystems; and
- b.
The opposite unit Division 2 DGCW subsystem.
APPLICABILITY:
MODES 1, 2, and 3.
ACTIONS
NOTE-------------------------------------
Separate Condition entry is allowed for each DGCW subsystem.
DGCW System 3.7.2 LaSalle 1 and 2 3.7.2-2 Amendment No. 200/187 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. --------NOTES--------
- 1. Not applicable to Division 1 during installation of the Division 1 CSCS isolation valves during Unit 1 Refueling 18 while Unit 1 is in MODE 4,5, or defueled and during Unit 2 Refueling 18 while Unit 2 is in MODE 4,5, or defueled.
- 2. Not applicable to Division 2 during installation of the Division 2 CSCS isolation valves during Unit 2 Refueling 17 while Unit 2 is in MODE 4,5, or defueled and during Unit 1 Refueling 19 while Unit 1 is in MODE 4,5, or defueled.
One or more DGCW subsystems inoperable.
A.1 Declare supported component(s) inoperable.
Immediately (continued)
DGCW System 3.7.2 LaSalle 1 and 2 3.7.2-3 Amendment No. 200/187 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. --------NOTES--------
- 1. Only applicable to Division 1 during installation of the Division 1 CSCS isolation valves during Unit 1 Refueling 18 while Unit 1 is in Mode 4,5, or defueled and during Unit 2 Refueling 18 while Unit 2 is in Mode 4,5, or defueled.
- 2. Only applicable to Division 2 during installation of the Division 2 CSCS isolation valves during Unit 2 Refueling 17 while Unit 2 is in MODE 4,5, or defueled and during Unit 1 Refueling 19 while Unit 1 is in MODE 4,5, or defueled.
One or more DGCW subsystems inoperable.
B.1 Restore DGCW subsystem to OPERABLE status.
7 days C. Required Action and associated Completion Time of Condition B not met.
C.1 Be in MODE 3.
AND C.2 Be in MODE 4.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours