| issue date = 09/09/1977
| issue date = 09/09/1977
| title = Forwards Reformat of Quality Assurance Program Description for QA Activities During Design, Construction and Operation
| title = Forwards Reformat of Quality Assurance Program Description for QA Activities During Design, Construction and Operation
| author name = Uhrig R E
| author name = Uhrig R
| author affiliation = Florida Power & Light Co
| author affiliation = Florida Power & Light Co
| addressee name = Boyd R S
| addressee name = Boyd R
| addressee affiliation = NRC/NRR
| addressee affiliation = NRC/NRR
| docket = 05000389, 05000335
| docket = 05000389, 05000335

Revision as of 07:48, 17 June 2019

Forwards Reformat of Quality Assurance Program Description for QA Activities During Design, Construction and Operation
ML18127A526
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 09/09/1977
From: Robert E. Uhrig
Florida Power & Light Co
To: Boyd R
Office of Nuclear Reactor Regulation
References
Download: ML18127A526 (18)


Text

NRC FORM 195 I2-76'), I p\.'(gRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL DOCKET NUMBER-as%FILE NUMBER PSAR/FSAR AMDT DIST.TO: jBLETTE R ABORIGINAL Q COPY DESCRIPTION R S Boyd 0 NOTO 8 IZE D BGNC LASS I FIED PROP'lorida Power 6 Light Co Miami, Fla R E Uhrig INPUT FORM ENCl QSURE DATE OF DOCUMENT 9-9-77 DATE RECEIVED 9-14-77 NUMBER OF COPIES RECEIVED S lCQ Reformat of Quality Assurance Program Descript re FELTQAR 1-76A for use during construction design&operation,""~~~~2p 10P PLANT NAME: St Luci,e g2 9-14-77 ehf ASSIGNED AD: LTR BK4%CH CHIEF: PROJECT MANAGER'ICE I G ASST: LTR QO EvCL.IQ l?KPIZaeucS5 FOR ACTION/INFORMATION RC PDR I G E LAINAS IPPOLITO F.ROSA INTERNAL DISTR I BUTION P.COLLINS HOUSTON HELTEMES CASE (L'ZR)MIPC LTR KNIGHT LTR)BOSNAK SIHIKIL PANLICKI ROSS LTR NOVAK ROSZTOCZY CHECK TEDESCO LTR BENAROYA LPDRl~TIC NSIC ACRS 16 CYS SENT CAT GAIIMILL (2 VOLLIIER (LTR)BUNCH J.COLLINS KREGER EXTERNAL DISTRIBUTION G RY CONTROL NUMBER t>>d gii f P.O.BOX 013100, MIAMI, FL 33101 0 ivory%FLORIDA POWER 8E LIGHT COMPANY Office of Nuclear Reactor Regulation Attn: Mr..Roger S.Boyd, Director Division of Project Management U.S.Nuclear Regulatory Commission Washington, D.C.20555

Dear Mr.Boyd:

Re: St.Lucie Plant Unit No.2 Docket No.50-389 Qualit Assurance Pro ram Septembe 1977 L 77 2 6 SEP 141977~.i g~MUCH R~~>~II<COmA1SSleII

~J~tM r fQ The Florida Power&Light Company Topical Quality Assurance Report (FPLTQAR 1-76A)describes a generic Quality Assurance Program for all existing and future nuclear generating stations at Florida Power&Light.This report, has been reviewed by the Nuclear Regula-tory Commission and has received its approval.Our intent to ul-timately apply the Topical QA Report.to St.Lucie Unit No.2 has been stated in the report, and the desirability of doing this has been expressed previously by members of your staff.Xn accordance with our policy of utilizing the Topical QA Report where appropriate, we are herewith submitting a reformat of the Quality Assurance Pro-gram description for QA activities during design, construction and operation for St.Lucie Unit No.2'PSL-2).The PSL-2 Quality Assurance Program is described in the attachment to this letter, which specifically add'resses details applicable only to PSL-2,'and the Topical.Quality Assurance Report (FPLTQAR 1-76A).Xn combination, these documents are.responsive to the"Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants," and are, therefore, being implemented in place of the existing information in Chapter 17 of the PSL-2 Preliminary Safety Analysis Report.As described below, this represents an aug-mentation of the existing program for PSL-2.These documents will be incorporated by reference'into Chapter 17 of the PSL-2 Final Safety Analysis Report.Xt is FPL's policy to have direct control of quality-related activities where possible.'In keeping with this policy, we had previously assumed control of the audit, inspection, and verifica-tion functions on site in the area of construction.

This increased responsibility was determined to be satisfactory to=the NRC staff as discussed in Supplement 1 to the St.Lucie Unit, 2 Safety Evaluation Report.Florida Power&Light is now additionally assuming direct responsibility for all.site construe'tion activities,-'with the exception of design engineering and craft labor relations which'ill continue to be the responsibility of Ebasco Services,, Xnc.Under this PEOPLE...SERVING PEOPLE 0 F/P), t1 Office of Nuclear Reactor Regulation Attn: Mr.Roger S.Boyd, Director Division of Project Management Page Two September 9, 1977 L-77-286 organization, the responsible job-site individual will be a Florida Power 6 Light Company representative.

All quality-related site activities will be performed under the guidance of the FPL Topical QA Report.The off-site and Combustion Engineering functions will continue to be performed as specified in the PSL-2 PSAR.Very truly yours, Robert E.Uhrig Vice President REU/LLL:ltm Attachment cc: J.P.O'Reilly, Region II C.J.Heltemes Robert L.Lowenstein, Esq.M.H.Hodder, Esq.

ST.LUCIE UNIT 2 QUALITY ASSURANCE l.0 GENERAL The overall organization chart"for the St.Lucie project is shown on Figures 1 and 2.2.0 FLORIDA POWER 6 LIGHT (FPL)QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION The generic elements of the FPL Quality Assurance Program are described in the FPL Topical Quality Assurance Report (FPLTQAR 1-76A).The Topical QA Report defines departmental responsibilities by which FPL implements the corporate QA Program and is an integral part of the corporate Quality Assurance Manual (FPL-NQA-100).

Additionally, the FPL Topical Quality Assurance Report defines the guidance documents the QA Program follows.The following additional information and exceptions are applicable to the St.Lucie Unit 2 Project.FPL Construction Quality Control Organization.

The FPL On-Site Construction Quality Control organization is shown in Figure 3.The function and,responsibilities of the Area Quality Control Supervisors and Quality Control Supervisor (Receipt Inspection) are: Assure that all construction, in the Quality Control Supervisor's assigned area (mechanical, electrical,"civil or receipt inspection)

'is completed in accordance with the approved'rocedures.

%his includes coordination with the on-site contractors in the scheduling of inspections, ensuring adequate completion of inspections and inspection documentation and technical direction for assigned QC personnel'.

The Area Quality Control Supervisor recommends Stop Work to the Project Quality Control Supervisor if the situation dictates.b.Procurement Document Control.During the construction phase, FPL delegates to the Architect Engineer and the NSSS Supplier the responsibility for ensuring that correct technical and quality requirements are incorporated into procurement documents for items they procure.'PL will perform the field procurement functions in accordance with TQR 4.0 and 7.0 of the FPLTQAR.

ST.LUCXE UNXT 2 Quality Assurance Page Mo c.Control of Special Processes.

During plant construction the FPL Construction organization will be responsible for welding control.This includes review of procedures, inspection, qualification of welders and welding operations and weld material control.During construction, the FPL Construction Quality Control Organization is responsible for the approval and qualification of NDE procedures and assuring qualification.

and certification of NDE personnel.

d.Inspection.

During construction, the FPL On-Site Construction Quality Control organization performs on-site receiving in-process and final inspections in accordance with TQR 10.0 of the FPLTQAR.e.Test Control.the FPL Test Control Program for construction is described in TQR 11.0 of the FPLTQAR.f.Control of Measuring and Test Equipment.

During construction,'he FPL On-Site Construction Quality Control organization is responsible for the control, calibration and maintenance of measuring and test equipment in accordance with TQR 12.0 of the FPLTQAR.g.Handling, Storage and Shipping.During construction, the FPL Stores Department is responsible for on-site handling, storage, disbursal from stores, and shipping of stored items, in accordance with TQR 8.0 and 13.0 of the FPLTQAR.h.Nonconforming Materials, Parts and Components.

During construction, the FPL On-Site Construction Quality Control organization controls nonconforming materials, parts and components as described in TQR 15.0 of the FPLTQAR.i.Quality Assurance Records.During construction, FPL is responsible for the receipt, review, and storage of QA records retained on-site in accordance with TQR 17.0 of.the FPLTQAR.FPL QA Construction has responsibility as custodian of all QA records on-site until turned over to operating personnel.

The responsibility for retention of off-site design and procurement records is delegated to the Architect-Engineer and NSSS supplier and maintained in accordance with KQR 17.0.

ST.LUCIE UNIT 2 QUALITY ASSURANCE PAGE i'three j.Audits.During construction, the FPL Quality Assurance Department is.responsible for conducting an audit program as specified in'XQR 18.0 of the FPLTQAR including the audit of all on-site quality related activities.

UALITY ASSURANCE DURING THE OPERATIONS PHASE The generic elements of the FPL Quality Assurance Program are described in the FPL Topical Quality Assurance Report (FPLTQAR).The Topical QA Report defines departmental responsibilities by which FPL implements the Corporate QA Program, and is an integral part of the Corporate Quality Assurance Manual (FPL-NQA-100).

Additionally, the FPL Topical Quality Assurance Report defines the guidance documents the QA Program follows.The Topical Quality Assurance Report is, therefore, referenced by this letter, and only information which is in addition to that found in the Topical QA Report is contained herein.1.0 ORGANIZATION The FPL organizational structure, including the Plant Manager, is described in the FPL Topical Quality Assurance Report (TQR 1.0).Ihe St.Lucie Unit 2 Plant staff organization below the Plant Manager'is shown in Figure 4 attached.Plant Manager The Plant Manager has the direct responsibility for implementing Quality Assurance requirements for the Power Resources Department at the St.Lucie Unit 2 Plant.uality Control Supervisor Thh Plant Quality Control Supervisor is responsible for planning and administering.the Plant Quality Control Program which comprises inspection, monitoring, and surveillance of quality-related Power Resources activities on site.Lines of communication between the Quality Control Supervisor and the plant staff have not been indicated in Figure 4 because the Quality Control Supervisor'has the authority and freedom to communicate with all levels of the plant staff and line management involved with activities affecting the quality of nuclear safety-related structures, systems, E and components; The Quality Control Supervisor reports to the Plant I Manager and has sufficient authority to stop nonconforming work or operations.

Additional responsibilities of the Quality Control Supervisor include: a)providing guidance in the interpretation of federal regulations related to the Quality Assurance Program, and , provide guidance in other administrative requirements involving quality assurance activities; b)serving as the plant interface with the Quality Assurance Department and Nuclear Regulatory Commission inspectors; c)tracking plant nonconformances, inspection and audit open items;d)advising plant management, including the Plant Manager if necessary, of the need for timely corrective action;e)maintaining adequate records of quality-related site activities; f)and distributing and controlling plant procedures, instructions,:

and approved drawings.Plant Quality Control Department engineers and inspectors receive functional and administrative direction from the Quality Control Supervisor.

In addition to members of the Quality Control Department, experienced individuals in other plant departments who are qualified and certified as Quality Control inspectois, may function in a Quality Control role.When so functioning, the individuals do not perform or directly supervise the performance of, the activity being inspected.

16.0 CORRECTIVE ACTXON The controls which assure timely corrective action of open items identified by the Quality Assurance Department, and unresolved items and items of non-compliance identified by the Nuclear Regulatory Commission, are described in the PPL Topical Quality Assurance Report (TQR 16.0).Plant corrective action tracking of nonconformance and audit or inspection open items, including items identified during Plant Quality Gontrol inspections, are documented and tracked in accordance with Plant Administrative Procedures.

These Administrative Procedures require that Quality.Gontrol inspections are performed, using inspection forms or checklists approved by the Quality Control Supervisor, with inspection results reported to the Quality Control Supervisor.

Open items against the Plant, from all inspection sources, are tracked by the Plant Quality Control Department:, which transmits periodic status reports of all open items to the Plant Manager and Plant personnel responsible for corrective action.In addition, Plant Quality Control performs open item follow-up activities to obtain corrective action commitments and obtain the status of open commitments.

This tracking activity does not end until the corrective action committed to, has been accomplished.

'1 I'F PROJECT GENERAL MANAGER COST AND SCHEDULE STAFF CORPORATE SERVICES For Project Staff Support MIAMI MANAGER (ASST.PGM)NEW YORK MANAGER (ESQSCO PROJ.(MGRII QUALITY ASSURANCE PROJECT COORD.Engineering Project Manager General Engineering Team Member Environmental Team Member Licensing Team Member Contract Coordinator Purchasing Team Member Project Engineer Project Cost Engineer Project Purchasing Agent Lead Project Planner New York Q.A.Supervisor Sched.Analyst SITE MANAGER QUALITY ASSURANCE ADMINIS-TRATIVE ASSISTANT PROJECT DIRECTION j I Starts p Supervisor Project Quality Control Supervisor Construction Controland Coordinator Supt.Senior Resident Engineer Project Supt.Security Supervisor Services Supt, Site Project Engineer Functional Reporting Project Direction ST.LUCIE PLANT NO.2 PROJECT ORGANIZATION CHART FIGURE 1 li V l Florida Power 5 Light Dir.of Projects Supervision

-Administration of Work Assignments Routine Reporting of Quality Assurance Information FPL QUALITY ASSURANCE (SITE)FPL PROJECT QC SUPV.(SITE)L I I I J FPL SITE MANAGER Construction Control;Coord.Senior Resident Eng.Project Supt.Startup Supt.Services Supt.Security Supv.FPL MIAMI MANAGER (ASST.PGM)Eng.Protect.Mgr.General Eng.Environmental Licensing Purchasing FPL QUALITY ASSURANCE.(MIAMI)I I I I I I'I I I l l New York Manager (Ebasco Project Manager)Ebasco N.Y.Quality Assurance Organization I l I I I I I Florida Power 5 Light Project General Mgr.Combustion Engineering Project Manager Con:bustion Engineering Quality Assurance Organization I L I I Component Suppliers Containment Sub-Contractor Combustion Engineering Nuclear Steam Supply System CONSTRUCTION QUALITY ASSURANCE ORGANIZATION ST.LUCIE PLANT NO.2 FIGURE 2 SUPERINTENDENT QUALITY CONTROL CONSTRUCTION PROJECT QUALITY CONTROL SUPERVISOR Home Office Site AREA QUALITY CONTROL SUPV.AREA QUALITY CONTROL SUPV.AREA QUALITY CONTROL SUPV.QUALITY CONTROL SUPV.INSPECTORS INSPECTORS INSPECTORS INSPECTORS Sf.LUCIE PLANT NO.2 QUALITY CONTROL ORGAN IZATION FIGURE 3' PLANT MANAGER MAINTENANCE SUPT.TECHNICAL STAFF SECURITY SUPV ADMINISTRATIVE SUPV OPERATIONS SUPT QUALITY CONTROL SUPV ASST.MGR.QA OPERATING PLANTS OFF SITE ON SITE INSTRUMENT

&CONTROL SUPV ASST PLANT SUPT ELECTRICAL ASST PLANT SUPT MECHANICAL FACILITY REVIEW GROUP CHEMISTRY SUPV HEALTH PHYS SUPV REACTOR SUPV QC ENGRS.&INSPECTORS DOCUMENT CONTROL SUPV QA OPERATING PLANTS.QA ENGINEERS TRAINING SUPV OPERATIONS SUPV Administrative Reporting Communications FIGURE 4 ST.LUCIE PLANT PLANT QUALITY CONTROL ORGANIZATION AND INTERFACE WITH QUALITY ASSRANCE.