FOR VERMONT YANKEE NUCLEAR POWER STATION VERNON, VERMONT ENTERGY NUCLEAR OPERATIONS, INC.NORTHSTAR NUCLEAR DECOMMISSIONING COMPANY, LLC AND ENTERGY NUCLEARNORTHSTAR VERMONT YANKEE, LLC DOCKET NO. 50-271 Amendment No. 263, 270, 2715.0 DESIGN FEATURES 5.1 Site The station is located on the property on the west bank | FOR VERMONT YANKEE NUCLEAR POWER STATION VERNON, VERMONT ENTERGY NUCLEAR OPERATIONS, INC.NORTHSTAR NUCLEAR DECOMMISSIONING COMPANY, LLC AND ENTERGY NUCLEARNORTHSTAR VERMONT YANKEE, LLC DOCKET NO. 50-271 Amendment No. 263, 270, 2715.0 DESIGN FEATURES 5.1 Site The station is located on the property on the west bank | ||
of the Connecticut River in the Town of Vernon, Vermont, which Entergy NuclearNorthStar Vermont Yankee, LLC either owns or to which it has perpetual rights and easements. | of the Connecticut River in the Town of Vernon, Vermont, which Entergy NuclearNorthStar Vermont Yankee, LLC either owns or to which it has perpetual rights and easements. | ||
5.2 Spent Fuel Storage Spent Fuel shall not be stored in the Spent Fuel Pool.}} | |||
Fuel Storage Spent Fuel shall not be stored in the Spent Fuel Pool.}} |
Revision as of 06:32, 5 May 2019
ML18253A202 | |
Person / Time | |
---|---|
Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
Issue date: | 10/11/2018 |
From: | Jack Parrott Reactor Decommissioning Branch |
To: | |
Parrott J | |
References | |
Download: ML18253A202 (15) | |
Similar Documents at Vermont Yankee | |
---|---|
Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML19175A0422019-09-11011 September 2019
[Table view]Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML18347B3592019-01-11011 January 2019 12-13-18-License Transfer Conforming Amendment Markup ML18347B3602019-01-11011 January 2019 Letter: Vermont Yankee Nuclear Power Station - Issuance of Amendment Application for Order Approving Direct and Indirect Transfer of Renewed Facility Operating License and Independent Spent Fuel Storage Installation General License. ML18253A2022018-10-11011 October 2018 Conforming License Amendment Approval of License Transfer Request(License DPR-28, Docket 50-271 and 72-59) ML18156A1812018-08-15015 August 2018 ISFSI Only Tech Spec Amendment Package ML18165A4232018-07-25025 July 2018 Issuance of Amendment to Change the Physical Security Plan to Reflect an ISFSI-Only Configuration ML18053A1122018-03-30030 March 2018 Issuance of Amendment to Change the Emergency Plan and Emergency Action Level Scheme to Reflect an ISFSI-Only Configuration ML16014A1692016-03-14014 March 2016 Vermont Yankee Nuclear Power Station - Issuance of Amendment No. 265 to Renewed Facility Operating License Re: Cyber Security Plan Implementation Schedule (CAC No. MF6403) ML15233A1662015-12-11011 December 2015 Issuance of Amendment No. 264 to Renewed Facility Operating License Changes to the Emergency Plan and Emergency Action Levels ML15117A5512015-10-0707 October 2015 Issuance of Amendment for Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition ML14304A5882015-02-12012 February 2015 Issuance of Amendment No. 261, Revise Technical Specifications to Eliminate Certain Requirements During Movement of Irradiated Fuel and Core Alterations Consistent with TSTF-51 ML14346A0652015-02-0404 February 2015 Issuance of Amendment No. 261, Revise Site Emergency Plan for Permanently Defueled Condition to Reflect Change in On-Shift Staffing and Emergency Response Staffing ML14217A0722014-12-22022 December 2014 Issuance of Amendment No. 260, Revise and Remove Certain Requirements from Technical Specification Section 6.0, Administrative Controls, No Longer Applicable for Its Permanently Defueled Condition ML14206A7102014-11-12012 November 2014 Issuance of Amendment No. 259, Revise Operating License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date ML13212A2012013-08-15015 August 2013 Issuance of Amendment No. 258 Change to Licensing Basis Regarding Station Blackout ML13105A1752013-04-26026 April 2013 Issuance of Amendment No. 257 Request to Revise Requirement of the Recirculation Pump Discharge Bypass Valves ML13042A2722013-04-17017 April 2013 Issuance of Amendment 256 Revision to License Condition 3.P and 3.S ML13025A3062013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical Specifications ML1300903212013-01-30030 January 2013 Issuance of Amendment Rod Worth Minimizer Bypass Allowance TS Change (TAC No. Me 7927) ML1300902152013-01-30030 January 2013 Issuance of Amendment Change to Suppression Chamber Drywell Leak Rate Test Surveillance Frequency ML12261A2922012-11-13013 November 2012 Issuance of Amendment to Renewed Facility Operating License Cyber Security Plan Implementation Schedule Milestone ML1127904592011-11-0404 November 2011 Issuance of Amendment Revised Reactor Vessel Pressure-Temperature Limitation Curves ML1127205902011-09-30030 September 2011 Issuance of Emergency Amendment Modification of Technical Specification for Single Loop Operation ML1121014312011-08-25025 August 2011 Issuance of Amendment Elimination of Technical Specification Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool ML11152A0132011-07-20020 July 2011 License Amendment, Cyber Security Plan ML0921100542011-03-21021 March 2011 Renewed Facility Operating License DPR-28 ML1103400782011-02-23023 February 2011 Issuance of Amendment Control Rod Block Actuation Logic System Functional Test ML1100601792011-02-0909 February 2011 Issuance of Amendment Regarding Modification to Technical Specification 4.12 as Result of Changes Made by License Amendment Nos. 230 and 239 and to Revise Wording in TS 3.7.A.8 ML1025717732010-10-0606 October 2010 License Amendment, Issuance of Amendment Scram Discharge Volume Vent and Drain Valves ML1004316132010-03-0808 March 2010 Issuance of Amendment Safety Limit Minimum Critical Power Ratio Change ML1001203062010-01-26026 January 2010 Issuance of Amendment Revision to Requirements for Inoperable Containment Isolation Valves ML0933604432010-01-0404 January 2010 License Amendment 241 Revision of High Radiation Area Controls ML0928906522009-10-28028 October 2009 Issuance of Amendment Extension of Appendix J, Type a Integrated Leakage Rate Test Interval ML0917400402009-07-13013 July 2009 License Amendment, Relocation of Reactor Building Crane Technical Specification ML0916102242009-07-0606 July 2009 Issuance of Amendment Testing and Inspection of Suppression Chamber-To-Drywell Vacuum Breakers ML0915505702009-06-17017 June 2009 License Amendment, Main Steam Isolation Valve Surveillance Requirements ML0914103582009-06-12012 June 2009 License Amendment, Issuance of Amendment Instrumentation Technical Specifications ML0903704562009-02-26026 February 2009 License Amendment, Issuance of Amendment Sale of Lease of Property within the Exclusion Boundary ML0901206582009-02-11011 February 2009 Issuance of Amendment Battery Systems ML0833001292009-01-0707 January 2009 Issuance of Amendment Control Rod Systems ML0815701872008-06-23023 June 2008 Issuance of Amendment Primary Containment Oxygen Concentration and Drywell-to-Suppression Chamber Differential Pressure Limits ML0808003342008-04-17017 April 2008 Issuance of Amendment Emergency Diesel Generator Fuel Oil Tank Volume, Fuel Oil Testing and Reactor Building Crane Inspections ML0723302302007-08-23023 August 2007 Revised Pages of Facility Operating License DPR-28 B.5.b ML0705301592007-03-26026 March 2007 Issuance of Amendment Adoption of Technical Specification Task Force (TSTF) Change TSTF-372, the Addition of Limiting Condition for Operation (LCO) 3.0.8 on the Inoperability of Snubbers ML0600500222006-03-0202 March 2006 Vermont Yankee, License Amendment 229 Regarding Extended Power Uprate ML0523600022005-09-20020 September 2005 License Amendment, Drywell Spray Header and Nozzle Air Test Frequency ML0520000032005-08-31031 August 2005 License Amendment, Revise One-Time Extension of Integrated Leak Rate Test Interval ML0519201382005-08-15015 August 2005 Issuance of License Amendment 226 Administrative Changes ML0516700622005-07-0707 July 2005 License Amendment, Extend Intermediate Range Monitor Surveillance Test Frequencies ML0504201652005-06-0101 June 2005 License Amendment, Relocation of Inservice Testing Requirements to a Licensee - Controlled Program 2019-09-11 Category:Technical Specifications MONTHYEARML19175A0422019-09-11011 September 2019
[Table view]Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML18347B3592019-01-11011 January 2019 12-13-18-License Transfer Conforming Amendment Markup ML18253A2022018-10-11011 October 2018 Conforming License Amendment Approval of License Transfer Request(License DPR-28, Docket 50-271 and 72-59) ML18156A1812018-08-15015 August 2018 ISFSI Only Tech Spec Amendment Package ML16014A1692016-03-14014 March 2016 Vermont Yankee Nuclear Power Station - Issuance of Amendment No. 265 to Renewed Facility Operating License Re: Cyber Security Plan Implementation Schedule (CAC No. MF6403) ML15117A5512015-10-0707 October 2015 Issuance of Amendment for Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition ML14304A5882015-02-12012 February 2015 Issuance of Amendment No. 261, Revise Technical Specifications to Eliminate Certain Requirements During Movement of Irradiated Fuel and Core Alterations Consistent with TSTF-51 ML14346A0652015-02-0404 February 2015 Issuance of Amendment No. 261, Revise Site Emergency Plan for Permanently Defueled Condition to Reflect Change in On-Shift Staffing and Emergency Response Staffing ML14217A0722014-12-22022 December 2014 Issuance of Amendment No. 260, Revise and Remove Certain Requirements from Technical Specification Section 6.0, Administrative Controls, No Longer Applicable for Its Permanently Defueled Condition BVY 14-083, Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 32014-12-0505 December 2014 Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 3 ML13212A2012013-08-15015 August 2013 Issuance of Amendment No. 258 Change to Licensing Basis Regarding Station Blackout BVY 12-085, Technical Specifications Proposed Change No. 302 Inoperable Control Rods2012-12-17017 December 2012 Technical Specifications Proposed Change No. 302 Inoperable Control Rods CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications BVY 12-005, Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change2012-02-0101 February 2012 Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change BVY 11-069, Technical Specifications Proposed Change No. 295 Proposed Emergency License Amendment for Single Loop Operation2011-09-29029 September 2011 Technical Specifications Proposed Change No. 295 Proposed Emergency License Amendment for Single Loop Operation BVY 10-045, Technical Specifications Proposed Change No. 289 Suppression Chamber-Drywell Vacuum Breakers and Differential Pressure2010-08-19019 August 2010 Technical Specifications Proposed Change No. 289 Suppression Chamber-Drywell Vacuum Breakers and Differential Pressure BVY 09-068, Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves2009-12-0303 December 2009 Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves ML0917400402009-07-13013 July 2009 License Amendment, Relocation of Reactor Building Crane Technical Specification BVY 09-035, Technical Specifications Proposed Change No. 273, Supplement 8, Transmittal of Final Technical Specification Pages2009-05-20020 May 2009 Technical Specifications Proposed Change No. 273, Supplement 8, Transmittal of Final Technical Specification Pages ML0901206582009-02-11011 February 2009 Issuance of Amendment Battery Systems BVY 08-084, Technical Specifications Proposed Change No. 273, Supplement 5, Response to Request for Additional Information2008-12-18018 December 2008 Technical Specifications Proposed Change No. 273, Supplement 5, Response to Request for Additional Information BVY 08-075, Technical Specifications Proposed Change No. 273, Supplement 4, Response to Request for Additional Information Related to Supplement 22008-12-15015 December 2008 Technical Specifications Proposed Change No. 273, Supplement 4, Response to Request for Additional Information Related to Supplement 2 BVY 08-052, Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements2008-09-22022 September 2008 Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements BVY 08-062, Technical Specifications Proposed Change No. 273, Supplement 2, Response to Request for Additional Information2008-09-15015 September 2008 Technical Specifications Proposed Change No. 273, Supplement 2, Response to Request for Additional Information BVY 08-053, Technical Specifications Proposed Change No. 279 Sale or Lease of Property within the Exclusion Boundary2008-09-0404 September 2008 Technical Specifications Proposed Change No. 279 Sale or Lease of Property within the Exclusion Boundary BVY 08-047, Technical Specification Proposed Change No. 276, Response to Request for Additional Information2008-07-29029 July 2008 Technical Specification Proposed Change No. 276, Response to Request for Additional Information ML0817601182008-06-23023 June 2008 Technical Specifications, Amendments to Primary Containment Oxygen Concentration and Drywell-to-Suppression Chamber Differential Pressure Limits ML0811201212008-04-17017 April 2008 Technical Specifications, Amendment No. 231 ML0806602032008-02-12012 February 2008 Vermont Yankee, Technical Specifications Proposed Change No. 273, Instrumentation Technical Specifications BVY 08-007, Technical Specification Proposed Change No. 276 Revision to TS Sections 3.3/4.3 for Control Rod System2008-02-0606 February 2008 Technical Specification Proposed Change No. 276 Revision to TS Sections 3.3/4.3 for Control Rod System BVY 07-056, Technical Specification Proposed Change No. 274, Changes to Technical Specifications for Emergency Diesel Generator Fuel Oil and Reactor Building Crane Surveillance Requirements2007-10-18018 October 2007 Technical Specification Proposed Change No. 274, Changes to Technical Specifications for Emergency Diesel Generator Fuel Oil and Reactor Building Crane Surveillance Requirements BVY 07-063, Technical Specifications Proposed Change No. 275 Primary Containment Oxygen Concentration and Drywell-to-Suppression Chamber Differential Pressure Limits2007-10-18018 October 2007 Technical Specifications Proposed Change No. 275 Primary Containment Oxygen Concentration and Drywell-to-Suppression Chamber Differential Pressure Limits ML0708607332007-03-26026 March 2007 Technical Specifications, Modify Requirements for Inoperable Snubbers by Relocating the Current TS Requirements Limiting Condition for Operation (LCO) 3.6.1 and Surveillance Requirement (SR) 4.6.1 ML0629103402006-08-28028 August 2006 Correction to Technical Specification Page 255 Amendment No. 226 BVY 06-067, Correction to Technical Specification Page2006-07-27027 July 2006 Correction to Technical Specification Page ML0603901072006-03-0202 March 2006 Vermont Yankee, Tech Spec Pages for Amendment 229 Regarding Extended Power Uprate BVY 06-018, Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 45, Extended Power Uprate - Revised Technical Specification Pages2006-02-22022 February 2006 Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 45, Extended Power Uprate - Revised Technical Specification Pages ML0604101192006-02-0303 February 2006 2006/02/03-Vermont Yankee - Technical Specification Proposed Change No. 263 Extended Power Uprate - Regulatory Commitment Information Regarding Potential Adverse Flow Effects BVY 05-105, Vermont Yankee Nuclear Power Station Correction to Technical Specifications Pages2005-12-12012 December 2005 Vermont Yankee Nuclear Power Station Correction to Technical Specifications Pages ML0526400902005-09-20020 September 2005 Technical Specifications, Drywell Spray Header and Nozzle Air Test Frequency BVY 05-083, Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 - Supplement No. 32 Extended Power Uprate - Additional Information2005-09-10010 September 2005 Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 - Supplement No. 32 Extended Power Uprate - Additional Information ML0522800592005-08-15015 August 2005 Tech Spec Pages for Amendment 226 Administrative Changes ML0519202762005-07-0707 July 2005 Tech Spec Pages for Amendment 225 Regarding Extend Intermediate Range Monitor Surveillance Test Frequencies ML0519202462005-06-30030 June 2005 Attachment 1 - Response to Request for Additional Information - Instrumentation Technical Specifications, Vermont Nuclear Power Station, Technical Specifications BVY 05-032, Vermont Nuclear Power Station - Response to Request for Additional Information Regarding Intermediate Range Monitor Surveillance Test Frequencies2005-03-31031 March 2005 Vermont Nuclear Power Station - Response to Request for Additional Information Regarding Intermediate Range Monitor Surveillance Test Frequencies ML0509003992005-03-29029 March 2005 Technical Specification Pages Re Alternative Source Term ML0508004322005-03-16016 March 2005 TS Pages for Amendment 221 to License DPR-28, Relocating Current Definition of Surveillance Frequency to New Technical Specification (TS) Sections 4.0.2 and 4.0.3 and Revises Requirements for Missed Surveillance in TS Section 4.0.3 ML0435102452004-12-14014 December 2004 Technical Specification Pages, Elimination of Requirements for Hydrogen/Oxygen Monitors ML0514500312004-06-0909 June 2004 E-Mail from R. Ennis of USNRC to Various, Regarding State of Vermont Comments on EPU and AST ML0411202522004-04-14014 April 2004 Technical Specification Pages for Vermont Yankee Nuclear Power Station, License Amendment, Issuance of Amendment Implementation of Arts/Mellla 2019-09-11 |
Text
VYNPSAmendment No. 263, 270, 271 1
Amendment No. 263, 270, 271
APPENDIX A TO 10 CFR PART 50 LICENSE DPR-28 TECHNICAL SPECIFICATIONS
FOR VERMONT YANKEE NUCLEAR POWER STATION VERNON, VERMONT ENTERGY NUCLEAR OPERATIONS, INC.NORTHSTAR NUCLEAR DECOMMISSIONING COMPANY, LLC AND ENTERGY NUCLEARNORTHSTAR VERMONT YANKEE, LLC DOCKET NO. 50-271 Amendment No. 263, 270, 2715.0 DESIGN FEATURES 5.1 Site The station is located on the property on the west bank
of the Connecticut River in the Town of Vernon, Vermont, which Entergy NuclearNorthStar Vermont Yankee, LLC either owns or to which it has perpetual rights and easements.
5.2 Spent Fuel Storage Spent Fuel shall not be stored in the Spent Fuel Pool.