ML101550050: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML101550050
| number = ML101550050
| issue date = 06/03/2010
| issue date = 06/03/2010
| title = Fort Calhoun, Notification of Inspection (IR 05000285-10-004) and Request for Information
| title = Notification of Inspection (IR 05000285-10-004) and Request for Information
| author name = Farnholtz T A
| author name = Farnholtz T A
| author affiliation = NRC/RGN-IV/DRS/EB-1
| author affiliation = NRC/RGN-IV/DRS/EB-1

Revision as of 07:42, 13 April 2019

Notification of Inspection (IR 05000285-10-004) and Request for Information
ML101550050
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 06/03/2010
From: Farnholtz T A
Region 4 Engineering Branch 1
To: Bannister D J
Omaha Public Power District
References
IR-10-004
Download: ML101550050 (6)


See also: IR 05000285/2010004

Text

June 3, 2010

David J. Bannister, Vice President and Chief Nuclear Officer

Omaha Public Power District 444 South 16

th St. Mall Omaha, NE 68102-2247

SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000285/2010004) AND REQUEST FOR INFORMATION

Dear Mr. Bannister:

From July 19 - 30, 2010, Reactor Inspectors from NRC's Region IV office will perform the baseline inspection of changes, tests, experiments, and permanent plant modifications at Fort Calhoun Station, using NRC Inspection Procedure 71111.17, "Evaluations of Changes, Tests, Experiments, and Permanent Plant Modifications."

Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. Upon review of these documents, the inspectors will select additional documentation for review upon arrival. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Erick Matzke of your licensing organization. If there are any questions about this inspection or the material requested, please contact the

lead inspector, Gerond A. George, at 817-276-6562 or by email Gerond.George@nrc.gov. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125

Omaha Public Power District - 2 -

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, /RA/ Thomas A. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety

Docket: 50-285

License: DPR-40

Enclosure: Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications Document Request cc w/enclosure: Jeffrey A. Reinhart Site Vice President Omaha Public Power District

Fort Calhoun Station FC-2-4 Adm. P.O. Box 550 Fort Calhoun, NE 68023-0550

Mr. Thomas C. Matthews

Manager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm. P.O. Box 550 Fort Calhoun, NE 68023-0550

David A. Repka Winston & Strawn 1700 K Street, NW Washington, DC 20006-3817

Chairman

Washington County Board of Supervisors P.O. Box 466 Blair, NE 68008

Omaha Public Power District - 3 -

Ms. Julia Schmitt, Manager Radiation Control Program Nebraska Health & Human Services Division of Public Health

P.O. Box 95026 Lincoln, NE 68509-5026

Ms. Melanie Rasmussen Radiation Control Program Officer

Bureau of Radiological Health Iowa Department of Public Health Lucas State Office Building, 5th Floor 321 East 12th Street Des Moines, IA 50319

Chief, Technological Hazards Branch

FEMA, Region VII 9221 Ward Parkway Suite 300 Kansas City, MO 64114-3372

Omaha Public Power District - 4 -

Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Chuck.Casto@nrc.gov) DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov) DRS Director (Roy.Caniano@nrc.gov) DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (John.Kirkland@nrc.gov) Resident Inspector (Jacob.Wingebach@nrc.gov)

Branch Chief, DRP/E (Jeff.Clark@nrc.gov) Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov) Project Engineer (William.Schaup@nrc.gov) FCS Administrative Assistant (Berni.Madison@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

Project Manager (Lynnea.Wilkins@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource

R:\REACTORS\FC2010004 RFI rpt - GAG ADAMS ML ADAMS: No Yes SUNSI Review Complete Reviewer Initials:GAG

Publicly Available Non-Sensitive

Non-publicly Available Sensitive DRS/EB1 C: DRS/EB1

G. George T. Farnholtz 6 /2 /10 6 /2 /10 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

- 1 - Enclosure Evaluations of Changes, Tests, or Experiments and Permanent Plant Modification

Inspection Dates: July 19 - 30, 2010

Inspection Procedures: IP 71111.17 "Evaluation of Changes, Tests, or Experiments and Permanent Plant Modifications"

Inspectors: Gerond A. George, Reactor Inspector, Lead Inspector Isaac Anchondo, Reactor Inspector

Theresa Buchanan, Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic format (Certrec database preferred), in care of Gerond A. George, by July 12, 2010, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspectors will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection weeks. We ask that the specific items requested be available and ready for review on the first day of inspection. Also, we request that you categorize the documents in your response with the numbered list below.

Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the lead inspector as soon as possible.

1. A list with descriptions, of all 50.59 screenings (or equivalent) performed since August 14, 2006, which did not result in an evaluation. Note: Description of screenings should be brief, but of sufficient detail so that inspectors can determine the significance of the issue.

2. A list with descriptions, of all 10 CFR 50.59 evaluations performed which did not result in an application for license amendment to NRC from August 14, 2006, to the present. Note: Description of evaluations should be brief, but of sufficient detail so that inspectors can determine the significance of the issue.

3. Fort Calhoun Station procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.

4. A list with descriptions of all Corrective Action documents related to 50.59 activities, including screenings and evaluations from August 14, 2006, to the present.

5. A list with descriptions of all permanent plant modifications, dating from August 14, 2006, Include sufficient detail to enable the inspector to determine the significance of each modification. For this inspection, permanent plant modifications include permanent plant changes, design changes, setpoint changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications.

- 2 - Enclosure 6. Fort Calhoun Station procedure(s) for implementing and controlling permanent plant modifications.

7. A list with descriptions of all Corrective Action documents related to your permanent plant modification program and its implementation since August 14, 2006. Include

sufficient detail to enable the inspector to determine the significance of each modification.

8. A listing of personnel qualified to prepare 50.59 screenings and evaluations, including qualification dates.

9. A listing of personnel qualified to review and approve 50.59 screenings and/or evaluations, including qualification dates.

Inspector Contact Information:

Gerond George Isaac Anchondo Theresa Buchanan Reactor Inspector Reactor Inspector Reactor Inspector 817-276-6562 817-860-8152 817-276-6503 Gerond.George@nrc.gov Isaac.Anchondo@nrc.gov Theresa.Buchanan@nrc.gov

Mailing Address: US NRC Region IV Attn: Gerond George 612 E. Lamar Blvd., Suite 400

Arlington, TX 76011-4125