| title = Manual Reactor Trip Due To Main Turbine High Vibration  
| title = Manual Reactor Trip Due to Main Turbine High Vibration  
| event text =  Seabrook Station initiated a Manual Reactor Trip during initial start of the main turbine following a refueling outage.  Turbine vibrations elevated to the automatic trip setpoint during initial increase to normal operating speed.  The reactor was manually tripped to allow breaking main condenser vacuum and reduce main turbine speed.
| event text =  Seabrook Station initiated a Manual Reactor Trip during initial start of the main turbine following a refueling outage.  Turbine vibrations elevated to the automatic trip setpoint during initial increase to normal operating speed.  The reactor was manually tripped to allow breaking main condenser vacuum and reduce main turbine speed.
The plant is currently stable in Mode 3.  All control rods [fully] inserted and decay heat removal is via the main condenser steam dumps.
The plant is currently stable in Mode 3.  All control rods [fully] inserted and decay heat removal is via the main condenser steam dumps.

Latest revision as of 22:21, 1 March 2018

ENS 41655 +/-
Where
Seabrook NextEra Energy icon.png
New Hampshire (NRC Region 1)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-2.2 h-0.0917 days <br />-0.0131 weeks <br />-0.00301 months <br />)
Opened: Damon Ritter
12:57 May 1, 2005
NRC Officer: John Knoke
Last Updated: May 1, 2005