ML13038A124: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 19: | Line 19: | ||
{{#Wiki_filter:February 7, 2013 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1) | {{#Wiki_filter:February 7, 2013 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1) | ||
AFFIDAVIT OF RAYMOND SHADIS CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336 I, Raymond Shadis, do hereby state as follows: | AFFIDAVIT OF RAYMOND SHADIS CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336 I, Raymond Shadis, do hereby state as follows: | ||
: 1. I am pro se representative for Friends of the Coast and New England Coalition ("Friends/NEC"), in the above captioned proceeding. | : 1. I am pro se representative for Friends of the Coast and New England Coalition ("Friends/NEC"), in the above captioned proceeding. | ||
: 2. In reviewing documents in my possession and those in possession of intervenors, Friends/NEC, I have not, as of January 15, 2013 identified any new documents upon which Friends/NEC intends to rely at hearing, or which are otherwise relevant to the admitted contention(s) and subject to the disclosure under 10 C.F.R. § 2.336. | : 2. In reviewing documents in my possession and those in possession of intervenors, Friends/NEC, I have not, as of January 15, 2013 identified any new documents upon which Friends/NEC intends to rely at hearing, or which are otherwise relevant to the admitted contention(s) and subject to the disclosure under 10 C.F.R. § 2.336. | ||
: 3. Therefore, I hereby certify that all relevant materials which Friends/NEC is required to disclose as of January 15, 2013 in the captioned proceeding have been disclosed. | : 3. Therefore, I hereby certify that all relevant materials which Friends/NEC is required to disclose as of January 15, 2013 in the captioned proceeding have been disclosed. | ||
: 4. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief. | : 4. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief. | ||
(signed electronically) | |||
Raymond Shadis Executed in Edgecomb, Maine this 7th day of February, 2013 Raymond Shadis Friends of the Coast/New England Coalition Post Office Box 98 Edgecomb, Maine 04556 207-882-7801 shadis@prexar.com Docket No. 50 | Raymond Shadis Executed in Edgecomb, Maine this 7th day of February, 2013 Raymond Shadis Friends of the Coast/New England Coalition Post Office Box 98 Edgecomb, Maine 04556 207-882-7801 shadis@prexar.com Docket No. 50 | ||
-443-LR ASLBP No. 10 | -443-LR ASLBP No. 10 | ||
-906-02-LR}} | -906-02-LR}} |
Revision as of 23:36, 28 April 2019
ML13038A124 | |
Person / Time | |
---|---|
Site: | Seabrook ![]() |
Issue date: | 02/07/2013 |
From: | Shadis R Friends of the Coast, New England Coalition |
To: | Atomic Safety and Licensing Board Panel |
SECY RAS | |
Shared Package | |
ML13038A122 | List: |
References | |
RAS 24099, 50-443-LR, ASLBP 10-906-02-LR-BD01 | |
Download: ML13038A124 (2) | |
Text
February 7, 2013 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1)
AFFIDAVIT OF RAYMOND SHADIS CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336 I, Raymond Shadis, do hereby state as follows:
- 1. I am pro se representative for Friends of the Coast and New England Coalition ("Friends/NEC"), in the above captioned proceeding.
- 2. In reviewing documents in my possession and those in possession of intervenors, Friends/NEC, I have not, as of January 15, 2013 identified any new documents upon which Friends/NEC intends to rely at hearing, or which are otherwise relevant to the admitted contention(s) and subject to the disclosure under 10 C.F.R. § 2.336.
- 3. Therefore, I hereby certify that all relevant materials which Friends/NEC is required to disclose as of January 15, 2013 in the captioned proceeding have been disclosed.
- 4. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
(signed electronically)
Raymond Shadis Executed in Edgecomb, Maine this 7th day of February, 2013 Raymond Shadis Friends of the Coast/New England Coalition Post Office Box 98 Edgecomb, Maine 04556 207-882-7801 shadis@prexar.com Docket No. 50
-443-LR ASLBP No. 10
-906-02-LR