| event date = 12/01/2011 13:44 EST
| event date = 12/01/2011 13:44 EST
| last update date = 12/01/2011
| last update date = 12/01/2011
| title = Control Room Air Conditioning And Control Room Emergency Ventilation Systems Inoperable
| title = Control Room Air Conditioning and Control Room Emergency Ventilation Systems Inoperable
| event text = At 1344 hours (EST) on December 1, 2011, the Control Building Instrument Air Dryer failed resulting in loss of control air.  As a result, the three Control Room Air Conditioning subsystems required by Technical Specification (TS) 3.7.4, 'Control Room Air Conditioning (AC) System,' and the two Control Room Emergency Ventilation [CREV] subsystems required by TS 3.7.3, 'Control Room Emergency Ventilation (CREV) System,' became inoperable. As a result, this condition could have prevented the fulfillment of the safety function for these systems. Because Brunswick has a shared control room, Unit 1 and Unit 2 entered TS 3.7.3 Required Action C.1, for two CREV subsystems inoperable (i.e., be in Mode 3 within 12 hours) and TS 3.7.4, Required Action E.1, for three Control Room AC subsystems inoperable (i.e., enter LCO 3.0.3 immediately).
| event text = At 1344 hours (EST) on December 1, 2011, the Control Building Instrument Air Dryer failed resulting in loss of control air.  As a result, the three Control Room Air Conditioning subsystems required by Technical Specification (TS) 3.7.4, 'Control Room Air Conditioning (AC) System,' and the two Control Room Emergency Ventilation [CREV] subsystems required by TS 3.7.3, 'Control Room Emergency Ventilation (CREV) System,' became inoperable. As a result, this condition could have prevented the fulfillment of the safety function for these systems. Because Brunswick has a shared control room, Unit 1 and Unit 2 entered TS 3.7.3 Required Action C.1, for two CREV subsystems inoperable (i.e., be in Mode 3 within 12 hours) and TS 3.7.4, Required Action E.1, for three Control Room AC subsystems inoperable (i.e., enter LCO 3.0.3 immediately).
Operability of two Control Room AC subsystems and one CREV subsystem was restored and LCO 3.0.3 was exited, at 1410 hours, when the Instrument Air Dryer was bypassed.
Operability of two Control Room AC subsystems and one CREV subsystem was restored and LCO 3.0.3 was exited, at 1410 hours, when the Instrument Air Dryer was bypassed.

Latest revision as of 21:05, 1 March 2018

ENS 47493 +/-
Where
Brunswick Duke Energy icon.png
North Carolina (NRC Region 2)
Reporting
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident
LER: 05000325/LER-2011-003
Time - Person (Reporting Time:+-2.65 h-0.11 days <br />-0.0158 weeks <br />-0.00363 months <br />)
Opened: Mike Odell
16:05 Dec 1, 2011
NRC Officer: Vince Klco
Last Updated: Dec 1, 2011
47493 - NRC Website