ML17228B045: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 03/02/1995
| issue date = 03/02/1995
| title = Forwards Rev 1 to Fracture Mechanics Evaluation..., Rev 1 to Stresses For...Pressurizer LEFM & Rev 0 to Subsequent Inservice Exam Plan for Pressurizer Instrument Nozzles.
| title = Forwards Rev 1 to Fracture Mechanics Evaluation..., Rev 1 to Stresses For...Pressurizer LEFM & Rev 0 to Subsequent Inservice Exam Plan for Pressurizer Instrument Nozzles.
| author name = SAGER D A
| author name = Sager D
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Revision as of 07:15, 19 June 2019

Forwards Rev 1 to Fracture Mechanics Evaluation..., Rev 1 to Stresses For...Pressurizer LEFM & Rev 0 to Subsequent Inservice Exam Plan for Pressurizer Instrument Nozzles.
ML17228B045
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/02/1995
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17228B046 List:
References
L-95-72, NUDOCS 9503070355
Download: ML17228B045 (3)


Text

PRIC)RI ZY (ACCELERATED RIDS PROCESSli REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)P NOTES: ACCESSION NBR:9503070355 DOC.DATE: 95/03/02 NOTARIZED:

NO DOCKET N FACIL:50-389 St.Lucie Plant, Unit 2, Florida Power 6 Light Co.05000389 AUTH.NAME'UTHOR AFFILIATION SAGER,D.A.

Florida Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)R

SUBJECT:

Forwards Rev 1 to"Fracture Mechanics Evaluation...," Rev 1 to"Stresses for...Pressurizer LEFM"&Rev 0 to"Subsequent Inservice Exam Plan for Pressurizer instrument Nozzles." I DISTRIBUTION CODE: R047D COPIES RECEIVED:LTR J ENCL g SIZE:++p TITLE: OR Submittal:

Inservice/Testing/Relief from ASM'ode-G-89-04 RECIPIENT ID CODE/NAME PD2.-2 LA NORRIS,J INTERNAL: ACRS FILE CENT R 01 RR/DE/EMEB OGC/HDS3 EXTERNAL: LITCO BROWN,B NOAC COPIES LTTR ENCL 1 1 1 1 6 6 1 1 1 1 1 0 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/SPD/RAB NRR/DE/EMCB NUDOCS-ABSTRACT RES/DSIR/EIB LITCO RANSOME,C NRC PDR COPIES LTTR ENCL 1 1 D U N NOTE TO ALL"RIDS RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACT TI IE DOCU."v!ENT CONTROL DESK, ROOM P]-37 (EXT.504-2083)TO ELI XIINATE YOUR NAME PROD!DISTRI!3UTION LISTS I'OR DOCUMENTS YOU DON"I'EED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 19 PP March 2, 1995 L-95-72 10 CFR 50.55a Florida Power 5 Light Company, P.O, Box 128, Fort Pierce, FL 34954-0128 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 RE: St.Lucie Unit 2 Docket No.50-389 Fracture Mechanics Analysis of Pressurizer Instrument Nozzle Flaws Pursuant to 10 CFR 50.55a(a)(3), Florida Power and Light Company (FPL)requests approval of the enclosed fracture mechanics evaluation with the supporting stress analysis and the subsequent ISI examination plan for the Unit~2 pressurizer instrument nozzle welds.The 1989 edition of the ASME Boiler and Pressure Vessel Code Section XI, IWB-3134(b) requires the licensee to submit analytical evaluation examination results to the regulatory authority having jurisdiction.

The NRC has previously granted approval of the initial evaluation for one fuel cycle by NRC letters dated April 1, 1994, and April 5, 1994.Approval of the Fracture Mechanics Evaluation and the In-Service Examination Plan is requested by July 1, 1995, to support the next Unit.2 Refueling Outage which is scheduled to start on September 25, 1995.FPL performed the evaluation of the pressurizer instrument nozzle flaws as described in IWB-3600.Based on the results of the evaluation, FPL has determined that the nozzles meet the acceptance criteria for continued service without the flaws being removed.Attachments A and B conclude that the nozzles are acceptable for an additional 30 years of plant life.The area containing the flaw will be periodically examined as described in Attachment C.Please contact us if there are any questions about this submittal.

Very truly yours, 4(A D.A.ger Vice P sident St.Lu'e Plant DAS/GRM Enclosures (3)cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant 9503070355 950302 PDR ADOCK 05000389 p PDR an FPL Group company 070047

~~lf