ML15126A389: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:AdN Three Mile Island Unit 1ExetonGenerationWRoute 441 SouthExelon Generatio  
{{#Wiki_filter:AdN Three Mile Island Unit 1 ExetonGenerationWRoute 441 South Exelon Generatio  
, P.O. Box 480Middletown, PA 17057717-948-8000 Officewww.exeloncorp.com April 30, 2015TMI-1 5-052U. S. Nuclear Regulatory Commission Attn: Document Control DeskWashington, DC 20555THREE MILE ISLAND NUCLEAR STATION UNIT 1 AND UNIT 2RENEWED OPERATING LICENSE NO. DPR-50 AND POSSESSION ONLYLICENSE NO. DPR 73DOCKET NOS. 50-289 AND 50-320
, P.O. Box 480 Middletown, PA 17057 717-948-8000 Office www.exeloncorp.com April 30, 2015 TMI-1 5-052 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 THREE MILE ISLAND NUCLEAR STATION UNIT 1 AND UNIT 2 RENEWED OPERATING LICENSE NO. DPR-50 AND POSSESSION ONLY LICENSE NO. DPR 73 DOCKET NOS. 50-289 AND 50-320  


==SUBJECT:==
==SUBJECT:==
 
COMBINED 2014 ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT The 2014 Annual Radioactive Effluent Release Reports required by TMI-1 Technical Specification 6.9.4.1, TMI-2 Technical Specifications 6.8.1.2, and 6.12, and the Off-Site Dose Calculation Manual Part 4, Section 2.1, is enclosed.Attachment 1 contains a summary of the quantities of radioactive liquid and gaseous effluents released from the site as outlined in Reg. Guide 1.21, Rev. 1, with data summarized on a quarterly basis following the format of Appendix B thereof.Attachment 2 contains information for each type of solid waste shipped offsite during the report period including the container volume, total curie quantity (specified as determined by measurement or estimate), principal radionuclides (specified as determined by measurement or estimate) and type of waste.Attachment 3 includes a summary of unplanned releases from the site to unrestricted areas of radioactive materials in gaseous and liquid effluents made during the reporting period.Attachment 4 describes any changes made during 2014 to the Process Control Program (PCP) documents or to the Offsite Dose Calculation Manual (ODCM) and a listing of new locations for dose calculations and/or environmental monitoring identified by the land use census pursuant to Part 3, Section 8.2, of the ODCM.Attachment 5 reports all instrumentation not returned to operable status within 30 days per the TMI ODCM Part 1, Sections 2.1.1.b and 2.1.2.b, and Part 2, Section 2.1.2.b.V Vq2 2014 Annual Radioactive Effluent Release Report for TMI Page 2 of 3 TMI-15-052 Attachment 6 is quarterly summaries of hourly meteorological data collected for 2014 in the form of joint frequency distribution of wind speed, wind direction and atmospheric stability.
COMBINED 2014 ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORTThe 2014 Annual Radioactive Effluent Release Reports required by TMI-1 Technical Specification 6.9.4.1, TMI-2 Technical Specifications 6.8.1.2, and 6.12, and the Off-SiteDose Calculation Manual Part 4, Section 2.1, is enclosed.
Attachment 7 is an assessment of the radiation doses due to the radioactive liquid and gaseous effluents released from the respective unit during 2014.Attachment 8 is an assessment of the radiation doses from the radioactive liquid and gaseous effluents to members of the public due to their activities inside the site boundary during 2014.Attachment 9 is an assessment of the radiation doses to the most likely exposed real individual from reactor releases and other nearby uranium fuel cycle sources including doses from primary effluent pathways and direct radiation for 2014.Attachment 10 is a summation of deviations from the sampling and analysis regime specified in the ODCM for TMI-1 and TMI-2.Pursuant to Technical Specifications Amendment 284, issued 12/30/14, which deleted TS 6.17 and created FSAR Section 11.2.6 to report Major Changes to Radioactive Waste Treatment Systems in the Annual Radioactive Effluent Release Report, this report is included as Attachment 11.Enclosure 1 is a copy of the 'TMI Offsite Dose Calculation Manual (ODCM)", CY-TM-1 70-300, Revision 3, which was issued on May 23, 2012, and current as of December 31, 2014. There were no revisions made to the ODCM during 2014.
Attachment 1 contains a summary of the quantities of radioactive liquid and gaseouseffluents released from the site as outlined in Reg. Guide 1.21, Rev. 1, with datasummarized on a quarterly basis following the format of Appendix B thereof.Attachment 2 contains information for each type of solid waste shipped offsite during thereport period including the container volume, total curie quantity (specified as determined by measurement or estimate),
2014 Annual Radioactive Effluent Release Report for TMI Page 3 of 3 TMI-15-052 Enclosure 2 is a copy of the change for TMI's Process Control Program, RW-AA-100 Revision 10, which was issued on April 16, 2014.Please contact Laura Weber at 717-948-8947 if you have any questions concerning this report.Sincerely, Thomas P. Haaf Plant Manager TPH/LKW/dam Attachments/Enclosures cc: Region 1 Administrator TMI Senior Resident Inspector TMI-1 Senior Project Manager TMI-2 Project Manager GPU Nuclear Cognizant Officer Department of Environmental Protection, Bureau of Radiation Protection}}
principal radionuclides (specified as determined bymeasurement or estimate) and type of waste.Attachment 3 includes a summary of unplanned releases from the site to unrestricted areas of radioactive materials in gaseous and liquid effluents made during the reporting period.Attachment 4 describes any changes made during 2014 to the Process Control Program(PCP) documents or to the Offsite Dose Calculation Manual (ODCM) and a listing of newlocations for dose calculations and/or environmental monitoring identified by the land usecensus pursuant to Part 3, Section 8.2, of the ODCM.Attachment 5 reports all instrumentation not returned to operable status within 30 days perthe TMI ODCM Part 1, Sections 2.1.1.b and 2.1.2.b, and Part 2, Section 2.1.2.b.V Vq2 2014 Annual Radioactive Effluent Release Report for TMIPage 2 of 3TMI-15-052 Attachment 6 is quarterly summaries of hourly meteorological data collected for 2014 in the formof joint frequency distribution of wind speed, wind direction and atmospheric stability.
Attachment 7 is an assessment of the radiation doses due to the radioactive liquid and gaseouseffluents released from the respective unit during 2014.Attachment 8 is an assessment of the radiation doses from the radioactive liquid and gaseouseffluents to members of the public due to their activities inside the site boundary during 2014.Attachment 9 is an assessment of the radiation doses to the most likely exposed real individual from reactor releases and other nearby uranium fuel cycle sources including doses from primaryeffluent pathways and direct radiation for 2014.Attachment 10 is a summation of deviations from the sampling and analysis regime specified inthe ODCM for TMI-1 and TMI-2.Pursuant to Technical Specifications Amendment 284, issued 12/30/14, which deleted TS 6.17and created FSAR Section 11.2.6 to report Major Changes to Radioactive Waste Treatment Systems in the Annual Radioactive Effluent Release Report, this report is included asAttachment 11.Enclosure 1 is a copy of the 'TMI Offsite Dose Calculation Manual (ODCM)",
CY-TM-1 70-300,Revision 3, which was issued on May 23, 2012, and current as of December 31, 2014. Therewere no revisions made to the ODCM during 2014.
2014 Annual Radioactive Effluent Release Report for TMIPage 3 of 3TMI-15-052 Enclosure 2 is a copy of the change for TMI's Process Control Program, RW-AA-100 Revision 10, which was issued on April 16, 2014.Please contact Laura Weber at 717-948-8947 if you have any questions concerning this report.Sincerely, Thomas P. HaafPlant ManagerTPH/LKW/dam Attachments/Enclosures cc: Region 1 Administrator TMI Senior Resident Inspector TMI-1 Senior Project ManagerTMI-2 Project ManagerGPU Nuclear Cognizant OfficerDepartment of Environmental Protection, Bureau of Radiation Protection}}

Revision as of 04:32, 9 July 2018

Three Mile Island, Units 1 and 2 - Submittal of Combined 2014 Annual Radioactive Effluent Release Report
ML15126A389
Person / Time
Site: Three Mile Island  Constellation icon.png
Issue date: 04/30/2015
From: Haaf T P
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
Shared Package
ML15126A376 List:
References
TMI-15-052
Download: ML15126A389 (3)


Text

AdN Three Mile Island Unit 1 ExetonGenerationWRoute 441 South Exelon Generatio

, P.O. Box 480 Middletown, PA 17057 717-948-8000 Office www.exeloncorp.com April 30, 2015 TMI-1 5-052 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 THREE MILE ISLAND NUCLEAR STATION UNIT 1 AND UNIT 2 RENEWED OPERATING LICENSE NO. DPR-50 AND POSSESSION ONLY LICENSE NO. DPR 73 DOCKET NOS. 50-289 AND 50-320

SUBJECT:

COMBINED 2014 ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT The 2014 Annual Radioactive Effluent Release Reports required by TMI-1 Technical Specification 6.9.4.1, TMI-2 Technical Specifications 6.8.1.2, and 6.12, and the Off-Site Dose Calculation Manual Part 4, Section 2.1, is enclosed.Attachment 1 contains a summary of the quantities of radioactive liquid and gaseous effluents released from the site as outlined in Reg. Guide 1.21, Rev. 1, with data summarized on a quarterly basis following the format of Appendix B thereof.Attachment 2 contains information for each type of solid waste shipped offsite during the report period including the container volume, total curie quantity (specified as determined by measurement or estimate), principal radionuclides (specified as determined by measurement or estimate) and type of waste.Attachment 3 includes a summary of unplanned releases from the site to unrestricted areas of radioactive materials in gaseous and liquid effluents made during the reporting period.Attachment 4 describes any changes made during 2014 to the Process Control Program (PCP) documents or to the Offsite Dose Calculation Manual (ODCM) and a listing of new locations for dose calculations and/or environmental monitoring identified by the land use census pursuant to Part 3, Section 8.2, of the ODCM.Attachment 5 reports all instrumentation not returned to operable status within 30 days per the TMI ODCM Part 1, Sections 2.1.1.b and 2.1.2.b, and Part 2, Section 2.1.2.b.V Vq2 2014 Annual Radioactive Effluent Release Report for TMI Page 2 of 3 TMI-15-052 Attachment 6 is quarterly summaries of hourly meteorological data collected for 2014 in the form of joint frequency distribution of wind speed, wind direction and atmospheric stability.

Attachment 7 is an assessment of the radiation doses due to the radioactive liquid and gaseous effluents released from the respective unit during 2014.Attachment 8 is an assessment of the radiation doses from the radioactive liquid and gaseous effluents to members of the public due to their activities inside the site boundary during 2014.Attachment 9 is an assessment of the radiation doses to the most likely exposed real individual from reactor releases and other nearby uranium fuel cycle sources including doses from primary effluent pathways and direct radiation for 2014.Attachment 10 is a summation of deviations from the sampling and analysis regime specified in the ODCM for TMI-1 and TMI-2.Pursuant to Technical Specifications Amendment 284, issued 12/30/14, which deleted TS 6.17 and created FSAR Section 11.2.6 to report Major Changes to Radioactive Waste Treatment Systems in the Annual Radioactive Effluent Release Report, this report is included as Attachment 11.Enclosure 1 is a copy of the 'TMI Offsite Dose Calculation Manual (ODCM)", CY-TM-1 70-300, Revision 3, which was issued on May 23, 2012, and current as of December 31, 2014. There were no revisions made to the ODCM during 2014.

2014 Annual Radioactive Effluent Release Report for TMI Page 3 of 3 TMI-15-052 Enclosure 2 is a copy of the change for TMI's Process Control Program, RW-AA-100 Revision 10, which was issued on April 16, 2014.Please contact Laura Weber at 717-948-8947 if you have any questions concerning this report.Sincerely, Thomas P. Haaf Plant Manager TPH/LKW/dam Attachments/Enclosures cc: Region 1 Administrator TMI Senior Resident Inspector TMI-1 Senior Project Manager TMI-2 Project Manager GPU Nuclear Cognizant Officer Department of Environmental Protection, Bureau of Radiation Protection