South Texas Project, Units 1 and 2 - Report of Full Compliance with Order EA-12-051, Reliable Spent Fuel Pool Instrumentation
ML16043A355
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/19/2016
From: Powell G T
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-12-051, NOC-AE-1 003297, STI 34206364, TAC MF0827, TAC MF0828
Download: ML16043A355 (7)


Text

Nuclear Operating CompanySouth Texas Pro/ect Electric Generating Station P.O. Box 28.9 Wadsworth, Toxas 77483 January 19, 2016NOC-AE-1 500329710 CFR 2.202U. S. Nuclear Regulatory CommissionAttention: Document Control DeskWashington, DC 20555-0001South Texas ProjectUnit 1 & 2Docket Nos. STN 50-498, STN 50-499Report of Full Compliance with Order EA-12-051Reliable Spent Fuel Pool InstrumentationReferences:1. Letter, Eric Leeds to All Power Reactor Licensees, Issuance of Order to ModifyLicenses with Regard to Requirements for Reliable Spent Fuel PoolInstrumentation, March 12, 2012 (EA-1 2-051 ) (ST-AE-NOC-1 2002271)(ML1 2054A679)2. Letter, D. L. Koehl to NRC Document Control Desk, Overall Integrated PlanRegarding Commission Order Modifying Licenses with Regard to Reliable SpentFuel Pool Instrumentation (Order Number EA-12-051), February 28, 2013 (NOC-AE-1 3002959) (MLE13070A006)3. Letter, G. T. Powell to NRC Document Control Desk, Six-Month Status Update ofOverall Integrated Plan in Response to Order EA-12-051, "Reliable Spent FuelPool Instrumentation" (TAC Nos. MF0827 and MF0828), August 27, 2013(ML1 3249A078)4. Letter, G. T. Powell to NRC Document Control Desk, 2nd Six-Month Status Updateof Overall Integrated Plan in Response to Order EA-12-051, "Reliable Spent FuelPool Instrumentation" (TAC Nos. MF0827 and MF0828) February 27, 2014(ML1 4066A388)5. Letter, G. T. Powell to NRC Document Control Desk, 3rd Six-Month Status Updateof Overall Integrated Plan in Response to Order EA-1 2-051, "Reliable Spent Fuel...... .Pool Instrumerntation" (TAC Nos.iMF0827 and MF0828) AuguSt 27, 2014(ML14251A028)6. Letter, G. T. Powell to NRC Document Control Desk, 4th Six-Month Status Updateof Overall Integrated Plan in Response to Order EA-1 2-051, "Reliable Spent FuelPool Instrumentation" (TAC Nos. MF0827 and MF0828) February 26, 2015(ML1 5069A2;20)STI 34206364 NOC-AE-1 5003297Page 2 of 37. Letter, G. T. Powell to NRC Document Control Desk, 5th Six-Month Status Updateof Overall Integrated Plan in Response to Order EA-1 2-051, "Reliable Spent FuelPool Instrumentation" (TAC Nos. MF0827 and MF0828) August 26, 2015(ML1 525 1A206)8. NRC Letter, South Texas Project, Units 1 and 2 -Interim Staff Evaluation andRequest For Additional Information Regarding the Overall Integrated Plan forImplementation of Order EA-1 2-051, Reliable Spent Fuel Pool Instrumentation(TAC Nos. MF0827 AND MF0828), September 19, 2013 (ML13254A210)On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Order EA-12-051(Reference 1) modifying licenses with regard to requirements for reliable spent fuel poolinstrumentation. The Order was immediately effective and directed STP Nuclear OperatingCompany (STPNOC) to install reliable spent fuel pool level instrumentation. Reference 1required submission of an overall integrated plan (OIP) and status reports at 6 month intervalspursuant to Section IV, Condition C (See References 2, 3, 4, 5, 6, and 7).The purpose of this letter is to provide the report of full compliance with the Order EA-1 2-051(Reference 1) pursuant to Section IV, Condition 0.3 of the Order for South Texas Project, Units1 and 2. Full compliance with Order EA-12-051 was achieved. See further details inAttachment 1.The STPNOC responses providing additional information as requested in Reference 8 havebeen summar'ized in the Attachment 1. As such, STPNOC considers these items completepending NRC closure.There are no regulatory commitments in this letter.If there are any questions, please contact Robyn Savage at 361-972-7438.I declare under penalty of perjury that the foregoing is true and correct.Executed on: G. T. PowellSite Vice PresidentAttachment: Compliance Bases for Order EA-12-051 and Status of Requests for InformationSTI 34206364 NOC-AE-1 5003297Page 3 of 3cc:(paper copy)(electronic copy)Regional Administrator, Region IVU.S. Nuclear Regulatory Commission1600 East Lamar BoulevardArlington, TX 76011-4511Lisa M. RegnerSenior Project ManagerU.S. Nuclear Regulatory CommissionOne White Flint North (MS O8H04)11555 Rockville PikeRockville, MD 20852NRC Resident InspectorU. S. Nuclear Regulatory CommissionP. O. Box 289, Mail Code: MN116Wadsworth, TX 77483Tony BrownProject ManagerOrders Management BranchJapan Lessons-Learned DivisionU.S. Nuclear Regulatory CommissionOne White Flint North (MS 13F15)11555 Rockville PikeRockville, MD 20852Milton ValentinProject ManagerOrders Management BranchJapan Lessons-Learned DivisionU.S. Nuclear Regulatory CommissionOne White Flint North (MS 13F15)11555 Rockville PikeRockville, MD 20852Morgqan, Lewis & Bockius LLPSteve Frantz, EsquireU.S. Nuclear Requlatory CommissionLisa M. RegnerNRG South Texas LPJohn RaganChris O'HaraJim von SuskilCPS EnergyKevin PolioCris EugsterL. 0. BlaylockCramn Caton & James, P.C.Peter NemethCity of AustinElaina BallJohn WesterTexas Dept. of State Health ServicesRichard A. RatliffRobert Free

Attachment

NOC-AE-1 5003297ATTACHMENTCompliance Bases for Order EA-12-051 and Status of Requests for Information

Attachment

NOC-AE-1 5003297Page 1 of 3Compliance Bases for Order EA-12-051 and Status of Requests for InformationBackpqroundOn March 12, 2012, the NRC issued Order EA-12-051, Order Modifying Licenses with Regardto Reliable Spent Fuel Pool (SFP) Instrumentation (Reference 1) to STP Nuclear OperatingCompany (STPNOC). The Order was effective immediately and directed STPNOC to installreliable SFP instrumentation as outlined in Attachment 2 of the Order at South Texas Project(STP). The information provided herein documents full compliance by STPNOC in response tothe Order.ComplianceSTPNOC has installed two independent full-scale lejvel monitors in the STP Unit 1 and Unit 2SFPs in response to Reference 1. Implementation includes diverse level sensors in the SFPs,backup uninterruptible power supplies (UPS), and level indicators in the radwaste control roomarea. Modifications and training have been completed and applicable procedures have beendeveloped and are available for use in accordance with the site procedure control program.STPNOC submitted STP's Overall Integrated Plan (OIP) by Reference 2. STPNOC's responsesto the NRC Interim Staff Evaluation Requests for Additional Information (ISE RAIs) in Reference8 have been addressed as documented in the correspondence referenced in the table below.The RAIs are considered complete pending NRC closure.Actions CompletedSEP Level Instrumentation (SFPLI) required by NRC Order EA-12-051 has been implementedin both Unit I and Unit 2 providing SEP level monitoring capability displaying remotely in eachrespective unit's Radwaste Control Room.Milestone CompletionSFPLI Milestones Unit 1 & Unit 2 Completion DateSubmit Overall Integrated Plan (Unit 1 & Unit 2) February 28, 20136 Month Updates & Unit Compliance Submittals1st Update August 27, 2013"2nd Up)date February 27, 20143rd Update August 27, 20144th Update February 26, 20155th Update August 26, 2015NRC Notification of Compliance with SFPLI Order for Unit 2 July 2, 2015Modifications/Implementation:

Attachment

NOC-AE-1 5003297Page 2 of 3Unit 1 Modification Design Complete October 24, 2015Unit 1 SEPLI Modification Implemented November 3, 2015Unit 2 Modifications Design Complete April 18, 2015Unit 2 SEPLI Modification Implemented May 1, 2015Programs Established:Training January 2015Procedures Issued (final changes for both units) November 11, 2015NRC Rea]uests for Additional Information (RAIs)STPNOC's response to the NRC Interim Staff Evaluation (ISE) Open Items (ISE RAIs) identifiedin Reference 8 have been addressed and closed as documented in References 3, 4, 5, 6, and 7and are considered complete pending NRC Closure. Additional documents were provided tothe NRC staff through the ePortal. NRC QIP Requests for Additional Information (OIP RAIs) inReference 11 were superseded by the NRC ISE RAIs. The following table provides completionreferences for each ISE RAI.RAIs ReferencesISE AI ,5,67,89,1,13,4,1,182nd status updateISERAI_4,_5,_,_7,_8,_9,_12,13,_14,_15,_1 (Reference 4)ISE RA 3,113rd status updateISE AI 3 11(Reference 5)ISE AI 6, 1,194th status updateISE AI 1, 17 19(Reference 6)ISE AI 12,104th and 5th status updatesISE Pl 1, , 10(References 6, 7)NRC Onsite Audit Questions (AQs)The NRC Onsite Audit of STP's SFPLI implementation of Order EA-12-051 occurred the weekof February 9, 2015. Three specific items remained open following the exit to include ISE RAl#1, ISE RAl #2 and ISE RAI #10. The responses to these RAls have been revised andsubsequently closed as indicated in NRC report for the Onsite Audit (Reference 10) where noNRC Open Audit Questions were ..... .... ..References1..Letter, Eric Leeds to All Power Reactor Licensees, Issuance of Order to ModifyLicenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation,March 12, 2012 (EA-12-051) (ST-AE-NOC-12002271) (ML12054A679)

Attachment

NOC-AE-1 5003297Page 3 of 32. Letter, D. L. Koehl to NRC Document Control Desk, Overall Integrated PlanRegarding Commission Order Modifying Licenses with Regard to Reliable SpentFuel Pool Instrumentation (Order Number EA-12-051), February 28, 2013 (NOC-AE-13002959) (ML1 3070A006)3. Letter, G. T. Powell to NRC Document Control Desk, Six-Month Status Update ofOverall Integrated Plan in Response to Order EA-12-051, "Reliable Spent Fuel PoolInstrumentation" (TAC Nos. MF0827 and MF0828), August 27, 2013 (ML13249A078)4. Letter, G. T. Powell to NRC Document Control Desk, 2nd Six-Month Status Update ofOverall Integrated Plan in Response to Order EA-12-051, "Reliable Spent Fuel PoolInstrumentation" (TAO Nos. MF0827 and MF0828) February 27, 2014 (ML14066A388)5. Letter, G. T. Powell to NRC Document Control Desk, 3rd Six-Month Status Update ofOverall Integrated Plan in Response to Order EA-12-051, "Reliable Spent Fuel PoolInstrumentation" (TAC Nos. MF0827 and MF0828) August 27, 2014 (ML14251A028)6. Letter, G. T. Powell to NRC Document Control Desk, 4th Six-Month Status Update ofOverall Integrated Plan in Response to Order EA-12-051, "Reliable Spent Fuel PoolInstrumentation" (TAO Nos. MF0827 and MF0828) February 26, 2015 (MLI 5069A220)7. Letter, G. T. Powell to NRC Document Control Desk, 5th Six-Month Status Update ofOverall Integrated Plan in Response to Order EA-12-051, "Reliable Spent Fuel PoolInstrumentation" (TAO Nos. MF0827 and MF0828) August 26, 2015 (ML15251A206)8. NRC Letter, South Texas Project, Units 1 and 2 -Interim Staff Evaluation andRequest For Additional Information Regarding the Overall Integrated Plan forImplementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TACNos. MF0827 AND MF0828), September 19, 2013 (ML13254A210)9. Letter, G. T. Powell to NRC Document Control Desk, Unit 2 Notification ofCompliance with Orders EA-12-049 for Mitigation Strategies for Beyond-Design-Basis External Events and EA-12-051 for Reliable Spent Fuel Pool Instrumentation(TAC Nos. MF0826 and MF0828) July 2, 2015 (ML15196A031)10. Letter from T. Brown, NRC, to D.L. Koehl, South Texas Project, Units 1 and 2 -Reportfor the Onsite Audit Regarding Implementation of Mitigating Strategies and ReliableSpent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 (TAO Nos.MF0825, MF0826, MF0827, and MF0828), May 6, 2015 (ML15I111A465)11. NRC letter, "South Texas Project, Units 1 and 2 -Request for Additional InformationRE: Overall Integrated Plan in Response to Order EA-1 2-051, "Reliable Spent FuelPool Instrumentation" (TAO Nos. MF0827 and MF0828), June 7, 2013 (ML1 311 49A09)