In the Matter of | In the Matter of | ||
FLORIDA POWER & LIGHT COMPANY | FLORIDA POWER & LIGHT COMPANY Docket Nos. 50-250- SLR-2 50- 251-SLR-2 | ||
(Turkey Point Nuclear Generating Units 3 and 4) | (Turkey Point Nuclear Generating Units 3 and 4) | ||
NRC | NRC STAFF ANSWER OPPOSING MIAMI WATERKEEPER MOTION TO ADMIT AMENDED AND NEW CONTENTIONS AND PETITION FOR WAIVER | ||
INTRODUCTION | INTRODUCTION | ||
Pursuant to 10 C.F.R. § 2.309(i) | Pursuant to 10 C.F.R. § 2.309(i), the Initial Scheduling Order dated March 26, 2024, and | ||
the Memorandum and Order (Granting Motion for Extension of Time) dated April 26, 2024, the | the Memorandum and Order (Granting Motion for Extension of Time) dated April 26, 2024, the | ||
U.S. Nuclear Regulatory Commission Staff files this answer opposing | U.S. Nuclear Regulatory Commission Staff files this answer opposing the amended and new | ||
contentions and Petition for Waiver filed by Biscayne Bay Waterkeeper, Inc. d/b/a Miami | contentions and Petition for Waiver filed by Biscayne Bay Waterkeeper, Inc. d/b/a Miami | ||
Line 42: | Line 42: | ||
Waterkeeper (Petitioner). Petitioner filed three amended (Amended Contentions 1-A, 1-B, and 1- | Waterkeeper (Petitioner). Petitioner filed three amended (Amended Contentions 1-A, 1-B, and 1- | ||
C) and three new (New Contention 2 and New Contentions 3-A and 3- | C) and three new (New Contention 2 and New Contentions 3-A and 3-B) contentions | ||
challenging the Staffs environmental review of the proposed action of licensing Florida Power & | challenging the Staffs environmental review of the proposed action of licensing Florida Power & | ||
Line 48: | Line 48: | ||
Light Company (FPL) to operate Turkey Point Nuclear Generating Units 3 and 4 for an | Light Company (FPL) to operate Turkey Point Nuclear Generating Units 3 and 4 for an | ||
additional 20 years, i.e., until July 19, 2052 for Unit 3 and | additional 20 years, i.e., until July 19, 2052 for Unit 3 and until April 10, 2053 for Unit 4. | ||
Petitioner s three amended contentions are inadmissible | Petitioner s three amended contentions are inadmissible because they are not based on new | ||
information, reiterate previous arguments that were previously rejected, | information, reiterate previous arguments that were previously rejected, do not raise genuine | ||
disputes | disputes with the Staffs environmental review, and are not factual supported. Petitioner s three | ||
new contentions are inadmissible because | new contentions are inadmissible because New Contention 2 does not raise a genuine dispute | ||
with the Staffs environmental review | with the Staffs environmental review, is not factually supported, and is not material and because | ||
New Contentions 3-A and 3- | New Contentions 3-A and 3-B are not based on new information, reiterate previous arguments | ||
that were previously rejected, | that were previously rejected, and do not raise genuine disputes with the Staffs environmental | ||
review. Further, New Contention 3-B is not within the limited | review. Further, New Contention 3-B is not within the limited scope of this license renewal | ||
proceeding. | proceeding. Although Petitioner requests a waiver of the NRCs regulations to support the | ||
admissibility of New Contention 3-B, Petitioner does not meet the requirements of showing that | admissibility of New Contention 3-B, Petitioner does not meet the requirements of showing that | ||
Line 74: | Line 74: | ||
safety or environmental problem. Because none of Petitioner s amended or new contentions | safety or environmental problem. Because none of Petitioner s amended or new contentions | ||
meet both the good cause requirements in 10 C.F.R. § 2.309(c)(i) and (ii) o | meet both the good cause requirements in 10 C.F.R. § 2.309(c)(i) and (ii) o f being based on new | ||
and | and materially different information and the contention admissibility requirements in 10 C.F.R. | ||
§ 2.309(f), and because the Petition for Waiver does not | § 2.309(f), and because the Petition for Waiver does not meet the requirements in 10 C.F.R. | ||
§ 2.335, the | § 2.335, the amended and new contentions should be dismissed and the Petition for Waiver | ||
should be denied. Additionally, because there would be no admitted or pending contentions | should be denied. Additionally, because there would be no admitted or pending contentions | ||
Line 92: | Line 92: | ||
Economic Resources, Division of Environmental Resources Management (DERM), entered into | Economic Resources, Division of Environmental Resources Management (DERM), entered into | ||
a consent agreement with FPL | a consent agreement with FPL (2015 DERM Consent Agreement) that included the | ||
requirements to construct a recovery well system to retract hypersaline groundwater in the | requirements to construct a recovery well system to retract hypersaline groundwater in the | ||
Line 98: | Line 98: | ||
Biscayne Aquifer and to freshen the water in the Turkey Point cooling canal system (CCS). 1 In | Biscayne Aquifer and to freshen the water in the Turkey Point cooling canal system (CCS). 1 In | ||
June 2016, | June 2016, the State of Florida Department of Environmental Protection (FDEP) entered into a | ||
Consent Order with FPL (2016 FDEP Consent Order) that included | Consent Order with FPL (2016 FDEP Consent Order) that included the requirement to cease | ||
1 Consent Agreement between Miami-Dade County, through its Department of Regulatory and Economic Resources, Division of Environmental Resources Management, and Florida Power & | 1 Consent Agreement between Miami-Dade County, through its Department of Regulatory and Economic Resources, Division of Environmental Resources Management, and Florida Power & | ||
Line 111: | Line 111: | ||
By {{letter dated|date=January 30, 2018|text=letter dated January 30, 2018}}, as supplemented, FPL submitted to the NRC a | By {{letter dated|date=January 30, 2018|text=letter dated January 30, 2018}}, as supplemented, FPL submitted to the NRC a | ||
subsequent license renewal application (SLRA) seeking permission | subsequent license renewal application (SLRA) seeking permission to operate Turkey Point | ||
Units 3 and 4 | Units 3 and 4 for an additional 20 years, i.e., from July 19, 2032, and April 10, 2033, to July 19, | ||
2052, | 2052, and April 10, 2053, respectively. 3 On August 1, 2018, Petitioner, along with Friends of the | ||
Earth and Natural Resources Defense Council (collectively, Joint Petitioners), filed a timely | Earth and Natural Resources Defense Council (collectively, Joint Petitioners), filed a timely | ||
hearing request challenging | hearing request challenging the SLRA. 4 The Staff and FPL filed answers in opposition, 5 to which | ||
Joint Petitioners replied. 6 | Joint Petitioners replied. 6 | ||
In LBP- | In LBP-19-3, the Board, among other things, granted Joint Petitioners hearing request | ||
and | and admitted, as revised, two contentions. 7 The first admitted contention, Contention 1-E, | ||
argued | argued that the ER was deficient for failing to consider mechanical draft cooling towers as a | ||
2 Consent Order between State of Florida Department of Environmental Protection and Florida Power & Light Company (Jun. 20, 2016) (ML16216A216) (2016 FDEP Consent Order). | 2 Consent Order between State of Florida Department of Environmental Protection and Florida Power & Light Company (Jun. 20, 2016) (ML16216A216) (2016 FDEP Consent Order). | ||
Line 133: | Line 133: | ||
3 See Letter from Mano K. Nazar, FPL, to NRC Document Control Desk (Jan. 30, 2018) | 3 See Letter from Mano K. Nazar, FPL, to NRC Document Control Desk (Jan. 30, 2018) | ||
(ML18037A812 (package)) (SLRA); Letter from William D. Maher, FPL, to NRC Document Control Desk (Feb. 9, 2018) (ML18044A653) (SLRA Supplement 1); Letter from William D. | (ML18037A812 (package)) (SLRA); Letter from William D. Maher, FPL, to NRC Document Control Desk (Feb. 9, 2018) (ML18044A653) (SLRA Supplement 1); Letter from William D. | ||
Maher, FPL, to NRC Document Control Desk (Feb. 16, 2018) (ML18053A123 | Maher, FPL, to NRC Document Control Desk (Feb. 16, 2018) (ML18053A123 (package)) ( S L R A Supplement 2); Letter from William D. Maher, FPL, to NRC Document Control Desk (Mar. 1, 2018) (ML18072A224 (package)) (SLRA Supplement 3); and Letter from William D. Maher, FPL, to NRC Document Control Desk (Apr. 10, 2018) (ML18113A132 (package)) (SLRA Revision 1). | ||
4 Request for Hearing and Petition to Intervene Submitted by Friends of the Earth, Natural Resources Defense Council, and Miami Waterkeeper (Aug. 1, 2018) (ML18213A418) (Joint Petition). | 4 Request for Hearing and Petition to Intervene Submitted by Friends of the Earth, Natural Resources Defense Council, and Miami Waterkeeper (Aug. 1, 2018) (ML18213A418) (Joint Petition). | ||
Line 140: | Line 140: | ||
6 Reply in Support of Request for Hearing and Petition to Intervene Submitted by Friends of the Earth, Natural Resources Defense Council, and Miami Waterkeeper (Sep. 10, 2018) | 6 Reply in Support of Request for Hearing and Petition to Intervene Submitted by Friends of the Earth, Natural Resources Defense Council, and Miami Waterkeeper (Sep. 10, 2018) | ||
(ML18253A280) | (ML18253A280). | ||
7 Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), LBP-19-3, 89 NRC 245, 301- | 7 Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), LBP-19-3, 89 NRC 245, 301-2 (2019). | ||
reasonable alternative, given the adverse impact of the continued operations of the Turkey Point | reasonable alternative, given the adverse impact of the continued operations of the Turkey Point | ||
Line 148: | Line 148: | ||
CCS on the threatened American crocodile and its critical seagrass habitat.8 The second | CCS on the threatened American crocodile and its critical seagrass habitat.8 The second | ||
admitted contention, Contention 5 | admitted contention, Contention 5 -E, argued that the ER wa s deficient in its failure to recognize | ||
Turkey Point as a source of ammonia in freshwater wetlands surrounding the site, and | Turkey Point as a source of ammonia in freshwater wetlands surrounding the site, and in its | ||
failure to analyze the potential impacts of ammonia releases during the renewal period on | failure to analyze the potential impacts of ammonia releases during the renewal period on | ||
Line 156: | Line 156: | ||
threatened and endangered species and their critical habitat. 9 | threatened and endangered species and their critical habitat. 9 | ||
In March 2019, consistent with 10 C.F.R. | In March 2019, consistent with 10 C.F.R. § 51.95(c), the Staff issued, as a supplement to | ||
the NRCs 2013 | the NRCs 2013 license renewal generic environmental impact statement, NUREG-1437 (LR | ||
GEIS), 10 its draft environmental impact statement regarding the Turkey Point SLRA | GEIS), 10 its draft environmental impact statement regarding the Turkey Point SLRA (2019 | ||
DSEIS). 11 Among other things, the 2019 DSEIS considered the use of mechanical draft cooling | DSEIS). 11 Among other things, the 2019 DSEIS considered the use of mechanical draft cooling | ||
Line 166: | Line 166: | ||
towers as an alternative to the CCS12 and analyzed ammonia releases within and around the | towers as an alternative to the CCS12 and analyzed ammonia releases within and around the | ||
Turkey Point site. | Turkey Point site. 13 Therefore, in LBP-19-6, the Board determined that the omissions that were | ||
the bases for Contentions | the bases for Contentions 1-E and 5-E had been cured and thus that the admitted contentions | ||
were rendered moot. 14 The Board did not terminate the proceeding, though, because the Board | were rendered moot. 14 The Board did not terminate the proceeding, though, because the Board | ||
Line 176: | Line 176: | ||
8 Id. at 287. | 8 Id. at 287. | ||
9 Id. at 293- | 9 Id. at 293-94. | ||
10 Generic Environmental Impact Statement for License Renewal of Nuclear Plants, NUREG-1437, R | 10 Generic Environmental Impact Statement for License Renewal of Nuclear Plants, NUREG-1437, R e v. 1, Vols. 1-3 (Jun. 2013) (ML13107A023 (package)) (LR GEIS). | ||
11 | 11 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Draft Report for Comment, NUREG-1437, Supplement 5, Second Renewal (Mar. 2019) | ||
(ML19078A330) (2019 DSEIS). | (ML19078A330) (2019 DSEIS). | ||
12 Id. at 2 | 12 Id. at 2 2-13, 2 2-23, 4-11, 4 4-19, 4-21, 4 4-42, 4-48-4-49, 4 4-60, 4-76, 4-82-4-84, 4-88, 4 4-95, 4-97. | ||
13 Id. at 3 | 13 Id. at 3 3-44. | ||
14 Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), LBP- | 14 Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), LBP-19-6, 90 NRC 17, 26 (2019). | ||
petition for waiver filed by Joint Petitioners. 15 The Staff and FPL filed answers opposing | petition for waiver filed by Joint Petitioners. 15 The Staff and FPL filed answers opposing these | ||
filings, 16 to which Joint Petitioners replied. | filings, 16 to which Joint Petitioners replied. 17 In LBP-19-8, the Board dismissed Joint Petitioners | ||
new and amended contentions and petition for waiver and, as there were no | new and amended contentions and petition for waiver and, as there were no pending | ||
contentions remaining before it, the Board terminated the proceeding.18 Joint Petitioners | contentions remaining before it, the Board terminated the proceeding.18 Joint Petitioners | ||
appealed LBP- | appealed LBP-19-3, LBP-19-6, and LBP-19-8. 19 | ||
In October 2019, the Staff issued the | In October 2019, the Staff issued the 2019 Final SEIS (2019 FSEIS). 20 Thereafter, since | ||
the Staff had previously | the Staff had previously completed its safety review of the SLRA, 21 it approved the SLRA and | ||
issued subsequent renewed licenses for Turkey Point Units 3 and 4. 22 | issued subsequent renewed licenses for Turkey Point Units 3 and 4. 22 | ||
15 Id. at 26; | 15 Id. at 26; Natural Resources Defense Councils, Friends of the Earth s, and Miami Waterkeepers Amended Motion to Migrate Contentions & Admit New Contentions in Response to NRC Staffs Supplemental Draft Environmental Impact Statement (Jun. 28, 2019) | ||
(ML19179A316) (Motion to Admit New and Amended Contentions). | (ML19179A316) (Motion to Admit New and Amended Contentions). | ||
16 NRC Staff s Answer to Joint Intervenors (1) Amended Motion to Migrate or Amend Contentions 1-E and 5-E and to Admit Four New Contentions, and (2) Petition for Waiver (Jul. | 16 NRC Staff s Answer to Joint Intervenors (1) Amended Motion to Migrate or Amend Contentions 1-E and 5-E and to Admit Four New Contentions, and (2) Petition for Waiver (Jul. | ||
19, 2019) (ML19200A300); Florida Power & Light Companys Answer Opposing Intervenors Motion to Migrate or Amend | 19, 2019) (ML19200A300); Florida Power & Light Companys Answer Opposing Intervenors Motion to Migrate or Amend Contentions 1-E and 5-E and to Admit New Contentions 6-E, 7-E, 8-E, and 9-E (Jul. 19, 2019) ( ML19200A297). | ||
17 Reply in Support of Motion to Migrate Contentions & Admit New Contentions in Response to NRC Staff s Supplemental Draft Environmental Impact Statement (Jul. 26, 2019) | 17 Reply in Support of Motion to Migrate Contentions & Admit New Contentions in Response to NRC Staff s Supplemental Draft Environmental Impact Statement (Jul. 26, 2019) | ||
Line 216: | Line 216: | ||
18 Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), LBP-19-8, 90 NRC 139, 178 (2019). | 18 Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), LBP-19-8, 90 NRC 139, 178 (2019). | ||
19 Friends of the Earths, Natural Resources Defense Councils, and Miami Waterkeeper s Petition for Review of the Atomic Safety and Licensing Boards Rulings in LBP | 19 Friends of the Earths, Natural Resources Defense Councils, and Miami Waterkeeper s Petition for Review of the Atomic Safety and Licensing Boards Rulings in LBP 3 and LBP 6 (Aug. 9, 2019) (ML19221B677); Friends of the Earths, Natural Resources Defense Councils, and Miami Waterkeeper s Petition for Review of the Atomic Safety and Licensing Boards Ruling in LBP-19-8 (Nov. 18, 2019) (ML19322D623). | ||
20 | 20 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Final Report), NUREG-1437, Supplement 5, Second Renewal (Oct. 2019) (ML19290H346) (2019 FSEIS). | ||
21 | 21 Safety Evaluation Report Related to the Subsequent License Renewal of Turkey Point Generating Units 3 and 4, Docket Nos. 50-250 and 50- 251, Florida Power & Light Company (Jul. 2019) (ML19191A057). | ||
22 Letter from David Drucker, NRC, to | 22 Letter from David Drucker, NRC, to Mano Nazar, FPL, Issuance of Subsequent Renewed Facility Operating License Nos. DPR-31 and DPR-41 for Turkey Point Nuclear Generating Unit Nos. 3 a nd 4 (EPID L -2018-RNW-0002) (Dec. 4, 2019) (ML19305C879). | ||
In 2022, the Commission took up the pending appeals of LBP | In 2022, the Commission took up the pending appeals of LBP 3, LBP-19-6, and LBP- | ||
19- | 19-8 and, in CLI-22-2, found that the Staffs environmental review of the Turkey Point SLRA was | ||
incomplete. | incomplete. 23 In CLI-22-3, the Commission explained that the Staffs environmental review could | ||
be completed | be completed through either (1) updating the LR GEIS so that it addresses subsequent license | ||
renewal and then reviewing the SLRA using this updated LR GEIS or (2) addressing | renewal and then reviewing the SLRA using this updated LR GEIS or (2) addressing | ||
environmental impacts on a site-specific basis in a site- | environmental impacts on a site-specific basis in a site-specific environmental impact | ||
statement. 24 The Commission explained that Option 2 would involve the Staff addressing the | statement. 24 The Commission explained that Option 2 would involve the Staff addressing the | ||
impacts designated as Category 1 or generic in the 2013 version | impacts designated as Category 1 or generic in the 2013 version of the LR GEIS on a site- | ||
specific basis in the Staff | specific basis in the Staff s site-specific environmental impact statements instead of simply | ||
incorporating the determinations for those impacts from the LR GEIS into the environmental | incorporating the determinations for those impacts from the LR GEIS into the environmental | ||
impact statements by reference. | impact statements by reference. 25 The Commission dismissed the environmental contentions | ||
and motions pending in the affected subsequent license renewal proceedings, including in the | and motions pending in the affected subsequent license renewal proceedings, including in the | ||
Turkey Point SLRA proceeding. | Turkey Point SLRA proceeding. 26 The Commission stated that there would be a hearing | ||
opportunity on any site-specific environmental impact statements developed by the Staff, but | opportunity on any site-specific environmental impact statements developed by the Staff, but | ||
that it would be | that it would be limited to contentions based on new information in the site-specific | ||
environmental impact statement. 27 | environmental impact statement. 27 | ||
Line 257: | Line 257: | ||
In response to CLI-22-2 and CLI-22-3, F P L submitted Environmental Report (ER) | In response to CLI-22-2 and CLI-22-3, F P L submitted Environmental Report (ER) | ||
Supplement 2, which provided | Supplement 2, which provided a site-specific analysis of the impacts designated as Category 1 | ||
or generic in the 2013 version of the LR GEIS with respect to the continued operation of Turkey | or generic in the 2013 version of the LR GEIS with respect to the continued operation of Turkey | ||
Line 263: | Line 263: | ||
23 Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), CLI-22-2, 95 NRC 26, 27 (2022). | 23 Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), CLI-22-2, 95 NRC 26, 27 (2022). | ||
24 Duke Energy Carolinas, LLC (Oconee Nuclear Station, Units 1, 2, and 3), CLI | 24 Duke Energy Carolinas, LLC (Oconee Nuclear Station, Units 1, 2, and 3), CLI 3, 95 NRC 40, 41-42 (2022). | ||
25 Id. at 41 | 25 Id. at 41 | ||
Line 271: | Line 271: | ||
27 Id. | 27 Id. | ||
Point during | Point during the subsequent license renewal term. 28 That analysis supplemented the ER and | ||
ER Supplement 1 that were | ER Supplement 1 that were included as part of the Turkey Point SLRA 29 and addressed, on a | ||
site-specific basis, each | site-specific basis, each generic environmental issue. | ||
In 2023, following its receipt of ER | In 2023, following its receipt of ER Supplement 2, the Staff issued the 2023 Draft SEIS | ||
(2023 DSEIS), which evaluated | (2023 DSEIS), which evaluated, on a site -specific basis, the impacts designated as Category 1 | ||
or generic in the 2013 version | or generic in the 2013 version of the LR GEIS with respect to the continued operation of Turkey | ||
Point during the | Point during the subsequent license renewal term. 30 The 2023 DSEIS considered information | ||
contained in ER Supplement 2; the Staffs consultation with Federal, State, Tribal, and local | contained in ER Supplement 2; the Staffs consultation with Federal, State, Tribal, and local | ||
Line 289: | Line 289: | ||
government agencies; and other information, as appropriate. 31 The 2023 DSEIS also | government agencies; and other information, as appropriate. 31 The 2023 DSEIS also | ||
considered | considered whether there was significant new information that would change the St aff s | ||
conclusions regarding the impacts designated as Category 2 or site-specific in the 2013 | conclusions regarding the impacts designated as Category 2 or site-specific in the 2013 | ||
version of the LR GEIS and evaluated on a site- | version of the LR GEIS and evaluated on a site-specific basis in the 2019 FSEIS, 32 and also | ||
considered | considered the then-ongoing rulemaking to update the 2013 license renewal rule and LR | ||
GEIS. 33 Thus, the 2023 DSEIS supplemented | GEIS. 33 Thus, the 2023 DSEIS supplemented and updated the 2019 FSEIS so that together, the | ||
2023 DSEIS and the 2019 | 2023 DSEIS and the 2019 FSEIS evaluated, on a site -specific basis and without relying on the | ||
28 Letter from William D. Maher, FPL, to | 28 Letter from William D. Maher, FPL, to NRC Document Control Desk (Jun. 9, 2022) | ||
(ML22160A301) (ER Supplement 2). | (ML22160A301) (ER Supplement 2). | ||
29 Florida Power & Light Company, | 29 Florida Power & Light Company, Appendix E, Applicants Environmental Report, Subsequent Operating License Renewal Stage, Turkey Point Nuclear Plant Units 3 and 4 (Jan. 2018) | ||
(ML18113A145) (ER); Letter from William D. Maher, FPL, to NRC Document Control Desk (Apr. | (ML18113A145) (ER); Letter from William D. Maher, FPL, to NRC Document Control Desk (Apr. | ||
10, 2018) (ML18102A521) (ER Supplement 1). | 10, 2018) (ML18102A521) (ER Supplement 1). | ||
30 Site -Specific Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Draft Report for Comment, NUREG- | 30 Site -Specific Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Draft Report for Comment, NUREG-1437, Supplement 5a, Second Renewal (Aug. 2023) | ||
(ML23242A216) (2023 DSEIS). | (ML23242A216) (2023 DSEIS). | ||
Line 316: | Line 316: | ||
33 Id. at App. E. | 33 Id. at App. E. | ||
2013 version of the LR GEIS, all of the | 2013 version of the LR GEIS, all of the environmental impacts of continued operation during the | ||
subsequent license renewal term for Turkey | subsequent license renewal term for Turkey Point. 34 | ||
On September 8, 2023, the Staff noticed the availability of the 2023 DSEIS and provided | On September 8, 2023, the Staff noticed the availability of the 2023 DSEIS and provided | ||
members of the public an opportunity to request a hearing on it. 35 This | members of the public an opportunity to request a hearing on it. 35 This opportunity to request a | ||
hearing was specifically | hearing was specifically limited to contentions based on new information in the [2023 | ||
DSEIS]. 36 This limitation mirrors the language in CLI | DSEIS]. 36 This limitation mirrors the language in CLI 3, in which the Commission directed | ||
the Staff to provide a new notice of opportunity for hearing after each site- | the Staff to provide a new notice of opportunity for hearing after each site-specific review is | ||
complete limited to contentions based on new information in the site-specific environmental | complete limited to contentions based on new information in the site-specific environmental | ||
Line 342: | Line 342: | ||
DSEIS because Petitioner has standing and has proposed five contentions. 39 The Staff and FPL | DSEIS because Petitioner has standing and has proposed five contentions. 39 The Staff and FPL | ||
filed answers in opposition,40 to which Petitioner replied. | filed answers in opposition,40 to which Petitioner replied. 41 | ||
34 Id. at 1 | 34 Id. at 1 1-5. | ||
35 Florida Power & Light Company; Turkey Point Nuclear Generating Unit Nos. 3 and 4; Draft environmental impact statement; request for comment; public comment meetings; opportunity to request a hearing and to petition for leave to intervene, 88 Fed. Reg. 62,110, 62,110- | 35 Florida Power & Light Company; Turkey Point Nuclear Generating Unit Nos. 3 and 4; Draft environmental impact statement; request for comment; public comment meetings; opportunity to request a hearing and to petition for leave to intervene, 88 Fed. Reg. 62,110, 62,110- 11 (Sep. 8, 2023). | ||
36 Id. | 36 Id. | ||
Line 354: | Line 354: | ||
39 Request for Hearing and Petition to Intervene Submitted by Miami Waterkeeper (Nov. 27, 2023) (ML23331A971) (Hearing Request). | 39 Request for Hearing and Petition to Intervene Submitted by Miami Waterkeeper (Nov. 27, 2023) (ML23331A971) (Hearing Request). | ||
Petitioner filed, among others, | Petitioner filed, among others, the following with Hearing Request: Exhibit 3, Declaration of Dr. | ||
William K. Nuttle regarding the draft EIS for the Turkey Point Nuclear Generating Unit Nos. 3 and 4 (NUREG- | William K. Nuttle regarding the draft EIS for the Turkey Point Nuclear Generating Unit Nos. 3 and 4 (NUREG-1437 Supplement 5a Second Renewal) (ML23331A983) (2023 Nuttle Report). | ||
40 NRC Staff Answer Opposing Miami Waterkeeper Hearing Request (Dec. 22, 2023) | 40 NRC Staff Answer Opposing Miami Waterkeeper Hearing Request (Dec. 22, 2023) | ||
(ML23356A162); Florida Power & Light Companys Answer Opposing Miami Waterkeeper s Hearing Request and Petition for Leave to Intervene | (ML23356A162); Florida Power & Light Companys Answer Opposing Miami Waterkeeper s Hearing Request and Petition for Leave to Intervene (Dec. 22, 2023) (ML23356A156). | ||
41 Reply in Support of Request for Hearing and Petition to Intervene Submitted by Miami Waterkeeper (Jan. 8, 2024) (ML24008A293). | 41 Reply in Support of Request for Hearing and Petition to Intervene Submitted by Miami Waterkeeper (Jan. 8, 2024) (ML24008A293). | ||
Line 364: | Line 364: | ||
In LBP-24-3, the Board determined that Petitioner had standing to intervene and | In LBP-24-3, the Board determined that Petitioner had standing to intervene and | ||
admitted a portion of Contention 1 as a contention of omission. As | admitted a portion of Contention 1 as a contention of omission. As narrowed and reformulated | ||
by the Board, Contention 1 argued that the Staffs analysis in the 2023 DSEIS lacks an | by the Board, Contention 1 argued that the Staffs analysis in the 2023 DSEIS lacks an | ||
explanation as to how the uncertainty about the success of FP | explanation as to how the uncertainty about the success of FP L s efforts to retract the | ||
hypersaline groundwater plume resulting from the operation of the CCS to within the Tur k e y | hypersaline groundwater plume resulting from the operation of the CCS to within the Tur k e y | ||
Line 378: | Line 378: | ||
Contentions 2 through 5 and the remaining portions of Contention 1.43 | Contentions 2 through 5 and the remaining portions of Contention 1.43 | ||
On March 29, 2024, the Staff issued the 2024 Final SEIS (2024 FSEIS) | On March 29, 2024, the Staff issued the 2024 Final SEIS (2024 FSEIS), which made | ||
changes to the 2023 DSEIS, as necessary, based on the information gathered during the public | changes to the 2023 DSEIS, as necessary, based on the information gathered during the public | ||
Line 386: | Line 386: | ||
Scheduling Order dated March 26, 2024, 45 Petitioner, the Staff, and FPL jointly filed a motion | Scheduling Order dated March 26, 2024, 45 Petitioner, the Staff, and FPL jointly filed a motion | ||
agreeing | agreeing that Reformulated Contention 1 should be dismissed as moot because the Staff | ||
included | included the explanation alleged by that contention to be missing from the 2023 DSEIS in the | ||
2024 FSEIS. | 2024 FSEIS. 46 Prior to the Board ruling on that joint motion, on May 8, 2024, Petitioner timely | ||
filed 47 a motion to admit amended | filed 47 a motion to admit amended and new contentions based on the 2024 FSEIS and | ||
42 Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 | 42 Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), LBP-24-3, 99 NRC __, __ (Mar. 7, 2024) (slip op. at 11, 21-22). | ||
43 Id. at __ (slip op. at 34). | 43 Id. at __ (slip op. at 34). | ||
44 Site -Specific Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Final Report, NUREG- | 44 Site -Specific Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Final Report, NUREG-1437, Supplement 5a, Second Renewal, at 1-3 (Mar. 2024) | ||
(ML24087A061) (2024 FSEIS). | (ML24087A061) (2024 FSEIS). | ||
Line 407: | Line 407: | ||
47 See Initial Scheduling Order (Mar. 26, 2024) (ML24086A446); Memorandum and Order (Granting Motion for Extension of Time) (Apr. 26, 2024) (ML24117A266). | 47 See Initial Scheduling Order (Mar. 26, 2024) (ML24086A446); Memorandum and Order (Granting Motion for Extension of Time) (Apr. 26, 2024) (ML24117A266). | ||
Government Accountability Office Report 24 | Government Accountability Office Report 24 -106326 (GAO Report) 48 and a petition for waiver.49 | ||
Specifically, Petitioner requested, based on the 2024 FSEIS, | Specifically, Petitioner requested, based on the 2024 FSEIS, the admission of Amended | ||
Contentions 1 | Contentions 1 -A, 1-B, and 1-C and New Contention 2 and, based on the GAO Report, the | ||
admission of New Contentions 3- | admission of New Contentions 3-A and 3-B. 50 In addition, Petitioner included the Petition for | ||
Wa i v er associated with New Contention 3-B to challenge | Wa i v er associated with New Contention 3-B to challenge the Staff s severe accident mitigation | ||
alternatives (SAMA) update. 51 Thereafter, on May 9, 2024, the Board granted the parties joint | alternatives (SAMA) update. 51 Thereafter, on May 9, 2024, the Board granted the parties joint | ||
Line 427: | Line 427: | ||
In support of the dual mandates of the National Environmental Policy Act of 1969, as | In support of the dual mandates of the National Environmental Policy Act of 1969, as | ||
amended | amended (NEPA), to foster informed decision-making and informed public participation,53 the | ||
Staff has completed two reviews of the environmental impacts of the proposed action, with each | Staff has completed two reviews of the environmental impacts of the proposed action, with each | ||
Line 437: | Line 437: | ||
environmental impact statements total almost 900 pages. The deadline for filing contentions | environmental impact statements total almost 900 pages. The deadline for filing contentions | ||
48 Government Accountability Office, GAO-24-106326, Nuclear Power Plants: NRC Should Take Actions to Fully Consider the Potential Effects of Climate Change (Apr. 2, 2024), available at https://www.gao.gov/products/gao | 48 Government Accountability Office, GAO-24-106326, Nuclear Power Plants: NRC Should Take Actions to Fully Consider the Potential Effects of Climate Change (Apr. 2, 2024), available at https://www.gao.gov/products/gao 106326 (GAO Report). | ||
49 Miami Waterkeeper s Motion to Admit Amended and New Contentions in Response to NRC Staff s Final Site- | 49 Miami Waterkeeper s Motion to Admit Amended and New Contentions in Response to NRC Staff s Final Site-Specific Environmental Impact Statement (May 8, 2024) (ML24129A220) | ||
(Motion); Miami Waterkeeper s Petition for Waiver of 10 C.F.R. §§ 51.53(c)(3) and 51.71(d) and 10 C.F.R. Part 51, Subpart A, Appendix B (May 8, 2024) (ML24129A221) (Petition for Waiver). | (Motion); Miami Waterkeeper s Petition for Waiver of 10 C.F.R. §§ 51.53(c)(3) and 51.71(d) and 10 C.F.R. Part 51, Subpart A, Appendix B (May 8, 2024) (ML24129A221) (Petition for Waiver). | ||
50 Motion at 1 | 50 Motion at 1 - 2, 7, 51. | ||
51 Petition for Wavier at 1, | 51 Petition for Wavier at 1, 3, 5-9. | ||
52 Memorandum and Order (Granting Unopposed Motion to Dismiss Contention 1) (May 9, 2024) | 52 Memorandum and Order (Granting Unopposed Motion to Dismiss Contention 1) (May 9, 2024) | ||
(ML24130A205). | (ML24130A205). | ||
53 See Duke Energy Corp. (McGuire Nuclear Station, Units 1 and 2; Catawba Nuclear Station, Units 1 and 2), CLI | 53 See Duke Energy Corp. (McGuire Nuclear Station, Units 1 and 2; Catawba Nuclear Station, Units 1 and 2), CLI 17, 56 NRC 1, 10 (2002) (quoting Louisiana Energy Services, L.P. | ||
(Claiborne Enrichment Center), CLI-98-3, 47 NRC 77, 88 (1998)). | (Claiborne Enrichment Center), CLI-98-3, 47 NRC 77, 88 (1998)). | ||
regarding these environmental review s has passed. | regarding these environmental review s has passed. 54 Accordingly, in order to be admitted, | ||
Petitioner s amended and new | Petitioner s amended and new contentions must meet both the heightened pleading | ||
standards of 10 C.F.R. § 2.309(c), which require, in part, demonstrating that the information | standards of 10 C.F.R. § 2.309(c), which require, in part, demonstrating that the information | ||
Line 461: | Line 461: | ||
information previously available, and the strict-by-design contention admissibility requirements | information previously available, and the strict-by-design contention admissibility requirements | ||
of 10 C.F.R. § 2.309(f)(1). 55 As discussed below, Petitioner has not | of 10 C.F.R. § 2.309(f)(1). 55 As discussed below, Petitioner has not demonstrated that any of | ||
its amended or new contentions meet all of these | its amended or new contentions meet all of these requirements. In addition, in order to be | ||
admitted, New Contention 3- | admitted, New Contention 3-B, which challenges the Staff s SAMA update, must also be | ||
accompanied by a waiver of the NRCs rules under | accompanied by a waiver of the NRCs rules under 10 C.F.R. § 2.335. A petition for such a | ||
waiver must meet | waiver must meet all four factors of the Millstone test to demonstrate a prima facie case | ||
that the waiver should be granted. 56 As also discussed below, Petitioner s Petition for | that the waiver should be granted. 56 As also discussed below, Petitioner s Petition for | ||
Waiver does not meet the factors | Waiver does not meet the factors of showing that the circumstances at issue are unique | ||
and that the waiver is necessary to reach a significant safety or environmental problem | and that the waiver is necessary to reach a significant safety or environmental problem. | ||
Therefore, the amended and new contentions should be dismissed and the Petition for Waiver | Therefore, the amended and new contentions should be dismissed and the Petition for Waiver | ||
Line 481: | Line 481: | ||
should be denied. Because there would be no admitted or pending contentions remaining | should be denied. Because there would be no admitted or pending contentions remaining | ||
before it, the Board should also terminate this proceeding. | before it, the Board should also terminate this proceeding. 57 | ||
54 See 88 Fed. Reg. at 62,110- | 54 See 88 Fed. Reg. at 62,110- 11; Order (Granting a 20- Day Extension Deadline to Request for Hearing) (Nov. 6, 2023) (ML23310A269); CLI 01, 99 NRC at __ (slip op. at 6). | ||
55 See, e.g., Crow Butte Resources, Inc. (In Situ Leach Uranium Recovery Facility), CLI | 55 See, e.g., Crow Butte Resources, Inc. (In Situ Leach Uranium Recovery Facility), CLI 8, 92 NRC 255, 259-60 (2020); Turkey Point, LBP-19-8, 90 NRC at 149, 159-60. | ||
56 Dominion Nuclear Conn., Inc. (Millstone Nuclear Power Station, Units 2 and 3), CLI | 56 Dominion Nuclear Conn., Inc. (Millstone Nuclear Power Station, Units 2 and 3), CLI 24, 62 NRC 551, 559-60 (2005). | ||
57 See Virginia Electric and Power Co. D/B/A Dominion Virginia Power and Old Dominion Electric Coop. (North Anna Power Station, Unit 3), CLI-12-14, 75 NRC 692, 699- | 57 See Virginia Electric and Power Co. D/B/A Dominion Virginia Power and Old Dominion Electric Coop. (North Anna Power Station, Unit 3), CLI-12-14, 75 NRC 692, 699-701 (2012) | ||
(directing that licensing boards terminate proceedings once all contentions have been decided and not hold them open for future filings; instead, the appropriate process is a 10 C.F.R. § 2.326 motion to reopen); Turkey Point, LBP-19-8, 90 NRC at | (directing that licensing boards terminate proceedings once all contentions have been decided and not hold them open for future filings; instead, the appropriate process is a 10 C.F.R. § 2.326 motion to reopen); Turkey Point, LBP-19-8, 90 NRC at 178 (terminating the first Turkey Point subsequent license renewal proceeding at the Board level after the admitted contention of omission was found to be moot and all proposed new and amended contentions were dismissed). | ||
I. | I. Requirements for the Admissibility of New or Amended Contentions Filed after the Deadline | ||
Pursuant to | Pursuant to 10 C.F.R. § 2.309(c), new and amended contentions will not be | ||
entertained absent a determination by the presiding officer that a participant has | entertained absent a determination by the presiding officer that a participant has | ||
demonstrated good cause. | demonstrated good cause. 58 Good cause is demonstrated by showing that: | ||
(i) The information upon which the filing is based was not previously available; (ii) The information upon which the filing is based is materially different from information previously available; | (i) The information upon which the filing is based was not previously available; (ii) The information upon which the filing is based is materially different from information previously available; [ 59] and (iii) The filing has been submitted in a timely fashion based on the availability of the subsequent information. [ 60] | ||
As defined by the three factors in 10 C.F.R. § 2.309(c), good cause is the sole factor to be | As defined by the three factors in 10 C.F.R. § 2.309(c), good cause is the sole factor to be | ||
Line 505: | Line 505: | ||
considered when evaluating whether to review the admissibility of a new or amended | considered when evaluating whether to review the admissibility of a new or amended | ||
contention. 61 Thus, the | contention. 61 Thus, the regulation requires that the contention s proponent establish good | ||
cause | cause for why the contention was not raised at the outset of the proceeding and when | ||
determining whether a new or amended contention is timely, the Commission | determining whether a new or amended contention is timely, the Commission look[s] to whether | ||
the contention could have been raised earlier. | the contention could have been raised earlier. 62 There is no good cause if the challenge that | ||
58 See also | 58 See also 10 C.F.R. § 2.309(f)(2) (Participants may file new or amended environmental contentions after the deadline in paragraph (b) of this section (e.g., based on a draft or final NRC environmental impact statement, environmental assessment, or any supplements to these documents) if the contention complies with the requirements in paragraph (c) of this section.). | ||
59 10 C.F.R. § 2.309(c) ; cf. Turkey Point, LBP- | 59 10 C.F.R. § 2.309(c) ; cf. Turkey Point, LBP-19-8, 90 NRC at 149 n.13 (The term materially describes the type or degree of difference between the new information and previously available information, and it is synonymous with, for example, significantly, considerably, or importantly.) (quoting Florida Power & Light Co. (Turkey Point Units 6 and 7), LBP-17-6, 86 NRC 37, 48 (2017), aff d on other grounds, CLI 12, 86 NRC 215 (2017)). | ||
60 10 C.F.R. § 2.309(c) ; see Initial Scheduling Order (Mar. 26, 2024) (ML24086A446) (providing that new or amended contentions based on the 2024 | 60 10 C.F.R. § 2.309(c) ; see Initial Scheduling Order (Mar. 26, 2024) (ML24086A446) (providing that new or amended contentions based on the 2024 FSEIS are due 40 days after the issuance of the 2024 FSEIS); Memorandum and Order (Granting Motion for Extension of Time) (Apr. 26, 2024) (ML24117A266) (providing that new or amended contentions based on the GAO Report are due at the same time as new or amended contentions based on the 2024 FSEIS). | ||
61 Amendments to Adjudicatory Process Rules and Related Requirements; Proposed Rule, 76 Fed. Reg. 10,781, 10,783 (Feb. 28, 2011). See also | 61 Amendments to Adjudicatory Process Rules and Related Requirements; Proposed Rule, 76 Fed. Reg. 10,781, 10,783 (Feb. 28, 2011). See also Amendments to Adjudicatory Process Rules and Related Requirements; Final Rule, 77 Fed. Reg. 46,562, 46,572 (Aug. 3, 2012). | ||
62 Holtec International (HI-STORE Consolidated Interim Storage Facility), CLI-21-7, 93 NRC 215, 221 (2021). | 62 Holtec International (HI-STORE Consolidated Interim Storage Facility), CLI-21-7, 93 NRC 215, 221 (2021). | ||
Line 524: | Line 524: | ||
is the subject of the new contention or the amendment to a previous contention could have been | is the subject of the new contention or the amendment to a previous contention could have been | ||
timely raised at the outset of the proceeding. | timely raised at the outset of the proceeding. 63 This includes a challenge arguing that there is an | ||
omission in a draft environmental impact statement when that same omission was present in the | omission in a draft environmental impact statement when that same omission was present in the | ||
environmental report on which the | environmental report on which the hearing opportunity was offered.64 Relatedly, there is no good | ||
cause if the information being challenged is not actually new. | cause if the information being challenged is not actually new. 65 A new or amended contention is | ||
not timely even if it is based on a new report if the information in that report was either | not timely even if it is based on a new report if the information in that report was either | ||
Line 540: | Line 540: | ||
requirements for proffering a contention out of time, without more, necessarily requires the | requirements for proffering a contention out of time, without more, necessarily requires the | ||
rejection of the new or amended contention, | rejection of the new or amended contention, regardless of whether the new or amended | ||
contention meets the contention admissibility requirements. 67 | contention meets the contention admissibility requirements. 67 | ||
Line 546: | Line 546: | ||
New and amended contentions must also meet the general contention admissibility | New and amended contentions must also meet the general contention admissibility | ||
requirements in 10 C.F.R. § 2.309(f) | requirements in 10 C.F.R. § 2.309(f). 68 Those requirements and the related case law continue to | ||
63 Interim Storage Partners LLC (WCS Consolidated Interim Storage Facility), CLI-21-9, 93 NRC 244, 247- | 63 Interim Storage Partners LLC (WCS Consolidated Interim Storage Facility), CLI-21-9, 93 NRC 244, 247-49 (2021) (affirming the Board ruling that because the petitioner could have raised these challenges in its [timely] hearing request, the petitioner s new contention was untimely). | ||
64 Id. at 248. | 64 Id. at 248. | ||
Line 554: | Line 554: | ||
65 Id. (discussing that both the environmental report, on which a hearing opportunity was offered, and the subsequent draft environmental impact statement discussed the same impacts and, therefore, there was no good cause to challenge the draft environmental impact statement regarding these impacts when that same challenge could have been raised in a timely manner against the environmental report). | 65 Id. (discussing that both the environmental report, on which a hearing opportunity was offered, and the subsequent draft environmental impact statement discussed the same impacts and, therefore, there was no good cause to challenge the draft environmental impact statement regarding these impacts when that same challenge could have been raised in a timely manner against the environmental report). | ||
66 Holtec International (HI-STORE Consolidated Interim Storage Facility), CLI | 66 Holtec International (HI-STORE Consolidated Interim Storage Facility), CLI 4, 93 NRC 119, 127-28 (2021). See also 77 Fed. Reg. at 46,566 (discussing how the good-cause test applies to documents that use previously available information). | ||
67 See, e.g., Holtec International | 67 See, e.g., Holtec International (HI-STORE Consolidated Interim Storage Facility), LBP 10, 92 NRC 235, 249 (2020). | ||
68 See, e.g., NextEra Energy Point Beach | 68 See, e.g., NextEra Energy Point Beach, LLC (Point Beach Nuclear Plant, Units 1 and 2), LBP-21-5, 94 NRC 1, 38 (2021) (Once a movant satisfies the motion to amend requirements, a new or amended contention must still satisfy the contention admissibility standards in 10 C.F.R. § 2.309(f) to be admitted.). | ||
be the same as presented in the Staffs answer to Petitioner s hearing request.69 As relevant | be the same as presented in the Staffs answer to Petitioner s hearing request.69 As relevant | ||
Line 565: | Line 565: | ||
raise and, for each contention, the petitioner must: | raise and, for each contention, the petitioner must: | ||
(i) | (i) Provide a specific statement of the issue of law or fact to be raised or controverted; (ii) Provide a brief explanation of the basis for the contention; 70 (iii) Demonstrate that the issue raised in the contention is within the scope of the proceeding;71 (iv) Demonstrate that the issue raised in the contention is material to the findings the NRC must make to support the action involved in the proceeding;72 (v) Provide a concise statement of the alleged facts or expert opinions that support the petitioner s position on the issue and on which the petitioner intends to rely at hearing, together with references to the specific sources and documents on which the petitioner intends to rely;73 and | ||
69 NRC Staff Answer Opposing Miami Waterkeeper Hearing Request at 14- | 69 NRC Staff Answer Opposing Miami Waterkeeper Hearing Request at 14-20 (Dec. 22, 2023) | ||
(ML23356A162). | (ML23356A162). | ||
70 Contentions cannot be based on speculation and must have some reasonably specific factual or legal basis. Entergy Nuclear Vt. Yankee, LLC and Entergy Nuclear Operations, Inc. | 70 Contentions cannot be based on speculation and must have some reasonably specific factual or legal basis. Entergy Nuclear Vt. Yankee, LLC and Entergy Nuclear Operations, Inc. | ||
(Vermont Yankee Nuclear Power Station), CLI-15-20, 82 NRC 211, 221 (2015). | (Vermont Yankee Nuclear Power Station), CLI-15-20, 82 NRC 211, 221 (2015). | ||
71 The scope of the proceeding is defined by the Commission in its initial hearing notice and order referring the proceeding to the licensing board. See Florida Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4), CLI | 71 The scope of the proceeding is defined by the Commission in its initial hearing notice and order referring the proceeding to the licensing board. See Florida Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4), CLI 23, 52 NRC 327, 329 (2000). As a consequence, any contention that falls outside the specified scope of the proceeding must be rejected. See Pacific Gas and Electric Co. (Diablo Canyon Nuclear Power Plant, Units 1 and 2), | ||
CLI-11-11, 74 NRC 427, 435 | CLI-11-11, 74 NRC 427, 435 - 36 (2011). | ||
72 A dispute at issue is material if its resolution would make a difference in the outcome of the licensing proceeding. Holtec International (Hi- | 72 A dispute at issue is material if its resolution would make a difference in the outcome of the licensing proceeding. Holtec International (Hi-STORE Consolidated Interim Storage Facility), | ||
CLI | CLI 4, 91 NRC 167, 190 (2020). There may, of course, be mistakes in an environmental document, but in an NRC adjudication, it is the burden of petitioners to show their significance and materiality because boards do not sit to flyspeck environmental documents or to add details or nuances and [i]f the [document] on its face comes to grips with all important considerations nothing more need be done. Exelon Generation Co., LLC (Early Site Permit for Clinton ESP Site), CLI- 05-29, 62 NRC 801, 811 (2005) (quoting Systems Energy Resources, Inc. | ||
(Early Site Permit for Grand Gulf ESP Site), CLI- | (Early Site Permit for Grand Gulf ESP Site), CLI- 05-4, 61 NRC 10, 13 (2005)). | ||
73 The petitioner is obliged to present the facts and expert opinions necessary to support its contention. See USEC Inc. (American Centrifuge Plant), CLI-06-10, 63 NRC 451, 457 (2006) (it is the petitioner s responsibility to satisfy the basic contention admissibility requirements; boards should not have to search through a petition to uncover arguments and support for a contention and may not simply infer | 73 The petitioner is obliged to present the facts and expert opinions necessary to support its contention. See USEC Inc. (American Centrifuge Plant), CLI-06-10, 63 NRC 451, 457 (2006) (it is the petitioner s responsibility to satisfy the basic contention admissibility requirements; boards should not have to search through a petition to uncover arguments and support for a contention and may not simply infer unarticulated bases of contentions); see also Arizona | ||
(vi) | (vi) Provide sufficient information to show that a genuine dispute exists with the applicant or licensee on a material issue of law or fact. This information must include references to specific portions of the application (including the applicants environmental report and safety report) that the petitioner disputes and the supporting reasons for each dispute, or, if the petitioner believes that the application fails to contain information on a relevant matter as required by law, the identification of each failure and the supporting reasons for the petitioner s belief. | ||
The NRCs regulations governing contention admissibility are intended to | The NRCs regulations governing contention admissibility are intended to focus litigation on | ||
concrete issues and result in a clearer and more focused record for decision.74 The | concrete issues and result in a clearer and more focused record for decision.74 The | ||
Line 591: | Line 591: | ||
above, the rules require a clear statement as to the basis for the contentions and the | above, the rules require a clear statement as to the basis for the contentions and the | ||
Public Service Co., et. al. (Palo Verde Nuclear Generating Station, Units 1, 2 and | Public Service Co., et. al. (Palo Verde Nuclear Generating Station, Units 1, 2 and 3), CLI-91-12, 34 NRC 149, 155 (1991). Bare assertions and speculation, even by an expert, are insufficient to trigger a full adjudicatory proceeding. Entergy Nuclear Generation Co. and Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), CLI-12-15, 75 NRC 704, 714 (2012). | ||
74 See, e.g., Southern Nuclear Operating Co. Inc. (Vogtle Electric Generating Plant, Unit 3), | 74 See, e.g., Southern Nuclear Operating Co. Inc. (Vogtle Electric Generating Plant, Unit 3), | ||
LBP- | LBP-20- 8, 92 NRC 23, 46 (2020) (quoting Changes to Adjudicatory Process, 69 Fed. Reg. 2182, 2202 (Jan. 14, 2004)); Crow Butte Resources, Inc. (In Situ Leach Facility, Crawford, NE), LBP - | ||
15-15, 81 NRC 598, 601 (2015). | 15-15, 81 NRC 598, 601 (2015). | ||
75 Entergy Nuclear Operations, Inc. (Indian Point, Unit 2) CLI-16-5, 83 NRC 131, 136 (2016) | 75 Entergy Nuclear Operations, Inc. (Indian Point, Unit 2) CLI-16-5, 83 NRC 131, 136 (2016) | ||
(citing Dominion Nuclear Connecticut, Inc. (Millstone Nuclear Power Station, Units 2 and 3), | (citing Dominion Nuclear Connecticut, Inc. (Millstone Nuclear Power Station, Units 2 and 3), | ||
CLI-01-24, 54 | CLI-01-24, 54 NRC 349, 358 (2001) and South Carolina Electric & Gas Co. and South Carolina Public Service Authority (Virgil C. Summer Nuclear Station, Units 2 and 3), CLI-10-1, 71 NRC 1, 7 (2010). The Commission has stated that it should not have to expend resources to support the hearing process unless there is an issue that is appropriate for, and susceptible to, resolution in an NRC hearing. 69 Fed. Reg. at 2202. | ||
76 Indian Point, CLI | 76 Indian Point, CLI 5, 83 NRC at 136; see also Duke Energy Corp. (Oconee Nuclear Station, Units 1, 2, and 3), CLI-99-11, 49 NRC 328, 334-35 (1999) (the heightened contention admissibility rules are designed to preclude contentions based on little more than speculation). | ||
The requirements are intended, among other things, to ensure that a petitioner reviews the application and supporting documents prior to filing contentions; that contentions are supported by at least some facts or expert opinion known to the petitioner at the time of filing; and that there exists a genuine dispute before a contention is admitted for litigation, to avoid the practice of filing contentions that lack any factual support and seeking to flesh them out later through discovery. Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), LBP-91-35, 34 NRC 163, 167- | The requirements are intended, among other things, to ensure that a petitioner reviews the application and supporting documents prior to filing contentions; that contentions are supported by at least some facts or expert opinion known to the petitioner at the time of filing; and that there exists a genuine dispute before a contention is admitted for litigation, to avoid the practice of filing contentions that lack any factual support and seeking to flesh them out later through discovery. Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), LBP-91-35, 34 NRC 163, 167-68 (1991). | ||
submission of | submission of supporting information and references to specific documents and sources that | ||
establish the validity of the contention.77 | establish the validity of the contention.77 | ||
Line 609: | Line 609: | ||
Although a petitioner does not have to prove its contention at the admissibility stage,78 | Although a petitioner does not have to prove its contention at the admissibility stage,78 | ||
the contention admissibility standards are meant to afford hearings only to those who | the contention admissibility standards are meant to afford hearings only to those who proffer at | ||
least some minimal factual and legal foundation in support of their contentions. 79 The petitioner | least some minimal factual and legal foundation in support of their contentions. 79 The petitioner | ||
Line 617: | Line 617: | ||
and failure to do so requires that the contention be rejected.80 Any supporting material provided | and failure to do so requires that the contention be rejected.80 Any supporting material provided | ||
by the petitioner is subject to scrutiny by the presiding officer,81 who must confirm that the proffered material provides adequate support for the contention.82 | by the petitioner is subject to scrutiny by the presiding officer,81 who must confirm that the proffered material provides adequate support for the contention.82 If a petitioner neglects to | ||
provide the requisite support for its contentions, then the presiding officer should not make | provide the requisite support for its contentions, then the presiding officer should not make | ||
Line 623: | Line 623: | ||
assumptions of fact that favor the petitioner or search for or supply information that is lacking.83 | assumptions of fact that favor the petitioner or search for or supply information that is lacking.83 | ||
Moreover, providing any material or document as a basis for a contention without explaining | Moreover, providing any material or document as a basis for a contention without explaining its | ||
significance is grounds for the presiding officer to reject the contention. | significance is grounds for the presiding officer to reject the contention. 84 In sum, the | ||
77 AmerGen Energy Co. (Oyster Creek Nuclear Generating Station), CLI-06-24, 64 NRC 111, 118- | 77 AmerGen Energy Co. (Oyster Creek Nuclear Generating Station), CLI-06-24, 64 NRC 111, 118-19 (2006). | ||
78 Private Fuel Storage L.L.C. (Independent Spent Fuel Storage Installation), CLI | 78 Private Fuel Storage L.L.C. (Independent Spent Fuel Storage Installation), CLI 22, 60 NRC 125, 139 (2004). | ||
79 Oconee, CLI-99-11, 49 NRC at 334. | 79 Oconee, CLI-99-11, 49 NRC at 334. | ||
80 Palo Verde, CLI- | 80 Palo Verde, CLI-91-12, 34 NRC at 155 ; accord, Indian Point, CLI 5, 83 NRC at 136. See Rules of Practice for Domestic Licensing ProceedingsProcedural Changes in the Hearing Process, 54 Fed. Reg. 33,168, 33,170 (Aug. 11, 1989) (This requirement does not call upon the intervener to make its case at this stage of the proceeding, but rather to indicate what facts or expert opinions, be it one fact or opinion or many, of which it is aware at that point in time [that] | ||
provide the basis for its contention.). | provide the basis for its contention.). | ||
81 See Vermont Yankee Nuclear Power Co. (Vermont Yankee Nuclear Power Station), ALAB-919, 30 NRC 29, 48 (1989), vacated in part on other grounds and remanded, CLI | 81 See Vermont Yankee Nuclear Power Co. (Vermont Yankee Nuclear Power Station), ALAB-919, 30 NRC 29, 48 (1989), vacated in part on other grounds and remanded, CLI 4, 31 NRC 333 (1990); see also Tennessee Valley Authority (Bellefonte Nuclear Plant, Units 1 and 2), LBP-10-7, 71 NRC 391, 421 (2010). | ||
82 See Vermont Yankee, | 82 See Vermont Yankee, A L A B -919, 30 NRC at 48; see also Bellefonte, LBP-10-7, 71 NRC at 421. | ||
83 See USEC Inc. (American Centrifuge Plant), CLI-06-10, 63 NRC 451, 457 (2006). | 83 See USEC Inc. (American Centrifuge Plant), CLI-06-10, 63 NRC 451, 457 (2006). | ||
84 See Fansteel, Inc. (Muskogee, Oklahoma Site), CLI | 84 See Fansteel, Inc. (Muskogee, Oklahoma Site), CLI 13, 58 NRC 195, 205 (2003). | ||
information, facts, and expert opinions provided by the petitioner are examined by the presiding | information, facts, and expert opinions provided by the petitioner are examined by the presiding | ||
Line 646: | Line 646: | ||
officer to determine whether they provide adequate support for the proffered contentions. 85 | officer to determine whether they provide adequate support for the proffered contentions. 85 | ||
The Commissions regulations in 10 C.F.R. Part 54 | The Commissions regulations in 10 C.F.R. Part 54 limit the scope of license renewal | ||
proceedings to those matters that must be considered for the license renewal application | proceedings to those matters that must be considered for the license renewal application to be | ||
granted and that have not been addressed by rulemaking or on a generic basis.86 A plants | granted and that have not been addressed by rulemaking or on a generic basis.86 A plants | ||
Line 656: | Line 656: | ||
license renewal applications are bounded by the same rules and scope as the NRCs license | license renewal applications are bounded by the same rules and scope as the NRCs license | ||
renewal review. 88 Under 10 C.F.R. Part 54 , the NRC conducts a technical review of the license | renewal review. 88 Under 10 C.F.R. Part 54, the NRC conducts a technical review of the license | ||
renewal application to ensure that public health and safety requirements are satisfied.89 | renewal application to ensure that public health and safety requirements are satisfied.89 | ||
Line 672: | Line 672: | ||
the scope of this safety review are inadmissible and must be rejected.92 | the scope of this safety review are inadmissible and must be rejected.92 | ||
85 American Centrifuge, CLI | 85 American Centrifuge, CLI 10, 63 NRC at 457; see Bellefonte, LBP 7, 71 NRC at 421. | ||
86 Oyster Creek, CLI-06-24, 64 NRC at 117- | 86 Oyster Creek, CLI-06-24, 64 NRC at 117-18; see also 10 C.F.R. § 54.29; Turkey Point, CLI-01-17, 54 NRC at 8 - 10. | ||
87 10 C.F.R. § 54.30. | 87 10 C.F.R. § 54.30. | ||
88 Turkey Point, CLI- | 88 Turkey Point, CLI- 01-17, 54 NRC at 8 (Adjudicatory hearings in individual license renewal proceedings will share the same scope of issues as our NRC Staff review, for our hearing process (like our Staffs review) necessarily examines only the questions our safety rules make pertinent.). | ||
89 Id. at 6. | 89 Id. at 6. | ||
90 Id. at 10 (quoting 60 Fed. Reg. at 22,469). | 90 Id. at 10 (quoting 60 Fed. Reg. at 22,469). | ||
91 See, e.g., Turkey Point, CLI-01-17, 54 NRC at 8- | 91 See, e.g., Turkey Point, CLI-01-17, 54 NRC at 8-10 (holding that [i]ssues like emergency planningwhich already are the focus of ongoing regulatory processes do not come within the NRC's safety review at the license renewal stage). | ||
92 10 C.F.R. § 2.309(f)(1)(iii); | 92 10 C.F.R. § 2.309(f)(1)(iii); see, e.g., Dominion Nuclear Conn., Inc. (Millstone Nuclear Power Station, Units 2 and 3), CLI 24, 62 NRC 551, 567 (2005). | ||
In accordance with its N | In accordance with its N E PA responsibilities, the Staff is required to take a hard look at | ||
the environmental impacts of a proposed major federal action that could significantly affect the | the environmental impacts of a proposed major federal action that could significantly affect the | ||
environment, as well as reasonable alternatives to that action.93 This hard look is tempered | environment, as well as reasonable alternatives to that action.93 This hard look is tempered by | ||
a rule of reason | a rule of reason consideration of environmental impacts need not address all theoretical | ||
possibilities, but rather only those that have some possibility of occurring.94 An agency thus | possibilities, but rather only those that have some possibility of occurring.94 An agency thus | ||
Line 699: | Line 699: | ||
need only address impacts that are reasonably foreseeable; the agency need not perform | need only address impacts that are reasonably foreseeable; the agency need not perform | ||
analyses concerning events that would be considered worst case scenarios | analyses concerning events that would be considered worst case scenarios or those | ||
considered remote and highly speculative.95 Further, N | considered remote and highly speculative.95 Further, N E PA does not call for certainty or | ||
precision, but an estimate | precision, but an estimate of anticipated (not unduly speculative) impacts.96 NEPA similarly | ||
does not require review when the circumstances render review impossible.97 And NEPA gives | does not require review when the circumstances render review impossible.97 And NEPA gives | ||
agencies | agencies broad discretion to keep their inquiries within appropriate and manageable | ||
boundaries. 98 As the Commission has observed, NEPA requires consideration of reasonable | boundaries. 98 As the Commission has observed, NEPA requires consideration of reasonable | ||
Line 713: | Line 713: | ||
alternatives, not all conceivable ones.99 Further, environmental impact statements need only | alternatives, not all conceivable ones.99 Further, environmental impact statements need only | ||
discuss those alternatives that | discuss those alternatives that will bring about the ends of the proposed action. 100 | ||
Following publication of an environmental impact statement, further supplementation is required | Following publication of an environmental impact statement, further supplementation is required | ||
93 See Claiborne, CLI | 93 See Claiborne, CLI 3, 47 NRC at 87-88; Crow Butte Resources, Inc. (Marsland Expansion Area), LBP-19-2, 89 NRC 18, 40 (2019). | ||
94 Crow Butte Marsland, LBP-19-2, 89 NRC at 40 (quoting | 94 Crow Butte Marsland, LBP-19-2, 89 NRC at 40 (quoting Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), ALAB-156, 6 AEC 831, 836 (1973)). | ||
95 Holtec International (HI | 95 Holtec International (HI -STORE Consolidated Interim Storage Facility), LBP-19-4, 89 NRC 353, 357 (2019) (quoting Limerick Ecology Action, Inc. v. NRC, 869 F.2d 719, 754 - 55 (3d Cir. | ||
1989)). | 1989)). | ||
96 Crow Butte Marsland, LBP | 96 Crow Butte Marsland, LBP 2, 89 NRC at 40 (quoting Louisiana Energy Services, L.P. | ||
(National Enrichment Facility), CLI-05-20, 62 NRC 523, 536 (2005)). | (National Enrichment Facility), CLI-05-20, 62 NRC 523, 536 (2005)). | ||
97 The Supreme Court has observed that where it is not possible for an agency to analyze the environmental consequences of a proposed action or alternatives to it, requiring such analysis would have no factual predicate and under those circumstances an EIS is not required. Kleppe | 97 The Supreme Court has observed that where it is not possible for an agency to analyze the environmental consequences of a proposed action or alternatives to it, requiring such analysis would have no factual predicate and under those circumstances an EIS is not required. Kleppe | ||
: v. Sierra Club, 427 U.S. 390, 401- | : v. Sierra Club, 427 U.S. 390, 401- 02 (1976). | ||
98 Crow Butte Marsland, LBP | 98 Crow Butte Marsland, LBP 2, 89 NRC at 40 (quoting Claiborne, CLI-98-3, 47 NRC at 103). | ||
99 Seabrook, CLI-12-5, 75 NRC at 338. | 99 Seabrook, CLI-12-5, 75 NRC at 338. | ||
Line 735: | Line 735: | ||
100 Id. at 339 (footnotes and quotation marks omitted). | 100 Id. at 339 (footnotes and quotation marks omitted). | ||
only if there are significant new circumstances or information | only if there are significant new circumstances or information [that] paint a dramatically | ||
different picture of impacts compared to the description of impacts in the EIS. 101 | different picture of impacts compared to the description of impacts in the EIS. 101 | ||
Line 763: | Line 763: | ||
§ 2.335. 106 Similarly, the exception in 10 C.F.R. § 51.53(c)(3)(ii)(L) operates as the functional | § 2.335. 106 Similarly, the exception in 10 C.F.R. § 51.53(c)(3)(ii)(L) operates as the functional | ||
101 Massachusetts v. U.S. Nuclear Reg. Comm., 708 F.3d 63, 68- | 101 Massachusetts v. U.S. Nuclear Reg. Comm., 708 F.3d 63, 68-69 (1st Cir. 2013) ( quoting Town of Winthrop v. FAA, 535 F.3d 1, 7, 12 (1st Cir. 2008)); accord, Exelon Generation Co., LLC (Limerick Generating Station, Units 1 and 2), CLI 7, 78 NRC 199, 211, 216 - 17 (2013). | ||
102 As set forth in 10 C.F.R. § 2.335(a), no rule or regulation of the Commission | 102 As set forth in 10 C.F.R. § 2.335(a), no rule or regulation of the Commission is subject to attack in any adjudicatory proceeding, in the absence of a waiver petition granted by the Commission. Further, any contention that amounts to an attack on applicable statutory requirements or represents a challenge to the basic structure of the Commissions regulatory process must be rejected. Dominion Nuclear Conn. (Millstone Nuclear Power Station, Unit 2), | ||
CLI | CLI 14, 58 NRC 207, 218 (2003). | ||
103 Turkey Point, CLI-01-17, 54 NRC at 11 - | 103 Turkey Point, CLI-01-17, 54 NRC at 11 - 12; see 10 C.F.R. § 51.53(c)(3)(i)- (ii). | ||
104 Id. | 104 Id. | ||
105 Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (Vermont Yankee Nuclear Power Station), Entergy Nuclear Generation Co. and Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), CLI-07-3, 65 NRC 13, 17 (footnotes omitted), | 105 Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (Vermont Yankee Nuclear Power Station), Entergy Nuclear Generation Co. and Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), CLI-07-3, 65 NRC 13, 17 (footnotes omitted), | ||
reconsid. denied, CLI- | reconsid. denied, CLI- 07-13, 65 NRC 211, 214 (2007). This approach has been found to comply with NEPA. See, e.g., Massachusetts v. NRC, 708 F.3d at 68 - 69. | ||
106 10 C.F.R. § 2.335(b). | 106 10 C.F.R. § 2.335(b). | ||
equivalent of a Category 1 issue, thereby removing SAMA updates from litigation in this license | equivalent of a Category 1 issue, thereby removing SAMA updates from litigation in this license | ||
renewal adjudication. | renewal adjudication. 107 | ||
II. | II. The Amended and New Contentions Do Not Meet All of the Requirements in 10 C.F.R. | ||
§ 2.309(c) and (f) and, therefore, should be Dismissed | |||
Amended Contentions | Amended Contentions 1-A, 1-B, and 1-C and New Contentions 3-A and 3-B are not | ||
admissible because, as a threshold matter, the information that they challenge | admissible because, as a threshold matter, the information that they challenge in the 2024 | ||
FSEIS, as well as the information that they provide in support of | FSEIS, as well as the information that they provide in support of these challenges, including in | ||
the GAO Report, is not new and | the GAO Report, is not new and materially different from information previously available and | ||
thus Petitioner could have timely filed contentions raising | thus Petitioner could have timely filed contentions raising these same issues during the hearing | ||
opportunity on the 2023 DSEIS. Therefore, Petitioner has failed to demonstrate good cause | opportunity on the 2023 DSEIS. Therefore, Petitioner has failed to demonstrate good cause | ||
under 10 C.F.R. § 2.309(c) for the Board to entertain these challenges n | under 10 C.F.R. § 2.309(c) for the Board to entertain these challenges n o w. Additionally, | ||
Amended Contentions | Amended Contentions 1-A, 1-B, and 1-C and New Contentions 3-A and 3-B do not meet the | ||
contention admissibility requirements of 10 C.F.R. § | contention admissibility requirements of 10 C.F.R. § 2.309(f). Unlike Amended Contentions 1-A, | ||
1-B, and 1-C and New Contentions | 1-B, and 1-C and New Contentions 3-A and 3-B, New Contention 2 does challenge information in | ||
the 2024 FSEIS that is new and materially different from information previously available. But | the 2024 FSEIS that is new and materially different from information previously available. But | ||
Line 807: | Line 807: | ||
Contention 2 still does not show that a genuine dispute exists with the 2024 FSEIS on a material | Contention 2 still does not show that a genuine dispute exists with the 2024 FSEIS on a material | ||
issue of law or fact, lacks adequate factual support for Petitioner s position, | issue of law or fact, lacks adequate factual support for Petitioner s position, and does not | ||
demonstrate that the issue raised is material to the findings that the NRC must make. Therefore, | demonstrate that the issue raised is material to the findings that the NRC must make. Therefore, | ||
while New Contention 2 demonstrates good cause | while New Contention 2 demonstrates good cause under 10 C.F.R. § 2.309(c), it does not meet | ||
the contention admissibility requirements of 10 C.F.R. § | the contention admissibility requirements of 10 C.F.R. § 2.309(f). For these reasons, as detailed | ||
below, the Board should dismiss Amended Contentions | below, the Board should dismiss Amended Contentions 1-A, 1-B, and 1-C, New Contention 2, | ||
and New Contentions | and New Contentions 3-A and 3-B. | ||
107 Limerick, CLI- | 107 Limerick, CLI-13-7, 78 NRC at 210- 12. | ||
A. | A. Amended Contentions 1-A, 1-B, and 1-C are Not Admissible because they Both Challenge and are Based on Preexisting Information and because they are Not Supported and Do Not Dispute a Material Issue of Law or Fact | ||
Amended Contentions 1-A, 1-B, and 1 | Amended Contentions 1-A, 1-B, and 1 -C identify Section 2.8.3 of the 2024 FSEIS as | ||
containing | containing language that is new to the 2024 FSEIS as compared to the 2023 DSEIS, 108 but, | ||
as explained below | as explained below in the Staff answer to Amended Contention 1 -B, all of that new | ||
language is adapted from preexisting information in the 2019 FSEIS and the 2023 DSEIS. | language is adapted from preexisting information in the 2019 FSEIS and the 2023 DSEIS. | ||
Moreover, Petitioner s challenges to that new | Moreover, Petitioner s challenges to that new language are substantively similar to previous | ||
challenges | challenges to the 2019 DSEIS and the 2023 DSEIS, specifically, having to do with (1) the | ||
beneficial impacts of | beneficial impacts of ceasing operations of the CCS and (2) the theory that the required | ||
remediation actions of | remediation actions of withdrawing hypersaline groundwater and freshening the CCS will | ||
worsen groundwater conditions in the Biscayne Aquifer, | worsen groundwater conditions in the Biscayne Aquifer, and those challenges were | ||
previously rejected. 109 Because the information | previously rejected. 109 Because the information being challenged and the information in | ||
support of that challenge are not new and because | support of that challenge are not new and because the challenges are not admissible for | ||
the same reasons that they were not admissible | the same reasons that they were not admissible previously, Amended Contentions 1 -A, 1-B, | ||
and 1-C do not meet all of the requirements of | and 1-C do not meet all of the requirements of 10 C.F.R. § 2.309(c) and (f) and should be | ||
dismissed. | dismissed. | ||
108 Motion at 16, | 108 Motion at 16, 18-19, 21-22 (citing 2024 FSEIS at 2-39-2-40). | ||
109 See Turkey Point, LBP-19-3, 89 NRC at 294 ( | 109 See Turkey Point, LBP-19-3, 89 NRC at 294 ( stating that the expert report attached to the pleading discusses the potential for the hydraulic plume to reach and impact the quality of the L-31E Canal); Turkey Point, LBP-19-8, 90 NRC at 154 (The [2019] DSEIS describes the scenario in which discontinued use of the CCS would reduce discharges of heated water and other effluents to the CCS, potentially reducing the amount of water used to support freshening activities. Joint Intervenors do not cite, much less contest, that part of the [2019] DSEIS. ); | ||
LBP- | LBP-24-3, 99 NRC at __ (slip op. at 17, n.86) ([E] ven were we to consider Miami Waterkeeper s argument regarding the benefits of discontinuing use of the CCS, it would not change our admissibility determination for Contention 1); LBP 3, 99 NRC at __ (slip op. at 22) | ||
(Petitioner s challenge that the recovery well system | (Petitioner s challenge that the recovery well system exerts additional pressure on exiting groundwater use conflicts does not explain how this information would change the analyses in the [2023 DSEIS], nor does Miami Waterkeeper otherwise show that the Staffs analyses are unreasonable. ). | ||
: 1. | : 1. Amended Contention 1-A is Not Admissible because it is Not Based on New Information, is Not Supported, and Does Not Genuinely Dispute the 2024 FSEIS | ||
In Amended Contention 1-A Petitioner states: | In Amended Contention 1-A Petitioner states: | ||
The 2024 FSEIS fails to adequately analyze groundwater conditions for the | The 2024 FSEIS fails to adequately analyze groundwater conditions for the no action alternative, which should be the conditions present when the plant is not operational.[ 110] | ||
Petitioner argues that it has good cause | Petitioner argues that it has good cause under 10 C.F.R. § 2.309(c) to raise this contention now | ||
because Petitioner asserts that Section 2.8.3 of the 2024 FSEIS includes new information that | because Petitioner asserts that Section 2.8.3 of the 2024 FSEIS includes new information that | ||
Line 870: | Line 870: | ||
law that it asserts stand for the proposition that NEPA requires an evaluation of a no action | law that it asserts stand for the proposition that NEPA requires an evaluation of a no action | ||
alternative, or | alternative, or, in this case, an evaluation of the environmental difference between extending | ||
and not extending the expiration dates of the Turkey Point licenses for an additional 20 years.112 | and not extending the expiration dates of the Turkey Point licenses for an additional 20 years.112 | ||
Line 878: | Line 878: | ||
challenging the 2023 DSEIS and a basis for comments that Petitioner submitted on the 2023 | challenging the 2023 DSEIS and a basis for comments that Petitioner submitted on the 2023 | ||
DSEIS. | DSEIS. 113 Petitioner further states that Section 3.2 of the 2024 FSEIS, which is unchanged from | ||
the 2023 DSEIS in this regard, | the 2023 DSEIS in this regard, 114 refers to the 2019 FSEIS for its discussion of the alternatives | ||
to the proposed action, including the no-action alternative, and that | to the proposed action, including the no-action alternative, and that Section 4.6.2 of the 2019 | ||
FSEIS discusses CCS conditions under the no- | FSEIS discusses CCS conditions under the no-action alternative. 115 In essence, Petitioner | ||
argues that the Staffs environmental review is deficient in its analysis of | argues that the Staffs environmental review is deficient in its analysis of the condition of the | ||
110 Motion at 7. | 110 Motion at 7. | ||
111 Id. at 6, 16; compare 2024 FSEIS at 2 | 111 Id. at 6, 16; compare 2024 FSEIS at 2 2-40 with 2023 DSEIS at 2-22-2-31. | ||
112 Motion at 7 | 112 Motion at 7 - 13. | ||
113 Id. at 7; see LBP- | 113 Id. at 7; see LBP-24-3, 99 NRC at __ (slip op. at 17, n.86) (noting that Petitioner raised this argument at oral argument and in its reply brief); Motion at 13 (although the comment actually asserts a challenge to the discussion of the environmental baseline and not to the discussion of the no-action alternative). | ||
114 Compare 2024 FSEIS at 3-2 with 2023 DSEIS at 3-2. | 114 Compare 2024 FSEIS at 3-2 with 2023 DSEIS at 3-2. | ||
115 Motion at 13- | 115 Motion at 13-14; 2019 FSEIS at 4 -49. | ||
groundwater in the vicinity of the plant under the no- | groundwater in the vicinity of the plant under the no-action alternative, that is, under the | ||
alternative that | alternative that the CCS is no longer used as a heat sink. 116 | ||
Amended Contention 1-A is not admissible because, contrary to 10 C.F.R. § 2.309(c), | Amended Contention 1-A is not admissible because, contrary to 10 C.F.R. § 2.309(c), | ||
Petitioner admits that it has raised | Petitioner admits that it has raised the same argument previously in this proceeding. 117 Although | ||
Petitioner states that Amended Contention 1-A i | Petitioner states that Amended Contention 1-A i s revised, 118 Petitioner does not identify any | ||
way in which Amended Contention 1-A is different than Petitioner s previous argument. Instead, | way in which Amended Contention 1-A is different than Petitioner s previous argument. Instead, | ||
Line 914: | Line 914: | ||
it appears that Petitioner is raising the same argument against the 2024 FSEIS that it raised | it appears that Petitioner is raising the same argument against the 2024 FSEIS that it raised | ||
against the 2023 DSEISthat the Staffs impact determination of SMALL or MODERATE | against the 2023 DSEISthat the Staffs impact determination of SMALL or MODERATE with | ||
respect to groundwater quality is insufficient because it doesnt discuss the impacts to | respect to groundwater quality is insufficient because it doesnt discuss the impacts to | ||
Line 920: | Line 920: | ||
groundwater quality under the alternative of no longer using the CCS as a heat sink. 119 The only | groundwater quality under the alternative of no longer using the CCS as a heat sink. 119 The only | ||
real difference here, though, | real difference here, though, is that Petitioner now explicitly challenges the no-action alternative | ||
instead of its previous challenge, which had to do with | instead of its previous challenge, which had to do with the cooling tower alternative, but both | ||
arguments encompass the same situation of the CCS no longer being used as a heat sink.120 | arguments encompass the same situation of the CCS no longer being used as a heat sink.120 | ||
Moreover, the information that Petitioner identifies as | Moreover, the information that Petitioner identifies as its basis for re-pleading this previous | ||
argument, Section 2.8.3 of the 2024 FSEIS, is neither new nor materially different from | argument, Section 2.8.3 of the 2024 FSEIS, is neither new nor materially different from | ||
Line 932: | Line 932: | ||
116 Motion at 13. | 116 Motion at 13. | ||
117 Id. at 7; see LBP- | 117 Id. at 7; see LBP-24-3, 99 NRC at __ (slip op. at 17, n.86) (noting that Petitioner raised this argument at oral argument and in its reply brief). | ||
118 Motion at 7. | 118 Motion at 7. | ||
119 Compare Motion at 7- | 119 Compare Motion at 7-8, 16 (The Staff has made only a cursory effort to evaluate the baseline conditions for the no action alternative instead of fully analyz[ing] and present[ing] to the public and the Boards consideration, the environmental difference between extending the license and continuing the use of the CCS and declining the application and, therefore, its reliance in section 2.8.3 of the 2024 FSEIS on an incorrect environmental baseline is the basis of its erroneous determination that impacts on groundwater quality will be SMALL or MODERATE.) with Reply at 16-17 ([T]he 2023 DSEISs determination that the proposed action will have a SMALL or MODERATE impact on groundwater quality failed to compare the positive and remedial impact to groundwater of reasonable alternatives to the proposed action (i.e., discontinuing the use of the CCS as a heat sink for Units 3 and 4 mandating FPL implement a cooling tower) against the perpetuating and exacerbating impact of the proposed action (continuing to operate the CCS as a heat sink for Units 3 and 4).). | ||
120 See Motion at 9, 13 (specifying that its argument is related to | 120 See Motion at 9, 13 (specifying that its argument is related to the use of the CCS as a heat sink). | ||
information that was previously available. Although | information that was previously available. Although that section uses new language to present | ||
the Staffs SMALL to MODERATE impact determination with respect to groundwater quality, | the Staffs SMALL to MODERATE impact determination with respect to groundwater quality, | ||
Line 946: | Line 946: | ||
Petitioner does not identify and challenge any substantive difference between that impact | Petitioner does not identify and challenge any substantive difference between that impact | ||
determination and the impact determination in the same section of | determination and the impact determination in the same section of the 2023 DSEIS.121 In fact, | ||
as explained below in the Staff answer to Amended Contention 1-B, all of the new language in | as explained below in the Staff answer to Amended Contention 1-B, all of the new language in | ||
Line 958: | Line 958: | ||
available during the hearing opportunity on the 2023 DSEIS. The purpose of the heightened | available during the hearing opportunity on the 2023 DSEIS. The purpose of the heightened | ||
pleading standard of 10 C.F.R. § | pleading standard of 10 C.F.R. § 2.309(c), though, is to ensure that the only arguments admitted | ||
after the deadline are those that could not have otherwise been filed by the deadline. 122 | after the deadline are those that could not have otherwise been filed by the deadline. 122 | ||
Line 972: | Line 972: | ||
deadline. First, Petitioner asserts that its request to amend Contention 1 is appropriate because | deadline. First, Petitioner asserts that its request to amend Contention 1 is appropriate because | ||
Contention 1 was previously admitted. | Contention 1 was previously admitted. 123 This statement, though, is incorrect. The narrowly | ||
reformulated portion of Contention 1 that the Board admitted was a contention of omission | reformulated portion of Contention 1 that the Board admitted was a contention of omission | ||
121 Compare 2024 FSEIS at 2 | 121 Compare 2024 FSEIS at 2 2-40 (stating that impacts to groundwater quality would be MODERATE under the scenario of the hypersaline groundwater plume extending outside of the Turkey Point site boundary during the subsequent license renewal term and SMALL under the scenario of the hypersaline groundwater plume being fully retracted to within the Turkey Point site boundary either before or during the subsequent license renewal term) with 2023 DSEIS at 2-31 ( [I]f FPL can retract and maintain the hypersaline plume to within the FPL site boundary prior to the [subsequent license renewal] term, the impacts on groundwater quality from the CCS operations during the [subsequent license renewal] term would be SMALL; otherwise, if the hypersaline groundwater plume is not retracted, impacts could be MODERATE.). | ||
122 See HI-STORE Consolidated Interim Storage Facility, CLI-21-7, 93 NRC at 221. | 122 See HI-STORE Consolidated Interim Storage Facility, CLI-21-7, 93 NRC at 221. | ||
Line 984: | Line 984: | ||
that the 2023 DSEIS lacks an explanation as to how the uncertainty about the success of FPLs | that the 2023 DSEIS lacks an explanation as to how the uncertainty about the success of FPLs | ||
efforts to | efforts to retract the hypersaline groundwater plume to within the Turkey Point site boundary | ||
prior to the subsequent license renewal term leads to a finding of moderate environmental | prior to the subsequent license renewal term leads to a finding of moderate environmental | ||
impacts. 124 The Board did not find that this omission extended | impacts. 124 The Board did not find that this omission extended to the discussion of the | ||
groundwater impacts of the no- | groundwater impacts of the no-action alternative. 125 In fact, the Board explicitly questioned | ||
whether Petitioner s argument regarding | whether Petitioner s argument regarding the beneficial impacts of discontinuing the use of the | ||
CCS as a heat sink was even | CCS as a heat sink was even a part of Contention 1 and, therefore, did not include this | ||
argument as part of the admitted portion of Contention 1. 126 | argument as part of the admitted portion of Contention 1. 126 | ||
Second, Petitioner asserts that the basis for Amended Contention 1-A i | Second, Petitioner asserts that the basis for Amended Contention 1-A i s that the 2023 | ||
DSEIS | DSEIS omitted explanation of the predictions regarding the hypersaline plume and that now | ||
the 2024 FSEIS includes that explanation | the 2024 FSEIS includes that explanation in Section 2.8.3. 127 Again, this is inaccurate because | ||
the omission that was the subject of Reformulated Contention 1 was not of an explanation of | the omission that was the subject of Reformulated Contention 1 was not of an explanation of | ||
Line 1,012: | Line 1,012: | ||
impacts. 128 Accordingly, although Petitioner challenges the new language of Section 2.8.3 of the | impacts. 128 Accordingly, although Petitioner challenges the new language of Section 2.8.3 of the | ||
2024 FSEIS for not discussing the no- | 2024 FSEIS for not discussing the no-action alternative, this was never the purpose of that new | ||
language. Because | language. Because neither Section 2.8.3 of the 2024 FSEIS nor Section 2.8.3 of the 2023 | ||
DSEIS discusses | DSEIS discusses the no-action alternative in this regard, Petitioner s repetition of this argument | ||
does not identify any new information | does not identify any new information as its basis. Instead, as conceded by Petitioner, 129 the no- | ||
action alternative is discussed in the 2024 FSEIS at Section 3.2, which is unchanged from the | action alternative is discussed in the 2024 FSEIS at Section 3.2, which is unchanged from the | ||
124 LBP- | 124 LBP-24-3, 99 NRC at __ (slip op. at 21 - 22). | ||
125 Id. | 125 Id. | ||
126 Id. at 17, n.86 ( [W]e admit | 126 Id. at 17, n.86 ( [W]e admit only a narrow portion of Contention 1 and conclude that all other claims, including this one, are inadmissible.). | ||
127 Motion at 6, 16. | 127 Motion at 6, 16. | ||
128 LBP- | 128 LBP-24-3, 99 NRC at __ (slip op. at 21-22). | ||
129 Motion at 13- | 129 Motion at 13-14. | ||
2023 DSEIS at Section 3.2 | 2023 DSEIS at Section 3.2 and which states that the Staff identified no significant new | ||
information that would change its discussion of the issue in Chapter 4 of the 2019 FSEIS. 130 This | information that would change its discussion of the issue in Chapter 4 of the 2019 FSEIS. 130 This | ||
is also not new information. Additionally, all of the regulations and case law cited | is also not new information. Additionally, all of the regulations and case law cited in Amended | ||
Contention 1-A are not new information, but rather were also available during the hearing | Contention 1-A are not new information, but rather were also available during the hearing | ||
Line 1,044: | Line 1,044: | ||
opportunity on the 2023 DSEIS. 131 Therefore, although Petitioner is asserting that the new | opportunity on the 2023 DSEIS. 131 Therefore, although Petitioner is asserting that the new | ||
language | language in Section 2.8.3 of the 2024 FSEIS provides good cause for bringing Amended | ||
Contention 1-A now, its | Contention 1-A now, its proposed amendment of Contention 1 is actually based solely on old | ||
information. | information. As such, Amended Contention 1-A is an untimely supplementation of a preexisting | ||
argument with preexisting | argument with preexisting information and, therefore, should be dismissed for failing to meet the | ||
good cause requirement of 10 C.F.R. § 2.309(c) | good cause requirement of 10 C.F.R. § 2.309(c). | ||
Even if it were not dismissed | Even if it were not dismissed for lack of good cause, Amended Contention 1-A should be | ||
dismissed because it doesnt meet the contention admissibility requirements of 10 C.F.R. | dismissed because it doesnt meet the contention admissibility requirements of 10 C.F.R. | ||
§ 2.309(f). In Amended Contention 1-A, Petitioner asserts | § 2.309(f). In Amended Contention 1-A, Petitioner asserts that the Staffs discussion of the | ||
environmental impacts to groundwater of no longer using the CCS as a heat sink is inadequate | environmental impacts to groundwater of no longer using the CCS as a heat sink is inadequate. | ||
However, Petitioner (1) | However, Petitioner (1) does not provide factual support for this assertion and (2) does not | ||
explain how this assertion genuinely disputes any specific portion of the Staffs environmental | explain how this assertion genuinely disputes any specific portion of the Staffs environmental | ||
review. With respect to factual support, Amended Contention 1-A states that the Staff has | review. With respect to factual support, Amended Contention 1-A states that the Staff has made | ||
only a cursory effort to evaluate the baseline conditions for the no action alternative, has not | only a cursory effort to evaluate the baseline conditions for the no action alternative, has not | ||
conducted | conducted an adequate baseline analysis against which to compare the impacts of the [CCS] | ||
on saltwater intrusion, | on saltwater intrusion, and has not explained the environmental difference between extending | ||
the license and continuing the use of the CCS and declining the application. | the license and continuing the use of the CCS and declining the application. 132 The balance of | ||
Amended Contention 1-A is a recitation of assertedly relevant regulations and case law. | Amended Contention 1-A is a recitation of assertedly relevant regulations and case law. 133 That | ||
130 2023 DSEIS at 3 | 130 2023 DSEIS at 3 3-2; 2024 FSEIS at 3 3-2. | ||
131 See Motion at 8- | 131 See Motion at 8-13 (citing case law that all predates the 2023 DSEIS). | ||
132 Motion at 7 | 132 Motion at 7 - 8, 11-12. | ||
133 Id. at 8- | 133 Id. at 8-13. | ||
discussion does not include any factual support, despite Petitioner referring to it as providing the | discussion does not include any factual support, despite Petitioner referring to it as providing the | ||
Line 1,090: | Line 1,090: | ||
facts supporting Amended Contention 1-A. 134 And there is no factual support anywhere else in | facts supporting Amended Contention 1-A. 134 And there is no factual support anywhere else in | ||
Amended Contention 1-A f | Amended Contention 1-A f o r Petitioner s position that the 2024 FSEIS does not comply with the | ||
recited | recited legal standards just asserting that a discussion is inadequate and that regulations and | ||
case law require adequate discussions is not factual support.135 Petitioner concludes that the | case law require adequate discussions is not factual support.135 Petitioner concludes that the | ||
Line 1,102: | Line 1,102: | ||
statement does not support Amended Contention 1-A because that contention challenges the | statement does not support Amended Contention 1-A because that contention challenges the | ||
adequacy of the Staffs analysis of groundwater conditions for the no-action alternative, | adequacy of the Staffs analysis of groundwater conditions for the no-action alternative, 137 but | ||
this statement concerns the separate issue of | this statement concerns the separate issue of the adequacy of the environmental baseline. As | ||
explained in the Staffs environmental review, the environmental baseline describes the | explained in the Staffs environmental review, the environmental baseline describes the | ||
environment at the time of the Staffs | environment at the time of the Staffs analysis 138 and the no-action alternative describes the | ||
impacts on that environmental baseline from the action of not authorizing an additional 20 years | impacts on that environmental baseline from the action of not authorizing an additional 20 years | ||
Line 1,116: | Line 1,116: | ||
Contention 1-A. Additionally, to the extent that Petitioner may with this statement somehow be | Contention 1-A. Additionally, to the extent that Petitioner may with this statement somehow be | ||
pointing | pointing to Amended Contention 1-C for the factual support required for Amended Contention 1- | ||
134 Id. at 15 (The facts supporting the Petitioner s contention are set forth in the Basis Statement in Section 2, above.). | 134 Id. at 15 (The facts supporting the Petitioner s contention are set forth in the Basis Statement in Section 2, above.). | ||
135 See Pilgrim, CLI- | 135 See Pilgrim, CLI-12-15, 75 NRC at 714 (explaining that bare assertions and speculation, even by an expert, are insufficient to trigger a full adjudicatory proceeding). | ||
136 Motion at 16. | 136 Motion at 16. | ||
137 Id. at 7. | 137 Id. at 7. | ||
138 See 2019 FSEIS at | 138 See 2019 FSEIS at 3-1 (In conducting its environmental review the [NRC s t a ff] first defines and describes the environment that could be affected by the subsequent license renewal. For this review, the NRC staff defines the affected environment as the environment that currently exists at and around the Turkey Point site.); 2019 FSEIS at 3 3-88 (describing the Baseline Groundwater Quality). | ||
139 See 2019 FSEIS at 4-2 (The affected environment (i.e., environmental baseline) for each resource area considered | 139 See 2019 FSEIS at 4-2 (The affected environment (i.e., environmental baseline) for each resource area considered is described in Chapter 3 and it is against this environmental baseline that the potential environmental impacts of the alternatives are measured.). | ||
A, that too would be of no avail because, as discussed below, Amended Contention 1-C similarly | A, that too would be of no avail because, as discussed below, Amended Contention 1-C similarly | ||
Line 1,135: | Line 1,135: | ||
Therefore, contrary to 10 C.F.R. § 2.309(f)(1)(v), Amended Contention 1-A does not include | Therefore, contrary to 10 C.F.R. § 2.309(f)(1)(v), Amended Contention 1-A does not include | ||
supporting alleged facts or expert opinions and, accordingly, | supporting alleged facts or expert opinions and, accordingly, it should be dismissed. | ||
Amended Contention 1-A is also not admissible because although it references portions | Amended Contention 1-A is also not admissible because although it references portions | ||
Line 1,143: | Line 1,143: | ||
genuine dispute exists with those documents on a material issue of law or fact. First, Petitioner | genuine dispute exists with those documents on a material issue of law or fact. First, Petitioner | ||
points to [t]he 2024 FSEIS at pages 2- | points to [t]he 2024 FSEIS at pages 2-24 to 2-40, which corresponds to Section 2.8.3 of the | ||
2024 FSEIS, and points to Section 3.2, | 2024 FSEIS, and points to Section 3.2, Comparison of Alternatives, of the 2024 FSEIS and | ||
identifies that Section 3.2 of the 2024 FSEIS points, in turn | identifies that Section 3.2 of the 2024 FSEIS points, in turn, to the Staff evaluation of | ||
alternatives in Chapter 4 of the 2019 FSEIS. 140 Petitioner then references | alternatives in Chapter 4 of the 2019 FSEIS. 140 Petitioner then references Section 4.6.2 of the | ||
2019 FSEIS, 141 which is the Staff discussion of the no- | 2019 FSEIS, 141 which is the Staff discussion of the no-action alternative with respect to | ||
terrestrial resources. 142 Petitioner, though, does not reference the Staff discussion of the no- | terrestrial resources. 142 Petitioner, though, does not reference the Staff discussion of the no- | ||
action alternative with respect to groundwater resources,143 despite its statement that | action alternative with respect to groundwater resources,143 despite its statement that this | ||
contention | contention concerns only groundwater analysis. 144 Because it doesnt cite the actually | ||
relevant information of | relevant information of the Staffs discussion of beneficial impacts to groundwater quality from | ||
Turkey Point Units 3 and 4 no longer using the CCS as a heat sink, 145 Petitioner has not shown | Turkey Point Units 3 and 4 no longer using the CCS as a heat sink, 145 Petitioner has not shown | ||
Line 1,169: | Line 1,169: | ||
142 2019 FSEIS at 4 -49. | 142 2019 FSEIS at 4 -49. | ||
143 See id. at 4 | 143 See id. at 4 4-38. | ||
144 Motion at 14. | 144 Motion at 14. | ||
145 See 2019 FSEIS at 4 | 145 See 2019 FSEIS at 4 4-38 (The shutdown of Turkey Point would substantially reduce thermal discharges to the CCS as well as cooling water and other effluents from the plants cooling water system. This flow reduction would reduce groundwater mounding (i.e., a localized increase in the water table) beneath the CCS and reduce the generation of hypersaline water. | ||
As a result, the NRC staff expects that the amount of water used to support freshening activities could be reduced[, which] is derived from five production wells tapping the Upper Floridan aquifer. | As a result, the NRC staff expects that the amount of water used to support freshening activities could be reduced[, which] is derived from five production wells tapping the Upper Floridan aquifer. [However,] FPL may need to operate and maintain the recovery well and associated | ||
that a genuine dispute exists. Moreover, Petitioner s clarification that Amended Contention 1-A | that a genuine dispute exists. Moreover, Petitioner s clarification that Amended Contention 1-A | ||
Line 1,184: | Line 1,184: | ||
DSEIS analysis and neither discusses the beneficial impacts of ceasing Turkey Point Units 3 | DSEIS analysis and neither discusses the beneficial impacts of ceasing Turkey Point Units 3 | ||
and 4 operations on the CCS because both rely, instead, on the discussion of the no- | and 4 operations on the CCS because both rely, instead, on the discussion of the no-action | ||
alternative in the 2019 FSEIS. 146 | alternative in the 2019 FSEIS. 146 | ||
Line 1,192: | Line 1,192: | ||
and rejected in both LBP-19-8 and LBP-24-3 for not meeting all of the contention admissibility | and rejected in both LBP-19-8 and LBP-24-3 for not meeting all of the contention admissibility | ||
requirements of 10 C.F.R. § 2.309(f) | requirements of 10 C.F.R. § 2.309(f). 147 Although focusing on the cooling tower alternative as | ||
opposed to the no- | opposed to the no-action alternative, in 2019, the Board addressed the argument that the Staff | ||
had not sufficiently discussed the beneficial environmental impacts to groundwater of Turkey | had not sufficiently discussed the beneficial environmental impacts to groundwater of Turkey | ||
Line 1,204: | Line 1,204: | ||
and other effluents to the CCS, potentially reducing the amount of water used to support | and other effluents to the CCS, potentially reducing the amount of water used to support | ||
freshening | freshening activities and that the Joint Petitioners did not cite, much less contest, that part of | ||
the Staffs analysis and that, therefore, that aspect of the contention was inadmissible for failing | the Staffs analysis and that, therefore, that aspect of the contention was inadmissible for failing | ||
to raise a genuine dispute on a material issue of law or fact.149 In LBP | to raise a genuine dispute on a material issue of law or fact.149 In LBP 3, the Board also | ||
deep well injection systems for as long as necessary to achieve and maintain compliance with County and FDEP requirements.). | deep well injection systems for as long as necessary to achieve and maintain compliance with County and FDEP requirements.). | ||
146 Compare 2024 FSEIS at 3-2 with 2023 DSEIS at 3- | 146 Compare 2024 FSEIS at 3-2 with 2023 DSEIS at 3-2 (both stating that [t]he NRC staff evaluated the no-action alternative, in depth in Chapter 4 of the [2019] FSEIS and has identified no significant new information that would change these discussions in the [2019] | ||
FSEIS). | FSEIS). | ||
147 See Turkey Point, LBP-19-8, 90 NRC at 154; Turkey Point | 147 See Turkey Point, LBP-19-8, 90 NRC at 154; Turkey Point LBP-24-3, 99 NRC at __ (slip op. | ||
at 17, n.86). | at 17, n.86). | ||
148 Turkey Point, LBP- | 148 Turkey Point, LBP-19-8, 90 NRC at 154. | ||
149 Id. | 149 Id. | ||
Line 1,225: | Line 1,225: | ||
inadmissible. 150 | inadmissible. 150 | ||
As explained above, | As explained above, the argument of Amended Contention 1-A that the Staffs discussion | ||
of the environmental impacts to groundwater of no longer using the CCS as a heat sink is | of the environmental impacts to groundwater of no longer using the CCS as a heat sink is | ||
inadequate | inadequate is not timely because, with respect to this topic, Petitioner does not point to any | ||
materially different information in the 2024 FSEIS as compared to the 2023 DSEIS and does not | materially different information in the 2024 FSEIS as compared to the 2023 DSEIS and does not | ||
make any materially different arguments than it made regarding | make any materially different arguments than it made regarding the 2023 DSEIS. This argument | ||
also does not meet the contention admissibility requirements because Petitioner does not | also does not meet the contention admissibility requirements because Petitioner does not | ||
Line 1,242: | Line 1,242: | ||
accordance with 10 C.F.R. § 2.309(c) and (f), Amended Contention 1-A should be dismissed. | accordance with 10 C.F.R. § 2.309(c) and (f), Amended Contention 1-A should be dismissed. | ||
: 2. | : 2. Amended Contention 1-B is Not Admissible because it is Not Based on New Information, Does Not Genuinely Dispute the 2024 FSEIS, and is Not Supported | ||
In Amended Contention 1-B Petitioner states: | In Amended Contention 1-B Petitioner states: | ||
The 2024 FSEIS employs the wrong standard to determine | The 2024 FSEIS employs the wrong standard to determine the impact of the CCS on potable water.[ 151] | ||
Petitioner disputes the discussion in the conclusion of Section 2.8.3 of the 2024 FSEIS that | Petitioner disputes the discussion in the conclusion of Section 2.8.3 of the 2024 FSEIS that | ||
Line 1,254: | Line 1,254: | ||
Units 3 and 4 site boundary during the subsequent license renewal term, the appropriate impact | Units 3 and 4 site boundary during the subsequent license renewal term, the appropriate impact | ||
determination for groundwater quality would be | determination for groundwater quality would be MODERATE. 152 Petitioner argues that the | ||
impact determination of MODERATE is an underestimate because Petitioner asserts | impact determination of MODERATE is an underestimate because Petitioner asserts that the | ||
environmental impacts of continued operations of the CCS during | environmental impacts of continued operations of the CCS during the subsequent license | ||
150 LBP- | 150 LBP-24-3, 99 NRC at __ (slip op. at 17, n.86). | ||
151 Motion at 16. | 151 Motion at 16. | ||
152 Id. at 18- | 152 Id. at 18-19 (citing 2024 FSEIS at 2-39-2-40). | ||
renewal term would destabilize the important attribute of potability of the Biscayne Aquifer | renewal term would destabilize the important attribute of potability of the Biscayne Aquifer. 153 | ||
Petitioner faults the 2024 FSEIS for supposedly not look[ing] to whether [the] proposed action | Petitioner faults the 2024 FSEIS for supposedly not look[ing] to whether [the] proposed action | ||
will render potable portions of the Biscayne Aquifer non-potable. | will render potable portions of the Biscayne Aquifer non-potable. 154 Petitioner supports this | ||
argument by stating that the potable water standards for Miami-Dade County are a total | argument by stating that the potable water standards for Miami-Dade County are a total | ||
Line 1,278: | Line 1,278: | ||
a chloride concentration of less than or equal to 250 mg/L.155 Petitioner then reasons that | a chloride concentration of less than or equal to 250 mg/L.155 Petitioner then reasons that | ||
because the conclusion of | because the conclusion of Section 2.8.3 of the 2024 FSEIS defines the classification of the | ||
Biscayne Aquifer | Biscayne Aquifer under the CCS as having a TDS concentration of 10,000 mg/L or greater and | ||
defines hypersaline groundwater as groundwater with a chloride concentration of greater than | defines hypersaline groundwater as groundwater with a chloride concentration of greater than | ||
19,000 mg/L, it must not be properly addressing the | 19,000 mg/L, it must not be properly addressing the impact of the proposed action on potable | ||
water. 156 Rather, Petitioner asserts that the discussion in Section 2.8.3 of the 2024 FSEIS | water. 156 Rather, Petitioner asserts that the discussion in Section 2.8.3 of the 2024 FSEIS | ||
amounts to the Staff | amounts to the Staff employ[ing] a relaxed standard (hypersalinity) to determine whether the | ||
continued CCS operations will destabilize a potable drinking water resource. | continued CCS operations will destabilize a potable drinking water resource. 157 | ||
Petitioner s arguments in Amended Contention 1-B miss the mark because (1) the | Petitioner s arguments in Amended Contention 1-B miss the mark because (1) the | ||
information that the arguments challenge in the conclusion of | information that the arguments challenge in the conclusion of Section 3.8.2 of the 2024 FSEIS is | ||
not new and, instead, summarizes preexisting information from the 2019 FSEIS and the 2023 | not new and, instead, summarizes preexisting information from the 2019 FSEIS and the 2023 | ||
DSEIS; (2) the arguments do not identify, let alone dispute, the discussions in | DSEIS; (2) the arguments do not identify, let alone dispute, the discussions in the 2019 FSEIS, | ||
the 2023 DSEIS, and the 2024 FSEIS of the very issue of the im | the 2023 DSEIS, and the 2024 FSEIS of the very issue of the im pact of the proposed action to | ||
potable water use of the Biscayne Aquifer; and (3) the arguments do not include any factual | potable water use of the Biscayne Aquifer; and (3) the arguments do not include any factual | ||
support for their | support for their assertion that there will be a greater impact to potable water use of the | ||
Biscayne Aquifer than that already discussed in the 2019 FSEIS, the 2023 DSEIS, and the 2024 | Biscayne Aquifer than that already discussed in the 2019 FSEIS, the 2023 DSEIS, and the 2024 | ||
153 Motion at 17 | 153 Motion at 17. | ||
154 Id. at 18. | 154 Id. at 18. | ||
Line 1,314: | Line 1,314: | ||
155 Id. | 155 Id. | ||
156 Id. at 18- | 156 Id. at 18-19 (citing 2024 FSEIS at 2-39-2-40). | ||
157 Motion at 19. | 157 Motion at 19. | ||
Line 1,320: | Line 1,320: | ||
FSEIS. Therefore, as explained next, Amended Contention 1-B does not meet the good cause | FSEIS. Therefore, as explained next, Amended Contention 1-B does not meet the good cause | ||
standard of 10 C.F.R. § | standard of 10 C.F.R. § 2.309(c) and does not meet the contention admissibility requirements of | ||
10 C.F.R. § 2.309(f)(1)(vi) and (v), respectively. | 10 C.F.R. § 2.309(f)(1)(vi) and (v), respectively. | ||
Line 1,330: | Line 1,330: | ||
opportunity for a hearing on the 2023 DSEIS. As indicated by the fact that the challenged | opportunity for a hearing on the 2023 DSEIS. As indicated by the fact that the challenged | ||
portion of Section 2.8.3 of the 2024 FSEIS is preceded by the heading Conclusion, | portion of Section 2.8.3 of the 2024 FSEIS is preceded by the heading Conclusion, 158 the | ||
information therein is not new to the 2024 FSEIS; instead, that information relies on, and | information therein is not new to the 2024 FSEIS; instead, that information relies on, and largely | ||
summarizes, information that was already available in the 2023 DSEIS. As relevant to Amended | summarizes, information that was already available in the 2023 DSEIS. As relevant to Amended | ||
Contention 1-B, before the 2024 FSEIS, Section 2.8.3 of the | Contention 1-B, before the 2024 FSEIS, Section 2.8.3 of the 2023 DSEIS had already | ||
determined that the impact to groundwater quality could be MODERATE if FPL is not | determined that the impact to groundwater quality could be MODERATE if FPL is not able to | ||
retract the hypersaline groundwater plume to | retract the hypersaline groundwater plume to within the FPL site boundary prior to the | ||
[subsequent license renewal] term. 159 Section 2.8.3 of the 2023 DSEIS also already discussed | [subsequent license renewal] term. 159 Section 2.8.3 of the 2023 DSEIS also already discussed | ||
how the existence of the | how the existence of the hypersaline groundwater plume outside of the Turkey Point site | ||
boundary | boundary would not destabilize the groundwater resource. 160 Section 2.8.3 of the 2023 DSEIS | ||
already stated that | already stated that the Biscayne Aquifer is classified as both Class G-III (nonpotable use, with | ||
TDS levels of 10,000 mg/L or greater) beneath the Turkey Point site and CCS, and Class-II | TDS levels of 10,000 mg/L or greater) beneath the Turkey Point site and CCS, and Class-II | ||
(potable) to the west of the CCS. 161 It also already discussed | (potable) to the west of the CCS. 161 It also already discussed how hypersaline groundwater, as | ||
defined as groundwater with a chloride concentration | defined as groundwater with a chloride concentration greater than 19,000 mg/L, extends to the | ||
west of the CCS but is being retracted towards the CCS boundary by FPLs required | west of the CCS but is being retracted towards the CCS boundary by FPLs required | ||
Line 1,360: | Line 1,360: | ||
remediation actions. 162 Taken together, these preexisting portions of Section 2.8.3 of the 2023 | remediation actions. 162 Taken together, these preexisting portions of Section 2.8.3 of the 2023 | ||
158 2024 FSEIS at 2- | 158 2024 FSEIS at 2-38. | ||
159 2023 DSEIS at 2- | 159 2023 DSEIS at 2-31. | ||
160 Id. | 160 Id. | ||
Line 1,368: | Line 1,368: | ||
161 Id. at 2-22. | 161 Id. at 2-22. | ||
162 Id. at 2 | 162 Id. at 2 2-31. | ||
DSEIS add up to exactly the new language in | DSEIS add up to exactly the new language in the conclusion of Section 2.8.3 of the 2024 FSEIS | ||
that Petitioner is now challengingthat | that Petitioner is now challengingthat if the plume of groundwater with a chloride | ||
concentration of greater than 19,000 mg/L were to extend into the Class-II (potable) portion of | concentration of greater than 19,000 mg/L were to extend into the Class-II (potable) portion of | ||
the | the Biscayne Aquifer during the subsequent license renewal term, then the impact on the | ||
groundwater resource from subsequent license renewal would be moderate. | groundwater resource from subsequent license renewal would be moderate. Additionally, as | ||
discussed next, all of Petitioner s arguments regarding impacts to the potable use of the | discussed next, all of Petitioner s arguments regarding impacts to the potable use of the | ||
Line 1,390: | Line 1,390: | ||
contention until a document becomes available that collects, summarizes and places into | contention until a document becomes available that collects, summarizes and places into | ||
context the facts supporting that contention, such as the new conclusion of | context the facts supporting that contention, such as the new conclusion of Section 2.8.3 of the | ||
2024 FSEIS. 163 Similarly, Petitioner had the responsibility to carefully review the 2019 FSEIS | 2024 FSEIS. 163 Similarly, Petitioner had the responsibility to carefully review the 2019 FSEIS | ||
Line 1,396: | Line 1,396: | ||
and the 2023 DSEIS and cant now bring an argument that was simply missed earlier.164 | and the 2023 DSEIS and cant now bring an argument that was simply missed earlier.164 | ||
Therefore, Amended Contention 1-B is impermissibly untimely and | Therefore, Amended Contention 1-B is impermissibly untimely and, consistent with 10 C.F.R. | ||
§ 2.309(c), should be dismissed | § 2.309(c), should be dismissed for this reason alone. | ||
Additionally, Amended Contention 1-B is not admissible because it does not genuinely | Additionally, Amended Contention 1-B is not admissible because it does not genuinely | ||
Line 1,406: | Line 1,406: | ||
Staff has not adequately discussed the impact of the proposed action on the potable water use | Staff has not adequately discussed the impact of the proposed action on the potable water use | ||
of | of the Biscayne Aquifer. 165 Petitioner premises this argument on its assertion that the Staff did | ||
not employ the drinking water standards of 500 mg/L TDS and 250 mg/L chloride and its | not employ the drinking water standards of 500 mg/L TDS and 250 mg/L chloride and its | ||
Line 1,412: | Line 1,412: | ||
163 Northern States Power Co. (Prairie Island Nuclear Generating Plant, Units 1 and 2), CLI 27, 72 NRC 481, 496 (2010). | 163 Northern States Power Co. (Prairie Island Nuclear Generating Plant, Units 1 and 2), CLI 27, 72 NRC 481, 496 (2010). | ||
164 See Louisiana Energy Services, L.P. (National Enrichment Facility), CLI-04-25, 60 NRC 223, 224- | 164 See Louisiana Energy Services, L.P. (National Enrichment Facility), CLI-04-25, 60 NRC 223, 224-25 (2004) (As the Commission has stressed, our contention admissibility and timeliness requirements demand a level of discipline and preparedness on the part of petitioners, who must examine the publicly available material and set forth their claims and the support for their claims at the outset.) (quotation marks omitted). | ||
165 Motion at 18- | 165 Motion at 18-19. | ||
assertion that the Staff, instead, improperly relied upon the values of 10,000 mg/L TDS and | assertion that the Staff, instead, improperly relied upon the values of 10,000 mg/L TDS and | ||
Line 1,421: | Line 1,421: | ||
explanation of the Staffs review of this very issue in the 2019 FSEIS, including in the sections | explanation of the Staffs review of this very issue in the 2019 FSEIS, including in the sections | ||
Groundwater Quality Standards and Current Designated Uses, 167 | Groundwater Quality Standards and Current Designated Uses, 167 Baseline Groundwater | ||
Quality and Changes Attributable to Turkey Point Operations, 168 and Groundwater Use | Quality and Changes Attributable to Turkey Point Operations, 168 and Groundwater Use | ||
Line 1,427: | Line 1,427: | ||
Conflicts (Plants That Withdraw More Than 100 Gallons per Minute). 169 As discussed next, in | Conflicts (Plants That Withdraw More Than 100 Gallons per Minute). 169 As discussed next, in | ||
light of the 2019 FSEIS, it is apparent that Petitioner s assertions | light of the 2019 FSEIS, it is apparent that Petitioner s assertions are both incorrect and | ||
immaterial and, therefore, do not amount to an admissible contention. | immaterial and, therefore, do not amount to an admissible contention. | ||
Like Amended Contention 1-B, 170 the 2019 FSEIS recognizes that the Biscayne | Like Amended Contention 1-B, 170 the 2019 FSEIS recognizes that the Biscayne [A]quifer | ||
is the major public water supply source across Miami-Dade County as well as for the Florida | is the major public water supply source across Miami-Dade County as well as for the Florida | ||
Keys. | Keys. 171 The 2019 FSEIS explicitly states the applicable drinking water standard of 500 mg/L | ||
TDS. 172 The 2019 FSEIS then explains, however, that with respect to water in the Biscayne | TDS. 172 The 2019 FSEIS then explains, however, that with respect to water in the Biscayne | ||
Line 1,441: | Line 1,441: | ||
Aquifer, potability is defined differently.173 That is, the FDEP categorizes Florida groundwater | Aquifer, potability is defined differently.173 That is, the FDEP categorizes Florida groundwater | ||
into one of five classes and | into one of five classes and defines potable water use to include groundwater with a TDS of less | ||
than 10,000 mg/L, which | than 10,000 mg/L, which is called Class G-II groundwater. 174 Non-potable water use, defined, in | ||
part, as a TDS content of 10,000 mg/L or greater, is separately categorized as Class G-III | part, as a TDS content of 10,000 mg/L or greater, is separately categorized as Class G-III | ||
groundwater. 175 The 2019 FSEIS recounts that the | groundwater. 175 The 2019 FSEIS recounts that the Biscayne Aquifer near the Turkey Point site is | ||
166 Id. | 166 Id. | ||
167 2019 FSEIS at 3 | 167 2019 FSEIS at 3 3-71. | ||
168 Id. at 3 | 168 Id. at 3 3-88. | ||
169 Id. at 4 | 169 Id. at 4 4-35. | ||
170 Motion at 17- | 170 Motion at 17-18. | ||
171 2019 FSEIS at 3 -70. | 171 2019 FSEIS at 3 -70. | ||
Line 1,463: | Line 1,463: | ||
172 Id. at 3-69 ([T]the Federal drinking water standard or secondary maximum contaminant level for TDS is 500 mg/L and [t]he FDEP has adopted the same secondary standard for Florida drinking water.). | 172 Id. at 3-69 ([T]the Federal drinking water standard or secondary maximum contaminant level for TDS is 500 mg/L and [t]he FDEP has adopted the same secondary standard for Florida drinking water.). | ||
173 Id. at 3 | 173 Id. at 3 3-69. | ||
174 Id. | 174 Id. | ||
Line 1,469: | Line 1,469: | ||
175 Id. | 175 Id. | ||
saline and has been since | saline and has been since before the construction of the CCS. 176 It also recounts that the FDEP | ||
classified the Biscayne Aquifer within the Turkey Point plant property as Class G-III, or non | classified the Biscayne Aquifer within the Turkey Point plant property as Class G-III, or non - | ||
potable use, and the Biscayne Aquifer west of Turkey Point as Class G-II, or potable use. 177 The | potable use, and the Biscayne Aquifer west of Turkey Point as Class G-II, or potable use. 177 The | ||
Line 1,477: | Line 1,477: | ||
2019 FSEIS then explains that, consistent with this FDEP classification, the boundary between | 2019 FSEIS then explains that, consistent with this FDEP classification, the boundary between | ||
these two classes of groundwater, that is, the boundary between potable and non- | these two classes of groundwater, that is, the boundary between potable and non-potable use | ||
water, is termed the saltwater interface. | water, is termed the saltwater interface. 178 | ||
Based on | Based on this background, the 2019 FSEIS analyzes the impact of the proposed action | ||
on the potable use of the Biscayne Aquifer by considering the location of potable water users, | on the potable use of the Biscayne Aquifer by considering the location of potable water users, | ||
Line 1,493: | Line 1,493: | ||
Aquifer, defined as water with a chloride concentration exceeding 19,000 mg/L, directly beneath | Aquifer, defined as water with a chloride concentration exceeding 19,000 mg/L, directly beneath | ||
the CCS have influenced the movement of the | the CCS have influenced the movement of the saltwater interface and, therefore, the availability | ||
of potable water to the region. | of potable water to the region. 179 The 2019 FSEIS and the 2024 FSEIS, largely unchanged from | ||
the 2023 DSEIS, both discuss the impacts of the proposed action with respect to potable water | the 2023 DSEIS, both discuss the impacts of the proposed action with respect to potable water | ||
Line 1,505: | Line 1,505: | ||
affected by recovery well system operation, which is, in turn, required by the 2015 DERM | affected by recovery well system operation, which is, in turn, required by the 2015 DERM | ||
176 2019 FSEIS at 3 | 176 2019 FSEIS at 3 3-70. | ||
177 Id. at 3-70. | 177 Id. at 3-70. | ||
Line 1,511: | Line 1,511: | ||
178 Id. | 178 Id. | ||
179 2019 FSEIS at 3 | 179 2019 FSEIS at 3 3-88 (stating, among other things, that the inland migration of the saltwater interface is closely related to TDS concentrations in the CCS; that [m]onitoring results show the influence of CCS operations on Biscayne [A]quifer groundwater quality adjacent to and west of the CCS, based on the presence of hypersaline water (chloride concentrations greater than 19,000 mg/L), in addition to elevated tritium levels; and that annual monitoring reports indicate the expansion of more saline groundwater, and possible CCS influence ). | ||
180 See 2019 FSEIS at | 180 See 2019 FSEIS at 4 4-32; 2023 DSEIS at 2 2-20; 2024 FSEIS at 2 2-21. | ||
Consent Agreement. 181 Specifically, the recovery well system will extract hypersaline | Consent Agreement. 181 Specifically, the recovery well system will extract hypersaline | ||
Line 1,524: | Line 1,524: | ||
2019 FSEIS then compares the location of the saltwater interface and the extent of the | 2019 FSEIS then compares the location of the saltwater interface and the extent of the | ||
drawdown of the aquifer to the location of other users of the aquifer | drawdown of the aquifer to the location of other users of the aquifer and concludes that there | ||
would be no impact to those users. 184 The 2024 FSEIS incorporates by reference the Biscayne | would be no impact to those users. 184 The 2024 FSEIS incorporates by reference the Biscayne | ||
Aquifer groundwater use conflicts information from the 2019 FSEIS and adds to it | Aquifer groundwater use conflicts information from the 2019 FSEIS and adds to it a discussion | ||
that accounts for two u | that accounts for two u nderground injection control (UIC) test extraction wells that were | ||
activated since the publication of the 2019 FSEIS to remove hypersaline groundwater from the | activated since the publication of the 2019 FSEIS to remove hypersaline groundwater from the | ||
Line 1,542: | Line 1,542: | ||
Moreover, the 2024 FSEIS evaluates the new information regarding a potential increased | Moreover, the 2024 FSEIS evaluates the new information regarding a potential increased | ||
recovery well system | recovery well system extraction capacity and finds that it too will not contribute to impacting any | ||
offsite wells. 188 The 2024 FSEIS also continues to find that the saltwater interface will be moved | offsite wells. 188 The 2024 FSEIS also continues to find that the saltwater interface will be moved | ||
Line 1,550: | Line 1,550: | ||
the Biscayne Aquifer serves as the major public water supply source for the region, including | the Biscayne Aquifer serves as the major public water supply source for the region, including | ||
181 2019 FSEIS at 4 | 181 2019 FSEIS at 4 4-31. | ||
182 Id. at 4-31. | 182 Id. at 4-31. | ||
Line 1,558: | Line 1,558: | ||
184 Id. at 4-31, 4-34. | 184 Id. at 4-31, 4-34. | ||
185 2024 FSEIS at 2- | 185 2024 FSEIS at 2-19. | ||
186 Id. at 2 | 186 Id. at 2 2-20. | ||
187 Compare 2024 FSEIS at 2 | 187 Compare 2024 FSEIS at 2 2-20 with 2023 DSEIS at 2 2-20. | ||
188 2024 FSEIS at 2- | 188 2024 FSEIS at 2-20. | ||
Miami-Dade County and the Florida Keys. 189 Accordingly, the 2019 FSEIS, the 2023 DSEIS, | Miami-Dade County and the Florida Keys. 189 Accordingly, the 2019 FSEIS, the 2023 DSEIS, | ||
Line 1,574: | Line 1,574: | ||
In total, the 2019 FSEIS, the 2023 DSEIS, and the 2024 FSEIS explain (1) that the | In total, the 2019 FSEIS, the 2023 DSEIS, and the 2024 FSEIS explain (1) that the | ||
delineation between potable and non- | delineation between potable and non-potable water in the Biscayne Aquifer is the 10,000 mg/L | ||
TDS boundary referred to as the | TDS boundary referred to as the saltwater interface, (2) that the hypersaline groundwater | ||
plume, which is defined as groundwater with greater than 19,000 mg/L chloride, influences the | plume, which is defined as groundwater with greater than 19,000 mg/L chloride, influences the | ||
Line 1,582: | Line 1,582: | ||
position of this saltwater interface, (3) that FPL is taking remedial actions required by the 2016 | position of this saltwater interface, (3) that FPL is taking remedial actions required by the 2016 | ||
Consent Order to retract the | Consent Order to retract the hypersaline groundwater plume to within the Turkey Point site | ||
boundary, and (4) that, therefore, the impact to the potable water use of the | boundary, and (4) that, therefore, the impact to the potable water use of the Biscayne Aquifer is | ||
based on the relative locations of potable water users and the saltwater interface, as well as the | based on the relative locations of potable water users and the saltwater interface, as well as the | ||
drawdown effect from F | drawdown effect from F P L s remediation actions. The Staffs environmental review then | ||
discusses | discusses the monitoring data that demonstrate that the withdrawals of hypersaline groundwater | ||
from | from the Biscayne Aquifer are removing its influence on the saltwater interface and that the | ||
drawdown caused by these withdrawals will also not impact those other water users. Moreover, | drawdown caused by these withdrawals will also not impact those other water users. Moreover, | ||
Line 1,600: | Line 1,600: | ||
and the presumption that State and local regulators will enforce applicable laws and regulations, | and the presumption that State and local regulators will enforce applicable laws and regulations, | ||
including through continued enforcement of the 2015 DERM Consent Agreement | including through continued enforcement of the 2015 DERM Consent Agreement and the 2016 | ||
FDEP Consent Order, it is reasonably foreseeable that the hypersaline groundwater plume will | FDEP Consent Order, it is reasonably foreseeable that the hypersaline groundwater plume will | ||
Line 1,606: | Line 1,606: | ||
eventually return to the Turkey Point site boundary, pull the saltwater interface in the Biscayne | eventually return to the Turkey Point site boundary, pull the saltwater interface in the Biscayne | ||
Aquifer seaward from its current location, | Aquifer seaward from its current location, and increase the amount of fresh groundwater in | ||
areas surrounding the CCS. Petitioner does not identify, let alone dispute, this preexisting | areas surrounding the CCS. Petitioner does not identify, let alone dispute, this preexisting | ||
information. Moreover, | information. Moreover, this information illustrates that Petitioners assertion that the Staff | ||
189 Id. at 2-24. | 189 Id. at 2-24. | ||
190 2019 FSEIS at 4 | 190 2019 FSEIS at 4 4-35; 2023 DSEIS at 2-20; 2024 FSEIS at 2-20. | ||
incorrectly used the values of 10,000 mg/L TDS and 19,000 mg/L chloride instead of the values | incorrectly used the values of 10,000 mg/L TDS and 19,000 mg/L chloride instead of the values | ||
Line 1,622: | Line 1,622: | ||
review. Finally, Petitioner does not explain how this information, which it doesnt dispute, could | review. Finally, Petitioner does not explain how this information, which it doesnt dispute, could | ||
lead to an impact determination of greater than the Staff s | lead to an impact determination of greater than the Staff s SMALL to MODERATE | ||
determination | determination with respect to groundwater quality191 or the Staffs SMALL determination with | ||
respect to groundwater use conflicts for the Biscayne Aquifer.192 Therefore, Amended | respect to groundwater use conflicts for the Biscayne Aquifer.192 Therefore, Amended | ||
Contention 1-B does not meet 10 C.F.R. § | Contention 1-B does not meet 10 C.F.R. § 2.309(f)(1)(vi) and, accordingly, it should be | ||
dismissed. | dismissed. | ||
Line 1,638: | Line 1,638: | ||
proposed action on the potable use of the Biscayne Aquifer. As discussed above, all of the facts | proposed action on the potable use of the Biscayne Aquifer. As discussed above, all of the facts | ||
that Petitioner statesthat | that Petitioner statesthat the Biscayne Aquifer is partially classified as a source of potable | ||
drinking water; that the CCS discharges to the Biscayne Aquifer; that, prior to remediation, | drinking water; that the CCS discharges to the Biscayne Aquifer; that, prior to remediation, the | ||
saltwater interface had | saltwater interface had historically moved west of the boundary of the Turkey Point site; and that | ||
the standards for drinking water are 500 mg/L TDS and 250 mg/L chloride,193are consistent | the standards for drinking water are 500 mg/L TDS and 250 mg/L chloride,193are consistent | ||
Line 1,650: | Line 1,650: | ||
Petitioner also discusses the definitions of Class G-III groundwater as 10,000 mg/L or greater | Petitioner also discusses the definitions of Class G-III groundwater as 10,000 mg/L or greater | ||
TDS and hypersaline groundwater as 19,000 mg/L chloride, | TDS and hypersaline groundwater as 19,000 mg/L chloride, 194 both of which facts, as also | ||
discussed above, do not support a genuine dispute with the Staffs environmental review. | discussed above, do not support a genuine dispute with the Staffs environmental review. | ||
Line 1,656: | Line 1,656: | ||
Because none of these facts support Petitioner s position on the issue, Amended Contention 1-B | Because none of these facts support Petitioner s position on the issue, Amended Contention 1-B | ||
does not meet the contention admissibility requirement of 10 C.F.R. § | does not meet the contention admissibility requirement of 10 C.F.R. § 2.309(f)(1)(v) and should | ||
be dismissed. | be dismissed. | ||
191 2023 DSEIS at 2- | 191 2023 DSEIS at 2-31; 2024 FSEIS at 2 -40. | ||
192 2023 DSEIS at 2-20; 2024 FSEIS at 2 -20. | 192 2023 DSEIS at 2-20; 2024 FSEIS at 2 -20. | ||
193 Motion at 17- | 193 Motion at 17-18. | ||
194 Id. at 18- | 194 Id. at 18-19. | ||
The failure of Petitioner to provide facts in support of | The failure of Petitioner to provide facts in support of Amended Contention 1-B is not | ||
cured by Petitioner s statement that facts supporting the contention are also | cured by Petitioner s statement that facts supporting the contention are also in the expert report | ||
of William Nuttle, Ph.D, which Petitioner attached to the Motion. 195 Amended Contention 1-B | of William Nuttle, Ph.D, which Petitioner attached to the Motion. 195 Amended Contention 1-B | ||
Line 1,678: | Line 1,678: | ||
underestimated the impact of the proposed action on the potable use of the Biscayne Aquifer. | underestimated the impact of the proposed action on the potable use of the Biscayne Aquifer. | ||
Therefore, since | Therefore, since 10 C.F.R. § 2.309(f)(1) specifies that it is the pleading that must satisfy the | ||
contention admissibility requirements, such a general reference to an attachment cannot | contention admissibility requirements, such a general reference to an attachment cannot | ||
Line 1,686: | Line 1,686: | ||
without further explanation, on other documents to satisfy the contention admissibility | without further explanation, on other documents to satisfy the contention admissibility | ||
requirements. 196 As the Commission has stated, its | requirements. 196 As the Commission has stated, its practice is clear that a petitioner may not | ||
simply incorporate massive documents by reference as the basis for or a statement of his | simply incorporate massive documents by reference as the basis for or a statement of his | ||
Line 1,692: | Line 1,692: | ||
contentions because this does not serve the purposes of a pleading in which participants | contentions because this does not serve the purposes of a pleading in which participants | ||
must | must clearly identify the matters on which they intend to rely with reference to a specific | ||
point. 197 Therefore, Petitioner s general reference to the Nuttle Report cannot meet the factual | point. 197 Therefore, Petitioner s general reference to the Nuttle Report cannot meet the factual | ||
Line 1,704: | Line 1,704: | ||
contain any support for the assertion that the Staffs discussion of the impacts of the proposed | contain any support for the assertion that the Staffs discussion of the impacts of the proposed | ||
195 Id. at 20- | 195 Id. at 20- 21 (citing to Motion at Att. A). | ||
196 See, e.g., Fansteel, Inc. (Muskogee, Oklahoma Site), CLI | 196 See, e.g., Fansteel, Inc. (Muskogee, Oklahoma Site), CLI 13, 58 NRC 195, 204 (2003) | ||
(Petitioners have an obligation not just to refer generally to voluminous documents, but to provide analysis and supporting evidence as to why particular sections of those documents provide a basis for the contention); USEC Inc. | (Petitioners have an obligation not just to refer generally to voluminous documents, but to provide analysis and supporting evidence as to why particular sections of those documents provide a basis for the contention); USEC Inc. (American Centrifuge Plant), CLI-06-10, 63 NRC 451, 457 (2006) (stating that it is the petitioner s responsibility to satisfy the basic contention admissibility requirements; boards should not have to search through a petition to uncover arguments and support for a contention and may not simply infer unarticulated bases of contentions). | ||
197 Public Service Co. of New Hampshire (Seabrook Station, Units 1 and 2), CLI-89-03, 29 NRC 234, 240- | 197 Public Service Co. of New Hampshire (Seabrook Station, Units 1 and 2), CLI-89-03, 29 NRC 234, 240- 41 (1989). | ||
action on potable water is deficient. This is fully explained in the Staffs answer to Amended | action on potable water is deficient. This is fully explained in the Staffs answer to Amended | ||
Line 1,717: | Line 1,717: | ||
Because Amended Contention 1-B is not based on new information, does not identify, let | Because Amended Contention 1-B is not based on new information, does not identify, let | ||
alone | alone dispute, on-point discussions in the Staffs environmental review, and does not provide | ||
alleged facts or expert opinions that support its challenges to the Staffs environmental review, it | alleged facts or expert opinions that support its challenges to the Staffs environmental review, it | ||
does not meet either the good cause requirements | does not meet either the good cause requirements of 10 C.F.R. § 2.309(c) or the contention | ||
admissibility requirements of 10 C.F.R. § 2.309(f). Accordingly, Contention 1-B should be | admissibility requirements of 10 C.F.R. § 2.309(f). Accordingly, Contention 1-B should be | ||
dismissed. | dismissed. | ||
: 3. | : 3. Amended Contention 1-C is Not Admissible because it is Not Based on New Information, Does Not Genuinely Dispute the 2024 FSEIS, and is Not Supported | ||
In Amended Contention 1-C Petitioner states: | In Amended Contention 1-C Petitioner states: | ||
Line 1,742: | Line 1,742: | ||
1-C, however, Petitioner asserts that these remediation actions will have the opposite of their | 1-C, however, Petitioner asserts that these remediation actions will have the opposite of their | ||
intended effect, as explicitly set forth by state and local regulators, | intended effect, as explicitly set forth by state and local regulators, 201 and will instead actually | ||
expand the saltwater interface so that it moves towards and ultimately impacts users of the | expand the saltwater interface so that it moves towards and ultimately impacts users of the | ||
Line 1,752: | Line 1,752: | ||
200 Motion at 22. | 200 Motion at 22. | ||
201 See 2015 DERM Consent Agreement at 5- | 201 See 2015 DERM Consent Agreement at 5-6 (stating that the recovery well system shall retract hypersaline groundwater); 2016 FDEP Consent Order at 7-9 (stating that FPL shall freshen the CCS and operate a recovery well system to retr act the hypersaline groundwater plume). | ||
Biscayne Aquifer for potable water.202 Petitioner asserts that this is a major concern203 and lays | Biscayne Aquifer for potable water.202 Petitioner asserts that this is a major concern203 and lays | ||
Line 1,758: | Line 1,758: | ||
out a theory for why this concern may come to pass.204 | out a theory for why this concern may come to pass.204 | ||
Amended Contention 1-C largely restates the arguments in Amended Contention 1 | Amended Contention 1-C largely restates the arguments in Amended Contention 1 -B | ||
and, therefore, is not admissible for the same reasons that Amended Contention | and, therefore, is not admissible for the same reasons that Amended Contention 1-B is not | ||
admissible. Like Amended Contention 1-B, Amended Contention 1-C asserts that the Staffs | admissible. Like Amended Contention 1-B, Amended Contention 1-C asserts that the Staffs | ||
impact determination regarding groundwater quality of | impact determination regarding groundwater quality of SMALL to MODERATE was incorrect | ||
because the | because the continued operation of the CCS as a heat sink during the [subsequent license | ||
renewal] term will produce significant and destabilizing effects on the Biscayne Aquifer, a | renewal] term will produce significant and destabilizing effects on the Biscayne Aquifer, a | ||
potable groundwater resource. | potable groundwater resource. 205 However, as with Amended Contention 1-B, Amended | ||
Contention 1-C does not discuss any of the information in the 2019 FSEIS, the 2023 DSEIS, and | Contention 1-C does not discuss any of the information in the 2019 FSEIS, the 2023 DSEIS, and | ||
Line 1,776: | Line 1,776: | ||
the 2024 FSEIS regarding groundwater use conflicts for the Biscayne Aquifer. In those | the 2024 FSEIS regarding groundwater use conflicts for the Biscayne Aquifer. In those | ||
documents, the Staff explains that | documents, the Staff explains that (1) the delineation between potable and non-potable water in | ||
the Biscayne Aquifer is the 10,000 mg/L TDS boundary referred to as the saltwater interface, (2) | the Biscayne Aquifer is the 10,000 mg/L TDS boundary referred to as the saltwater interface, (2) | ||
Line 1,788: | Line 1,788: | ||
the saltwater interface, and (4) these withdrawals are not drawing down the aquifer to an extent | the saltwater interface, and (4) these withdrawals are not drawing down the aquifer to an extent | ||
that would impact these users.206 In this manner, the preexisting | that would impact these users.206 In this manner, the preexisting Staff environmental review in | ||
the 2019 FSEIS and the 2023 DSEIS already discussed | the 2019 FSEIS and the 2023 DSEIS already discussed the issues in Amended Contention 1-C, | ||
including | including the Newton Field wells that Petitioner asserts are the nearest wells to the CCS, 207 and | ||
202 Motion at 22. | 202 Motion at 22. | ||
Line 1,800: | Line 1,800: | ||
204 Id. at 34. | 204 Id. at 34. | ||
205 Id. at 21- | 205 Id. at 21-22. | ||
206 See 2019 FSEIS at 3 | 206 See 2019 FSEIS at 3 3-88, 4-29-4-35; 2023 DSEIS at 2-16-2-20; 2024 FSEIS at 2 2-21. | ||
207 Motion at 27 | 207 Motion at 27. | ||
determined that the impact to potable water use of the Biscayne Aquifer would be SMALL. | determined that the impact to potable water use of the Biscayne Aquifer would be SMALL. 208 | ||
Therefore, as explained in the Staff answer to Amended Contention 1-B, Petitioner s argument | Therefore, as explained in the Staff answer to Amended Contention 1-B, Petitioner s argument | ||
Line 1,811: | Line 1,811: | ||
both (1) is not timely and (2) does not genuinely dispute the Staffs environmental review and, | both (1) is not timely and (2) does not genuinely dispute the Staffs environmental review and, | ||
accordingly, consistent with 10 C.F.R. § | accordingly, consistent with 10 C.F.R. § 2.309(c) and 10 C.F.R. § 2.309(f) (1)(vi), respectively, | ||
should be dismissed. | should be dismissed. | ||
Line 1,831: | Line 1,831: | ||
the 2015 DERM Consent Agreement, the 2016 FDEP Consent Order, and NPDES permit, will | the 2015 DERM Consent Agreement, the 2016 FDEP Consent Order, and NPDES permit, will | ||
actually expand the saltwater interface | actually expand the saltwater interface such that it moves closer to users of the Biscayne | ||
Aquifer and, therefore, could potentially impact their use of the aquifer. 211 Petitioner s theory, | Aquifer and, therefore, could potentially impact their use of the aquifer. 211 Petitioner s theory, | ||
208 See, e.g., 2019 FSEIS at 3-106- | 208 See, e.g., 2019 FSEIS at 3-106-7 (While the Biscayne aquifer is the principal source of potable water supplied by the Miami-Dade Water and Sewer Department there are no potable water wells within the Turkey Point site boundary. There are no registered groundwater supply wells within a 2 -mi (3.2-km) band of the Turkey Point site boundary. | ||
Relative to the Turkey Point site, the nearest mapped water supply wells are located about 5 mi (8 km) west of the western boundary of the CCS and are used to support mining operations. | Relative to the Turkey Point site, the nearest mapped water supply wells are located about 5 mi (8 km) west of the western boundary of the CCS and are used to support mining operations. | ||
As for public water supply sources, the nearest wells are located about 6 mi (10 km) from the northwest corner of the CCS and approximately 7 mi (11 km) from the center of the Turkey Point plant complex. Potable water supply for the Florida Keys comes from Biscayne aquifer wells located west of Florida City at the Florida Keys Aqueduct Authoritys J. Robert Dean Water Treatment Plant. These facilities are located approximately 9.5 mi (15 km) west, northwest of the western boundary of the CCS.); 2023 DSEIS at 2 | As for public water supply sources, the nearest wells are located about 6 mi (10 km) from the northwest corner of the CCS and approximately 7 mi (11 km) from the center of the Turkey Point plant complex. Potable water supply for the Florida Keys comes from Biscayne aquifer wells located west of Florida City at the Florida Keys Aqueduct Authoritys J. Robert Dean Water Treatment Plant. These facilities are located approximately 9.5 mi (15 km) west, northwest of the western boundary of the CCS.); 2023 DSEIS at 2 2-22 ([T]he 0.1 ft drawdown contour within the Biscayne Aquifer extends approximately 1.5 miles west of the CCS in year 5 of the remediation period, and this contour does not intersect with any offsite water supply wells completed in the Biscayne Aquifer.). | ||
209 Motion at 20- | 209 Motion at 20- 21. | ||
210 Id. at 26- | 210 Id. at 26-34. | ||
211 Id. at 22. | 211 Id. at 22. | ||
Line 1,847: | Line 1,847: | ||
taken from the 2024 Nuttle Report, is that FPLs withdrawal of hypersaline groundwater from the | taken from the 2024 Nuttle Report, is that FPLs withdrawal of hypersaline groundwater from the | ||
Biscayne Aquifer | Biscayne Aquifer lowers the head in that area on the inland side of the reactor and that F P L s | ||
freshening of the CCS with water from the Upper Floridan Aquifer, and to a lesser extent, the | freshening of the CCS with water from the Upper Floridan Aquifer, and to a lesser extent, the | ||
interceptor ditch | interceptor ditch increases the head in the [CCS], leading to the infiltration of larger volumes | ||
of saline water into the Biscayne Aquifer. | of saline water into the Biscayne Aquifer. 212 Petitioner concludes that this would effectively | ||
suck[] saline water inland. 213 Based on this additional argument in Amended Contention 1-C as | suck[] saline water inland. 213 Based on this additional argument in Amended Contention 1-C as | ||
Line 1,883: | Line 1,883: | ||
towards potable water users in Contention 1 against the 2023 DSEIS, and Petitioner does not | towards potable water users in Contention 1 against the 2023 DSEIS, and Petitioner does not | ||
identify how the arguments in that Contention 1 are | identify how the arguments in that Contention 1 are being amended in any way here. The basis | ||
for Amended Contention 1-C largely repeats the basis for Contention 1. 215 As provided by 10 | for Amended Contention 1-C largely repeats the basis for Contention 1. 215 As provided by 10 | ||
Line 1,891: | Line 1,891: | ||
213 Id. | 213 Id. | ||
214 See Pilgrim, CLI- | 214 See Pilgrim, CLI-12-15, 75 NRC at 714 (explaining that bare assertions and speculation, even by an expert, are insufficient to trigger a full adjudicatory proceeding). | ||
215 Compare Motion at 22 with Hearing Request at 14- | 215 Compare Motion at 22 with Hearing Request at 14-20 (both asserting that F P L s freshening of the CCS with water from the Upper Floridan Aquifer and the interceptor ditch and withdrawal | ||
C.F.R. § 2.309(c), the opportunity to file amended contentions based on new information does | C.F.R. § 2.309(c), the opportunity to file amended contentions based on new information does | ||
Line 1,907: | Line 1,907: | ||
FSEIS and the 2023 DSEIS. For example, Petitioner states that the 2024 FSEIS did not discuss | FSEIS and the 2023 DSEIS. For example, Petitioner states that the 2024 FSEIS did not discuss | ||
its theory, raised in its 2023 Hearing Request,216 that the required | its theory, raised in its 2023 Hearing Request,216 that the required CCS freshening and | ||
hypersaline groundwater withdrawal activities would expand the saltwater interface217 and that, | hypersaline groundwater withdrawal activities would expand the saltwater interface217 and that, | ||
Line 1,915: | Line 1,915: | ||
resources. 218 However, an assertion that the 2024 FSEIS does not include information that | resources. 218 However, an assertion that the 2024 FSEIS does not include information that | ||
similarly was not included in the 2023 DSEIS | similarly was not included in the 2023 DSEIS does not provide an adequate basis for an | ||
amended contention under 10 C.F.R § 2.309(c).219 Petitioner also argues that the Staff response | amended contention under 10 C.F.R § 2.309(c).219 Petitioner also argues that the Staff response | ||
in the 2024 FSEIS to Petitioner s comment on the 2023 DSEIS | in the 2024 FSEIS to Petitioner s comment on the 2023 DSEIS on this topic was not | ||
sufficient; 220 however, that Staff response is similarly not new information because it relies on | sufficient; 220 however, that Staff response is similarly not new information because it relies on | ||
preexisting information in the 2019 FSEIS regarding | preexisting information in the 2019 FSEIS regarding significant ongoing S tate and local | ||
oversight and a water balance calculation of the inflows | oversight and a water balance calculation of the inflows and outflows related to the CCS.221 | ||
Petitioner then challenges the information from the 2019 FSEIS identified by the Staff, 222 but | Petitioner then challenges the information from the 2019 FSEIS identified by the Staff, 222 but | ||
such a | such a challenge is plainly something that could have been raised earlier and is not now timely. | ||
Additionally, Petitioner cites new language from the 2024 FSEIS regarding the determination | Additionally, Petitioner cites new language from the 2024 FSEIS regarding the determination | ||
of hypersaline groundwater from the Biscayne Aquifer increases the expansion of the saltwater interface in the Biscayne Aquifer). | of hypersaline groundwater from the Biscayne Aquifer increases the expansion of the saltwater interface in the Biscayne Aquifer). | ||
216 Hearing Request at 14- | 216 Hearing Request at 14-20. | ||
217 Motion at 22- | 217 Motion at 22-23. | ||
218 Id. at 23- | 218 Id. at 23-24. | ||
219 See WCS, CLI-21-9, 93 NRC at 248. | 219 See WCS, CLI-21-9, 93 NRC at 248. | ||
220 Motion at 23- | 220 Motion at 23-24 (citing 2024 FSEIS at A A-46). | ||
221 2024 FSEIS at A | 221 2024 FSEIS at A A-46. | ||
222 Motion at 23- | 222 Motion at 23-24. | ||
that the hypersaline groundwater plume will not expand such that it could cause an impact | that the hypersaline groundwater plume will not expand such that it could cause an impact | ||
Line 1,954: | Line 1,954: | ||
presenting preexisting information from the 2019 FSEIS, as is discussed above in the Staff | presenting preexisting information from the 2019 FSEIS, as is discussed above in the Staff | ||
answer to Amended Contention 1-B. 224 Finally, the 202 | answer to Amended Contention 1-B. 224 Finally, the 202 4 Nuttle Report, on which Amended | ||
Contention 1-C relies, advances the same theory as the 2018 Nuttle Report that was attached to | Contention 1-C relies, advances the same theory as the 2018 Nuttle Report that was attached to | ||
Line 1,960: | Line 1,960: | ||
Petitioner s 2023 Hearing Request. 225 Moreover, the 2018 Nuttle R eport was previously relied | Petitioner s 2023 Hearing Request. 225 Moreover, the 2018 Nuttle R eport was previously relied | ||
upon to raise similar challenges against | upon to raise similar challenges against the draft of the 2019 FSEIS. 226 And the 2024 Nuttle | ||
Report relies on a 1978 study, | Report relies on a 1978 study, 227 which is plainly not new information. For these reasons, neither | ||
the basis for Amended Contention 1-C nor the argument of Amended Contention 1-C is new and | the basis for Amended Contention 1-C nor the argument of Amended Contention 1-C is new and | ||
Line 1,972: | Line 1,972: | ||
and, therefore, repeating them here does not meet the good cause standard of 10 C.F.R. | and, therefore, repeating them here does not meet the good cause standard of 10 C.F.R. | ||
§ 2.309(c) and, accordingly, Amended Contention 1-C should | § 2.309(c) and, accordingly, Amended Contention 1-C should be dismissed. | ||
Second, Petitioner s theory of the expansion of the saltwater interface | Second, Petitioner s theory of the expansion of the saltwater interface towards potable | ||
water users is not admissible because, although it relies on the same baseline conditions as the | water users is not admissible because, although it relies on the same baseline conditions as the | ||
Line 1,986: | Line 1,986: | ||
saltwater interface. Both the Staffs environmental review and Amended Contention 1-C discuss | saltwater interface. Both the Staffs environmental review and Amended Contention 1-C discuss | ||
223 Id. at 24- | 223 Id. at 24-25 (citing 2024 FSEIS at 2 -39). | ||
224 See 2019 FSEIS at 4 | 224 See 2019 FSEIS at 4 4-35. | ||
225 See Hearing Request at Ex. 3, Att. A, | 225 See Hearing Request at Ex. 3, Att. A, page 3, 14-20 (ML23331A983) (Continued operation of the CCS impacts regional fresh water resources because active exchange between the CCS and the underlying aquifer feeds the growth of a plume of hypersaline water that accelerates the intrusion of saltwater toward well fields used for public water supply.). | ||
226 See Southern Alliance for Clean Energys Request for Hearing and Petition to Intervene, Att. | 226 See Southern Alliance for Clean Energys Request for Hearing and Petition to Intervene, Att. | ||
4 (Aug. 1, 2018) (ML18213A528 | 4 (Aug. 1, 2018) (ML18213A528 (package)). | ||
227 Motion at 32. | 227 Motion at 32. | ||
that the effect of the proposed | that the effect of the proposed action on potable water users is based, in part, on whether the | ||
saltwater interface is expanded. | saltwater interface is expanded. 228 Both discuss the position of the saltwater interface outside of | ||
the CCS as affected by the inflows to and outflows from the CCS. 229 Whereas Petitioner asserts | the CCS as affected by the inflows to and outflows from the CCS. 229 Whereas Petitioner asserts | ||
that the Staff | that the Staff is tracking only chlorinity at 19,000 mg/L in its determination as to whether the | ||
continued operation of the CCS as a heat sink will affect groundwater quality;230 the Staffs | continued operation of the CCS as a heat sink will affect groundwater quality;230 the Staffs | ||
environmental review actually | environmental review actually discusses the impact of the CCS on the saltwater interface. 231 | ||
Petitioner discusses the CCS water budget, including freshening activities, 232 but doesnt | Petitioner discusses the CCS water budget, including freshening activities, 232 but doesnt | ||
Line 2,014: | Line 2,014: | ||
FSEIS and the 2024 FSEIS.233 Finally, the discussion of the identification of tritium at levels | FSEIS and the 2024 FSEIS.233 Finally, the discussion of the identification of tritium at levels | ||
greater than 20 pico- | greater than 20 pico-Curie per liter in wells as it relates to the Newton Wellfield agrees with, and | ||
does not dispute, the Staffs environmental review.234 Taken together, Petitioner does not | does not dispute, the Staffs environmental review.234 Taken together, Petitioner does not | ||
dispute any aspect of the Staffs environmental review with respect to the location of | dispute any aspect of the Staffs environmental review with respect to the location of the | ||
saltwater interface in relation to potable water users of the Biscayne Aquifer. | saltwater interface in relation to potable water users of the Biscayne Aquifer. | ||
The only portion of the Staffs environmental review that Petitioner | The only portion of the Staffs environmental review that Petitioner specifically disputes | ||
is its conclusion that potable water users of | is its conclusion that potable water users of the Biscayne Aquifer will not be impacted by the | ||
required remediation actions. 235 This, though, is not a genuine dispute because | required remediation actions. 235 This, though, is not a genuine dispute because Petitioner does | ||
not engage with any of Staffs reasoning for reaching that | not engage with any of Staffs reasoning for reaching that conclusion; instead, Petitioner ignores | ||
that reasoning and supplies its own theory on how the CCS can affect | that reasoning and supplies its own theory on how the CCS can affect nearby public water | ||
228 Motion at 27; 2019 FSEIS at 4 | 228 Motion at 27; 2019 FSEIS at 4 4-31, 4-34. | ||
229 Motion at 27- | 229 Motion at 27-29; 2019 FSEIS at 3 3-11, 3 3-88; 2024 FSEIS at 2 2-38. | ||
230 Motion at 31 | 230 Motion at 31 - 32. | ||
231 2019 FSEIS at 3 | 231 2019 FSEIS at 3 3-70; see also 2019 FSEIS at 3 3-88 (examining the CCSs contribution to the movement of the saltwater interface). | ||
232 Motion at 32- | 232 Motion at 32-33. | ||
233 2019 FSEIS at 3 | 233 2019 FSEIS at 3 3-11, 3 3-88; 2024 FSEIS at 2-25-2-38. | ||
234 Compare Motion at 34 with 2019 FSEIS at 3 | 234 Compare Motion at 34 with 2019 FSEIS at 3 76, 4-27; 2024 FSEIS at 2 2-66 (identifying the westward boundary of potential CCS water as approximately 2 miles southeast of the Newton Wellfield). | ||
235 Motion at 26 (citing 2024 FSEIS at 2-39). | 235 Motion at 26 (citing 2024 FSEIS at 2-39). | ||
Line 2,051: | Line 2,051: | ||
from the Biscayne Aquifer by the recovery well system and the amount of freshening of the | from the Biscayne Aquifer by the recovery well system and the amount of freshening of the | ||
CCS, discussed modeling | CCS, discussed modeling predicting that the withdrawals would indirectly pull the saltwater | ||
interface seaward, discussed modeling predicting that the withdrawals would not drawdown the | interface seaward, discussed modeling predicting that the withdrawals would not drawdown the | ||
Line 2,057: | Line 2,057: | ||
aquifer to an extent that would impact existing users, discussed peer-reviewed data indicating | aquifer to an extent that would impact existing users, discussed peer-reviewed data indicating | ||
that the hypersaline groundwater plume has been reduced | that the hypersaline groundwater plume has been reduced since the start of recovery well | ||
system operations in 2018, discussed data indicating that the salinity of the CCS has decreased, | system operations in 2018, discussed data indicating that the salinity of the CCS has decreased, | ||
and discussed the continuing requirements of the | and discussed the continuing requirements of the 2015 DERM Consent Agreement, the 2016 | ||
FDEP Consent Order, and the NPDES permit that are enforced by local and State regulators. 237 | FDEP Consent Order, and the NPDES permit that are enforced by local and State regulators. 237 | ||
Line 2,067: | Line 2,067: | ||
In response to this fulsome analysis, Petitioner only disputes the Staffs reliance on regulatory | In response to this fulsome analysis, Petitioner only disputes the Staffs reliance on regulatory | ||
requirements as enforced by local and State regulators, stating that such reliance | requirements as enforced by local and State regulators, stating that such reliance is contrary to | ||
N | N E PA. 238 However, as found by a previous Board addressing previous arguments based on | ||
these same facts, the suggestion that NEPA proscribes the NRC Staff from considering | these same facts, the suggestion that NEPA proscribes the NRC Staff from considering | ||
Line 2,075: | Line 2,075: | ||
enforcement requirements and oversight activities by local authorities when preparing its | enforcement requirements and oversight activities by local authorities when preparing its | ||
environmental review is | environmental review is incorrect as a matter of law and does not amount to a genuine | ||
dispute; instead, [p] | dispute; instead, [p] ursuant to binding case law, licensing boards accord substantial weight to | ||
the determination of Florida and Miami-Dade County that FPL will comply with its legal | the determination of Florida and Miami-Dade County that FPL will comply with its legal | ||
obligations. | obligations. 239 Because Petitioner does not engage with the Staffs analysis for why the | ||
proposed action will not result in any conflicts with potable water users of the Biscayne Aquifer, | proposed action will not result in any conflicts with potable water users of the Biscayne Aquifer, | ||
Line 2,091: | Line 2,091: | ||
236 Motion at 27. | 236 Motion at 27. | ||
237 2019 FSEIS at 4 | 237 2019 FSEIS at 4 4-31; 2024 FSEIS at 2 2-40. | ||
238 Motion at 23- | 238 Motion at 23-24. | ||
239 Turkey Point, LBP- | 239 Turkey Point, LBP-19-8, 90 NRC at 164-65. See also Arkansas Power & Light Co. (Arkansas Nuclear One Unit 2), ALAB -94, 6 AEC 25, 28 (1973). | ||
Finally, even if the Board were to entertain Petitioner s theory, despite the fact that it was | Finally, even if the Board were to entertain Petitioner s theory, despite the fact that it was | ||
Line 2,101: | Line 2,101: | ||
presented before in 2018 and 2023 and rejected and therefore is not timely, and despite the fact | presented before in 2018 and 2023 and rejected and therefore is not timely, and despite the fact | ||
that it does not refer to and dispute any of the Staffs analysis of the matter | that it does not refer to and dispute any of the Staffs analysis of the matter and therefore is not | ||
a genuine dispute, the Board would still have to find that the theory is not sufficiently supported, | a genuine dispute, the Board would still have to find that the theory is not sufficiently supported, | ||
contrary to the contention admissibility requirement of 10 C.F.R. § 2.309(f)(1)(v) | contrary to the contention admissibility requirement of 10 C.F.R. § 2.309(f)(1)(v). According to his | ||
report, Dr. Nuttle used multiple regression analysis applied to a record of changes in water | report, Dr. Nuttle used multiple regression analysis applied to a record of changes in water | ||
Line 2,129: | Line 2,129: | ||
[approximately] 7 miles, under dry, low regional gradient conditions.242 However, nowhere does | [approximately] 7 miles, under dry, low regional gradient conditions.242 However, nowhere does | ||
Petitioner explain how this prediction of an expansion of the saltwater interface aligns | Petitioner explain how this prediction of an expansion of the saltwater interface aligns with the | ||
monitoring data discussed in the Staffs environmental review. Specifically, Petitioner s position | monitoring data discussed in the Staffs environmental review. Specifically, Petitioner s position | ||
Line 2,153: | Line 2,153: | ||
decrease in the annual average salinity in the CCS and the overall volume and extent of the | decrease in the annual average salinity in the CCS and the overall volume and extent of the | ||
hypersaline groundwater plume, | hypersaline groundwater plume, 245 which is contrary to the prediction of Petitioner s theory. By | ||
not addressing this monitoring data, Petitioner does not provide support for its theory and such | not addressing this monitoring data, Petitioner does not provide support for its theory and such | ||
Line 2,159: | Line 2,159: | ||
an unsupported theory, even if proposed by an expert, is not admissible. 246 | an unsupported theory, even if proposed by an expert, is not admissible. 246 | ||
B. | B. New Contention 2 is Not Admissible because it Does Not Genuinely Dispute the 2024 FSEIS, is Not Supported, and is Not Material to the Findings that the NRC Must Make | ||
In New Contention 2 Petitioner states: | In New Contention 2 Petitioner states: | ||
The 2024 FSEISs analysis of the potential impacts of Turkey Points continued operation during the | The 2024 FSEISs analysis of the potential impacts of Turkey Points continued operation during the renewal period on Miami cave crayfish is inadequate and its determination that continued operation is unlikely to adversely affect or jeopardize the Miami cave crayfish is unsupported.[ 247] | ||
Petitioner bases New Contention 2 on the same theory that Petitioner advanced | Petitioner bases New Contention 2 on the same theory that Petitioner advanced in Amended | ||
Contention 1-Cthat | Contention 1-Cthat the required remediation actions of freshening the CCS and withdrawing | ||
hypersaline groundwater from the Biscayne Aquifer are | hypersaline groundwater from the Biscayne Aquifer are actually expanding saltwater intrusion in | ||
the Biscayne Aquifer. 248 Petitioner argues that because the Miami cave crayfish is susceptible to | the Biscayne Aquifer. 248 Petitioner argues that because the Miami cave crayfish is susceptible to | ||
Line 2,174: | Line 2,174: | ||
the effects of water salinity at any level above natural freshwater conditions, such an expansion | the effects of water salinity at any level above natural freshwater conditions, such an expansion | ||
of saltwater intrusion in its habitat | of saltwater intrusion in its habitat will necessarily adversely affect the crayfish. 249 Therefore, | ||
Petitioner concludes that the proposed action, which would include the continued operation of | Petitioner concludes that the proposed action, which would include the continued operation of | ||
Line 2,180: | Line 2,180: | ||
the CCS and, in turn, potentially continued remediation actions, will adversely affect the Miami | the CCS and, in turn, potentially continued remediation actions, will adversely affect the Miami | ||
244 Id. at 32- | 244 Id. at 32-34. | ||
245 2024 FSEIS at 2- | 245 2024 FSEIS at 2-30- 2-38. | ||
246 Pilgrim, CLI- | 246 Pilgrim, CLI-12-15, 75 NRC at 714. | ||
247 Motion at 36. | 247 Motion at 36. | ||
248 Id. at 38- | 248 Id. at 38-39; 42-44. See also id. at 46 (challenging the Staffs assumption in its discussion of impacts on the Miami cave crayfish that the hypersaline plume will retract as planned). | ||
249 Motion at 41- | 249 Motion at 41-44. | ||
cave crayfish through increased exposure to salinity. 250 Petitioner also asserts that for this | cave crayfish through increased exposure to salinity. 250 Petitioner also asserts that for this | ||
reason the Staff is required | reason the Staff is required under the Endangered Species Act of 1973, as amended (ESA), to | ||
confer with the U.S. Fish and Wildlife Service | confer with the U.S. Fish and Wildlife Service (FWS) regarding the proposed action. 251 | ||
New Contention 2 is not admissible because, first, just as with Amended Contention 1 | New Contention 2 is not admissible because, first, just as with Amended Contention 1 -C, | ||
the theory on which New Contention 2 is based does not genuinely dispute the Staffs | the theory on which New Contention 2 is based does not genuinely dispute the Staffs | ||
Line 2,213: | Line 2,213: | ||
freshening of the CCS, discussed modeling predicting that these remediation actions are | freshening of the CCS, discussed modeling predicting that these remediation actions are | ||
removing the hypersaline groundwater plumes influence on saltwater intrusion, discussed peer | removing the hypersaline groundwater plumes influence on saltwater intrusion, discussed peer - | ||
reviewed data indicating that the hypersaline groundwater plume has been reduced in size | reviewed data indicating that the hypersaline groundwater plume has been reduced in size | ||
Line 2,219: | Line 2,219: | ||
since the start of recovery well system operations in 2018, discussed data indicating that the | since the start of recovery well system operations in 2018, discussed data indicating that the | ||
salinity of the CCS has decreased, and discussed the continuing requirements | salinity of the CCS has decreased, and discussed the continuing requirements to reduce the | ||
hypersaline groundwater plume in the Biscayne Aquifer and the salinity | hypersaline groundwater plume in the Biscayne Aquifer and the salinity of the CCS of the 2015 | ||
DERM | DERM Consent Agreement, the 2016 FDEP Consent Order, and the NPDES permit that are | ||
enforced by local and State regulators. 252 For these same reasons for why the proposed action | enforced by local and State regulators. 252 For these same reasons for why the proposed action | ||
and the related required remediation actions | and the related required remediation actions would not expand saltwater intrusion in the | ||
Biscayne Aquifer, the 2024 FSEIS explains that the proposed action would also not adversely | Biscayne Aquifer, the 2024 FSEIS explains that the proposed action would also not adversely | ||
affect the Miami cave crayfish.253 Petitioner, though, does not genuinely dispute | affect the Miami cave crayfish.253 Petitioner, though, does not genuinely dispute this | ||
250 Id. at 44. | 250 Id. at 44. | ||
251 Id. at 48- | 251 Id. at 48-49. | ||
252 See 2019 FSEIS at 3 | 252 See 2019 FSEIS at 3 3-11, 3 3-88, 4-29-4-35; 2023 DSEIS at 2-16-2-20; 2024 FSEIS at 2 2-40. | ||
253 2024 FSEIS at 2-67 ([T]he NRC staff concludes that based on the results obtained to date, it is likely that, with continued freshening of the CCS | 253 2024 FSEIS at 2-67 ([T]he NRC staff concludes that based on the results obtained to date, it is likely that, with continued freshening of the CCS and continued operation of the [recovery | ||
explanation; instead, | explanation; instead, Petitioner, with reference to Amended Contention 1-C, advances its own | ||
theory for how the required remediation actions wil | theory for how the required remediation actions wil l actually expand, rather than retract, | ||
saltwater intrusion. 254 Nowhere | saltwater intrusion. 254 Nowhere does Petitioner explain how this theory aligns with the | ||
monitoring data discussed in the Staffs environmental review, which show an overall decrease | monitoring data discussed in the Staffs environmental review, which show an overall decrease | ||
in the annual average salinity of | in the annual average salinity of the CCS as well as in the overall volume and extent of the | ||
hypersaline groundwater plume. | hypersaline groundwater plume. 255 By not supply ing any data or discussing the contrary data in | ||
the Staffs environmental review, Petitioner does not provide support for its theory and such an | the Staffs environmental review, Petitioner does not provide support for its theory and such an | ||
Line 2,261: | Line 2,261: | ||
the proposed action will not adversely affect the Miami cave crayfish,257 that State and local | the proposed action will not adversely affect the Miami cave crayfish,257 that State and local | ||
regulators will enforce their regulations such that | regulators will enforce their regulations such that the required remediation actions will not | ||
expand | expand the current saltwater intrusion in the Biscayne Aquifer. Such a challenge, though, is | ||
contrary to the well- | contrary to the well-recognized presumption of administrative regularity that applies to these | ||
well system] to halt and retract the westward migration of the hypersaline plume, as required by the 2015 Miami-Dade County Consent Agreement, the 2016 FDEP Consent Order, and the NPDES permit and enforced by local and State regulators, the operation of Turkey Point Units 3 and 4 during the [subsequent license renewal] term would not worsen the hypersaline groundwater plume outside the plant boundary, destabilize the groundwater resource, or adversely affect the beneficial uses of groundwater offsite by existing users. Notably, the hypersaline plume does not currently overlap with the endemic range of the Miami cave crayfish and the required continued CCS freshening would ensure that water originating from the CCS does not influence the Biscayne Aquifer s saltwater/freshwater interface within the species range. Therefore, the NRC staff finds that Miami cave crayfish are unlikely to experience measurable effects from saltwater intrusion associated with the proposed continued operation of Turkey Point during the [subsequent license renewal] term.). | well system] to halt and retract the westward migration of the hypersaline plume, as required by the 2015 Miami-Dade County Consent Agreement, the 2016 FDEP Consent Order, and the NPDES permit and enforced by local and State regulators, the operation of Turkey Point Units 3 and 4 during the [subsequent license renewal] term would not worsen the hypersaline groundwater plume outside the plant boundary, destabilize the groundwater resource, or adversely affect the beneficial uses of groundwater offsite by existing users. Notably, the hypersaline plume does not currently overlap with the endemic range of the Miami cave crayfish and the required continued CCS freshening would ensure that water originating from the CCS does not influence the Biscayne Aquifer s saltwater/freshwater interface within the species range. Therefore, the NRC staff finds that Miami cave crayfish are unlikely to experience measurable effects from saltwater intrusion associated with the proposed continued operation of Turkey Point during the [subsequent license renewal] term.). | ||
254 Motion at 38- | 254 Motion at 38-39. | ||
255 2024 FSEIS at 2- | 255 2024 FSEIS at 2-30- 2-38. | ||
256 Pilgrim, CLI- | 256 Pilgrim, CLI-12-15, 75 NRC at 714. | ||
257 2024 FSEIS at 2- | 257 2024 FSEIS at 2-67. | ||
regulators. 258 For these reasons, Petitioners challenge to the Staff | regulators. 258 For these reasons, Petitioners challenge to the Staff s determination of the effect | ||
of the proposed action on the Miami cave crayfish does not amount to an admissible contention. | of the proposed action on the Miami cave crayfish does not amount to an admissible contention. | ||
Line 2,282: | Line 2,282: | ||
In addition to the theory at the core of New Contention 2 not amounting to an admissible | In addition to the theory at the core of New Contention 2 not amounting to an admissible | ||
contention | contention regarding the effect of the proposed action on the Miami cave crayfish, none of | ||
Petitioners other arguments in New Contention 2 amount to an admissible contention | Petitioners other arguments in New Contention 2 amount to an admissible contention either. | ||
Petitioner makes arguments regarding the environmental baseline relevant to the Miami cave | Petitioner makes arguments regarding the environmental baseline relevant to the Miami cave | ||
Line 2,292: | Line 2,292: | ||
environmental review on a material issue of law or fact. For example, Petitioner faults the 2024 | environmental review on a material issue of law or fact. For example, Petitioner faults the 2024 | ||
FSEIS for not | FSEIS for not specifically identifying that the Miami cave crayfish is susceptible to the effects of | ||
water salinity at any level above natural freshwater conditions 259 and for not discussing the | water salinity at any level above natural freshwater conditions 259 and for not discussing the | ||
Line 2,298: | Line 2,298: | ||
gradient of the saltwater intrusion.260 Petitioner also asserts that saltwater intrusion already | gradient of the saltwater intrusion.260 Petitioner also asserts that saltwater intrusion already | ||
extends | extends into known crayfish habitat. 261 Finally, Petitioner identifies uncertainty with respect to | ||
the Miami cave crayfishs range.262 The basis for all of these statements related to the Miami | the Miami cave crayfishs range.262 The basis for all of these statements related to the Miami | ||
cave crayfish environmental baseline | cave crayfish environmental baseline is the Federal Register Notice proposing to list the Miami | ||
cave crayfish as a threatened species under the ESA263 and the FWS species status | cave crayfish as a threatened species under the ESA263 and the FWS species status | ||
assessment report used as the basis for that notice. | assessment report used as the basis for that notice. 264 These, though, are the exact same | ||
sources of information on which the 2024 FSEIS | sources of information on which the 2024 FSEIS is based. 265 Therefore, Petitioners assertions | ||
258 Arkansas Nuclear One, ALAB- | 258 Arkansas Nuclear One, ALAB-94, 6 AEC at 28. See also Turkey Point, LBP-19-8, 90 NRC at 164-65. | ||
259 Motion at 41. | 259 Motion at 41. | ||
Line 2,320: | Line 2,320: | ||
263 Endangered and Threatened Wildlife and Plants; Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish; Proposed Rule, 88 Fed. Reg. 64,856 (Sept. 20, 2023). | 263 Endangered and Threatened Wildlife and Plants; Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish; Proposed Rule, 88 Fed. Reg. 64,856 (Sept. 20, 2023). | ||
264 FWS, | 264 FWS, Miami Cave Crayfish (Procambarus milleri) Species Status Assessment Version 1.2 (Sept. 2023), available at https://ecos.fws.gov/ServCat/DownloadFile/238642. | ||
265 2024 FSEIS at 2- | 265 2024 FSEIS at 2-63 (Information in this section is drawn from the FWSs proposed rule (88 FR 64856) and Species Status Assessment unless otherwise cited.). | ||
agree with, rather than dispute, the 2024 FSEIS and recognize that these sources of information | agree with, rather than dispute, the 2024 FSEIS and recognize that these sources of information | ||
Line 2,328: | Line 2,328: | ||
are appropriate, contrary to Petitioners later criticism of the 2024 FSEIS for using decades old | are appropriate, contrary to Petitioners later criticism of the 2024 FSEIS for using decades old | ||
information. | information. 266 NEPA requires the conduct of an environmental review with the best information | ||
available today and does not mandate that an agency undertake studies to obtain information | available today and does not mandate that an agency undertake studies to obtain information | ||
that is not already available. | that is not already available. 267 And the Staffs environmental review, as discussed above, has | ||
gathered substantial information in support of the conclusion that the proposed action would not | gathered substantial information in support of the conclusion that the proposed action would not | ||
Line 2,340: | Line 2,340: | ||
the Miami cave crayfish. 268 Petitioner also states that the Staffs environmental review ignores | the Miami cave crayfish. 268 Petitioner also states that the Staffs environmental review ignores | ||
the | the volume of saline water exiting the CCS as a function of its operations and related | ||
freshening, the effects of the continued operation of the CCS on t | freshening, the effects of the continued operation of the CCS on t he hydraulic gradient, and | ||
the | the advancing line of saltwater intrusion 269 and asserts that the Staffs environmental review | ||
instead | instead assumes that the impacts of the hypersaline plume are coextensive with the broader | ||
salinizing effects of the CCS. 270 These statements are also not genuine disputes because they | salinizing effects of the CCS. 270 These statements are also not genuine disputes because they | ||
Line 2,358: | Line 2,358: | ||
266 Motion at 47. | 266 Motion at 47. | ||
267 Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), CLI-16-18, 84 NRC 167, 173- | 267 Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), CLI-16-18, 84 NRC 167, 173-174 (2016) (finding that the Staffs environmental review discussing the CCS combined with the Boards decision was sufficient to disclose the environmental impacts of the proposed action and that no further information needed to be developed); Luminant Generation Co., LLC (Comanche Peak Nuclear Power Plant, Units 3 and 4), CLI-12-7, 75 NRC 379, 391 - 92 (2012). | ||
268 See 2019 FSEIS at 3 | 268 See 2019 FSEIS at 3 3-11, 3 3-88, 4-29-4-35; 2023 DSEIS at 2-16-2-20; 2024 FSEIS at 2 2-40. | ||
269 Motion at 45. | 269 Motion at 45. | ||
270 Id. at 46. | 270 Id. at 46. | ||
271 2019 FSEIS at 3 | 271 2019 FSEIS at 3 3-11, 3 3-88; 2024 FSEIS at 2-25-2-38. | ||
272 2019 FSEIS at 3 | 272 2019 FSEIS at 3 3-88. | ||
is also not a genuine dispute on a material issue;273 on the contrary, NEPA | is also not a genuine dispute on a material issue;273 on the contrary, NEPA does not call for | ||
certainty or precision, but an estimate of anticipated (not unduly speculative) impacts.274 | certainty or precision, but an estimate of anticipated (not unduly speculative) impacts.274 | ||
Additionally, Petitioner faults the Staffs evaluation of the | Additionally, Petitioner faults the Staffs evaluation of the effects of the proposed action | ||
on the Miami cave crayfish for not discussing the cumulative effects of the proposed action and | on the Miami cave crayfish for not discussing the cumulative effects of the proposed action and | ||
Line 2,381: | Line 2,381: | ||
impacts of sea level rise and operation of the CCS on the saltwater interface.276 It states that | impacts of sea level rise and operation of the CCS on the saltwater interface.276 It states that | ||
currently, the saltwater interface is located about 4.7 m | currently, the saltwater interface is located about 4.7 m iles west of the CCS at its closest | ||
point. 277 It explains that because of the operation of the recovery well system and the freshening | point. 277 It explains that because of the operation of the recovery well system and the freshening | ||
of the CCS, the saltwater interface will be retracted | of the CCS, the saltwater interface will be retracted back to the east from its current | ||
location. 278 It also explains that as sea levels rise, saltwater from the east would move along | location. 278 It also explains that as sea levels rise, saltwater from the east would move along | ||
Line 2,401: | Line 2,401: | ||
genuine dispute exists with the Staffs environmental review on a material issue of law or fact. | genuine dispute exists with the Staffs environmental review on a material issue of law or fact. | ||
Taken together, the environmental baseline of both | Taken together, the environmental baseline of both the current condition of the Miami cave | ||
crayfish and future sea level rise is | crayfish and future sea level rise is discussed in the Staffs environmental review. Accordingly, | ||
273 Motion at 46- | 273 Motion at 46-48. | ||
274 Louisiana Energy Services, L.P. (National Enrichment Facility), CLI | 274 Louisiana Energy Services, L.P. (National Enrichment Facility), CLI 20, 62 NRC 523, 536 (2005). | ||
275 Motion at 44- | 275 Motion at 44-45. | ||
276 2019 FSEIS at 4 -132- | 276 2019 FSEIS at 4 -132-4-133. | ||
277 Id. at 4-132. | 277 Id. at 4-132. | ||
Line 2,420: | Line 2,420: | ||
280 Id. | 280 Id. | ||
281 2024 FSEIS at E | 281 2024 FSEIS at E E-11. | ||
the Staffs environmental review fulfills the dual mandates of NEPA to foster informed decision- | the Staffs environmental review fulfills the dual mandates of NEPA to foster informed decision- | ||
Line 2,430: | Line 2,430: | ||
Finally, the issue raised in New Contention 2 is not material to the findings that the NRC | Finally, the issue raised in New Contention 2 is not material to the findings that the NRC | ||
must make under the ESA to support the proposed action | must make under the ESA to support the proposed action because Petitioner largely challenges | ||
the Staffs discussion of | the Staffs discussion of the current and future environmental baseline and how it may affect the | ||
Miami cave crayfish and not | Miami cave crayfish and not the issue that is actually relevant to the ESA and its implementing | ||
regulationsthe | regulationsthe potential effects of the proposed action itself on the Miami cave crayfish. 283 As | ||
discussed above, the only argument that Petitioner makes with respect to the potential effects of | discussed above, the only argument that Petitioner makes with respect to the potential effects of | ||
the proposed action itself | the proposed action itself does not amount to an admissible contention because it is based on a | ||
theory of the | theory of the required remediation actions actually expanding saltwater intrusion, which does | ||
not genuinely dispute the Staffs environmental review and is not supported. | not genuinely dispute the Staffs environmental review and is not supported. | ||
Line 2,448: | Line 2,448: | ||
On September 20, 2023, the FWS proposed a rule to list the Miami cave crayfish as a | On September 20, 2023, the FWS proposed a rule to list the Miami cave crayfish as a | ||
threatened species under the ESA. 284 Therefore, consistent with Section 7(a)(4) | threatened species under the ESA. 284 Therefore, consistent with Section 7(a)(4) of the ESA and | ||
50 C.F.R. § 402.10, the finding that the NRC must make | 50 C.F.R. § 402.10, the finding that the NRC must make under the ESA is whether the | ||
proposed action of licensing Turkey Point for an additional 20 years, which would include the | proposed action of licensing Turkey Point for an additional 20 years, which would include the | ||
Line 2,456: | Line 2,456: | ||
plants continued use of the CCS and potentially continued required remediation actions, is | plants continued use of the CCS and potentially continued required remediation actions, is | ||
likely to jeopardize the continued existence of the Miami cave crayfish | likely to jeopardize the continued existence of the Miami cave crayfish or result in the | ||
282 See McGuire, CLI-02-17, 56 NRC at 10 (quoting | 282 See McGuire, CLI-02-17, 56 NRC at 10 (quoting Claiborne, CLI-98-3, 47 NRC at 88). | ||
283 See ESA § 7(a)(4) (Each Federal agency shall confer with the Secretary on any agency action | 283 See ESA § 7(a)(4) (Each Federal agency shall confer with the Secretary on any agency action which is likely to jeopardize the continued existence of any species proposed to be listed under [ESA] section 4 or result in the destruction or adverse modification of critical habitat proposed to be designated for such species.) (emphasis added); 50 C.F.R. § 402.10(a) ( Each Federal agency shall confer with the Service on any action which is likely to jeopardize the continued existence of any proposed species or result in the destruction or adverse modification of proposed critical habitat.) (emphasis added); 50 C.F.R. § 402.2 (defining action as all activities or programs of any kind authorized, funded, or carried out, in whole or in part, by Federal agencies in the United States, which include the granting of licenses); Center for Biological Diversity v. U.S. Fish & Wildlife Service, 807 F.3d 1031, 1052 (9th Cir. 2015). | ||
284 88 Fed. Reg. at 64,856. | 284 88 Fed. Reg. at 64,856. | ||
destruction or adverse modification of proposed critical habitat. 285 If so, then the Staff must | destruction or adverse modification of proposed critical habitat. 285 If so, then the Staff must | ||
confer with the FWS.286 In order to make this finding, the Staff evaluates | confer with the FWS.286 In order to make this finding, the Staff evaluates the potential effects of | ||
the proposed action on proposed species and proposed critical habitat | the proposed action on proposed species and proposed critical habitat to determine whether | ||
they are likely to be adversely affected by the proposed action such that | they are likely to be adversely affected by the proposed action such that a conference would be | ||
required. 287 This evaluation looks at the environmental baseline, which is | required. 287 This evaluation looks at the environmental baseline, which is the condition of the | ||
listed species or its designated critical habitat in the action area, without the consequences to | listed species or its designated critical habitat in the action area, without the consequences to | ||
the listed species or designated critical habitat caused by the proposed action and | the listed species or designated critical habitat caused by the proposed action and includes the | ||
past and present impacts of all Federal, State, or private actions and other human activities in | past and present impacts of all Federal, State, or private actions and other human activities in | ||
the action | the action area. 288 It then looks at the effects of the action, which are all consequences to | ||
listed species or critical habitat that are caused by the proposed action | listed species or critical habitat that are caused by the proposed action meaning that the | ||
consequence | consequence would not occur but for the proposed action and it is reasonably certain to occur | ||
and cumulative effects, which are | and cumulative effects, which are those effects of future State or private activities, not involving | ||
Federal activities, that are | Federal activities, that are reasonably certain to occur within the action area of the Federal | ||
action subject to consultation. | action subject to consultation. 289 | ||
Consistent with the ESA and its implementing regulations | Consistent with the ESA and its implementing regulations, in the 2024 FSEIS, the Staff | ||
documents why it determined that the proposed action itself is not likely to jeopardize the | documents why it determined that the proposed action itself is not likely to jeopardize the | ||
285 | 285 Jeopardize the continued existence of means to engage in an action that reasonably would be expected, directly or indirectly, to reduce appreciably the likelihood of both the survival and recovery of a listed species in the wild by reducing the reproduction, numbers, or distribution of that species; Destruction or adverse modification means a direct or indirect alteration that appreciably diminishes the value of critical habitat as a whole for the conservation of a listed species. 50 C.F.R. § 402.02. | ||
286 50 C.F.R. § 402.10(a). | 286 50 C.F.R. § 402.10(a). | ||
287 50 C.F.R. § 402.12(a). | 287 50 C.F.R. § 402.12(a). | ||
288 50 C.F.R. § 402.02. | 288 50 C.F.R. § 402.02. See also 50 C.F.R. § 402.14(c)(1)(iii) (Information on the listed species and designated critical habitat in the action area, including available information such as the presence, abundance, density, or periodic occurrence of listed species and the condition and location of the species habitat, including any critical habitat.). | ||
289 50 C.F.R. § 402.02. | 289 50 C.F.R. § 402.02. | ||
continued existence of the Miami cave crayfish.290 Specifically, all of the data | continued existence of the Miami cave crayfish.290 Specifically, all of the data obtained to date | ||
demonstrate that the required remediation actions | demonstrate that the required remediation actions of hypersaline groundwater withdrawals and | ||
CCS freshening are removing the hypersaline groundwater plumes influence on saltwater | CCS freshening are removing the hypersaline groundwater plumes influence on saltwater | ||
intrusion, | intrusion, and, moreover, the 2015 DERM Consent Agreement, the 2016 FDEP Consent Order, | ||
and the NPDES permit provide reasonable assurance that this will continue to be the case.291 | and the NPDES permit provide reasonable assurance that this will continue to be the case.291 | ||
Line 2,519: | Line 2,519: | ||
Petitioners challenges to the Staffs discussion of the environmental baseline, such as the | Petitioners challenges to the Staffs discussion of the environmental baseline, such as the | ||
current condition | current condition of the Miami cave crayfish and future sea level rise, are not material to this | ||
finding | finding because the Staffs finding is based on the determination that the effects of the proposed | ||
action would not be any worse than the effects of the environmental baseline. | action would not be any worse than the effects of the environmental baseline. That is, when the | ||
effects of the action and | effects of the action and cumulative effects are added to the environmental baseline and in | ||
light of the status of the species and critical habitat, | light of the status of the species and critical habitat, the proposed action is not likely to | ||
jeopardize the continued existence of the Miami cave crayfish | jeopardize the continued existence of the Miami cave crayfish or result in the destruction or | ||
adverse modification of its critical habitat294 because, as demonstrated throughout the Staffs | adverse modification of its critical habitat294 because, as demonstrated throughout the Staffs | ||
environmental review, the effects of the proposed | environmental review, the effects of the proposed action and cumulative effects at most would | ||
not increase the environmental baseline salinity conditions. Petitioners characterization of | not increase the environmental baseline salinity conditions. Petitioners characterization of | ||
Line 2,539: | Line 2,539: | ||
existing saltwater intrusion conditions and sea level rise as a cumulative effects 295 does not | existing saltwater intrusion conditions and sea level rise as a cumulative effects 295 does not | ||
change this, because it is the incremental | change this, because it is the incremental effect of the proposed action itself that is the factor | ||
290 2024 FSEIS at 2- | 290 2024 FSEIS at 2-63-2-67, B-2. | ||
291 Id. at 2-67. | 291 Id. at 2-67. | ||
292 See 2019 FSEIS at 3 | 292 See 2019 FSEIS at 3 3-11, 3 3-88, 4-29-4-35; 2023 DSEIS at 2-16-2-20; 2024 FSEIS at 2 2-40. | ||
293 Motion at 36. | 293 Motion at 36. | ||
Line 2,551: | Line 2,551: | ||
294 50 C.F.R. § 402.14(g)(4). | 294 50 C.F.R. § 402.14(g)(4). | ||
295 Motion at 44- | 295 Motion at 44-46. | ||
that is material to the | that is material to the analysis required by the ESA. 296 Taken together, Petitioner has not | ||
demonstrated that any of these arguments are material to the Staffs evaluation of the Miami | demonstrated that any of these arguments are material to the Staffs evaluation of the Miami | ||
cave crayfish under the ESA and would in any way change the Staffs determination that | cave crayfish under the ESA and would in any way change the Staffs determination that the | ||
effects of the proposed action itself would not require the NRC to confer with the FWS. | effects of the proposed action itself would not require the NRC to confer with the FWS. | ||
Line 2,571: | Line 2,571: | ||
Staff is based on a theory that the required remediation actions of hypersaline groundwater | Staff is based on a theory that the required remediation actions of hypersaline groundwater | ||
withdrawals and CCS freshening will somehow expand, rather than retract, | withdrawals and CCS freshening will somehow expand, rather than retract, salinity in the | ||
Biscayne Aquifer and, therefore, impact the crayfish; however, Petitioner | Biscayne Aquifer and, therefore, impact the crayfish; however, Petitioner does not provide | ||
sufficient information to show that a genuine dispute exists with the Staffs environmental review | sufficient information to show that a genuine dispute exists with the Staffs environmental review | ||
Line 2,579: | Line 2,579: | ||
in this regard or provide facts that support this theory. Moreover, Petitioners criticisms of the | in this regard or provide facts that support this theory. Moreover, Petitioners criticisms of the | ||
Staffs discussion of | Staffs discussion of the current and future environmental baseline relevant to the Miami cave | ||
crayfish do not show that a genuine dispute exists with that discussion, but | crayfish do not show that a genuine dispute exists with that discussion, but, instead, largely | ||
agree with that discussion. Finally, | agree with that discussion. Finally, Petitioner does not demonstrate that its challenges regarding | ||
the Miami cave crayfish are material to the findings that the Staff must make under the ESA and | the Miami cave crayfish are material to the findings that the Staff must make under the ESA and | ||
Line 2,589: | Line 2,589: | ||
its implementing regulations because Petitioner does not explain how the proposed action itself, | its implementing regulations because Petitioner does not explain how the proposed action itself, | ||
and not the current and future environmental baseline, will | and not the current and future environmental baseline, will jeopardize the continued existence of | ||
the crayfish such that the Staff would be required to confer with the FWS | the crayfish such that the Staff would be required to confer with the FWS. Therefore, New | ||
296 See Center for Biological Diversity v. U.S. Fish & Wildlife Service, 807 F. 3 | 296 See Center for Biological Diversity v. U.S. Fish & Wildlife Service, 807 F. 3 d at 1052 (stating that it would be inconsistent with the statutory scheme that jeopardy caused by cumulative effects could obviate the requirement that the federal action itself must cause some incremental deterioration in the species pre-action condition) (emphasis added); Appalachian Voices v. | ||
United States Department of Interior, 25 F.4th 259, 276 (4th Cir. 2022) (not faul | United States Department of Interior, 25 F.4th 259, 276 (4th Cir. 2022) (not faul ting the FWS for considering climate change as part of the environmental baseline analysis). | ||
Contention 2 does not meet the contention admissibility requirements of 10 C.F.R. | Contention 2 does not meet the contention admissibility requirements of 10 C.F.R. | ||
§ 2.309(f)(1)(iv)- | § 2.309(f)(1)(iv)- (vi) and, accordingly, should be dismissed. | ||
C. | C. New Contentions 3-A and 3-B are Not Admissible because they Do Not Meet Both the Good Cause Requirements of 10 C.F.R. § 2.309(c) and the Contention Admissibility Requirements of 10 C.F.R. § 2.309(f) | ||
As explained below, New Contentions | As explained below, New Contentions 3-A and 3-B are not admissible because they do | ||
not meet both the good cause requirements of 10 C.F.R. § 2.309(c) and the contention | not meet both the good cause requirements of 10 C.F.R. § 2.309(c) and the contention | ||
admissibility requirements of 10 C.F.R. § 2.309(f). | admissibility requirements of 10 C.F.R. § 2.309(f). | ||
: 1. | : 1. New Contentions 3-A and 3-B are Not Admissible because the Information on which they are Based is Not New and Materially Different f rom Information Previously Available | ||
On April 2, 2024, the GAO issued Report 24-106326 on the potential effects of climate | On April 2, 2024, the GAO issued Report 24-106326 on the potential effects of climate | ||
change on nuclear power plants.297 Petitioner asserts | change on nuclear power plants.297 Petitioner asserts that this report constitutes good cause | ||
under 10 C.F.R. § 2.309(c)(i)- | under 10 C.F.R. § 2.309(c)(i)- (iii) to file new contentions on the 2024 FSEIS. 298 But Petitioner | ||
has | has effectively reconstituted prior Contentions 3 and 5, which were not admitted as part of its | ||
challenge to the 2023 DSEIS, | challenge to the 2023 DSEIS, 299 as New Contentions 3-A and 3-B, respectively, and the GAO | ||
Report does not include information that is new and materially different from information | Report does not include information that is new and materially different from information | ||
Line 2,623: | Line 2,623: | ||
previously available such that the Board should re-entertain these contentions. | previously available such that the Board should re-entertain these contentions. | ||
The GAO R | The GAO R eport is insufficient to support New Contentions 3-A and 3-B as admissible | ||
contentions | contentions because the information in the GAO Report is a generalized compilation of | ||
previously publicly available information | previously publicly available information and is unrelated to license renewal at Turkey Point and, | ||
therefore, does not demonstrate good cause pursuant to 10 C.F.R. § 2.309(c)(i). Furthermore, | therefore, does not demonstrate good cause pursuant to 10 C.F.R. § 2.309(c)(i). Furthermore, | ||
the information | the information is not materially different from information previously available relating to climate | ||
change impacts on Turkey Point as is required for Petitioner to demonstrate good cause | change impacts on Turkey Point as is required for Petitioner to demonstrate good cause | ||
pursuant to 10 C.F.R. § 2.309(c)(ii) | pursuant to 10 C.F.R. § 2.309(c)(ii). The GAO Report recommends that the Chair of the NRC | ||
297 GAO Report at 1. | 297 GAO Report at 1. | ||
298 Motion at 52- | 298 Motion at 52-53. | ||
299 See LBP- | 299 See LBP-24-3, 99 NRC at __ (slip op. at 26 - 29, 31-34). | ||
direct internal assessment of the processes to address climate change, implement a plan to | direct internal assessment of the processes to address climate change, implement a plan to | ||
Line 2,651: | Line 2,651: | ||
statutory or regulatory requirements.300 | statutory or regulatory requirements.300 | ||
Nevertheless, Petitioner claims | Nevertheless, Petitioner claims that the GAO Report provides a novel site-specific | ||
analysis | analysis and conclusions about the specific vulnerability of Turkey Point to climate | ||
change. 301 Petitioner mis-represents the GAO Report. The GAO Report expressly states | change. 301 Petitioner mis-represents the GAO Report. The GAO Report expressly states | ||
Line 2,665: | Line 2,665: | ||
information previously available to describe the cumulative impacts to the environment from | information previously available to describe the cumulative impacts to the environment from | ||
climate change specific to the CCS in New Contention 3- | climate change specific to the CCS in New Contention 3-A. 303 The GAO Report does no such | ||
thing. Instead, the GAO Report references the threat of saltwater intrusion | thing. Instead, the GAO Report references the threat of saltwater intrusion into the CCS as a | ||
threat to operations at Turkey Point due to saltwater corrosion,304 and describes the historical | threat to operations at Turkey Point due to saltwater corrosion,304 and describes the historical | ||
Line 2,681: | Line 2,681: | ||
302 GAO Report at 17, 20, 22, 24. | 302 GAO Report at 17, 20, 22, 24. | ||
303 Motion at 55- | 303 Motion at 55-59. | ||
304 GAO Report at 22, 23 n.31 (According to [National Oceanic and Atmospheric Administration (NOAA)] officials, a rise in sea level can increase corrosion from saltwater intrusion | 304 GAO Report at 22, 23 n.31 (According to [National Oceanic and Atmospheric Administration (NOAA)] officials, a rise in sea level can increase corrosion from saltwater intrusion NOAA officials said that Turkey Point Nuclear Generating Station is an example of a plant where, if unaddressed, sea level rise could lead to saltwater intrusion into the plants cooling canals.) | ||
(emphasis added). | (emphasis added). | ||
Line 2,692: | Line 2,692: | ||
Staff is not using the most up -to-date information from the fifth National Climate Assessment. 306 | Staff is not using the most up -to-date information from the fifth National Climate Assessment. 306 | ||
The Staff updated the climate information discussion in the 2024 | The Staff updated the climate information discussion in the 2024 FSEIS to incorporate the fifth | ||
National | National Climate Assessment. 307 Petitioner remains unhappy with the Staff s data and claims | ||
that the GAO R | that the GAO R eport provides more up-to-date information. 308 To the contrary, the GAO Report | ||
analyzed climate change effects on temperature using the fourth National Climate | analyzed climate change effects on temperature using the fourth National Climate | ||
Assessment. 309 In fact, the GAO R | Assessment. 309 In fact, the GAO R eport came to the same conclusion that the Staff did that | ||
after reviewing the relevant sections from the fifth National Climate Assessment, the GAO did | after reviewing the relevant sections from the fifth National Climate Assessment, the GAO did | ||
Line 2,708: | Line 2,708: | ||
hazards [compared to the fourth National Climate Assessment]. 310 The Staff used the same | hazards [compared to the fourth National Climate Assessment]. 310 The Staff used the same | ||
data | data that the GAO Report used and came to the same conclusion that the GAO Report did, yet | ||
Petitioner claims that the S | Petitioner claims that the S taffs conclusion is insufficient,311 while Petitioner also claims that the | ||
GAO Report constitutes the exact sort of analysis that NRC Staff ought to undertake | GAO Report constitutes the exact sort of analysis that NRC Staff ought to undertake. 312 | ||
In New Contention 3-A, Petitioner seeks to rectify deficienc | In New Contention 3-A, Petitioner seeks to rectify deficienc ies identified by this Board in | ||
prior Contention 3 with information derived from the 2002 FSEIS, 313 and the 2019 FSEIS.314 In | prior Contention 3 with information derived from the 2002 FSEIS, 313 and the 2019 FSEIS.314 In | ||
so much as Petitioner attempts to rectify | so much as Petitioner attempts to rectify these deficiencies and others with preexisting | ||
information, | information, this constitutes a late attempt to reinvigorate thinly supported contentions by | ||
306 Motion at 59- | 306 Motion at 59-60. | ||
307 2024 FSEIS at E | 307 2024 FSEIS at E E-11. | ||
308 Motion at 59- | 308 Motion at 59-60. | ||
309 GAO Report at 49. | 309 GAO Report at 49. | ||
310 Id. at 3 n.3; see also | 310 Id. at 3 n.3; see also 2024 FSEIS at E E-11. | ||
311 Motion at 60. | 311 Motion at 60. | ||
Line 2,736: | Line 2,736: | ||
312 Id. at 61. | 312 Id. at 61. | ||
313 See, e.g., id. at 59, n.230 - | 313 See, e.g., id. at 59, n.230 - 231 (citing Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Turkey Point Plant, Units 3 and 4 - Final Report, NUREG-1437, Supplement 5, at 2-1 (Jan. 2002) (ML020280119) (2002 FSEIS)). | ||
314 Id. at n.232. | 314 Id. at n.232. | ||
Line 2,745: | Line 2,745: | ||
for any arguments not based on the GAO Report. | for any arguments not based on the GAO Report. | ||
The GAO R | The GAO R eport compiles previously available climate information that was already | ||
incorporated into the 2024 FSEIS. Accordingly, this information was previously available, and | incorporated into the 2024 FSEIS. Accordingly, this information was previously available, and | ||
the GAO Report relies on the same data that the 2024 FSEIS relies | the GAO Report relies on the same data that the 2024 FSEIS relies upon and, therefore, | ||
Petitioner does not demonstrate good cause pursuant to 10 C.F.R. § 2.309(c)(i)- | Petitioner does not demonstrate good cause pursuant to 10 C.F.R. § 2.309(c)(i)- (ii). To the | ||
extent that any new factual support for arguments | extent that any new factual support for arguments has been raised that is not derived from the | ||
GAO Report, Petitioner does not allege that good cause exists to include | GAO Report, Petitioner does not allege that good cause exists to include it as support for the | ||
admissibility of New Contentions 3-A and 3- | admissibility of New Contentions 3-A and 3-B. Therefore, Petitioner does not demonstrate good | ||
cause pursuant to 10 C.F.R. § 2.309(c)(1)(i) and | cause pursuant to 10 C.F.R. § 2.309(c)(1)(i) and (ii) for both New Contentions 3-A and 3-B and, | ||
accordingly, the Board should not entertain | accordingly, the Board should not entertain New Contentions 3-A and 3-B. 316 | ||
: 2. | : 2. New Contention 3-A (Previous Contention 3) Does Not Genuinely Dispute the 2024 FSEIS, and the GAO Report Does Not Provide the Necessary Support as a Basis for the Previously Rejected Contention 3 to be Admissible Now | ||
In New Contention 3-A Petitioner states: | In New Contention 3-A Petitioner states: | ||
The 2024 FSEIS fails to adequately analyze climate | The 2024 FSEIS fails to adequately analyze climate change-related environmental impacts that are reasonably foreseeable to occur during the subsequent license renewal period. [ 317] | ||
Specifically, Petitioner re-argues Contention 3 from its challenge to the 2023 DSEIS that the | Specifically, Petitioner re-argues Contention 3 from its challenge to the 2023 DSEIS that the | ||
Staffs environmental review fails to | Staffs environmental review fails to adequately consider the cumulative impacts of continued | ||
operations of | operations of Turkey Point, which was determined by the Board to not be admissible because | ||
Petitioner did not provide sufficient support to raise a genuine material dispute. Even more | Petitioner did not provide sufficient support to raise a genuine material dispute. Even more | ||
Line 2,778: | Line 2,778: | ||
pertinent, this Board previously found that although Petitioner offered several sources of | pertinent, this Board previously found that although Petitioner offered several sources of | ||
315 See National Enrichment Facility, CLI | 315 See National Enrichment Facility, CLI 25, 60 NRC at 224-25; Duke Energy Corp., | ||
(McGuire Nuclear Station, Units 1 and 2) | (McGuire Nuclear Station, Units 1 and 2), CLI 17, 58 NRC 419, 428 - 29 (2003). | ||
316 10 C.F.R. § 2.309(c). | 316 10 C.F.R. § 2.309(c). | ||
Line 2,787: | Line 2,787: | ||
purportedly new information in support of its contention, it does not explain the significance of | purportedly new information in support of its contention, it does not explain the significance of | ||
that information to the Staffs review ... and does not explain how its proffered information would | that information to the Staffs review... and does not explain how its proffered information would | ||
amount to more than fine-tuning the information in the [2023 D | amount to more than fine-tuning the information in the [2023 D SEIS]. 318 | ||
As discussed above, Petitioner has not demonstrated good cause to file New Contention | As discussed above, Petitioner has not demonstrated good cause to file New Contention | ||
3-A, as the information compiled in the | 3-A, as the information compiled in the GAO Report is not new and materially different from the | ||
information previously available and, | information previously available and, therefore, the good cause requirements of 10 C.F.R. | ||
§ 2.309(c)(1)(i) | § 2.309(c)(1)(i) - (ii) are not met. Furthermore, for the same reasons that this Board previously | ||
did not admit Contention 3, this Board should not now admit New Contention 3- | did not admit Contention 3, this Board should not now admit New Contention 3-A as it, again, | ||
fails to provide the necessary support for Petitioners assertions or demonstrate that a genuine | fails to provide the necessary support for Petitioners assertions or demonstrate that a genuine | ||
dispute exists on a material issue of fact or law, as is required by 10 C.F.R. § 2.309(f)(1) | dispute exists on a material issue of fact or law, as is required by 10 C.F.R. § 2.309(f)(1) (v)- (vi). | ||
Petitioner asserts that the GAO R | Petitioner asserts that the GAO R eport provides a novel site-specific analysis and | ||
conclusions about the specific vulnerability of Turkey Point to climate change.319 To the | conclusions about the specific vulnerability of Turkey Point to climate change.319 To the | ||
Line 2,811: | Line 2,811: | ||
contrary, it does not make any findings about any specific unaddressed environmental impacts | contrary, it does not make any findings about any specific unaddressed environmental impacts | ||
that might be exacerbated by climate change at Turkey Point. 320 The GAO R | that might be exacerbated by climate change at Turkey Point. 320 The GAO R eport makes many | ||
findings general to all U.S. | findings general to all U.S. nuclear power plants by applying climate change projections to the | ||
general area of nuclear power plants, without taking into account any protective measures to | general area of nuclear power plants, without taking into account any protective measures to | ||
Line 2,819: | Line 2,819: | ||
mitigate the external hazards at each plant.321 | mitigate the external hazards at each plant.321 | ||
Petitioner claims that the site- | Petitioner claims that the site-specific analysis of climate change-related impacts is | ||
located within the GAO Report. 322 Yet all of P | located within the GAO Report. 322 Yet all of P etitioner s claims in New Contention 3-A simply | ||
318 LBP- | 318 LBP-24-3, 99 NRC at __ (slip op. at 27). | ||
319 Motion at 53. | 319 Motion at 53. | ||
320 The site- | 320 The site-specific analysis is contained in the GAO Report at Appendix III, page 55. Turkey Point is mentioned on pages 15 and 23 regarding CCS salinity (unrelated to accident risk) and at page 19 to showcase the flood barriers protecting Turkey Point. None of this discussion suggests or demonstrates that climate change presents an unaddressed external hazard not yet considered, as the report specifically states that it does not account for protective measures to mitigate against natural hazards. | ||
321 GAO Report at 17, 20, 22, 24. | 321 GAO Report at 17, 20, 22, 24. | ||
Line 2,839: | Line 2,839: | ||
nuclear power plant to the environment. Instead, the GAO Report discusses the effects of | nuclear power plant to the environment. Instead, the GAO Report discusses the effects of | ||
climate change on U.S. | climate change on U.S. nuclear power plant operations and makes three general | ||
recommendations for executive action at the NRC. 323 | recommendations for executive action at the NRC. 323 | ||
Line 2,857: | Line 2,857: | ||
overtopped or breached.325 The GAO Report provides no new information that addresses any | overtopped or breached.325 The GAO Report provides no new information that addresses any | ||
of these factors. Instead, | of these factors. Instead, Petitioner seeks to rectify this deficiency in its previous pleading with | ||
preexisting information derived from the 2002 EIS,326 and the 2019 FSEIS. 327 Nevertheless, | preexisting information derived from the 2002 EIS,326 and the 2019 FSEIS. 327 Nevertheless, | ||
despite reciting the facts identified as missing previously by the Board, Petitioner fails | despite reciting the facts identified as missing previously by the Board, Petitioner fails to | ||
demonstrate how a potential overtopping event could cause any significant environmental | demonstrate how a potential overtopping event could cause any significant environmental | ||
Line 2,867: | Line 2,867: | ||
impacts that might change the Staffs determination of SMALL impacts on surface water quality | impacts that might change the Staffs determination of SMALL impacts on surface water quality | ||
in Biscayne Bay and Card Sound. 328 In the 2019 FSEIS, the S | in Biscayne Bay and Card Sound. 328 In the 2019 FSEIS, the S taff addressed a comment | ||
regarding overtopping and climate change and explained with references to the body of the | regarding overtopping and climate change and explained with references to the body of the | ||
2019 FSEIS why overtopping events, even if more frequent, would | 2019 FSEIS why overtopping events, even if more frequent, would not have a material effect on | ||
323 GAO Report at 40. | 323 GAO Report at 40. | ||
324 LBP- | 324 LBP-24-3, 99 NRC at __ (slip op. at 27). | ||
325 Id. at __ (slip op. | 325 Id. at __ (slip op. at 28). | ||
326 See Motion | 326 See Motion at 59, n. 230- 231. | ||
327 Id. at n. | 327 Id. at n. 232. | ||
328 2019 FSEIS at 2-23; 2024 FSEIS at 2-2. | 328 2019 FSEIS at 2-23; 2024 FSEIS at 2-2. | ||
the Staffs determination of SMALL impacts on surface water quality in Biscayne | the Staffs determination of SMALL impacts on surface water quality in Biscayne Bay and Card | ||
Sound. 329 | Sound. 329 | ||
Line 2,897: | Line 2,897: | ||
Contention 3-A is not accompanied by sufficient support to demonstrate that the [postulated] | Contention 3-A is not accompanied by sufficient support to demonstrate that the [postulated] | ||
higher temperatures | higher temperatures would increase evaporation in the CCS to any particular extent, much | ||
less to an extent that would be sufficient to increase the CCS salinity such that it would, in turn, | less to an extent that would be sufficient to increase the CCS salinity such that it would, in turn, | ||
affect the environment. 331 The GAO R | affect the environment. 331 The GAO R eport provides no new information that addresses any of | ||
these issues, 332 nor does New Contention 3-A and, therefore, | these issues, 332 nor does New Contention 3-A and, therefore, Petitioner has failed to rectify the | ||
deficiencies identified by the Board regarding CCS salinity levels and climate change. | deficiencies identified by the Board regarding CCS salinity levels and climate change. | ||
Petitioner raises | Petitioner raises hurricane risks as a basis for its contention, but only cite s to a general | ||
statement in the GAO Report about nuclear power plant safety in the event of a hurricane that | statement in the GAO Report about nuclear power plant safety in the event of a hurricane that | ||
remains unconnected to cumulative impacts.333 Petitioner does | remains unconnected to cumulative impacts.333 Petitioner does not connect the GAO R eports | ||
discussion of hurricanes to the | discussion of hurricanes to the Staffs cumulative impacts analysis, and it is not clear if | ||
Petitioner seeks | Petitioner seeks to raise a current licensing basis issue instead of a cumulative impacts | ||
contention. | contention. Regardless, this vague assertion does not demonstrate a genuine dispute of | ||
material fact regarding the cumulative impacts analysis in the 2024 | material fact regarding the cumulative impacts analysis in the 2024 FSEIS. | ||
Petitioner does | Petitioner does not demonstrate how any of the relevant information in the GAO Report | ||
has not been accounted for in the Staffs environmental review. Instead, Petitioner effectively | has not been accounted for in the Staffs environmental review. Instead, Petitioner effectively | ||
329 2019 FSEIS | 329 2019 FSEIS at A A-40. See also 2024 FSEIS at A A-54. | ||
330 LBP- | 330 LBP-24-3, 99 NRC at __ (slip op. at 28 - 29). | ||
331 Id. at __ (slip op. at 28 | 331 Id. at __ (slip op. at 28 - 29) (quotation marks omitted). | ||
332 The GAO R | 332 The GAO R eport specifically did not evaluate drought. We did not analyze drought data because we were unable to identify national-level geospatial data that was both relevant to nuclear power plants and sufficiently reliable for our purposes. GAO Report at 43, n. 3. | ||
333 Motion at 61- | 333 Motion at 61-62. | ||
uses | uses the GAO Report as an opportunity to re-argue its previously twice dismissed contention | ||
and does | and does not advance any argument that the GAO Report somehow remedies the previously | ||
identified deficiencies in that contention. Therefore, New Contention 3-A does not meet 10 | identified deficiencies in that contention. Therefore, New Contention 3-A does not meet 10 | ||
C.F.R. § 2.309(f)(1)(v)- | C.F.R. § 2.309(f)(1)(v)- (vi) and should be dismissed. | ||
: 3. | : 3. New Contention 3-B is Not Admissible because it is Not Supported, Does Not Genuinely Dispute the 2024 FSEIS, and is Not Within the Limited Scope of this License Renewal Proceeding | ||
In New Contention 3-B Petitioner states: | In New Contention 3-B Petitioner states: | ||
Line 2,949: | Line 2,949: | ||
Specifically, Petitioner re-argues Contention 5 from its challenge to the 2023 DSEIS that the | Specifically, Petitioner re-argues Contention 5 from its challenge to the 2023 DSEIS that the | ||
Staffs environmental review fails to consider the | Staffs environmental review fails to consider the effects of climate change on a ccident risk. In | ||
LBP- | LBP-24-3, the Board rejected Contention 5 because Petitioner did not provide sufficient support | ||
to raise a genuine material dispute | to raise a genuine material dispute with the Staffs analysis in the 2023 DSEIS. 335 Petitioner now | ||
argues that the GAO Report provides new and materially different information that satisfies the | argues that the GAO Report provides new and materially different information that satisfies the | ||
Line 2,959: | Line 2,959: | ||
good cause standard for new and amended contentions.336 | good cause standard for new and amended contentions.336 | ||
New | New Contention 3-B is not admissible because the GAO Report that Petitioner cites as | ||
support for this contention does not contain new and materially different information than that | support for this contention does not contain new and materially different information than that | ||
Line 2,965: | Line 2,965: | ||
which was previously available and Petitioner does not otherwise satisfy the good cause | which was previously available and Petitioner does not otherwise satisfy the good cause | ||
requirements of 10 C.F.R. § 2.309(c)(i)- | requirements of 10 C.F.R. § 2.309(c)(i)- (ii). And even though Petitioner requested a waiver | ||
under 10 C.F.R. § 2.335(b) to challenge the Staffs SAMA analysis in the 2024 FSEIS, as | under 10 C.F.R. § 2.335(b) to challenge the Staffs SAMA analysis in the 2024 FSEIS, as | ||
discussed below in Section III, Petitioner s | discussed below in Section III, Petitioner s Petition for Waiver to challenge S taffs updated | ||
SAMA analysis should be denied because it does not meet Millstone factors (iii) and (iv) to | SAMA analysis should be denied because it does not meet Millstone factors (iii) and (iv) to | ||
demonstrate a prima facie case of special circumstances as required by 10 C.F.R. § 2.335(b) | demonstrate a prima facie case of special circumstances as required by 10 C.F.R. § 2.335(b). | ||
334 Id. at 69. | 334 Id. at 69. | ||
335 LBP- | 335 LBP-24-3, 99 NRC at __ (slip op. at 33 - 34). | ||
336 Motion at 52- | 336 Motion at 52-53. | ||
Additionally, New | Additionally, New Contention 3-B raises issues that are not within the limited scope of this | ||
license renewal proceeding, | license renewal proceeding, it is not supported, and it does not demonstrate that a genuine | ||
dispute exists with the 2024 FSEIS on a material issue of | dispute exists with the 2024 FSEIS on a material issue of fact or law and, therefore, it does not | ||
meet 10 C.F.R. § | meet 10 C.F.R. § 2.309(f)(1)(iii), (v), or (vi). Accordingly, New Contention 3-B should be | ||
dismissed. | dismissed. | ||
(a) | (a) New Contention 3 -B (Previous Contention 5) Does Not Genuinely Dispute the 2024 FSEIS, and the GAO R eport Does Not Provide the Necessary Support as a Basis for the Previously Rejected Contention 5 to be Admissible Now | ||
This Board previously held that Contention 5, the prior iteration of New Contention 3 | This Board previously held that Contention 5, the prior iteration of New Contention 3 -B, | ||
is inadmissible because it does not provide sufficient information to show a genuine, material | is inadmissible because it does not provide sufficient information to show a genuine, material | ||
dispute exists with the [2023 DSEIS] | dispute exists with the [2023 DSEIS]. 337 New Contention 3-B is not admissible for similar | ||
reasons. Here, Petitioner advances | reasons. Here, Petitioner advances a generic GAO Report on climate change effects on nuclear | ||
power plants as an attempt to demonstrate that it | power plants as an attempt to demonstrate that it has good cause to file a new and amended | ||
contention on climate change risks | contention on climate change risks and SAMAs for Turkey Point specifically. | ||
New Contention 3-B based on the GAO Report does not demonstrate how the Staffs | New Contention 3-B based on the GAO Report does not demonstrate how the Staffs | ||
existing conservatisms, safety margins, and defense- | existing conservatisms, safety margins, and defense-in-depth to address natural phenomena fail | ||
to adequately consider risks posed by climate change to nuclear power plants, and does not | to adequately consider risks posed by climate change to nuclear power plants, and does not | ||
demonstrate that Staffs SAMA update is inadequate. | demonstrate that Staffs SAMA update is inadequate. 338 The Commission has stated that unless | ||
petitioners can show that their challenges to SAMA analyses could change the cost-benefit | petitioners can show that their challenges to SAMA analyses could change the cost-benefit | ||
Line 3,019: | Line 3,019: | ||
only to determine what safety enhancements are cost-effective to implement. 339 Citing the GAO | only to determine what safety enhancements are cost-effective to implement. 339 Citing the GAO | ||
337 LBP- | 337 LBP-24-3, 99 NRC __ (slip op. at 32). | ||
338 GAO Report at 65. | 338 GAO Report at 65. | ||
339 Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), CLI-10-11, 71 NRC 287, 315 - | 339 Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), CLI-10-11, 71 NRC 287, 315 - 17 (2010). See also McGuire, CLI-02-17, 56 NRC at 8, 11-12 (finding that the relevant inquiry to determine if a SAMA analysis meets the materiality contention admissibility requirement is whether the contention could change the cost-benefit analysis). | ||
Report as support for its arguments, Petitioner advances | Report as support for its arguments, Petitioner advances safety concerns over f looding, | ||
hurricane, and temperatures at Turkey Point before, during, | hurricane, and temperatures at Turkey Point before, during, and after the subsequent license | ||
renewal term by alleging that the SAMA analysis does not account for climate change. 340 But | renewal term by alleging that the SAMA analysis does not account for climate change. 340 But | ||
while the GAO Report looks at climate | while the GAO Report looks at climate change projections at Turkey Point in its analysis, which | ||
Petitioner elevates | Petitioner elevates as a novel site -specific analysis and conclusions about the specific | ||
vulnerability of Turkey Point to climate change, it does not make any findings about any specific | vulnerability of Turkey Point to climate change, it does not make any findings about any specific | ||
Line 3,041: | Line 3,041: | ||
Turkey Point, or point to any cost-effective accident mitigation measures that should be | Turkey Point, or point to any cost-effective accident mitigation measures that should be | ||
considered. | considered. 341 This omission is significant. 342 | ||
Although the GAO R | Although the GAO R eport is new, the information within it is not and Petitioner has not | ||
shown how this information | shown how this information supports challenges to the SAMA analysis that could change the | ||
Staffs cost-benefit conclusions. Petitioner cites to the 2024 FSEIS and claims that the GAO | Staffs cost-benefit conclusions. Petitioner cites to the 2024 FSEIS and claims that the GAO | ||
Line 3,051: | Line 3,051: | ||
Report is new and significant information that would satisfy the criteria identified in the 2024 | Report is new and significant information that would satisfy the criteria identified in the 2024 | ||
FSEIS of new information that | FSEIS of new information that indicates that a given potentially cost-beneficial SAMA would | ||
substantially reduce the impacts of a severe accident or the probability or consequences (risk) | substantially reduce the impacts of a severe accident or the probability or consequences (risk) | ||
Line 3,057: | Line 3,057: | ||
of a severe accident occurring.343 The Staff undertook this new and significant information | of a severe accident occurring.343 The Staff undertook this new and significant information | ||
340 Motion at 72- | 340 Motion at 72-74 (Petitioner also raises concerns about the storage of spent nuclear fuel well past the 2050s). | ||
341 The site- | 341 The site-specific analysis is contained in the GAO Report at Appendix III, page 55. Tur k e y Point is mentioned on pages 15 and 23 regarding CCS salinity (unrelated to accident risk) and at page 19 to showcase the flood barriers protecting Turkey Point. None of this discussion suggests or demonstrates that climate change presents an unaddressed external hazard not yet considered, as the report specifically states that it does not account for protective measures to mitigate against natural hazards. | ||
342 As evidenced by Petitioner s citations to the GAO Report in its Motion, many of the concerns raised by the GAO R | 342 As evidenced by Petitioner s citations to the GAO Report in its Motion, many of the concerns raised by the GAO R eport are about nuclear power plants reliability in delivering electricity to the grid, and the potential safety effects of individuals not having access to electricity. | ||
343 Motion at 77 (quoting | 343 Motion at 77 (quoting 2024 FSEIS at D-4). | ||
evaluation pursuant to the NRC- | evaluation pursuant to the NRC-endorsed topical report Nuclear Energy Institute (NEI) 17-04. 344 | ||
The | The Staff performed a new and significant information evaluation in the 2024 FSEIS based on | ||
the first SAMA performed in accordance with 10 C.F.R. § 51.53(c)(3)(ii)(L). 345 As is explained in | the first SAMA performed in accordance with 10 C.F.R. § 51.53(c)(3)(ii)(L). 345 As is explained in | ||
Line 3,070: | Line 3,070: | ||
the 2024 FSEIS: | the 2024 FSEIS: | ||
An analysis of SAMAs was performed for Turkey Point at the time of the initial license renewal. The NRC staff documented its review of this analysis in NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 5, Regarding Turkey Point Units 3 and 4. Any new and significant information that might alter the conclusions of that analysis was considered in the [subsequent license renewal] application, as discussed below. No new and significant SAMAs were identified through FPLs use of the NRC-endorsed topical report Nuclear Energy Institute (NEI) 17 -04, Model [Subsequent License Renewal] New and Significant Assessment Approach for SAMA, nor was any new and significant information regarding SAMAs identified by the NRC staff in the FSEIS. | An analysis of SAMAs was performed for Turkey Point at the time of the initial license renewal. The NRC staff documented its review of this analysis in NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 5, Regarding Turkey Point Units 3 and 4. Any new and significant information that might alter the conclusions of that analysis was considered in the [subsequent license renewal] application, as discussed below. No new and significant SAMAs were identified through FPLs use of the NRC-endorsed topical report Nuclear Energy Institute (NEI) 17 -04, Model [Subsequent License Renewal] New and Significant Assessment Approach for SAMA, nor was any new and significant information regarding SAMAs identified by the NRC staff in the FSEIS. [ 346] | ||
Petitioner does | Petitioner does not propose any SAMA alternative and does not argue that any proposed new | ||
SAMA might be cost beneficial. Instead, Petitioner relies on the bare | SAMA might be cost beneficial. Instead, Petitioner relies on the bare assertion that the SAMA | ||
analysis does not address climate changes effects on flooding, hurricane, or temperate-related | analysis does not address climate changes effects on flooding, hurricane, or temperate-related | ||
Line 3,080: | Line 3,080: | ||
severe accidents. 347 | severe accidents. 347 | ||
While Petitioner believes | While Petitioner believes that the SAMA analysis needs to be redone with updated | ||
climate data, Petitioner does | climate data, Petitioner does not engage at all with F P L s underlying SAMA analysis.348 In the | ||
2002 EIS, FPL provided a SAMA analysis, which the Staff evaluated and concurred with, which | 2002 EIS, FPL provided a SAMA analysis, which the Staff evaluated and concurred with, which | ||
identified | identified internal events as the primary contributor to the baseline core damage frequency | ||
344 2024 FSEIS at D-4 (citing Nuclear Energy Institute, | 344 2024 FSEIS at D-4 (citing Nuclear Energy Institute, Model [Subsequent License Renewal] | ||
New and Significant Assessment Approach for SAMA, NEI 17-04, Rev. 1 (Aug. 2019) | New and Significant Assessment Approach for SAMA, NEI 17-04, Rev. 1 (Aug. 2019) | ||
(ML19316C718). | (ML19316C718). | ||
345 2002 FSEIS at 5 | 345 2002 FSEIS at 5 5-25. | ||
346 2024 FS | 346 2024 FS EIS at D-4. | ||
347 Motion at 72- | 347 Motion at 72-75. | ||
348 Id. at 77- | 348 Id. at 77-78 (If NRC Staff were to update the SAMA evaluation to reflect the risks identified in the GAO Report, it might very well call into question the [2024 FSEISs] overall conclusions regarding the probability-weighted consequences of potential severe accidents.) (quotation marks omitted). | ||
(CDF). 349 FPLs SAMA analysis did not identify any fundamental weaknesses or vulnerabilities | (CDF). 349 FPLs SAMA analysis did not identify any fundamental weaknesses or vulnerabilities | ||
Line 3,103: | Line 3,103: | ||
of Turkey Point to severe accident risk with regard to the separate matter of external events | of Turkey Point to severe accident risk with regard to the separate matter of external events | ||
related to seismic, fire, high winds, flood, | related to seismic, fire, high winds, flood, and other external hazards. 350 | ||
Here, Petitioner seeks to challenge the underlying inputs to the safety analyses, which | Here, Petitioner seeks to challenge the underlying inputs to the safety analyses, which | ||
become the bases for the Staffs SAMA update in the 2024 FSEIS | become the bases for the Staffs SAMA update in the 2024 FSEIS. 351 However, while Petitioner | ||
asserts that it has identified a deficiency in the Staffs SAMA analysis, Petitioner has not | asserts that it has identified a deficiency in the Staffs SAMA analysis, Petitioner has not | ||
Line 3,113: | Line 3,113: | ||
demonstrated that the existing historical climate data, with layers of conservatisms, safety | demonstrated that the existing historical climate data, with layers of conservatisms, safety | ||
margins, and defense-in-depth, | margins, and defense-in-depth, incorporated into NRCs processes might be unreliable to | ||
address the natural hazards experienced at the plant, especially as external events are a low | address the natural hazards experienced at the plant, especially as external events are a low | ||
contributor to overall CDF in F | contributor to overall CDF in F P L s SAMA analysis. 352 Just as P etitioner has not demonstrated | ||
how the Staffs reliance on its existing climate data is unreliable or fails to adequately account | how the Staffs reliance on its existing climate data is unreliable or fails to adequately account | ||
for climate change, it has | for climate change, it has not pointed to how consideration of climate change might result in a | ||
different cost-benefit analysis. Petitioner does | different cost-benefit analysis. Petitioner does not make a logical connection to how the | ||
incorporation of any information from the GAO Report paints | incorporation of any information from the GAO Report paints a materially different picture of the | ||
cost-benefit analysis done to address the SAMA analysis and Petitioner does not show that | cost-benefit analysis done to address the SAMA analysis and Petitioner does not show that | ||
climate change might change the | climate change might change the SAMA analysis. In sum, New Contention 3-B does not provide | ||
alleged facts or expert opinions that support its position and does not demonstrate that a | alleged facts or expert opinions that support its position and does not demonstrate that a | ||
Line 3,137: | Line 3,137: | ||
350 Id. at 5-9. | 350 Id. at 5-9. | ||
351 As Petitioner is challenging the underlying SAMA analysis, its challenge | 351 As Petitioner is challenging the underlying SAMA analysis, its challenge amounts to a challenge to 10 C.F.R. § 51.53(c)(3)(ii)(L). | ||
352 Cf. Diablo Canyon, CLI | 352 Cf. Diablo Canyon, CLI 11, 74 NRC 427 (2011), affirming Pacific Gas & Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 & 2), LBP-10-15, 72 NRC 257, 282 (2010) (as the disproportionate risk at Diablo Canyon in the initial SAMA analysis was, in part, due to seismic contributors, the petitioners had demonstrated that the SAMA analysis contained an omission because there was a newly discovered fault line that was not yet considered and therefore could change the seismic SAMA cost-benefit calculations). | ||
genuine dispute exists on a material issue of fact as is required by 10 C.F.R. § 2.309(f)(1)(v)- | genuine dispute exists on a material issue of fact as is required by 10 C.F.R. § 2.309(f)(1)(v)- (vi) | ||
and, | and, accordingly, it should be dismissed. | ||
(b) | (b) The Effects of Climate Change on the Structures, Systems, and Components of a Nuclear Power Plant are Not Within the Scope of License Renewal and therefore are Not Within the Scope of SAMA Analyses | ||
Petitioner argues that the Staffs environmental review of the updated SAMA analysis is | Petitioner argues that the Staffs environmental review of the updated SAMA analysis is | ||
inconsistent with the GAO | inconsistent with the GAO Report and N E PA because it does not address the impacts of climate | ||
change | change on plant safety. 353 However, this argument amounts to a challenge to the NRCs license | ||
renewal regulations because | renewal regulations because those regulations specify that such current licensing basis plant | ||
safety issues are addressed separately through ongoing oversight and not through the license | safety issues are addressed separately through ongoing oversight and not through the license | ||
renewal process.354 As provided | renewal process.354 As provided by 10 C.F.R. § 2.335, no rule or regulation of the Commission | ||
may be | may be subject to attack in an adjudicatory proceeding unless the proponent files a petition for | ||
waiver of that rule or regulation. Petitioner filed a waiver to challenge 10 C.F.R. § 51.53(c), which | waiver of that rule or regulation. Petitioner filed a waiver to challenge 10 C.F.R. § 51.53(c), which | ||
is required to challenge generic environmental findings in the NRCs regulations, but | is required to challenge generic environmental findings in the NRCs regulations, but it has not | ||
requested a | requested a waiver to challenge 10 C.F.R. § 54.30, which excludes current licensing basis issues | ||
from the scope of license renewal and, therefore, its challenges to current licensing basis safety | from the scope of license renewal and, therefore, its challenges to current licensing basis safety | ||
Line 3,171: | Line 3,171: | ||
concerns should be dismissed. 355 | concerns should be dismissed. 355 | ||
Petitioner asserts | Petitioner asserts that the 2024 FS EIS does not discuss climate change impacts on | ||
accident risk. 356 However, the 2019 FSEIS, which the 2024 FSEIS supplements, | accident risk. 356 However, the 2019 FSEIS, which the 2024 FSEIS supplements, contains a | ||
section entitled, Climate Change Projections, that specifically states | section entitled, Climate Change Projections, that specifically states that the effects of climate | ||
change on Turkey Point structures, systems, and components (SSCs) are not within the scope | change on Turkey Point structures, systems, and components (SSCs) are not within the scope | ||
Line 3,183: | Line 3,183: | ||
354 See 10 C.F.R. § 54.30 (excluding current licensing basis issues from the scope of license renewal). | 354 See 10 C.F.R. § 54.30 (excluding current licensing basis issues from the scope of license renewal). | ||
355 Millstone, CLI- | 355 Millstone, CLI- 03-14, 58 NRC at 218. | ||
356 Motion at 69. | 356 Motion at 69. | ||
Line 3,189: | Line 3,189: | ||
of the Staffs license renewal environmental review. 357 Nevertheless, Petitioner disputes these | of the Staffs license renewal environmental review. 357 Nevertheless, Petitioner disputes these | ||
statements, and asserts that the St aff s | statements, and asserts that the St aff s SAMA update is an appropriate vehicle to raise these | ||
safety concerns. 358 As the Commission has often | safety concerns. 358 As the Commission has often explained, though, the effects of | ||
environmental conditions on a nuclear power plant, as opposed to the effects of the nuclear | environmental conditions on a nuclear power plant, as opposed to the effects of the nuclear | ||
Line 3,197: | Line 3,197: | ||
power plant on the environment, are not within the scope of license renewal.359 Accordingly, as | power plant on the environment, are not within the scope of license renewal.359 Accordingly, as | ||
the effects of climate change on nuclear power plant safety is a | the effects of climate change on nuclear power plant safety is a current licensing basis issue, | ||
the statement of the 2019 FSEIS that the effects of climate change on Turkey Point Unit 3 and 4 | the statement of the 2019 FSEIS that the effects of climate change on Turkey Point Unit 3 and 4 | ||
Line 3,217: | Line 3,217: | ||
the Staff only looks to new and significant information in its update to the previous SAMA | the Staff only looks to new and significant information in its update to the previous SAMA | ||
357 2019 FSEIS at 4-120- | 357 2019 FSEIS at 4-120- 4-124. See also 2024 FSEIS at A-5, A-3 4, A-35. | ||
358 Motion at 79- | 358 Motion at 79-80 (citing 2024 FSEIS at D-1) (asserting that NRC Staffs SAMA evaluation must ensure that the analysis accounts for the risks of severe accidents and their environmental consequences). | ||
359 See, e.g., Pacific Gas & Elec. Co. (Diablo Canyon Nuclear Power Plant, Units 1 and 2), | 359 See, e.g., Pacific Gas & Elec. Co. (Diablo Canyon Nuclear Power Plant, Units 1 and 2), CLI-15-21, 82 NRC 295, 304- 05 (2015). | ||
360 2019 FSEIS at 4 -124. | 360 2019 FSEIS at 4 -124. | ||
361 See Turkey Point, CLI- | 361 See Turkey Point, CLI- 01-17, 54 NRC at 16-18 (T he Licensing Board correctly concluded that | ||
[a contention was] outside of the scope of license renewal reviews and proceedings [because as] the Board found, the contention does not raise any aspect of the Applicants aging management review or evaluation of the plants systems, structures, and components subject to time-aging analysis. It does not, then, identify any issue encompassed by the NRC safety review for license renewal, conducted under 10 C.F.R. Part 54, which focuses on aging.) | [a contention was] outside of the scope of license renewal reviews and proceedings [because as] the Board found, the contention does not raise any aspect of the Applicants aging management review or evaluation of the plants systems, structures, and components subject to time-aging analysis. It does not, then, identify any issue encompassed by the NRC safety review for license renewal, conducted under 10 C.F.R. Part 54, which focuses on aging.) | ||
(internal citations omitted). | (internal citations omitted). | ||
Line 3,232: | Line 3,232: | ||
analysis. 363 In contrast to the analyses needed to determine whether a nuclear power plant | analysis. 363 In contrast to the analyses needed to determine whether a nuclear power plant | ||
meets the safety requirements in the NRCs | meets the safety requirements in the NRCs regulations, a SAMA analysis focuses on potential | ||
alternative mitigation measures that are supplemental to the NRCs safety requirements that are | alternative mitigation measures that are supplemental to the NRCs safety requirements that are | ||
Line 3,251: | Line 3,251: | ||
protection under the NRCs safety regulations.366 | protection under the NRCs safety regulations.366 | ||
The effects of climate change on n | The effects of climate change on n uclear power plant SSCs is a current licensing basis | ||
issue. While the Board has previously taken Petitioner at its word that it seeks to challenge the | issue. While the Board has previously taken Petitioner at its word that it seeks to challenge the | ||
Line 3,257: | Line 3,257: | ||
Draft SEIS and does not seek to challenge the Staffs safety analysis, such deference is not | Draft SEIS and does not seek to challenge the Staffs safety analysis, such deference is not | ||
363 Limerick, CLI- | 363 Limerick, CLI-13-7, 78 NRC at 211-12. | ||
364 Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), CLI | 364 Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), CLI 7, 83 NRC 293, 296, 298 (2016) (emphasis added). | ||
365 | 365 Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications, NRC Regulatory Guide 4.2, Suppl. 1, Rev. 1, at 44-45 (Jun. 2013) | ||
(ML13067A354). | (ML13067A354). | ||
366 Indian Point, CLI- | 366 Indian Point, CLI-16-7, 83 NRC at 296. | ||
appropriate here as Petitioner s arguments repeatedly invoke safety concerns and directly | appropriate here as Petitioner s arguments repeatedly invoke safety concerns and directly | ||
Line 3,270: | Line 3,270: | ||
the GAO Report, asserts that it is unclear whether the safety margins for nuclear power plants | the GAO Report, asserts that it is unclear whether the safety margins for nuclear power plants | ||
are adequate to address the risks that climate change poses to plants. | are adequate to address the risks that climate change poses to plants. 368 Cloaking current | ||
licensing basis safety concerns in an environmental cloth does not transform Petitioner s | licensing basis safety concerns in an environmental cloth does not transform Petitioner s | ||
Line 3,278: | Line 3,278: | ||
This Board previously held that Petitioner s safety contention was an environmental | This Board previously held that Petitioner s safety contention was an environmental | ||
SAMA contention | SAMA contention citing to Diablo Canyon. 369 However, Diablo Canyon does not support | ||
including | including climate change with in the scope of the Staff s license renewal environmental review in | ||
this instance, as here Petitioner seeks | this instance, as here Petitioner seeks to challenge the underlying process that the Staff uses to | ||
perform its safety determinations during it safety reviews. 370 In Diablo Canyon, the Commission | perform its safety determinations during it safety reviews. 370 In Diablo Canyon, the Commission | ||
Line 3,288: | Line 3,288: | ||
found that a newly discovered seismic fault line had not yet been incorporated into the safety | found that a newly discovered seismic fault line had not yet been incorporated into the safety | ||
review and, | review and, therefore, was absent from the SAMA analysis, and, notably the applicants SAMA | ||
analysis acknowledge[d] that both fire and seismic contributors [were] disproportionately | analysis acknowledge[d] that both fire and seismic contributors [were] disproportionately | ||
Line 3,298: | Line 3,298: | ||
safety processes which provide reasonable assurance regarding any plausible natural hazard | safety processes which provide reasonable assurance regarding any plausible natural hazard | ||
367 LBP- | 367 LBP-24-3, 99 NRC at __ (slip op. at 32). | ||
368 Motion at 76 (quoting GAO Report at 39). | 368 Motion at 76 (quoting GAO Report at 39). | ||
369 LBP- | 369 LBP-24-3, 99 NRC at __ (slip op. at 33, n.173) (citing Diablo Canyon, CLI 11, 74 NRC at 442-43). | ||
370 A holding that the Staffs analysis of current licensing basis | 370 A holding that the Staffs analysis of current licensing basis issues is inadequate for the purposes of SAMAs would bifurcate the methodologies used by the Staff to perform its safety reviews to analyze a nuclear power plants compliance with its current licensing basis, and the analysis that the Staff uses to examine SAMAs during license renewal. Effectively, the Staff would have to undertake a new safety analysis using different methodologies exclusively for SAMAs. | ||
371 Diablo Canyon, LBP | 371 Diablo Canyon, LBP 15, 72 NRC at 282 (quotation marks omitted) (The underlying safety analysis for the current licensing basis of Diablo Canyon regarding the new fault line was in process at the time of the hearing requests). | ||
and combinations at the site for the licensed operation lifetime of the reactor, including those | and combinations at the site for the licensed operation lifetime of the reactor, including those | ||
Line 3,316: | Line 3,316: | ||
in the Turkey Point SAMA analysis.373 Instead, Petitioner advances a broad GAO Report framed | in the Turkey Point SAMA analysis.373 Instead, Petitioner advances a broad GAO Report framed | ||
as an omission | as an omission in the Staffs environmental impact statement, but actually contests the | ||
adequacy of how the Staff addresses natural phenomena | adequacy of how the Staff addresses natural phenomena in the current licensing bases for all | ||
plants. To this point, Petitioner broadly asserts that the current licensing basis for Turkey Point | plants. To this point, Petitioner broadly asserts that the current licensing basis for Turkey Point | ||
Line 3,332: | Line 3,332: | ||
climate change impacts on accident risk in the license renewal environmental review. 375 In place | climate change impacts on accident risk in the license renewal environmental review. 375 In place | ||
of environmental contentions, Petitioner raises | of environmental contentions, Petitioner raises speculative safety concerns about the effect of | ||
climate change on Turkey Point.376 This runs contrary to the Commissions license renewal | climate change on Turkey Point.376 This runs contrary to the Commissions license renewal | ||
Line 3,344: | Line 3,344: | ||
372 GAO Report at 65. | 372 GAO Report at 65. | ||
373 Diablo Canyon, CLI- | 373 Diablo Canyon, CLI-11-11, 74 NRC at 442-43 (There, we affirmed the boards decision with regard to the portion of the admitted contention in which the petitioner asserted that the applicant failed to consider the result of a particular study in its SAMA analysis.). | ||
374 Motion at 72- | 374 Motion at 72-75, 77, 79-80. | ||
375 Cf. State of New York v. NRC, | 375 Cf. State of New York v. NRC, 681 F.3d 471, 478 (2012) (whereas the court held that the NRC must analyze any environmental effects that are not remote and speculative, here the Staff did not exclude this topic because it was remote and speculative, but excluded consideration of climate change on SSCs because this topic is a current licensing basis issue that is excluded from review during license renewal by 10 C.F.R. § 54.30(b)). | ||
376 Motion at 72- | 376 Motion at 72-75. | ||
377 10 C.F.R. §§ 54.21 | 377 10 C.F.R. §§ 54.21 and 54.29. | ||
effects, of the proposed action | effects, of the proposed action, 378 but not the effects of the environment on the plant as those | ||
issues are current licensing basis issues that are not within the scope of license renewal | issues are current licensing basis issues that are not within the scope of license renewal | ||
Line 3,366: | Line 3,366: | ||
projections may produce a different picture of the underlying natural hazards analysis that the | projections may produce a different picture of the underlying natural hazards analysis that the | ||
Staff performs under the current licensing basis. 380 The | Staff performs under the current licensing basis. 380 The Staffs NEPA SAMA analysis takes the | ||
data from the current licensing basis to perform the SAMA analysis. Therefore, Petitioner s claim | data from the current licensing basis to perform the SAMA analysis. Therefore, Petitioner s claim | ||
Line 3,386: | Line 3,386: | ||
Protecting Turkey Points SSCs from natural phenomena, climate induced or otherwise, | Protecting Turkey Points SSCs from natural phenomena, climate induced or otherwise, | ||
is a current licensing basis safety issue and, | is a current licensing basis safety issue and, therefore, is excluded from the scope of this | ||
license renewal proceeding. An argument to the contrary amounts to an impermissible collateral | license renewal proceeding. An argument to the contrary amounts to an impermissible collateral | ||
attack on 10 C .F.R. § 54.30(b), for which Petitioner has | attack on 10 C.F.R. § 54.30(b), for which Petitioner has not requested a waiver. Petitioner s | ||
request to use data that it claims the Staff omitted from the 2024 FSEIS | request to use data that it claims the Staff omitted from the 2024 FSEIS about the effects of | ||
climate change on the SSCs of Turkey Point would arguably require a full re- | climate change on the SSCs of Turkey Point would arguably require a full re-analysis of all | ||
natural phenomenon safety reviews, which is simply outside of the scope of the Staff s review | natural phenomenon safety reviews, which is simply outside of the scope of the Staff s review | ||
378 See, e.g., 10 C.F.R. § 51.71(d) and | 378 See, e.g., 10 C.F.R. § 51.71(d) and 10 C.F.R. § 51.95(c). | ||
379 Diablo Canyon, CLI- | 379 Diablo Canyon, CLI-15-21, 82 NRC at 304 - 05. | ||
380 Motion at 77- | 380 Motion at 77-80. | ||
381 Diablo Canyon, CLI 15 | 381 Diablo Canyon, CLI 15 -21, 82 NRC at 30 7- 08. | ||
under the NRCs license renewal requirements. Therefore, New Contention | under the NRCs license renewal requirements. Therefore, New Contention 3-B does not meet | ||
the contention admissibility requirement of 10 C.F.R. § | the contention admissibility requirement of 10 C.F.R. § 2.309(f)(1)(iii) and, accordingly, should be | ||
dismissed. | dismissed. | ||
(c) | (c) Conclusion for New Contention 3-B | ||
In Sum, New Contention 3- | In Sum, New Contention 3-B is not within the limited scope of this license renewal | ||
proceeding, is not supported, | proceeding, is not supported, and does not show that a genuine dispute exists on a material | ||
issue of law or fact, as required by 10 C.F.R. § 2.309(f)(1)(iii), (v), and (vi). Therefore, New | issue of law or fact, as required by 10 C.F.R. § 2.309(f)(1)(iii), (v), and (vi). Therefore, New | ||
Line 3,422: | Line 3,422: | ||
Contention 3-B should be dismissed. | Contention 3-B should be dismissed. | ||
III. | III. The Petition for Waiver should be Denied | ||
It is a fundamental principle that NRC regulations are not subject to attack in an | It is a fundamental principle that NRC regulations are not subject to attack in an | ||
adjudicatory proceeding | adjudicatory proceeding unless the Commission grants a request for the waiver of the | ||
application of a specific regulation or otherwise makes an exception for a particular | application of a specific regulation or otherwise makes an exception for a particular | ||
Line 3,478: | Line 3,478: | ||
In Millstone, the Commission established a four-factor test for waiver applications: | In Millstone, the Commission established a four-factor test for waiver applications: | ||
(i) | (i) the rules strict application would not serve the purposes for which it was adopted; (ii) the movant has alleged special circumstances that were not considered either explicitly or by necessary implication, in the rulemaking proceeding leading to the rule sought to be waived; (iii) those circumstances are unique to the facility rather than common to a large class of facilities; and (iv) a waiver of the regulation is necessary to reach a significant safety problem.[ 388] | ||
Intervenors must satisfy all four factors to obtain a waiver.389 The fourth Millstone factor may | Intervenors must satisfy all four factors to obtain a waiver.389 The fourth Millstone factor may | ||
Line 3,492: | Line 3,492: | ||
387 10 C.F.R. § 2.335(d). | 387 10 C.F.R. § 2.335(d). | ||
388 Millstone, CLI- | 388 Millstone, CLI- 05-24, 62 NRC at 559-60 (quotation marks omitted). | ||
389 Id. at 560. | 389 Id. at 560. | ||
390 Limerick, CLI- | 390 Limerick, CLI-13-07, 78 NRC at 209. | ||
391 Id. at 207 | 391 Id. at 207. | ||
therefore, petitioners must show something extraordinary about the subject matter of the | therefore, petitioners must show something extraordinary about the subject matter of the | ||
Line 3,506: | Line 3,506: | ||
Here, Petitioner seeks a waiver of the Commissions regulations in 10 C.F.R. | Here, Petitioner seeks a waiver of the Commissions regulations in 10 C.F.R. | ||
§§ | §§ 51.53(c)(3) and 51.71(d) and 10 C.F.R. Part 51, Appendix B with respect to the Staffs updated | ||
SAMA analysis in the 2024 | SAMA analysis in the 2024 FSEIS for allegedly failing to account for the effects of climate | ||
change on Turkey Point. Even though this proceeding relates to a Staff analysis of all | change on Turkey Point. Even though this proceeding relates to a Staff analysis of all | ||
Line 3,518: | Line 3,518: | ||
C.F.R. § 51.53(c)(3)(ii)(L) which requires a waiver to litigate.394 | C.F.R. § 51.53(c)(3)(ii)(L) which requires a waiver to litigate.394 | ||
Petitioner also argues | Petitioner also argues that a waiver petition is not required to litigate the issue of new | ||
and significant information regarding climate change risks because [n]o NRC regulation | and significant information regarding climate change risks because [n]o NRC regulation | ||
prohibits Petitioner from challenging the adequacy of the 2024 FS | prohibits Petitioner from challenging the adequacy of the 2024 FS EISs SAMA evaluation. 395 | ||
This is not true. The Commission has squarely | This is not true. The Commission has squarely addressed this issue. In Limerick, the | ||
Commission held that a waiver is required to litigate purportedly new and significant information | Commission held that a waiver is required to litigate purportedly new and significant information | ||
with respect to a previously conducted SAMA analysis, akin to | with respect to a previously conducted SAMA analysis, akin to a challenge on new and | ||
significant information with respect to a Category 1 issue.396 Therefore, Petitioner must obtain a | significant information with respect to a Category 1 issue.396 Therefore, Petitioner must obtain a | ||
waiver to litigate N | waiver to litigate N ew Contention 3-B here, which raises a SAMA-related contention.397 | ||
392 Id. (quotation marks omitted). | 392 Id. (quotation marks omitted). | ||
393 Exelon Generation Co., LLC (Limerick Generating Station, Units 1 and 2), CLI | 393 Exelon Generation Co., LLC (Limerick Generating Station, Units 1 and 2), CLI 19, 76 NRC 377, 386-87 (2012). | ||
394 Limerick, CLI-13-07, 78 NRC | 394 Limerick, CLI-13-07, 78 NRC at 210- 12. | ||
395 Petition for Waiver at 5- | 395 Petition for Waiver at 5-6. | ||
396 Limerick, CLI- | 396 Limerick, CLI-13-07, 78 NRC at 211. See also Entergy Nuclear Vt. Yankee, LLC and Entergy Nuclear Operations, Inc. (Vermont Yankee Nuclear Power Station), Entergy Nuclear Generation Co. and Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Sta tion), CLI-07-3, 65 NRC 13, 26 (2007). | ||
397 Limerick, CLI- | 397 Limerick, CLI-13-07, 78 NRC at 212 (Consequently, to litigate a SAMA-related contention in this, as well as other adjudicatory proceedings where the SAMA-analysis exception applies, a petitioner must obtain a waiver by satisfying the requirements in section 2.335(b).). | ||
In the | In the 2024 FSEIS, the Staff analyzed the significance of new information concerning the | ||
previously performed SAMA analysis and concluded that no new and significant SAMAs were | previously performed SAMA analysis and concluded that no new and significant SAMAs were | ||
Line 3,556: | Line 3,556: | ||
challenge the Staffs analysis of new and potentially significant information on this functionally | challenge the Staffs analysis of new and potentially significant information on this functionally | ||
equivalent Category 1 issue, | equivalent Category 1 issue, or to rely upon other new information concerning this issue, | ||
Petitioner must obtain a waiver of the Commissions rules concerning 10 C.F.R. | Petitioner must obtain a waiver of the Commissions rules concerning 10 C.F.R. | ||
Line 3,564: | Line 3,564: | ||
FSEIS, was already performed on a site-specific basis for Turkey Point and is not designated as | FSEIS, was already performed on a site-specific basis for Turkey Point and is not designated as | ||
a generic Category 1 issue in the 2013 LR GEIS, the SAMA updates | a generic Category 1 issue in the 2013 LR GEIS, the SAMA updates in the 2019 FSEIS or the | ||
2024 FSEIS were not affected | 2024 FSEIS were not affected by the Commissions rulings in CLI-22-2 and CLI-22-3. 400 | ||
Therefore, a waiver of the Commissions regulations is still required to challenge a SAMA when | Therefore, a waiver of the Commissions regulations is still required to challenge a SAMA when | ||
one has already previously been conducted, even in the proceedings affected by CLI | one has already previously been conducted, even in the proceedings affected by CLI 2 and | ||
CLI | CLI 3, such as this one. | ||
Here, Petitioner has | Here, Petitioner has failed to make a prima facie showing that the Commissions | ||
regulations in 10 C.F.R. § 51.53(c)(3)(ii)(L) should be waived with respect to the functionally | regulations in 10 C.F.R. § 51.53(c)(3)(ii)(L) should be waived with respect to the functionally | ||
equivalent Category 1 issue of an updated SAMA analysis. Petitioner fails | equivalent Category 1 issue of an updated SAMA analysis. Petitioner fails to satisfy criteria (iii) | ||
and (iv) of the Millstone factors that the circumstances are unique and that the waiver of 10 | and (iv) of the Millstone factors that the circumstances are unique and that the waiver of 10 | ||
Line 3,588: | Line 3,588: | ||
399 Indeed, the Board has previously concluded that Joint Petitioners may not circumvent the regulatory bar against challenging a Category 1 issue by alleging the existence of new and significant information. Turkey Point, LBP-19-3, 89 NRC at 294 n.74. | 399 Indeed, the Board has previously concluded that Joint Petitioners may not circumvent the regulatory bar against challenging a Category 1 issue by alleging the existence of new and significant information. Turkey Point, LBP-19-3, 89 NRC at 294 n.74. | ||
400 Oconee, CLI-22-3, 95 NRC at 42 | 400 Oconee, CLI-22-3, 95 NRC at 42 (As a general matter, in CLI-22-2 the Commission found that the 2013 [LR] GEIS did not consider the impacts from operations during the subsequent license renewal period and applicants for subsequent license renewal must evaluate Category 1 impacts in their environmental reports. Accordingly, these impacts must be addressed on a site-specific basis in the Staff s site-specific environmental impact statements.). | ||
Climate change is a global phenomenon, with impacts to global weather patterns. The | Climate change is a global phenomenon, with impacts to global weather patterns. The | ||
Line 3,598: | Line 3,598: | ||
argues that the GAO Report identified Turkey Point to be at the highest risk level for flooding | argues that the GAO Report identified Turkey Point to be at the highest risk level for flooding | ||
and high- | and high-intensity hurricanes - and identified the increasing risk of severe accidents due to | ||
climate change. 402 Petitioner overstates | climate change. 402 Petitioner overstates the significance of the GAO R eports findings to Turkey | ||
Point. The GAO Report is a generalized | Point. The GAO Report is a generalized analysis of climate change effects to all nuclear power | ||
plants. 403 Furthermore, the GAO Report only expressly mentions Turkey Point in three locations, | plants. 403 Furthermore, the GAO Report only expressly mentions Turkey Point in three locations, | ||
Line 3,608: | Line 3,608: | ||
as examples for the report to be used to highlight the generalizable effects of climate change.404 | as examples for the report to be used to highlight the generalizable effects of climate change.404 | ||
Therefore, the Petition for Waiver is based on circumstancesclimate change effects | Therefore, the Petition for Waiver is based on circumstancesclimate change effects which | ||
are applicable to all nuclear power plants to varying degrees and, accordingly, it | are applicable to all nuclear power plants to varying degrees and, accordingly, it fails to satisfy | ||
Millstone factor (iii). | Millstone factor (iii). | ||
Line 3,618: | Line 3,618: | ||
environmental problem as required to satisfy Millstone factor (iv). 405 As was explained in | environmental problem as required to satisfy Millstone factor (iv). 405 As was explained in | ||
response to | response to New Contention 3-B, external events are a low contributor to CDF, which is used as | ||
the baseline input into the SAMA analysis.406 Petitioner speculates | the baseline input into the SAMA analysis.406 Petitioner speculates that new climate data might | ||
change FPLs SAMA analysis, but does not | change FPLs SAMA analysis, but does not explain how this new climate data would result in a | ||
significant change to the external events analysis in the existing SAMA analysis, or that there | significant change to the external events analysis in the existing SAMA analysis, or that there | ||
Line 3,630: | Line 3,630: | ||
402 Petition for Waiver at 8. | 402 Petition for Waiver at 8. | ||
403 GAO Report at 43, 46 (To conduct our data analysis, we identified national-level data sets from relevant federal agencies for six of the seven natural hazards identified by the NCA, and our review of literature, as likely to be exacerbated by climate change in | 403 GAO Report at 43, 46 (To conduct our data analysis, we identified national-level data sets from relevant federal agencies for six of the seven natural hazards identified by the NCA, and our review of literature, as likely to be exacerbated by climate change in the United States. | ||
Using hazard and nuclear power plant location data, we analyzed natural hazard exposure in the areas around nuclear power plants.). | Using hazard and nuclear power plant location data, we analyzed natural hazard exposure in the areas around nuclear power plants.). | ||
Line 3,637: | Line 3,637: | ||
405 Limerick, CLI-13-07, 78 NRC at 209. | 405 Limerick, CLI-13-07, 78 NRC at 209. | ||
406 2002 FSEIS at 5- | 406 2002 FSEIS at 5-6. | ||
might conceivably be a new mitigation alternative that might be cost-beneficial. 407 Instead, | might conceivably be a new mitigation alternative that might be cost-beneficial. 407 Instead, | ||
Petitioner speculates | Petitioner speculates about the possibility for climate change to increase accident risk due to | ||
natural phenomena, and cites | natural phenomena, and cites to the GAO Report as its basis for this argument. 408 The GAO | ||
Report, though, expressly states multiple times that [t]his analysis does not account for any | Report, though, expressly states multiple times that [t]his analysis does not account for any | ||
Line 3,651: | Line 3,651: | ||
Therefore, the GAO Report does not identify any particular risk to nuclear safety at any nuclear | Therefore, the GAO Report does not identify any particular risk to nuclear safety at any nuclear | ||
power plant, and Petitioner has | power plant, and Petitioner has not provided any basis to establish that a new SAMA analysis, | ||
using the new climate inputs, would result in any change to the Staffs conclusion that there is | using the new climate inputs, would result in any change to the Staffs conclusion that there is | ||
no | no new and significant information to update the SAMA cost-benefit calculations. As a result, a | ||
waiver of the regulations is not necessary to reach a significant environmental problem as the | waiver of the regulations is not necessary to reach a significant environmental problem as the | ||
new climate data would only result in the fine-tuning of the | new climate data would only result in the fine-tuning of the St aff s original SAMA analysis, and | ||
Petitioner has | Petitioner has not presented any argument that this fine-tuning would result in any new SAMA | ||
mitigation alternatives becoming cost-beneficial to implement. | mitigation alternatives becoming cost-beneficial to implement. | ||
In conclusion, the Petition for W | In conclusion, the Petition for W aiver does not meet Millstone factors (iii) and (iv) that | ||
circumstances are unique and that a waiver of 10 C.F.R. § 51.53(c)(3)(ii)(L) is necessary to | circumstances are unique and that a waiver of 10 C.F.R. § 51.53(c)(3)(ii)(L) is necessary to | ||
Line 3,671: | Line 3,671: | ||
reach a significant safety or environmental problem. Accordingly, the Board should not further | reach a significant safety or environmental problem. Accordingly, the Board should not further | ||
consider Petitioner s challenge regarding the functionally Category 1 issue of the updated S | consider Petitioner s challenge regarding the functionally Category 1 issue of the updated S A M A | ||
analysis in New | analysis in New Contention 3-B. | ||
IV. | IV. The Pending 10 C.F.R. Part 51 Rulemaking Has No Unique Impact on this Adjudication | ||
On May 16, 2024, the Commission approved a final rule that would amend 10 C.F.R. Part | On May 16, 2024, the Commission approved a final rule that would amend 10 C.F.R. Part | ||
Line 3,681: | Line 3,681: | ||
51 regarding environmental reviews for license renewal applications to account for up to one | 51 regarding environmental reviews for license renewal applications to account for up to one | ||
407 Motion at 77- | 407 Motion at 77-78. | ||
408 Id. at 72- | 408 Id. at 72-76. | ||
409 GAO Report at 17, 20, 22, 24. | 409 GAO Report at 17, 20, 22, 24. | ||
Line 3,691: | Line 3,691: | ||
would be issued with the final rule. 411 The Staffs rulemaking information includes estimated | would be issued with the final rule. 411 The Staffs rulemaking information includes estimated | ||
publication of the final rule in August 2024.412 As explained above, Amended Contentions | publication of the final rule in August 2024.412 As explained above, Amended Contentions 1-A, 1- | ||
B, and 1-C, New Contention 2, and New Contentions | B, and 1-C, New Contention 2, and New Contentions 3-A and 3-B do not meet the good cause | ||
requirements of 10 C.F.R. § | requirements of 10 C.F.R. § 2.309(c) and/or all of the contention admissibility requirements of 10 | ||
C.F.R. § 2.309(f) and, therefore, should be dismissed. At that time, b | C.F.R. § 2.309(f) and, therefore, should be dismissed. At that time, b ecause there would be no | ||
admitted or pending contentions remaining before it, the Board should also terminate this | admitted or pending contentions remaining before it, the Board should also terminate this | ||
proceeding. | proceeding. 413 If this proceeding is terminated before the publication of the final rule and | ||
issuance of the revised LR GEIS, then that occurrence | issuance of the revised LR GEIS, then that occurrence would have no impact on this | ||
proceeding. Although it is unlikely that the final rule and revised LR GEIS could amount to new | proceeding. Although it is unlikely that the final rule and revised LR GEIS could amount to new | ||
or materially different information since that same information has been available | or materially different information since that same information has been available for a | ||
significant amount of time, the appropriate way for any petitioner to utilize the information in | significant amount of time, the appropriate way for any petitioner to utilize the information in | ||
such a | such a situation would be through a motion to reopen under 10 C.F.R. § 2.32 6 and a motion to | ||
file new or amended contentions after the deadline under 10 C.F.R. § 2.309(c) and not for this | file new or amended contentions after the deadline under 10 C.F.R. § 2.309(c) and not for this | ||
Line 3,721: | Line 3,721: | ||
final rule and issuance of the revised LR GEIS, that occurrence would have no impact on this | final rule and issuance of the revised LR GEIS, that occurrence would have no impact on this | ||
adjudication other than, as explained above, the | adjudication other than, as explained above, the unlikely possibility of new or materially different | ||
information. In CLI-22-3, the Commission provided the direction | information. In CLI-22-3, the Commission provided the direction for subsequent license | ||
410 Staff RequirementsSECY | 410 Staff RequirementsSECY 0017Final Rule: Renewing Nuclear Power Plant Operating LicensesEnvironmental Review (RIN 3150 -AK32; NRC-2018-0296) (May 16, 2024) | ||
(ML24137A213 (package)). | (ML24137A213 (package)). | ||
411 Id. at 1. | 411 Id. at 1. | ||
412 See https://www.nrc.gov/reactors/operating/licensing/renewal/sled.html; https://www.nrc.gov/reading- | 412 See https://www.nrc.gov/reactors/operating/licensing/renewal/sled.html; https://www.nrc.gov/reading-rm/doc-collections/rulemaking-ruleforum/active/ruledetails.html?id=96. | ||
413 See | 413 See North Anna, CLI 14, 75 NRC at 699-701. | ||
414 Id. | 414 Id. | ||
Line 3,738: | Line 3,738: | ||
renewal reviews that the applicants could follow either one of two processes going forward(1) | renewal reviews that the applicants could follow either one of two processes going forward(1) | ||
wait for the completion of the [revised LR GEIS] | wait for the completion of the [revised LR GEIS] and associated rulemaking or (2) submit a | ||
revised [site- | revised [site-specific] environmental report based on which the Staff would develop a revised | ||
site-specific environmental impact statement. 415 The Commission explained that Option 2 | site-specific environmental impact statement. 415 The Commission explained that Option 2 | ||
Line 3,746: | Line 3,746: | ||
would involve the Staff addressing the impacts designated as Category 1 or generic in the 2013 | would involve the Staff addressing the impacts designated as Category 1 or generic in the 2013 | ||
versions | versions of 10 C.F.R. Part 51 and the LR GEIS on a site -specific basis in the Staff's site -specific | ||
environmental impact statements instead of simply incorporating the determinations for those | environmental impact statements instead of simply incorporating the determinations for those | ||
Line 3,758: | Line 3,758: | ||
reviews of subsequent license renewal applications could proceed. The Commission did not | reviews of subsequent license renewal applications could proceed. The Commission did not | ||
provide direction to combine | provide direction to combine this new, optional process and the typical Option 1 process of | ||
waiting for the completion of a rulemaking | waiting for the completion of a rulemaking and then following new applicable regulations. 417 The | ||
Commission also directed the Staff to provide members of the public with an opportunity to seek | Commission also directed the Staff to provide members of the public with an opportunity to seek | ||
a hearing on the Staffs updated, site- | a hearing on the Staffs updated, site-specific environmental impact determinations. 418 | ||
Based on the above, if the final rule were to be made effective during the pendency of | Based on the above, if the final rule were to be made effective during the pendency of | ||
Line 3,770: | Line 3,770: | ||
this proceeding, then that would not somehow stop this proceeding from moving forward | this proceeding, then that would not somehow stop this proceeding from moving forward | ||
consistent with | consistent with the new Option 2 process of conducting a site-specific review of the 2013 | ||
generic impacts in lieu of waiting for updated regulations | generic impacts in lieu of waiting for updated regulations. For example, neither the applicant nor | ||
the Staff would be required to replace their site-specific evaluations with the new generic impact | the Staff would be required to replace their site-specific evaluations with the new generic impact | ||
determinations in the revised | determinations in the revised 10 C.F.R. Part 51 and LR GEIS. Such an outcome would | ||
essentially invalidate Option 2 and mandate Option 1, contrary to the Commissions direction. | essentially invalidate Option 2 and mandate Option 1, contrary to the Commissions direction. | ||
415 Oconee, CLI-22-3, 95 NRC | 415 Oconee, CLI-22-3, 95 NRC at 41. | ||
416 Id. | 416 Id. | ||
Line 3,786: | Line 3,786: | ||
417 Id. | 417 Id. | ||
418 Id. at 41 - | 418 Id. at 41 - 42. | ||
This would also deprive the members of the public of the meaningful opportunity for hearing | This would also deprive the members of the public of the meaningful opportunity for hearing | ||
Line 3,792: | Line 3,792: | ||
envisioned in CLI-22-3. Additionally, such an outcome would defeat the purpose of Option 2 of | envisioned in CLI-22-3. Additionally, such an outcome would defeat the purpose of Option 2 of | ||
allowing subsequent license renewal environmental reviews to proceed in a | allowing subsequent license renewal environmental reviews to proceed in a timely manner | ||
without having to wait for and be delayed | without having to wait for and be delayed by the rulemaking process. That being said, the | ||
rulemaking to amend 10 C.F.R. Part 51 and the | rulemaking to amend 10 C.F.R. Part 51 and the LR GEIS, both before and after any issuance of | ||
a final rule, is still information that could potentially be used in support of an argument before | a final rule, is still information that could potentially be used in support of an argument before | ||
Line 3,802: | Line 3,802: | ||
this Board or could potentially be addressed by the Staff as part of a new-and-significant- | this Board or could potentially be addressed by the Staff as part of a new-and-significant- | ||
information analysis. The latter contingency | information analysis. The latter contingency is exactly why the Staff included in the 2023 DSEIS | ||
and 2024 FSEIS a discussion of the rulemakings applicability to the Turkey Point subsequent | and 2024 FSEIS a discussion of the rulemakings applicability to the Turkey Point subsequent | ||
license renewal application. | license renewal application. 419 Specifically, those documents state: To account for the | ||
possibility that the proposed rule and the 2023 LR GEIS may be finalized before a final | possibility that the proposed rule and the 2023 LR GEIS may be finalized before a final | ||
Line 3,812: | Line 3,812: | ||
determination is reached on FPLs [subsequent license renewal] application, the NRC staff | determination is reached on FPLs [subsequent license renewal] application, the NRC staff | ||
analyzes in this appendix, on a site- | analyzes in this appendix, on a site-specific basis, the new and revised environmental issues | ||
described in the 2023 LR GEIS because they may apply to [subsequent license renewal] for | described in the 2023 LR GEIS because they may apply to [subsequent license renewal] for | ||
Turkey Point. 420 This approach | Turkey Point. 420 This approach has been available for Petitioner to dispute along with all of the | ||
other information in the 2023 DSEIS and 2024 FSEIS; Petitioner has not timely raised any such | other information in the 2023 DSEIS and 2024 FSEIS; Petitioner has not timely raised any such | ||
dispute | dispute with this information and the Board cannot raise such a dispute for Petitioner. 421 | ||
Taken together, the Staff position is that if the final rule and revised LR GEIS were to be | Taken together, the Staff position is that if the final rule and revised LR GEIS were to be | ||
made effective during the pendency of this proceeding, then that would not require re- | made effective during the pendency of this proceeding, then that would not require re-analyzing | ||
the existing contentions; that is, the case or controversy before the Board would remain the | the existing contentions; that is, the case or controversy before the Board would remain the | ||
completeness and adequacy of the Staffs site- | completeness and adequacy of the Staffs site-specific evaluation of the 2013 generic impact | ||
419 See 2023 DSEIS at App. E; 2024 FSEIS at App. E. | 419 See 2023 DSEIS at App. E; 2024 FSEIS at App. E. | ||
Line 3,834: | Line 3,834: | ||
420 2023 DSEIS at E-3; 2024 FSEIS at E -3. | 420 2023 DSEIS at E-3; 2024 FSEIS at E -3. | ||
421 See, e.g., DTE Elec. Co. | 421 See, e.g., DTE Elec. Co. (Fermi Nuclear Power Plant, Unit 2), CLI-15-18, 82 NRC 135, 141 (2015) ( Although boards have some discretion to reformulate or narrow contentions to eliminate extraneous issues or to consolidate issues for a more efficient proceeding, this authority is not without limit. A licensing board, for example, may not supply information that is lacking in a contention that otherwise would be inadmissible.) (quotation marks omitted). | ||
determinations. Petitioner, FPL, and the Staff remain free to argue that information related to the | determinations. Petitioner, FPL, and the Staff remain free to argue that information related to the | ||
rulemaking | rulemaking supports or contradicts these questions of completeness and adequacy in the Staffs | ||
environmental impact statement. In fact, the Staff | environmental impact statement. In fact, the Staff accounted for the rulemaking by specifically | ||
discussing it in the 2023 DSEIS and 2024 FSEIS | discussing it in the 2023 DSEIS and 2024 FSEIS and Petitioner did not challenge these | ||
discussions. | discussions. The proper way to bring arguments on this matter before the Board is not through | ||
any Board action in response to the effectiveness of the final rule, but through the existing | any Board action in response to the effectiveness of the final rule, but through the existing | ||
Line 3,856: | Line 3,856: | ||
CONCLUSION | CONCLUSION | ||
In support of the dual mandates of NEPA to foster informed decision- | In support of the dual mandates of NEPA to foster informed decision-making and | ||
informed public participation,422 the Staff has completed two reviews of the environmental | informed public participation,422 the Staff has completed two reviews of the environmental | ||
Line 3,868: | Line 3,868: | ||
environmental impact statements total almost 900 pages. Petitioner s efforts to require more of | environmental impact statements total almost 900 pages. Petitioner s efforts to require more of | ||
the Staff are not availing because they do not, as required, | the Staff are not availing because they do not, as required, meet both the heightened pleading | ||
standards of 10 C.F.R. § 2.309(c) and the strict-by-design contention admissibility requirements | standards of 10 C.F.R. § 2.309(c) and the strict-by-design contention admissibility requirements | ||
of 10 C.F.R. § 2.309(f)(1). 423 As a threshold matter, | of 10 C.F.R. § 2.309(f)(1). 423 As a threshold matter, the Board should dismiss A mended | ||
Contentions 1-A, 1-B, and 1-C and New Contentions 3- | Contentions 1-A, 1-B, and 1-C and New Contentions 3-A and 3-B for not meeting 10 C.F.R. | ||
§ 2.309(c) because the information that these contentions | § 2.309(c) because the information that these contentions challenge in the 2024 FSEIS, as well | ||
as the information that they provide in support of | as the information that they provide in support of these challenges, including in the GAO Report, | ||
is not new and materially different from information previously available. | is not new and materially different from information previously available. Petitioner could have | ||
422 See McGuire, CLI | 422 See McGuire, CLI 17, 56 NRC at 10 (quoting Claiborne, CLI-98-3, 47 NRC at 88). | ||
423 See, e.g., Crow Butte, CLI- | 423 See, e.g., Crow Butte, CLI-20-8, 92 NRC at 259-60; Turkey Point, LBP-19-8, 90 NRC at 149, 159-60. | ||
timely filed, and largely did | timely filed, and largely did timely file, essentially these same challenges previously. Additionally, | ||
Amended Contentions | Amended Contentions 1-A, 1-B, and 1-C, New Contention 2, and New Contentions 3-A and 3-B | ||
do not meet the contention admissibility requirements of 10 C.F.R. § 2.309(f). Instead, these | do not meet the contention admissibility requirements of 10 C.F.R. § 2.309(f). Instead, these | ||
Line 3,896: | Line 3,896: | ||
dispute the Staffs comprehensive environmental review, and rely on bare assertions rather than | dispute the Staffs comprehensive environmental review, and rely on bare assertions rather than | ||
specific factual support. Moreover, New Contention 3- | specific factual support. Moreover, New Contention 3-B challenges both the plants current | ||
licensing basis as well as the Staffs S | licensing basis as well as the Staffs S A M A update, both of which issues are not within the | ||
scope of this license renewal proceeding | scope of this license renewal proceeding and thus are not subject to challenge without a waiver | ||
of the NRCs regulations. Petitioner s Petition for Waiver, though, does not cure this defect of | of the NRCs regulations. Petitioner s Petition for Waiver, though, does not cure this defect of | ||
Line 3,906: | Line 3,906: | ||
New Contention 3-B because the Petition for Wavier does not meet the applicable requirements | New Contention 3-B because the Petition for Wavier does not meet the applicable requirements | ||
of 10 C.F.R. § 2.335. Specifically, the Petition for Waiver does not | of 10 C.F.R. § 2.335. Specifically, the Petition for Waiver does not meet all four factors of the | ||
Millstone test because it does not show that | Millstone test because it does not show that the circumstances at issue are unique and that | ||
the waiver is necessary to reach a significant safety or environmental problem | the waiver is necessary to reach a significant safety or environmental problem. | ||
For these reasons, Amended Contentions 1-A, 1-B, and 1-C, New Contention 2, and New | For these reasons, Amended Contentions 1-A, 1-B, and 1-C, New Contention 2, and New | ||
Contentions 3-A and 3- | Contentions 3-A and 3-B should be dismissed and the Petition for Waiver should be denied. | ||
Because | Because there would be no admitted or pending contentions remaining before it, the Board | ||
should also terminate this proceeding. 424 | should also terminate this proceeding. 424 | ||
Line 3,922: | Line 3,922: | ||
Respectfully submitted, | Respectfully submitted, | ||
/Signed (electronically) by/ | |||
Jeremy L. Wachutka Counsel for NRC Staff Mail Stop: O-14-A44 U.S. Nuclear Regulatory Commission Washington, DC 20555- | Jeremy L. Wachutka Counsel for NRC Staff Mail Stop: O-14-A44 U.S. Nuclear Regulatory Commission Washington, DC 20555- 0001 Telephone: (301) 287-9188 Email: Jeremy.Wachutka@nrc.gov | ||
Executed in Accord with 10 CFR 2.304(d) | Executed in Accord with 10 CFR 2.304(d) | ||
424 See North Anna, CLI-12-14, 75 NRC at 699- | 424 See North Anna, CLI-12-14, 75 NRC at 699-701; Turkey Point, LBP-19-8, 90 NRC at 178. | ||
Kevin D. Bernstein Counsel for NRC Staff Mail Stop: O-14-A44 U.S. Nuclear Regulatory Commission Washington, DC 20555- | Kevin D. Bernstein Counsel for NRC Staff Mail Stop: O-14-A44 U.S. Nuclear Regulatory Commission Washington, DC 20555- 0001 Telephone: (301) 415-1001 Dated June 3, 2024 E mail: Kevin.Bernstein@nrc.gov UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION | ||
BEFORE THE ATOMIC SAFETY AND LICENSING BOARD | BEFORE THE ATOMIC SAFETY AND LICENSING BOARD | ||
Line 3,935: | Line 3,935: | ||
In the Matter of | In the Matter of | ||
FLORIDA POWER & LIGHT COMPANY | FLORIDA POWER & LIGHT COMPANY Docket Nos. 50- 250- SLR-2 50- 251-SLR-2 | ||
(Turkey Point Nuclear Generating Units 3 and 4) | (Turkey Point Nuclear Generating Units 3 and 4) | ||
Line 3,941: | Line 3,941: | ||
Certificate of Service | Certificate of Service | ||
Pursuant to 10 C.F.R . § 2.305, I hereby certify that copies of the foregoing | Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing NRC STAFF | ||
ANSWER OPPOSING MIAMI WATERKEEPER MOTION TO ADMIT AMENDED AND NEW | ANSWER OPPOSING MIAMI WATERKEEPER MOTION TO ADMIT AMENDED AND NEW | ||
CONTENTIONS AND PETITION FOR WAIVER | CONTENTIONS AND PETITION FOR WAIVER, dated June 3, 202 4, have been served upon | ||
the Electronic Information Exchange (the NRCs E-Filing System), in the captioned proceeding, | the Electronic Information Exchange (the NRCs E-Filing System), in the captioned proceeding, | ||
this 3rd day of June | this 3rd day of June 2024. | ||
/Signed (electronically) by/ | |||
Jeremy L. Wachutka Counsel for NRC Staff Mail Stop: O-14-A44 U.S. Nuclear Regulatory Commission Washington, DC 20555- | Jeremy L. Wachutka Counsel for NRC Staff Mail Stop: O-14-A44 U.S. Nuclear Regulatory Commission Washington, DC 20555- 0001 Telephone: (301) 287-9188 Email: Jeremy.Wachutka@nrc.gov Dated June 3, 2024}} |
Revision as of 13:36, 4 October 2024
ML24155A110 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 06/03/2024 |
From: | Jeremy Wachutka NRC/OGC |
To: | Atomic Safety and Licensing Board Panel |
SECY RAS | |
References | |
ASLBP 24-981-01-SLR-BD01, RAS 57038, 50-250-SLR-2, 50-251-SLR-2 | |
Download: ML24155A110 (0) | |
Text
June 3, 2024
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION
BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
In the Matter of
FLORIDA POWER & LIGHT COMPANY Docket Nos. 50-250- SLR-2 50- 251-SLR-2
(Turkey Point Nuclear Generating Units 3 and 4)
NRC STAFF ANSWER OPPOSING MIAMI WATERKEEPER MOTION TO ADMIT AMENDED AND NEW CONTENTIONS AND PETITION FOR WAIVER
INTRODUCTION
Pursuant to 10 C.F.R. § 2.309(i), the Initial Scheduling Order dated March 26, 2024, and
the Memorandum and Order (Granting Motion for Extension of Time) dated April 26, 2024, the
U.S. Nuclear Regulatory Commission Staff files this answer opposing the amended and new
contentions and Petition for Waiver filed by Biscayne Bay Waterkeeper, Inc. d/b/a Miami
Waterkeeper (Petitioner). Petitioner filed three amended (Amended Contentions 1-A, 1-B, and 1-
C) and three new (New Contention 2 and New Contentions 3-A and 3-B) contentions
challenging the Staffs environmental review of the proposed action of licensing Florida Power &
Light Company (FPL) to operate Turkey Point Nuclear Generating Units 3 and 4 for an
additional 20 years, i.e., until July 19, 2052 for Unit 3 and until April 10, 2053 for Unit 4.
Petitioner s three amended contentions are inadmissible because they are not based on new
information, reiterate previous arguments that were previously rejected, do not raise genuine
disputes with the Staffs environmental review, and are not factual supported. Petitioner s three
new contentions are inadmissible because New Contention 2 does not raise a genuine dispute
with the Staffs environmental review, is not factually supported, and is not material and because
New Contentions 3-A and 3-B are not based on new information, reiterate previous arguments
that were previously rejected, and do not raise genuine disputes with the Staffs environmental
review. Further, New Contention 3-B is not within the limited scope of this license renewal
proceeding. Although Petitioner requests a waiver of the NRCs regulations to support the
admissibility of New Contention 3-B, Petitioner does not meet the requirements of showing that
the circumstances at issue are unique and that the waiver is necessary to reach a significant
safety or environmental problem. Because none of Petitioner s amended or new contentions
meet both the good cause requirements in 10 C.F.R. § 2.309(c)(i) and (ii) o f being based on new
and materially different information and the contention admissibility requirements in 10 C.F.R.
§ 2.309(f), and because the Petition for Waiver does not meet the requirements in 10 C.F.R.
§ 2.335, the amended and new contentions should be dismissed and the Petition for Waiver
should be denied. Additionally, because there would be no admitted or pending contentions
remaining before it, the Board should also terminate this proceeding.
BACKGROUND
In October 2015, Miami-Dade County, through its Department of Regulatory and
Economic Resources, Division of Environmental Resources Management (DERM), entered into
a consent agreement with FPL (2015 DERM Consent Agreement) that included the
requirements to construct a recovery well system to retract hypersaline groundwater in the
Biscayne Aquifer and to freshen the water in the Turkey Point cooling canal system (CCS). 1 In
June 2016, the State of Florida Department of Environmental Protection (FDEP) entered into a
Consent Order with FPL (2016 FDEP Consent Order) that included the requirement to cease
1 Consent Agreement between Miami-Dade County, through its Department of Regulatory and Economic Resources, Division of Environmental Resources Management, and Florida Power &
Light Company (Oct. 7, 2015) (ADAMS Accession No. ML15286A366) (2015 DERM Consent Agreement).
discharges from the CCS that impair the reasonable and beneficial uses of adjacent
groundwater in the Biscayne Aquifer by freshening the CCS. 2
By letter dated January 30, 2018, as supplemented, FPL submitted to the NRC a
subsequent license renewal application (SLRA) seeking permission to operate Turkey Point
Units 3 and 4 for an additional 20 years, i.e., from July 19, 2032, and April 10, 2033, to July 19,
2052, and April 10, 2053, respectively. 3 On August 1, 2018, Petitioner, along with Friends of the
Earth and Natural Resources Defense Council (collectively, Joint Petitioners), filed a timely
hearing request challenging the SLRA. 4 The Staff and FPL filed answers in opposition, 5 to which
Joint Petitioners replied. 6
In LBP-19-3, the Board, among other things, granted Joint Petitioners hearing request
and admitted, as revised, two contentions. 7 The first admitted contention, Contention 1-E,
argued that the ER was deficient for failing to consider mechanical draft cooling towers as a
2 Consent Order between State of Florida Department of Environmental Protection and Florida Power & Light Company (Jun. 20, 2016) (ML16216A216) (2016 FDEP Consent Order).
3 See Letter from Mano K. Nazar, FPL, to NRC Document Control Desk (Jan. 30, 2018)
(ML18037A812 (package)) (SLRA); Letter from William D. Maher, FPL, to NRC Document Control Desk (Feb. 9, 2018) (ML18044A653) (SLRA Supplement 1); Letter from William D.
Maher, FPL, to NRC Document Control Desk (Feb. 16, 2018) (ML18053A123 (package)) ( S L R A Supplement 2); Letter from William D. Maher, FPL, to NRC Document Control Desk (Mar. 1, 2018) (ML18072A224 (package)) (SLRA Supplement 3); and Letter from William D. Maher, FPL, to NRC Document Control Desk (Apr. 10, 2018) (ML18113A132 (package)) (SLRA Revision 1).
4 Request for Hearing and Petition to Intervene Submitted by Friends of the Earth, Natural Resources Defense Council, and Miami Waterkeeper (Aug. 1, 2018) (ML18213A418) (Joint Petition).
5 NRC Staff s Corrected Response to Petitions to Intervene and Requests for Hearing filed by (1) Friends of the Earth, Natural Resources Defense Council and Miami Waterkeeper, and (2)
Southern Alliance for Clean Energy (Aug. 27, 2018) (ML18239A458); Applicants Answer Opposing Request for Hearing and Petition to Intervene Submitted by Friends of the Earth, Natural Resources Defense Council, and Miami Waterkeeper (Aug. 27, 2018) (ML18239A445).
6 Reply in Support of Request for Hearing and Petition to Intervene Submitted by Friends of the Earth, Natural Resources Defense Council, and Miami Waterkeeper (Sep. 10, 2018)
(ML18253A280).
7 Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), LBP-19-3, 89 NRC 245, 301-2 (2019).
reasonable alternative, given the adverse impact of the continued operations of the Turkey Point
CCS on the threatened American crocodile and its critical seagrass habitat.8 The second
admitted contention, Contention 5 -E, argued that the ER wa s deficient in its failure to recognize
Turkey Point as a source of ammonia in freshwater wetlands surrounding the site, and in its
failure to analyze the potential impacts of ammonia releases during the renewal period on
threatened and endangered species and their critical habitat. 9
In March 2019, consistent with 10 C.F.R. § 51.95(c), the Staff issued, as a supplement to
the NRCs 2013 license renewal generic environmental impact statement, NUREG-1437 (LR
GEIS), 10 its draft environmental impact statement regarding the Turkey Point SLRA (2019
DSEIS). 11 Among other things, the 2019 DSEIS considered the use of mechanical draft cooling
towers as an alternative to the CCS12 and analyzed ammonia releases within and around the
Turkey Point site. 13 Therefore, in LBP-19-6, the Board determined that the omissions that were
the bases for Contentions 1-E and 5-E had been cured and thus that the admitted contentions
were rendered moot. 14 The Board did not terminate the proceeding, though, because the Board
was still considering two amended and four new contentions regarding the 2019 DSEIS and a
8 Id. at 287.
9 Id. at 293-94.
10 Generic Environmental Impact Statement for License Renewal of Nuclear Plants, NUREG-1437, R e v. 1, Vols. 1-3 (Jun. 2013) (ML13107A023 (package)) (LR GEIS).
11 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Draft Report for Comment, NUREG-1437, Supplement 5, Second Renewal (Mar. 2019)
(ML19078A330) (2019 DSEIS).
12 Id. at 2 2-13, 2 2-23, 4-11, 4 4-19, 4-21, 4 4-42, 4-48-4-49, 4 4-60, 4-76, 4-82-4-84, 4-88, 4 4-95, 4-97.
13 Id. at 3 3-44.
14 Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), LBP-19-6, 90 NRC 17, 26 (2019).
petition for waiver filed by Joint Petitioners. 15 The Staff and FPL filed answers opposing these
filings, 16 to which Joint Petitioners replied. 17 In LBP-19-8, the Board dismissed Joint Petitioners
new and amended contentions and petition for waiver and, as there were no pending
contentions remaining before it, the Board terminated the proceeding.18 Joint Petitioners
appealed LBP-19-3, LBP-19-6, and LBP-19-8. 19
In October 2019, the Staff issued the 2019 Final SEIS (2019 FSEIS). 20 Thereafter, since
the Staff had previously completed its safety review of the SLRA, 21 it approved the SLRA and
issued subsequent renewed licenses for Turkey Point Units 3 and 4. 22
15 Id. at 26; Natural Resources Defense Councils, Friends of the Earth s, and Miami Waterkeepers Amended Motion to Migrate Contentions & Admit New Contentions in Response to NRC Staffs Supplemental Draft Environmental Impact Statement (Jun. 28, 2019)
(ML19179A316) (Motion to Admit New and Amended Contentions).
16 NRC Staff s Answer to Joint Intervenors (1) Amended Motion to Migrate or Amend Contentions 1-E and 5-E and to Admit Four New Contentions, and (2) Petition for Waiver (Jul.
19, 2019) (ML19200A300); Florida Power & Light Companys Answer Opposing Intervenors Motion to Migrate or Amend Contentions 1-E and 5-E and to Admit New Contentions 6-E, 7-E, 8-E, and 9-E (Jul. 19, 2019) ( ML19200A297).
17 Reply in Support of Motion to Migrate Contentions & Admit New Contentions in Response to NRC Staff s Supplemental Draft Environmental Impact Statement (Jul. 26, 2019)
(ML19207C092).
18 Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), LBP-19-8, 90 NRC 139, 178 (2019).
19 Friends of the Earths, Natural Resources Defense Councils, and Miami Waterkeeper s Petition for Review of the Atomic Safety and Licensing Boards Rulings in LBP 3 and LBP 6 (Aug. 9, 2019) (ML19221B677); Friends of the Earths, Natural Resources Defense Councils, and Miami Waterkeeper s Petition for Review of the Atomic Safety and Licensing Boards Ruling in LBP-19-8 (Nov. 18, 2019) (ML19322D623).
20 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Final Report), NUREG-1437, Supplement 5, Second Renewal (Oct. 2019) (ML19290H346) (2019 FSEIS).
21 Safety Evaluation Report Related to the Subsequent License Renewal of Turkey Point Generating Units 3 and 4, Docket Nos. 50-250 and 50- 251, Florida Power & Light Company (Jul. 2019) (ML19191A057).
22 Letter from David Drucker, NRC, to Mano Nazar, FPL, Issuance of Subsequent Renewed Facility Operating License Nos. DPR-31 and DPR-41 for Turkey Point Nuclear Generating Unit Nos. 3 a nd 4 (EPID L -2018-RNW-0002) (Dec. 4, 2019) (ML19305C879).
In 2022, the Commission took up the pending appeals of LBP 3, LBP-19-6, and LBP-
19-8 and, in CLI-22-2, found that the Staffs environmental review of the Turkey Point SLRA was
incomplete. 23 In CLI-22-3, the Commission explained that the Staffs environmental review could
be completed through either (1) updating the LR GEIS so that it addresses subsequent license
renewal and then reviewing the SLRA using this updated LR GEIS or (2) addressing
environmental impacts on a site-specific basis in a site-specific environmental impact
statement. 24 The Commission explained that Option 2 would involve the Staff addressing the
impacts designated as Category 1 or generic in the 2013 version of the LR GEIS on a site-
specific basis in the Staff s site-specific environmental impact statements instead of simply
incorporating the determinations for those impacts from the LR GEIS into the environmental
impact statements by reference. 25 The Commission dismissed the environmental contentions
and motions pending in the affected subsequent license renewal proceedings, including in the
Turkey Point SLRA proceeding. 26 The Commission stated that there would be a hearing
opportunity on any site-specific environmental impact statements developed by the Staff, but
that it would be limited to contentions based on new information in the site-specific
environmental impact statement. 27
In response to CLI-22-2 and CLI-22-3, F P L submitted Environmental Report (ER)
Supplement 2, which provided a site-specific analysis of the impacts designated as Category 1
or generic in the 2013 version of the LR GEIS with respect to the continued operation of Turkey
23 Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), CLI-22-2, 95 NRC 26, 27 (2022).
24 Duke Energy Carolinas, LLC (Oconee Nuclear Station, Units 1, 2, and 3), CLI 3, 95 NRC 40, 41-42 (2022).
25 Id. at 41
26 Id. at 42.
27 Id.
Point during the subsequent license renewal term. 28 That analysis supplemented the ER and
ER Supplement 1 that were included as part of the Turkey Point SLRA 29 and addressed, on a
site-specific basis, each generic environmental issue.
In 2023, following its receipt of ER Supplement 2, the Staff issued the 2023 Draft SEIS
(2023 DSEIS), which evaluated, on a site -specific basis, the impacts designated as Category 1
or generic in the 2013 version of the LR GEIS with respect to the continued operation of Turkey
Point during the subsequent license renewal term. 30 The 2023 DSEIS considered information
contained in ER Supplement 2; the Staffs consultation with Federal, State, Tribal, and local
government agencies; and other information, as appropriate. 31 The 2023 DSEIS also
considered whether there was significant new information that would change the St aff s
conclusions regarding the impacts designated as Category 2 or site-specific in the 2013
version of the LR GEIS and evaluated on a site-specific basis in the 2019 FSEIS, 32 and also
considered the then-ongoing rulemaking to update the 2013 license renewal rule and LR
GEIS. 33 Thus, the 2023 DSEIS supplemented and updated the 2019 FSEIS so that together, the
2023 DSEIS and the 2019 FSEIS evaluated, on a site -specific basis and without relying on the
28 Letter from William D. Maher, FPL, to NRC Document Control Desk (Jun. 9, 2022)
(ML22160A301) (ER Supplement 2).
29 Florida Power & Light Company, Appendix E, Applicants Environmental Report, Subsequent Operating License Renewal Stage, Turkey Point Nuclear Plant Units 3 and 4 (Jan. 2018)
(ML18113A145) (ER); Letter from William D. Maher, FPL, to NRC Document Control Desk (Apr.
10, 2018) (ML18102A521) (ER Supplement 1).
30 Site -Specific Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Draft Report for Comment, NUREG-1437, Supplement 5a, Second Renewal (Aug. 2023)
(ML23242A216) (2023 DSEIS).
31 Id. at 1-4
32 Id.
33 Id. at App. E.
2013 version of the LR GEIS, all of the environmental impacts of continued operation during the
subsequent license renewal term for Turkey Point. 34
On September 8, 2023, the Staff noticed the availability of the 2023 DSEIS and provided
members of the public an opportunity to request a hearing on it. 35 This opportunity to request a
hearing was specifically limited to contentions based on new information in the [2023
DSEIS]. 36 This limitation mirrors the language in CLI 3, in which the Commission directed
the Staff to provide a new notice of opportunity for hearing after each site-specific review is
complete limited to contentions based on new information in the site-specific environmental
impact statement. 37 The Commission confirmed that the timing of the Staffs notice of
opportunity to request a hearing was appropriate. 38
In response to the notice of opportunity to request a hearing, Petitioner timely filed a
hearing request, in which Petitioner argued that a hearing should be granted regarding the 2023
DSEIS because Petitioner has standing and has proposed five contentions. 39 The Staff and FPL
filed answers in opposition,40 to which Petitioner replied. 41
34 Id. at 1 1-5.
35 Florida Power & Light Company; Turkey Point Nuclear Generating Unit Nos. 3 and 4; Draft environmental impact statement; request for comment; public comment meetings; opportunity to request a hearing and to petition for leave to intervene, 88 Fed. Reg. 62,110, 62,110- 11 (Sep. 8, 2023).
36 Id.
37 Oconee, CLI-22-3, 95 NRC at 42.
38 CLI-24-01, 99 NRC __ ( Mar. 7, 2024) (slip op.).
39 Request for Hearing and Petition to Intervene Submitted by Miami Waterkeeper (Nov. 27, 2023) (ML23331A971) (Hearing Request).
Petitioner filed, among others, the following with Hearing Request: Exhibit 3, Declaration of Dr.
William K. Nuttle regarding the draft EIS for the Turkey Point Nuclear Generating Unit Nos. 3 and 4 (NUREG-1437 Supplement 5a Second Renewal) (ML23331A983) (2023 Nuttle Report).
40 NRC Staff Answer Opposing Miami Waterkeeper Hearing Request (Dec. 22, 2023)
(ML23356A162); Florida Power & Light Companys Answer Opposing Miami Waterkeeper s Hearing Request and Petition for Leave to Intervene (Dec. 22, 2023) (ML23356A156).
41 Reply in Support of Request for Hearing and Petition to Intervene Submitted by Miami Waterkeeper (Jan. 8, 2024) (ML24008A293).
In LBP-24-3, the Board determined that Petitioner had standing to intervene and
admitted a portion of Contention 1 as a contention of omission. As narrowed and reformulated
by the Board, Contention 1 argued that the Staffs analysis in the 2023 DSEIS lacks an
explanation as to how the uncertainty about the success of FP L s efforts to retract the
hypersaline groundwater plume resulting from the operation of the CCS to within the Tur k e y
Point site boundary prior to the subsequent license renewal term leads to a finding of moderate
environmental impacts. 42 Therefore, the Board granted the hearing request and dismissed
Contentions 2 through 5 and the remaining portions of Contention 1.43
On March 29, 2024, the Staff issued the 2024 Final SEIS (2024 FSEIS), which made
changes to the 2023 DSEIS, as necessary, based on the information gathered during the public
comment period and any other new information received.44 Consistent with the Boards Initial
Scheduling Order dated March 26, 2024, 45 Petitioner, the Staff, and FPL jointly filed a motion
agreeing that Reformulated Contention 1 should be dismissed as moot because the Staff
included the explanation alleged by that contention to be missing from the 2023 DSEIS in the
2024 FSEIS. 46 Prior to the Board ruling on that joint motion, on May 8, 2024, Petitioner timely
filed 47 a motion to admit amended and new contentions based on the 2024 FSEIS and
42 Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), LBP-24-3, 99 NRC __, __ (Mar. 7, 2024) (slip op. at 11, 21-22).
43 Id. at __ (slip op. at 34).
44 Site -Specific Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Final Report, NUREG-1437, Supplement 5a, Second Renewal, at 1-3 (Mar. 2024)
(ML24087A061) (2024 FSEIS).
45 Initial Scheduling Order (Mar. 26, 2024) (ML24086A446).
46 Joint Unopposed Motion to Dismiss Reformulated Contention 1 as Moot and Position of the NRC Staff and Miami Waterkeeper Regarding Opportunity to File New or Amended Contentions, at 5 (Apr. 4, 2024) (ML24095A314).
47 See Initial Scheduling Order (Mar. 26, 2024) (ML24086A446); Memorandum and Order (Granting Motion for Extension of Time) (Apr. 26, 2024) (ML24117A266).
Government Accountability Office Report 24 -106326 (GAO Report) 48 and a petition for waiver.49
Specifically, Petitioner requested, based on the 2024 FSEIS, the admission of Amended
Contentions 1 -A, 1-B, and 1-C and New Contention 2 and, based on the GAO Report, the
admission of New Contentions 3-A and 3-B. 50 In addition, Petitioner included the Petition for
Wa i v er associated with New Contention 3-B to challenge the Staff s severe accident mitigation
alternatives (SAMA) update. 51 Thereafter, on May 9, 2024, the Board granted the parties joint
motion and dismissed Reformulated Contention 1, such that no admitted contentions remain
before the Board. 52
DISCUSSION
In support of the dual mandates of the National Environmental Policy Act of 1969, as
amended (NEPA), to foster informed decision-making and informed public participation,53 the
Staff has completed two reviews of the environmental impacts of the proposed action, with each
review consisting of a draft environmental impact statement that was issued for comment and a
final environmental impact statement addressing comments received, and the two final
environmental impact statements total almost 900 pages. The deadline for filing contentions
48 Government Accountability Office, GAO-24-106326, Nuclear Power Plants: NRC Should Take Actions to Fully Consider the Potential Effects of Climate Change (Apr. 2, 2024), available at https://www.gao.gov/products/gao 106326 (GAO Report).
49 Miami Waterkeeper s Motion to Admit Amended and New Contentions in Response to NRC Staff s Final Site-Specific Environmental Impact Statement (May 8, 2024) (ML24129A220)
(Motion); Miami Waterkeeper s Petition for Waiver of 10 C.F.R. §§ 51.53(c)(3) and 51.71(d) and 10 C.F.R. Part 51, Subpart A, Appendix B (May 8, 2024) (ML24129A221) (Petition for Waiver).
50 Motion at 1 - 2, 7, 51.
51 Petition for Wavier at 1, 3, 5-9.
52 Memorandum and Order (Granting Unopposed Motion to Dismiss Contention 1) (May 9, 2024)
(ML24130A205).
53 See Duke Energy Corp. (McGuire Nuclear Station, Units 1 and 2; Catawba Nuclear Station, Units 1 and 2), CLI 17, 56 NRC 1, 10 (2002) (quoting Louisiana Energy Services, L.P.
(Claiborne Enrichment Center), CLI-98-3, 47 NRC 77, 88 (1998)).
regarding these environmental review s has passed. 54 Accordingly, in order to be admitted,
Petitioner s amended and new contentions must meet both the heightened pleading
standards of 10 C.F.R. § 2.309(c), which require, in part, demonstrating that the information
upon which the filing is based was not previously available and is materially different from
information previously available, and the strict-by-design contention admissibility requirements
of 10 C.F.R. § 2.309(f)(1). 55 As discussed below, Petitioner has not demonstrated that any of
its amended or new contentions meet all of these requirements. In addition, in order to be
admitted, New Contention 3-B, which challenges the Staff s SAMA update, must also be
accompanied by a waiver of the NRCs rules under 10 C.F.R. § 2.335. A petition for such a
waiver must meet all four factors of the Millstone test to demonstrate a prima facie case
that the waiver should be granted. 56 As also discussed below, Petitioner s Petition for
Waiver does not meet the factors of showing that the circumstances at issue are unique
and that the waiver is necessary to reach a significant safety or environmental problem.
Therefore, the amended and new contentions should be dismissed and the Petition for Waiver
should be denied. Because there would be no admitted or pending contentions remaining
before it, the Board should also terminate this proceeding. 57
54 See 88 Fed. Reg. at 62,110- 11; Order (Granting a 20- Day Extension Deadline to Request for Hearing) (Nov. 6, 2023) (ML23310A269); CLI 01, 99 NRC at __ (slip op. at 6).
55 See, e.g., Crow Butte Resources, Inc. (In Situ Leach Uranium Recovery Facility), CLI 8, 92 NRC 255, 259-60 (2020); Turkey Point, LBP-19-8, 90 NRC at 149, 159-60.
56 Dominion Nuclear Conn., Inc. (Millstone Nuclear Power Station, Units 2 and 3), CLI 24, 62 NRC 551, 559-60 (2005).
57 See Virginia Electric and Power Co. D/B/A Dominion Virginia Power and Old Dominion Electric Coop. (North Anna Power Station, Unit 3), CLI-12-14, 75 NRC 692, 699-701 (2012)
(directing that licensing boards terminate proceedings once all contentions have been decided and not hold them open for future filings; instead, the appropriate process is a 10 C.F.R. § 2.326 motion to reopen); Turkey Point, LBP-19-8, 90 NRC at 178 (terminating the first Turkey Point subsequent license renewal proceeding at the Board level after the admitted contention of omission was found to be moot and all proposed new and amended contentions were dismissed).
I. Requirements for the Admissibility of New or Amended Contentions Filed after the Deadline
Pursuant to 10 C.F.R. § 2.309(c), new and amended contentions will not be
entertained absent a determination by the presiding officer that a participant has
demonstrated good cause. 58 Good cause is demonstrated by showing that:
(i) The information upon which the filing is based was not previously available; (ii) The information upon which the filing is based is materially different from information previously available; [ 59] and (iii) The filing has been submitted in a timely fashion based on the availability of the subsequent information. [ 60]
As defined by the three factors in 10 C.F.R. § 2.309(c), good cause is the sole factor to be
considered when evaluating whether to review the admissibility of a new or amended
contention. 61 Thus, the regulation requires that the contention s proponent establish good
cause for why the contention was not raised at the outset of the proceeding and when
determining whether a new or amended contention is timely, the Commission look[s] to whether
the contention could have been raised earlier. 62 There is no good cause if the challenge that
58 See also 10 C.F.R. § 2.309(f)(2) (Participants may file new or amended environmental contentions after the deadline in paragraph (b) of this section (e.g., based on a draft or final NRC environmental impact statement, environmental assessment, or any supplements to these documents) if the contention complies with the requirements in paragraph (c) of this section.).
59 10 C.F.R. § 2.309(c) ; cf. Turkey Point, LBP-19-8, 90 NRC at 149 n.13 (The term materially describes the type or degree of difference between the new information and previously available information, and it is synonymous with, for example, significantly, considerably, or importantly.) (quoting Florida Power & Light Co. (Turkey Point Units 6 and 7), LBP-17-6, 86 NRC 37, 48 (2017), aff d on other grounds, CLI 12, 86 NRC 215 (2017)).
60 10 C.F.R. § 2.309(c) ; see Initial Scheduling Order (Mar. 26, 2024) (ML24086A446) (providing that new or amended contentions based on the 2024 FSEIS are due 40 days after the issuance of the 2024 FSEIS); Memorandum and Order (Granting Motion for Extension of Time) (Apr. 26, 2024) (ML24117A266) (providing that new or amended contentions based on the GAO Report are due at the same time as new or amended contentions based on the 2024 FSEIS).
61 Amendments to Adjudicatory Process Rules and Related Requirements; Proposed Rule, 76 Fed. Reg. 10,781, 10,783 (Feb. 28, 2011). See also Amendments to Adjudicatory Process Rules and Related Requirements; Final Rule, 77 Fed. Reg. 46,562, 46,572 (Aug. 3, 2012).
62 Holtec International (HI-STORE Consolidated Interim Storage Facility), CLI-21-7, 93 NRC 215, 221 (2021).
is the subject of the new contention or the amendment to a previous contention could have been
timely raised at the outset of the proceeding. 63 This includes a challenge arguing that there is an
omission in a draft environmental impact statement when that same omission was present in the
environmental report on which the hearing opportunity was offered.64 Relatedly, there is no good
cause if the information being challenged is not actually new. 65 A new or amended contention is
not timely even if it is based on a new report if the information in that report was either
previously available or not materially different from the information that was previously available;
old information repackaged in a new report is not new information.66 A failure to satisfy the
requirements for proffering a contention out of time, without more, necessarily requires the
rejection of the new or amended contention, regardless of whether the new or amended
contention meets the contention admissibility requirements. 67
New and amended contentions must also meet the general contention admissibility
requirements in 10 C.F.R. § 2.309(f). 68 Those requirements and the related case law continue to
63 Interim Storage Partners LLC (WCS Consolidated Interim Storage Facility), CLI-21-9, 93 NRC 244, 247-49 (2021) (affirming the Board ruling that because the petitioner could have raised these challenges in its [timely] hearing request, the petitioner s new contention was untimely).
64 Id. at 248.
65 Id. (discussing that both the environmental report, on which a hearing opportunity was offered, and the subsequent draft environmental impact statement discussed the same impacts and, therefore, there was no good cause to challenge the draft environmental impact statement regarding these impacts when that same challenge could have been raised in a timely manner against the environmental report).
66 Holtec International (HI-STORE Consolidated Interim Storage Facility), CLI 4, 93 NRC 119, 127-28 (2021). See also 77 Fed. Reg. at 46,566 (discussing how the good-cause test applies to documents that use previously available information).
67 See, e.g., Holtec International (HI-STORE Consolidated Interim Storage Facility), LBP 10, 92 NRC 235, 249 (2020).
68 See, e.g., NextEra Energy Point Beach, LLC (Point Beach Nuclear Plant, Units 1 and 2), LBP-21-5, 94 NRC 1, 38 (2021) (Once a movant satisfies the motion to amend requirements, a new or amended contention must still satisfy the contention admissibility standards in 10 C.F.R. § 2.309(f) to be admitted.).
be the same as presented in the Staffs answer to Petitioner s hearing request.69 As relevant
here, a petitioner must set forth with particularity the contentions that the petitioner seeks to
raise and, for each contention, the petitioner must:
(i) Provide a specific statement of the issue of law or fact to be raised or controverted; (ii) Provide a brief explanation of the basis for the contention; 70 (iii) Demonstrate that the issue raised in the contention is within the scope of the proceeding;71 (iv) Demonstrate that the issue raised in the contention is material to the findings the NRC must make to support the action involved in the proceeding;72 (v) Provide a concise statement of the alleged facts or expert opinions that support the petitioner s position on the issue and on which the petitioner intends to rely at hearing, together with references to the specific sources and documents on which the petitioner intends to rely;73 and
69 NRC Staff Answer Opposing Miami Waterkeeper Hearing Request at 14-20 (Dec. 22, 2023)
(ML23356A162).
70 Contentions cannot be based on speculation and must have some reasonably specific factual or legal basis. Entergy Nuclear Vt. Yankee, LLC and Entergy Nuclear Operations, Inc.
(Vermont Yankee Nuclear Power Station), CLI-15-20, 82 NRC 211, 221 (2015).
71 The scope of the proceeding is defined by the Commission in its initial hearing notice and order referring the proceeding to the licensing board. See Florida Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4), CLI 23, 52 NRC 327, 329 (2000). As a consequence, any contention that falls outside the specified scope of the proceeding must be rejected. See Pacific Gas and Electric Co. (Diablo Canyon Nuclear Power Plant, Units 1 and 2),
CLI-11-11, 74 NRC 427, 435 - 36 (2011).
72 A dispute at issue is material if its resolution would make a difference in the outcome of the licensing proceeding. Holtec International (Hi-STORE Consolidated Interim Storage Facility),
CLI 4, 91 NRC 167, 190 (2020). There may, of course, be mistakes in an environmental document, but in an NRC adjudication, it is the burden of petitioners to show their significance and materiality because boards do not sit to flyspeck environmental documents or to add details or nuances and [i]f the [document] on its face comes to grips with all important considerations nothing more need be done. Exelon Generation Co., LLC (Early Site Permit for Clinton ESP Site), CLI- 05-29, 62 NRC 801, 811 (2005) (quoting Systems Energy Resources, Inc.
(Early Site Permit for Grand Gulf ESP Site), CLI- 05-4, 61 NRC 10, 13 (2005)).
73 The petitioner is obliged to present the facts and expert opinions necessary to support its contention. See USEC Inc. (American Centrifuge Plant), CLI-06-10, 63 NRC 451, 457 (2006) (it is the petitioner s responsibility to satisfy the basic contention admissibility requirements; boards should not have to search through a petition to uncover arguments and support for a contention and may not simply infer unarticulated bases of contentions); see also Arizona
(vi) Provide sufficient information to show that a genuine dispute exists with the applicant or licensee on a material issue of law or fact. This information must include references to specific portions of the application (including the applicants environmental report and safety report) that the petitioner disputes and the supporting reasons for each dispute, or, if the petitioner believes that the application fails to contain information on a relevant matter as required by law, the identification of each failure and the supporting reasons for the petitioner s belief.
The NRCs regulations governing contention admissibility are intended to focus litigation on
concrete issues and result in a clearer and more focused record for decision.74 The
Commission has explained that the contention admissibility rules are strict by design. 75 Failure
to satisfy any of the six pleading requirements renders a contention inadmissible.76 As noted
above, the rules require a clear statement as to the basis for the contentions and the
Public Service Co., et. al. (Palo Verde Nuclear Generating Station, Units 1, 2 and 3), CLI-91-12, 34 NRC 149, 155 (1991). Bare assertions and speculation, even by an expert, are insufficient to trigger a full adjudicatory proceeding. Entergy Nuclear Generation Co. and Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), CLI-12-15, 75 NRC 704, 714 (2012).
74 See, e.g., Southern Nuclear Operating Co. Inc. (Vogtle Electric Generating Plant, Unit 3),
LBP-20- 8, 92 NRC 23, 46 (2020) (quoting Changes to Adjudicatory Process, 69 Fed. Reg. 2182, 2202 (Jan. 14, 2004)); Crow Butte Resources, Inc. (In Situ Leach Facility, Crawford, NE), LBP -
15-15, 81 NRC 598, 601 (2015).
75 Entergy Nuclear Operations, Inc. (Indian Point, Unit 2) CLI-16-5, 83 NRC 131, 136 (2016)
(citing Dominion Nuclear Connecticut, Inc. (Millstone Nuclear Power Station, Units 2 and 3),
CLI-01-24, 54 NRC 349, 358 (2001) and South Carolina Electric & Gas Co. and South Carolina Public Service Authority (Virgil C. Summer Nuclear Station, Units 2 and 3), CLI-10-1, 71 NRC 1, 7 (2010). The Commission has stated that it should not have to expend resources to support the hearing process unless there is an issue that is appropriate for, and susceptible to, resolution in an NRC hearing. 69 Fed. Reg. at 2202.
76 Indian Point, CLI 5, 83 NRC at 136; see also Duke Energy Corp. (Oconee Nuclear Station, Units 1, 2, and 3), CLI-99-11, 49 NRC 328, 334-35 (1999) (the heightened contention admissibility rules are designed to preclude contentions based on little more than speculation).
The requirements are intended, among other things, to ensure that a petitioner reviews the application and supporting documents prior to filing contentions; that contentions are supported by at least some facts or expert opinion known to the petitioner at the time of filing; and that there exists a genuine dispute before a contention is admitted for litigation, to avoid the practice of filing contentions that lack any factual support and seeking to flesh them out later through discovery. Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), LBP-91-35, 34 NRC 163, 167-68 (1991).
submission of supporting information and references to specific documents and sources that
establish the validity of the contention.77
Although a petitioner does not have to prove its contention at the admissibility stage,78
the contention admissibility standards are meant to afford hearings only to those who proffer at
least some minimal factual and legal foundation in support of their contentions. 79 The petitioner
must provide some support for the contention, either in the form of facts or expert testimony,
and failure to do so requires that the contention be rejected.80 Any supporting material provided
by the petitioner is subject to scrutiny by the presiding officer,81 who must confirm that the proffered material provides adequate support for the contention.82 If a petitioner neglects to
provide the requisite support for its contentions, then the presiding officer should not make
assumptions of fact that favor the petitioner or search for or supply information that is lacking.83
Moreover, providing any material or document as a basis for a contention without explaining its
significance is grounds for the presiding officer to reject the contention. 84 In sum, the
77 AmerGen Energy Co. (Oyster Creek Nuclear Generating Station), CLI-06-24, 64 NRC 111, 118-19 (2006).
78 Private Fuel Storage L.L.C. (Independent Spent Fuel Storage Installation), CLI 22, 60 NRC 125, 139 (2004).
79 Oconee, CLI-99-11, 49 NRC at 334.
80 Palo Verde, CLI-91-12, 34 NRC at 155 ; accord, Indian Point, CLI 5, 83 NRC at 136. See Rules of Practice for Domestic Licensing ProceedingsProcedural Changes in the Hearing Process, 54 Fed. Reg. 33,168, 33,170 (Aug. 11, 1989) (This requirement does not call upon the intervener to make its case at this stage of the proceeding, but rather to indicate what facts or expert opinions, be it one fact or opinion or many, of which it is aware at that point in time [that]
provide the basis for its contention.).
81 See Vermont Yankee Nuclear Power Co. (Vermont Yankee Nuclear Power Station), ALAB-919, 30 NRC 29, 48 (1989), vacated in part on other grounds and remanded, CLI 4, 31 NRC 333 (1990); see also Tennessee Valley Authority (Bellefonte Nuclear Plant, Units 1 and 2), LBP-10-7, 71 NRC 391, 421 (2010).
82 See Vermont Yankee, A L A B -919, 30 NRC at 48; see also Bellefonte, LBP-10-7, 71 NRC at 421.
83 See USEC Inc. (American Centrifuge Plant), CLI-06-10, 63 NRC 451, 457 (2006).
84 See Fansteel, Inc. (Muskogee, Oklahoma Site), CLI 13, 58 NRC 195, 205 (2003).
information, facts, and expert opinions provided by the petitioner are examined by the presiding
officer to determine whether they provide adequate support for the proffered contentions. 85
The Commissions regulations in 10 C.F.R. Part 54 limit the scope of license renewal
proceedings to those matters that must be considered for the license renewal application to be
granted and that have not been addressed by rulemaking or on a generic basis.86 A plants
current licensing basis is not within the scope of the license renewal rule.87 Adjudications on
license renewal applications are bounded by the same rules and scope as the NRCs license
renewal review. 88 Under 10 C.F.R. Part 54, the NRC conducts a technical review of the license
renewal application to ensure that public health and safety requirements are satisfied.89
However, the focus of this safety portion of the NRCs license renewal review is on plant
systems, structures, and components for which current [regulatory] activities and requirements
may not be sufficient to manage the effects of aging in the period of extended operation.90 The
Commission has found it unnecessary, at the license renewal stage, to review issues already
monitored and reviewed in ongoing regulatory oversight processes.91 Contentions falling outside
the scope of this safety review are inadmissible and must be rejected.92
85 American Centrifuge, CLI 10, 63 NRC at 457; see Bellefonte, LBP 7, 71 NRC at 421.
86 Oyster Creek, CLI-06-24, 64 NRC at 117-18; see also 10 C.F.R. § 54.29; Turkey Point, CLI-01-17, 54 NRC at 8 - 10.
87 10 C.F.R. § 54.30.
88 Turkey Point, CLI- 01-17, 54 NRC at 8 (Adjudicatory hearings in individual license renewal proceedings will share the same scope of issues as our NRC Staff review, for our hearing process (like our Staffs review) necessarily examines only the questions our safety rules make pertinent.).
89 Id. at 6.
90 Id. at 10 (quoting 60 Fed. Reg. at 22,469).
91 See, e.g., Turkey Point, CLI-01-17, 54 NRC at 8-10 (holding that [i]ssues like emergency planningwhich already are the focus of ongoing regulatory processes do not come within the NRC's safety review at the license renewal stage).
92 10 C.F.R. § 2.309(f)(1)(iii); see, e.g., Dominion Nuclear Conn., Inc. (Millstone Nuclear Power Station, Units 2 and 3), CLI 24, 62 NRC 551, 567 (2005).
In accordance with its N E PA responsibilities, the Staff is required to take a hard look at
the environmental impacts of a proposed major federal action that could significantly affect the
environment, as well as reasonable alternatives to that action.93 This hard look is tempered by
a rule of reason consideration of environmental impacts need not address all theoretical
possibilities, but rather only those that have some possibility of occurring.94 An agency thus
need only address impacts that are reasonably foreseeable; the agency need not perform
analyses concerning events that would be considered worst case scenarios or those
considered remote and highly speculative.95 Further, N E PA does not call for certainty or
precision, but an estimate of anticipated (not unduly speculative) impacts.96 NEPA similarly
does not require review when the circumstances render review impossible.97 And NEPA gives
agencies broad discretion to keep their inquiries within appropriate and manageable
boundaries. 98 As the Commission has observed, NEPA requires consideration of reasonable
alternatives, not all conceivable ones.99 Further, environmental impact statements need only
discuss those alternatives that will bring about the ends of the proposed action. 100
Following publication of an environmental impact statement, further supplementation is required
93 See Claiborne, CLI 3, 47 NRC at 87-88; Crow Butte Resources, Inc. (Marsland Expansion Area), LBP-19-2, 89 NRC 18, 40 (2019).
94 Crow Butte Marsland, LBP-19-2, 89 NRC at 40 (quoting Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), ALAB-156, 6 AEC 831, 836 (1973)).
95 Holtec International (HI -STORE Consolidated Interim Storage Facility), LBP-19-4, 89 NRC 353, 357 (2019) (quoting Limerick Ecology Action, Inc. v. NRC, 869 F.2d 719, 754 - 55 (3d Cir.
1989)).
96 Crow Butte Marsland, LBP 2, 89 NRC at 40 (quoting Louisiana Energy Services, L.P.
(National Enrichment Facility), CLI-05-20, 62 NRC 523, 536 (2005)).
97 The Supreme Court has observed that where it is not possible for an agency to analyze the environmental consequences of a proposed action or alternatives to it, requiring such analysis would have no factual predicate and under those circumstances an EIS is not required. Kleppe
- v. Sierra Club, 427 U.S. 390, 401- 02 (1976).
98 Crow Butte Marsland, LBP 2, 89 NRC at 40 (quoting Claiborne, CLI-98-3, 47 NRC at 103).
99 Seabrook, CLI-12-5, 75 NRC at 338.
100 Id. at 339 (footnotes and quotation marks omitted).
only if there are significant new circumstances or information [that] paint a dramatically
different picture of impacts compared to the description of impacts in the EIS. 101
The Commission has held that, absent a waiver, a contention must be rejected if it
challenges applicable statutory requirements, regulations, or the basic structure of the
Commissions regulatory process. 102 Contentions raising environmental issues in a license
renewal proceeding are limited to those issues that are affected by license renewal and that
have not been addressed by rulemaking or otherwise on a generic basis.103 As the Commission
has stated, Category 1 determinations are not subject to site-specific review and thus fall
beyond the scope of individual license renewal proceedings.104 Because these Category 1
determinations have been incorporated into a regulation, the conclusions of that analysis may
not be challenged in litigation unless the rule is waived.105 Accordingly, a contention challenging
a Category 1 determination, even if based on new and significant information, can be admitted
only if the Commission grants a waiver of its regulations according to the provisions of 10 C.F.R.
§ 2.335. 106 Similarly, the exception in 10 C.F.R. § 51.53(c)(3)(ii)(L) operates as the functional
101 Massachusetts v. U.S. Nuclear Reg. Comm., 708 F.3d 63, 68-69 (1st Cir. 2013) ( quoting Town of Winthrop v. FAA, 535 F.3d 1, 7, 12 (1st Cir. 2008)); accord, Exelon Generation Co., LLC (Limerick Generating Station, Units 1 and 2), CLI 7, 78 NRC 199, 211, 216 - 17 (2013).
102 As set forth in 10 C.F.R. § 2.335(a), no rule or regulation of the Commission is subject to attack in any adjudicatory proceeding, in the absence of a waiver petition granted by the Commission. Further, any contention that amounts to an attack on applicable statutory requirements or represents a challenge to the basic structure of the Commissions regulatory process must be rejected. Dominion Nuclear Conn. (Millstone Nuclear Power Station, Unit 2),
CLI 14, 58 NRC 207, 218 (2003).
103 Turkey Point, CLI-01-17, 54 NRC at 11 - 12; see 10 C.F.R. § 51.53(c)(3)(i)- (ii).
104 Id.
105 Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (Vermont Yankee Nuclear Power Station), Entergy Nuclear Generation Co. and Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), CLI-07-3, 65 NRC 13, 17 (footnotes omitted),
reconsid. denied, CLI- 07-13, 65 NRC 211, 214 (2007). This approach has been found to comply with NEPA. See, e.g., Massachusetts v. NRC, 708 F.3d at 68 - 69.
106 10 C.F.R. § 2.335(b).
equivalent of a Category 1 issue, thereby removing SAMA updates from litigation in this license
renewal adjudication. 107
II. The Amended and New Contentions Do Not Meet All of the Requirements in 10 C.F.R.
§ 2.309(c) and (f) and, therefore, should be Dismissed
Amended Contentions 1-A, 1-B, and 1-C and New Contentions 3-A and 3-B are not
admissible because, as a threshold matter, the information that they challenge in the 2024
FSEIS, as well as the information that they provide in support of these challenges, including in
the GAO Report, is not new and materially different from information previously available and
thus Petitioner could have timely filed contentions raising these same issues during the hearing
opportunity on the 2023 DSEIS. Therefore, Petitioner has failed to demonstrate good cause
under 10 C.F.R. § 2.309(c) for the Board to entertain these challenges n o w. Additionally,
Amended Contentions 1-A, 1-B, and 1-C and New Contentions 3-A and 3-B do not meet the
contention admissibility requirements of 10 C.F.R. § 2.309(f). Unlike Amended Contentions 1-A,
1-B, and 1-C and New Contentions 3-A and 3-B, New Contention 2 does challenge information in
the 2024 FSEIS that is new and materially different from information previously available. But
Contention 2 still does not show that a genuine dispute exists with the 2024 FSEIS on a material
issue of law or fact, lacks adequate factual support for Petitioner s position, and does not
demonstrate that the issue raised is material to the findings that the NRC must make. Therefore,
while New Contention 2 demonstrates good cause under 10 C.F.R. § 2.309(c), it does not meet
the contention admissibility requirements of 10 C.F.R. § 2.309(f). For these reasons, as detailed
below, the Board should dismiss Amended Contentions 1-A, 1-B, and 1-C, New Contention 2,
and New Contentions 3-A and 3-B.
107 Limerick, CLI-13-7, 78 NRC at 210- 12.
A. Amended Contentions 1-A, 1-B, and 1-C are Not Admissible because they Both Challenge and are Based on Preexisting Information and because they are Not Supported and Do Not Dispute a Material Issue of Law or Fact
Amended Contentions 1-A, 1-B, and 1 -C identify Section 2.8.3 of the 2024 FSEIS as
containing language that is new to the 2024 FSEIS as compared to the 2023 DSEIS, 108 but,
as explained below in the Staff answer to Amended Contention 1 -B, all of that new
language is adapted from preexisting information in the 2019 FSEIS and the 2023 DSEIS.
Moreover, Petitioner s challenges to that new language are substantively similar to previous
challenges to the 2019 DSEIS and the 2023 DSEIS, specifically, having to do with (1) the
beneficial impacts of ceasing operations of the CCS and (2) the theory that the required
remediation actions of withdrawing hypersaline groundwater and freshening the CCS will
worsen groundwater conditions in the Biscayne Aquifer, and those challenges were
previously rejected. 109 Because the information being challenged and the information in
support of that challenge are not new and because the challenges are not admissible for
the same reasons that they were not admissible previously, Amended Contentions 1 -A, 1-B,
and 1-C do not meet all of the requirements of 10 C.F.R. § 2.309(c) and (f) and should be
dismissed.
108 Motion at 16, 18-19, 21-22 (citing 2024 FSEIS at 2-39-2-40).
109 See Turkey Point, LBP-19-3, 89 NRC at 294 ( stating that the expert report attached to the pleading discusses the potential for the hydraulic plume to reach and impact the quality of the L-31E Canal); Turkey Point, LBP-19-8, 90 NRC at 154 (The [2019] DSEIS describes the scenario in which discontinued use of the CCS would reduce discharges of heated water and other effluents to the CCS, potentially reducing the amount of water used to support freshening activities. Joint Intervenors do not cite, much less contest, that part of the [2019] DSEIS. );
LBP-24-3, 99 NRC at __ (slip op. at 17, n.86) ([E] ven were we to consider Miami Waterkeeper s argument regarding the benefits of discontinuing use of the CCS, it would not change our admissibility determination for Contention 1); LBP 3, 99 NRC at __ (slip op. at 22)
(Petitioner s challenge that the recovery well system exerts additional pressure on exiting groundwater use conflicts does not explain how this information would change the analyses in the [2023 DSEIS], nor does Miami Waterkeeper otherwise show that the Staffs analyses are unreasonable. ).
- 1. Amended Contention 1-A is Not Admissible because it is Not Based on New Information, is Not Supported, and Does Not Genuinely Dispute the 2024 FSEIS
In Amended Contention 1-A Petitioner states:
The 2024 FSEIS fails to adequately analyze groundwater conditions for the no action alternative, which should be the conditions present when the plant is not operational.[ 110]
Petitioner argues that it has good cause under 10 C.F.R. § 2.309(c) to raise this contention now
because Petitioner asserts that Section 2.8.3 of the 2024 FSEIS includes new information that
was previously unavailable in the 2023 DSEIS.111 Petitioner then presents regulations and case
law that it asserts stand for the proposition that NEPA requires an evaluation of a no action
alternative, or, in this case, an evaluation of the environmental difference between extending
and not extending the expiration dates of the Turkey Point licenses for an additional 20 years.112
According to Petitioner, this proposition was also a basis for Petitioner s Contention 1
challenging the 2023 DSEIS and a basis for comments that Petitioner submitted on the 2023
DSEIS. 113 Petitioner further states that Section 3.2 of the 2024 FSEIS, which is unchanged from
the 2023 DSEIS in this regard, 114 refers to the 2019 FSEIS for its discussion of the alternatives
to the proposed action, including the no-action alternative, and that Section 4.6.2 of the 2019
FSEIS discusses CCS conditions under the no-action alternative. 115 In essence, Petitioner
argues that the Staffs environmental review is deficient in its analysis of the condition of the
110 Motion at 7.
111 Id. at 6, 16; compare 2024 FSEIS at 2 2-40 with 2023 DSEIS at 2-22-2-31.
112 Motion at 7 - 13.
113 Id. at 7; see LBP-24-3, 99 NRC at __ (slip op. at 17, n.86) (noting that Petitioner raised this argument at oral argument and in its reply brief); Motion at 13 (although the comment actually asserts a challenge to the discussion of the environmental baseline and not to the discussion of the no-action alternative).
114 Compare 2024 FSEIS at 3-2 with 2023 DSEIS at 3-2.
115 Motion at 13-14; 2019 FSEIS at 4 -49.
groundwater in the vicinity of the plant under the no-action alternative, that is, under the
alternative that the CCS is no longer used as a heat sink. 116
Amended Contention 1-A is not admissible because, contrary to 10 C.F.R. § 2.309(c),
Petitioner admits that it has raised the same argument previously in this proceeding. 117 Although
Petitioner states that Amended Contention 1-A i s revised, 118 Petitioner does not identify any
way in which Amended Contention 1-A is different than Petitioner s previous argument. Instead,
it appears that Petitioner is raising the same argument against the 2024 FSEIS that it raised
against the 2023 DSEISthat the Staffs impact determination of SMALL or MODERATE with
respect to groundwater quality is insufficient because it doesnt discuss the impacts to
groundwater quality under the alternative of no longer using the CCS as a heat sink. 119 The only
real difference here, though, is that Petitioner now explicitly challenges the no-action alternative
instead of its previous challenge, which had to do with the cooling tower alternative, but both
arguments encompass the same situation of the CCS no longer being used as a heat sink.120
Moreover, the information that Petitioner identifies as its basis for re-pleading this previous
argument, Section 2.8.3 of the 2024 FSEIS, is neither new nor materially different from
116 Motion at 13.
117 Id. at 7; see LBP-24-3, 99 NRC at __ (slip op. at 17, n.86) (noting that Petitioner raised this argument at oral argument and in its reply brief).
118 Motion at 7.
119 Compare Motion at 7-8, 16 (The Staff has made only a cursory effort to evaluate the baseline conditions for the no action alternative instead of fully analyz[ing] and present[ing] to the public and the Boards consideration, the environmental difference between extending the license and continuing the use of the CCS and declining the application and, therefore, its reliance in section 2.8.3 of the 2024 FSEIS on an incorrect environmental baseline is the basis of its erroneous determination that impacts on groundwater quality will be SMALL or MODERATE.) with Reply at 16-17 ([T]he 2023 DSEISs determination that the proposed action will have a SMALL or MODERATE impact on groundwater quality failed to compare the positive and remedial impact to groundwater of reasonable alternatives to the proposed action (i.e., discontinuing the use of the CCS as a heat sink for Units 3 and 4 mandating FPL implement a cooling tower) against the perpetuating and exacerbating impact of the proposed action (continuing to operate the CCS as a heat sink for Units 3 and 4).).
120 See Motion at 9, 13 (specifying that its argument is related to the use of the CCS as a heat sink).
information that was previously available. Although that section uses new language to present
the Staffs SMALL to MODERATE impact determination with respect to groundwater quality,
Petitioner does not identify and challenge any substantive difference between that impact
determination and the impact determination in the same section of the 2023 DSEIS.121 In fact,
as explained below in the Staff answer to Amended Contention 1-B, all of the new language in
Section 2.8.3 of the 2024 FSEIS is adapted from preexisting information in the 2019 FSEIS and
the 2023 DSEIS. Therefore, both Petitioner s argument and the portion of the 2024 FSEIS that
Petitioner points to as the basis for that argument are substantively unchanged from what was
available during the hearing opportunity on the 2023 DSEIS. The purpose of the heightened
pleading standard of 10 C.F.R. § 2.309(c), though, is to ensure that the only arguments admitted
after the deadline are those that could not have otherwise been filed by the deadline. 122
Accordingly, Amended Contention 1-A does not meet 10 C.F.R. § 2.309(c) and should, for this
reason alone, be dismissed.
All the other facets of Amended Contention 1-A and the related portions of the 2024
FSEIS are also not new and could not support the admission of this contention after the
deadline. First, Petitioner asserts that its request to amend Contention 1 is appropriate because
Contention 1 was previously admitted. 123 This statement, though, is incorrect. The narrowly
reformulated portion of Contention 1 that the Board admitted was a contention of omission
121 Compare 2024 FSEIS at 2 2-40 (stating that impacts to groundwater quality would be MODERATE under the scenario of the hypersaline groundwater plume extending outside of the Turkey Point site boundary during the subsequent license renewal term and SMALL under the scenario of the hypersaline groundwater plume being fully retracted to within the Turkey Point site boundary either before or during the subsequent license renewal term) with 2023 DSEIS at 2-31 ( [I]f FPL can retract and maintain the hypersaline plume to within the FPL site boundary prior to the [subsequent license renewal] term, the impacts on groundwater quality from the CCS operations during the [subsequent license renewal] term would be SMALL; otherwise, if the hypersaline groundwater plume is not retracted, impacts could be MODERATE.).
122 See HI-STORE Consolidated Interim Storage Facility, CLI-21-7, 93 NRC at 221.
123 Motion at 7.
that the 2023 DSEIS lacks an explanation as to how the uncertainty about the success of FPLs
efforts to retract the hypersaline groundwater plume to within the Turkey Point site boundary
prior to the subsequent license renewal term leads to a finding of moderate environmental
impacts. 124 The Board did not find that this omission extended to the discussion of the
groundwater impacts of the no-action alternative. 125 In fact, the Board explicitly questioned
whether Petitioner s argument regarding the beneficial impacts of discontinuing the use of the
CCS as a heat sink was even a part of Contention 1 and, therefore, did not include this
argument as part of the admitted portion of Contention 1. 126
Second, Petitioner asserts that the basis for Amended Contention 1-A i s that the 2023
DSEIS omitted explanation of the predictions regarding the hypersaline plume and that now
the 2024 FSEIS includes that explanation in Section 2.8.3. 127 Again, this is inaccurate because
the omission that was the subject of Reformulated Contention 1 was not of an explanation of
predictions regarding the hypersaline groundwater plume, but rather was of an explanation of
how the uncertainty regarding those predictions could result in moderate groundwater
impacts. 128 Accordingly, although Petitioner challenges the new language of Section 2.8.3 of the
2024 FSEIS for not discussing the no-action alternative, this was never the purpose of that new
language. Because neither Section 2.8.3 of the 2024 FSEIS nor Section 2.8.3 of the 2023
DSEIS discusses the no-action alternative in this regard, Petitioner s repetition of this argument
does not identify any new information as its basis. Instead, as conceded by Petitioner, 129 the no-
action alternative is discussed in the 2024 FSEIS at Section 3.2, which is unchanged from the
124 LBP-24-3, 99 NRC at __ (slip op. at 21 - 22).
125 Id.
126 Id. at 17, n.86 ( [W]e admit only a narrow portion of Contention 1 and conclude that all other claims, including this one, are inadmissible.).
127 Motion at 6, 16.
128 LBP-24-3, 99 NRC at __ (slip op. at 21-22).
129 Motion at 13-14.
2023 DSEIS at Section 3.2 and which states that the Staff identified no significant new
information that would change its discussion of the issue in Chapter 4 of the 2019 FSEIS. 130 This
is also not new information. Additionally, all of the regulations and case law cited in Amended
Contention 1-A are not new information, but rather were also available during the hearing
opportunity on the 2023 DSEIS. 131 Therefore, although Petitioner is asserting that the new
language in Section 2.8.3 of the 2024 FSEIS provides good cause for bringing Amended
Contention 1-A now, its proposed amendment of Contention 1 is actually based solely on old
information. As such, Amended Contention 1-A is an untimely supplementation of a preexisting
argument with preexisting information and, therefore, should be dismissed for failing to meet the
good cause requirement of 10 C.F.R. § 2.309(c).
Even if it were not dismissed for lack of good cause, Amended Contention 1-A should be
dismissed because it doesnt meet the contention admissibility requirements of 10 C.F.R.
§ 2.309(f). In Amended Contention 1-A, Petitioner asserts that the Staffs discussion of the
environmental impacts to groundwater of no longer using the CCS as a heat sink is inadequate.
However, Petitioner (1) does not provide factual support for this assertion and (2) does not
explain how this assertion genuinely disputes any specific portion of the Staffs environmental
review. With respect to factual support, Amended Contention 1-A states that the Staff has made
only a cursory effort to evaluate the baseline conditions for the no action alternative, has not
conducted an adequate baseline analysis against which to compare the impacts of the [CCS]
on saltwater intrusion, and has not explained the environmental difference between extending
the license and continuing the use of the CCS and declining the application. 132 The balance of
Amended Contention 1-A is a recitation of assertedly relevant regulations and case law. 133 That
130 2023 DSEIS at 3 3-2; 2024 FSEIS at 3 3-2.
131 See Motion at 8-13 (citing case law that all predates the 2023 DSEIS).
132 Motion at 7 - 8, 11-12.
133 Id. at 8-13.
discussion does not include any factual support, despite Petitioner referring to it as providing the
facts supporting Amended Contention 1-A. 134 And there is no factual support anywhere else in
Amended Contention 1-A f o r Petitioner s position that the 2024 FSEIS does not comply with the
recited legal standards just asserting that a discussion is inadequate and that regulations and
case law require adequate discussions is not factual support.135 Petitioner concludes that the
Staff s environmental baseline is incorrect, which is the basis of [the Staffs] erroneous
determination that impacts on groundwater quality will be SMALL or MODERATE. 136 This
statement does not support Amended Contention 1-A because that contention challenges the
adequacy of the Staffs analysis of groundwater conditions for the no-action alternative, 137 but
this statement concerns the separate issue of the adequacy of the environmental baseline. As
explained in the Staffs environmental review, the environmental baseline describes the
environment at the time of the Staffs analysis 138 and the no-action alternative describes the
impacts on that environmental baseline from the action of not authorizing an additional 20 years
of operation. 139 Conflating these two issues does not amount to support for Amended
Contention 1-A. Additionally, to the extent that Petitioner may with this statement somehow be
pointing to Amended Contention 1-C for the factual support required for Amended Contention 1-
134 Id. at 15 (The facts supporting the Petitioner s contention are set forth in the Basis Statement in Section 2, above.).
135 See Pilgrim, CLI-12-15, 75 NRC at 714 (explaining that bare assertions and speculation, even by an expert, are insufficient to trigger a full adjudicatory proceeding).
136 Motion at 16.
137 Id. at 7.
138 See 2019 FSEIS at 3-1 (In conducting its environmental review the [NRC s t a ff] first defines and describes the environment that could be affected by the subsequent license renewal. For this review, the NRC staff defines the affected environment as the environment that currently exists at and around the Turkey Point site.); 2019 FSEIS at 3 3-88 (describing the Baseline Groundwater Quality).
139 See 2019 FSEIS at 4-2 (The affected environment (i.e., environmental baseline) for each resource area considered is described in Chapter 3 and it is against this environmental baseline that the potential environmental impacts of the alternatives are measured.).
A, that too would be of no avail because, as discussed below, Amended Contention 1-C similarly
is untimely, not supported, and doesnt genuinely dispute the Staffs environmental review.
Therefore, contrary to 10 C.F.R. § 2.309(f)(1)(v), Amended Contention 1-A does not include
supporting alleged facts or expert opinions and, accordingly, it should be dismissed.
Amended Contention 1-A is also not admissible because although it references portions
of the 2024 FSEIS and the 2019 FSEIS, it doesnt provide sufficient information to show that a
genuine dispute exists with those documents on a material issue of law or fact. First, Petitioner
points to [t]he 2024 FSEIS at pages 2-24 to 2-40, which corresponds to Section 2.8.3 of the
2024 FSEIS, and points to Section 3.2, Comparison of Alternatives, of the 2024 FSEIS and
identifies that Section 3.2 of the 2024 FSEIS points, in turn, to the Staff evaluation of
alternatives in Chapter 4 of the 2019 FSEIS. 140 Petitioner then references Section 4.6.2 of the
2019 FSEIS, 141 which is the Staff discussion of the no-action alternative with respect to
terrestrial resources. 142 Petitioner, though, does not reference the Staff discussion of the no-
action alternative with respect to groundwater resources,143 despite its statement that this
contention concerns only groundwater analysis. 144 Because it doesnt cite the actually
relevant information of the Staffs discussion of beneficial impacts to groundwater quality from
Turkey Point Units 3 and 4 no longer using the CCS as a heat sink, 145 Petitioner has not shown
140 Motion at 13.
141 Id.
142 2019 FSEIS at 4 -49.
143 See id. at 4 4-38.
144 Motion at 14.
145 See 2019 FSEIS at 4 4-38 (The shutdown of Turkey Point would substantially reduce thermal discharges to the CCS as well as cooling water and other effluents from the plants cooling water system. This flow reduction would reduce groundwater mounding (i.e., a localized increase in the water table) beneath the CCS and reduce the generation of hypersaline water.
As a result, the NRC staff expects that the amount of water used to support freshening activities could be reduced[, which] is derived from five production wells tapping the Upper Floridan aquifer. [However,] FPL may need to operate and maintain the recovery well and associated
that a genuine dispute exists. Moreover, Petitioner s clarification that Amended Contention 1-A
only has to do with the updated groundwater analysis in the 2024 FSEIS is not availing
because, with respect to the no-action alternative, that analysis is exactly the same as the 2023
DSEIS analysis and neither discusses the beneficial impacts of ceasing Turkey Point Units 3
and 4 operations on the CCS because both rely, instead, on the discussion of the no-action
alternative in the 2019 FSEIS. 146
Contentions substantively similar to Amended Contention 1-A have already been raised
and rejected in both LBP-19-8 and LBP-24-3 for not meeting all of the contention admissibility
requirements of 10 C.F.R. § 2.309(f). 147 Although focusing on the cooling tower alternative as
opposed to the no-action alternative, in 2019, the Board addressed the argument that the Staff
had not sufficiently discussed the beneficial environmental impacts to groundwater of Turkey
Point Units 3 and 4 ceasing to use the CCS.148 The Board pointed out that the Staff described
the scenario in which discontinued use of the CCS would reduce discharges of heated water
and other effluents to the CCS, potentially reducing the amount of water used to support
freshening activities and that the Joint Petitioners did not cite, much less contest, that part of
the Staffs analysis and that, therefore, that aspect of the contention was inadmissible for failing
to raise a genuine dispute on a material issue of law or fact.149 In LBP 3, the Board also
deep well injection systems for as long as necessary to achieve and maintain compliance with County and FDEP requirements.).
146 Compare 2024 FSEIS at 3-2 with 2023 DSEIS at 3-2 (both stating that [t]he NRC staff evaluated the no-action alternative, in depth in Chapter 4 of the [2019] FSEIS and has identified no significant new information that would change these discussions in the [2019]
FSEIS).
147 See Turkey Point, LBP-19-8, 90 NRC at 154; Turkey Point LBP-24-3, 99 NRC at __ (slip op.
at 17, n.86).
148 Turkey Point, LBP-19-8, 90 NRC at 154.
149 Id.
found that Petitioner s argument regarding the benefits of discontinuing use of the CCS was
inadmissible. 150
As explained above, the argument of Amended Contention 1-A that the Staffs discussion
of the environmental impacts to groundwater of no longer using the CCS as a heat sink is
inadequate is not timely because, with respect to this topic, Petitioner does not point to any
materially different information in the 2024 FSEIS as compared to the 2023 DSEIS and does not
make any materially different arguments than it made regarding the 2023 DSEIS. This argument
also does not meet the contention admissibility requirements because Petitioner does not
provide any alleged facts or expert opinions in support of it and because Petitioner does not
genuinely dispute any relevant portions of the Staffs environmental review. Therefore, in
accordance with 10 C.F.R. § 2.309(c) and (f), Amended Contention 1-A should be dismissed.
- 2. Amended Contention 1-B is Not Admissible because it is Not Based on New Information, Does Not Genuinely Dispute the 2024 FSEIS, and is Not Supported
In Amended Contention 1-B Petitioner states:
The 2024 FSEIS employs the wrong standard to determine the impact of the CCS on potable water.[ 151]
Petitioner disputes the discussion in the conclusion of Section 2.8.3 of the 2024 FSEIS that
under the scenario of the hypersaline groundwater plume extending outside of the Turkey Point
Units 3 and 4 site boundary during the subsequent license renewal term, the appropriate impact
determination for groundwater quality would be MODERATE. 152 Petitioner argues that the
impact determination of MODERATE is an underestimate because Petitioner asserts that the
environmental impacts of continued operations of the CCS during the subsequent license
150 LBP-24-3, 99 NRC at __ (slip op. at 17, n.86).
151 Motion at 16.
152 Id. at 18-19 (citing 2024 FSEIS at 2-39-2-40).
renewal term would destabilize the important attribute of potability of the Biscayne Aquifer. 153
Petitioner faults the 2024 FSEIS for supposedly not look[ing] to whether [the] proposed action
will render potable portions of the Biscayne Aquifer non-potable. 154 Petitioner supports this
argument by stating that the potable water standards for Miami-Dade County are a total
dissolved solids (TDS) concentration of less than or equal to 500 milligrams per liter ( mg/L) and
a chloride concentration of less than or equal to 250 mg/L.155 Petitioner then reasons that
because the conclusion of Section 2.8.3 of the 2024 FSEIS defines the classification of the
Biscayne Aquifer under the CCS as having a TDS concentration of 10,000 mg/L or greater and
defines hypersaline groundwater as groundwater with a chloride concentration of greater than
19,000 mg/L, it must not be properly addressing the impact of the proposed action on potable
water. 156 Rather, Petitioner asserts that the discussion in Section 2.8.3 of the 2024 FSEIS
amounts to the Staff employ[ing] a relaxed standard (hypersalinity) to determine whether the
continued CCS operations will destabilize a potable drinking water resource. 157
Petitioner s arguments in Amended Contention 1-B miss the mark because (1) the
information that the arguments challenge in the conclusion of Section 3.8.2 of the 2024 FSEIS is
not new and, instead, summarizes preexisting information from the 2019 FSEIS and the 2023
DSEIS; (2) the arguments do not identify, let alone dispute, the discussions in the 2019 FSEIS,
the 2023 DSEIS, and the 2024 FSEIS of the very issue of the im pact of the proposed action to
potable water use of the Biscayne Aquifer; and (3) the arguments do not include any factual
support for their assertion that there will be a greater impact to potable water use of the
Biscayne Aquifer than that already discussed in the 2019 FSEIS, the 2023 DSEIS, and the 2024
153 Motion at 17.
154 Id. at 18.
155 Id.
156 Id. at 18-19 (citing 2024 FSEIS at 2-39-2-40).
157 Motion at 19.
FSEIS. Therefore, as explained next, Amended Contention 1-B does not meet the good cause
standard of 10 C.F.R. § 2.309(c) and does not meet the contention admissibility requirements of
10 C.F.R. § 2.309(f)(1)(vi) and (v), respectively.
Amended Contention 1-B should be dismissed because, contrary to 10 C.F.R. § 2.309(c),
it is not based on new information and, therefore, could have been timely brought during the
opportunity for a hearing on the 2023 DSEIS. As indicated by the fact that the challenged
portion of Section 2.8.3 of the 2024 FSEIS is preceded by the heading Conclusion, 158 the
information therein is not new to the 2024 FSEIS; instead, that information relies on, and largely
summarizes, information that was already available in the 2023 DSEIS. As relevant to Amended
Contention 1-B, before the 2024 FSEIS, Section 2.8.3 of the 2023 DSEIS had already
determined that the impact to groundwater quality could be MODERATE if FPL is not able to
retract the hypersaline groundwater plume to within the FPL site boundary prior to the
[subsequent license renewal] term. 159 Section 2.8.3 of the 2023 DSEIS also already discussed
how the existence of the hypersaline groundwater plume outside of the Turkey Point site
boundary would not destabilize the groundwater resource. 160 Section 2.8.3 of the 2023 DSEIS
already stated that the Biscayne Aquifer is classified as both Class G-III (nonpotable use, with
TDS levels of 10,000 mg/L or greater) beneath the Turkey Point site and CCS, and Class-II
(potable) to the west of the CCS. 161 It also already discussed how hypersaline groundwater, as
defined as groundwater with a chloride concentration greater than 19,000 mg/L, extends to the
west of the CCS but is being retracted towards the CCS boundary by FPLs required
remediation actions. 162 Taken together, these preexisting portions of Section 2.8.3 of the 2023
158 2024 FSEIS at 2-38.
159 2023 DSEIS at 2-31.
160 Id.
161 Id. at 2-22.
162 Id. at 2 2-31.
DSEIS add up to exactly the new language in the conclusion of Section 2.8.3 of the 2024 FSEIS
that Petitioner is now challengingthat if the plume of groundwater with a chloride
concentration of greater than 19,000 mg/L were to extend into the Class-II (potable) portion of
the Biscayne Aquifer during the subsequent license renewal term, then the impact on the
groundwater resource from subsequent license renewal would be moderate. Additionally, as
discussed next, all of Petitioner s arguments regarding impacts to the potable use of the
Biscayne Aquifer are already addressed in the 2019 FSEIS, with that information only being
updated by the subsequent 2023 DSEIS and 2024 FSEIS; Petitioner simply does not identify
this information that it could have challenged earlier. A petitioner may not delay filing a
contention until a document becomes available that collects, summarizes and places into
context the facts supporting that contention, such as the new conclusion of Section 2.8.3 of the
2024 FSEIS. 163 Similarly, Petitioner had the responsibility to carefully review the 2019 FSEIS
and the 2023 DSEIS and cant now bring an argument that was simply missed earlier.164
Therefore, Amended Contention 1-B is impermissibly untimely and, consistent with 10 C.F.R.
§ 2.309(c), should be dismissed for this reason alone.
Additionally, Amended Contention 1-B is not admissible because it does not genuinely
dispute the Staffs environmental review. In Amended Contention 1-B, Petitioner argues that the
Staff has not adequately discussed the impact of the proposed action on the potable water use
of the Biscayne Aquifer. 165 Petitioner premises this argument on its assertion that the Staff did
not employ the drinking water standards of 500 mg/L TDS and 250 mg/L chloride and its
163 Northern States Power Co. (Prairie Island Nuclear Generating Plant, Units 1 and 2), CLI 27, 72 NRC 481, 496 (2010).
164 See Louisiana Energy Services, L.P. (National Enrichment Facility), CLI-04-25, 60 NRC 223, 224-25 (2004) (As the Commission has stressed, our contention admissibility and timeliness requirements demand a level of discipline and preparedness on the part of petitioners, who must examine the publicly available material and set forth their claims and the support for their claims at the outset.) (quotation marks omitted).
165 Motion at 18-19.
assertion that the Staff, instead, improperly relied upon the values of 10,000 mg/L TDS and
19,000 mg/L. 166 This argument, though, does not discuss, let alone engage, the fulsome
explanation of the Staffs review of this very issue in the 2019 FSEIS, including in the sections
Groundwater Quality Standards and Current Designated Uses, 167 Baseline Groundwater
Quality and Changes Attributable to Turkey Point Operations, 168 and Groundwater Use
Conflicts (Plants That Withdraw More Than 100 Gallons per Minute). 169 As discussed next, in
light of the 2019 FSEIS, it is apparent that Petitioner s assertions are both incorrect and
immaterial and, therefore, do not amount to an admissible contention.
Like Amended Contention 1-B, 170 the 2019 FSEIS recognizes that the Biscayne [A]quifer
is the major public water supply source across Miami-Dade County as well as for the Florida
Keys. 171 The 2019 FSEIS explicitly states the applicable drinking water standard of 500 mg/L
TDS. 172 The 2019 FSEIS then explains, however, that with respect to water in the Biscayne
Aquifer, potability is defined differently.173 That is, the FDEP categorizes Florida groundwater
into one of five classes and defines potable water use to include groundwater with a TDS of less
than 10,000 mg/L, which is called Class G-II groundwater. 174 Non-potable water use, defined, in
part, as a TDS content of 10,000 mg/L or greater, is separately categorized as Class G-III
groundwater. 175 The 2019 FSEIS recounts that the Biscayne Aquifer near the Turkey Point site is
166 Id.
167 2019 FSEIS at 3 3-71.
168 Id. at 3 3-88.
169 Id. at 4 4-35.
170 Motion at 17-18.
171 2019 FSEIS at 3 -70.
172 Id. at 3-69 ([T]the Federal drinking water standard or secondary maximum contaminant level for TDS is 500 mg/L and [t]he FDEP has adopted the same secondary standard for Florida drinking water.).
173 Id. at 3 3-69.
174 Id.
175 Id.
saline and has been since before the construction of the CCS. 176 It also recounts that the FDEP
classified the Biscayne Aquifer within the Turkey Point plant property as Class G-III, or non -
potable use, and the Biscayne Aquifer west of Turkey Point as Class G-II, or potable use. 177 The
2019 FSEIS then explains that, consistent with this FDEP classification, the boundary between
these two classes of groundwater, that is, the boundary between potable and non-potable use
water, is termed the saltwater interface. 178
Based on this background, the 2019 FSEIS analyzes the impact of the proposed action
on the potable use of the Biscayne Aquifer by considering the location of potable water users,
the impact of the proposed action on the location of the saltwater interface, and the impact of
the proposed action on any drawdown of the Biscayne Aquifer. The 2019 FSEIS discusses in
detail how the operation of the CCS and the hypersaline groundwater plume in the Biscayne
Aquifer, defined as water with a chloride concentration exceeding 19,000 mg/L, directly beneath
the CCS have influenced the movement of the saltwater interface and, therefore, the availability
of potable water to the region. 179 The 2019 FSEIS and the 2024 FSEIS, largely unchanged from
the 2023 DSEIS, both discuss the impacts of the proposed action with respect to potable water
use as part of the evaluation of the groundwater use conflicts resource area.180 This discussion
looks at the saltwater interface and how modeling and monitoring data predict that it would be
affected by recovery well system operation, which is, in turn, required by the 2015 DERM
176 2019 FSEIS at 3 3-70.
177 Id. at 3-70.
178 Id.
179 2019 FSEIS at 3 3-88 (stating, among other things, that the inland migration of the saltwater interface is closely related to TDS concentrations in the CCS; that [m]onitoring results show the influence of CCS operations on Biscayne [A]quifer groundwater quality adjacent to and west of the CCS, based on the presence of hypersaline water (chloride concentrations greater than 19,000 mg/L), in addition to elevated tritium levels; and that annual monitoring reports indicate the expansion of more saline groundwater, and possible CCS influence ).
180 See 2019 FSEIS at 4 4-32; 2023 DSEIS at 2 2-20; 2024 FSEIS at 2 2-21.
Consent Agreement. 181 Specifically, the recovery well system will extract hypersaline
groundwater, which will pull the saltwater interface in the Biscayne aquifer seaward (i.e., to the
east) from its current location and increase the amount of fresh groundwater in areas
surrounding the CCS. 182 This, though, will also have a drawdown effect on the aquifer.183 The
2019 FSEIS then compares the location of the saltwater interface and the extent of the
drawdown of the aquifer to the location of other users of the aquifer and concludes that there
would be no impact to those users. 184 The 2024 FSEIS incorporates by reference the Biscayne
Aquifer groundwater use conflicts information from the 2019 FSEIS and adds to it a discussion
that accounts for two u nderground injection control (UIC) test extraction wells that were
activated since the publication of the 2019 FSEIS to remove hypersaline groundwater from the
Biscayne Aquifer in addition to the recovery well system. 185 The 2024 FSEIS finds that the
additional UIC test extraction well withdrawals will not result in a drawdown that could impact
any offsite water supply wells. 186 This information is largely unchanged from the 2023 DSEIS.187
Moreover, the 2024 FSEIS evaluates the new information regarding a potential increased
recovery well system extraction capacity and finds that it too will not contribute to impacting any
offsite wells. 188 The 2024 FSEIS also continues to find that the saltwater interface will be moved
toward the CCS and therefore further away from offsite wells, including a major well field where
the Biscayne Aquifer serves as the major public water supply source for the region, including
181 2019 FSEIS at 4 4-31.
182 Id. at 4-31.
183 Id.
184 Id. at 4-31, 4-34.
185 2024 FSEIS at 2-19.
186 Id. at 2 2-20.
187 Compare 2024 FSEIS at 2 2-20 with 2023 DSEIS at 2 2-20.
188 2024 FSEIS at 2-20.
Miami-Dade County and the Florida Keys. 189 Accordingly, the 2019 FSEIS, the 2023 DSEIS,
and the 2024 FSEIS conclude that the proposed action would have a SMALL impact on
groundwater use conflicts for the Biscayne Aquifer.190
In total, the 2019 FSEIS, the 2023 DSEIS, and the 2024 FSEIS explain (1) that the
delineation between potable and non-potable water in the Biscayne Aquifer is the 10,000 mg/L
TDS boundary referred to as the saltwater interface, (2) that the hypersaline groundwater
plume, which is defined as groundwater with greater than 19,000 mg/L chloride, influences the
position of this saltwater interface, (3) that FPL is taking remedial actions required by the 2016
Consent Order to retract the hypersaline groundwater plume to within the Turkey Point site
boundary, and (4) that, therefore, the impact to the potable water use of the Biscayne Aquifer is
based on the relative locations of potable water users and the saltwater interface, as well as the
drawdown effect from F P L s remediation actions. The Staffs environmental review then
discusses the monitoring data that demonstrate that the withdrawals of hypersaline groundwater
from the Biscayne Aquifer are removing its influence on the saltwater interface and that the
drawdown caused by these withdrawals will also not impact those other water users. Moreover,
the Staffs environmental review discusses that, based on the monitoring data available to date
and the presumption that State and local regulators will enforce applicable laws and regulations,
including through continued enforcement of the 2015 DERM Consent Agreement and the 2016
FDEP Consent Order, it is reasonably foreseeable that the hypersaline groundwater plume will
eventually return to the Turkey Point site boundary, pull the saltwater interface in the Biscayne
Aquifer seaward from its current location, and increase the amount of fresh groundwater in
areas surrounding the CCS. Petitioner does not identify, let alone dispute, this preexisting
information. Moreover, this information illustrates that Petitioners assertion that the Staff
189 Id. at 2-24.
190 2019 FSEIS at 4 4-35; 2023 DSEIS at 2-20; 2024 FSEIS at 2-20.
incorrectly used the values of 10,000 mg/L TDS and 19,000 mg/L chloride instead of the values
of 500 mg/L TDS and 250 mg/L chloride is not a genuine dispute with the Staffs environmental
review. Finally, Petitioner does not explain how this information, which it doesnt dispute, could
lead to an impact determination of greater than the Staff s SMALL to MODERATE
determination with respect to groundwater quality191 or the Staffs SMALL determination with
respect to groundwater use conflicts for the Biscayne Aquifer.192 Therefore, Amended
Contention 1-B does not meet 10 C.F.R. § 2.309(f)(1)(vi) and, accordingly, it should be
dismissed.
Finally, Amended Contention 1-B is not admissible because it doesnt provide any factual
support for its assertion that the Staff did not adequately evaluate the issue of the impact of the
proposed action on the potable use of the Biscayne Aquifer. As discussed above, all of the facts
that Petitioner statesthat the Biscayne Aquifer is partially classified as a source of potable
drinking water; that the CCS discharges to the Biscayne Aquifer; that, prior to remediation, the
saltwater interface had historically moved west of the boundary of the Turkey Point site; and that
the standards for drinking water are 500 mg/L TDS and 250 mg/L chloride,193are consistent
with the Staffs environmental review and do not support any inadequacies in that review.
Petitioner also discusses the definitions of Class G-III groundwater as 10,000 mg/L or greater
TDS and hypersaline groundwater as 19,000 mg/L chloride, 194 both of which facts, as also
discussed above, do not support a genuine dispute with the Staffs environmental review.
Because none of these facts support Petitioner s position on the issue, Amended Contention 1-B
does not meet the contention admissibility requirement of 10 C.F.R. § 2.309(f)(1)(v) and should
be dismissed.
191 2023 DSEIS at 2-31; 2024 FSEIS at 2 -40.
192 2023 DSEIS at 2-20; 2024 FSEIS at 2 -20.
193 Motion at 17-18.
194 Id. at 18-19.
The failure of Petitioner to provide facts in support of Amended Contention 1-B is not
cured by Petitioner s statement that facts supporting the contention are also in the expert report
of William Nuttle, Ph.D, which Petitioner attached to the Motion. 195 Amended Contention 1-B
does not explain how this report supports Petitioner s argument that the Staff has
underestimated the impact of the proposed action on the potable use of the Biscayne Aquifer.
Therefore, since 10 C.F.R. § 2.309(f)(1) specifies that it is the pleading that must satisfy the
contention admissibility requirements, such a general reference to an attachment cannot
support an admissible contention. The Commission has rejected contentions that generally rely,
without further explanation, on other documents to satisfy the contention admissibility
requirements. 196 As the Commission has stated, its practice is clear that a petitioner may not
simply incorporate massive documents by reference as the basis for or a statement of his
contentions because this does not serve the purposes of a pleading in which participants
must clearly identify the matters on which they intend to rely with reference to a specific
point. 197 Therefore, Petitioner s general reference to the Nuttle Report cannot meet the factual
support requirement with respect to Amended Contention 1-B and, accordingly, the Board
should not search through that report for such factual support. Additionally, even if the Board
were to review the Nuttle Report with respect to Amended Contention 1-B, that report doesnt
contain any support for the assertion that the Staffs discussion of the impacts of the proposed
195 Id. at 20- 21 (citing to Motion at Att. A).
196 See, e.g., Fansteel, Inc. (Muskogee, Oklahoma Site), CLI 13, 58 NRC 195, 204 (2003)
(Petitioners have an obligation not just to refer generally to voluminous documents, but to provide analysis and supporting evidence as to why particular sections of those documents provide a basis for the contention); USEC Inc. (American Centrifuge Plant), CLI-06-10, 63 NRC 451, 457 (2006) (stating that it is the petitioner s responsibility to satisfy the basic contention admissibility requirements; boards should not have to search through a petition to uncover arguments and support for a contention and may not simply infer unarticulated bases of contentions).
197 Public Service Co. of New Hampshire (Seabrook Station, Units 1 and 2), CLI-89-03, 29 NRC 234, 240- 41 (1989).
action on potable water is deficient. This is fully explained in the Staffs answer to Amended
Contention 1-C below.
Because Amended Contention 1-B is not based on new information, does not identify, let
alone dispute, on-point discussions in the Staffs environmental review, and does not provide
alleged facts or expert opinions that support its challenges to the Staffs environmental review, it
does not meet either the good cause requirements of 10 C.F.R. § 2.309(c) or the contention
admissibility requirements of 10 C.F.R. § 2.309(f). Accordingly, Contention 1-B should be
dismissed.
- 3. Amended Contention 1-C is Not Admissible because it is Not Based on New Information, Does Not Genuinely Dispute the 2024 FSEIS, and is Not Supported
In Amended Contention 1-C Petitioner states:
The 2024 FSEISs assessment of the impact of the proposed action to groundwater quality is inadequate because it underestimates the impacts on drinking water resources.[ 198]
As required by the 2015 DERM Consent Agreement, the 2016 FDEP Consent Order, and its
National Pollutant Discharge Elimination System (NPDES) permit, 199 FPL must take the
remediation actions of freshening the CCS and retracting the hypersaline groundwater plume
and must measure and report the effect of those remediation actions. 200 In Amended Contention
1-C, however, Petitioner asserts that these remediation actions will have the opposite of their
intended effect, as explicitly set forth by state and local regulators, 201 and will instead actually
expand the saltwater interface so that it moves towards and ultimately impacts users of the
198 Motion at 21.
199 See 2024 FSEIS at 2-28.
200 Motion at 22.
201 See 2015 DERM Consent Agreement at 5-6 (stating that the recovery well system shall retract hypersaline groundwater); 2016 FDEP Consent Order at 7-9 (stating that FPL shall freshen the CCS and operate a recovery well system to retr act the hypersaline groundwater plume).
Biscayne Aquifer for potable water.202 Petitioner asserts that this is a major concern203 and lays
out a theory for why this concern may come to pass.204
Amended Contention 1-C largely restates the arguments in Amended Contention 1 -B
and, therefore, is not admissible for the same reasons that Amended Contention 1-B is not
admissible. Like Amended Contention 1-B, Amended Contention 1-C asserts that the Staffs
impact determination regarding groundwater quality of SMALL to MODERATE was incorrect
because the continued operation of the CCS as a heat sink during the [subsequent license
renewal] term will produce significant and destabilizing effects on the Biscayne Aquifer, a
potable groundwater resource. 205 However, as with Amended Contention 1-B, Amended
Contention 1-C does not discuss any of the information in the 2019 FSEIS, the 2023 DSEIS, and
the 2024 FSEIS regarding groundwater use conflicts for the Biscayne Aquifer. In those
documents, the Staff explains that (1) the delineation between potable and non-potable water in
the Biscayne Aquifer is the 10,000 mg/L TDS boundary referred to as the saltwater interface, (2)
the saltwater interface is influenced by the CCS and the hypersaline groundwater plume
underlying the CCS, (3) the modeling and monitoring data indicate that the remediation action of
withdrawals of hypersaline groundwater from the Biscayne Aquifer are removing its influence on
the saltwater interface, and (4) these withdrawals are not drawing down the aquifer to an extent
that would impact these users.206 In this manner, the preexisting Staff environmental review in
the 2019 FSEIS and the 2023 DSEIS already discussed the issues in Amended Contention 1-C,
including the Newton Field wells that Petitioner asserts are the nearest wells to the CCS, 207 and
202 Motion at 22.
203 Id.
204 Id. at 34.
205 Id. at 21-22.
206 See 2019 FSEIS at 3 3-88, 4-29-4-35; 2023 DSEIS at 2-16-2-20; 2024 FSEIS at 2 2-21.
207 Motion at 27.
determined that the impact to potable water use of the Biscayne Aquifer would be SMALL. 208
Therefore, as explained in the Staff answer to Amended Contention 1-B, Petitioner s argument
both (1) is not timely and (2) does not genuinely dispute the Staffs environmental review and,
accordingly, consistent with 10 C.F.R. § 2.309(c) and 10 C.F.R. § 2.309(f) (1)(vi), respectively,
should be dismissed.
The difference between Amended Contention 1-C and Amended Contention 1-B is that,
unlike Amended Contention 1-B, Amended Contention 1-C does discuss support for the
argument that the Staff did not adequately evaluate the issue of the impact of the proposed
action on the potable use of the Biscayne Aquifer. Specifically, where Amended Contention 1-B
only refers generally to the 2024 Nuttle Report,209 Amended Contention 1-C discusses that
report in detail. 210 Amended Contention 1-C states that, according to the 2024 Nuttle Report,
instead of retracting the saltwater interface, FPLs remediation actions, which are required by
the 2015 DERM Consent Agreement, the 2016 FDEP Consent Order, and NPDES permit, will
actually expand the saltwater interface such that it moves closer to users of the Biscayne
Aquifer and, therefore, could potentially impact their use of the aquifer. 211 Petitioner s theory,
208 See, e.g., 2019 FSEIS at 3-106-7 (While the Biscayne aquifer is the principal source of potable water supplied by the Miami-Dade Water and Sewer Department there are no potable water wells within the Turkey Point site boundary. There are no registered groundwater supply wells within a 2 -mi (3.2-km) band of the Turkey Point site boundary.
Relative to the Turkey Point site, the nearest mapped water supply wells are located about 5 mi (8 km) west of the western boundary of the CCS and are used to support mining operations.
As for public water supply sources, the nearest wells are located about 6 mi (10 km) from the northwest corner of the CCS and approximately 7 mi (11 km) from the center of the Turkey Point plant complex. Potable water supply for the Florida Keys comes from Biscayne aquifer wells located west of Florida City at the Florida Keys Aqueduct Authoritys J. Robert Dean Water Treatment Plant. These facilities are located approximately 9.5 mi (15 km) west, northwest of the western boundary of the CCS.); 2023 DSEIS at 2 2-22 ([T]he 0.1 ft drawdown contour within the Biscayne Aquifer extends approximately 1.5 miles west of the CCS in year 5 of the remediation period, and this contour does not intersect with any offsite water supply wells completed in the Biscayne Aquifer.).
209 Motion at 20- 21.
210 Id. at 26-34.
211 Id. at 22.
taken from the 2024 Nuttle Report, is that FPLs withdrawal of hypersaline groundwater from the
Biscayne Aquifer lowers the head in that area on the inland side of the reactor and that F P L s
freshening of the CCS with water from the Upper Floridan Aquifer, and to a lesser extent, the
interceptor ditch increases the head in the [CCS], leading to the infiltration of larger volumes
of saline water into the Biscayne Aquifer. 212 Petitioner concludes that this would effectively
suck[] saline water inland. 213 Based on this additional argument in Amended Contention 1-C as
compared to Amended Contention 1-B, Amended Contention 1-C should be dismissed for the
additional reasons that (1) its theory of the expansion of the saltwater interface is not based on
new information in the 2024 FSEIS and is not a new theory that only became available after the
opportunity to request a hearing on the 2023 DSEIS, but rather has been proposed since at
least 2018; (2) its theory of the expansion of the saltwater interface does not identify, let alone
dispute, the large amount of discussion and data in the 2019 FSEIS, the 2023 DSEIS, and the
2024 FSEIS demonstrating that the remediation action of withdrawals of hypersaline
groundwater from the Biscayne Aquifer are removing its influence on the saltwater interface;
and (3) its theory of the expansion of the saltwater interface is not supported because Petitioner
provides no data to support this theory and because bare assertions, even by an expert, are not
admissible. 214
First, Petitioner previously argued its theory of the expansion of the saltwater interface
towards potable water users in Contention 1 against the 2023 DSEIS, and Petitioner does not
identify how the arguments in that Contention 1 are being amended in any way here. The basis
for Amended Contention 1-C largely repeats the basis for Contention 1. 215 As provided by 10
212 Id.
213 Id.
214 See Pilgrim, CLI-12-15, 75 NRC at 714 (explaining that bare assertions and speculation, even by an expert, are insufficient to trigger a full adjudicatory proceeding).
215 Compare Motion at 22 with Hearing Request at 14-20 (both asserting that F P L s freshening of the CCS with water from the Upper Floridan Aquifer and the interceptor ditch and withdrawal
C.F.R. § 2.309(c), the opportunity to file amended contentions based on new information does
not grant Petitioner the ability to simply refile its Contention 1 because there is new language in
the 2024 FSEIS as compared to the 2023 DSEIS; on the contrary, the amended contention
must be based on information that is new in the 2024 FSEIS. All Petitioner s references to the
2024 FSEIS, though, are with respect to information that was already available in the 2019
FSEIS and the 2023 DSEIS. For example, Petitioner states that the 2024 FSEIS did not discuss
its theory, raised in its 2023 Hearing Request,216 that the required CCS freshening and
hypersaline groundwater withdrawal activities would expand the saltwater interface217 and that,
therefore, the Staff has not fully assess[ed] the impact of extended operation on groundwater
resources. 218 However, an assertion that the 2024 FSEIS does not include information that
similarly was not included in the 2023 DSEIS does not provide an adequate basis for an
amended contention under 10 C.F.R § 2.309(c).219 Petitioner also argues that the Staff response
in the 2024 FSEIS to Petitioner s comment on the 2023 DSEIS on this topic was not
sufficient; 220 however, that Staff response is similarly not new information because it relies on
preexisting information in the 2019 FSEIS regarding significant ongoing S tate and local
oversight and a water balance calculation of the inflows and outflows related to the CCS.221
Petitioner then challenges the information from the 2019 FSEIS identified by the Staff, 222 but
such a challenge is plainly something that could have been raised earlier and is not now timely.
Additionally, Petitioner cites new language from the 2024 FSEIS regarding the determination
of hypersaline groundwater from the Biscayne Aquifer increases the expansion of the saltwater interface in the Biscayne Aquifer).
216 Hearing Request at 14-20.
217 Motion at 22-23.
218 Id. at 23-24.
219 See WCS, CLI-21-9, 93 NRC at 248.
220 Motion at 23-24 (citing 2024 FSEIS at A A-46).
221 2024 FSEIS at A A-46.
222 Motion at 23-24.
that the hypersaline groundwater plume will not expand such that it could cause an impact
existing groundwater users,223 but doesnt acknowledge that this new language is simply
presenting preexisting information from the 2019 FSEIS, as is discussed above in the Staff
answer to Amended Contention 1-B. 224 Finally, the 202 4 Nuttle Report, on which Amended
Contention 1-C relies, advances the same theory as the 2018 Nuttle Report that was attached to
Petitioner s 2023 Hearing Request. 225 Moreover, the 2018 Nuttle R eport was previously relied
upon to raise similar challenges against the draft of the 2019 FSEIS. 226 And the 2024 Nuttle
Report relies on a 1978 study, 227 which is plainly not new information. For these reasons, neither
the basis for Amended Contention 1-C nor the argument of Amended Contention 1-C is new and
there is no indication that either of these has actually been amended. Therefore, all of the
arguments of Amended Contention 1-C could have been, and largely were, raised previously
and, therefore, repeating them here does not meet the good cause standard of 10 C.F.R.
§ 2.309(c) and, accordingly, Amended Contention 1-C should be dismissed.
Second, Petitioner s theory of the expansion of the saltwater interface towards potable
water users is not admissible because, although it relies on the same baseline conditions as the
Staffs environmental review, it comes to a different conclusion without discussing, let alone
disputing, the data that support the Staffs conclusion that the remediation action of withdrawals
of hypersaline groundwater from the Biscayne Aquifer are removing its influence on the
saltwater interface. Both the Staffs environmental review and Amended Contention 1-C discuss
223 Id. at 24-25 (citing 2024 FSEIS at 2 -39).
224 See 2019 FSEIS at 4 4-35.
225 See Hearing Request at Ex. 3, Att. A, page 3, 14-20 (ML23331A983) (Continued operation of the CCS impacts regional fresh water resources because active exchange between the CCS and the underlying aquifer feeds the growth of a plume of hypersaline water that accelerates the intrusion of saltwater toward well fields used for public water supply.).
226 See Southern Alliance for Clean Energys Request for Hearing and Petition to Intervene, Att.
4 (Aug. 1, 2018) (ML18213A528 (package)).
227 Motion at 32.
that the effect of the proposed action on potable water users is based, in part, on whether the
saltwater interface is expanded. 228 Both discuss the position of the saltwater interface outside of
the CCS as affected by the inflows to and outflows from the CCS. 229 Whereas Petitioner asserts
that the Staff is tracking only chlorinity at 19,000 mg/L in its determination as to whether the
continued operation of the CCS as a heat sink will affect groundwater quality;230 the Staffs
environmental review actually discusses the impact of the CCS on the saltwater interface. 231
Petitioner discusses the CCS water budget, including freshening activities, 232 but doesnt
explain how this discussion in any way disputes the discussion of this same topic in the 2019
FSEIS and the 2024 FSEIS.233 Finally, the discussion of the identification of tritium at levels
greater than 20 pico-Curie per liter in wells as it relates to the Newton Wellfield agrees with, and
does not dispute, the Staffs environmental review.234 Taken together, Petitioner does not
dispute any aspect of the Staffs environmental review with respect to the location of the
saltwater interface in relation to potable water users of the Biscayne Aquifer.
The only portion of the Staffs environmental review that Petitioner specifically disputes
is its conclusion that potable water users of the Biscayne Aquifer will not be impacted by the
required remediation actions. 235 This, though, is not a genuine dispute because Petitioner does
not engage with any of Staffs reasoning for reaching that conclusion; instead, Petitioner ignores
that reasoning and supplies its own theory on how the CCS can affect nearby public water
228 Motion at 27; 2019 FSEIS at 4 4-31, 4-34.
229 Motion at 27-29; 2019 FSEIS at 3 3-11, 3 3-88; 2024 FSEIS at 2 2-38.
230 Motion at 31 - 32.
231 2019 FSEIS at 3 3-70; see also 2019 FSEIS at 3 3-88 (examining the CCSs contribution to the movement of the saltwater interface).
232 Motion at 32-33.
233 2019 FSEIS at 3 3-11, 3 3-88; 2024 FSEIS at 2-25-2-38.
234 Compare Motion at 34 with 2019 FSEIS at 3 76, 4-27; 2024 FSEIS at 2 2-66 (identifying the westward boundary of potential CCS water as approximately 2 miles southeast of the Newton Wellfield).
235 Motion at 26 (citing 2024 FSEIS at 2-39).
supply wells.236 In sum, the Staffs environmental review determined the amount of withdrawals
from the Biscayne Aquifer by the recovery well system and the amount of freshening of the
CCS, discussed modeling predicting that the withdrawals would indirectly pull the saltwater
interface seaward, discussed modeling predicting that the withdrawals would not drawdown the
aquifer to an extent that would impact existing users, discussed peer-reviewed data indicating
that the hypersaline groundwater plume has been reduced since the start of recovery well
system operations in 2018, discussed data indicating that the salinity of the CCS has decreased,
and discussed the continuing requirements of the 2015 DERM Consent Agreement, the 2016
FDEP Consent Order, and the NPDES permit that are enforced by local and State regulators. 237
In response to this fulsome analysis, Petitioner only disputes the Staffs reliance on regulatory
requirements as enforced by local and State regulators, stating that such reliance is contrary to
N E PA. 238 However, as found by a previous Board addressing previous arguments based on
these same facts, the suggestion that NEPA proscribes the NRC Staff from considering
enforcement requirements and oversight activities by local authorities when preparing its
environmental review is incorrect as a matter of law and does not amount to a genuine
dispute; instead, [p] ursuant to binding case law, licensing boards accord substantial weight to
the determination of Florida and Miami-Dade County that FPL will comply with its legal
obligations. 239 Because Petitioner does not engage with the Staffs analysis for why the
proposed action will not result in any conflicts with potable water users of the Biscayne Aquifer,
Amended Contention 1-C does not meet the requirement and 10 C.F.R. § 2.309(f)(1)(vi) and,
accordingly, should be dismissed.
236 Motion at 27.
237 2019 FSEIS at 4 4-31; 2024 FSEIS at 2 2-40.
238 Motion at 23-24.
239 Turkey Point, LBP-19-8, 90 NRC at 164-65. See also Arkansas Power & Light Co. (Arkansas Nuclear One Unit 2), ALAB -94, 6 AEC 25, 28 (1973).
Finally, even if the Board were to entertain Petitioner s theory, despite the fact that it was
presented before in 2018 and 2023 and rejected and therefore is not timely, and despite the fact
that it does not refer to and dispute any of the Staffs analysis of the matter and therefore is not
a genuine dispute, the Board would still have to find that the theory is not sufficiently supported,
contrary to the contention admissibility requirement of 10 C.F.R. § 2.309(f)(1)(v). According to his
report, Dr. Nuttle used multiple regression analysis applied to a record of changes in water
levels in the CCS, the water balance fluxes, and salinity from January 2016 through May 2020
to quantify the change in water level that will result from planned current and planned future
freshening operations.240 This resulted in a finding of a current total increase in CCS water
level of 0.38 feet and, if the amount of water added for freshening is increased to approximately
30 million gallons per day, then a total increase of 0.52 feet, as compared to a 2010
baseline. 241 Dr. Nuttle then compared these values to a 1978 study and concluded that a 0.5
foot increase in CCS water level could decrease the regional gradient by as much as 25
percent and can be expected to displace the position of the salt water interface to the west
between [approximately] 1 mile, under wet, high regional gradient conditions, and
[approximately] 7 miles, under dry, low regional gradient conditions.242 However, nowhere does
Petitioner explain how this prediction of an expansion of the saltwater interface aligns with the
monitoring data discussed in the Staffs environmental review. Specifically, Petitioner s position
is that the remediation actions of withdrawing hypersaline groundwater and freshening the CCS
combine to suck[] saline water inland 243 and Dr. Nuttle asserts that this could expand the
saltwater interface by as much as 7 miles, which would approach wells in the Biscayne
240 2024 Nuttle Report at 23.
241 Id.
242 Id. at 24.
243 Motion at 22.
Aquifer. 244 However, the 2024 FSEIS includes monitoring data gathered since both the
operation of the recovery well system and the freshening of the CCS that shows an overall
decrease in the annual average salinity in the CCS and the overall volume and extent of the
hypersaline groundwater plume, 245 which is contrary to the prediction of Petitioner s theory. By
not addressing this monitoring data, Petitioner does not provide support for its theory and such
an unsupported theory, even if proposed by an expert, is not admissible. 246
B. New Contention 2 is Not Admissible because it Does Not Genuinely Dispute the 2024 FSEIS, is Not Supported, and is Not Material to the Findings that the NRC Must Make
In New Contention 2 Petitioner states:
The 2024 FSEISs analysis of the potential impacts of Turkey Points continued operation during the renewal period on Miami cave crayfish is inadequate and its determination that continued operation is unlikely to adversely affect or jeopardize the Miami cave crayfish is unsupported.[ 247]
Petitioner bases New Contention 2 on the same theory that Petitioner advanced in Amended
Contention 1-Cthat the required remediation actions of freshening the CCS and withdrawing
hypersaline groundwater from the Biscayne Aquifer are actually expanding saltwater intrusion in
the Biscayne Aquifer. 248 Petitioner argues that because the Miami cave crayfish is susceptible to
the effects of water salinity at any level above natural freshwater conditions, such an expansion
of saltwater intrusion in its habitat will necessarily adversely affect the crayfish. 249 Therefore,
Petitioner concludes that the proposed action, which would include the continued operation of
the CCS and, in turn, potentially continued remediation actions, will adversely affect the Miami
244 Id. at 32-34.
245 2024 FSEIS at 2-30- 2-38.
246 Pilgrim, CLI-12-15, 75 NRC at 714.
247 Motion at 36.
248 Id. at 38-39; 42-44. See also id. at 46 (challenging the Staffs assumption in its discussion of impacts on the Miami cave crayfish that the hypersaline plume will retract as planned).
249 Motion at 41-44.
cave crayfish through increased exposure to salinity. 250 Petitioner also asserts that for this
reason the Staff is required under the Endangered Species Act of 1973, as amended (ESA), to
confer with the U.S. Fish and Wildlife Service (FWS) regarding the proposed action. 251
New Contention 2 is not admissible because, first, just as with Amended Contention 1 -C,
the theory on which New Contention 2 is based does not genuinely dispute the Staffs
environmental review and is not supported by data, including the contrary data identified in the
Staffs environmental review. In the 2019 FSEIS, the 2023 DSEIS, and the 2024 FSEIS, the
Staff explained that saltwater intrusion in the Biscayne Aquifer is influenced by the salinity of the
CCS and the hypersaline groundwater plume underlying the CCS, determined the amount of
withdrawals from the Biscayne Aquifer by the recovery well system and the amount of
freshening of the CCS, discussed modeling predicting that these remediation actions are
removing the hypersaline groundwater plumes influence on saltwater intrusion, discussed peer -
reviewed data indicating that the hypersaline groundwater plume has been reduced in size
since the start of recovery well system operations in 2018, discussed data indicating that the
salinity of the CCS has decreased, and discussed the continuing requirements to reduce the
hypersaline groundwater plume in the Biscayne Aquifer and the salinity of the CCS of the 2015
DERM Consent Agreement, the 2016 FDEP Consent Order, and the NPDES permit that are
enforced by local and State regulators. 252 For these same reasons for why the proposed action
and the related required remediation actions would not expand saltwater intrusion in the
Biscayne Aquifer, the 2024 FSEIS explains that the proposed action would also not adversely
affect the Miami cave crayfish.253 Petitioner, though, does not genuinely dispute this
250 Id. at 44.
251 Id. at 48-49.
252 See 2019 FSEIS at 3 3-11, 3 3-88, 4-29-4-35; 2023 DSEIS at 2-16-2-20; 2024 FSEIS at 2 2-40.
253 2024 FSEIS at 2-67 ([T]he NRC staff concludes that based on the results obtained to date, it is likely that, with continued freshening of the CCS and continued operation of the [recovery
explanation; instead, Petitioner, with reference to Amended Contention 1-C, advances its own
theory for how the required remediation actions wil l actually expand, rather than retract,
saltwater intrusion. 254 Nowhere does Petitioner explain how this theory aligns with the
monitoring data discussed in the Staffs environmental review, which show an overall decrease
in the annual average salinity of the CCS as well as in the overall volume and extent of the
hypersaline groundwater plume. 255 By not supply ing any data or discussing the contrary data in
the Staffs environmental review, Petitioner does not provide support for its theory and such an
unsupported theory, even if proposed by an expert, is not admissible.256 Moreover, Petitioner s
theory implicitly challenges the presumption, relied upon as part of the Staffs conclusion that
the proposed action will not adversely affect the Miami cave crayfish,257 that State and local
regulators will enforce their regulations such that the required remediation actions will not
expand the current saltwater intrusion in the Biscayne Aquifer. Such a challenge, though, is
contrary to the well-recognized presumption of administrative regularity that applies to these
well system] to halt and retract the westward migration of the hypersaline plume, as required by the 2015 Miami-Dade County Consent Agreement, the 2016 FDEP Consent Order, and the NPDES permit and enforced by local and State regulators, the operation of Turkey Point Units 3 and 4 during the [subsequent license renewal] term would not worsen the hypersaline groundwater plume outside the plant boundary, destabilize the groundwater resource, or adversely affect the beneficial uses of groundwater offsite by existing users. Notably, the hypersaline plume does not currently overlap with the endemic range of the Miami cave crayfish and the required continued CCS freshening would ensure that water originating from the CCS does not influence the Biscayne Aquifer s saltwater/freshwater interface within the species range. Therefore, the NRC staff finds that Miami cave crayfish are unlikely to experience measurable effects from saltwater intrusion associated with the proposed continued operation of Turkey Point during the [subsequent license renewal] term.).
254 Motion at 38-39.
255 2024 FSEIS at 2-30- 2-38.
256 Pilgrim, CLI-12-15, 75 NRC at 714.
257 2024 FSEIS at 2-67.
regulators. 258 For these reasons, Petitioners challenge to the Staff s determination of the effect
of the proposed action on the Miami cave crayfish does not amount to an admissible contention.
In addition to the theory at the core of New Contention 2 not amounting to an admissible
contention regarding the effect of the proposed action on the Miami cave crayfish, none of
Petitioners other arguments in New Contention 2 amount to an admissible contention either.
Petitioner makes arguments regarding the environmental baseline relevant to the Miami cave
crayfish, but these arguments do not show that a genuine dispute exists with the Staffs
environmental review on a material issue of law or fact. For example, Petitioner faults the 2024
FSEIS for not specifically identifying that the Miami cave crayfish is susceptible to the effects of
water salinity at any level above natural freshwater conditions 259 and for not discussing the
gradient of the saltwater intrusion.260 Petitioner also asserts that saltwater intrusion already
extends into known crayfish habitat. 261 Finally, Petitioner identifies uncertainty with respect to
the Miami cave crayfishs range.262 The basis for all of these statements related to the Miami
cave crayfish environmental baseline is the Federal Register Notice proposing to list the Miami
cave crayfish as a threatened species under the ESA263 and the FWS species status
assessment report used as the basis for that notice. 264 These, though, are the exact same
sources of information on which the 2024 FSEIS is based. 265 Therefore, Petitioners assertions
258 Arkansas Nuclear One, ALAB-94, 6 AEC at 28. See also Turkey Point, LBP-19-8, 90 NRC at 164-65.
259 Motion at 41.
260 Id. at 43.
261 Id. at 45.
262 Id. at 47.
263 Endangered and Threatened Wildlife and Plants; Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish; Proposed Rule, 88 Fed. Reg. 64,856 (Sept. 20, 2023).
264 FWS, Miami Cave Crayfish (Procambarus milleri) Species Status Assessment Version 1.2 (Sept. 2023), available at https://ecos.fws.gov/ServCat/DownloadFile/238642.
265 2024 FSEIS at 2-63 (Information in this section is drawn from the FWSs proposed rule (88 FR 64856) and Species Status Assessment unless otherwise cited.).
agree with, rather than dispute, the 2024 FSEIS and recognize that these sources of information
are appropriate, contrary to Petitioners later criticism of the 2024 FSEIS for using decades old
information. 266 NEPA requires the conduct of an environmental review with the best information
available today and does not mandate that an agency undertake studies to obtain information
that is not already available. 267 And the Staffs environmental review, as discussed above, has
gathered substantial information in support of the conclusion that the proposed action would not
expand saltwater intrusion in the Biscayne Aquifer and, accordingly, would not adversely affect
the Miami cave crayfish. 268 Petitioner also states that the Staffs environmental review ignores
the volume of saline water exiting the CCS as a function of its operations and related
freshening, the effects of the continued operation of the CCS on t he hydraulic gradient, and
the advancing line of saltwater intrusion 269 and asserts that the Staffs environmental review
instead assumes that the impacts of the hypersaline plume are coextensive with the broader
salinizing effects of the CCS. 270 These statements are also not genuine disputes because they
do not acknowledge that the Staffs environmental review discusses the water budget of the
CCS 271 and how groundwater of differing salinity moves in the Biscayne Aquifer in relation to the
operation of the CCS.272 Finally, Petitioners identification of uncertainties in the Staffs analysis
266 Motion at 47.
267 Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), CLI-16-18, 84 NRC 167, 173-174 (2016) (finding that the Staffs environmental review discussing the CCS combined with the Boards decision was sufficient to disclose the environmental impacts of the proposed action and that no further information needed to be developed); Luminant Generation Co., LLC (Comanche Peak Nuclear Power Plant, Units 3 and 4), CLI-12-7, 75 NRC 379, 391 - 92 (2012).
268 See 2019 FSEIS at 3 3-11, 3 3-88, 4-29-4-35; 2023 DSEIS at 2-16-2-20; 2024 FSEIS at 2 2-40.
269 Motion at 45.
270 Id. at 46.
271 2019 FSEIS at 3 3-11, 3 3-88; 2024 FSEIS at 2-25-2-38.
272 2019 FSEIS at 3 3-88.
is also not a genuine dispute on a material issue;273 on the contrary, NEPA does not call for
certainty or precision, but an estimate of anticipated (not unduly speculative) impacts.274
Additionally, Petitioner faults the Staffs evaluation of the effects of the proposed action
on the Miami cave crayfish for not discussing the cumulative effects of the proposed action and
of sea level rise. 275 The Staffs environmental review, though, does discuss the cumulative
impacts of sea level rise and operation of the CCS on the saltwater interface.276 It states that
currently, the saltwater interface is located about 4.7 m iles west of the CCS at its closest
point. 277 It explains that because of the operation of the recovery well system and the freshening
of the CCS, the saltwater interface will be retracted back to the east from its current
location. 278 It also explains that as sea levels rise, saltwater from the east would move along
the base of the Biscayne Aquifer, pushing the saltwater interface farther to the west from its
current location. 279 Combined with sea level rise, decreases in recharge to the Biscayne Aquifer
would reduce the freshwater hydraulic head in the Biscayne aquifer, further increasing the
potential for westerly migration of the saltwater interface.280 The 2024 FSEIS contains an
updated discussion of sea level rise.281 Therefore, again, Petitioner has not shown that a
genuine dispute exists with the Staffs environmental review on a material issue of law or fact.
Taken together, the environmental baseline of both the current condition of the Miami cave
crayfish and future sea level rise is discussed in the Staffs environmental review. Accordingly,
273 Motion at 46-48.
274 Louisiana Energy Services, L.P. (National Enrichment Facility), CLI 20, 62 NRC 523, 536 (2005).
275 Motion at 44-45.
276 2019 FSEIS at 4 -132-4-133.
277 Id. at 4-132.
278 Id. at 4-131.
279 Id. at 4-132.
280 Id.
281 2024 FSEIS at E E-11.
the Staffs environmental review fulfills the dual mandates of NEPA to foster informed decision-
making and informed public participation282 and Petitioner does not demonstrate that more is
required.
Finally, the issue raised in New Contention 2 is not material to the findings that the NRC
must make under the ESA to support the proposed action because Petitioner largely challenges
the Staffs discussion of the current and future environmental baseline and how it may affect the
Miami cave crayfish and not the issue that is actually relevant to the ESA and its implementing
regulationsthe potential effects of the proposed action itself on the Miami cave crayfish. 283 As
discussed above, the only argument that Petitioner makes with respect to the potential effects of
the proposed action itself does not amount to an admissible contention because it is based on a
theory of the required remediation actions actually expanding saltwater intrusion, which does
not genuinely dispute the Staffs environmental review and is not supported.
On September 20, 2023, the FWS proposed a rule to list the Miami cave crayfish as a
threatened species under the ESA. 284 Therefore, consistent with Section 7(a)(4) of the ESA and
50 C.F.R. § 402.10, the finding that the NRC must make under the ESA is whether the
proposed action of licensing Turkey Point for an additional 20 years, which would include the
plants continued use of the CCS and potentially continued required remediation actions, is
likely to jeopardize the continued existence of the Miami cave crayfish or result in the
282 See McGuire, CLI-02-17, 56 NRC at 10 (quoting Claiborne, CLI-98-3, 47 NRC at 88).
283 See ESA § 7(a)(4) (Each Federal agency shall confer with the Secretary on any agency action which is likely to jeopardize the continued existence of any species proposed to be listed under [ESA] section 4 or result in the destruction or adverse modification of critical habitat proposed to be designated for such species.) (emphasis added); 50 C.F.R. § 402.10(a) ( Each Federal agency shall confer with the Service on any action which is likely to jeopardize the continued existence of any proposed species or result in the destruction or adverse modification of proposed critical habitat.) (emphasis added); 50 C.F.R. § 402.2 (defining action as all activities or programs of any kind authorized, funded, or carried out, in whole or in part, by Federal agencies in the United States, which include the granting of licenses); Center for Biological Diversity v. U.S. Fish & Wildlife Service, 807 F.3d 1031, 1052 (9th Cir. 2015).
284 88 Fed. Reg. at 64,856.
destruction or adverse modification of proposed critical habitat. 285 If so, then the Staff must
confer with the FWS.286 In order to make this finding, the Staff evaluates the potential effects of
the proposed action on proposed species and proposed critical habitat to determine whether
they are likely to be adversely affected by the proposed action such that a conference would be
required. 287 This evaluation looks at the environmental baseline, which is the condition of the
listed species or its designated critical habitat in the action area, without the consequences to
the listed species or designated critical habitat caused by the proposed action and includes the
past and present impacts of all Federal, State, or private actions and other human activities in
the action area. 288 It then looks at the effects of the action, which are all consequences to
listed species or critical habitat that are caused by the proposed action meaning that the
consequence would not occur but for the proposed action and it is reasonably certain to occur
and cumulative effects, which are those effects of future State or private activities, not involving
Federal activities, that are reasonably certain to occur within the action area of the Federal
action subject to consultation. 289
Consistent with the ESA and its implementing regulations, in the 2024 FSEIS, the Staff
documents why it determined that the proposed action itself is not likely to jeopardize the
285 Jeopardize the continued existence of means to engage in an action that reasonably would be expected, directly or indirectly, to reduce appreciably the likelihood of both the survival and recovery of a listed species in the wild by reducing the reproduction, numbers, or distribution of that species; Destruction or adverse modification means a direct or indirect alteration that appreciably diminishes the value of critical habitat as a whole for the conservation of a listed species. 50 C.F.R. § 402.02.
286 50 C.F.R. § 402.10(a).
287 50 C.F.R. § 402.12(a).
288 50 C.F.R. § 402.02. See also 50 C.F.R. § 402.14(c)(1)(iii) (Information on the listed species and designated critical habitat in the action area, including available information such as the presence, abundance, density, or periodic occurrence of listed species and the condition and location of the species habitat, including any critical habitat.).
289 50 C.F.R. § 402.02.
continued existence of the Miami cave crayfish.290 Specifically, all of the data obtained to date
demonstrate that the required remediation actions of hypersaline groundwater withdrawals and
CCS freshening are removing the hypersaline groundwater plumes influence on saltwater
intrusion, and, moreover, the 2015 DERM Consent Agreement, the 2016 FDEP Consent Order,
and the NPDES permit provide reasonable assurance that this will continue to be the case.291
As discussed above, this finding is based on significant discussions in the 2019 FSEIS, the
2023 DSEIS, and the 2024 FSEIS292 and is not unsupported as Petitioner asserts. 293
Petitioners challenges to the Staffs discussion of the environmental baseline, such as the
current condition of the Miami cave crayfish and future sea level rise, are not material to this
finding because the Staffs finding is based on the determination that the effects of the proposed
action would not be any worse than the effects of the environmental baseline. That is, when the
effects of the action and cumulative effects are added to the environmental baseline and in
light of the status of the species and critical habitat, the proposed action is not likely to
jeopardize the continued existence of the Miami cave crayfish or result in the destruction or
adverse modification of its critical habitat294 because, as demonstrated throughout the Staffs
environmental review, the effects of the proposed action and cumulative effects at most would
not increase the environmental baseline salinity conditions. Petitioners characterization of
existing saltwater intrusion conditions and sea level rise as a cumulative effects 295 does not
change this, because it is the incremental effect of the proposed action itself that is the factor
290 2024 FSEIS at 2-63-2-67, B-2.
291 Id. at 2-67.
292 See 2019 FSEIS at 3 3-11, 3 3-88, 4-29-4-35; 2023 DSEIS at 2-16-2-20; 2024 FSEIS at 2 2-40.
293 Motion at 36.
294 50 C.F.R. § 402.14(g)(4).
295 Motion at 44-46.
that is material to the analysis required by the ESA. 296 Taken together, Petitioner has not
demonstrated that any of these arguments are material to the Staffs evaluation of the Miami
cave crayfish under the ESA and would in any way change the Staffs determination that the
effects of the proposed action itself would not require the NRC to confer with the FWS.
In conclusion, Petitioners argument in New Contention 2 that the Staffs environmental
review is inadequate under NEPA and the ESA with respect to its discussion of the Miami cave
crayfish does not amount to an admissible contention. First, Petitioners assertion that the effect
of the proposed action on the Miami cave crayfish will be greater than that determined by the
Staff is based on a theory that the required remediation actions of hypersaline groundwater
withdrawals and CCS freshening will somehow expand, rather than retract, salinity in the
Biscayne Aquifer and, therefore, impact the crayfish; however, Petitioner does not provide
sufficient information to show that a genuine dispute exists with the Staffs environmental review
in this regard or provide facts that support this theory. Moreover, Petitioners criticisms of the
Staffs discussion of the current and future environmental baseline relevant to the Miami cave
crayfish do not show that a genuine dispute exists with that discussion, but, instead, largely
agree with that discussion. Finally, Petitioner does not demonstrate that its challenges regarding
the Miami cave crayfish are material to the findings that the Staff must make under the ESA and
its implementing regulations because Petitioner does not explain how the proposed action itself,
and not the current and future environmental baseline, will jeopardize the continued existence of
the crayfish such that the Staff would be required to confer with the FWS. Therefore, New
296 See Center for Biological Diversity v. U.S. Fish & Wildlife Service, 807 F. 3 d at 1052 (stating that it would be inconsistent with the statutory scheme that jeopardy caused by cumulative effects could obviate the requirement that the federal action itself must cause some incremental deterioration in the species pre-action condition) (emphasis added); Appalachian Voices v.
United States Department of Interior, 25 F.4th 259, 276 (4th Cir. 2022) (not faul ting the FWS for considering climate change as part of the environmental baseline analysis).
Contention 2 does not meet the contention admissibility requirements of 10 C.F.R.
§ 2.309(f)(1)(iv)- (vi) and, accordingly, should be dismissed.
C. New Contentions 3-A and 3-B are Not Admissible because they Do Not Meet Both the Good Cause Requirements of 10 C.F.R. § 2.309(c) and the Contention Admissibility Requirements of 10 C.F.R. § 2.309(f)
As explained below, New Contentions 3-A and 3-B are not admissible because they do
not meet both the good cause requirements of 10 C.F.R. § 2.309(c) and the contention
admissibility requirements of 10 C.F.R. § 2.309(f).
- 1. New Contentions 3-A and 3-B are Not Admissible because the Information on which they are Based is Not New and Materially Different f rom Information Previously Available
On April 2, 2024, the GAO issued Report 24-106326 on the potential effects of climate
change on nuclear power plants.297 Petitioner asserts that this report constitutes good cause
under 10 C.F.R. § 2.309(c)(i)- (iii) to file new contentions on the 2024 FSEIS. 298 But Petitioner
has effectively reconstituted prior Contentions 3 and 5, which were not admitted as part of its
challenge to the 2023 DSEIS, 299 as New Contentions 3-A and 3-B, respectively, and the GAO
Report does not include information that is new and materially different from information
previously available such that the Board should re-entertain these contentions.
The GAO R eport is insufficient to support New Contentions 3-A and 3-B as admissible
contentions because the information in the GAO Report is a generalized compilation of
previously publicly available information and is unrelated to license renewal at Turkey Point and,
therefore, does not demonstrate good cause pursuant to 10 C.F.R. § 2.309(c)(i). Furthermore,
the information is not materially different from information previously available relating to climate
change impacts on Turkey Point as is required for Petitioner to demonstrate good cause
pursuant to 10 C.F.R. § 2.309(c)(ii). The GAO Report recommends that the Chair of the NRC
297 GAO Report at 1.
298 Motion at 52-53.
299 See LBP-24-3, 99 NRC at __ (slip op. at 26 - 29, 31-34).
direct internal assessment of the processes to address climate change, implement a plan to
address any gaps identified, and finalize guidance to incorporate climate data, and does not
identify any way in which the Staffs license renewal reviews are deficient under the current
statutory or regulatory requirements.300
Nevertheless, Petitioner claims that the GAO Report provides a novel site-specific
analysis and conclusions about the specific vulnerability of Turkey Point to climate
change. 301 Petitioner mis-represents the GAO Report. The GAO Report expressly states
multiple times that [t]his analysis does not account for any protective measures plants may
have taken to mitigate the risk of selected natural hazards.302
Petitioner claims that the GAO Report provides a materially different picture from the
information previously available to describe the cumulative impacts to the environment from
climate change specific to the CCS in New Contention 3-A. 303 The GAO Report does no such
thing. Instead, the GAO Report references the threat of saltwater intrusion into the CCS as a
threat to operations at Turkey Point due to saltwater corrosion,304 and describes the historical
problem of high salinity in the CCS.305 The GAO Report does not present any new information
that has not already been litigated at length in this and prior proceedings.
300 GAO Report at 40.
301 Motion at 53.
302 GAO Report at 17, 20, 22, 24.
303 Motion at 55-59.
304 GAO Report at 22, 23 n.31 (According to [National Oceanic and Atmospheric Administration (NOAA)] officials, a rise in sea level can increase corrosion from saltwater intrusion NOAA officials said that Turkey Point Nuclear Generating Station is an example of a plant where, if unaddressed, sea level rise could lead to saltwater intrusion into the plants cooling canals.)
(emphasis added).
305 Id. at 15 (To mitigate these risks, the licensee constructed a series of wells to decrease the water salinity in the cooling canals.) (emphasis added).
A chief concern raised by Petitioner with the climate data in the 2024 FSEIS is that the
Staff is not using the most up -to-date information from the fifth National Climate Assessment. 306
The Staff updated the climate information discussion in the 2024 FSEIS to incorporate the fifth
National Climate Assessment. 307 Petitioner remains unhappy with the Staff s data and claims
that the GAO R eport provides more up-to-date information. 308 To the contrary, the GAO Report
analyzed climate change effects on temperature using the fourth National Climate
Assessment. 309 In fact, the GAO R eport came to the same conclusion that the Staff did that
after reviewing the relevant sections from the fifth National Climate Assessment, the GAO did
not identify any major differences in the predicted or projected trends for the selected natural
hazards [compared to the fourth National Climate Assessment]. 310 The Staff used the same
data that the GAO Report used and came to the same conclusion that the GAO Report did, yet
Petitioner claims that the S taffs conclusion is insufficient,311 while Petitioner also claims that the
GAO Report constitutes the exact sort of analysis that NRC Staff ought to undertake. 312
In New Contention 3-A, Petitioner seeks to rectify deficienc ies identified by this Board in
prior Contention 3 with information derived from the 2002 FSEIS, 313 and the 2019 FSEIS.314 In
so much as Petitioner attempts to rectify these deficiencies and others with preexisting
information, this constitutes a late attempt to reinvigorate thinly supported contentions by
306 Motion at 59-60.
307 2024 FSEIS at E E-11.
308 Motion at 59-60.
309 GAO Report at 49.
310 Id. at 3 n.3; see also 2024 FSEIS at E E-11.
311 Motion at 60.
312 Id. at 61.
313 See, e.g., id. at 59, n.230 - 231 (citing Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Turkey Point Plant, Units 3 and 4 - Final Report, NUREG-1437, Supplement 5, at 2-1 (Jan. 2002) (ML020280119) (2002 FSEIS)).
314 Id. at n.232.
presenting new arguments in response to the Boards previous ruling.315 Such arguments are
not supported by good cause, and Petitioner makes no attempt to justify that good cause exists
for any arguments not based on the GAO Report.
The GAO R eport compiles previously available climate information that was already
incorporated into the 2024 FSEIS. Accordingly, this information was previously available, and
the GAO Report relies on the same data that the 2024 FSEIS relies upon and, therefore,
Petitioner does not demonstrate good cause pursuant to 10 C.F.R. § 2.309(c)(i)- (ii). To the
extent that any new factual support for arguments has been raised that is not derived from the
GAO Report, Petitioner does not allege that good cause exists to include it as support for the
admissibility of New Contentions 3-A and 3-B. Therefore, Petitioner does not demonstrate good
cause pursuant to 10 C.F.R. § 2.309(c)(1)(i) and (ii) for both New Contentions 3-A and 3-B and,
accordingly, the Board should not entertain New Contentions 3-A and 3-B. 316
- 2. New Contention 3-A (Previous Contention 3) Does Not Genuinely Dispute the 2024 FSEIS, and the GAO Report Does Not Provide the Necessary Support as a Basis for the Previously Rejected Contention 3 to be Admissible Now
In New Contention 3-A Petitioner states:
The 2024 FSEIS fails to adequately analyze climate change-related environmental impacts that are reasonably foreseeable to occur during the subsequent license renewal period. [ 317]
Specifically, Petitioner re-argues Contention 3 from its challenge to the 2023 DSEIS that the
Staffs environmental review fails to adequately consider the cumulative impacts of continued
operations of Turkey Point, which was determined by the Board to not be admissible because
Petitioner did not provide sufficient support to raise a genuine material dispute. Even more
pertinent, this Board previously found that although Petitioner offered several sources of
315 See National Enrichment Facility, CLI 25, 60 NRC at 224-25; Duke Energy Corp.,
(McGuire Nuclear Station, Units 1 and 2), CLI 17, 58 NRC 419, 428 - 29 (2003).
316 10 C.F.R. § 2.309(c).
317 Motion at 75.
purportedly new information in support of its contention, it does not explain the significance of
that information to the Staffs review... and does not explain how its proffered information would
amount to more than fine-tuning the information in the [2023 D SEIS]. 318
As discussed above, Petitioner has not demonstrated good cause to file New Contention
3-A, as the information compiled in the GAO Report is not new and materially different from the
information previously available and, therefore, the good cause requirements of 10 C.F.R.
§ 2.309(c)(1)(i) - (ii) are not met. Furthermore, for the same reasons that this Board previously
did not admit Contention 3, this Board should not now admit New Contention 3-A as it, again,
fails to provide the necessary support for Petitioners assertions or demonstrate that a genuine
dispute exists on a material issue of fact or law, as is required by 10 C.F.R. § 2.309(f)(1) (v)- (vi).
Petitioner asserts that the GAO R eport provides a novel site-specific analysis and
conclusions about the specific vulnerability of Turkey Point to climate change.319 To the
contrary, it does not make any findings about any specific unaddressed environmental impacts
that might be exacerbated by climate change at Turkey Point. 320 The GAO R eport makes many
findings general to all U.S. nuclear power plants by applying climate change projections to the
general area of nuclear power plants, without taking into account any protective measures to
mitigate the external hazards at each plant.321
Petitioner claims that the site-specific analysis of climate change-related impacts is
located within the GAO Report. 322 Yet all of P etitioner s claims in New Contention 3-A simply
318 LBP-24-3, 99 NRC at __ (slip op. at 27).
319 Motion at 53.
320 The site-specific analysis is contained in the GAO Report at Appendix III, page 55. Turkey Point is mentioned on pages 15 and 23 regarding CCS salinity (unrelated to accident risk) and at page 19 to showcase the flood barriers protecting Turkey Point. None of this discussion suggests or demonstrates that climate change presents an unaddressed external hazard not yet considered, as the report specifically states that it does not account for protective measures to mitigate against natural hazards.
321 GAO Report at 17, 20, 22, 24.
322 Motion at 59, 61.
restate its prior arguments without citing to the GAO Report in a substantive manner. This is
because the GAO Report does not analyze climate changes cumulative impacts from any
nuclear power plant to the environment. Instead, the GAO Report discusses the effects of
climate change on U.S. nuclear power plant operations and makes three general
recommendations for executive action at the NRC. 323
The Board previously found that Petitioner did not provide sufficient information to
demonstrate a genuine, material dispute with the 2023 DSEIS regarding overtopping of the
CCS. 324 This Board previously found that the contention, citing a prior Board facing the
substantively similar argument, lacked such necessary information as the relationship between
th[e] projected sea levels and the relevant elevations of the Turkey Point site, its sea level
barriers, or the CCS, to support th[e] claim that the site will be flooded and the CCS
overtopped or breached.325 The GAO Report provides no new information that addresses any
of these factors. Instead, Petitioner seeks to rectify this deficiency in its previous pleading with
preexisting information derived from the 2002 EIS,326 and the 2019 FSEIS. 327 Nevertheless,
despite reciting the facts identified as missing previously by the Board, Petitioner fails to
demonstrate how a potential overtopping event could cause any significant environmental
impacts that might change the Staffs determination of SMALL impacts on surface water quality
in Biscayne Bay and Card Sound. 328 In the 2019 FSEIS, the S taff addressed a comment
regarding overtopping and climate change and explained with references to the body of the
2019 FSEIS why overtopping events, even if more frequent, would not have a material effect on
323 GAO Report at 40.
324 LBP-24-3, 99 NRC at __ (slip op. at 27).
325 Id. at __ (slip op. at 28).
326 See Motion at 59, n. 230- 231.
327 Id. at n. 232.
328 2019 FSEIS at 2-23; 2024 FSEIS at 2-2.
the Staffs determination of SMALL impacts on surface water quality in Biscayne Bay and Card
Sound. 329
This Board previously identified that a prior Board rejected a substantively similar
argument regarding the increase in air temperature and the rate of evaporation from the CCS.330
Just as the reasoning applied in 2019, and before this Board in 2024, it applies again here. New
Contention 3-A is not accompanied by sufficient support to demonstrate that the [postulated]
higher temperatures would increase evaporation in the CCS to any particular extent, much
less to an extent that would be sufficient to increase the CCS salinity such that it would, in turn,
affect the environment. 331 The GAO R eport provides no new information that addresses any of
these issues, 332 nor does New Contention 3-A and, therefore, Petitioner has failed to rectify the
deficiencies identified by the Board regarding CCS salinity levels and climate change.
Petitioner raises hurricane risks as a basis for its contention, but only cite s to a general
statement in the GAO Report about nuclear power plant safety in the event of a hurricane that
remains unconnected to cumulative impacts.333 Petitioner does not connect the GAO R eports
discussion of hurricanes to the Staffs cumulative impacts analysis, and it is not clear if
Petitioner seeks to raise a current licensing basis issue instead of a cumulative impacts
contention. Regardless, this vague assertion does not demonstrate a genuine dispute of
material fact regarding the cumulative impacts analysis in the 2024 FSEIS.
Petitioner does not demonstrate how any of the relevant information in the GAO Report
has not been accounted for in the Staffs environmental review. Instead, Petitioner effectively
329 2019 FSEIS at A A-40. See also 2024 FSEIS at A A-54.
330 LBP-24-3, 99 NRC at __ (slip op. at 28 - 29).
331 Id. at __ (slip op. at 28 - 29) (quotation marks omitted).
332 The GAO R eport specifically did not evaluate drought. We did not analyze drought data because we were unable to identify national-level geospatial data that was both relevant to nuclear power plants and sufficiently reliable for our purposes. GAO Report at 43, n. 3.
333 Motion at 61-62.
uses the GAO Report as an opportunity to re-argue its previously twice dismissed contention
and does not advance any argument that the GAO Report somehow remedies the previously
identified deficiencies in that contention. Therefore, New Contention 3-A does not meet 10
C.F.R. § 2.309(f)(1)(v)- (vi) and should be dismissed.
- 3. New Contention 3-B is Not Admissible because it is Not Supported, Does Not Genuinely Dispute the 2024 FSEIS, and is Not Within the Limited Scope of this License Renewal Proceeding
In New Contention 3-B Petitioner states:
The 2024 FSEIS fails to adequately update its evaluation of FPLs SAMA analysis to reflect the effects of climate change on accident risk.[ 334]
Specifically, Petitioner re-argues Contention 5 from its challenge to the 2023 DSEIS that the
Staffs environmental review fails to consider the effects of climate change on a ccident risk. In
LBP-24-3, the Board rejected Contention 5 because Petitioner did not provide sufficient support
to raise a genuine material dispute with the Staffs analysis in the 2023 DSEIS. 335 Petitioner now
argues that the GAO Report provides new and materially different information that satisfies the
good cause standard for new and amended contentions.336
New Contention 3-B is not admissible because the GAO Report that Petitioner cites as
support for this contention does not contain new and materially different information than that
which was previously available and Petitioner does not otherwise satisfy the good cause
requirements of 10 C.F.R. § 2.309(c)(i)- (ii). And even though Petitioner requested a waiver
under 10 C.F.R. § 2.335(b) to challenge the Staffs SAMA analysis in the 2024 FSEIS, as
discussed below in Section III, Petitioner s Petition for Waiver to challenge S taffs updated
SAMA analysis should be denied because it does not meet Millstone factors (iii) and (iv) to
demonstrate a prima facie case of special circumstances as required by 10 C.F.R. § 2.335(b).
334 Id. at 69.
335 LBP-24-3, 99 NRC at __ (slip op. at 33 - 34).
336 Motion at 52-53.
Additionally, New Contention 3-B raises issues that are not within the limited scope of this
license renewal proceeding, it is not supported, and it does not demonstrate that a genuine
dispute exists with the 2024 FSEIS on a material issue of fact or law and, therefore, it does not
meet 10 C.F.R. § 2.309(f)(1)(iii), (v), or (vi). Accordingly, New Contention 3-B should be
dismissed.
(a) New Contention 3 -B (Previous Contention 5) Does Not Genuinely Dispute the 2024 FSEIS, and the GAO R eport Does Not Provide the Necessary Support as a Basis for the Previously Rejected Contention 5 to be Admissible Now
This Board previously held that Contention 5, the prior iteration of New Contention 3 -B,
is inadmissible because it does not provide sufficient information to show a genuine, material
dispute exists with the [2023 DSEIS]. 337 New Contention 3-B is not admissible for similar
reasons. Here, Petitioner advances a generic GAO Report on climate change effects on nuclear
power plants as an attempt to demonstrate that it has good cause to file a new and amended
contention on climate change risks and SAMAs for Turkey Point specifically.
New Contention 3-B based on the GAO Report does not demonstrate how the Staffs
existing conservatisms, safety margins, and defense-in-depth to address natural phenomena fail
to adequately consider risks posed by climate change to nuclear power plants, and does not
demonstrate that Staffs SAMA update is inadequate. 338 The Commission has stated that unless
petitioners can show that their challenges to SAMA analyses could change the cost-benefit
conclusions, no purpose would be served to further refine the SAMA analysis, whose goal is
only to determine what safety enhancements are cost-effective to implement. 339 Citing the GAO
337 LBP-24-3, 99 NRC __ (slip op. at 32).
338 GAO Report at 65.
339 Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), CLI-10-11, 71 NRC 287, 315 - 17 (2010). See also McGuire, CLI-02-17, 56 NRC at 8, 11-12 (finding that the relevant inquiry to determine if a SAMA analysis meets the materiality contention admissibility requirement is whether the contention could change the cost-benefit analysis).
Report as support for its arguments, Petitioner advances safety concerns over f looding,
hurricane, and temperatures at Turkey Point before, during, and after the subsequent license
renewal term by alleging that the SAMA analysis does not account for climate change. 340 But
while the GAO Report looks at climate change projections at Turkey Point in its analysis, which
Petitioner elevates as a novel site -specific analysis and conclusions about the specific
vulnerability of Turkey Point to climate change, it does not make any findings about any specific
unaddressed risks of external hazards exacerbated by climate change to the safe operation of
Turkey Point, or point to any cost-effective accident mitigation measures that should be
considered. 341 This omission is significant. 342
Although the GAO R eport is new, the information within it is not and Petitioner has not
shown how this information supports challenges to the SAMA analysis that could change the
Staffs cost-benefit conclusions. Petitioner cites to the 2024 FSEIS and claims that the GAO
Report is new and significant information that would satisfy the criteria identified in the 2024
FSEIS of new information that indicates that a given potentially cost-beneficial SAMA would
substantially reduce the impacts of a severe accident or the probability or consequences (risk)
of a severe accident occurring.343 The Staff undertook this new and significant information
340 Motion at 72-74 (Petitioner also raises concerns about the storage of spent nuclear fuel well past the 2050s).
341 The site-specific analysis is contained in the GAO Report at Appendix III, page 55. Tur k e y Point is mentioned on pages 15 and 23 regarding CCS salinity (unrelated to accident risk) and at page 19 to showcase the flood barriers protecting Turkey Point. None of this discussion suggests or demonstrates that climate change presents an unaddressed external hazard not yet considered, as the report specifically states that it does not account for protective measures to mitigate against natural hazards.
342 As evidenced by Petitioner s citations to the GAO Report in its Motion, many of the concerns raised by the GAO R eport are about nuclear power plants reliability in delivering electricity to the grid, and the potential safety effects of individuals not having access to electricity.
343 Motion at 77 (quoting 2024 FSEIS at D-4).
evaluation pursuant to the NRC-endorsed topical report Nuclear Energy Institute (NEI) 17-04. 344
The Staff performed a new and significant information evaluation in the 2024 FSEIS based on
the first SAMA performed in accordance with 10 C.F.R. § 51.53(c)(3)(ii)(L). 345 As is explained in
the 2024 FSEIS:
An analysis of SAMAs was performed for Turkey Point at the time of the initial license renewal. The NRC staff documented its review of this analysis in NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 5, Regarding Turkey Point Units 3 and 4. Any new and significant information that might alter the conclusions of that analysis was considered in the [subsequent license renewal] application, as discussed below. No new and significant SAMAs were identified through FPLs use of the NRC-endorsed topical report Nuclear Energy Institute (NEI) 17 -04, Model [Subsequent License Renewal] New and Significant Assessment Approach for SAMA, nor was any new and significant information regarding SAMAs identified by the NRC staff in the FSEIS. [ 346]
Petitioner does not propose any SAMA alternative and does not argue that any proposed new
SAMA might be cost beneficial. Instead, Petitioner relies on the bare assertion that the SAMA
analysis does not address climate changes effects on flooding, hurricane, or temperate-related
severe accidents. 347
While Petitioner believes that the SAMA analysis needs to be redone with updated
climate data, Petitioner does not engage at all with F P L s underlying SAMA analysis.348 In the
2002 EIS, FPL provided a SAMA analysis, which the Staff evaluated and concurred with, which
identified internal events as the primary contributor to the baseline core damage frequency
344 2024 FSEIS at D-4 (citing Nuclear Energy Institute, Model [Subsequent License Renewal]
New and Significant Assessment Approach for SAMA, NEI 17-04, Rev. 1 (Aug. 2019)
(ML19316C718).
345 2002 FSEIS at 5 5-25.
346 2024 FS EIS at D-4.
347 Motion at 72-75.
348 Id. at 77-78 (If NRC Staff were to update the SAMA evaluation to reflect the risks identified in the GAO Report, it might very well call into question the [2024 FSEISs] overall conclusions regarding the probability-weighted consequences of potential severe accidents.) (quotation marks omitted).
(CDF). 349 FPLs SAMA analysis did not identify any fundamental weaknesses or vulnerabilities
of Turkey Point to severe accident risk with regard to the separate matter of external events
related to seismic, fire, high winds, flood, and other external hazards. 350
Here, Petitioner seeks to challenge the underlying inputs to the safety analyses, which
become the bases for the Staffs SAMA update in the 2024 FSEIS. 351 However, while Petitioner
asserts that it has identified a deficiency in the Staffs SAMA analysis, Petitioner has not
demonstrated that the existing historical climate data, with layers of conservatisms, safety
margins, and defense-in-depth, incorporated into NRCs processes might be unreliable to
address the natural hazards experienced at the plant, especially as external events are a low
contributor to overall CDF in F P L s SAMA analysis. 352 Just as P etitioner has not demonstrated
how the Staffs reliance on its existing climate data is unreliable or fails to adequately account
for climate change, it has not pointed to how consideration of climate change might result in a
different cost-benefit analysis. Petitioner does not make a logical connection to how the
incorporation of any information from the GAO Report paints a materially different picture of the
cost-benefit analysis done to address the SAMA analysis and Petitioner does not show that
climate change might change the SAMA analysis. In sum, New Contention 3-B does not provide
alleged facts or expert opinions that support its position and does not demonstrate that a
349 2002 FSEIS at 5-6 (listing the four top contributors to CDF as Transients, Loss-of-coolant accident (LOCA), Steam generator tube rupture (SGTR), and Interfacing system LOCA).
350 Id. at 5-9.
351 As Petitioner is challenging the underlying SAMA analysis, its challenge amounts to a challenge to 10 C.F.R. § 51.53(c)(3)(ii)(L).
352 Cf. Diablo Canyon, CLI 11, 74 NRC 427 (2011), affirming Pacific Gas & Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 & 2), LBP-10-15, 72 NRC 257, 282 (2010) (as the disproportionate risk at Diablo Canyon in the initial SAMA analysis was, in part, due to seismic contributors, the petitioners had demonstrated that the SAMA analysis contained an omission because there was a newly discovered fault line that was not yet considered and therefore could change the seismic SAMA cost-benefit calculations).
genuine dispute exists on a material issue of fact as is required by 10 C.F.R. § 2.309(f)(1)(v)- (vi)
and, accordingly, it should be dismissed.
(b) The Effects of Climate Change on the Structures, Systems, and Components of a Nuclear Power Plant are Not Within the Scope of License Renewal and therefore are Not Within the Scope of SAMA Analyses
Petitioner argues that the Staffs environmental review of the updated SAMA analysis is
inconsistent with the GAO Report and N E PA because it does not address the impacts of climate
change on plant safety. 353 However, this argument amounts to a challenge to the NRCs license
renewal regulations because those regulations specify that such current licensing basis plant
safety issues are addressed separately through ongoing oversight and not through the license
renewal process.354 As provided by 10 C.F.R. § 2.335, no rule or regulation of the Commission
may be subject to attack in an adjudicatory proceeding unless the proponent files a petition for
waiver of that rule or regulation. Petitioner filed a waiver to challenge 10 C.F.R. § 51.53(c), which
is required to challenge generic environmental findings in the NRCs regulations, but it has not
requested a waiver to challenge 10 C.F.R. § 54.30, which excludes current licensing basis issues
from the scope of license renewal and, therefore, its challenges to current licensing basis safety
concerns should be dismissed. 355
Petitioner asserts that the 2024 FS EIS does not discuss climate change impacts on
accident risk. 356 However, the 2019 FSEIS, which the 2024 FSEIS supplements, contains a
section entitled, Climate Change Projections, that specifically states that the effects of climate
change on Turkey Point structures, systems, and components (SSCs) are not within the scope
353 Motion at 70.
354 See 10 C.F.R. § 54.30 (excluding current licensing basis issues from the scope of license renewal).
355 Millstone, CLI- 03-14, 58 NRC at 218.
356 Motion at 69.
of the Staffs license renewal environmental review. 357 Nevertheless, Petitioner disputes these
statements, and asserts that the St aff s SAMA update is an appropriate vehicle to raise these
safety concerns. 358 As the Commission has often explained, though, the effects of
environmental conditions on a nuclear power plant, as opposed to the effects of the nuclear
power plant on the environment, are not within the scope of license renewal.359 Accordingly, as
the effects of climate change on nuclear power plant safety is a current licensing basis issue,
the statement of the 2019 FSEIS that the effects of climate change on Turkey Point Unit 3 and 4
Structures, Systems, and Components (SSCs) are outside the scope of the NRC staffs license
renewal environmental review, 360 is consistent with the scope limitations excluding current
licensing basis issues from license renewal reviews, pursuant to 10 C.F.R. §§ 54.21, 54.29(a),
and 54.30 and pursuant to Commission precedent.361 For this reason, New Contention 3-B is
not admissible.
A SAMA analysis is required in a license renewal only when the applicant has not
performed one previously. 362 As a SAMA analysis was previously performed for Turkey Point,
the Staff only looks to new and significant information in its update to the previous SAMA
357 2019 FSEIS at 4-120- 4-124. See also 2024 FSEIS at A-5, A-3 4, A-35.
358 Motion at 79-80 (citing 2024 FSEIS at D-1) (asserting that NRC Staffs SAMA evaluation must ensure that the analysis accounts for the risks of severe accidents and their environmental consequences).
359 See, e.g., Pacific Gas & Elec. Co. (Diablo Canyon Nuclear Power Plant, Units 1 and 2), CLI-15-21, 82 NRC 295, 304- 05 (2015).
360 2019 FSEIS at 4 -124.
361 See Turkey Point, CLI- 01-17, 54 NRC at 16-18 (T he Licensing Board correctly concluded that
[a contention was] outside of the scope of license renewal reviews and proceedings [because as] the Board found, the contention does not raise any aspect of the Applicants aging management review or evaluation of the plants systems, structures, and components subject to time-aging analysis. It does not, then, identify any issue encompassed by the NRC safety review for license renewal, conducted under 10 C.F.R. Part 54, which focuses on aging.)
(internal citations omitted).
362 10 C.F.R. § 51.53(c)(3)(ii)(L).
analysis. 363 In contrast to the analyses needed to determine whether a nuclear power plant
meets the safety requirements in the NRCs regulations, a SAMA analysis focuses on potential
alternative mitigation measures that are supplemental to the NRCs safety requirements that are
needed for adequate protection of the public health and safety:
Of note, none of the mitigation alternatives evaluated in the SAMA analysis are measures the agency has deemed necessary for safety. They are supplemental to mitigation capabilities our safety regulations already require. As an ongoing matter, the NRC oversees the safety of reactor operations pursuant to the Atomic Energy Act of 1954, as amended, and may require licensees to implement new mitigation measures whenever warranted to assure adequate protection of public health and safety. The NEPA mitigation analysis conducted for license renewal helps to identify additional measures that may further reduce plant risk beyond that necessary for adequate protection of public health and safety.
To identify those mitigation measures that may be cost-beneficial to implement, the SAMA cost-benefit analysis compares the cost of implementing a new mitigation measure with its assessed potential to reduce severe accident risk.[ 364]
A SAMA analysis is an alternatives analysis carried out under NEPA in order to determine if
there are any procedures, training activities, or plant-design alternatives that could significantly
reduce environmental risks at a reactor site in the event of a severe accident. 365 The
Commission has stated that the alternatives evaluated go beyond what is needed for adequate
protection under the NRCs safety regulations.366
The effects of climate change on n uclear power plant SSCs is a current licensing basis
issue. While the Board has previously taken Petitioner at its word that it seeks to challenge the
Draft SEIS and does not seek to challenge the Staffs safety analysis, such deference is not
363 Limerick, CLI-13-7, 78 NRC at 211-12.
364 Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), CLI 7, 83 NRC 293, 296, 298 (2016) (emphasis added).
365 Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications, NRC Regulatory Guide 4.2, Suppl. 1, Rev. 1, at 44-45 (Jun. 2013)
(ML13067A354).
366 Indian Point, CLI-16-7, 83 NRC at 296.
appropriate here as Petitioner s arguments repeatedly invoke safety concerns and directly
challenge the scope of the NRCs license renewal process. 367 Specifically, Petitioner, quoting
the GAO Report, asserts that it is unclear whether the safety margins for nuclear power plants
are adequate to address the risks that climate change poses to plants. 368 Cloaking current
licensing basis safety concerns in an environmental cloth does not transform Petitioner s
concerns into an environmental contention.
This Board previously held that Petitioner s safety contention was an environmental
SAMA contention citing to Diablo Canyon. 369 However, Diablo Canyon does not support
including climate change with in the scope of the Staff s license renewal environmental review in
this instance, as here Petitioner seeks to challenge the underlying process that the Staff uses to
perform its safety determinations during it safety reviews. 370 In Diablo Canyon, the Commission
found that a newly discovered seismic fault line had not yet been incorporated into the safety
review and, therefore, was absent from the SAMA analysis, and, notably the applicants SAMA
analysis acknowledge[d] that both fire and seismic contributors [were] disproportionately
dominant risk factors.371 But here, in contrast, climate change is addressed through the current
licensing basis through layers of conservatism and defense in depth incorporated into NRCs
safety processes which provide reasonable assurance regarding any plausible natural hazard
367 LBP-24-3, 99 NRC at __ (slip op. at 32).
368 Motion at 76 (quoting GAO Report at 39).
369 LBP-24-3, 99 NRC at __ (slip op. at 33, n.173) (citing Diablo Canyon, CLI 11, 74 NRC at 442-43).
370 A holding that the Staffs analysis of current licensing basis issues is inadequate for the purposes of SAMAs would bifurcate the methodologies used by the Staff to perform its safety reviews to analyze a nuclear power plants compliance with its current licensing basis, and the analysis that the Staff uses to examine SAMAs during license renewal. Effectively, the Staff would have to undertake a new safety analysis using different methodologies exclusively for SAMAs.
371 Diablo Canyon, LBP 15, 72 NRC at 282 (quotation marks omitted) (The underlying safety analysis for the current licensing basis of Diablo Canyon regarding the new fault line was in process at the time of the hearing requests).
and combinations at the site for the licensed operation lifetime of the reactor, including those
that could result from climate change.372 Petitioner is not advancing new and significant
information in the form of specific recommendations or study demonstrating a specific omission
in the Turkey Point SAMA analysis.373 Instead, Petitioner advances a broad GAO Report framed
as an omission in the Staffs environmental impact statement, but actually contests the
adequacy of how the Staff addresses natural phenomena in the current licensing bases for all
plants. To this point, Petitioner broadly asserts that the current licensing basis for Turkey Point
might not provide adequate protection to the public and the environment leading up to, during,
and after the subsequent license renewal term, because climate change is not specifically
considered in the current licensing basis. 374
Contrary to Petitioners argument, New York v. NRC does not require the Staff to discuss
climate change impacts on accident risk in the license renewal environmental review. 375 In place
of environmental contentions, Petitioner raises speculative safety concerns about the effect of
climate change on Turkey Point.376 This runs contrary to the Commissions license renewal
regulations that, regarding safety issues, limit hearings in license renewal proceedings to
concerns regarding the applicants aging management programs and time-limited aging
analyses. 377 Contentions may address the environmental effects, including any cumulative
372 GAO Report at 65.
373 Diablo Canyon, CLI-11-11, 74 NRC at 442-43 (There, we affirmed the boards decision with regard to the portion of the admitted contention in which the petitioner asserted that the applicant failed to consider the result of a particular study in its SAMA analysis.).
374 Motion at 72-75, 77, 79-80.
375 Cf. State of New York v. NRC, 681 F.3d 471, 478 (2012) (whereas the court held that the NRC must analyze any environmental effects that are not remote and speculative, here the Staff did not exclude this topic because it was remote and speculative, but excluded consideration of climate change on SSCs because this topic is a current licensing basis issue that is excluded from review during license renewal by 10 C.F.R. § 54.30(b)).
376 Motion at 72-75.
377 10 C.F.R. §§ 54.21 and 54.29.
effects, of the proposed action, 378 but not the effects of the environment on the plant as those
issues are current licensing basis issues that are not within the scope of license renewal
proceedings. 379
Petitioner s arguments at bottom challenge the ability of Turkey Point to provide
adequate protection against natural hazards, because they assert that using climate change
projections may produce a different picture of the underlying natural hazards analysis that the
Staff performs under the current licensing basis. 380 The Staffs NEPA SAMA analysis takes the
data from the current licensing basis to perform the SAMA analysis. Therefore, Petitioner s claim
that it is challenging the SAMA analysis as a contention of omission is, in fact, a challenge to the
adequacy of the underlying current licensing basis, without demonstrating that it is
unreasonable for the Staff to rely on this data. This challenge reaches far beyond license
renewal and seeks to challenge the way that the NRC determines compliance with the current
licensing basis for nuclear power plants ability to cope with natural phenomenon. The
appropriate way to raise such a challenge to a plants current licensing basis is not through a
license renewal proceeding but through a 10 C.F.R. § 2.206 request for agency action. 381
Protecting Turkey Points SSCs from natural phenomena, climate induced or otherwise,
is a current licensing basis safety issue and, therefore, is excluded from the scope of this
license renewal proceeding. An argument to the contrary amounts to an impermissible collateral
attack on 10 C.F.R. § 54.30(b), for which Petitioner has not requested a waiver. Petitioner s
request to use data that it claims the Staff omitted from the 2024 FSEIS about the effects of
climate change on the SSCs of Turkey Point would arguably require a full re-analysis of all
natural phenomenon safety reviews, which is simply outside of the scope of the Staff s review
378 See, e.g., 10 C.F.R. § 51.71(d) and 10 C.F.R. § 51.95(c).
379 Diablo Canyon, CLI-15-21, 82 NRC at 304 - 05.
380 Motion at 77-80.
381 Diablo Canyon, CLI 15 -21, 82 NRC at 30 7- 08.
under the NRCs license renewal requirements. Therefore, New Contention 3-B does not meet
the contention admissibility requirement of 10 C.F.R. § 2.309(f)(1)(iii) and, accordingly, should be
dismissed.
(c) Conclusion for New Contention 3-B
In Sum, New Contention 3-B is not within the limited scope of this license renewal
proceeding, is not supported, and does not show that a genuine dispute exists on a material
issue of law or fact, as required by 10 C.F.R. § 2.309(f)(1)(iii), (v), and (vi). Therefore, New
Contention 3-B should be dismissed.
III. The Petition for Waiver should be Denied
It is a fundamental principle that NRC regulations are not subject to attack in an
adjudicatory proceeding unless the Commission grants a request for the waiver of the
application of a specific regulation or otherwise makes an exception for a particular
proceeding.382 The sole ground for a petition of waiver is that special circumstances with
respect to the subject matter of the particular proceeding are such that the application of the rule
or regulation (or a provision of it) would not serve the purposes for which the rule or regulation
was adopted. 383 The petition must be accompanied by an affidavit that identifies the specific
aspect or aspects of the subject matter of the proceeding as to which the application of the rule
or regulation (or provision of it) would not serve the purposes for which the rule or regulation
was adopted. The affidavit must state with particularity the special circumstances alleged to
justify the waiver or exception requested.384 Other participants may file a response by counter-
affidavit or otherwise. 385
382 10 C.F.R. § 2.335(a).
383 10 C.F.R. § 2.335(b).
384 Id.
385 Id.
If the presiding officer determines that the petitioning participant has not made a prima
facie showing that the application of the specific Commission rule or regulation (or provision
thereof) to a particular aspect or aspects of the subject matter of the proceeding would not serve
the purposes for which the rule or regulation was adopted and that application of the rule or
regulation should be waived or an exception granted, the presiding officer may not further
consider the matter.386 If, however, the presiding officer determines that the required prima facie
showing has been made, the presiding officer shall, before ruling on the petition, certify the
matter directly to the Commission for a determination in the matter of whether the application of
the rule or regulation or provision thereof to a particular aspect or aspects of the subject matter
of the proceeding should be waived or an exception made.387
In Millstone, the Commission established a four-factor test for waiver applications:
(i) the rules strict application would not serve the purposes for which it was adopted; (ii) the movant has alleged special circumstances that were not considered either explicitly or by necessary implication, in the rulemaking proceeding leading to the rule sought to be waived; (iii) those circumstances are unique to the facility rather than common to a large class of facilities; and (iv) a waiver of the regulation is necessary to reach a significant safety problem.[ 388]
Intervenors must satisfy all four factors to obtain a waiver.389 The fourth Millstone factor may
also apply to a significant environmental issue.390 The waiver standard is stringent by design
and [t]he waiver petitioner faces a substantial burden, but not an impossible one.391 The
purpose of rulemaking is to carv[e] out issues from adjudication for generic resolution;
386 10 C.F.R. § 2.335(c).
387 10 C.F.R. § 2.335(d).
388 Millstone, CLI- 05-24, 62 NRC at 559-60 (quotation marks omitted).
389 Id. at 560.
390 Limerick, CLI-13-07, 78 NRC at 209.
391 Id. at 207.
therefore, petitioners must show something extraordinary about the subject matter of the
proceeding such that the rule should not apply. 392
Here, Petitioner seeks a waiver of the Commissions regulations in 10 C.F.R.
§§ 51.53(c)(3) and 51.71(d) and 10 C.F.R. Part 51, Appendix B with respect to the Staffs updated
SAMA analysis in the 2024 FSEIS for allegedly failing to account for the effects of climate
change on Turkey Point. Even though this proceeding relates to a Staff analysis of all
environmental impacts in a site-specific basis and there are no Category 1 issues, a previously
completed SAMA analysis is the functional equivalent of a Category 1 issue393 pursuant to 10
C.F.R. § 51.53(c)(3)(ii)(L) which requires a waiver to litigate.394
Petitioner also argues that a waiver petition is not required to litigate the issue of new
and significant information regarding climate change risks because [n]o NRC regulation
prohibits Petitioner from challenging the adequacy of the 2024 FS EISs SAMA evaluation. 395
This is not true. The Commission has squarely addressed this issue. In Limerick, the
Commission held that a waiver is required to litigate purportedly new and significant information
with respect to a previously conducted SAMA analysis, akin to a challenge on new and
significant information with respect to a Category 1 issue.396 Therefore, Petitioner must obtain a
waiver to litigate N ew Contention 3-B here, which raises a SAMA-related contention.397
392 Id. (quotation marks omitted).
393 Exelon Generation Co., LLC (Limerick Generating Station, Units 1 and 2), CLI 19, 76 NRC 377, 386-87 (2012).
394 Limerick, CLI-13-07, 78 NRC at 210- 12.
395 Petition for Waiver at 5-6.
396 Limerick, CLI-13-07, 78 NRC at 211. See also Entergy Nuclear Vt. Yankee, LLC and Entergy Nuclear Operations, Inc. (Vermont Yankee Nuclear Power Station), Entergy Nuclear Generation Co. and Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Sta tion), CLI-07-3, 65 NRC 13, 26 (2007).
397 Limerick, CLI-13-07, 78 NRC at 212 (Consequently, to litigate a SAMA-related contention in this, as well as other adjudicatory proceedings where the SAMA-analysis exception applies, a petitioner must obtain a waiver by satisfying the requirements in section 2.335(b).).
In the 2024 FSEIS, the Staff analyzed the significance of new information concerning the
previously performed SAMA analysis and concluded that no new and significant SAMAs were
identified through FPLs use of the NRC-endorsed topical report NEI 17-04, nor was any new
and significant information regarding SAMAs identified by the Staff in the 2024 FSEIS. 398 To
challenge the Staffs analysis of new and potentially significant information on this functionally
equivalent Category 1 issue, or to rely upon other new information concerning this issue,
Petitioner must obtain a waiver of the Commissions rules concerning 10 C.F.R.
§ 51.53(c)(3)(ii)(L). 399 As the original SAMA analysis, as reviewed by the Staff in the 2002
FSEIS, was already performed on a site-specific basis for Turkey Point and is not designated as
a generic Category 1 issue in the 2013 LR GEIS, the SAMA updates in the 2019 FSEIS or the
2024 FSEIS were not affected by the Commissions rulings in CLI-22-2 and CLI-22-3. 400
Therefore, a waiver of the Commissions regulations is still required to challenge a SAMA when
one has already previously been conducted, even in the proceedings affected by CLI 2 and
CLI 3, such as this one.
Here, Petitioner has failed to make a prima facie showing that the Commissions
regulations in 10 C.F.R. § 51.53(c)(3)(ii)(L) should be waived with respect to the functionally
equivalent Category 1 issue of an updated SAMA analysis. Petitioner fails to satisfy criteria (iii)
and (iv) of the Millstone factors that the circumstances are unique and that the waiver of 10
C.F.R. § 51.53(c)(3)(ii)(L) is necessary to reach a significant safety or environmental problem.
398 2024 FSEIS at D-4.
399 Indeed, the Board has previously concluded that Joint Petitioners may not circumvent the regulatory bar against challenging a Category 1 issue by alleging the existence of new and significant information. Turkey Point, LBP-19-3, 89 NRC at 294 n.74.
400 Oconee, CLI-22-3, 95 NRC at 42 (As a general matter, in CLI-22-2 the Commission found that the 2013 [LR] GEIS did not consider the impacts from operations during the subsequent license renewal period and applicants for subsequent license renewal must evaluate Category 1 impacts in their environmental reports. Accordingly, these impacts must be addressed on a site-specific basis in the Staff s site-specific environmental impact statements.).
Climate change is a global phenomenon, with impacts to global weather patterns. The
GAO Report is one example of downscaling climate change effects onto regional areas, with
generalizable regional effects, such as on sea level, temperature, and precipitation.401 Petitioner
argues that the GAO Report identified Turkey Point to be at the highest risk level for flooding
and high-intensity hurricanes - and identified the increasing risk of severe accidents due to
climate change. 402 Petitioner overstates the significance of the GAO R eports findings to Turkey
Point. The GAO Report is a generalized analysis of climate change effects to all nuclear power
plants. 403 Furthermore, the GAO Report only expressly mentions Turkey Point in three locations,
as examples for the report to be used to highlight the generalizable effects of climate change.404
Therefore, the Petition for Waiver is based on circumstancesclimate change effects which
are applicable to all nuclear power plants to varying degrees and, accordingly, it fails to satisfy
Millstone factor (iii).
Furthermore, the requested waiver is not necessary to reach a significant safety or
environmental problem as required to satisfy Millstone factor (iv). 405 As was explained in
response to New Contention 3-B, external events are a low contributor to CDF, which is used as
the baseline input into the SAMA analysis.406 Petitioner speculates that new climate data might
change FPLs SAMA analysis, but does not explain how this new climate data would result in a
significant change to the external events analysis in the existing SAMA analysis, or that there
401 GAO Report at 49.
402 Petition for Waiver at 8.
403 GAO Report at 43, 46 (To conduct our data analysis, we identified national-level data sets from relevant federal agencies for six of the seven natural hazards identified by the NCA, and our review of literature, as likely to be exacerbated by climate change in the United States.
Using hazard and nuclear power plant location data, we analyzed natural hazard exposure in the areas around nuclear power plants.).
404 Id. at 15, 19, 23.
405 Limerick, CLI-13-07, 78 NRC at 209.
406 2002 FSEIS at 5-6.
might conceivably be a new mitigation alternative that might be cost-beneficial. 407 Instead,
Petitioner speculates about the possibility for climate change to increase accident risk due to
natural phenomena, and cites to the GAO Report as its basis for this argument. 408 The GAO
Report, though, expressly states multiple times that [t]his analysis does not account for any
protective measures plants may have taken to mitigate the risk of selected natural hazards.409
Therefore, the GAO Report does not identify any particular risk to nuclear safety at any nuclear
power plant, and Petitioner has not provided any basis to establish that a new SAMA analysis,
using the new climate inputs, would result in any change to the Staffs conclusion that there is
no new and significant information to update the SAMA cost-benefit calculations. As a result, a
waiver of the regulations is not necessary to reach a significant environmental problem as the
new climate data would only result in the fine-tuning of the St aff s original SAMA analysis, and
Petitioner has not presented any argument that this fine-tuning would result in any new SAMA
mitigation alternatives becoming cost-beneficial to implement.
In conclusion, the Petition for W aiver does not meet Millstone factors (iii) and (iv) that
circumstances are unique and that a waiver of 10 C.F.R. § 51.53(c)(3)(ii)(L) is necessary to
reach a significant safety or environmental problem. Accordingly, the Board should not further
consider Petitioner s challenge regarding the functionally Category 1 issue of the updated S A M A
analysis in New Contention 3-B.
IV. The Pending 10 C.F.R. Part 51 Rulemaking Has No Unique Impact on this Adjudication
On May 16, 2024, the Commission approved a final rule that would amend 10 C.F.R. Part
51 regarding environmental reviews for license renewal applications to account for up to one
407 Motion at 77-78.
408 Id. at 72-76.
409 GAO Report at 17, 20, 22, 24.
term of subsequent license renewal.410 The final rule is supported by a revised LR GEIS that
would be issued with the final rule. 411 The Staffs rulemaking information includes estimated
publication of the final rule in August 2024.412 As explained above, Amended Contentions 1-A, 1-
B, and 1-C, New Contention 2, and New Contentions 3-A and 3-B do not meet the good cause
requirements of 10 C.F.R. § 2.309(c) and/or all of the contention admissibility requirements of 10
C.F.R. § 2.309(f) and, therefore, should be dismissed. At that time, b ecause there would be no
admitted or pending contentions remaining before it, the Board should also terminate this
proceeding. 413 If this proceeding is terminated before the publication of the final rule and
issuance of the revised LR GEIS, then that occurrence would have no impact on this
proceeding. Although it is unlikely that the final rule and revised LR GEIS could amount to new
or materially different information since that same information has been available for a
significant amount of time, the appropriate way for any petitioner to utilize the information in
such a situation would be through a motion to reopen under 10 C.F.R. § 2.32 6 and a motion to
file new or amended contentions after the deadline under 10 C.F.R. § 2.309(c) and not for this
Board to somehow hold this proceeding open in anticipation of this contingency. 414
Additionally, even if this proceeding were still open at the time of the publication of the
final rule and issuance of the revised LR GEIS, that occurrence would have no impact on this
adjudication other than, as explained above, the unlikely possibility of new or materially different
information. In CLI-22-3, the Commission provided the direction for subsequent license
410 Staff RequirementsSECY 0017Final Rule: Renewing Nuclear Power Plant Operating LicensesEnvironmental Review (RIN 3150 -AK32; NRC-2018-0296) (May 16, 2024)
(ML24137A213 (package)).
411 Id. at 1.
412 See https://www.nrc.gov/reactors/operating/licensing/renewal/sled.html; https://www.nrc.gov/reading-rm/doc-collections/rulemaking-ruleforum/active/ruledetails.html?id=96.
413 See North Anna, CLI 14, 75 NRC at 699-701.
414 Id.
renewal reviews that the applicants could follow either one of two processes going forward(1)
wait for the completion of the [revised LR GEIS] and associated rulemaking or (2) submit a
revised [site-specific] environmental report based on which the Staff would develop a revised
site-specific environmental impact statement. 415 The Commission explained that Option 2
would involve the Staff addressing the impacts designated as Category 1 or generic in the 2013
versions of 10 C.F.R. Part 51 and the LR GEIS on a site -specific basis in the Staff's site -specific
environmental impact statements instead of simply incorporating the determinations for those
impacts from the regulation and LR GEIS into the environmental impact statements by
reference. 416 In this manner, the Commission created the new Option 2 process of a site-
specific review of the 2013 generic impacts as a separate process so that the environmental
reviews of subsequent license renewal applications could proceed. The Commission did not
provide direction to combine this new, optional process and the typical Option 1 process of
waiting for the completion of a rulemaking and then following new applicable regulations. 417 The
Commission also directed the Staff to provide members of the public with an opportunity to seek
a hearing on the Staffs updated, site-specific environmental impact determinations. 418
Based on the above, if the final rule were to be made effective during the pendency of
this proceeding, then that would not somehow stop this proceeding from moving forward
consistent with the new Option 2 process of conducting a site-specific review of the 2013
generic impacts in lieu of waiting for updated regulations. For example, neither the applicant nor
the Staff would be required to replace their site-specific evaluations with the new generic impact
determinations in the revised 10 C.F.R. Part 51 and LR GEIS. Such an outcome would
essentially invalidate Option 2 and mandate Option 1, contrary to the Commissions direction.
415 Oconee, CLI-22-3, 95 NRC at 41.
416 Id.
417 Id.
418 Id. at 41 - 42.
This would also deprive the members of the public of the meaningful opportunity for hearing
envisioned in CLI-22-3. Additionally, such an outcome would defeat the purpose of Option 2 of
allowing subsequent license renewal environmental reviews to proceed in a timely manner
without having to wait for and be delayed by the rulemaking process. That being said, the
rulemaking to amend 10 C.F.R. Part 51 and the LR GEIS, both before and after any issuance of
a final rule, is still information that could potentially be used in support of an argument before
this Board or could potentially be addressed by the Staff as part of a new-and-significant-
information analysis. The latter contingency is exactly why the Staff included in the 2023 DSEIS
and 2024 FSEIS a discussion of the rulemakings applicability to the Turkey Point subsequent
license renewal application. 419 Specifically, those documents state: To account for the
possibility that the proposed rule and the 2023 LR GEIS may be finalized before a final
determination is reached on FPLs [subsequent license renewal] application, the NRC staff
analyzes in this appendix, on a site-specific basis, the new and revised environmental issues
described in the 2023 LR GEIS because they may apply to [subsequent license renewal] for
Turkey Point. 420 This approach has been available for Petitioner to dispute along with all of the
other information in the 2023 DSEIS and 2024 FSEIS; Petitioner has not timely raised any such
dispute with this information and the Board cannot raise such a dispute for Petitioner. 421
Taken together, the Staff position is that if the final rule and revised LR GEIS were to be
made effective during the pendency of this proceeding, then that would not require re-analyzing
the existing contentions; that is, the case or controversy before the Board would remain the
completeness and adequacy of the Staffs site-specific evaluation of the 2013 generic impact
419 See 2023 DSEIS at App. E; 2024 FSEIS at App. E.
420 2023 DSEIS at E-3; 2024 FSEIS at E -3.
421 See, e.g., DTE Elec. Co. (Fermi Nuclear Power Plant, Unit 2), CLI-15-18, 82 NRC 135, 141 (2015) ( Although boards have some discretion to reformulate or narrow contentions to eliminate extraneous issues or to consolidate issues for a more efficient proceeding, this authority is not without limit. A licensing board, for example, may not supply information that is lacking in a contention that otherwise would be inadmissible.) (quotation marks omitted).
determinations. Petitioner, FPL, and the Staff remain free to argue that information related to the
rulemaking supports or contradicts these questions of completeness and adequacy in the Staffs
environmental impact statement. In fact, the Staff accounted for the rulemaking by specifically
discussing it in the 2023 DSEIS and 2024 FSEIS and Petitioner did not challenge these
discussions. The proper way to bring arguments on this matter before the Board is not through
any Board action in response to the effectiveness of the final rule, but through the existing
regulatory processes such as motions for leave to admit new or amended contentions under 10
C.F.R. § 2.309(c). Therefore, the Staff concludes that the effectiveness of the final rule, in and of
itself, would not impact this proceeding.
CONCLUSION
In support of the dual mandates of NEPA to foster informed decision-making and
informed public participation,422 the Staff has completed two reviews of the environmental
impacts of the proposed action, with each review consisting of a draft environmental impact
statement that was issued for comment and a final environmental impact statement addressing
comments received, including many comments received from Petitioner, and the two final
environmental impact statements total almost 900 pages. Petitioner s efforts to require more of
the Staff are not availing because they do not, as required, meet both the heightened pleading
standards of 10 C.F.R. § 2.309(c) and the strict-by-design contention admissibility requirements
of 10 C.F.R. § 2.309(f)(1). 423 As a threshold matter, the Board should dismiss A mended
Contentions 1-A, 1-B, and 1-C and New Contentions 3-A and 3-B for not meeting 10 C.F.R.
§ 2.309(c) because the information that these contentions challenge in the 2024 FSEIS, as well
as the information that they provide in support of these challenges, including in the GAO Report,
is not new and materially different from information previously available. Petitioner could have
422 See McGuire, CLI 17, 56 NRC at 10 (quoting Claiborne, CLI-98-3, 47 NRC at 88).
423 See, e.g., Crow Butte, CLI-20-8, 92 NRC at 259-60; Turkey Point, LBP-19-8, 90 NRC at 149, 159-60.
timely filed, and largely did timely file, essentially these same challenges previously. Additionally,
Amended Contentions 1-A, 1-B, and 1-C, New Contention 2, and New Contentions 3-A and 3-B
do not meet the contention admissibility requirements of 10 C.F.R. § 2.309(f). Instead, these
contentions largely reiterate previous arguments that were previously rejected, do not genuinely
dispute the Staffs comprehensive environmental review, and rely on bare assertions rather than
specific factual support. Moreover, New Contention 3-B challenges both the plants current
licensing basis as well as the Staffs S A M A update, both of which issues are not within the
scope of this license renewal proceeding and thus are not subject to challenge without a waiver
of the NRCs regulations. Petitioner s Petition for Waiver, though, does not cure this defect of
New Contention 3-B because the Petition for Wavier does not meet the applicable requirements
of 10 C.F.R. § 2.335. Specifically, the Petition for Waiver does not meet all four factors of the
Millstone test because it does not show that the circumstances at issue are unique and that
the waiver is necessary to reach a significant safety or environmental problem.
For these reasons, Amended Contentions 1-A, 1-B, and 1-C, New Contention 2, and New
Contentions 3-A and 3-B should be dismissed and the Petition for Waiver should be denied.
Because there would be no admitted or pending contentions remaining before it, the Board
should also terminate this proceeding. 424
Respectfully submitted,
/Signed (electronically) by/
Jeremy L. Wachutka Counsel for NRC Staff Mail Stop: O-14-A44 U.S. Nuclear Regulatory Commission Washington, DC 20555- 0001 Telephone: (301) 287-9188 Email: Jeremy.Wachutka@nrc.gov
Executed in Accord with 10 CFR 2.304(d)
424 See North Anna, CLI-12-14, 75 NRC at 699-701; Turkey Point, LBP-19-8, 90 NRC at 178.
Kevin D. Bernstein Counsel for NRC Staff Mail Stop: O-14-A44 U.S. Nuclear Regulatory Commission Washington, DC 20555- 0001 Telephone: (301) 415-1001 Dated June 3, 2024 E mail: Kevin.Bernstein@nrc.gov UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION
BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
In the Matter of
FLORIDA POWER & LIGHT COMPANY Docket Nos. 50- 250- SLR-2 50- 251-SLR-2
(Turkey Point Nuclear Generating Units 3 and 4)
Certificate of Service
Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing NRC STAFF
ANSWER OPPOSING MIAMI WATERKEEPER MOTION TO ADMIT AMENDED AND NEW
CONTENTIONS AND PETITION FOR WAIVER, dated June 3, 202 4, have been served upon
the Electronic Information Exchange (the NRCs E-Filing System), in the captioned proceeding,
this 3rd day of June 2024.
/Signed (electronically) by/
Jeremy L. Wachutka Counsel for NRC Staff Mail Stop: O-14-A44 U.S. Nuclear Regulatory Commission Washington, DC 20555- 0001 Telephone: (301) 287-9188 Email: Jeremy.Wachutka@nrc.gov Dated June 3, 2024