UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

In the Matter of: )

)

FLORIDA POWER & LIGHT COMPANY ) Docket No. 50 -250 -SLR -2

) Docket No. 50 -251 -SLR -2 (Turkey Point Nuclear Generating Units 3 and 4) )

) June 12, 2 024 (Subsequent License Renewal Application) )

MIAMI WATERKEEPERS REPLY IN SUPPORT OF MOTION TO ADMIT AMENDED AND NEW CONTENTIONS

I. INTRODUCTION

Pursuant to 10 C.F.R. § 2.309(i)(2), Petitioner Miami Waterkeeper files this reply to the

Answers in opposition to its Petition that have be en filed by the U.S. Nuclear Regulatory Commission Staff (NRC Staff) 1 and the Florida Power and Light Company (FPL) 2.

1 NRC Staff Answer to Amended and New Contentions and Petition for Waiver, ADAMS Accession No. ML24155A110 (June 3, 2024) (hereinafter NRC Staff Answer).

2 Applicants Answer to Petitioners Motion to Admit New and Amended Contentions on the Final Site -

Specific Environmental Impact Statement, ADAMS Accession No. ML24155A267 (June 3, 2024)

(hereinafter FPL Answer).

1 II. PROCEDURAL HISTORY AND STANDARD OF REVIEW

A. Procedural History

Petitioner incorporates by reference the procedural history of the Turkey Point

proceeding provided in Petitioners May 2024 Motion to Admit Amended and New Contentions

in Response to NRC Staffs Final Site -Specific Environmental Impact Statement. 3

B. Standard of Review

Petitioner does not have to prove its contentions at the admissibility stage. 4 Nor does

the Board adjudicate disputed facts at this juncture. 5 As the Commission explained in proposing

what became § 2.309(f), the presiding officers job is to determine whether the information

presented is sufficient to prompt a reasonable mind to inquire further with regard to the validity of the contention, not to rule on the validity of the contention. 6

10 C.F.R. § 2.309(f)s purpose is to relieve Boards of the duty to hold hearings on vague and unsubstantiated claims. 7 The rule is not intended to alter NRCs core principle of open,

3 Miami Waterkeepers Motion to Admit Amended and New Contentions in Response to NRC Staffs Final Site -Specific Environmental Impact Statement, ADAMS Accession No. ML24129A220 (May 9, 2024) (hereinafter Miami Waterkeeper Motion) at 2 -4.

4 Clinch River, 86 NRC at 150 (quoting Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation), CLI -04 -22, 60 NRC 125, 139 (2004)).

5 Id. at 151 (citing AmerGen Energy Co. (Oyster Creek Nuclear Generating Station), LBP -06 -22, 64 NRC 229, 244 (2006)).

6 Rules of Practice for Domestic Licensing Proceedings Procedural Changes in the Hearing Process, 1986 WL 328108 (June 30, 1986), at *3.

7 Duke Energy Co. (Oconee Nuclear Station, Units 1, 2 & 3), CLI -99 -11, 49 NRC 328, 338 (1999)

(Licensing boards need not hear contentions that appeared to be based on little more than speculation.);

Dominion Nuclear Connecticut Inc. (Millstone Nuclear Power Station Units 2 and 3), CLI -01 -24, 55 NRC 1 (2001) (Admissibility rules are strict by design in that they shield Boards from sift[ing]

through poorly defined or supported contentions.); Fla. Power & Light Co. (Turkey Point Units 6 & 7),

ASLBP No. 10 -903 -02 -COL -BD01, 2017 WL 4310384, at *9 (Jan. 13, 2017) (Board may reject conclusory assertion[s] unsupported by fact or expert opinion.).

2 understandable, and accessible processes. 8 Thus, the Commission stated forcefully that our

contention rule should not be turned into a fortress to deny intervention, 9 but rather used to

require at least some minimal factual and legal foundation for contentions. 10 A Board ought

not reject the contentions of petitioners who, after reviewing all relevant licensing documents, have isolated specific issues they dispute and wish to litigate. 11

Here, each of Petitioners contentions meets the good cause standard and presents a

genuine dispute regarding discrete material issues. Petitioner has provided robust factual support

for its claims, including a 44 -page expert report by hydrologist Dr. William Nuttle 12 and a

Government Accountability Office containing new site -specific information. Petitioner

demonstrates in turn why each contention should be admitted.

III. EFFECT OF THE PENDING PART 51 RULEMAKING

All parties agree that the pending Part 51 rulemaking does not affect this proceeding. 13

The Commissions order CLI -22 -03 established an alternative procedural pathway, allowing FPL

to submit a site -specific environmental report to supplement a site -specific review, rather than wait for NRC Staff to complete its LR GEIS rulemaking. 14 FPL elected to take this pathway. 15

8 Changes to Adjudicatory Process, 69 Fed. Reg. 2182, 2182 (Jan. 14, 2004).

9 Oconee, 49 NRC at 335 (quoting Peach Bottom, ALAB - 216, 8 AEC 13, 21 (1974)).

10 Tennessee Valley Authority (Clinch River Nuclear Site Early Site Permit Application), ASLBP No. 17 -

954 -01 -ESP -BD01, 2017 WL 9478622 (Oct. 10, 2017), at 150 (quoting Oconee, CLI -99 -11, 49 NRC at 334).

11 Oconee, 49 NRC at 337.

12 See Miami Waterkeeper Motion Attachment A - Expert Report of William Nuttle, Ph.D., PEng (May 8, 2024), (hereinafter May 2024 Nuttle Report).

13 FPL Answer at 6 -9; NRC Staff Answer at 82 -86.

14 See Fla. Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), CLI -22 -3, 95 NRC 40 (2022)

15 FPL Answer at 6 -7.

3 NRC Staff agrees that it is now bound to conduct a site -specific review in its FSEIS. 16 Petitioner

agrees with NRC Staff that the new rule would not enable NRC Staff to replace their site -

specific evaluations with the new generic impact determinations, as this would deprive the members of the public of the meaningful opportunity for heari ng envisioned in CLI -22 -3. 17

IV. AMENDED A ND NEW CONTENTIONS

CONTENTION 1:

1 -A : THE 2024 FSEIS FAILS TO ADEQUATELY ANALYZE GROUNDWATER CONDITIONS FOR THE "NO ACTION" ALTERNATIVE, WHICH SHOULD BE THE CONDITIONS PRESENT WHEN THE PLANT IS NOT OPERATIONAL.

1 -B: THE 2024 FSEIS EMPLOYS THE WRONG STANDARD TO DETERMINE THE IMPACT OF THE CCS ON POTABLE WATER.

1 -C : THE 2024 FSEISS ASSESSMENT OF THE IMPACT OF THE PROPOSED ACTION TO GROUNDWATER QUALITY IS INADEQUATE BECAUSE IT UNDERESTIMATES THE IMPACTS ON DRINKING WATER RESOURCES.

A. Contentions 1 -A, 1 -B, and 1 -C satisfy the good cause standard for new and amended contentions.

The good cause standard for new and amended contentions is stated in 10 C.F.R. §

2.309(c) and requires Petitioner to demonstrate that:

(i) The information upon which the filing is based was not previously available;

(ii) The information upon which the filing is based is materially different from information previously available; and

(iii) The filing has been submitted in a timely fashion based on the availability of the subsequent information.

16 NRC Staff Answer at 6 -7.

17 Id. at 84 -85.

4 Here, there is no dispute that Petitioner filed in accordance with a schedule set forth by

the Board and that the filing was timely. Instead, NRC Staff and FPL allege that Contentions 1 -

A, 1 -B, and 1 -C fail to satisfy the good cause factor of being based on new information that is materially different from information previously available.18 The Staff and FPL cannot have it

both ways. If the new groundwater analysis is sufficient to moot out Petitioners prior contention,

it must be materially different to the prior analysis. It cannot be a mere rephrasing as the Staff alleges. 19

The 2024 FSEIS contains new information that significantly changes the analysis and

explanation offered previously specifically the analysis of groundwater issues that Petitioner

had previously contended was omitted. That analysis and explanation is there fore open to

challenge. As noted above, the new analysis in the 2024 FSEIS was the reason why Petitioner

joined the motion to dismiss the previously admitted contention of omission and why the Board

dismissed that contention as moot. 20

Boards have consistently found good cause under the procedural circumstances present

here: where an earlier contention of omission is mooted by an amended environmental document

that includes the previously omitted analysis, and the Petitioner subsequently challenges the

adequacy of that new analysis in an amended contention. This precise circumstance was

presented earlier in this proceeding, where a Board admitted two of Joint Petitioners contentions of omission challenging FPLs Environmental Report. 21 NRC Staff later published a DSEIS

18 Both parties, however, concede that Petitioner satisfies section 2.309(c)(1)(iii) by filing the Motion within the time set by the scheduling order. NRC Staff Answer at 20; FPL Answer at 2.

19 NRC Staff Ans wer at 21, 24.

20 See March 2024 Board Order at 34.

21 In the Matter of Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), 90 NRC 139, 146 (2019).

5 rendering the two admitted contentions as moot, 22 and Joint Petitioners moved to admit new

contentions challenging the adequacy of the DSEIS. 23 The Board found that good cause was

satisfied: the new cooling tower analysis that NRC Staff added to cure Petitioners prior

contention constituted new information that (1) was not previously available; and (2) is materially different from previously av ailable information in the [Environmental Report]. 24

Likewise, in In the Matter of Tennessee Valley Authority (Clinch River Nuclear Site), 88

NRC 55 (2018), the Board admitted a contention of omission regarding the risks of spent fuel

pool fires, 25 and NRC Staff later published a DEIS that added a new section discussing the risks

of spent fuel pool fires. 26 After dismissing the originally admitted contention of omission as

moot, the Board held that the intervenors satisfied the good cause standard to file a new

contention that challenged the adequacy of that discussion, noting that this was the first

oppo rtunity to challenge the adequacy of any discussion of spent fuel pool fires, which appeared

for the first time in the DEIS. 27

These decisions illustrate that the good cause standard does not require that every piece

of information used in a revised analysis to be new. If an analysis is new and different to what

was previously presented, it constitutes new information for the purposes of good cause, even

if it is based on existing information. Moreover, a key part of Petitioners dispute is that the

22 Id.

23 Id.

24 Id.

25 In the Matter of Tennessee Valley Authority (Clinch River Nuclear Site), 88 NRC 55, 58 (2018).

26 Id. at 59.

27 Id. at 60.

6 groundwater analysis that NRC Staff added is inadequate precisely because it relies on outdated

information, rather than recent data.

Contention 1 -A therefore demonstrates good cause. Petitioner challenges the use of an

outdated and incomplete assessment of groundwater conditions under the no action alternative in

the updated comparison of alternatives section provided in the latest 20 24 FSEIS. Petitioner

could not have challenged this before for two reasons. First, the updated analysis of alternatives

it seeks to challenge was not available; and second, the 2019 analysis has become more and more

outdated over the last few years and nee ds to be updated. 28 As a Board ruled earlier in this

proceeding, because the alternatives analysis is new, it can be challenged at this stage. 29

Contention 1 -B demonstrates good cause for similar reasons. In its March 7, 2024,

order, the Board admitted the following contention of omission:

The 2023 Draft SEIS fails to take a hard look at impacts to groundwater quality because it does not include an explanation for the Staffs conclusion that the uncertainty in retracting the hypersaline groundwater plume could result in moderate impacts. 30

In response to that order, on March 29, 2024, NRC Staff showed its work by adding significant

new analysis to the FSEIS that explained how it arrived at its determination that the impacts to

28 Although NRC and FPL claim that the 2019 FSEIS fully evaluated the no action alternative, this review occurred two years before freshening allocations were doubled in 2021. Id. at 22 & 28 n.4; FPL Answer at 13; 2024 FSEIS at 2 -26. It also makes no reference to the movement of the salt/fresh groundwater interface. By using the 2019 assessment of the no action alternative, the 2024 FSEIS has not accounted for the environmental imp acts of increasing volumes of freshening water on the surrounding environment and the impact of reducing or eliminating that flow rendering the updated comparison of alternatives inadequate. Nor did it analyze how ceasing use if the CCS would affect the mo vement of the salt/fresh groundwater interface, which lies close to existing public drinking water wells.

29 Id.

30 Memorandum and Order (Granting Request for Hearing) (LBP -24 -03), ADAMS Accession No. ML24067A280 (Mar. 7, 2024), at 22.

7 water quality will be moderate. 31 Among other things, this new analysis revealed that NRC Staff

was employing a hypersalinity standard to gauge the impact of the proposed action to the

potability of a sole -source drinking water aquifer. 32 Because this explanation which is the

subject of Amended Contention 1 -B was revealed for the first time in the 2024 FSEIS in response to the Boards order, sections 2.309(c)(1)(i) and (ii) are satisfied. 33

Finally, Contention 1 -C meets the good cause standard in two ways. First, it challenges

the adequacy of NRC Staffs newly added explanation in the 2024 FSEIS about why it chose

SMALL or MODERATE as the impact that the continuing operation of the cooling c anal system

would cause to groundwater quality. This analysis and explanation were included in the 2024

FSEIS in response to the Boards previous admission of a contention of omission. Thus, there

was no opportunity to challenge its adequacy earlier in the proceeding. Second, it is based on an

expert interpretation of critical tritium d ata including previously unavailable data that was not

included in the 2024 FSEIS. 34 This data illustrates that the analysis of groundwater impacts is

inadequate because it underestimates the potential for the operation of the CCS to contaminate

potable water supplies.

Thus, Contentions 1 -A, 1 -B, and 1 -C satisfy the good cause requirement.

31 2024 FSEIS at 2 -24 40.

32 Id. at 2 -39 40.

33 10 C.F.R. §2.309(c)(1); In the Matter of Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), 90 NRC 139, 152 n.16 (2019); In the Matter of Tennessee Valley Authority (Clinch River Nuclear Site), 88 NRC 55, 60 (2018).

34 Tritium data shown in Figure 7 of Dr. William K. Nuttles expert report is not available in any public database and was received by Miami Waterkeeper on April 29, 2024, by request.

8 B. Contentions 1 -A, 1 -B, and 1 -C satisfy the admissibility criteria.

CONTENTION 1 -A: THE 2024 FSEIS FAILS TO ADEQUATELY ANALYZE GROUNDWATER CONDITIONS FOR THE "NO ACTION" ALTERNATIVE, WHICH SHOULD BE THE CONDITIONS PRESENT WHEN THE PLANT IS NOT OPERATIONAL.

In addition to meeting the good cause standard, Contention 1 -A satisfies the admissibility

criteria.

1. Contention 1 -A provides substantial factual support

NRC staff alleges that factual support is inadequate but ignores the basis set forth in the

initial pleading and in particular references to Section 2.8.3 and Section 3.2 of the FSEIS in its

discussion of the factual support. The basis of the contention is broadly that conditions have

changed since 2019 and therefore the revised analysis of alternatives must include an updated

version of the no -action alternative before the comparison of alternatives in the 2024 FSEIS can

satis fy NEPA. That things have cha nged since 2019 is not in dispute. Indeed, NRC Staffs

acknowledgement and FPLs protestations that much new information has been generated over

the last five years serve to buttress the factual support for Contention 1 -A. In particular, the Staff notes that two extraction wells have been added since 2019. 35 FPL states that the 2024 FSEIS

discusses extensive new information including five years of updated well data. 36 FPL goes on

to discuss much new data presented in the 2024 SEIS on seepage rates and rate of sale

withdrawal. 37 Obviously, a thorough analysis would incorporate this new information in the

discussion of the no -action alternative and analysis of alternatives. NRC Staffs analysis, which

35 NRC Staff Answer at 36.

36 FPL Answer at 27.

37 Id. at 29 -30.

9 does not adequately consider material information, falls short of the hard look standard

mandated by NEPA.

2. Contention 1 -A raises a genuine dispute regarding a material issue

Finally, Contention 1 -A presents a genuine dispute regarding a material issue. At bottom,

Petitioner asserts that failing to update that old analysis before incorporating it into the new

analyses provided in the 2024 FSEIS rendered the new analyses inadequate. This does raise a

genuine dispute. NRC Staff believe that the analysis of alternatives in the 2024 FSEIS that

incorporates the outdated 2019 analysis of the no -action alternative remains adequate, while

Petitioner does not. It is this issue that Peti tioner seeks to adjudicate in this proceeding.

CONTENTION 1 -B: THE 2024 FSEIS EMPLOYS THE WRONG STANDARD TO DETERMINE THE IMPACT OF THE CCS ON POTABLE WATER.

In addition to demonstrating good cause, Contention 1 -B satisfies the admissibility

requirements.

1. Contention 1 -B raises a genuine dispute regarding a material issue

NRC Staff and FPL do not dispute that the 2024 FSEIS employs a relaxed

hypersalinity standard and not a potable water standard to determine whether the proposed

action is sufficient to destabilize a potable water aquifer. On this concession alone, the Bo ard

should admit Amended Contention 1 -B: The hypersalinity standard is 19,000 mg/L chlorinity,

yet the most permissive metric of potability Floridas Class G -II groundwater standard is 10,000 mg/L of total dissolved solids (TDS) which equates to 5,500 mg /L chlorinity.38 In other

38 The conversion standard for TDS to chlorinity in seawater is provided in Frank J. Millero, et al. The Composition of Standard Seawater and the Definition of the Reference -Composition Salinity Scale, 55 Deep Sea Research Part I: Oceanographic Research Paper 50, 56 (2009), ISSN 0967-0637, available at https://doi.org/10.1016/j.dsr.2007.10.001. TDS is roughly 1.8 times greater than chlorinity in seawater.

10 words, the hypersaline standard used in the 2024 FSEIS to analyze impacts to a drinking water aquifer is almost four -times greater than the most lenient drinking water standard. 39

This methodological flaw led the 2024 FSEIS to severely underestimate the impact of the

proposed action to groundwater quality. By looking only to whether hypersaline water would

destabilize the sole -source drinking water aquifer, the 2024 FSEIS failed to account for the

impact to drinking water during the subsequent license renewal (SLR) term caused by the discharge of non -potable CCS water between 5,500 and 19,000 mg/L chlorinity. 40

Critically, this is the expected chlorinity range of all the CCS water that will discharge

into the Biscayne Aquifer over the SLR term. Recall that the FDEP Consent Order requires FPL to add enough fresh water to reduce CCS salinity levels to 34 practical salinity units (PSU). 41

Thirty -four PSU is the equivalent of 19,000 mg/L chlorinity the standard for hypersaline water. 42 If, as FPL claims, these freshening activities succeed in reducing salinity levels to

below 19,000 mg/L chlorinity, then the CCS water discharged into the Biscayne Aquifer during

39 In its Motion, MWK argued that the hypersalinity standard was twice as large as the G -II potable water standard. See Miami Waterkeeper Motion at 16, 19. Regrettably, this was a significant understatement. The G -II potable water standard is expressed in TDS, whereas the hypersalinity standard is expressed in chlorinity. Compare 2016 FDEP Consent Order at 7, with Fla. Admin. Code Ann. R. (F.A.C.) 62 -

520.410(1). The G-II potable water standard is 10,000 mg/L of TDS, which includes both chloride concentrations and other dissolved solids. F.A.C. 620-520.410(1). Converting that TDS standard to chlorinity results in a maximum measure of chlorinity for G -II groundwater of 5,500 mg/L - almost four times less than the hypersalinity standard of 19,000 mg/L chlorinity. See n. 38, supra. For the Boards convenience, MWK attaches as Attachment A a demonstrative table that lists the applicable standards.

40 2024 FSEIS at 2 -22 - 2 -24.

41 2016 FDEP Consent Order at 7.

42 May 2024 Nuttle Report at 7 (Chlorinity is closely related to salinity; where salinity measures the concentration of total dissolved solids, chlorinity measures the concentration of dissolved chloride ions.

Typical values for seawater are ~35 parts per th ousand total dissolved solids, corresponding to ~35 PSU (practical salinity units, the conventional measure for seawater salinity), and 19,000 mg/L chlorinity.

Hypersaline water, as discussed below, is defined as water with chlorinity greater than 19,000 m g/L.

Seawater and hypersaline water are considered to be non potable.).

11 the SLR term will necessarily be lower than the hypersaline standard of 19,000 mg/L

chlorinity.

By its very design, the methodology employed in the 2024 FSEIS does not account for

any of that non -potable saltwater. The reason is that the 2024 FSEIS looks only at the impact to

groundwater quality of hypersaline water, i.e., water with chlorinity greater than 19,000

mg/L. 43 As a result, none of the post -freshening CCS water between 5,500 and 19,000 mg/L

chlorinity water, again, that is not potable has been accounted for in the Staffs impact

determination. This is an enormous volume of water : although there is some dispute about the

exact number, all parties agree that the freshening activities currently result in the CCS

discharging an average of between four to nine million gallons of saltwater into the Biscayne

Aquifer, every day, over the twenty year SLR term. 44 This equates to between 29.2 billion and

65.7 billion gallons of non -potable saltwater that will discharge into a sole -source drinking water

aquifer between 2032 and 2052. But, due to the hypersalinity standard employed in the 2024

FSEIS, none of that saltwater has been accounted for in the NRC Staffs impact determination to groundwater quality. 45

In short, the methodology applied in the 2024 FSEIS fails to account for the impacts to

groundwater quality of most if not all of the saltwater that will discharge from the CCS to the

Biscayne Aquifer during the SLR term. The hard look standard requires NRC Staff to actually

look at the environmental effects of the proposed action. Designing a study to avoid learning the

43 See, e.g., 2024 FSEIS at 2 -38 39 ( However, the hypersaline groundwater has not destabilized the aquifer as demonstrated by the facts that the use of the aquifer by existing users has not been affected and that remediation efforts have demonstrated that the hypersaline groundwater plume is subject to retraction.).

44 See May 2024 Nuttle Report at 17; FPL Answer at 29.

45 NRC Staff Answer at 30 -40.

12 impact of groundwater pollution to a potable drinking water aquifer is the exact opposite of what

NEPA demands.

None of NRC Staff and FPLs responsive arguments change the outcome.

FPL claims that Amended Contention 1 -B is based on either a misreading of the 2024 FSEIS or a carefully selected representation of the NRCs analysis. 46 Petitioner did neither, and

FPLs argument proves the point. As FPL aptly explains in its answer, NRC Staff considered

only the impacts to groundwater quality of the hypersaline plume and not the tens of billions of

gallons of non -potable saltwater that will discharge from the CCS into the Biscayne Aquifer over

the SLR term. 47

Likewise, NRC Staffs lengthy discussion of the 2019 FSEIS confirms that NRC Staff

only considered the impact of the hypersaline plume to groundwater:

The 2019 FSEIS discusses in detail how the operation of the CCS and the hypersaline groundwater plume in the Biscayne Aquifer, defined as water with a chloride concentration exceeding 19,000 mg/L, directly beneath the CCS have influenced the movement of th e saltwater interface and, therefore, the availability of potable water to the region. 48

This supports Petitioners position that the hypersalinity standard employed by NRC Staff

failed to account for the impact to groundwater quality of the substantial volume of non -potable

saltwater, between 5,500 mg/L and 19,000 mg/L chlorinity, that will discharge from the CCS to

the Biscayne Aquifer over the SLR term. 49

46 FPL Answer at 18.

47 See, e.g., id. at 18 -19 (NRC Staff consider s scenarios of the hypersaline plume not expanding and the hypersaline plume being retracted; the staffs analysis is based, in part, on the location of the plume.).

48 NRC Staff Answer at 35.

49 Miami Waterkeeper Motion at 18 -20.

13 FPL then attempts to bootstrap the NRC Staffs use of a hypersaline standard to the FDEPs use of that standard in its consent order. 50 This argument is irrelevant to the question of

whether the 2024 FSEIS complies with NEPA. If the proposed action contemplates FPL

discharging tens of billions of gallons of non -potable saltwater into a sole -source drinking water

aquifer (which it does), t hen NRC Staff has a statutory duty to consider the environmental impact

of that action - regardless of whether those discharges exceed the FDEPs hypersalinity

standard.

Next, FPL asserts that the hypersaline plume is an appropriate proxy to determine the

CCS impact on the aquifer and its potable water users. 51 Whether or not that had some utility

when the CCS primarily discharged hypersaline water, hypersalinity is not a proxy here. The

2024 FSEIS must consider groundwater impacts over the SLR term not the past. And, as noted

earlier, FPLs freshening activi ties have, and will continue to, pump millions of gallons of

water into the CCS every day over the SLR term to bring salinity levels below the hypersaline

target. Because the water discharging from the CCS to the Biscayne Aquifer over the SLR term

will likely not be hypersaline, it can hardly be said that the hypersaline plume is an appropriate

proxy to evaluate whether CCS operation would destabilize the aquifer over the SLR term. 52

FPL then claims that Petitioner presents a dubious theory by speculat[ing] that non -

potable saltwater from the CCS somehow could reach and impact the currently potable portion of the Biscayne Aquifer. 53 Far from dubious, this, in fact, is exactly what has happened. As Dr.

Nuttle explains, [d]etection of tritium in excess of the 20 pico Curie per liter threshold in

50 FPL Answer at 19.

51 Id. at 20 (emphasis in original).

52 Id.

53 Id. at 21.

14 monitoring well G -3699, first in 2014 and continuing to the present day (Figure 7) places water

originating from the CCS at the vanguard of the advancing salt water interface that is

encroaching on the Newton wellfield. 54 Thus, contrary to FPLs suggestion, the impacts of

non -potable saltwater to groundwater quality are real and occurring. They must be considered

under NEPA.

Finally, NRC Staff (but not FPL) claims that Petitioner doesnt provide any factual support for Amended Contention 1 -B. 55 This is wrong. Amended Contention 1 -B challenges the

methodology and standard employed in the 2024 FSEIS to determine if the proposed action is

sufficient to destabilize an important attribute (i.e. potability) of a sole -source drinking water aquifer. 56 Petitioner identifies the hypersalinity standard employed by NRC Staff (19,000 mg/L

chlorinity) and argues that that standard is improperly relaxed because it far exceeds the most

permissive metric of potability, i.e., Floridas Class G -II groundwater sta ndard of 10,000 mg/L

TDS and 5,500 mg/L chlorinity. This is the factual basis of amended Contention 1 -B. The

materiality of using a standard that is nearly four -times greater than the most lenient potability

metric is self -evident: by employing a hypersali nity standard, the 2024 FSEIS fails to consider

the impact to groundwater quality of any of the non -potable saltwater between 5,500 mg/L to 19,000 mg/L chlorinity that will discharge into the Biscayne Aquifer of the SLR term. 57 As noted

above, this may well comprise all of the water that discharges from the CCS to the Biscayne

Aquifer over the SLR term.

54 2024 Nuttle Report at 101, 102, 116 (map of wells ), 121 (tracing CCS groundwater in wells), 122 (tritium table and map); see also MWK Motion at 17 n.60 (citing 2024 FSEIS at 2 -39).

55 Id. at 38.

56 Miami Waterkeeper Motion at 16 -18.

57 Id. at 20.

15 The Board should admit Amended Contention 1 -B because it demonstrates good cause

and satisfies all admissibility criteria.

CONTENTION 1 -C : THE 2024 FSEISS ASSESSMENT OF THE IMPACT OF THE PROPOSED ACTION TO GROUNDWATER QUALITY IS INADEQUATE BECAUSE IT UNDERESTIMATES THE IMPACTS ON DRINKING WATER RESOURCES.

In addition to demonstrating good cause, Contention 1 -B satisfies the admissibility

requirements.

1. Contention 1 -C raises a genuine dispute

In their answers, NRC Staff and FPL inappropriately focus on the recovery well system

withdrawals and the hypersaline plume. 58 However, they still do not address Petitioners

concerns of the wider spread of saline water (less salty than hypersaline, which is defined as

chloride concentrations greater than 19,000 mg/L 59 ) moving far beyond the consent agreement

compliance area boundary. 60 Nowhere is it more evident that NRC Staff missed the mark than in

its summary of its answer to Petitioners Contention 1 -C:

In sum, the Staffs environmental review determined the amount of withdrawals from the Biscayne Aquifer by the recovery well system and the amount of freshening of the CCS, discussed modeling predicting that the withdrawals would indirectly pull the saltwa ter interface seaward, discussed modeling predicting that the withdrawals would not drawdown the aquifer to an extent that would impact existing users, discussed peer-reviewed data indicating that the hypersaline groundwater plume has been reduced since the start of recovery well system operations in 2018, discussed data indicating that the salinity of the CCS has decreased, and discussed the continuing requirements of the 2015 DERM Consent

58 NRC Staff Answer at 40 -41; FPL Answer at 22 -33.

59 2024 FSEIS at 2 -30 (noting that the 2015 Miami -Dade County Consent Agreement and the 2016 FDEP Consent Order define hypersaline groundwater as groundwater with a chloride concentration greater than 19,000 mg/L).

60 The compliance area boundary, which is not officially stated in either the 2015 Consent Agreement or 2016 Consent Order, consists of the aerial electromagnetic flight lines and monitoring well locations within a designated boundary shown in Figure 3 of Pe titioners expert report prepared by Dr. William Nuttle. It is also shown as Figure 2 -1 in the 2019 FSEIS, the 2023 DSEIS, and the 2024 FSEIS.

16 Agreement, the 2016 FDEP Consent Order, and the NPDES permit that are enforced by local and State regulators. 61

NRC Staff believes that this represents a fulsome analysis. But this very statement indicates

that the agency still has not grappled with the claim and evidence that Petitioner clearly

articulated in its motion. Furthermore, it implies that Staff are foc used on the wrong standards.

The task of the EIS is not to assess compliance with standards in permits and consent orders, it is

to evaluate the impact on the environment. 62 If the state regulator has failed to impose standards

to directly safeguard drinking water, that does not mean that the potential impacts on drinking

water can be ignored.

At the contention admissibility stage, the Board does not adjudicate the merits of the

contention, rather it verifies that a contention meets the admissibility requirements. However, for

Contention 1 -C, NRC Staff and FPL attempt to dispute the basis of the contention in a misguided

effort to show there is no genuine dispute. As shown below, this approach actually illustrates that

the Staff and FPLs myopic focus on the hypersaline area have led them to fail to evaluate a

related, but distinct issue: how con tinued operation during the extended licensing period will

affect drinking water.

2. Contention 1 -C disputes a material issue, and provides substantial support

Petitioners expert showed that the operation of the CCS as a heat sink, and the

massive amounts of freshening water required to cool this heat sink, can cause hydraulic gradient

changes to occur such that CCS water migrates along an east to west gradient and towards public

water supply wells so far that CCS -origin water is f ound at the leading edge of the salt water

61 NRC Staff Answer at 47.

62 Miami Waterkeeper Motion at 8 -9.

17 interface advancing toward the Newton Wellfield. 63 Instead of addressing this finding, NRC

Staff and FPL fixate on hypersaline groundwater withdrawals and aquifer drawdown. But these

are not the central concern raised by the Petitioner in Contention 1 -C. Case in point: NRC

remarks at that the hypersaline groundwater plume, which is defined as groundwater with

greater than 19,000 mg/L chloride, influences the position of the saltwater interface, that FPL

is taking remedial actions required by the 2016 Consent Order to retract the hypersaline

groundwater plume to within the Turkey Point site boundary, and that, therefore, the impact to

the potable water use of the Biscayne Aquifer is based on the relative locations of potable water

users and the saltwater interface, as well as the drawdown effect from FP Ls remediation actions. 64 NRC Staff goes on to state that Staffs environmental review then discusses the

monitoring data that demonstrate that the withdrawals of the hypersaline groundwater from the

Biscayne Aquifer are removing its influence on the saltwater interface and that the drawdown

caused by these withdrawals will also not impact those other water users. 65

NRC Staff therefore signals it believes that the hypersaline water is the sole influence on

the saltwater interface. NRC Staff and FPL fail to understand that the inland extent of saltwater

in the aquifer, the saltwater interface, and the hypersaline inter face are three distinctly different

aspects of the plume of saltwater intruding into the aquifer. Therefore, NRC Staff and FPL must

not conflate the monitoring associated with one of these three aspects (the hypersaline plume) as indicative of the other aspects. Petitioners expert discusses this on pages 9 and 10 of his report, 66

63 Miami Waterkeeper Motion at 34 (citing May 2024 Nuttle Report at 17).

64 NRC Staff Answer at 37.

65 Id.

66 May 2024 Nuttle Report at 10 (warning that information generated by the annual monitoring program and the groundwater remediation is limited in scope by the particular requirements of the 2016 consent order. Care must be exercised in relying on this information for other purposes, suc h as assessing the

18 but NRC Staff and FPL have failed to grasp this essential aspect of the surrounding hydrology.

Regardless, the hypersaline groundwater withdrawals and aquifer drawdown are not the issues

that Petitioner raised in Contention 1 -C. Petitioners expert demonst rated that the addition (not

withdrawal) of massive amounts of water into the CCS heat sink influences the salt water

interface. NRC Staff and FPL refuse to acknowledge the substance of Contention 1 -C, and as

such, are digging themselves deeper into the we ll.

NRC Staff and FPL cite five years of monitoring data that they claim Petitioner has

ignored. 67 In reading annual RAASRs, Petitioner is aware that FPL monitors groundwater within

the orange polygon depicted in Figure 3 of Dr. Nuttles report, 68 and which is also shown in

Figure 2 -6 of the 2024 FSEIS. This area is the compliance zone associated with the County

Consent Agreement and State Consent Order and encompasses the region of the hypersaline

plume. It is, by far, further east of the approx imate extent of saltwater shown in Figure 6 of Dr.

Nuttles experts report. Figure 6 shows the spread of tritium in excess of the countys 20 PiC/L compliance standard far outside this compliance zone. 69 NRC Staff and FPL do not

acknowledge Figure 7 of Dr. Nuttles report showing the buildup of tritium in well G -3966S

again, far outside the compliance zone. In other words, the five years of monitoring data

associated with the hypersaline plume remediation discussed in section 2.8.3.2. are at a different

impact of the operation of the CCS on adjacent users of groundwater and on groundwater resources generally ).

67 NRC Answer at 49 ([T]he 2024 FSEIS includes monitoring data gathered since both the operation of the recovery well system and the freshening of the CCS that shows an overall decrease in the annual average salinity in the CCS and the overall volume and ex tent of the hypersaline groundwater plume.).

NRC Staff cite to the 2024 FSEIS at 2 -30 through 2 -38. This section, 2.8.3.2, discusses the recovery of the hypersaline groundwater from the Biscayne Aquifer and monitoring. It acknowledges the 2017 baseline su rvey, subsequent aerial electromagnetic monitoring flights, and monitoring wells locations shown in Figure 2 -6.

68 May 2024 Nuttle Report at 34; 2024 FSEIS at Figure 2 -6.

69 May 2024 Nuttle Report at 37.

19 location than the salt water interface. The geographic limitations of FPLs monitoring a re

articulated in Dr. Nuttles expert opinion:

The boundaries of the compliance area defined for compliance with the 2016 consent order illustrate graphically the limitations on the information that is produced by FPLs annual monitoring program and groundwater remediation program, Figure 3. The compli ance area corresponds to the area covered by the aerial survey used to map the extent of the hypersaline plume. The position of the salt water interface, as indicated by the landward extent of salt water intrusion, is located far outside the western bounda ry of the compliance area, Figures 1 and 4. 70

Additionally:

Consideration for the position of the salt water interface is absent from the information produced by the annual monitoring program and the groundwater remediation program. FPL uses three tools to assess the progress of the groundwater remediation: groundw ater monitoring, aerial electromagnetic surveys of the hypersaline plume, and groundwater modeling. None of these address changes in the position of the saltwater interface. 71

NRC and FPL continue to dig themselves deeper into the well. Petitioner proffered data showing

that the CCSs influence continues to be at the leading edge of the salt front, and that salt front is

making its way towards public water supply wells. Yet NRC Staff and FPL do not acknowledge

this new information and do not dispute that this information provides sufficient basis for

contention 1 -C.

NRC Staff claims that its environmental review in the 2019 FSEIS actually discusses the impact of the CCS on the salt water interface. 72 In its 2019 FSEIS, NRC Staff remarks that [t]he

interaction of water in the CCS... with underlying groundwater in the Biscayne aquifer is complex. 73 Staff goes on to enumerate variables and factors that affect groundwater interactions

70 May 2024 Nuttle Report at 10.

71 Id.

72 NRC Staff Answer at 46 (citing 2019 FSEIS at 3 -69 - 3 -70, 3 -72 - 3 -88).

73 2019 FSEIS at 3 -27.

20 between the CCS waters and the Biscayne Aquifer waters. 74 However, NRC Staff omits the

driving factor that Petitioner has raised in Contention 1 -C: the elevated water levels in the CCS,

which have changed since 2019.

Water and salt budgets compiled and reported as part of FDEPs annual monitoring

program illustrate that the vertical discharge through the bottom of the CCS in the north and west

area consistently accounts for the largest discharge of water and salt into the aquifer. And while

NRC Staff notes that variations in hydraulic head (water table elevation) are a factor, it

elaborates no further, and certainly there is no discussion in this 17 -page section regarding

variations in hydraulic head caused by millions of gallons of Upper Floridan Aquifer water

additions per day. Moreover, this fulsome analysis occurred two years before freshening

allocations were doubled, from 15 to 30 million gallons per day, in 2021. 75 Accordingly, the

2024 FSEIS has not accounted for the environmental impacts of increasing volumes of

freshening water on the surrounding environment. FPL goes so far as to frame the leakage of 4 million gallons per day of saltwater from the CCS as a pittance. 76 To put the cumulative impacts

of 4 million gallons per day of saltwater leakage into perspective over a 20 -year license

extension, this would equate to 29.2 billion gallons, or nearly 90,000 acre -feet, of polluted water.

FPL claims that Petitioner disregards the goal of the recovery well system. FPL explains

that the goal of the recovery well system is not merely intended to intercept hypersaline water; but also to prevent additional CCS -sourced water, regardless of salini ty, from moving inland. 77

FPL also claims that Petitioner has ignored that the recovery well system is highly effective in

74 Id.

75 2024 FSEIS at 2 -26.

76 FPL Answer at 29.

77 Id. at 31.

21 this regard and has halted the westward advance of the saltwater interface in the Biscayne Aquifer. 78 In response, Petitioner notes that the goal of the recovery well system to capture CCS

water is, at this point, still an unrealized goal. Bewilderingly, FPL cites to the 2024 FSEIS at

Section 2.8.3.2 in support of its claim that the recovery well system is successfully capturing the

hypersaline plu me and CCS -origin water. This section of the 2024 FSEIS acknowledges the

inability of the recovery well system to retract the plume back to the CCS boundary within ten years of its commencing operation, or to about 2028. 79

Section 2.8.3.2 also discusses a number of issues new and material to the 2024 FSEIS: (1)

Arcadis peer reviews that find there is evidence to indicate that the westward migration of the

hypersaline plume has not been entirely halted and that areas of plum e expansion or potentially

no net change have been underemphasized; 80 (2) that FPL has modeled multiple remedial

alternatives to the current recovery well system approach over a 15 year period through 2033

(which exceeds the start of the SLR term in 2032); 81 (3) that none of those alternatives were

shown to fully retract the hypersaline plume to the L -31E canal by 2033; 82 (4) that FPLs

recommended Alternative 1 both proposes to increase recovery well system pumping capacity

and to take a portion of extracted, saline water and return it to the CCS due to capacity limits of the existing deep well injection system; 83 (5) that there is uncertainty regarding the groundwater

modeling to the start of the SLR term and that there is no groundwater modeling to the end of the

78 Id.

79 2024 FSEIS at 2 -30.

80 Id. at 2 -28.

81 Id. at 2 -34.

82 Id.

83 Id.

22 SLR term, which precludes the staff from reaching a definitive conclusion about the likely extent of the hypersaline plume during the SLR term. 84

Moreover, FPL revealed in its Year 5 RAASR (unlike the previous four RAASRs) that the recovery well system was expected to be inadequate prior to its installation.85 It is

therefore completely inconsistent for FPL to frame the recovery well system as so successful that

it captures all hypersaline and saline water leaving the CCS, yet, also concede that recovery well

system withdrawal capacity must be increased because the wells are not capturing enough

water (as expected) and some of the captured water under the proposed Alternative 1 remedial

action scenario may have to be returned to the CCS due to lack of deep well injection system

capacity. Both cannot be true at t he same time.

3. The issues raised in Contention 1 -C are material to the findings that the NRC must make

NRC Staff and FPL have not addressed Petitioners claims in Contention 1 -C. Petitioner

has shown that the continued operation of the CCS as a heat sink, and the ongoing mitigation

of environmental impacts of this activity via significant quantities of freshening water and by

action of large circulating pumps, propel CCS water far beyond the monitoring zone associated

with the hypersaline plume remediatio n. Petitioner notes that, contrary to NRC Staffs assertion that Petitioner provides no data to support i ts claim in 1 -C, 86 tritium data was included in Dr.

84 Id. at 2 -38.

85 Year 5 RAASR at 1 -2 (Fifteen groundwater remediation alternatives were identified in 2016 as part of remedial measure formulation.... Descriptions of the 15 alternatives considered in the model, the screening criteria, and the resulting scores for al l alternatives were presented to the agencies on May 16, 2016, and formally submitted to [Miami -Dade County] on May 28, 2016, and [Florida Department of Environmental Protection] on July 20, 2016. Modeling showed none of the alternatives, including the pre ferred alternative (Alt -3D), were successful in retracting hypersaline groundwater at the base of the Biscayne aquifer to the L -31E canal by Year 10.).

86 NRC Staff Answer at 43.

23 Nuttles expert opinion 87 and discussed in Petitioners Motion for Amended and New

Contentions. 88 This data was obtained from Miami -Dade County for the monitoring wells near

the Newton Wellfield for the period of 2016 through 2023 and therefore could not have been

fully incorporated in the 2019 FSEIS or even the 2023 FSEIS.

Data show the persistence of CCS water and the saltwater interface at these locations. At

one well in particular located adjacent to the Newton wellfield, tritium levels are increasing even

as the recovery well system has operated and reduced the extent of the hypersaline plume. This

indicates that the CCS continues to pollute the Biscayne Aquifer for miles despite recovery well

system extraction. Moreover, Petitioner notes that these data are not included in the tritium data previously reported in FPLs an nual monitoring reports. 89 Petitioner therefore proffers data from

Miami -Dade County that FPL has chosen to exclude from its monitoring reports and that NRC

Staff has not evaluated in any of its environmental impact statements.

Petitioner also notes new information in the EIS that is material to the finding NRC must

make: Section 2.8.3.2 discusses FPLs proposal to increase recovery well system extraction rates

and return some extracted water back to the CCS, though this proposal and nine other

alternatives were modeled to fail to retract the plume back to FPLs property by the start of the

license extension period. When considering that nine alternatives to the current recovery well

system are all projected to fail, apparently due to lack of capacity; when considering the doubling

of freshening water allocations that can cause additional leakage along an east -west hydraulic

gradient; and when considering that there is already CCS -origin water tritiated at the leading

87 May 2024 Nuttle Report at 17, 38 (Figure 7).

88 Miami Waterkeeper Motion at 33 -34.

89 Id. at 33 -35.

24 edge of the salt water interface advancing on the Newton Wellfield, the NRCs conclusion of

SMALL to MODERATE impacts caused by CCS operations due to its use as a heat sink, is

inadequate. Because Petitioner believes that the 2024 FSEIS fails to provide an adequate analysis

of this issue, but the Staff and FPL believe that no more analysis is needed for NEPA

compliance, there is a material dispute.

The preventable pollution of public water supply wells represents a significant, clearly

noticeable, and destabilizing impact on Miami -Dade Countys sole source drinking water supply.

As such, NRC Staff must address the mechanisms outlined in Dr. Nuttles report explaining how

this water is arriving so far away from the cooling canal system, because it indicates that the

continued operation of the CCS as a heat sink and its 30 million gallon per day freshening

allocation is propelling polluted water towards critical resources in the public trust. NRC Staff

should also consider that active, continuous and on -going operation of the recovery well system

that is required to prevent the CCS from harming the Biscayne Aquifer is itself evidence that the

CCS has des tabilized the groundwater resource.

Contention 1 -C raises an important issue and is based on new information in the 2024

FSEIS and an expert report. NRC Staff and FPL have yet to fully grasp this new information, let

alone assess adequately in the FSEIS. Thus, Contention 1 -C satisfies the ad missibility criteria.

CONTENTION 2: THE 2024 FSEISS ANALYSIS OF THE POTENTIAL IMPACTS OF TURKEY POINTS CONTINUED OPERATION DURING THE RENEWAL PERIOD ON MIAMI CAVE CRAYFISH IS INADEQUATE AND ITS DETERMINATION THAT CONTINUED OPERATION IS UNLIKELY TO ADVERSELY AFFECT OR JEOPARDIZE THE MIAMI CAVE CRAYFISH IS UNSUPPORTED.

Contention 2 meets both the good cause standards under 10 C.F.R. § 2.309(c) and the

admissibility requirements of 10 C.F.R. § 2.309(f).

A. Contention 2 satisfies the good cause standard for new and amended contentions.

25 Good cause may be shown where a contention is based on new or materially different information. 90 Contention 2 challenges NRC Staffs analysis in its 2024 FSEIS, which includes

new information not raised in its earlier Draft SEIS. 91 NRC Staff acknowledges Contention 2

demonstrates good cause under Section 2.309(c), stating, [n]ew Contention 2 does challenge

information in the 2024 FSEIS that is new and materially different from information previously

available. 92 FPL acknowledges that after the publication of the 2023 DSEIS the Fish and

Wildlife Service proposed to list the Crayfish and does not dispute that this is new information

that was newly addressed in the 2024 FSEIS. 93 However, like NRC Staff, FPL complains that

there is no material dispute. 94 As demonstrated in detail below, this is incorrect. Serious

deficiencies in the 2024 FSEIS analysis of the effects on the Crayfish include excess focus on

hypersalinity and lack of attention to lower salinity levels that adversely affect the Crayfish.

Fu rthermore, the 2024 FSEIS fails to meaningfully consider the cumulative impacts of continued

CCS operations together with climate change, and it relies on invalid assumptions and outdated

data.

B. Contention 2 meets the admissibility requirements.

1. Contention 2 raises a genuine dispute with NRC Staffs environmental review and determination that Turkey Points continued operation is unlikely to adversely affect or jeopardize the Miami cave crayfish, with substantial support, which is material to the findings the NRC must make

90 10 C.F.R. § 2.309(c).

91 See generally 2024 FSEIS; see also FPL Answer at 38 -39 (describing new analysis in the 2024 FSEIS).

92 NRC Staff Answer at 20.

93 FPL Ans wer at 34.

94 Id

26 Contention 2 meets the admissibility requirements of 10 C.F.R. § 2.309(f). In short,

Contention 2 challenges NRC Staffs analysis of the potential impacts of Turkey Points

continued operation during the renewal period on Miami cave crayfish and its determ ination that

continued operation is unlikely to adversely affect or jeopardize the species. FPL and NRC Staff

argue Contention 2 fails to show that a genuine dispute exists with the 2024 FSEIS on a

material issue of law or fact, lacks adequate factual sup port for Petitioners position, and does not demonstrate that the issue raised is material to the findings that the NRC must make. 95 As

discussed in detail below, Contention 2 raises and supports several material disputes relating to

the adequacy of NRC Staffs environmental review under NEPA and the ESA, all material to the

findings the NRC must make in this proceeding. Petitioner rai ses a material dispute by

challenging the sufficiency of Staffs evaluation of impacts on the Miami cave crayfish in the

2024 FSEIS. NRC Staff and FPL each assert that the FSEISs consideration of those impacts is

sufficient. Petitioner disagrees. Staffs evaluation focuses narrowly on hypersaline plume

remediation, ignoring both other factors impacting the spread of saline water from the CCS more

broadly and the Miami cave crayfishs sensitivity to salinity levels that are much lower than

those represented by either the hypersaline plume or the salt water/freshwater interface as

defined in the 2024 FSEIS. Furthermore, the 2024 FSEIS fails to meaningfully consider the

cumulative impacts of continued CCS operations together with climate change, and it relies on

invalid assumptions and outdated data. These inadequacies amount to a failure to take the

required hard look at environmental impacts including impacts to the crayfish as required

by NEPA. They also undermine the 2024 FSEISs conclusion that continued operation of Turkey

Point will not adversely affect or jeopardize the Miami cave crayfish. These disputes are

95 NRC Staff Answer at 20; see also FPL Answer at 2, 34 -43.

27 substantially supported by evidence offered by Petitioners expert, as well as evidence found in

the 2024 FSEIS and its supporting documents and are material to the findings NRC must make

in this proceeding.

i. The 2024 FSEIS repurposes modeling of the hypersaline plume that cannot be used to predict effects on the crayfish

Petitioner shows that, fundamentally, NRC Staff failed to adequately analyze the effect of

the proposed Turkey Point license extension on the Miami cave crayfish. NRC Staff instead

repurposed analyses that were designed to assess different questions primar ily the impact of the

CCS operation and mitigation measures on the hypersaline plume, and to a lesser degree the

derivative impact on the freshwater/salt water interface on the impact of the continued

operation of the CCS and mitigation measures on the Mia mi cave crayfish, a species that can

only tolerate very low salinity levels. The essential argument in the 2024 FSEIS is that the

Miami cave crayfish is unlikely to experience measurable effects from saltwater intrusion

associated with the proposed contin ued operation of Turkey Point during the SLR term because

(1) the recovery well system would contract the hypersaline plume and prevent water

originating from the CCS from influencing the Biscayne Aquifers saltwater/freshwater

interface within the speci es range and (2) the hypersaline plume does not currently overlap with the endemic range of the Miami cave crayfish. 96 Based on those ideas, the 2024 FSEIS

concludes that:

All potential impacts on Miami cave crayfish from the proposed continued operation of Turkey Point during the SLR term would not be able to be meaningfully measured, detected, or evaluated, and would, therefore, be insignificant. Accordingly, the NRC staff co ncludes that Turkey Point SLR may affect, but is not likely to adversely affect, this species. 97

96 2024 FSEIS at 2 -67 (emphasis added).

97 Id. (emphasis added).

28 Petitioner has articulated a material dispute with the 2024 FSEISs claims that the Miami

cave crayfish is unlikely to experience measurable effects from saltwater intrusion associated

with the proposed continued operation of Turkey Point during the SLR term and that continued

CCS freshening would ensure that water originating from the CCS does not influence the Biscayne Aquifers saltwater/freshwater interface within the species range. 98 Petitioner has

also demonstrated a material dispute with the NRC Staffs legal claim that its analysis a simple

repackaging of environmental reviews created to answer different questions is sufficient to

support its conclusion that the Turkey Point SLR is not likely to affect the Miami cave crayfish

especially given that species intolerance to even very low levels of salinity.

NRC Staff failed to take the required hard look at groundwater salinity impacts on the

crayfish in its 2024 FSEIS by focusing almost entirely on the retraction of the hypersaline plume.

In the 2024 FSEIS, NRC Staff presents FPLs partial compliance with the consent agreements

governing the hypersaline plumes remediation efforts and tout this compliance alongside the

promise of future regulatory action if efforts are not completely successful as being a sufficient basis upon which to conclude the impacts to the crayfish will be negligible. 99 As discussed in

greater detail in Contention 1 -C, NRC Staffs analysis does not address the wider spread of

saline water moving beyond the Consent Agreement compliance zone. Petitioners concern lies

with the influence of CCS operations related to its use as a heat sink at the leading edge of the

salt water interface and not within a compliance zone focused on demonstrating the retraction of

the hypersaline plume (in shallow portions of the Biscayne Aquifer). There are more factors than

98 Id.

99 Id. (contending that compliance with the 2015 Miami -Dade County Consent Agreement, the 2016 FDEP Consent Order, and the NPDES permit and enforced by local and State regulators and the required freshening would, ensure that water originating from the CCS does not influence the Biscayne Aquifers saltwater/freshwater interface within the species range ).

29 the hypersaline plume and changes in salinity caused by the CCS that must be considered. A

complete assessment of CCS impacts must also consider other mechanisms by which the

operation of the CCS impacts groundwater resources. 100

FPL and NRC Staff each repeatedly assert that Petitioner has failed to consider its most

recent monitoring well data, yet themselves fail to acknowledge that these data do not speak to

the continuing influence of CCS operation on the broader area of saltwa ter influence beyond the

compliance zone associated with the hypersaline plume retraction and water leaking at reduced

salinities, though still saline, from the CCS. 101 Movement of the hypersaline plume is not the

only mechanism through which the CCS can affect the salt water interface. 102 NRC Staff does

not adequately address impacts to cave crayfish habitat outside the compliance zone in its 2024

FSEIS. The 2024 FSEIS states the recovery well system will halt and retract the westward migration of the hypersaline plume, 103 and FPL argues the FSEISs underlying data show that

mitigation measures have largely halted the westward advance of the salt water interface. 104

This, FPL claims, is enough to rely on hypersaline plume retraction as the deciding factor in

impacts to the saltwater/freshwater interface, as well as the leakage of water at reduced salinities

from the CCS of concern to the Miami cave crayfish. 105 However, remediation of the hypersaline

plume continues to be frau ght. 106 It is therefore highly suspect that FPL, in its reply, promotes

100 May 2024 Nuttle report at 8 -11.

101 NRC Staff Answer at 38 -39, 41 -42, and 48 -49; FPL Answer at 27 -32.

102 May 2024 Nuttle Report at 10 -11; see also discussion, supra Contention 1 -C.

103 2024 FSEIS at 2 -67.

104 FPL Answer at 31 (citing 2024 FSEIS at 2 -300).

105 Id. at 31 -32.

106 See discussion, supra Contention 1 -C, regarding Section 2.8.3.2 of the 2024 FSEIS.

30 the recovery well system as a solid barrier to water flow, 107 an idea that is disputed by Petitioners

and is at odds with the fact that the system has not retracted the hypersaline plume as originally

planned as discussed in more detail below and the fact that FPL is recommending increased extraction rates for all r ecovery well system wells. 108 At best, all that the 2024 FSEIS and

supporting documents offer as support for the claim that retraction of the hypersaline plume is an

adequate surrogate for all salinity impacts of the CCS is a theory that is belied by available data.

This is the crux of one of the material disputes with the analysis in the 2024 FSEIS. Petitioners

believe that the prediction of the movement of the hypersaline plume does not predi ct how much

less saline water will move and therefore cannot predict how the crayfish will be affected by that

less saline water.

Despite Staffs reliance on plume remediation as a sufficient marker of all salt water

influence from the CCS, the 2024 FSEIS admits that plume retraction has not been as effective

as hoped. 109 Monitoring data between 2018 and 2023 does show retraction of the plume in some

locations, but it also shows portions of the plume that are advancing west, away from the Turkey Point site. 110 The overall degree of reduction, as presented in Table 2 -5 of the FSEIS, illustrates

that FPLs remediation efforts have resulted in less plume reduction than previously

107 See FPL Answer at 33 (citing Final Order, Ex. A at 69 ) (The RWS... create[es] a hydraulic barrier such that none of the CCS water that seeps into ground water is able to move westward past the RWS.

The extraction of the hypersaline ground water beneath the CCS reduces the driving force that contributed to lateral movement away from the CCS thereby halting the westward migration of hypersaline water from the CCS. Thus, since May 2018, the RWS has functioned and continues to function as a hydrologic barrier that has halted the westward movement of hypersaline water from the CCS.).

(emphasis added)).

108 2024 FSEIS at 2 -34.

109 Id. at 2-28 40.

110 Id.

31 estimated. 111 This advancing portion is at the northern end of the plume, closest to known

crayfish habitat. 112 Acknowledging these shortcomings does not, as Staff claims, implicitly

challenge[] the presumption... that State and local regulators will enforce their regulations, but

rather reflects the reality that an adequate environmental impact assessment can not simply

assume that compliance with existing regulatory requirements will result in a predicted outcome

when faced with data to the contrary. 113

ii. The 2024 FSEIS fail s to take account of the habitat of the crayfish and its intolerance for salt

Lastly, the 2024 FSEIS fails to analyze critical impacts on the Miami cave crayfish. As

Petitioner pointed out in its Motion, the full extent of the crayfishs range remains uncertain, as sampling for the species has been sparse and much of the data is dec ades old. 114 The 2024 FSEIS

does not mention the potential for further plume encroachment on crayfish habitat, and does not

contemplate the possibility of crayfish outside the known range. Nor does it address the fact that

the best available science indicates that the Miami cave crayfish likely tolerates salinity levels

significantly lower than those represented by either the hypersaline plume or the saltwater/freshwater interface (as defined in the 2019 and 2024 FSEISs) 115 and fails to look at the

111 Id. at 2 -28 29. Staffs analysis notes: Figure 2 -8 illustrates that for the middle horizon, the plume in the area northwest of the CCS may have expanded slightly since 2018. Figure 2 -9 illustrates that in the deep horizon, the southwestern portion of the p lume shows minimal retraction in addition to an isolated area around well TPGW -22 with chloride concentrations above 19,000 mg/L. Id. at 2 -30 (emphasis added); see also discussion, supra Contention 1 -C (noting FPLs need to increase RWS withdrawal rates).

112 Id. at 2 -32 (Figure 2 -8 Comparison of the 2018 and 2023 Inland Extent of Hypersaline Groundwater (19,000 mg/L Chloride Isochlor) in the Middle Monitoring Well Horizon.), 2 -64 (Figure 2 -13 Endemic Range of Miami Cave Crayfish Divided into the Seven Units Us ed in the FWS Review).

113 NRC Staff Answer at 51 -52.

114 Miami Waterkeeper Motion at 47 (citing 2024 FSEIS at 2 -63; U.S. Fish & Wildlife Serv., Miami Cave Crayfish Species Status Assessment Version 1.2 (Sept. 20, 2023) at 19 -22 (hereinafter Status Assessment)).

115 2019 FSEIS (In 1983, the FDEP designated as Class G -Ill (i.e., non -potable use with TDS levels of 10,000 mg/L or greater) the... Biscayne aquifer [ ] within the Turkey Point plant property, with the west

32 impact of license extension on the lower levels of salinity that would preclude Miami cave crayfish from utilizing otherwise suitable habitat. 116

In short, Petitioner has set forth and supported a material dispute with the 2024 FSEISs

environmental review, based on its failure to take the required hard look at the environmental

consequences of the proposed action, a failure that leaves unsupporte d its conclusion that Turkey

Points license extension is unlikely to adversely affect or jeopardize the Miami cave crayfish.

iii. The 2024 FSEIS fails to take account of the cumulative effect of climate change and the extended period of operation

Petitioner also shows that NRC Staff failed to adequately evaluate the cumulative impacts

of climate change and sea level rise on the Miami cave crayfish. Staff and FPL rely on the false

assumption that CCS operations, including freshening water additions and pumps circulating

water, do not influence salt water intrusion an assumption Petitioner disputes. 117 An

examination of cumulative effects should consider the incremental effects of agency action when added to the impacts of other reasonably foreseeable actions in the past, present, and future. 118 A

cumulative climate change impacts assessment therefore should consider rising sea levels

(resulting in increasing saltwater intrusion), worsening storm events, hotter temperatures, and

drought. 119 A satisfactory environmental impact statement must therefore examine the combined

side of the CCS marking the western boundary.... The FDEP has classified surficial groundwater west of the Turkey Point site (i.e., to the west of the site boundary and CCS) as Class G -II, which means potable water use, with TDS levels of less than 10, 000 mg/L...The intersection of Class G -II and underlying Class G -III groundwater marks the saltwater interface[.]) (citations omitted).

116 Status Assessment at 69 (concluding that it is highly unlikely the crayfish could sustain reproductively successful populations at salinity measures above those evidenced in the natural freshwater aquifer environments from which they have been collecte d (i.e., 0.45 ppt).) (noting potential upper limit of tolerance of 18 ppt based on potential analogous species).

117 See discussion, supra Contentions 1 -C and 2.

118 40 C.F.R. § 1508.1(g)(3).

119 NUREG 1437, Volume 1 Revision 2, Generic Environmental Impact Statement for License Renewal

33 pressure of these forces on an ecologically significant resource, like the crayfish. The 2024

FSEIS fails to do so.

iv. Contention 2 provides substantial factual support

In addition to the facts presented in the discussion above, Petitioners arguments are

supported by the comprehensive analysis offered by the May 2024 report of Petitioners expert,

Dr. William Nuttle. Contention 2 also relies on the data and analysis pres ented in the 2024

FSEIS and the FWS Species Status Assessment for the Miami cave crayfish.

v. The issues raised in Contention 2 are material to the findings that the NRC must make

A contention is material to the NRCs duty to make environmental findings if the issue

of law or fact it raises is of possible significance to the result of the proceeding. 120 Material

contentions have some significant link between the claimed deficiency and either the health and

safety of the public or the environment. 121 The disputes raised in Contention 2 are material to

the findings NRC must make in this proceeding. NRC Staff have failed to meet the requirements

of both NEPA and the ESA by offering an inadequate evaluation of Turkey Points continued

CCS operations on t he Miami cave crayfish.

NEPAs hard look requirement is satisfied where analysis contains sufficient discussion

of the relevant issues and opposing viewpoints and is fully informed and well -considered. 122

Looking almost exclusively at only one aspect of the salinity impacts of CCS operations ignores

of Nuclear Plants, Main Report, Final Report, ADAMS Accession No. ML23201A224 (Feb. 2024), at 4 -

146.

120 Entergy Nuclear Vt. Yankee L.L.C. & Entergy Nuclear Operations (Vermont Yankee Nuclear Power Station), LBP -04 -28, 60 NRC 548, 556 -57 (Nov. 22, 2004).

121 Id.

122 Fla. Power & Light Co. (Turkey Point Units 6 and 7), LBP -17 -5, 86 NRC 1, 26 (2017).

34 relevant issues and cannot qualify as fully informed or well -considered. Staff and FPL remind

Petitioner that NEPA does not require agencies to analyze every conceivable aspect or

alternative. 123 While this is true, an analysis must be reasonable, 124 and it must encompass both

direct and indirect impacts. 125

Here, NRC Staff sought simply to repackage and repurpose an analysis of the impacts of

the CCS operations on the extent of the hypersaline plume, and to a lesser, derivative extent, on

the regional freshwater/saltwater interface. The Staff failed to acknow ledge, let alone analyze,

the effects of CCS operations on regional salinity levels with a view to the much lower salinity

levels that render aquifer habitat unavailable to the Miami cave crayfish. The Staff also failed to

focus on the specific regions of the aquifer most likely to provide habitat for the species.

Attempting to repurpose analyses designed to address different questions, Staffs analysis failed

to consider key issues central to understanding the potential effects of the license extension on

the Miami cave crayfish and its habitat, violating NEPA and rendering its conclusion that the extension will not adversely affect or jeopardize the species unsupported. 126

Furthermore, NRC and ESA regulations expressly require the impact of license renewal

on imperiled species and their habitats including specifically on species listed or proposed for

listing as endangered or threatened under the ESA to determine whether a l icense renewal is

likely to adversely affect or jeopardize the continued existence of the species. 127 Failure to

123 NRC Staff Answer at 18; FPL Answer at 42.

124 Powertech USA, Inc. (Dewey -Burdoch in Situ Uranium Recovery Facility), LBP -17 -9, 86 NRC 167, 191 (2017).

125 40 C.F.R. § 1508.1(g) (defining the scope of effects to be analyzed under the statute).

126 2024 FSEIS at 2 -67.

127 10 C.F.R. § 51.53(c)(3)(ii)(E) (All license renewal applicants shall assess the impact of... continued operations... on important plant and animal habitats. Additionally, the applicant shall assess the impact of the proposed action on threatened or endangered species[.]).

35 adequately assess impacts amounts to a violation of NEPA, the ESA, and their implementing

regulations.

As discussed above, Staff failed to adequately assess impacts to the Miami cave crayfish.

The FSEISs myopic, misguided focus on the hypersaline plume, its failure to analyze the

impacts of continued operation of the CCS on lower levels of salinity in the aquifer that likely

render potential habitat unsuitable for the Miami cave crayfish, as well as its failure to analyze

these impacts together with the cumulative impacts of sea level rise and climate change, are

material to findings the NRC must make regar ding the potential impact of the license renewal on

the Miami cave crayfish.

CONTENTION 3:

3 -A : THE 2024 FSEIS FAILS TO ADEQUATELY ANALYZE CLIMATE CHANGE -RELATED ENVIRONMENTAL IMPACTS THAT ARE REASONABLY FORESEEABLE TO OCCUR DURING THE SUBSEQUENT LICENSE RENEWAL PERIOD.

3 -B: THE 2024 FSEIS FAILS TO ADEQUATELY UPDATE ITS EVALUATION OF FPLS SAMA ANALYSIS TO REFLECT THE EFFECTS OF CLIMATE CHANGE ON ACCIDENT RISK.

A. Contentions 3 -A and 3 -B satisfy the good cause standard for new and amended contentions.

New Contentions 3 -A and 3 -B satisfy the section 2.309(c) standard. Because FPL and

NRC Staff challenge these contentions compliance with the good cause standard, Petitioner

addresses each prong of that analysis in turn. 128

128 To satisfy good cause under section 2.309(c) are recited earlier in this brief. See supra section IV.1 Amended Contention. Because all parties agree that Petitioners contention is timely, Petitioner does not address that prong here. NRC Staff Answer at 59 -67; FPL Answer at 43 -58.

36

1. The GAO Report provides new information that was not previously available

The GAO Report (the Report) contains new information that was not previously

available, and NRC Staff and FPLs assertions otherwise should be rejected. The Report makes

new and site -specific findings about the risks climate change poses to the Turkey Po int nuclear

facility. These findings are the result of an extensive review process whereby the Reports

authors (1) interviewed officials from federal agencies, including NRC, the Department of

Energy, and the National Oceanic and Atmospheric Administrati on, and knowledgeable

stakeholders from industry, academia, and nongovernmental organizations; (2) conducted site

visits to two plants, including Turkey Point; and (3) analyzed available federal data and reviewed regulations, agency documents, and rele vant literature. 129 The report incorporates the

new information obtained from these interviews and site visits.

Yet FPL and NRC Staff insist that the information in the GAO Report is not new, since it

cites past studies. By FPL and NRC Staffs logic, any report that relies on pre -existing

information would not be new. That is not and cannot be the good cause stand ard. Indeed,

earlier in this proceeding, the 2023 DSEIS relied on information and data that was already

publicly available to reach new conclusions about impacts and Petitioner still had the right to challenge this analysis. 130 Every new analysis of an ongoing issue necessarily incorporates

known information. That the GAO Reports analysis relies in part on pre -existing data and

government reports does not render its findings stale, nor does it mean that there is nothing new

in the Report. Even reports conducting a new analysis of existing data can provide new

conclusions. For example, literature reviews or meta -studies by design look only at pre -existing

129 Miami Waterkeeper Motion, Appendix B, U.S. Government Accountability Office Report (hereinafter GAO Report), at Highlights Page.

130 See generally 2023 DSEIS.

37 studies and data. Far from stale, such reports provide further insight that can lead to new

revelations. Such review and analysis of existing data should be and is open to challenge

where as here the study results in new findings.

Here, the GAO Report provides novel analysis. In determining each plants flood hazard

level, hurricane storm surge level, projected change in maximum temperature, and other factors,

the Report analyzes various datasets that had never before been cross -analyzed. For example, to

determine a plants exposure to hurricane storm surge, GAO staff identified overlap between (1)

the 0.5 -mile radius around nuclear power plant coordinates provi ded by the Nuclear Regulatory

Commission and (2) the National Oceanic and Atmospheric Administrations Sea, Lake, and

Overland Surges from Hurricanes Model, which estimates storm surge heights resulting from the

various categories of hurricanes. 131 Commenters had specifically urged NRC Staff to analyze this

NOAA storm surge dataset, but NRC Staff refused to do so. 132 Similarly, GAO staff used

MapInfo mapping software to layer specific plant locations with various hazards and determine exposure levels. 133 The GAO Report therefore conducted a new data analysis that relied in part

on existing information to draw new conclusions something that almost all studies, including

groundbreaking ones, do. No other report has comprehensively analyzed and compared the site -

specific climate risks at each of the United States 75 nuclear plants.

131 GAO Report at 22. The report used similar methodology for flood hazards. Id. at 20.

132 2024 FSEIS at A -36. NRC Staff mistakenly claimed that the NOAA storm surge data was outside of the scope of relicensing. Id.

133 GAO Report at 46 ("To analyze whether nuclear plants are located in areas that may be affected by heat, cold, wildfire, flooding, and hurricane storm surge, we used MapInfo mapping software to determine whether the nuclear power plant locations were located in areas with e xposure to the selected hazards. Exposure indicates that a facility is located in an area that may be affected by a selected hazard.

If the plant overlapped with multiple hazard layers, the layer representing the highest level of exposure was reported. For example, in our report, we coded a plant whose locations showed exposure to both layers for Category 1 and Category 5 storm surge data as having exposure to Category 5 storm surge.").

38 Moreover, the GAO report does not only rely on previously published information. GAO

Staff toured the Turkey Point plant, interviewed plant staff and NRC resident inspectors, and

observed an NRC safety evaluation review to understand the extent to which N RC incorporates

considerations of climate change risks when determining whether and under what conditions to license a nuclear power plant. 134 GAO Staff also interviewed officials from NRC headquarters

and all four NRC regional offices. 135 The GAO Report is therefore not merely a compendium of

historical information, as FPL insists, but rather independent new research that draws novel

conclusions from a holistic approach that includes new site -specific data.

2. The new information provided by the GAO Report is materially different from previously available information

Contentions 3 -A and 3 -B meet the second prong of section 2.309(c) because the new

information provided in the GAO Report is materially different from previously available information. 136 Despite having discussed (albeit inadequately) the impacts of climate change in

the 2024 FSEIS, NRC Staff now claims that the GAO Report titled: Nuclear Power Plants,

NRC Should Take Actions to Fully Consider the Potential Effects of Climate Change is unrelated to license renewal at Turkey Point. 137 Surely a site -specific analysis from a sister

agency warning Congress and the public that Miami -Dade County could experience an increased

risk of a nuclear release if the license renewal is granted without review of potential safety

updates is relevant.

134 Id. at 42, 47.

135 Id. at 47.

136 See 10 C.F.R. 2.309(c)(ii).

137 NRC Staff Answer at 59.

39 This is precisely the type of information that NRC Staff needs to consider in deciding

whether to update the severe action mitigation alternatives (SAMA) evaluation during

consideration of the application to renew FPLs operating license for another 20 yea rs. Members

of Congress, presumably concerned about nuclear plants vulnerability to climate change in coming decades, requested that GAO staff prepare this report. 138 As described at length in

Contentions 3 -A and 3 -B, the Report identifies and demonstrates the reasonable foreseeability of several climate change -related impacts that NRC Staff has failed to adequately analyze. 139

The Board interprets materially different new information from the standpoint of a

reasonable petitioner. 140 The NRC has found information to be materially different where more

recent information regarding a previously considered issue comes to light. For example, in In

Situ Leach Facility, the Board found that recent seismic information was materially different

from previously available seismic information, where the environmental report had previously

discussed earthquakes but neglected to analyze significant recent seismic information and failed to include discussion of seismic activity in... nearby areas. 141

The GAO Report is easily distinguished from other cases where a Board or Commission

has rejected contentions as not materially different, because the reports in question in those cases

contained not a single piece of new information, or because the conclu sions in question had been

previously published. 142

138 See GAO Report at Highlights Page; U.S. Government Accountability Office, What GAO Does,

available at https://www.gao.gov/about/what -gao -does (last visited June 12, 2024).

139 Miami Waterkeeper Motion at 56 -67, 72 -76.

140 In the Matter of Holtec Intl (HI -STORE Consolidated Interim Storage Facility), LBP -19 -4, 89 N R C 353 (2019) (affirmed in part, reversed in part on other grounds by CLI -20 -4, 91 NRC 167 (2020)).

141 In the Matter of Crow Butte Resources, Inc. (In Situ Leach Facility, Crawford, Nebraska), LBP -15 -11, 81 NRC 401 (2015) ( reversed in part on other grounds by CLI -19 -5, 89 NRC 329, 448 (2019)).

142 See In the Matter of Northern States Power Co. (Prairie Island Nuclear Generating Plant, Units 1 and 2), CLI -10 -27, 72 NRC 481 (2010) (rejecting a contention based on a report that compiled historical

40 NRC Staff implies that the Board ought to reject Contentions 3 -A and 3 -B because

Petitioner filed related contentions in the past. But whether a petitioner previously raised similar

issues has no bearing on whether the petitioner satisfies the good cause s tandard. Petitioner does

not have the access that GAO Staff had for example, Petitioner cannot interview Turkey Point

employees or conduct site inspections to assess the plants risk to climate change. That the GAO

Staff undertook that investigation and ar rived at the Reports conclusions should be enough for

NRC Staff to take a hard look at these issues. Petitioner should not be penalized for correctly

identifying an issue that was subsequently substantiated by an independent government

investigation. When new information became available that corroborated its argument, Petitioner

needed only to demonstrate that the new information provides a basis for the contention and that

it raises a material dispute with the FSEIS. Petitioner has done that. The GAO Rep ort provides

new information demonstrating that a number of climate risks are reasonably foreseeable, and

therefore rightfully serve as the basis for Contentions 3 -A and 3 -B. Had the GAO Report been

available when Petitioner filed its 2023 Petition, Petiti oner would have cited the Report to

substantiate its claims regarding climate -related impacts.

NRC Staff mistakenly claims that the GAO Report does not identify any way in which

the Staffs license renewal reviews are deficient under the current statutory or regulatory

requirements. 143 To the contrary: the Report identifies a number of inadequacies of NRCs

information but did not contain any single [new] event or any single [new] piece of information) ; In the Matter of Holtec Int l (HI -STORE Consolidated Interim Storage Facility), LBP -20 -6, 91 NRC 239 (2020)

(decisive factor cited by Board in rejecting the contention for lack of good cause wa s no t that the report largely cited pre -existing sources, but rather that the conclusions had already been published seven years earlier); see also In the Matter of Interim Storage Partners LLC (WCS Consolidated Interim Storage Facility), LBP -19 -11, 90 NRC 358 (2019) (same); In the Matter of Entergy Nuclear Generation Co. &

Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), LBP -12 -11, 75 NRC 731 (2012)

(finding information was not materially different where the relevant conclusions were previously available).

143 NRC Staff Answer at 60.

41 relicensing process, enumerated in Contention 3 -B. 144 At bottom, the Report found that

[w]ithout incorporating the best available information into its licensing and oversight processes,

it is unclear whether the safety margins for nuclear power plants established during the licensing

period in most cases ov er 40 years ago are adequate to address the risks that climate change poses to plants. 145 These inadequacies concern NRC Staffs violation of NEPA by neglecting to

adequately consider reasonably foreseeable climate -related environmental impacts, including the

environmental impacts of a severe accident.

NRC Staff cannot know if it has taken sufficient measures to mitigate risks of severe

accidents if it doesnt consider the climate data in its evaluation of reasonably foreseeable

climate change -related impacts and its SAMA evaluation. Therefore, the fact that the GAO

analysis does not incorporate the plants protective measures into its analysis has no effect on the

significance of its findings. In Diablo Canyon, the Board specifically rejected NRC Staffs

argument that despite new conclusions published i n a report, overall risk levels remain lower and the plant had been demonstrated to have reasonable assurance of safety. 146 The Board found

that it could not accept at face value PG&E's own interim conclusion about the bounding of

the risk level and that, in fact, this is the very issue on which [Petitioner] seeks a hearing, and on which [Petitioner] has set forth evidenc e that is at least plausible. 147

Contentions 3 -A and 3 -B therefore satisfy the good cause standard.

144 GAO Report at 39 -40; Miami Waterkeeper Motion at 75 -76.

145 GAO Report at 39; Miami Waterkeeper Motion at 76.

146 In the Matter of Pacific Gas & Electric Co. (Diablo Canyon Nuclear Power Plant, Units 1 and 2),

LBP -15 -6, 81 NRC 314, 320 (2015).

147 Id.

42 B. Contentions 3 -A and 3 -B satisfy the admissibility criteria.

CONTENTION 3 -A: THE 2024 FSEIS FAILS TO ADEQUATELY ANALYZE CLIMATE CHANGE -RELATED ENVIRONMENTAL IMPACTS THAT ARE REASONABLY FORESEEABLE TO OCCUR DURING THE SUBSEQUENT LICENSE RENEWAL PERIOD.

In addition to satisfying the good cause requirement, Contention 3 -A meets the

admissibility requirements.

1. Contention 3 -A raises a genuine dispute regarding a material issue and provides substantial factual support

Contention 3 -A raises a genuine dispute. FPL mistakenly suggests that because the GAO Report does not directly cite the 2024 FSEIS, Petitioner has not identified a material dispute. 148

FPL misunderstands the contention. The information in the GAO Report provides the basis for

the contention and demonstrates that a number of climate change -related impacts are reasonably

foreseeable. Contention 3 -A relies on the information in the Report to explain why, in light of the

reasonable foreseeability of these impacts, the analysis in the 2024 FSEIS is inadequate.

Contention 3 -A concerns a material issue. Contrary to NRC Staffs claims, Petitioner adequately explained why the issues it identifies are material to NRC Staffs review. 149

Materiality requires Petitioner to show a significant link between the claimed deficiency and

either the health and safety of the public or the environment. 150 As discussed at length in the

petition, the GAO Report demonstrates that the environmental impacts of continued plant

148 FPL Answer at 51 -53 (The GAO Report, Itself, Fails to Demonstrate a Genuine Dispute Because It Does Not Evaluate the 2024 FSEIS).

149 See Miami Waterkeeper Motion at 68, 77 -78.

150 Vermont Yankee, 60 NRC at 556 - 57. Contrary to NRC Staffs assertion, the report analyzes not only climate change effects on plant operations, but also effects on the environment, including sea level rise and heat. GAO Report at 13 -26; Miami Waterkeeper Motion at 56 -67; NRC Staff Answer at 64.

43 operation in light of climate change are reasonably foreseeable to be significant. 151 Were NRC

Staff to take a hard look at these impacts, it might decide to deny the license renewal or impose

conditions on the renewal. 152

NRC Staff asserts that the GAO report makes only general claims applicable to all U.S.

power plants without specifically addressing climate change impacts at Turkey Point. 153 Yet, as

described at length in the Petition, the report analyzes the specific risk of each of the 75 U.S.

nuclear plants. 154 Out of the 75 plants it analyzed, GAO staff selected Turkey Point and one other

plant for a site visit, presumably because of the Turkey Point plants high risk level for a number

of climate -related risks. 155 Indeed, of the nine current and future hazards at operating nuclear

power plants assessed in the Report, Turkey Point was almost uniformly ranked in the highest

151 NRC Staff claims that part of Petitioners Contention 3 -A related to overtopping is not material because Petitioner has not adequately demonstrated the significance of the impact of overtopping. NRC Staff Answer at 64. In its Motion, Petitioner explains that CCS water flowing out into the Bay carries with it a number of pollutants, all of which could have detrimental impacts on the surrounding Bay.

Miami Waterkeeper Motion at 59. The fact that NRC Staff speculated in response to a comment in its 2019 FSEIS not its 2024 FSEIS that the impact of more frequent overtopping would be minimal does not constitute the hard look that NEPA requires to determine whether the impacts would in fact be SMALL. NRC Staff Answer at 64 -65 (citing 2019 FSEIS at A -39). We do not yet know whether the impacts of more frequent overtopping would be significant because NRC Staff has failed to adequately analyze this issue. Miami Waterkeeper Motion at 60. At this stage it is sufficient for Petitioner to identify the possibil ity of a significant impact that has been overlooked. Petitioner does not have to carry out the impact analysis.

NRC Staff also takes issue with the fact that the GAO Report relies on an outdated version of the National Climate Assessment, and suggests that if the GAO report can rely on this outdated version, so too can the 2024 FSEIS. NRC Staff Answer at 6 1. Yet Petitioner is not alleging that the GAO report is the end point for the analysis of climate impacts. Rather, it serves to illustrate why the NRC Staffs analysis needs to be updated to incorporate the latest available information on climate impacts by demonstrating that the plant faces reasonably foreseeable risks of sea level rise and heat if it continues to operate into the 2050s.

152 Contrary to NRC Staffs claim, Petitioner demonstrates at length how... the relevant information in the GAO Report has not been accounted for in the Staffs environmental review. NRC Answer at 65 -66; see Miami Waterkeeper Motion at 54 -69.

153 NRC Staff Answer at 63.

154 GAO Report at 14 -29, 55 -60; Miami Waterkeeper Motion at 56 -67.

155 GAO Report at 2, 42, 55; Miami Waterkeeper Motion at 56 -67.

44 risk category. 156 The Report also specifically identifies a number of shortfalls in the licensing

process that NRC Staff must remedy to adequately analyze climate risks. 157

The cases cited by FPL regarding the materiality of GAO reports therefore have no

bearing here. In Va. Elec. & Power Co. (North Anna Power Station, Unit 3), the Board did

indeed find that a GAO report cited by the petitioner provided useful background information,

and discussed the reports findings at length in a footnote and ultimately admitted the contention that was fou nded in part upon the GAO Report. 158 Nowhere did the Board state that

the report was too general to serve as a basis, or partial basis, for admission. 159 In Entergy

Nuclear Operations. Inc. (Palisades Nuclear Power Plant and Big Rock Point Site), the Board

rejected a contention based on generalized conclusions, where petitioners failed to explain how

they extrapolated a specific cost estimate based on general data. 160 In that case, the GAO report

table that petitioners relied on was titled Typical Costs Associated with Transferring Spent

Nuclear Fuel in Canisters from Wet to Dry Storage and contained no site -specific information regarding the nuclear plant in question. 161 Where Boards have rejected contentions based on

GAO reports, it has been where the report lacks any site -specific information about the nuclear

plant in question. 162

156 GAO Report at 56, Table 1.

157 Id. at 34 -40; Miami Waterkeeper Motion at 72, 75 -76.

158 LBP -08 -15, 68 NRC 294, 312 n.82 (2008).

159 Id.

160 CLI -22 -8, 96 NRC 1, 39 -40 (2022).

161 See U.S. Government Accountability Office, GAO -15 -141, Spent Fuel Management: Outreach Needed to Help Gain Public Acceptance for Federal Activities that Address Liability (Oct. 2014), 17 tbl.2 (emphasis added).

162 See In the Matter of Pacific Gas & Electric Co. (Diablo Canyon Nuclear Power Plant, Units 1 and 2),

LBP - 93 - 1, 37 N RC 5 (1993); In the Matter of Vermont Yankee Nuclear Power Corp. & Amergen Vermont, LLC (Vermont Yankee Nuclear Power Station), CLI -00 -20, 52 NRC 151 (2000); In the Matter of U.S. Department of Energy (High -Level Waste Repository), Docket No. 63 -001 -HLW, 69 NRC 367

45 In contrast, the GAO Report that Petitioner cites includes a table with a set of climate risk

information specific to Turkey Point, and the Reports authors specifically singled the Turkey

Point plant out for a site visit. 163 The GAO Report emphasizes that [f]indings from selected site

visits are not generalizable to all sites. 164

Indeed, Boards have found GAO reports that contain site -specific information to serve as

adequate bases for contention. For example, in In the Matter of Detroit Edison Co. (Fermi

Nuclear Power Plant, Unit 3), the Board admitted a contention based in part on a GAO study

containing specific information about the facility in question. 165 Boards and the Commission

have also granted enforcement action, 166 decided license amendments, 167 and conducted special

inspections, 168 based in part on information provided by GAO reports. GAO reports have

historically sounded the alarm on a variety of safety issues and served as the impetus for NRC

(2009) ( affirmed in part, reversed in part by CLI -09 -14, 2009 WL 1883741 (June 30, 2009); In the Matter of Calvert Cliffs 3 Nuclear Project, LLC & Unistar Nuclear Operating Services, LLC (Calvert Cliffs Nuclear Power Plant, Unit 3), LBP -09 -4, 69 NRC 170 (2009); In the Matter of Pennsylvania Power

& Light Co. & Allegheny Electric Cooperative, Inc. (Susquehanna Steam Electric Station, Units 1 and 2),

LBP - 79 - 6, 9 NRC 291, 325 (1979).

163 GAO Report at 55, Table 1.

164 Id. at 42 (emphasis added).

165 In the Matter of Detroit Edison Co. (Fermi Nuclear Power Plant, Unit 3), ASLBP No. 09 -880 -05 -

COL -BD01, 70 NRC 227 (2009).

166 In the Matter of Entergy Nuclear Operations, Inc. et al. (Indian Point Units 1, 2, and 3), DD -12 -3, 76 NRC 416 (2012).

167 In the Matter of Nuclear Fuel Services, Inc. & New York State Energy Research & Development Authority (Western New York Nuclear Service Center), CLI -81 - 29, 14 NRC 940 (1981).

168 In the Matter of Duke Power Co., et al. (Catawba Nuclear Station, Units 1 and 2), DD - 84 - 16, 20 NRC 161 (1984).

46 rulemaking. 169 Boards have consistently cited GAO reports as relevant and reliable sources of

information. 170

As discussed above in Petitioners good cause analysis, Petitioner provides ample factual support for its contention. 171 Notably, FPL does not contest that Petitioner provides

sufficient factual support in accordance with 10 C.F.R. § 2.09(f)(v). 172 NRC Staff implies that

the Board ought to reject Contentions 3 -A and 3 -B because Petitioner filed related contentions in the past. 173 But, as with good cause, whether a petitioner previously raised similar issues has no

bearing on whether the petitioner satisfies the admissibility standard. 174 The GAO Report

provides new information corroborating Petitioners concerns regarding climate change and

demonstrating that a number of climate risks are reasonably foreseeable, and therefore provides

169 See, e.g. In the Matter of Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), LBP -

83 -22, 17 NRC 608, 617 (1983) (describing a GAO Report as making important contributions' on the state of emergency planning around nuclear facilities and forming a part of the basis for the Commission's conclusion that more stringent emergency planning and preparedness requirements should be adopted for nuclear power plants) (citing 44 Fed. Reg. at 75,169 ); In the Matter of Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), ALAB - 818, 22 NRC 651 (1985) (describing GAO report as an impetus for rulemaking regarding emergency planning ) (reversed and remanded by CLI - 86 - 13, 24 N RC 22 (1986) ); Decommissioning Recordkeeping and License Termination:

Documentation Additions, RIN 3150 - AD98, 1993 WL 356491 (July 12, 1993) (noting that a GAO Report identifie d serious concerns that resulted in a rulemaking).

170 See In the Matter of Va. Electric & Power Co. (North Anna Nuclear Power Station, Units 1 and 2),

LBP 68, 6 NRC 1127 (1977) (citing a GAO Report as a relevant and reliable source of information regarding allegedly poor construction practices at a nuclear plant); In the Matter of Virginia Electric &

Power Co. (North Anna Power Station, Unit 3), ASLBP No. 08 -883 -01 -COL, 68 NRC 294 (2008) (citing a GAO report as a relevant source of information regarding disposal facilities); In the Matter of Radiac Research Corp., DD -04 -4, 60 NRC 387 (2004) (citing GAO report as a relevant and accurate source of information regarding security threats); In the Matter of Mixed Oxide Fuel, CLI - 78 - 10, 7 NRC 711 (1978) (citing to GAO Report recommendations as relevant information regarding domestic reprocessing policy); In the Matter of Holtec Intl (HI -STORE Consolidated Interim Storage Facility), LBP -19 -4, 89 NRC 353 (2019) (citing GAO Report recommendations as relevant source of information regarding spent nuclear fuel).

171 See supra Section IV.1 Amended Contention 1.

172 See FPL Answer at 50 -55.

173 NRC Staff Answer at 65 -66.

174 See 10 C.F.R. 2.309(f).

47 ample factual basis for Contentions 3 -A. 175 Staff cannot show how the new information has been

incorporated into its analysis simply because it has not done so.

CONTENTION 3 -B: THE 2024 FSEIS FAILS TO ADEQUATELY UPDATE ITS EVALUATION OF FPLS SAMA ANALYSIS TO REFLECT THE EFFECTS OF CLIMATE CHANGE ON ACCIDENT RISK.

In addition to satisfying the good cause requirement, Contention 3 -B meets the

admissibility requirements.

1. Contention 3 -B raises a genuine dispute regarding a material issue

FPL and NRC Staff mistakenly suggest that Petitioner has failed to identify a material

dispute because it has not identif[ied] specific SAMAs or specific inputs that would change the SAMA analysis. 176 This assertion misconstrues the criteria for admissibility. Section 2.309(f)

does not require that Petitioner conduct a full SAMA analysis, identify specific SAMA

mitigation measures on FPLs behalf, or conduct its own cost -benefit analysis in order to id entify

a genuine dispute at this stage. Rather, as NRC Staff itself admits, Petitioner need only

demonstrate that [its] challenges to SAMA analyses could change the cost -benefit conclusions. 177 Petitioner has done just that. Petitioner does not have to prove its contentions at

the admissibility stage, 178 nor does the Board adjudicate disputed facts at this juncture. 179 As a

Board explained in McGuire, "[w]hile the contention might have been more detailed or

175 See Miami Waterkeeper Motion at 54 -67.

176 FPL Answer at 57; see also NRC Staff Answer at 68 -69.

177 NRC Staff Answer at 67 (emphasis added) (citing Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), CLI 11, 71 NRC 287, 315 - 17 (2010);

McGuire, CLI -02 -17, 56 NRC at 8, 11 - 12 (finding that the relevant inquiry to determine if a SAMA analysis meets the materiality contention admissibility requirement is whether the contention could change the cost -benefit analysis)).

178 Clinch River, 86 NRC at 150 (quoting Peach Bottom, 8 AEC at 21).

179 Id.

48 otherwise better supported, the Petitioners have done enough to raise a question about the

adequacy of the probability figures used in Duke's SAMA analyses, namely, whether they should

have incorporated or otherwise acknowledged information" from a specific study. 180 Whether

the SAMA analysis in fact should have addressed the study [is] a question for the merits. 181

Petitioner satisfies the admissibility standard by identifying material shortfalls in NRC

Staffs evaluation of FPLs SAMA analysis, including its reliance on historic climate data rather

than climate projections. The GAO Report identifies specific externa l hazards that NRC Staff is

not adequately considering in its SAMA analysis: flooding, storm surge, hurricanes, rising

temperatures, and droughts. 182 Thus, Petitioner identifies a genuine dispute regarding a material

issue. Petitioner need not, nor is it best positioned to, complete the full SAMA analysis on FPL

or NRC Staffs behalf and especially not at this stage of the proceeding.

NRC Staff effectively admits that FPLs 2002 SAMA analysis is out of date, and its use

here presents a material dispute as to the adequacy of the Staffs analysis. According to NRC

Staff, the 2002 SAMA evaluation did not identify any fundamental weaknesse s or

vulnerabilities of Turkey Point to severe accident risk with regard to the separate matter of

external events related to seismic, fire, high winds, flood, and other external hazards. 183

Notably, the GAO an independent government agency conducting a study at the request of

Congress reached the exact opposite conclusion 22 years later: the Report specifically found

180 McGuire, 56 NRC 1, 8 (emphasis added).

181 Id. at 9 (citing 55 NRC at 126).

182 As discussed above, the GAO Report contains site -specific findings regarding the Turkey Point plants exposure to various hazards. See GAO Report at 15, 19, 23, 42, 55 (Table 1). Moreover, even where a study does not on its face purport to address the current design, operation, or maintenance of a specific plant, the Board nonetheless found that a sufficient question had been raised about the SAMA analyses failure to address or otherwise acknowledge results from the study upon which Petitioner based its contention. McGuire, 56 NRC 1 at 9 -10.

183 NRC Staff Answer at 69 -70.

49 that Turkey Points flood hazard level was high, hurricane storm surge level was high, and wild fire potential level was high/very high. 184 Its hard to envision a more material

dispute than where each party relies on evidence that points to a different conclusion. Moreover,

NRC Staffs citation to a 22 -year -old analysis that relies on historic data rather than climate

projections demonstrate s precisely the inadequacy that Petitioner is contesting. NRC Staffs

suggestion that it may rely on historical data because external events are a low contributor to overall [core damage frequency] in FPLs SAMA analysis is circular. 185 NRC Staff cannot

know the extent to which external events contribute to the risk of severe accidents unless it

considers the current and future risk levels posed by climate change, which it failed to do by

ignoring climate projections. This is the precise concern that GAO staff identified in their

report. 186

As discussed at length in the initial Motion, the information in the GAO Report is new

and significant: it provides a seriously different picture than the current FSEIS. 187 Whereas the

2024 FSEISs SAMA evaluation does not use climate projections to consider how climate

change will affect the risk of flooding, hurricane, and temperature -related severe accidents, the

GAO Report warns that severe accidents due to climate chang e are reasonably foreseeable. NRC

Staffs current SAMA evaluation relies on circular reasoning, asserting that because no

potentially cost -beneficial SAMAs were identified during the Turkey Point initial license

renewal review, it is unlikely that FPL wou ld have found any potentially cost -beneficial SAMAs

184 GAO Report at 56.

185 NRC Staff Answer at 70.

186 GAO Report at 34 -35.

187 Miami Waterkeeper Motion at 77 (citing 2024 FSEIS at D -4).

50 for the SLR term. 188 NRC Staff never factored in climate change projections to see if they

altered the risk level, and therefore the cost -benefit analysis of particular mitigation measures. 189

If NRC Staff were to update the SAMA evaluation to reflect the risks identified in the

GAO Report, it might very well call into question the [FSEISs] overall conclusions regarding the probability -weighted consequences of potential severe accidents. 190 As a previous Board

explained, the cost/risk equation that is the SAMA bottom line is only accurate if the risk assessment is valid. 191 Petitioner raises the possibility that the overall cost -benefit assessment

was skewed or incomplete because of a failure to include or at least acknowledge and

discount the higher event frequencies from the GAO Report. 192

By FPLs own admission, it elected to do site -specific supplemental EIS in accordance

with CLI -22 -03. 193 This means that FPL must conduct a site -specific SAMA analysis, and NRC

Staff needs to evaluate the adequacy of this analysis. 194 FPL and NRC Staff both acknowledge

that the pending NRC rulemaking, which would redefine SAMA as a Category 1, will not affect the proceeding. 195 NRC Staff is correct that it must look[] to new and significant information in

its update to the previous SAMA analysis. 196 As explained at length in the Petition and above,

the GAO report provides such new and significant information not considered in NRC Staffs

188 Miami Waterkeeper Motion at 71 (citing 2024 FSEIS at D -5).

189 2024 FSEIS at D D -8.

190 Miami Waterkeeper Motion at 77 -78 (citing In the Matter of Entergy Nuclear Operations, Inc. (Indian Point, Units 2 and 3), CLI -16 -10, 83 NRC 494 (June 2, 2016)).

191 McGuire, 56 NRC 1, 8.

192 Id. at 10.

193 FPL Answer at 6 -7.

194 See id.

195 FPL Answer at 6 -9; NRC Staff Answer at 82 -86.

196 NRC Staff Answer at 72 -73.

51 SAMA evaluation. NRC Staff does not address Petitioners concerns, instead reiterating that it identified no new and significant information in its SAMA evaluation. 197

2. Contention 3 -B is within the scope of this proceeding

Contrary to NRC Staffs assertion, Petitioners challenge of the SAMA evaluation is

subject to NEPA review and well within the scope of this proceeding, because severe accidents

can have severe environmental impacts. As NRC Staff acknowledges, [a] SAMA an alysis is an

alternatives analysis carried out under NEPA in order to determine if there are any procedures,

training activities, or plant -design alternatives that could significantly reduce environmental risks

at a reactor site in the event of a severe ac cident. 198 Precedent shows that SAMA analysis is

rightly the subject of NEPA review. 199

That SAMA analysis implicates safety concerns, in addition to environmental concerns,

does not place it outside of the scope of NEPA review. NRC Staff specifically takes issue with

Petitioners claim that it is unclear whether the safety margins for nucl ear power plants... are

adequate to address the risks that climate change poses to plants. 200 Far from cloaking current

licensing basis safety concerns in an environmental cloth, this framing simply acknowledges

that safety and environmental issues are intertwined when it comes to severe accidents for

example, a flooding or hurricane -related nuc lear release is a safety issue that would have severe

impacts on the surrounding environment. Thus, FPLs assertion that SAMA analyses are

environmental reviews; they have no safety purpose whatsoever is incorrect by identifying

197 See NRC Staff Answer at 69.

198 NRC Staff Answer at 73 (citing 5 Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications, NRC Regulatory Guide 4.2, Suppl. 1, Rev. 1, ADAMS Accession No. ML13067A354 (Jun. 2013) at 44 - 45 ) (emphasis added).

199 Limerick Ecology, 869 F.2d 719 (3d Cir. 1989).

200 NRC Staff Answer at 74 (citing Miami Waterkeeper Motion at 76).

52 and adopting all cost -effective measures to prevent and mitigate severe accidents, SAMA both

reduces environmental impact and protects safety.

NRC Staff also mischaracterizes Contention 3 -B as a challenge to the adequacy of the underlying current licensing basis. 201 Contention 3 -B, however, squarely challenges the

adequacy of NRC Staffs SAMA evaluation not the current licensing basis. Although the GAO

Report certainly contains information relevant to current plant safety, and NRC Staff should

independently re -evalua te the safety of its current operations, Petitioner here is simply

challenging the adequacy of the SAMA evaluation for the license renewal period. All of the

aging issues studied for license renewal are also managed through the current licensing basis.

Suc h management does not exempt these issues from study at the license renewal stage. For this

same reason, NRC Staffs assertion that it is not required to discuss climate change impacts on accident risk must be rejected. 202 Petitioner is raising an environmental contention challenging

the adequacy of the SAMA analysis. The Commission does not have the power to limit the scope of such analyses, because the study is mandated by NEPA and not the AEA. 203 If new

information shows the need to update SAMA, then that information is within the scope of license

renewal. 204

201 NRC Answer at 76. NRC Staff also mischaracterizes Contention 3 -B as a contention of omission; however, Contention 3 -B challenges the adequacy of the existing SAMA analysis. See id. ; 2024 Petition at x.

202 NRC Staff Answer at 75 -76.

203 Limerick Ecology, 869 F.2d at 730 -31, 741 (finding that the NRC was required to address [SAMAs]

and cannot now look to sufficiency under the AEA to avoid that obligation because simply meeting the requirements of the AEA does not exempt the Commission from complying with NEPA's procedural requi rements.).

204 Limerick Ecology, 869 F.2d 719, 755 (3d Cir. 1989)

53 V. WAIVER

A. A Waiver is unnecessary.

Petitioner agrees with FPL that a waiver is not needed for the Board to consider Contention 3 -B, as it challenges a site -specific SAMA evaluation in the 2024 FSEIS. 205

Petitioner submitted the waiver out of an abundance of caution. 206

All parties agree that FPL opted out of the generic review process and that NRC Staff is

now bound to analyze all environmental impacts in [sic] a site -specific basis. 207 Therefore,

NRC Staffs assertion that a waiver of the Commissions regulations is still required to challenge a SAMA when one has already previously been conducted does not hold up. 208 The

reasoning in Limerick does not apply here, 209 because FPL elected to do a site -specific analysis

of all environmental impacts, rather than relying on generic, Category 1 findings. NRC Staff

reasons that because FPL previously conducted a site -specific SAMA analysis, and the 2013 LR

GEIS designates SA MA as a category 2 issue, the 2019 FSEIS or the 2024 FSEIS were not affected by the Commissions rulings in CLI -22 -2 and CLI -22 -3. 210 FPL, having elected to

proceed through a site specific review, understands that a generic finding does not apply here;

NRC Staff cannot now hide behind a generic finding.

205 FPL Answer at 60.

206 Miami Waterkeepers Petition for Waiver of 10 C.F.R. §§ 51.53(C)(3) and 51.71(D) and 10 C.F.R. Part 51, Subpart A, Appendix B, ADAMS Accession No. ML24129A221 (May 8, 2024) (hereinafter Miami Waterkeeper Waiver Petition) at 5.

207 NRC Staff Answer at 79.

208 NRC Staff Answer at 80.

209 In the Matter of Exelon Generation Co. (Limerick Generating Station, Units 1 and 2), CLI -13 -7, 78 NRC 199, 211 -12 (2013).

210 NRC Staff Answer at 80.

54 NRC Staff acknowledges in the 2024 FSEIS that it is required to update the SAMA evaluation where new and significant information comes to light. 211 As explained in detail

above, the GAO Report constitutes such new and significant information. Petitioner need only

demonstrate that [its] challenges to SAMA analyses could change the cost -benefit conclusions. 212 Petitioner has met this burden and does not need a waiver.

As discussed above, Petitioner is challenging the adequacy of NRC Staffs SAMA

evaluation, and not the current licensing basis, and therefore is not seeking a waiver for 10

C.F.R. § 54.30. 213

B. If the Board determines that a waiver is necessary, it should grant the waiver.

In the event that the Board interprets Contention 3 -B as a rule challenge, the Board

should grant the waiver because Petitioner meets all three Millstone waiver criteria.

1. Millstone Factor 1: Purpose for which the regulation was adopted

SAMA analysis is designed to evaluate the risk of beyond -design basis severe accidents

and determine whether measures to reduce the risks of severe accidents that could release radiation are cost justified. 214 In the context of NEPA, SAMA is intended to determine when

risk mitigation measures are justified to reduce the effects of severe accidents on the environment. 215 Here, Petitioner raises concerns that NRC Staff does not know whether there

211 2024 FSEIS at D D -7.

212 NRC Staff Answer at 67 (emphasis added) (citing Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), CLI -10 -11, 71 NRC 287, 315 - 17 (2010);

McGuire, 56 NRC at 8, 11 - 12 (finding that the relevant inquiry to determine if a SAMA analysis meets the materiality contention admissibility requirement is whether the contention could change the cost -

benefit analysis)).

213 See NRC Staff Answer at 71.

214 2024 FSEIS at A -5.

215 In the Matter of Entergy Nuclear Operations, Inc. (Indian Point, Units 2 and 3), CLI -16 -10, 83 NRC 494 (June 2, 2016).

55 are cost -effective mitigation measures that would further SAMAs goal because FPL and NRC

Staff failed to do adequate evaluation in light of climate change projections. As a previous

Board explained, the cost/risk equation that is the SAMA bottom line i s only accurate if the risk assessment is valid. 216 The GAO Report makes it clear that climate change has and will

increase the risk of certain external events such as hurricanes and flooding that may result in

severe accidents. Therefore Petitioner raises the possibility that the overall cost -benefit

assessment was skewed or incomplete because of a failure to include or at least acknowledge

and discount the higher event frequencies from the GAO Report. 217 Interpreting Sections

51.53(c)(3) and 51.71(d) and Appendix B to prevent Petitioner from challenging the

sufficiency of the SAMA evaluation would undermine SAMAs goal of accurately determining

whether additional mitigation measures are warranted and ensur ing that the environment is

adequately protected from severe accidents.

2. Millstone Factors 2 and 3 : Special circumstances unique to the plant

NRC Staff suggests that because [c]limate change is a global phenomenon, there can be no special circumstances that justify a waiver in this case. 218 Neither NRC Staff nor FPL address

the fact that the GAO Report identified Turkey Plant as one of most vulnerable plants in the

country to flooding, storm surge, and hurricanes that could cause severe accidents. As explained

in the Motion and the Petition Waiver, these factors are exacerbated by the plants unique CCS,

216 McGuire, 56 NRC 1, 8.

217 Id. at 10.

218 NRC Staff Answer at 81.

56 which is located at sea level and sits on the shore of Biscayne Bay, 219 making it particularly

vulnerable to these risks and the resultant environmental impacts. 220

FPL claims that Petitioner identifies no information in the GAO Report that is surprising

or unexpected in the context of severe accident analysis, or information that NRC was unaware when it promulgated the rule. 221 But Turkey Point's unique vulnerability to the effects of

climate as demonstrated in the recent analysis of Turkey Point -specific climate risks provided

by the GAO Report was not adequately considered in SAMA -related rulemakings or the

current GEIS for su bsequent license renewal proceedings. This issue therefore constitutes a new,

site -specific issue with respect to Turkey Point.

FPLs assurances that Turkey Points ability to withstand flooding and strong hurricanes

has been part of its design basis since the time of its construction, and the NRC certainly

considered the risk of hurricanes in its GEIS analyses of postulated acci dents completely miss

the point. 222 As Petitioner explains in its motion, the plant was sited and designed in the 1960s,

before scientific consensus around anthropogenic climate change had emerged. 223 The design

certainly did not account for climate change worsening flooding, storm surge, hurricanes; nor do

the 2013 GEIS or NRC Staffs most recent SAMA evaluation, which rely on historic climate

data.

219 NUREG -1437 Supplement 5, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 5, Regarding Turkey Points Units 3 and 4, Final Report, ADAMS Accession No. ML020280119 (Jan. 2002), at 2 -1.

220 Miami Waterkeeper Waiver Petition at 7 -8.

221 FPL Answer at 62.

222 Id. at 62 -63.

223 Miami Waterkeeper Motion at 78 -79.

57

3. Millstone Factor 4 : Significant problem

Waiver is necessary to permit Petitioner to raise new information regarding reasonably

foreseeable severe accidents caused by climate change undoubtedly a significant problem.

NRC Staff acknowledges that [t]he fourth Millstone factor may also apply to a significant environmental issue. 224 FPL simply asserts that the GAO Report discusses potential impacts

of climate, rather than conducting a full risk analysis. As discussed at length above, the

potential that is, reasonably foreseeable impacts of climate change are precisely what NRC

Staff must consider in its NEPA analysis. 225 The GAO Report identifies a number of ways that

climate change increases the likelihood of severe accidents at Turkey Point in a way that the

existing SAMA analysis does not account for. That the GAO Report does not contain a formal

risk analysis is no is sue, since Petitioner is not required to conduct a full, independent SAMA analysis on FPLs behalf in order to identify a significant problem. 226

Petitioner explains at length why the existing SAMA analysis is deficient, and failure to

re -evaluate these risks constitutes a significant problem. 227 At worst, it could lead to a

preventable severe accident, while at minimum it would undermine public confidence in the

NRC as a regulator.

VI. CONCLUSION

Petitioner has demonstrated good cause and satisfied the admissibility criteria for each of

its contentions, and we are entitled to a hearing on these contentions.

224 NRC Staff Answer at 78 (citing Limerick, CLI -13 -07, 78 NRC at 209).

225 See discussion, supra Contention 3 -B at (2.).

226 See id.

227 Miami Waterkeeper Motion at 69 -77.

58 Respectfully submitted,

/Signed (electronically) by/ Cameron Bills Richard Webster Cameron Bills Law Office of Richard Webster Miami Waterkeeper 133 Wildwood Avenue PO Box 141596 Montclair, NJ 07043 Coral Gables, FL 33114 -1596 Phone: (202) -630 -5708 Phone: (305) 905 -0856 Email: rwebster463@gmail.com Email: cameron@miamiwaterkeeper.org

Counsel for Miami Waterkeeper

59 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

In the Matter of: )

)

FLORIDA POWER & LIGHT COMPANY ) Docket No. 50 -250 -SLR -2

) Docket No. 50 -251 -SLR -2 (Turkey Point Nuclear Generating Units 3 and 4) )

) June 12, 2 024 (Subsequent License Renewal Application) )

CERTIFICATE OF SERVICE

Pursuant to 10 C.F.R. § 2.305, I certify that, on this date, the foregoing Miami

Waterkeepers Reply in Support of Motion to Admit Amended and New Contentions was

served upon the Electronic Information Exchange (EIE, the NRCs E -Filing System), in

the above -captioned docket, which to the best of my knowledge resulted in transmittal of

same to those on the EIE Service List for the captioned proceeding.

/Signed (electronically) by/ Cameron Bills Richard Webster Cameron Bills Law Office of Richard Webster Miami Waterkeeper 133 Wildwood Avenue PO Box 141596 Montclair, NJ 07043 Coral Gables, FL 33114 -1596 Phone: (202) 630 -5708 Phone: (305) 905 -0856 Email: rwebster463@gmail.com Email: cameron@miamiwaterkeeper.org

Counsel for Miami Waterkeeper

2 ATTACHMENTA