ENS 55899: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 22: | Line 22: | ||
Peach Bottom Unit 2 automatically scrammed from 100 percent power due to an electrical transient and subsequent PCIS Group I isolation (Main Steam Isolation Valve closure). Unit 2 lost main feedwater due to the PCIS Group I isolation, however, all other systems responded as expected following the scram. High Pressure Coolant Injection is maintaining pressure control while Condensate Pumps are maintaining inventory. The unit is currently stable and in Mode 3. Peach Bottom Unit 3's Adjustable Speed Drives were impacted by the electrical transients and the unit reduced power to 98 percent power. | Peach Bottom Unit 2 automatically scrammed from 100 percent power due to an electrical transient and subsequent PCIS Group I isolation (Main Steam Isolation Valve closure). Unit 2 lost main feedwater due to the PCIS Group I isolation, however, all other systems responded as expected following the scram. High Pressure Coolant Injection is maintaining pressure control while Condensate Pumps are maintaining inventory. The unit is currently stable and in Mode 3. Peach Bottom Unit 3's Adjustable Speed Drives were impacted by the electrical transients and the unit reduced power to 98 percent power. | ||
The NRC Resident Inspector was notified. | The NRC Resident Inspector was notified. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2022/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2022/20220518en.html#en55899 | ||
}}{{unit info | }}{{unit info | ||
| Unit = 2 | | Unit = 2 |
Revision as of 06:30, 18 May 2022
Where | |
---|---|
Peach Bottom Pennsylvania (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
Time - Person (Reporting Time:+-0.02 h-8.333333e-4 days <br />-1.190476e-4 weeks <br />-2.7396e-5 months <br />) | |
Opened: | Linell, Bill 19:51 May 16, 2022 |
NRC Officer: | Brian P. Smith |
Last Updated: | May 16, 2022 |
55899 - NRC Website
| |