ENS 55807: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 23: Line 23:
ESI recommends an ultrasonic thickness inspection on the fireface to confirm thickness is within specified range to plants with these power pack assemblies. ESI has also revised its dedication package to increase the number of  ultrasonic thickness inspection points. An additional enhancement is the inclusion of an inspection map for guidance and clarity of the locations to be measured. The revision was implemented on March 15, 2022.  
ESI recommends an ultrasonic thickness inspection on the fireface to confirm thickness is within specified range to plants with these power pack assemblies. ESI has also revised its dedication package to increase the number of  ultrasonic thickness inspection points. An additional enhancement is the inclusion of an inspection map for guidance and clarity of the locations to be measured. The revision was implemented on March 15, 2022.  
Technical questions concerning this notification can be directed to Dan Roberts, Quality Manager and John Kriesel, Engineering Manager at (252) 977-2720.
Technical questions concerning this notification can be directed to Dan Roberts, Quality Manager and John Kriesel, Engineering Manager at (252) 977-2720.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2022/20220405en.html#en55807
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2022/20220406en.html#en55807
}}
}}


{{ENS-Nav}}
{{ENS-Nav}}

Revision as of 06:30, 6 April 2022

ENS 55807 +/-
Where
Engine Systems, Inc.
Rocky Mount, North Carolina (NRC Region 2)
Organization: Engine Systems, Inc.
Reporting
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect
Time - Person (Reporting Time:+1477.63 h61.568 days <br />8.795 weeks <br />2.024 months <br />)
Opened: Dan Roberts
16:38 Mar 29, 2022
NRC Officer: Karen Cotton-Gross
Last Updated: Mar 29, 2022
55807 - NRC Website